EP3697680B1 - Bouée de traction - Google Patents

Bouée de traction Download PDF

Info

Publication number
EP3697680B1
EP3697680B1 EP18786745.2A EP18786745A EP3697680B1 EP 3697680 B1 EP3697680 B1 EP 3697680B1 EP 18786745 A EP18786745 A EP 18786745A EP 3697680 B1 EP3697680 B1 EP 3697680B1
Authority
EP
European Patent Office
Prior art keywords
pull
line
connecting part
floating
loading hose
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP18786745.2A
Other languages
German (de)
English (en)
Other versions
EP3697680A1 (fr
EP3697680C0 (fr
Inventor
Arne Smedal
Kåre SYVERTSEN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sealoading Holding As
Original Assignee
Sealoading Holding AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sealoading Holding AS filed Critical Sealoading Holding AS
Publication of EP3697680A1 publication Critical patent/EP3697680A1/fr
Application granted granted Critical
Publication of EP3697680C0 publication Critical patent/EP3697680C0/fr
Publication of EP3697680B1 publication Critical patent/EP3697680B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/20Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/02Devices for facilitating retrieval of floating objects, e.g. for recovering crafts from water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids

Definitions

  • the present invention relates to the use of a loading hose for transferring fluids between a first and second reservoir offshore.
  • the loading hose is used to transfer hydrocarbons to a tanker from a loading buoy, from a floating production and/or storage unit (FPSO / FSO), or from a loading unit (e.g. cargo transfer vessel - CTV).
  • FPSO / FSO floating production and/or storage unit
  • a loading unit e.g. cargo transfer vessel - CTV
  • a floating loading hose which typically extends from a loading buoy.
  • the end of the loading hose is provided with a loading hose coupling and is lifted onto the tanker, where a connection is made between the loading hose coupling and a receiving connection flange on the tanker.
  • a crane arranged on the tanker In order to hoist the end of the floating loading hose onto the tanker, a crane arranged on the tanker is used. To do this, the crane hook must be connected to the floating hose. This connection is typically made manually with personnel on a tug or a workboat. The personnel must typically get hold of a lifting chain arranged on the floating hose end, and connect the lifting chain to the crane hook.
  • Patent application publication WO2014083056 discloses a solution for connecting a mooring line from a floating structure, such as a ship, to a structure situated on the seabed, typically an anchor installed in the seabed.
  • a guideline extends from the ship down to a wire tackle attached to the anchor, and back up to the ship.
  • One end of the guideline is connected to a winch on the ship for pulling in the guideline, while the other end connects to a mooring line.
  • the mooring line is paid out while the guideline is pulled in.
  • GB2461713 discloses a marine connection system that includes a floating winch structure with a winch line that is suspended in a floating member adjacent the winch structure.
  • a surface cable is to be connected to a cable on the seabed.
  • the which line is connected to a further line that extends from a buoy and down to the cable on the subsea. By pulling the winch line, the subsea cable is lifted up to the surface cable.
  • US20140034137 presents an offshore fluid transfer system on a ship, and thus relates to the same field as the present invention.
  • a pulling line and an overhanging crane beam are used to move the end of an articulated fluid pipe into engagement with the fluid interface of an adjacent ship.
  • the articulated fluid pipe absorbs mutual movement between the two ships. Notably, except for the two ships themselves, no part of the fluid transfer system is in contact with the seawater.
  • An object of the present invention may be to present equipment and a method that may reduce the risk for personnel injuries and/or to increase the operational limits.
  • a loading hose connection assembly having a pull-in line, a floating part, and a connecting part.
  • the floating part comprises a buoyant body configured to make the floating part float in a body of water, a connecting part reception interface, a first locking element, a pull-in line guide element, and a loading hose connection interface.
  • the connecting part comprises a second locking element configured to enter into locking engagement with the first locking element, a pull-in line connection interface, a crane string connection interface.
  • the pull-in line extends from the pull-in line connection interface to the pull-in line guide element, and further to a pull-in section of the pull-in line, such that a pull in the pull-in section pulls the connecting part into the connecting part reception interface, thereby enabling a locking engagement with the floating part.
  • the pull-in section of the pull-in line, which is pulled, is a portion of the pull-in line, which is outside the floating part and the connecting part.
  • the pull-in section can be on a tanker or another ship.
  • the connecting part reception interface can be arranged in a receiving body with an entrance aperture, wherein the first locking means is arranged between the entrance aperture and the pull-in line guide element.
