EP3573914B1 - Vessel and method for handling a long-length cable on said vessel - Google Patents

Vessel and method for handling a long-length cable on said vessel Download PDF

Info

Publication number
EP3573914B1
EP3573914B1 EP18700601.0A EP18700601A EP3573914B1 EP 3573914 B1 EP3573914 B1 EP 3573914B1 EP 18700601 A EP18700601 A EP 18700601A EP 3573914 B1 EP3573914 B1 EP 3573914B1
Authority
EP
European Patent Office
Prior art keywords
laying
long
cable
guide
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP18700601.0A
Other languages
German (de)
French (fr)
Other versions
EP3573914A1 (en
Inventor
Rob ROELOFS
Dingeman ROPS
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Twentsche Kabelfabriek BV
Original Assignee
Twentsche Kabelfabriek BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Twentsche Kabelfabriek BV filed Critical Twentsche Kabelfabriek BV
Publication of EP3573914A1 publication Critical patent/EP3573914A1/en
Application granted granted Critical
Publication of EP3573914B1 publication Critical patent/EP3573914B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/76Depositing materials in cans or receptacles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/29Other loading or unloading equipment involving a continuous action, not provided in groups B63B27/22 - B63B27/28
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/12Tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/28Reciprocating or oscillating guides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H59/00Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators
    • B65H59/38Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators by regulating speed of driving mechanism of unwinding, paying-out, forwarding, winding, or depositing devices, e.g. automatically in response to variations in tension
    • B65H59/384Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators by regulating speed of driving mechanism of unwinding, paying-out, forwarding, winding, or depositing devices, e.g. automatically in response to variations in tension using electronic means
    • B65H59/385Regulating winding speed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B2035/002Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for inland waters, e.g. for use on canals or rivers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/04Cable-laying vessels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Definitions

  • the invention relates to a handling system, a vessel, in particular a cable barge, and a method for handling a long-length cable on said vessel.
  • Long length cables e.g. for use as electrical infrastructure in an offshore wind farm, are typically shipped from a factory located at a sea port by a Cable Laying Vessel or CLV.
  • CLV Cable Laying Vessel
  • cables are stored on large rotating turn tables. Said cables may be conveniently manufactured at or near said sea port and loaded directly into the CLV.
  • the cables are manufactured at an inland factory and have to be transported first to the sea port via the waterways.
  • the cable is wound on a reel, which is limited in size because of the width of the locks and the height of the bridges along the waterways. Hence, the length of the cable that can be transported is limited.
  • WO 2010/121781 A2 discloses an assembly of a plurality of winding drums for storing a long length of an electrical cable on a vessel.
  • the winding drums are arranged coaxially in a straight line, one behind the other.
  • the winding drums have drum discs that are provided with openings so that the drum discs can be bridged.
  • the cable can be wound onto one of the winding drums until it is full, after which the cable is fed onto one of the adjacent winding drums to continue the winding.
  • the assembly of winding drums allows for more length of continuous cable to be transported on a single vessel without increasing the size of the winding drums.
  • the assembly is rather complex in use.
  • US 5,902,072 A discloses a modular seismic cable handling system including a large wheel mounted in the front of the vessel for retrieving seismic cable from the water, a horizontally mounted cable handler comprising an eight wheel cable puller for pulling the cable from the wheel, urging same to the main deck level of the vessel, the cable puller comprising four pairs of tires to frictionally grab and pull a seismic cable along a linear path.
  • the pulled cable is urged along a track running generally the length of the vessel, where a smaller, rear cable puller further urges the cable to the rear of the vessel.
  • the system further includes a trolley cable deployment system for deploying the cable into cable bins on the main deck for storage, which trolley system includes a cable wheel puller arrangement having movement situated along the longitudinal axis of the container.
  • the invention provides a vessel, in particular a cable barge, with a handling system for handling a long-length cable on said vessel, wherein the vessel comprises a hull with a bow, a stern and a port side and a starboard side extending in a longitudinal direction between the bow and the stern, wherein the hull defines an elongated storage compartment, wherein the handling system comprises an input member for receiving the long-length cable onto the vessel and for feeding the long-length cable into the storage compartment in a feeding direction at an input position, wherein the handling system further comprises a laying device that is movable along a loop-shaped laying path through the storage compartment in a first laying direction parallel to the longitudinal direction along the port side and in a second laying direction opposite to the first laying direction along the starboard side, wherein the laying device comprises an output member that is arranged for laying the long-length cable inside the storage compartment at an output position that moves along said loop-shaped laying path when the laying device is moved, wherein
  • the laying device By keeping the accumulated length of the long-length cable constant, the laying device can be moved in both laying directions along the loop-shaped laying path while the long-length cable can be fed continuously through the input member in the feeding direction into the storage compartment.
  • the long-length cable can thus be continuously moved at a constant speed, even though the laying device moves in an opposite direction to the feeding direction for at least a part of the loop-shaped laying path.
  • the first cable guide is arranged for doubling back at least a part of the accumulated length of the long-length cable in a return direction opposite to the feeding direction when the laying device is upstream of the input position in the feeding direction.
  • the doubled-back part of the accumulated length of the long-length cable can effectively keep the overall length of the accumulated length of the long-length cable constant, even if the laying device is moving upstream of the input position.
  • the first cable guide comprises a plurality of interlinked segments that are movable with respect to each other to define the first guide path. Said interlinked segments can effectively guide the long-length cable while providing the first cable guide with the freedom of movement to keep the accumulated length constant and simultaneously allowing the long-length cable to be continuously fed through said first cable guide.
  • the first cable guide is a cable carrier, preferably a chain-style cable carrier.
  • a cable carrier can effectively guide the long-length cable while providing the first cable guide with the freedom of movement to keep the accumulated length constant.
  • the feeding direction is parallel or substantially parallel to the longitudinal direction.
  • input member and the first cable guide are all arranged to function in the longitudinal direction of the vessel.
  • the input position is half-way along the loop-shaped laying path in the feeding direction. This ensures that the part of the accumulated length of the long-length cable that can be doubled-back in the return direction opposite to the feeding direction is sufficient to reach the opposite end of the loop-shaped laying path.
  • the first cable guide is arranged for forming a first variably arcuate section in the first guide path that is arranged for directing the long-length cable from the feeding direction into a first guide direction towards the laying device.
  • the long-length cable can be deflected away from the feeding direction towards the laying device.
  • the laying device is arranged for receiving the long-length cable from the first cable guide in a second guide direction, wherein the first cable guide is arranged for forming a second variably arcuate section in the first guide path that is arranged for directing the long-length cable from the first guide direction into said second guide direction.
  • the first guide path can be made to more accurately meet the direction in which the long-length cable is received into the laying device.
  • the second guide direction is directed away from the output member
  • the laying device comprises a second cable guide for guiding the long-length cable along a second guide path from the second guide direction into a third guide direction towards the output member.
  • the second guide path can be chosen to have a larger radius between the second guide direction and the third guide direction so that the minimum bending radius of the long-length cable is not exceeded.
  • the laying device is arranged to extend upright or vertical from the storage compartment, wherein the second guide direction is upwards and the third guide direction is downwards.
  • the bend in the long-length cable in the second cable guide can be made in a vertical direction above the vessel.
  • the second guide path comprises a freefall section directly upstream of the output member in which the second guide path extends vertical or substantially vertical.
  • the freefall section allows the long-length cable to relax tension, e.g. torsion and/or twists prior to the laying at the output position.
  • the second cable guide comprises a plurality of interlinked segments that are movable with respect to each other to define the second guide path. Said interlinked segments can effectively guide the long-length cable while simultaneously allowing the long-length cable to continuously fed through said second cable guide.
  • the laying device comprises a base and a head that is rotatable with respect to said base about an upright or vertical rotation axis, wherein the output member is provided to and rotatable together with the head, wherein the head is arranged to be rotated when transitioning from the first laying direction to the second laying direction and when transitioning from the second laying direction to the first laying direction.
  • the head can follow the loop-shaped guide path while the output member lays the long-length cable along said loop-shaped guide path.
  • the head is liftable with respect to the base in a lifting direction parallel to the upright or vertical rotation axis.
  • the head By lifting the head, several layers of side-by-side windings of the long-length cable can be stacked on top of each other inside the storage chamber, thereby increasing the capacity of the vessel.
  • the output member is provided with a laying arm with an output nozzle at the distal end thereof to lay the long-length cable into the storage compartment along the loop-shaped laying path, wherein the laying arm is swivable about a laying axis for laterally adjusting the output position with respect to the loop-shape laying path with each winding of the long-length cable.
  • Said laying arm can be used to consecutive windings of the same long-length cable side-by-side in said lateral direction to form a layer of side-by-side windings.
  • the head is foldable with respect to the base about a horizontal folding axis from an active upright position into an inactive transport position.
  • the head can be folded into the inactive transport position to reduce the height of the handling system on the vessel, so that the vessel can pass more easily under some bridges.
  • the laying device is arranged to be moved along the loop-shaped laying path at a laying speed, wherein the laying device comprises a pulling member for pulling the long-length cable through the laying device towards the output member at a pulling speed, wherein the handling system comprises a control unit for controlling the pulling speed of the pulling member with respect to the laying speed of the laying device.
  • the control unit is arranged for controlling the pulling speed to a speed smaller than the laying speed during inside-out laying of the long-length cable to pull consecutive windings of the long-length cable tightly against each other.