  • the first locking element and the second locking element can in some embodiments be configured to automatically enter into a locking engagement when the connecting part is pulled into the connecting part reception interface. This means that no other actuation of the locking elements will be necessary in order to establish the locked connection between the floating part and the connecting part. In other words, the connecting part is pulled into the locking engagement by means of the pull-in line.
  • the floating part may further comprise a pull-in line return channel.
  • the pull-in line may enter the floating part through an entrance aperture, and exit the floating part through the pull-in line return channel.
  • the connecting part reception interface and the pull-in line return channel may both have a straight, elongated extension, wherein the mutual angle between their respective axially extending center axes may be less than 30 degrees.
  • the pull-in line return channel may have a return channel aperture and the floating part may further comprise an auxiliary return aperture, which is configured to guide the pull-in line out of the floating part.
  • the pull-in line may be returned out from the assembly without extending through the pull-in line return channel.
  • the use of the auxiliary return aperture will typically be used when the pull-in of the connecting part is performed from a tug. In such situations, there may be a significant angle between the portion of the pull-in line extending into the assembly and the portion that returns out from the assembly.
  • a method of providing, by using the loading hose connection assembly according to the first aspect of the invention, a connection between a crane hook of a ship crane and a floating loading hose floating in the sea, and lifting the loading hose onto a ship comprises the following steps:
  • step c) may comprise pulling the pull-in section from a position on the same ship as on which the ship crane is mounted. That is, in such embodiments, the part of the pull-in line that extends out from the connection assembly and which is pulled, is pulled from a position on a ship, on which the crane is positioned.
  • a ship may typically be a tanker, onto which fluid shall be loaded through the loading hose.
  • step c) may alternatively comprise pulling the pull-in section from a position on another ship than the ship on which the ship crane is mounted. Such an embodiment will be discussed in one the examples below.
  • the actuation of the locking function may take place by operation of the pull-in line. I.e. by a pull in the pull-in line, so that the two parts are mated together into a locked position.
  • Fig. 1 shows a typical situation before a floating loading hose 1 is connected to a tanker 3.
  • the tanker 3 is positioned adjacent the floating loading hose 1, which floats in the sea and which is connected to a fluid reservoir, such as a floating buoy (not shown).
  • the tanker 3 is provided with a crane 5.
  • the crane 5 has a crane hook 7 at the end of a crane wire 9.
  • the end of the loading hose 1 is provided with a coupling 11 configured for connection to a connection flange (not shown) on the tanker 3. Also arranged on the end of the loading hose 1 is a lifting chain 13, which is used to lift the end of the loading hose.
  • a tug 15 Adjacent the tanker 1 and the floating hose 3 is a tug 15.
  • personnel on the tug 15 control the end of the loading hose 1 with a towing line 17 connected to the lifting chain 13.
  • the personnel on the tug 15 will manually connect the lifting chain 13 to the crane hook 7. Since the floating hose will move and the tug 15 may roll and heave due to waves, this operation may be hazardous and cannot be performed during excessive wave heights.
  • Fig. 2 and Fig. 3 show a connection assembly 10 according to the present invention, the use of which makes it possible to reduce hazard during the connection of the crane hook 7 to the floating hose 1.
  • the connection assembly 10 comprises a floating part 50, a connecting part 70, and a pull-in line 20.
  • the connecting part 70 is configured to be locked to the floating part 50 when pulled towards the floating part by means of the pull-in line 20.
  • the pull-in line 20 can typically be a rope or any other suitable string.
  • Fig. 2 depicts the assembly in a non-connected state.
  • the floating part has a buoyant body 51, which has such a weight and volume that it makes the assembly 10 float in a body of water.
  • the buoyant body 51 can advantageously comprise a hardening foam, giving both low weight and robustness.
  • the floating part 50 will float in water when the connecting part 70 is not connected to the floating part 50.
  • the floating part 50 may advantageously also be made to float in water when the connecting part 70 is connected.
  • Fig. 2 and Fig. 3 depict the connection assembly 10 with cross section side views.
  • the buoyant body 51 has a circular shape with a centrally arranged opening 53.
  • the buoyant body 51 is attached to the upper portion of a sleeve 55, which extends through the opening 53.
  • the lower end of the sleeve 55 comprises a loading hose connection interface, here shown in the form of a chain connection 57.
  • the loading hose connection interface 57 is configured to be connected to the floating loading hose 1 ( Fig. 1 ) for hoisting the end of the hose onto the tanker 3.
  • the upper end of the sleeve 55 comprises a guide funnel 59.
  • the guide funnel is arranged at the upper end of a connecting part reception interface 61, which in the shown embodiment is inside the sleeve 55.
  • the guide funnel 59 constitutes an entrance aperture 52 of the connecting part reception interface 61.
  • the pull-in line guide element is in form of a sheave 63 on which the pull-in line 20 is guided.
  • the pull-in line 20 enters the sleeve 55 at an upper portion of the sleeve, through the guide funnel 59.
  • the pull-in line 20 extends downward to the pull-in line guide element 63, at which position it exits the sleeve 55 through an aperture 65 in the sleeve wall.
  • the pull-in line 20 then extends back upwards along the sleeve 55, on the external part of the sleeve, and through a pull-in line return channel 67.
  • the pull-in line 20 is at one end attached to the connecting part 70, via a pull-in line connection interface 71 at a lower end of the connecting part.
  • the connecting part 70 When pulling in the part of the pull-in line 20 that extends out of the floating part 50, and which is opposite the end of the pull-in line connected to the connecting part 70, the connecting part 70 will be pulled towards the floating part 50. Such a pull is indicated with the arrow 20b, and this part of the pull-in line 20 is termed a pull-in section 20a.
  • the connecting part 70 will be pulled into engagement with the floating part 50, as is shown with Fig. 3 . In this position, the connecting part 70 has been pulled into the connecting part reception interface 61, namely inside the sleeve 55. When being pulled into this position, the connecting part 70 is guided by means of the guide funnel 59.
  • the connecting part 70 has a central stem 73.
  • the pull-in line connection interface 71 is arranged at a lower portion of the central stem 73.
  • the connecting part 70 is provided with a crane string connection interface 75.
  • the crane string connection interface is attached to a crane wire 9 (cf. Fig. 1 ).
  • the connecting part 70 further comprises a second locking element, which in the shown embodiment is in form of a radially compressible locking sleeve 77.
  • the locking sleeve 77 may comprise axially extending slits at its upper portion, which make the upper portion of the sleeve radially compressible.
  • the second locking element 77 When pulled into the sleeve 55 of the floating part 50, the second locking element 77 is configured to make a locking engagement with a first locking element 69.
  • the first locking element is in the form of an axially facing locking shoulder inside the bore of the sleeve 55.
  • the sleeve 55 forms a receiving body, configured to receive at least a portion of the connecting part 70, wherein the said portion is pulled beyond the entrance aperture 52.
  • the crane 5 may hoist the connection assembly 10 and the end of the floating loading hose 1 onto the tanker, as the floating part 50 is attached to the loading hose.
  • This attachment may be provided with a connection between the floating part 50 and the lifting chain 13 ( Fig. 1 ).
  • the operator in order to connect the crane hook 7 to the coupling 11 at the end of the loading hose 7, the operator employs a pull-in line 20 that extends to the connecting part 70, via the floating part 50.
  • the floating part 50 is attached to the end of the loading hose 7, such as with the lifting chain 13 ( Fig. 1 ).
  • the pull in the pull-in line 20 and the paying out of the crane wire 9, will move the connecting part 70 into a locked engagement with the floating part 50. Since the connecting part 70 is attached to the crane hook 7, the operator may lift the loading hose end once the locking engagement between the connecting part 70 and the floating part 50 has been made.
  • this operation may be performed without any personnel being close to the crane hook 7 or the end of the loading hose 1 (e.g. the coupling 11), when the connection is made between the crane and the loading hose 1. Consequently, the operator has reduced risk for injuries and the operation is less limited by wave heights.
  • connection assembly 10 between loading operations, i.e. when the connection assembly 10 according to the invention is not in use, it should be stored in a dry state in order to prevent fouling. If for instance being used in a situation involving a CALM (catenary anchor leg mooring) buoy, the loading hose will typically be floating at sea all the time. In such a situation, one may advantageously store the connection assembly 10 on board a workboat between the operations.
  • CALM catenary anchor leg mooring
  • connection assembly 10 may be connected to the floating hose end before the floating hose is reeled out from the storage reel.
  • the loading operation is finished, the loading hose is reeled back onto the reel on the ship, and the connection assembly 10 will be disconnected.
  • Fig. 4 schematically depicts a situation where the operator is in the process of pulling the connecting part 70 towards the floating part 50.
  • a person on the tug 15 controls the pulling of the pull-in line 20 by using a winch 19 on the tug, which provides the pulling force in the pull-in line.
  • Also connected to the lifting chain 13 and/or the floating part 50 is the towing line 17.
  • Fig. 5 schematically depicts a situation similar to that in Fig. 4 , however where the operator pulls the pull-in line 20 from a position on the tanker 3.
  • Fig. 6a to Fig. 6e illustrate the process of connecting the crane hook 7 to the floating hose 1, via the connection assembly 10 according to the invention.
  • the personnel handling the pull-in line 20 is on the tug 15.
  • Fig. 6a the connecting part 70 has been connected to the crane hook 7.
  • One end of the pull-in line 20 has been hoisted to personnel on the tanker 3.
  • the personnel connects that end to the pull-in line connection interface 71 of the connecting part 70, cf. Fig. 6b .
  • Fig. 7a to Fig. 7e correspond to Fig. 6a to Fig. 6e discussed above, except that the operator pulls the pull-in line 20 from a position on the tanker 3 and not from a position on the tug 15.