  • control unit is arranged for controlling the pulling speed to a speed larger than the laying speed during outside-in laying of the long-length cable to push consecutive windings of the long-length cable tightly against each other.
  • the input member comprises a beam that is arranged to be placed at the bow or the stern of the vessel and that is arranged to be swivable about an upright or vertical swivel axis between a first loading orientation parallel to the feeding direction, a second loading orientation transverse and/or perpendicular to the feeding direction and any loading orientation therein between.
  • the loading orientation can be chosen conveniently.
  • the first loading orientation may for instance be used for loading or unloading in line with the feeding direction, e.g. to another vessel or when the draught of the fully loaded vessel makes it impossible to deliver the long-length cable directly onto the quay.
  • the second loading orientation can be used to load or unload the long-length cable directly onto the quay.
  • the long-length cable is fed onto the vessel via the input member at an input speed
  • the input member comprises a dancer roller for measuring said input speed.
  • the dancer roller allows for keeping the tension in the long-length cable constant, despite changes in the input speed.
  • a signal indicative of the input speed can be obtained, which can be used by the handling system to optimize the loading and/or unloading of the long-length cable.
  • the output member of the laying device is arranged for pulling the long-length cable out of the storage compartment and wherein the input member is arranged for paying out the long-length cable during an unloading mode of the handling system.
  • the loop-shaped laying path comprises a first straight section extending parallel to the longitudinal direction along the port side, a second straight section extending parallel to the longitudinal direction along the starboard side and a first corner section and a second corner section connecting the first straight section to the second straight section at the bow and the stern, respectively, of the vessel.
  • the laying device comprises a base and a head that is rotatable with respect to said base about a vertical rotation axis, wherein the rotation axis is located at the center between the first straight section and the second straight section.
  • first corner section and the second corner section are semicircular arcs.
  • first straight section and the second straight section extend over at least fifty meters. Hence, a considerable length of the long-length cable can be stored along each straight section.
  • the storage compartment comprises a bottom wall that defines a support plane for receiving the long-length cable in a plurality of side-by-side windings along the loop-shaped laying path, a first circumferential wall and a second circumferential wall upright from said bottom wall and extending on the outside and the inside, respectively, of the loop-shaped laying path, to define a first loop-shaped storage chamber for containing said plurality of side-by-side windings along the loop-shaped laying path.
  • Said first storage chamber can be used to securely store the windings of the long-length cable while keeping the central area of the storage compartment free from said windings.
  • first circumferential wall and the second circumferential wall have a height with respect to the support plane of at least three meters and preferably at least four meters for receiving a plurality of layers of side-by-side windings of the long-length cable within said height.
  • the first loop-shaped storage chamber is wider at the bottom than at the top. Hence, more windings of the long-length cable can be stored towards the bottom. This increases the capacity of the first storage chamber. By increasing the width of the first storage chamber towards the bottom, the stability of the vessel can be ensured.
  • the storage compartment comprises a third circumferential wall spaced apart from and extending on the inside of the second circumferential wall to define a second loop-shaped storage chamber.
  • Said second storage chamber can be used to store a second long-length cable within the same vessel.
  • the input member is arranged for receiving the long-length cable onto the vessel on the outside of the first circumferential wall, wherein the input member comprises an underpass extending from above the support plane at the outside of the first circumferential wall, underneath the support plane between the first circumferential wall and the second circumferential wall to above the support plane at the inside of the second circumferential wall, wherein the input member is arranged to convey the long-length cable through said underpass into the storage compartment.
  • Said underpass allows the long-length cable to be fed into the storage compartment below the support plane, and thus without hindering the storage of the windings of the long-length cable in the first storage chamber.
  • the invention provides a method for handling a long-length cable on the aforementioned vessel, wherein the method comprises the steps of:
  • the method describes the active operation of the previously discussed handling system on the previously discussed vessel. Hence, the method has the same advantageous effects as described before. These advantages will not be repeated hereafter for reasons of conciseness.
  • the method comprises the step of moving the laying device along the loop-shaped laying path at a laying speed, wherein the laying device comprises a pulling member for pulling the long-length cable through the laying device towards the output member at a pulling speed, wherein the method further comprises the step of controlling the pulling speed to a speed smaller than the laying speed during inside-out laying of the long-length cable.
  • the method further comprises the step of controlling the pulling speed to a speed larger than the laying speed during outside-in laying of the long-length cable.
  • Figure 1 shows a cable factory 1 for producing a long-length cable 9 and a vessel 2, in particular a cable barge, moored in the vicinity of said cable factory 1 for receiving and storing the long-length cable 9 from the cable factory 1 for transport.
  • a long-length cable is a cable with a continuous length of at least ten kilometers, preferably at least fifty kilometers and most preferably at least one-hundred kilometers and a weight of more than 500 metric Ton for a single cable.
  • Said long-length cable 9 is typically intended for use in electrical infrastructure, e.g. in an offshore wind farm. In this example, the cable factory 1 is located inland.
  • Said long-length cable 9 has to be transported in an efficient manner via the waterways from the inland cable factory 1 to a port at sea side where a CLV can take over the cable or temporary land storage is organized. Locks and bridges along the waterways limit the width and height, respectively, of the vessel 2.
  • the vessel 2 comprises a hull 20 with a bow 21 and a stern 22.
  • the hull 20 further has a port side 23 and a starboard side 24 extending in a longitudinal direction L between the bow 21 and the stern 22.
  • the hull 20 defines an elongated storage compartment 25 for receiving the long-length cable 9 in a manner that will be described in more detail hereafter.
  • the storage compartment 25 comprises a bottom wall 26 that defines a support plane A, as shown in figures 6 and 7 , for supporting the long-length cable 9.
  • the storage compartment 25 is further provided with a first circumferential wall 27 and a second circumferential wall 28 extending upright from said bottom wall 26 to define a first loop-shaped storage chamber 29.
  • the storage compartment 25 has a width W of at least six meters and a length N of at least fifty meters.
  • the circumferential walls 27, 28 have a height H of at least four meters.
  • the vessel 2 is provided with handling system 3 for handling the long-length cable 9 on said vessel 2.
  • the handling includes loading, storing and unloading of said long-length cable 9.
  • the handling system 3 will first be described in relation to the loading process. It will however be apparent to one skilled in the art that unloading merely involves using the handling system 3 in reverse order.
  • the handling system 3 comprises an input member 30 for receiving the long-length cable 9 onto the vessel 2 and for feeding the long-length cable 9 into the storage compartment 25 at an input position B.
  • the input member 30 is preferably arranged for feeding the long-length cable 9 into the storage compartment 25 at the input position B at a feeding direction F parallel or substantially parallel to the longitudinal direction L of the vessel 2.
  • the input member 30 comprises a beam 31 that is arranged to be placed at the bow 21 or the stern 22 of the vessel 2 and that is arranged to be swivable about an upright or vertical swivel axis S between a first loading orientation (shown in dashed lines) parallel to the feeding direction F, a second loading orientation transverse and/or perpendicular to the feeding direction F any loading orientation therein between.
  • the first loading orientation may be used for loading or unloading in line with the feeding direction F, e.g. to another vessel (not shown) or when the draught of the fully loaded vessel 2 makes it impossible to deliver the long-length cable 9 directly onto the quay.
  • the input member 30 further comprises a dancer roller 32.
  • the long-length cable 9 is fed onto the vessel 2 via the input member 30 at an input speed V1.
  • This input speed V1 may not always be constant.
  • a signal indicative of the input speed V1 can be obtained, which can be used by the handling system 3 to adapt the loading and/or unloading speed of the long-length cable 9.
  • the input member 30 further comprises an input channel 33 for guiding the long-length cable 9 from the beam 31 into the storage compartment 25.
  • the input channel 33 extends from the beam 31 at the bow 21 or the stern 22 of the vessel 2 downwards towards the support plane A of the storage compartment 25, yet still on the outside of the first circumferential wall 27.
  • the input member 30 is provided with an underpass 34 in the input channel 33 that extends from above the support plane A at the outside of the first circumferential wall 27, underneath the support plane A between the first circumferential wall 27 and the second circumferential wall 28 to above the support plane A at the inside of the second circumferential wall 28.
  • the long-length cable 9 can be conveyed at least partially underneath the support plane A at the first storage chamber 29 into the part of the storage compartment 25 inside the second circumferential wall 28.
  • the input channel 33 continues downstream of the underpass 34 in the feeding direction F up to the input position B.
  • the handling system 3 further comprises a laying device 4 that is arranged for receiving the long-length cable 9 from the input member 30 and for laying the long-length cable 9 in a plurality of windings along a loop-shaped laying path P inside the first storage chamber 29.
  • the laying device 4 is movable through the first storage chamber 29 along said loop-shaped laying path P in a first laying direction D1 parallel to the longitudinal direction L along the port side 23 and in a second laying direction D2 opposite to the first laying direction D1 along the starboard side 24.
  • the laying device 4 is arranged to be moved along the loop-shaped laying path P at a laying speed V2 that is equal or substantially equal to the input speed V1.
  • the loop-shaped laying path P comprises a first straight section P1 extending parallel to the longitudinal direction L along the port side 23, a second straight section P2 extending parallel to the longitudinal direction L along the starboard side 24 and a first corner section P3 and a second corner section P4 connecting the first straight section P1 to the second straight section P2 at the bow 21 and the stern 22, respectively, of the vessel 2.
  • the first corner section P3 and the second corner section P4 are semicircular or one-hundred-and-eighty degree arcs.