  • Fig. 8 depicts a cross section view through a floating part 50 having a slightly different design compared to the one shown in Fig. 2 and Fig. 3 .
  • the buoyant body 51 extends along more than half of the axial extension of the sleeve 55. Furthermore, the lower part of the buoyant body 51 is positioned at the axial position of the pull-in line guide element 63.
  • the pull-in line 20 does not extend through the pull-in line return channel 67. Instead, it extends laterally out to the side of the floating part 50.
  • This situation will typically be the case when the operator pulls the pull-in line 20 from the tug 15, as illustrated in Fig. 4 .
  • the parts of the pull-in line 20 extending into and out from the floating part 50 will have substantially different directions.
  • the floating part 50 has a cutout 62 in the buoyant body 51 to give space for the pull-in line 20 in such situations.
  • Fig. 9 depicts the same floating part 50 as Fig. 8 .
  • the pull-in line return channel 67 is arranged in the buoyant body 51, and extends substantially or almost in parallel with the sleeve 55. Notably, between the position of the entrance aperture 52 and the position of the pull-in line guide element 63, the pull-in line 20 extends down and back up in a substantially parallel or almost parallel fashion.
  • the pull-in line return channel 67 has a return channel aperture 68, out of which the pull-in line 20 extends (i.e. out of which the pull-in section 20a of the pull-in line 20 extends).
  • the return channel aperture 68 faces substantially in the same direction as the entrance aperture 52 of the connecting part reception interface 61.
  • both the connecting part reception interface 61 and the pull-in line return channel 67 have a straight, elongated extension.
  • the mutual angle between their respective center axes may typically be less than 30 degrees, and advantageously less than 20 degrees. This may also apply to other embodiments within the scope of the invention.
  • pull-in line guide element 63 shown in the embodiment discussed herein is in the form of a sheave, other embodiments may involve another type of pull-in line guide element.
  • the pull-in line guide element 63 may merely comprise a curved, smooth edge, about which the pull-in line 20 may curve.
  • Fig. 10 and Fig. 11 depict an alternative embodiment of the connection assembly 10 according to the invention, in a non-connected and connected state, respectively.
  • the locking engagement between the floating part 50 and the connecting part 70 is provided with means different from the embodiment discussed with reference to Fig. 2 and Fig. 3 .
  • the connecting part 70 has a central stem 73 configured to be pulled into a sleeve 55 of the floating part 50.
  • the second locking engagement 77 is arranged on the central stem 73.
  • the second locking engagement 77 is in the form of a connection system commercially marketed under the name Ballgrab from the company First Subsea Ltd.
  • the central stem 73 is provided with a plurality of aperture in outer face, out of which apertures a plurality of balls partly extend.
  • the first locking element 69 of the floating part 50 may be the radially inwardly facing wall of the sleeve 55, against which the balls 77 of the connecting part 70 are forced when in the connected state.
  • Fig. 12 and Fig. 13 depict yet another alternative embodiment of the connection assembly 10 according to the invention.
  • the second locking element 77 is in form of three sliding elements.
  • the sliding elements 77 are configured to slide in an axial direction on the central stem 73.
  • the central stem 73 is provided with a tapered outer face, which will force the sliding elements 77 radially outwards when being pulled with the crane wire 9.
  • Fig. 12 shows the connection assembly 10 in a non-connected state.
  • the central stem 73 and the sliding elements 77 have been pulled into the connecting part reception interface 61, i.e. within the sleeve 55.
  • the tapered design of the central stem 73 will force the sliding elements 77 to expand radially. This radial expansion will provide mechanical engagement between the connecting part 70 and the floating part 50, making the operator able to hoist the end of the loading hose 1 onto the tanker 3.
  • Fig. 14a, Fig. 14b, and Fig. 14c illustrate the connecting part 70 of the embodiment shown in Fig. 12 and Fig. 13 with three cross sections views along three different portions of the connecting part 70.
  • Fig. 14a is a cross section view along a horizontal plane at a bottom part of the stem 73.
  • Fig. 14b is a corresponding view at a mid-portion, while Fig. 14c is a cross section view along an upper portion.
  • Each of the three sliding elements 77 is provided with a protrusion 77b that is received in a groove 73b in the central stem 73.
  • the protrusion 77b and the groove 73b retains the sliding elements 77 in place on an outer inclined face 73c of the central stem 73.
  • An inner face 77c of the sliding elements abuts the inclined face 73c.
  • each of the three drawings of Fig. 14a, Fig. 14b, and Fig. 14c are depicting the same situation, wherein the outer faces of the three sliding elements 77 have the same radial position. As the central stem 73 is pulled upwards, the diameter constituted by the outer faces of the three sliding elements 77 will increase.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)
  • Joints That Cut Off Fluids, And Hose Joints (AREA)
  • Seal Device For Vehicle (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)
  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Claims (10)

  1. Ensemble de connexion de flexible de chargement (10), comprenant une ligne de traction (20), une partie flottante (50) et une partie de connexion (70), dans lequel la partie flottante (50) comprend
    - un corps flottant (51) configuré pour faire flotter la partie flottante dans un plan d'eau ;
    - une interface de réception de partie de connexion (61) ;
    - un premier élément de verrouillage (69) ;
    - un élément de guidage de ligne de traction (63) ;
    - une interface de connexion de ligne de chargement (57) ;
    et dans lequel la partie de connexion (70) comprend
    - un second élément de verrouillage (77) configuré pour venir en prise de verrouillage avec le premier élément de verrouillage (69) ;
    - une interface de connexion de ligne de traction (71) ;
    - une interface de connexion de chaîne de grue (75) ;
    caractérisé en ce que
    la ligne de traction (20) s'étend à partir de l'interface de connexion de ligne de traction (71) vers l'élément de guidage de ligne de traction (63), et plus loin vers une section de traction (20a) de la ligne de traction, de sorte qu'une traction dans la section de traction (20a) tire la partie de connexion (70) dans l'interface de réception de partie de connexion (61), en permettant ainsi une mise en prise de verrouillage avec la partie flottante (50).
  2. Ensemble de connexion de flexible de chargement (10) selon la revendication 1, caractérisé en ce que l'interface de réception de partie de connexion (61) est agencée dans un corps de réception (55) avec une ouverture d'entrée (52), dans lequel le premier moyen de verrouillage (69) est agencé entre l'ouverture d'entrée (52) et l'élément de guidage de ligne de traction (63).
  3. Ensemble de connexion de flexible de chargement (10) selon la revendication 1 ou la revendication 2, caractérisé en ce que le premier élément de verrouillage (69) et le second élément de verrouillage (77) sont configurés pour entrer automatiquement en prise de verrouillage lorsque la partie de connexion (70) est tirée dans l'interface de réception de partie de connexion (61).
  4. Ensemble de connexion de flexible de chargement (10) selon l'une quelconque des revendications précédentes, caractérisé en ce que la partie flottante (50) comprend en outre un canal de retour de ligne de traction (67).
  5. Ensemble de connexion de flexible de chargement (10) selon la revendication 4, caractérisé en ce que l'interface de réception de partie de connexion (61) et le canal de retour de ligne de traction (67) présentent tous deux une extension droite et allongée, et en ce que l'angle mutuel entre leurs axes centraux respectifs s'étendant axialement est inférieur à 30 degrés.
  6. Ensemble de connexion de flexible de chargement selon la revendication 4 ou la revendication 5, caractérisé en ce que le canal de retour de ligne de traction (67) présente une ouverture de canal de retour (68) et en ce que la partie flottante (50) comprend en outre une ouverture de retour auxiliaire (62), configurée pour guider la ligne de traction (20) hors de la partie flottante (50).
  7. Ensemble de connexion de flexible de chargement selon la revendication 1, caractérisé en ce que le second élément de verrouillage (77) comprend une pluralité d'éléments coulissants qui sont configurés pour coulisser sur une surface inclinée externe de la partie de connexion (70).
  8. Procédé de fourniture, en utilisant l'ensemble de connexion de flexible de chargement selon l'une des revendications 1 à 7, d'une connexion entre un crochet de grue (7) d'une grue de navire (5) et un flexible de chargement flottant (1), et de levage du flexible de chargement jusque sur un navire (3), le procédé comprenant les étapes suivantes consistant à :
    a) connecter une partie de connexion (70) d'un ensemble de connexion (10) au crochet de grue (7) ;
    b) connecter une extrémité d'un ligne de traction (20) de l'ensemble de connexion (10) à la partie de connexion (70) ;
    c) tirer dans l'extrémité opposée ou dans une section de traction (20a) de la ligne de traction et dévider le câble de grue (9) à partir de la grue, en tirant ainsi la partie de connexion (70) vers une partie flottante (50) de l'ensemble de connexion, qui est connecté au flexible de chargement flottant (1), lorsque le ligne de traction (20) s'étend librement dans et hors de la partie flottante (50) ;
    d) verrouiller la partie de connexion (70) à la partie flottante (50) en tirant sur la ligne de traction, la partie de connexion et la partie flottante comprenant des éléments de verrouillage (69, 77) configurés pour établir automatiquement un connexion verrouillée lorsque la partie de connexion est tirée dans une interface de réception de partie de connexion (61) ;
    e) soulever le flexible de chargement (1) sur le navire (3) par transmission d'une force de levage du crochet de grue (7) au flexible de chargement, lorsque le connexion verrouillée entre la partie flottante (50) et la partie de connexion (70) est configurée pour transmettre ladite force de levage.
  9. Procédé selon la revendication 8, dans lequel l'étape c) comprend l'étape consistant à tirer la section de traction (20a) à partir d'une position sur le même navire que celui sur lequel la grue de navire (5) est montée.
  10. Procédé selon la revendication 8, dans lequel l'étape c) comprend l'étape consistant à tirer la section de tirage (20a) à partir d'une position sur un autre navire que le navire sur lequel la grue de navire (5) est montée.
EP18786745.2A 2017-10-17 2018-10-12 Bouée de traction Active EP3697680B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20171655A NO343762B1 (en) 2017-10-17 2017-10-17 Loading hose Connection assembly
PCT/EP2018/077837 WO2019076741A1 (fr) 2017-10-17 2018-10-12 Bouée de traction