  • the first straight section P1 and the second straight section P2 preferably extend over at least fifty meters, most preferably over at least seventy-five meters.
  • the long-length cable 9 can be wound inside the storage chamber 25 along the loop-shaped laying path P with relatively long windings extending straight along a substantial part of the port side 23 and the starboard side 24 of the vessel 2.
  • each winding may store a length of the long-length cable 9 of at least one-hundred meters, preferably at least two-hundred meters and most preferably at least two-hundred-and-fifty meters.
  • the laying device 4 comprises a base 40 and a head 41 that is rotatable with respect to said base 40 about an upright or vertical rotation axis R.
  • the laying device 4 is provided with an output member 42 at the head 41 for laying the long-length cable 9 in the storage compartment 25 along the loop-shaped laying path P.
  • the head 41 is arranged to be rotated about the rotation axis R when transitioning from the first laying direction D1 to the second laying direction D2 at the first corner section P3 between figures 3 and 4 and when transitioning from the second laying direction D2 to the first laying direction D1 at the second corner section P4.
  • the head 41 is rotated over one-hundred-and-eighty degrees to move the output member 42 from one straight section P1, P2 to the other straight section P1, P2 at the respective corner section P3, P4 while the output member 42 follows the loop-shaped laying path P.
  • the output member 42 comprises a laying arm 43 with an output nozzle 44 at the distal end thereof to lay the long-length cable 9 into the storage compartment 25 along the loop-shaped laying path P.
  • the laying arm 43 has an arc that allows for tangentially laying the long-length cable 9 into the storage compartment 25, parallel to the support plane A.
  • the laying arm 43 is swivable about a laying axis T for adjusting the output position B laterally with respect to the loop-shaped laying path P with each winding, e.g. in a direction towards or away from the center of the storage compartment 25.
  • the laying arm 43 is swiveled about the laying axis T from the second circumferential wall 28 towards the first circumferential wall 27 with increments that correspond to the thickness of the long-length cable 9.
  • the laying arm 43 is swiveled about the laying axis T from the first circumferential wall 27 towards the second circumferential wall 28 with similar increments. In this manner, the long-length cable 9 can be accurately laid into the storage compartment 25 in stacked layers of side-by-side windings.
  • the head 41 is liftable with respect to the base 40 in a lifting direction Y parallel to the rotation axis R, e.g. with the use of pistons. After a layer has been completed, the head 41 is lifted over a distance that is equal to the thickness of a layer to stack another layer on top of the previously completed layer. The head 41 is liftable to such an extent that the full height H of the first storage compartment 29 between the first circumferential wall 27 and the second circumferential wall 28 can be filled, thereby fully utilizing the capacity of the first storage chamber 29.
  • the handling system 3 comprises a first cable guide 6 for accumulating a length of the long-length cable 9 between the input position B and the output position C.
  • the first cable guide 6 is arranged for guiding said accumulated length along a first guide path that is variable in shape to keep the length between the input position B and the output position C constant or substantially constant. More in particular, the first cable guide 6 is arranged for doubling back at least a part of the accumulated length of the long-length cable 9 in a return direction E opposite to the feeding direction F when the laying device 4 is upstream of the input position B in the feeding direction F.
  • the input position B is preferably located half-way along the loop-shaped laying path P in the feeding direction F. Hence, the accumulated length of the long-length cable 9 can be doubled back along at least half of the loop-shaped laying path P.
  • the first cable guide 6 accumulates a constant length of the long-length cable 9
  • said long-length cable 9 is continuously fed via the input member 30 at the input speed V1 through the input position B, through the first cable guide 6 along the first guide path, through the laying device 4 and out of the output member 42 at the output position C into the first storage chamber 29.
  • the accumulated length of the long-length cable 9 may be kept constant, the long-length cable 9 itself is continuously moving relative to the first cable guide 6.
  • the first cable guide 6 comprises a plurality of interlinked segments 60 that are movable with respect to each other to define the first guide path.
  • the first cable guide 6 is a cable carrier, preferably a chain-style cable carrier.
  • the interlinked segments 60 have a limited freedom of rotation with respect to each other, so that the interlinked segments 60 can only form an arc with a minimum radius of at least two meters. This can prevent that the long-length cable 9 is bend beyond its minimum bending radius.
  • the first cable guide 6 is arranged for forming a first variably arcuate section 61 in the first guide path.
  • Said first variably arcuate section 61 is arranged for directing the long-length cable 9 from the feeding direction F into a first guide direction K1 towards the laying device 4.
  • the first variably arcuate section 61 can be shaped and/or rolled-up into an arc of up to one-hundred-and-eighty degrees such that the first guide direction K1 is opposite to the feeding direction F.
  • the handling system 3 is provided with a plurality of guide supports 65 for supporting the first cable guide 6, preferably at regular intervals, with respect to the vessel 2 when a considerable part of the accumulated length of the long-length cable 9 is doubled back in said first guide direction K1. Hence, the weight of the first cable guide 6 and the long-length cable 9 carried therein can be reliably supported along the entire first guide path.
  • the laying device 4 is provided with a second cable guide 7 at the head 41 that is arranged for receiving the long-length cable 9 from the first cable guide 6 in a second guide direction K2 along a second guide path into a third guide direction K3 towards the output member 42.
  • the second cable guide 7 rotates together with the head 41 about the upright or vertical rotation axis R to direct the long-length cable 9 towards the output member 42 as the laying device 4 is moved along the loop-shaped laying path P.
  • the second guide direction K2 is directed away from the output member 42.
  • the laying device 4 is arranged to extend upright or vertical from the storage compartment 25.
  • the second guide direction K2 is upwards and the third guide direction K3 is downwards.
  • the second cable guide 7 extends over an arc of at least one-hundred-and-eighty degrees from the upward second guide direction K2 to the downward third guide direction K3.
  • the second guide direction K2 is different from the first guide direction K1 defined by the first variably arcuate section 61 of the first cable guide 6.
  • the first cable guide 6 is therefore arranged for forming a second variably arcuate section 62 in the first guide path that is arranged for directing the long-length cable 9 from first guide direction K1 into said second guide direction K2 towards and into the laying device 4.
  • the long-length cable 9 can be fed tangentially from the input position B through the first guide member 6 into the second guide member 7.
  • the second cable guide 7 comprises a plurality of interlinked segments 70 that are movable with respect to each other to define the second guide path.
  • the second cable guide 7 is a cable carrier, preferably a chain-style cable carrier.
  • the interlinked segments 70 have a limited freedom of rotation with respect to each other, so that the interlinked segments 70 can only form an arc with a minimum radius of at least two meters. This can prevent that the long-length cable 9 is bend beyond its minimum bending radius.
  • the laying device 4 is shown in an active upright position in which a considerable part of the laying device 4 extends above and/or protrudes upwards from the storage compartment 25 to above the deck of the vessel 2.
  • the vessel 2 may not be able to pass under some lower bridges.
  • the head 41 is foldable with respect to the base 40 member about a horizontal folding axis M from the active upright position, as shown in figures 6, 7 and 8 , into an inactive transport position as shown in figure 10 .
  • the folding axis M may extend parallel to the feeding direction F, in which case the head 41 is folded down in a lateral direction with respect to the longitudinal direction L of the vessel 2, or perpendicular to the feeding direction F, in which case the head 41 is folded down in the longitudinal direction L.
  • the laying device 4 further comprises a pulling member 45 for pulling the long-length cable 9 through the laying device 4 towards the output member 42 at a pulling speed V3.
  • the handling system 3 comprises a control unit 8 for controlling the pulling speed V3 of the pulling member 45.
  • the control unit 8 is arranged for controlling the laying speed V2 and/or the pulling speed V3 such that the pulling speed V3 is smaller than the laying speed V2 during inside-out laying of the long-length cable 9 to pull consecutive windings of the long-length cable 9 tightly against each other, in particular at the corner sections P3, P4 of the loop-shaped laying path P.
  • control unit 8 is arranged for controlling the laying speed V2 and/or the pulling speed V3 such that the pulling speed V3 is larger than the laying speed V1 during outside-in laying of the long-length cable 9 to push consecutive windings of the long-length cable 9 tightly against each other, in particular at the corner sections P3, P4 of the loop-shaped laying path P.
  • Figure 1 shows the situation in which the long-length cable 9 is being manufactured in the factory 1 and is subsequently fed by a feeding system from the factory 1 to the vessel 2.
  • the input member 30 of the handling system 3 receives the long-length cable 9 from the factory 1 and guides it into the storage compartment 25 of the vessel 2 in the manner as described before.
  • the long-length cable 9 is fed by the input member 30 into the storage compartment 25 at input position B.
  • the laying device 4 has already laid two windings of the long-length cable 9 into the first storage compartment 29 along the loop-shaped storage path P and has started to lay a third winding of the long-length cable 9 on the outside of the previously laid windings of the same long-length cable 9.
  • the laying device 4 has just moved through the second corner section P4 of the loop-shaped laying path P and is now ready to move at the laying speed V2 in the first laying direction D1 along the first straight section P1 at the portside 23 of the vessel 2.
  • the first cable guide 6 doubles back the long-length cable 9 in the return direction R opposite to the feeding direction F to keep the accumulated length of the long-length cable 9 between the stationary input position B and the continuously moving output position C constant.
  • Figures 4 and 7 shows the situation in which the laying device 4 has completed laying the third winding of the long-length cable 9.