Publications (3)

Publication Number Publication Date
EP3697680A1 EP3697680A1 (fr) 2020-08-26
EP3697680C0 EP3697680C0 (fr) 2023-07-26
EP3697680B1 true EP3697680B1 (fr) 2023-07-26

Family

ID=63862145

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18786745.2A Active EP3697680B1 (fr) 2017-10-17 2018-10-12 Bouée de traction

Country Status (5)

Country Link
EP (1) EP3697680B1 (fr)
ES (1) ES2960048T3 (fr)
NO (1) NO343762B1 (fr)
PL (1) PL3697680T3 (fr)
WO (1) WO2019076741A1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111704019B (zh) * 2020-06-11 2022-03-15 中船黄埔文冲船舶有限公司 一种锚链整理铺设工装及铺设方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1337520A (en) * 1972-03-20 1973-11-14 Continental Oil Co Bow liquid cargo handling system
GB2461713B (en) * 2008-07-09 2010-09-08 Pelamis Wave Power Ltd Marine connection system and method
FR2973771B1 (fr) * 2011-04-11 2015-07-17 Fmc Technologies Sa Systeme et procede de transfert de fluide offshore
NO335406B1 (no) * 2012-11-27 2014-12-08 Aker Engineering & Technology System for undervanns sammenkobling