  • the head 41 of the laying device 4 has been rotated about the rotation axis R through the first corner section P3 and is now ready to move in the second laying direction D2 along the second straight section P2 at the starboard side 24 of the vessel 3.
  • the doubled back length of the long-length cable 9 in the first cable guide 6 is now gradually rolled back in the feeding direction F, again to keep the accumulated length of the long-length cable 9 between the stationary input position B and the continuously moving output position C constant.
  • Figure 5 shows the situation after a first layer of windings of the long-length cable 9 has been completed and the laying device 4 has started a new layer of windings of the long-length cable 9 on top of the previously completed windings.
  • the laying device 4 has been lifted in the lifting direction Y as shown in figure 7 . This process can be continued until the first storage chamber 29 is completely filled.
  • Figure 9 shows an alternative vessel 102 according to a second embodiment of the invention.
  • the alternative vessel 102 differs from the previously discussed vessel 2 in that the circumferential walls 127, 128 that form the first storage compartment 129 are not parallel. Instead, they are spaced apart further at near the bottom wall 126 than at the top. Hence, the alternative first storage chamber 129 is wider at or near the bottom wall 126 than at the top. This allows for more side-by-side windings of the long-length cable 9 towards the bottom, thereby increasing the capacity of the first storage chamber 129.
  • Figure 9 further shows an alternative handling system 103 according to a second embodiment of the invention that can be applied individually or together with the aforementioned alternative first storage compartment 129.
  • the alternative handling system 103 differs from the previously discussed handling system 3 in that the second cable guide 107 of the laying device 104 follows a second guide path that includes a freefall section 171 directly upstream of the output member 140.
  • the second guide path extends vertical or substantially vertical, preferably over at least three meters, most preferably over at least five meters, to allow the long-length cable 9 to relax tension, e.g. torsion and/or twists in the long-length cable 9 prior to the laying at the output position C.
  • FIG 11 shows a further alternative vessel 202 according to a third embodiment of the invention.
  • the further alternative vessel 202 differs from the vessel 2 according to the first embodiment of the invention only in that it is provided with a third circumferential wall 228 in the storage compartment 25.
  • Said third circumferential wall 228 is spaced apart from and extending on the inside of the second circumferential wall 28 to define a second loop-shaped storage chamber 229 extending along an alternative loop-shaped laying path Z adjacent to loop-shaped laying path P in the first loop-shaped storage chamber 29.
  • the second loop-shaped storage chamber 229 can be used to store an additional long-length cable (not shown).
  • the radius of said second storage chamber 229 is slightly smaller than the radius of the first storage chamber 29 at the corner sections P3, P4. Hence, the second storage chamber 229 would probably be used for thinner cables that can bend to smaller radii.
  • the vessel 2 may comprises means for performing post-loading tests, such as time domain reflector (TDR) and/or optical time domain reflector (OTDR) measurements on the loaded long-length cable 9.
  • the vessel 2 may further comprises electronic means to further measure, log and/or control various parameters, such as - but not limited to - input speed V1, pulling speed V2, laying speed V3, temperature and acceleration or deceleration of the vessel 2 as a whole.
  • the invention relates to a vessel with a handling system and a method for handling a cable on said vessel.
  • the vessel comprises a hull that defines an elongated storage compartment.
  • the handling system comprises an input member for receiving the cable onto the vessel and for feeding the cable into the storage compartment at an input position, a laying device that is movable along a loop-shaped laying path, an output member that is arranged for laying the cable inside the storage compartment at an output position and a first cable guide for accumulating a length of the cable between the input position and the output position, wherein the first cable guide is arranged for guiding said accumulated length of the cable along a first guide path that is variable in shape to keep the length of the cable between the input position and the output position constant or substantially constant.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Description

    BACKGROUND
  • The invention relates to a handling system, a vessel, in particular a cable barge, and a method for handling a long-length cable on said vessel.
  • Long length cables, e.g. for use as electrical infrastructure in an offshore wind farm, are typically shipped from a factory located at a sea port by a Cable Laying Vessel or CLV. On a CLV, cables are stored on large rotating turn tables. Said cables may be conveniently manufactured at or near said sea port and loaded directly into the CLV. However, sometimes, the cables are manufactured at an inland factory and have to be transported first to the sea port via the waterways. When transporting from inland factories, the cable is wound on a reel, which is limited in size because of the width of the locks and the height of the bridges along the waterways. Hence, the length of the cable that can be transported is limited.
  • WO 2010/121781 A2 discloses an assembly of a plurality of winding drums for storing a long length of an electrical cable on a vessel. The winding drums are arranged coaxially in a straight line, one behind the other. The winding drums have drum discs that are provided with openings so that the drum discs can be bridged. Hence, the cable can be wound onto one of the winding drums until it is full, after which the cable is fed onto one of the adjacent winding drums to continue the winding. The assembly of winding drums allows for more length of continuous cable to be transported on a single vessel without increasing the size of the winding drums. However, the assembly is rather complex in use.
  • US 5,902,072 A discloses a modular seismic cable handling system including a large wheel mounted in the front of the vessel for retrieving seismic cable from the water, a horizontally mounted cable handler comprising an eight wheel cable puller for pulling the cable from the wheel, urging same to the main deck level of the vessel, the cable puller comprising four pairs of tires to frictionally grab and pull a seismic cable along a linear path. The pulled cable is urged along a track running generally the length of the vessel, where a smaller, rear cable puller further urges the cable to the rear of the vessel. The system further includes a trolley cable deployment system for deploying the cable into cable bins on the main deck for storage, which trolley system includes a cable wheel puller arrangement having movement situated along the longitudinal axis of the container.
  • It is an object of the present invention to provide a vessel and a method for handling a long length cable on said vessel.
  • SUMMARY OF THE INVENTION
  • According to a first aspect, the invention provides a vessel, in particular a cable barge, with a handling system for handling a long-length cable on said vessel, wherein the vessel comprises a hull with a bow, a stern and a port side and a starboard side extending in a longitudinal direction between the bow and the stern, wherein the hull defines an elongated storage compartment, wherein the handling system comprises an input member for receiving the long-length cable onto the vessel and for feeding the long-length cable into the storage compartment in a feeding direction at an input position, wherein the handling system further comprises a laying device that is movable along a loop-shaped laying path through the storage compartment in a first laying direction parallel to the longitudinal direction along the port side and in a second laying direction opposite to the first laying direction along the starboard side, wherein the laying device comprises an output member that is arranged for laying the long-length cable inside the storage compartment at an output position that moves along said loop-shaped laying path when the laying device is moved, wherein the handling system further comprises a first cable guide for accumulating a length of the long-length cable between the input position and the output position, wherein the first cable guide is arranged for guiding said accumulated length of the long-length cable along a first guide path that is variable in shape to keep the length of the long-length cable between the input position and the output position constant or substantially constant.
  • By keeping the accumulated length of the long-length cable constant, the laying device can be moved in both laying directions along the loop-shaped laying path while the long-length cable can be fed continuously through the input member in the feeding direction into the storage compartment. The long-length cable can thus be continuously moved at a constant speed, even though the laying device moves in an opposite direction to the feeding direction for at least a part of the loop-shaped laying path. By allowing the laying device to move in the longitudinal direction of the vessel, large lengths of the long-length cable can be laid down with each winding, thereby increasing the capacity of the vessel.
  • In an embodiment thereof the first cable guide is arranged for doubling back at least a part of the accumulated length of the long-length cable in a return direction opposite to the feeding direction when the laying device is upstream of the input position in the feeding direction. Hence, the doubled-back part of the accumulated length of the long-length cable can effectively keep the overall length of the accumulated length of the long-length cable constant, even if the laying device is moving upstream of the input position.
  • In a further embodiment thereof the first cable guide comprises a plurality of interlinked segments that are movable with respect to each other to define the first guide path. Said interlinked segments can effectively guide the long-length cable while providing the first cable guide with the freedom of movement to keep the accumulated length constant and simultaneously allowing the long-length cable to be continuously fed through said first cable guide.
  • Preferably, the first cable guide is a cable carrier, preferably a chain-style cable carrier. Such a cable carrier can effectively guide the long-length cable while providing the first cable guide with the freedom of movement to keep the accumulated length constant.
  • In a further embodiment the feeding direction is parallel or substantially parallel to the longitudinal direction. Hence, input member and the first cable guide are all arranged to function in the longitudinal direction of the vessel.
  • In a further embodiment the input position is half-way along the loop-shaped laying path in the feeding direction. This ensures that the part of the accumulated length of the long-length cable that can be doubled-back in the return direction opposite to the feeding direction is sufficient to reach the opposite end of the loop-shaped laying path.
  • In a further embodiment the first cable guide is arranged for forming a first variably arcuate section in the first guide path that is arranged for directing the long-length cable from the feeding direction into a first guide direction towards the laying device. Hence, the long-length cable can be deflected away from the feeding direction towards the laying device.
  • In an embodiment thereof the laying device is arranged for receiving the long-length cable from the first cable guide in a second guide direction, wherein the first cable guide is arranged for forming a second variably arcuate section in the first guide path that is arranged for directing the long-length cable from the first guide direction into said second guide direction. By providing the second variably arcuate section, the first guide path can be made to more accurately meet the direction in which the long-length cable is received into the laying device.
  • In an embodiment thereof the second guide direction is directed away from the output member, wherein the laying device comprises a second cable guide for guiding the long-length cable along a second guide path from the second guide direction into a third guide direction towards the output member. By initially directing the long-length cable away from the output member, the second guide path can be chosen to have a larger radius between the second guide direction and the third guide direction so that the minimum bending radius of the long-length cable is not exceeded.
  • In an embodiment thereof the laying device is arranged to extend upright or vertical from the storage compartment, wherein the second guide direction is upwards and the third guide direction is downwards. Hence, the bend in the long-length cable in the second cable guide can be made in a vertical direction above the vessel.
  • In an embodiment thereof the second guide path comprises a freefall section directly upstream of the output member in which the second guide path extends vertical or substantially vertical. The freefall section allows the long-length cable to relax tension, e.g. torsion and/or twists prior to the laying at the output position.
  • In a further embodiment thereof the second cable guide comprises a plurality of interlinked segments that are movable with respect to each other to define the second guide path. Said interlinked segments can effectively guide the long-length cable while simultaneously allowing the long-length cable to continuously fed through said second cable guide.
  • In a further embodiment the laying device comprises a base and a head that is rotatable with respect to said base about an upright or vertical rotation axis, wherein the output member is provided to and rotatable together with the head, wherein the head is arranged to be rotated when transitioning from the first laying direction to the second laying direction and when transitioning from the second laying direction to the first laying direction. Hence, the head can follow the loop-shaped guide path while the output member lays the long-length cable along said loop-shaped guide path.
  • In an embodiment thereof the head is liftable with respect to the base in a lifting direction parallel to the upright or vertical rotation axis. By lifting the head, several layers of side-by-side windings of the long-length cable can be stacked on top of each other inside the storage chamber, thereby increasing the capacity of the vessel.
  • In a further embodiment thereof the output member is provided with a laying arm with an output nozzle at the distal end thereof to lay the long-length cable into the storage compartment along the loop-shaped laying path, wherein the laying arm is swivable about a laying axis for laterally adjusting the output position with respect to the loop-shape laying path with each winding of the long-length cable. Said laying arm can be used to consecutive windings of the same long-length cable side-by-side in said lateral direction to form a layer of side-by-side windings.
  • In a further embodiment thereof the head is foldable with respect to the base about a horizontal folding axis from an active upright position into an inactive transport position. The head can be folded into the inactive transport position to reduce the height of the handling system on the vessel, so that the vessel can pass more easily under some bridges.
  • In a further embodiment the laying device is arranged to be moved along the loop-shaped laying path at a laying speed, wherein the laying device comprises a pulling member for pulling the long-length cable through the laying device towards the output member at a pulling speed, wherein the handling system comprises a control unit for controlling the pulling speed of the pulling member with respect to the laying speed of the laying device. This allows for controlling the behavior of the long-length cable during the laying. In particular, it has proven to be advantageous when the control unit is arranged for controlling the pulling speed to a speed smaller than the laying speed during inside-out laying of the long-length cable to pull consecutive windings of the long-length cable tightly against each other. Additionally or alternatively, it has proven advantageous when the control unit is arranged for controlling the pulling speed to a speed larger than the laying speed during outside-in laying of the long-length cable to push consecutive windings of the long-length cable tightly against each other. By pulling and pushing the long-length cable during inside-out and outside-in laying, respectively, more windings of the long-length cable can be fitted in the same area of the storage compartment.
  • In a further embodiment the input member comprises a beam that is arranged to be placed at the bow or the stern of the vessel and that is arranged to be swivable about an upright or vertical swivel axis between a first loading orientation parallel to the feeding direction, a second loading orientation transverse and/or perpendicular to the feeding direction and any loading orientation therein between. The loading orientation can be chosen conveniently. The first loading orientation may for instance be used for loading or unloading in line with the feeding direction, e.g. to another vessel or when the draught of the fully loaded vessel makes it impossible to deliver the long-length cable directly onto the quay. The second loading orientation can be used to load or unload the long-length cable directly onto the quay.
  • In a further embodiment the long-length cable is fed onto the vessel via the input member at an input speed, wherein the input member comprises a dancer roller for measuring said input speed. The dancer roller allows for keeping the tension in the long-length cable constant, despite changes in the input speed. Moreover, by measuring the position of the dancer roller, a signal indicative of the input speed can be obtained, which can be used by the handling system to optimize the loading and/or unloading of the long-length cable.
  • In a further embodiment the output member of the laying device is arranged for pulling the long-length cable out of the storage compartment and wherein the input member is arranged for paying out the long-length cable during an unloading mode of the handling system. The handling system has been described above in relation to the loading process. It will however be apparent to one skilled in the art that unloading merely involves using the handling system in reverse order.
  • In an embodiment the loop-shaped laying path comprises a first straight section extending parallel to the longitudinal direction along the port side, a second straight section extending parallel to the longitudinal direction along the starboard side and a first corner section and a second corner section connecting the first straight section to the second straight section at the bow and the stern, respectively, of the vessel.
  • In an embodiment the laying device comprises a base and a head that is rotatable with respect to said base about a vertical rotation axis, wherein the rotation axis is located at the center between the first straight section and the second straight section. By having the rotation axis at said center location, the laying device can be easily rotated between the first straight section and the second straight section.
  • In a further embodiment the first corner section and the second corner section are semicircular arcs. Hence, when rotating the head about the rotation axis, the output member can accurately follow the semicircular arcs at the respective corner sections.
  • In a further embodiment the first straight section and the second straight section extend over at least fifty meters. Hence, a considerable length of the long-length cable can be stored along each straight section.
  • In a further embodiment the storage compartment comprises a bottom wall that defines a support plane for receiving the long-length cable in a plurality of side-by-side windings along the loop-shaped laying path, a first circumferential wall and a second circumferential wall upright from said bottom wall and extending on the outside and the inside, respectively, of the loop-shaped laying path, to define a first loop-shaped storage chamber for containing said plurality of side-by-side windings along the loop-shaped laying path. Said first storage chamber can be used to securely store the windings of the long-length cable while keeping the central area of the storage compartment free from said windings.
  • In an embodiment the first circumferential wall and the second circumferential wall have a height with respect to the support plane of at least three meters and preferably at least four meters for receiving a plurality of layers of side-by-side windings of the long-length cable within said height. The higher the circumferential walls, the higher the capacity of the first storage chamber.
  • In a further embodiment the first loop-shaped storage chamber is wider at the bottom than at the top. Hence, more windings of the long-length cable can be stored towards the bottom. This increases the capacity of the first storage chamber. By increasing the width of the first storage chamber towards the bottom, the stability of the vessel can be ensured.
  • In a further embodiment the storage compartment comprises a third circumferential wall spaced apart from and extending on the inside of the second circumferential wall to define a second loop-shaped storage chamber. Said second storage chamber can be used to store a second long-length cable within the same vessel.
  • In a further embodiment the input member is arranged for receiving the long-length cable onto the vessel on the outside of the first circumferential wall, wherein the input member comprises an underpass extending from above the support plane at the outside of the first circumferential wall, underneath the support plane between the first circumferential wall and the second circumferential wall to above the support plane at the inside of the second circumferential wall, wherein the input member is arranged to convey the long-length cable through said underpass into the storage compartment. Said underpass allows the long-length cable to be fed into the storage compartment below the support plane, and thus without hindering the storage of the windings of the long-length cable in the first storage chamber.
  • According to a second aspect, the invention provides a method for handling a long-length cable on the aforementioned vessel, wherein the method comprises the steps of:
    • receiving the long-length cable onto the vessel through the input member and feeding the long-length cable with the input member into the storage compartment at an input position;
    • moving the laying device along the loop-shaped laying path through the storage compartment while using the output member to lay the long-length cable inside the storage compartment at the output position, wherein said output position moves along said loop-shaped laying path when the laying device is moved;
    • using the first cable guide for accumulating a length of the long-length cable between the input position and the output position and guiding said accumulated length of the long-length cable along the first guide path; and
    • variably shaping said first guide path to keep the length of the long-length cable between the input position and the output position constant or substantially constant.
  • The method describes the active operation of the previously discussed handling system on the previously discussed vessel. Hence, the method has the same advantageous effects as described before. These advantages will not be repeated hereafter for reasons of conciseness.
  • In a preferred embodiment the method comprises the step of moving the laying device along the loop-shaped laying path at a laying speed, wherein the laying device comprises a pulling member for pulling the long-length cable through the laying device towards the output member at a pulling speed, wherein the method further comprises the step of controlling the pulling speed to a speed smaller than the laying speed during inside-out laying of the long-length cable.
  • Preferably, the method further comprises the step of controlling the pulling speed to a speed larger than the laying speed during outside-in laying of the long-length cable.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The invention will be elucidated on the basis of an exemplary embodiment shown in the attached schematic drawings, in which:
    • figure 1 shows an isometric view of cable factory and a vessel, in particular a cable barge, moored in the vicinity of said cable factory, wherein the vessel is provided with a handling system according to a first embodiment of the invention;
    • figure 2 shows the vessel and the handling system of figure 1 in more detail;
    • figures 3 and 4 shows top views of the handling system in operation during inside-out winding of a long-length cable on said vessel;
    • figure 5 shows a top view of the handling system in operation during outside-in winding of a long-length cable on said vessel;
    • figures 6 and 7 show cross sections of the vessel along the lines VI-VI and VII-VII in figures 3 and 4, respectively;
    • figure 8 shows a cross section of the vessel along the line VIII-VIII in figure 3;
    • figure 9 shows a cross section of an alternative vessel and an alternative handling system according to a second embodiment of the invention;
    • figure 10 shows a side view of a part of the handling system in an inactive transport position; and
    • figure 11 shows a further alternative vessel according to a second embodiment of the invention.