Also Published As

Publication number Publication date
BR112020007426A2 (pt) 2020-10-27
EP3697680A1 (fr) 2020-08-26
BR112020007426A8 (pt) 2022-11-08
EP3697680C0 (fr) 2023-07-26
WO2019076741A1 (fr) 2019-04-25
PL3697680T3 (pl) 2024-02-05
NO343762B1 (en) 2019-06-03
NO20171655A1 (en) 2019-04-18
ES2960048T3 (es) 2024-02-29

Similar Documents

Publication Publication Date Title
US4808034A (en) System and method for securing a marine riser to a floating structure
EP1796958B1 (fr) Ancrage de navire de haute mer et systeme de chargement de tube goulotte
US6457908B1 (en) Method and apparatus for suction anchor and mooring deployment and connection
US10072467B2 (en) Method and apparatus for elevating the tapered stress joint or flex joint of an SCR above the water
EP2379404B1 (fr) Méthode et appareil pour soulever un poids
US20160185427A1 (en) Anchor line tensioning method
US8567335B2 (en) Deployment and retrieval of floatable objects
US8347804B2 (en) Mooring system
US6685396B1 (en) Method and apparatus for suction anchor and mooring deployment and connection
CN113939447A (zh) 可分离塔式叉臂系泊系统及其使用方法
EP3697680B1 (fr) Bouée de traction
CN113924247A (zh) 可分离塔式叉臂系泊系统及其使用方法
AU743420B2 (en) Method and apparatus for suction anchor and mooring deployment and connection
US3929087A (en) Method of retrieving anchors
NO20170862A1 (en) A mooring system
KR101281654B1 (ko) 케이슨 파이프를 구비한 선박의 앵커링 방법
BR112020007426B1 (pt) Boia de puxada
CN109415107B (zh) 可断开的船首转塔
Li et al. Installation of STP mooring system and FPSO hookup in south china Sea
KR20130072833A (ko) 케이슨 파이프를 구비한 선박을 이용한 해양플랜트 앵커링 방법
GB2500904A (en) Device for connection of a mooring line to a floating structure
KR101346258B1 (ko) 케이슨 파이프를 구비한 선박
NO341918B1 (en) Offshore loading hose coupling
NL1038599C2 (en) Turret mooring with disconnectable submerged buoy with interconnected vertically sliding riser tubes.
GB2459739A (en) A counterbalanced cantilever connector assembly for a vessel

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200421

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SEALOADING HOLDING AS

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602018054119

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: B63B0027300000

Ipc: B63B0027340000

Ref country code: DE

Ref legal event code: R079

Free format text: PREVIOUS MAIN CLASS: B63B0027300000

Ipc: B63B0027340000

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 22/02 19850101ALN20230112BHEP

Ipc: B63B 21/20 19680901ALI20230112BHEP

Ipc: B63B 27/30 19800101ALI20230112BHEP

Ipc: B66C 13/02 19680901ALI20230112BHEP

Ipc: B63B 27/34 19800101AFI20230112BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 22/02 20060101ALN20230117BHEP

Ipc: B63B 21/20 20060101ALI20230117BHEP

Ipc: B63B 27/30 20060101ALI20230117BHEP

Ipc: B66C 13/02 20060101ALI20230117BHEP

Ipc: B63B 27/34 20060101AFI20230117BHEP

INTG Intention to grant announced

Effective date: 20230220

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018054119

Country of ref document: DE

U01 Request for unitary effect filed

Effective date: 20230818

U07 Unitary effect registered

Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI

Effective date: 20230824

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

U20 Renewal fee paid [unitary effect]

Year of fee payment: 6

Effective date: 20231031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231027

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231017

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20231109

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231126

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230726

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231026

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231126

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230726

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231027

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20231005

Year of fee payment: 6

Ref country code: CY

Payment date: 20231010

Year of fee payment: 6

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2960048

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20240229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230726

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230726

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230726

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230726