    DETAILED DESCRIPTION OF THE INVENTION
  • Figure 1 shows a cable factory 1 for producing a long-length cable 9 and a vessel 2, in particular a cable barge, moored in the vicinity of said cable factory 1 for receiving and storing the long-length cable 9 from the cable factory 1 for transport. A long-length cable is a cable with a continuous length of at least ten kilometers, preferably at least fifty kilometers and most preferably at least one-hundred kilometers and a weight of more than 500 metric Ton for a single cable. Said long-length cable 9 is typically intended for use in electrical infrastructure, e.g. in an offshore wind farm. In this example, the cable factory 1 is located inland. Said long-length cable 9 has to be transported in an efficient manner via the waterways from the inland cable factory 1 to a port at sea side where a CLV can take over the cable or temporary land storage is organized. Locks and bridges along the waterways limit the width and height, respectively, of the vessel 2.
  • As shown in more detail in figure 2, the vessel 2 according to a first embodiment of the invention comprises a hull 20 with a bow 21 and a stern 22. The hull 20 further has a port side 23 and a starboard side 24 extending in a longitudinal direction L between the bow 21 and the stern 22. The hull 20 defines an elongated storage compartment 25 for receiving the long-length cable 9 in a manner that will be described in more detail hereafter. The storage compartment 25 comprises a bottom wall 26 that defines a support plane A, as shown in figures 6 and 7, for supporting the long-length cable 9. As shown in figure 2, the storage compartment 25 is further provided with a first circumferential wall 27 and a second circumferential wall 28 extending upright from said bottom wall 26 to define a first loop-shaped storage chamber 29.
  • The storage compartment 25 has a width W of at least six meters and a length N of at least fifty meters. In this exemplary embodiment, the circumferential walls 27, 28 have a height H of at least four meters.
  • The vessel 2 is provided with handling system 3 for handling the long-length cable 9 on said vessel 2. The handling includes loading, storing and unloading of said long-length cable 9. The handling system 3 will first be described in relation to the loading process. It will however be apparent to one skilled in the art that unloading merely involves using the handling system 3 in reverse order.
  • As shown in figures 2-8, the handling system 3 comprises an input member 30 for receiving the long-length cable 9 onto the vessel 2 and for feeding the long-length cable 9 into the storage compartment 25 at an input position B. The input member 30 is preferably arranged for feeding the long-length cable 9 into the storage compartment 25 at the input position B at a feeding direction F parallel or substantially parallel to the longitudinal direction L of the vessel 2. As shown in figure 2, the input member 30 comprises a beam 31 that is arranged to be placed at the bow 21 or the stern 22 of the vessel 2 and that is arranged to be swivable about an upright or vertical swivel axis S between a first loading orientation (shown in dashed lines) parallel to the feeding direction F, a second loading orientation transverse and/or perpendicular to the feeding direction F any loading orientation therein between. The first loading orientation may be used for loading or unloading in line with the feeding direction F, e.g. to another vessel (not shown) or when the draught of the fully loaded vessel 2 makes it impossible to deliver the long-length cable 9 directly onto the quay.
  • As best seen in figures 6 and 7, the input member 30 further comprises a dancer roller 32. The long-length cable 9 is fed onto the vessel 2 via the input member 30 at an input speed V1. This input speed V1 may not always be constant. By measuring the position of the dancer roller 32, a signal indicative of the input speed V1 can be obtained, which can be used by the handling system 3 to adapt the loading and/or unloading speed of the long-length cable 9.
  • The input member 30 further comprises an input channel 33 for guiding the long-length cable 9 from the beam 31 into the storage compartment 25. The input channel 33 extends from the beam 31 at the bow 21 or the stern 22 of the vessel 2 downwards towards the support plane A of the storage compartment 25, yet still on the outside of the first circumferential wall 27. The input member 30 is provided with an underpass 34 in the input channel 33 that extends from above the support plane A at the outside of the first circumferential wall 27, underneath the support plane A between the first circumferential wall 27 and the second circumferential wall 28 to above the support plane A at the inside of the second circumferential wall 28. By having said underpass 34, the long-length cable 9 can be conveyed at least partially underneath the support plane A at the first storage chamber 29 into the part of the storage compartment 25 inside the second circumferential wall 28. The input channel 33 continues downstream of the underpass 34 in the feeding direction F up to the input position B.
  • As shown in figures 3, 4 and 5, the handling system 3 further comprises a laying device 4 that is arranged for receiving the long-length cable 9 from the input member 30 and for laying the long-length cable 9 in a plurality of windings along a loop-shaped laying path P inside the first storage chamber 29. In particular, the laying device 4 is movable through the first storage chamber 29 along said loop-shaped laying path P in a first laying direction D1 parallel to the longitudinal direction L along the port side 23 and in a second laying direction D2 opposite to the first laying direction D1 along the starboard side 24. The laying device 4 is arranged to be moved along the loop-shaped laying path P at a laying speed V2 that is equal or substantially equal to the input speed V1.
  • The loop-shaped laying path P comprises a first straight section P1 extending parallel to the longitudinal direction L along the port side 23, a second straight section P2 extending parallel to the longitudinal direction L along the starboard side 24 and a first corner section P3 and a second corner section P4 connecting the first straight section P1 to the second straight section P2 at the bow 21 and the stern 22, respectively, of the vessel 2. The first corner section P3 and the second corner section P4 are semicircular or one-hundred-and-eighty degree arcs. The first straight section P1 and the second straight section P2 preferably extend over at least fifty meters, most preferably over at least seventy-five meters. Hence, the long-length cable 9 can be wound inside the storage chamber 25 along the loop-shaped laying path P with relatively long windings extending straight along a substantial part of the port side 23 and the starboard side 24 of the vessel 2. In particular, each winding may store a length of the long-length cable 9 of at least one-hundred meters, preferably at least two-hundred meters and most preferably at least two-hundred-and-fifty meters.
  • As best seen in figure 8, the laying device 4 comprises a base 40 and a head 41 that is rotatable with respect to said base 40 about an upright or vertical rotation axis R. The laying device 4 is provided with an output member 42 at the head 41 for laying the long-length cable 9 in the storage compartment 25 along the loop-shaped laying path P. The head 41 is arranged to be rotated about the rotation axis R when transitioning from the first laying direction D1 to the second laying direction D2 at the first corner section P3 between figures 3 and 4 and when transitioning from the second laying direction D2 to the first laying direction D1 at the second corner section P4. During said rotation, the head 41 is rotated over one-hundred-and-eighty degrees to move the output member 42 from one straight section P1, P2 to the other straight section P1, P2 at the respective corner section P3, P4 while the output member 42 follows the loop-shaped laying path P.
  • As best seen in figure 8, the output member 42 comprises a laying arm 43 with an output nozzle 44 at the distal end thereof to lay the long-length cable 9 into the storage compartment 25 along the loop-shaped laying path P. The laying arm 43 has an arc that allows for tangentially laying the long-length cable 9 into the storage compartment 25, parallel to the support plane A. The laying arm 43 is swivable about a laying axis T for adjusting the output position B laterally with respect to the loop-shaped laying path P with each winding, e.g. in a direction towards or away from the center of the storage compartment 25. In particular, during inside-out laying of the long-length cable 9, the laying arm 43 is swiveled about the laying axis T from the second circumferential wall 28 towards the first circumferential wall 27 with increments that correspond to the thickness of the long-length cable 9. Similarly, during outside-in laying of the long-length cable 9, the laying arm 43 is swiveled about the laying axis T from the first circumferential wall 27 towards the second circumferential wall 28 with similar increments. In this manner, the long-length cable 9 can be accurately laid into the storage compartment 25 in stacked layers of side-by-side windings.
  • To facilitate the stacking of the layers, as shown in figure 8, the head 41 is liftable with respect to the base 40 in a lifting direction Y parallel to the rotation axis R, e.g. with the use of pistons. After a layer has been completed, the head 41 is lifted over a distance that is equal to the thickness of a layer to stack another layer on top of the previously completed layer. The head 41 is liftable to such an extent that the full height H of the first storage compartment 29 between the first circumferential wall 27 and the second circumferential wall 28 can be filled, thereby fully utilizing the capacity of the first storage chamber 29.
  • As shown in figures 6 and 7, the handling system 3 comprises a first cable guide 6 for accumulating a length of the long-length cable 9 between the input position B and the output position C. The first cable guide 6 is arranged for guiding said accumulated length along a first guide path that is variable in shape to keep the length between the input position B and the output position C constant or substantially constant. More in particular, the first cable guide 6 is arranged for doubling back at least a part of the accumulated length of the long-length cable 9 in a return direction E opposite to the feeding direction F when the laying device 4 is upstream of the input position B in the feeding direction F. The input position B is preferably located half-way along the loop-shaped laying path P in the feeding direction F. Hence, the accumulated length of the long-length cable 9 can be doubled back along at least half of the loop-shaped laying path P.
  • Note that while the first cable guide 6 accumulates a constant length of the long-length cable 9, said long-length cable 9 is continuously fed via the input member 30 at the input speed V1 through the input position B, through the first cable guide 6 along the first guide path, through the laying device 4 and out of the output member 42 at the output position C into the first storage chamber 29. Hence, although the accumulated length of the long-length cable 9 may be kept constant, the long-length cable 9 itself is continuously moving relative to the first cable guide 6.
  • The first cable guide 6 comprises a plurality of interlinked segments 60 that are movable with respect to each other to define the first guide path. Preferably, the first cable guide 6 is a cable carrier, preferably a chain-style cable carrier. The interlinked segments 60 have a limited freedom of rotation with respect to each other, so that the interlinked segments 60 can only form an arc with a minimum radius of at least two meters. This can prevent that the long-length cable 9 is bend beyond its minimum bending radius.
  • The first cable guide 6 is arranged for forming a first variably arcuate section 61 in the first guide path. Said first variably arcuate section 61 is arranged for directing the long-length cable 9 from the feeding direction F into a first guide direction K1 towards the laying device 4. The first variably arcuate section 61 can be shaped and/or rolled-up into an arc of up to one-hundred-and-eighty degrees such that the first guide direction K1 is opposite to the feeding direction F. As best seen in figure 7, the handling system 3 is provided with a plurality of guide supports 65 for supporting the first cable guide 6, preferably at regular intervals, with respect to the vessel 2 when a considerable part of the accumulated length of the long-length cable 9 is doubled back in said first guide direction K1. Hence, the weight of the first cable guide 6 and the long-length cable 9 carried therein can be reliably supported along the entire first guide path.
  • As shown in figure 6 and 7, the laying device 4 is provided with a second cable guide 7 at the head 41 that is arranged for receiving the long-length cable 9 from the first cable guide 6 in a second guide direction K2 along a second guide path into a third guide direction K3 towards the output member 42. The second cable guide 7 rotates together with the head 41 about the upright or vertical rotation axis R to direct the long-length cable 9 towards the output member 42 as the laying device 4 is moved along the loop-shaped laying path P. As best seen in figure 8, the second guide direction K2 is directed away from the output member 42. In this exemplary embodiment, the laying device 4 is arranged to extend upright or vertical from the storage compartment 25. As such, the second guide direction K2 is upwards and the third guide direction K3 is downwards. The second cable guide 7 extends over an arc of at least one-hundred-and-eighty degrees from the upward second guide direction K2 to the downward third guide direction K3.
  • The second guide direction K2 is different from the first guide direction K1 defined by the first variably arcuate section 61 of the first cable guide 6. The first cable guide 6 is therefore arranged for forming a second variably arcuate section 62 in the first guide path that is arranged for directing the long-length cable 9 from first guide direction K1 into said second guide direction K2 towards and into the laying device 4. Hence, the long-length cable 9 can be fed tangentially from the input position B through the first guide member 6 into the second guide member 7.
  • Like the first cable guide 6, the second cable guide 7 comprises a plurality of interlinked segments 70 that are movable with respect to each other to define the second guide path. Preferably, the second cable guide 7 is a cable carrier, preferably a chain-style cable carrier. The interlinked segments 70 have a limited freedom of rotation with respect to each other, so that the interlinked segments 70 can only form an arc with a minimum radius of at least two meters. This can prevent that the long-length cable 9 is bend beyond its minimum bending radius.
  • In figures 6, 7 and 8, the laying device 4 is shown in an active upright position in which a considerable part of the laying device 4 extends above and/or protrudes upwards from the storage compartment 25 to above the deck of the vessel 2. In this active upright position, the vessel 2 may not be able to pass under some lower bridges. Hence, the head 41 is foldable with respect to the base 40 member about a horizontal folding axis M from the active upright position, as shown in figures 6, 7 and 8, into an inactive transport position as shown in figure 10. The folding axis M may extend parallel to the feeding direction F, in which case the head 41 is folded down in a lateral direction with respect to the longitudinal direction L of the vessel 2, or perpendicular to the feeding direction F, in which case the head 41 is folded down in the longitudinal direction L.
  • As shown in figure 8, the laying device 4 further comprises a pulling member 45 for pulling the long-length cable 9 through the laying device 4 towards the output member 42 at a pulling speed V3. The handling system 3 comprises a control unit 8 for controlling the pulling speed V3 of the pulling member 45. In particular, the control unit 8 is arranged for controlling the laying speed V2 and/or the pulling speed V3 such that the pulling speed V3 is smaller than the laying speed V2 during inside-out laying of the long-length cable 9 to pull consecutive windings of the long-length cable 9 tightly against each other, in particular at the corner sections P3, P4 of the loop-shaped laying path P. Similarly, the control unit 8 is arranged for controlling the laying speed V2 and/or the pulling speed V3 such that the pulling speed V3 is larger than the laying speed V1 during outside-in laying of the long-length cable 9 to push consecutive windings of the long-length cable 9 tightly against each other, in particular at the corner sections P3, P4 of the loop-shaped laying path P.
  • A method for handling a long-length cable 9 on the previously discussed vessel 2, using the aforementioned handling system 3, will be elucidated below with reference to figures 1-8.
  • Figure 1 shows the situation in which the long-length cable 9 is being manufactured in the factory 1 and is subsequently fed by a feeding system from the factory 1 to the vessel 2. At the vessel 2, the input member 30 of the handling system 3 receives the long-length cable 9 from the factory 1 and guides it into the storage compartment 25 of the vessel 2 in the manner as described before.
  • As shown in figures 3 and 6, the long-length cable 9 is fed by the input member 30 into the storage compartment 25 at input position B. In figure 3, the situation is shown in which the laying device 4 has already laid two windings of the long-length cable 9 into the first storage compartment 29 along the loop-shaped storage path P and has started to lay a third winding of the long-length cable 9 on the outside of the previously laid windings of the same long-length cable 9. In figure 3, the laying device 4 has just moved through the second corner section P4 of the loop-shaped laying path P and is now ready to move at the laying speed V2 in the first laying direction D1 along the first straight section P1 at the portside 23 of the vessel 2. As the laying device 4 moves in the first laying direction D1 towards and beyond the input position B, the first cable guide 6 doubles back the long-length cable 9 in the return direction R opposite to the feeding direction F to keep the accumulated length of the long-length cable 9 between the stationary input position B and the continuously moving output position C constant.
  • Figures 4 and 7 shows the situation in which the laying device 4 has completed laying the third winding of the long-length cable 9. The head 41 of the laying device 4 has been rotated about the rotation axis R through the first corner section P3 and is now ready to move in the second laying direction D2 along the second straight section P2 at the starboard side 24 of the vessel 3. The doubled back length of the long-length cable 9 in the first cable guide 6 is now gradually rolled back in the feeding direction F, again to keep the accumulated length of the long-length cable 9 between the stationary input position B and the continuously moving output position C constant.
  • Figure 5 shows the situation after a first layer of windings of the long-length cable 9 has been completed and the laying device 4 has started a new layer of windings of the long-length cable 9 on top of the previously completed windings. For this purpose, the laying device 4 has been lifted in the lifting direction Y as shown in figure 7. This process can be continued until the first storage chamber 29 is completely filled.
  • Figure 9 shows an alternative vessel 102 according to a second embodiment of the invention. The alternative vessel 102 differs from the previously discussed vessel 2 in that the circumferential walls 127, 128 that form the first storage compartment 129 are not parallel. Instead, they are spaced apart further at near the bottom wall 126 than at the top. Hence, the alternative first storage chamber 129 is wider at or near the bottom wall 126 than at the top. This allows for more side-by-side windings of the long-length cable 9 towards the bottom, thereby increasing the capacity of the first storage chamber 129.
  • Figure 9 further shows an alternative handling system 103 according to a second embodiment of the invention that can be applied individually or together with the aforementioned alternative first storage compartment 129. The alternative handling system 103 differs from the previously discussed handling system 3 in that the second cable guide 107 of the laying device 104 follows a second guide path that includes a freefall section 171 directly upstream of the output member 140. In said freefall section 171 the second guide path extends vertical or substantially vertical, preferably over at least three meters, most preferably over at least five meters, to allow the long-length cable 9 to relax tension, e.g. torsion and/or twists in the long-length cable 9 prior to the laying at the output position C.
  • Figure 11 shows a further alternative vessel 202 according to a third embodiment of the invention. The further alternative vessel 202 differs from the vessel 2 according to the first embodiment of the invention only in that it is provided with a third circumferential wall 228 in the storage compartment 25. Said third circumferential wall 228 is spaced apart from and extending on the inside of the second circumferential wall 28 to define a second loop-shaped storage chamber 229 extending along an alternative loop-shaped laying path Z adjacent to loop-shaped laying path P in the first loop-shaped storage chamber 29. The second loop-shaped storage chamber 229 can be used to store an additional long-length cable (not shown). The radius of said second storage chamber 229 is slightly smaller than the radius of the first storage chamber 29 at the corner sections P3, P4. Hence, the second storage chamber 229 would probably be used for thinner cables that can bend to smaller radii.
  • The vessel 2 may comprises means for performing post-loading tests, such as time domain reflector (TDR) and/or optical time domain reflector (OTDR) measurements on the loaded long-length cable 9. The vessel 2 may further comprises electronic means to further measure, log and/or control various parameters, such as - but not limited to - input speed V1, pulling speed V2, laying speed V3, temperature and acceleration or deceleration of the vessel 2 as a whole.
  • It is to be understood that the above description is included to illustrate the operation of the preferred embodiments and is not meant to limit the scope of the invention. From the above discussion, many variations will be apparent to one skilled in the art that would yet be encompassed by the scope of the present invention, which is defined by the appended claims.
  • In summary, the invention relates to a vessel with a handling system and a method for handling a cable on said vessel. The vessel comprises a hull that defines an elongated storage compartment. The handling system comprises an input member for receiving the cable onto the vessel and for feeding the cable into the storage compartment at an input position, a laying device that is movable along a loop-shaped laying path, an output member that is arranged for laying the cable inside the storage compartment at an output position and a first cable guide for accumulating a length of the cable between the input position and the output position, wherein the first cable guide is arranged for guiding said accumulated length of the cable along a first guide path that is variable in shape to keep the length of the cable between the input position and the output position constant or substantially constant.

Claims (18)

  1. Vessel (2, 102, 202), in particular a cable barge, with a handling system (3, 103) for handling a long-length cable (9) on said vessel (2, 102, 202), wherein the vessel (2, 102, 202) comprises a hull (20) with a bow (21), a stern (22) and a port side (23) and a starboard side (24) extending in a longitudinal direction (L) between the bow (21) and the stern (22), wherein the hull (20) defines an elongated storage compartment (25), wherein the handling system (3, 103) comprises an input member (30) for receiving the long-length cable (9) onto the vessel (2, 102, 202) and for feeding the long-length cable (9) into the storage compartment (25) in a feeding direction (F) at an input position (B), characterized in that the handling system (3, 103) further comprises a laying device (4, 104) that is movable along a loop-shaped laying path (P) through the storage compartment (25) in a first laying direction (D1) parallel to the longitudinal direction (L) along the port side (23) and in a second laying direction (D2) opposite to the first laying direction (D1) along the starboard side (24), wherein the laying device (4) comprises an output member (42, 140) that is arranged for laying the long-length cable (9) inside the storage compartment (25) at an output position (C) that moves along said loop-shaped laying path (P) when the laying device (4) is moved, wherein the handling system (3) further comprises a first cable guide (6) for accumulating a length of the long-length cable (9) between the input position (B) and the output position (C), wherein the first cable guide (6) is arranged for guiding said accumulated length of the long-length cable (9) along a first guide path that is variable in shape to keep the length of the long-length cable (9) between the input position (B) and the output position (C) constant or substantially constant.
  2. Vessel (2, 102, 202) according to claim 1, wherein the first cable guide (6) is arranged for doubling back at least a part of the accumulated length of the long-length cable (9) in a return direction (R) opposite to the feeding direction (F) when the laying device (4, 104) is upstream of the input position (B) in the feeding direction (F), preferably wherein the input position (B) is half-way along the loop-shaped laying path (P) in the feeding direction (F).
  3. Vessel (2, 102, 202) according to claim 1 or 2, wherein the first cable guide (6) comprises a plurality of interlinked segments (60) that are movable with respect to each other to define the first guide path, and/or wherein the first cable guide (6) is a cable carrier, preferably a chain-style cable carrier.
  4. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the feeding direction (F) is parallel or substantially parallel to the longitudinal direction (L).
  5. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the first cable guide (6) is arranged for forming a first variably arcuate section (61) in the first guide path that is arranged for directing the long-length cable (9) from the feeding direction (F) into a first guide direction (K1) towards the laying device (4, 104), preferably wherein the laying device (4, 104) is arranged for receiving the long-length cable (9) from the first cable guide (6) in a second guide direction (K2) and the first cable guide (6) is arranged for forming a second variably arcuate section (62) in the first guide path that is arranged for directing the long-length cable (9) from the first guide direction (K1) into said second guide direction (K2), more preferably wherein the second guide direction (K2) is directed away from the output member (42, 140) and the laying device (4, 104) comprises a second cable guide (7) for guiding the long-length cable (9) along a second guide path from the second guide direction (K2) into a third guide direction (K3) towards the output member (42, 140), more preferably wherein the laying device (4, 104) is arranged to extend upright or vertical from the storage compartment (25) and the second guide direction (K2) is upwards and the third guide direction (K3) is downwards, most preferably wherein the second guide path comprises a freefall section (171) directly upstream of the output member (140) in which the second guide path extends vertical or substantially vertical.
  6. Vessel (2, 102, 202) according to claim 5, wherein the laying device (4, 104) is arranged for receiving the long-length cable (9) from the first cable guide (6) in a second guide direction (K2), wherein the first cable guide (6) is arranged for forming a second variably arcuate section (62) in the first guide path that is arranged for directing the long-length cable (9) from the first guide direction (K1) into said second guide direction (K2), wherein the second guide direction (K2) is directed away from the output member (42, 140), wherein the laying device comprises a second cable guide (7) for guiding the long-length cable (9) along a second guide path from the second guide direction (K2) into a third guide direction (K3) towards the output member (42, 140), wherein the second cable guide (7) comprises a plurality of interlinked segments (70) that are movable with respect to each other to define the second guide path.
  7. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the laying device (4, 104) comprises a base (40) and a head (41) that is rotatable with respect to said base (40) about an upright or vertical rotation axis (R), wherein the output member (42, 140) is provided to and rotatable together with the head (41), wherein the head (41) is arranged to be rotated when transitioning from the first laying direction (D1) to the second laying direction (D2) and when transitioning from the second laying direction (D2) to the first laying direction (D1), preferably wherein the head (41) is liftable with respect to the base (40) in a lifting direction (Y) parallel to the upright or vertical rotation axis (R), and/or wherein the output member (42, 140) is provided with a laying arm (43) with an output nozzle (44) at the distal end thereof to lay the long-length cable (9) into the storage compartment (25) along the loop-shaped laying path (P), wherein the laying arm (43) is swivable about a laying axis (T) for laterally adjusting the output position with respect to the loop-shaped laying path (P) with each winding of the long-length cable (9).
  8. Vessel (2, 102, 202) according to claim 7, wherein the head (41) is foldable with respect to the base (40) about a horizontal folding axis (M) from an active upright position into an inactive transport position.
  9. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the laying device (4, 104) is arranged to be moved along the loop-shaped laying path (P) at a laying speed (V2), wherein the laying device (4, 104) comprises a pulling member (45) for pulling the long-length cable (9) through the laying device (4, 104) towards the output member (42, 140) at a pulling speed (V3), wherein the handling system (3) comprises a control unit (8) for controlling the pulling speed (V3) of the pulling member (45) with respect to the laying speed (V2) of the laying device (4, 104), preferably wherein the control unit (8) is arranged for controlling the pulling speed (V3) to a speed smaller than the laying speed (V2) during inside-out laying of the long-length cable (9), and/or wherein the control unit (8) is arranged for controlling the pulling speed (V3) to a speed larger than the laying speed (V2) during outside-in laying of the long-length cable (9).
  10. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the input member (30) comprises a beam (31) that is arranged to be placed at the bow (21) or the stern (22) of the vessel (2, 102, 202) and that is arranged to be swivable about an upright or vertical swivel axis (S) between a first loading orientation parallel to the feeding direction (F), a second loading orientation transverse and/or perpendicular to the feeding direction (F) and any loading orientation therein between.
  11. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the long-length cable (9) is fed onto the vessel (2, 102, 202) via the input member (30) at an input speed (V1), wherein the input member (30) comprises a dancer roller (32) for measuring said input speed (V1).
  12. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the output member (42, 140) of the laying device (4, 104) is arranged for pulling the long-length cable (9) out of the storage compartment (25) and wherein the input member (30) is arranged for paying out the long-length cable (9) during an unloading mode of the handling system (3).
  13. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the loop-shaped laying path (P) comprises a first straight section (P1) extending parallel to the longitudinal direction (L) along the port side (23), preferably over at least fifty meters, a second straight section (P2) extending parallel to the longitudinal direction (L) along the starboard side (24), preferably over at least fifty meters, and a first corner (P3) section and a second corner section (P3), preferably in the form of semicircular arcs, connecting the first straight section (P1) to the second straight section (P2) at the bow (21) and the stern (22), respectively, of the vessel (2, 102, 202), preferably wherein the laying device (4, 104) comprises a base (40) and a head (41) that is rotatable with respect to said base (40) about a vertical rotation axis (R), wherein the rotation axis (R) is located at the center between the first straight section (P1) and the second straight section (P2).
  14. Vessel (2, 102, 202) according to any one of the preceding claims, wherein the storage compartment (25) comprises a bottom wall (26, 126) that defines a support plane (A) for receiving the long-length cable (9) in a plurality of side-by-side windings along the loop-shaped laying path (P), a first circumferential wall (27, 127) and a second circumferential wall (28, 128) upright from said bottom wall (26, 126) and extending on the outside and the inside, respectively, of the loop-shaped laying path (P), to define a first loop-shaped storage chamber (29, 129) for containing said plurality of side-by-side windings along the loop-shaped laying path (P), preferably wherein the first circumferential wall (27, 127) and the second circumferential wall (28, 128) have a height (H) with respect to the support plane (A) of at least three meters and preferably at least four meters for receiving a plurality of layers of side-by-side windings of the long-length cable (9) within said height (H), and/or wherein the first loop-shaped storage chamber (129) is wider at the bottom than at the top.
  15. Vessel (202) according to claim 14, wherein the storage compartment comprises a third circumferential wall (228) spaced apart from and extending on the inside of the second circumferential wall (28, 128) to define a second loop-shaped storage chamber (229).
  16. Vessel (2, 102, 202) according to claim 14 or 15, wherein the input member (30) is arranged for receiving the long-length cable (9) onto the vessel (2, 102, 202) on the outside of the first circumferential wall (27, 127), wherein the input member (30) comprises an underpass (34) extending from above the support plane (A) at the outside of the first circumferential wall (27, 127), underneath the support plane (A) between the first circumferential wall (27, 127) and the second circumferential wall (28, 128) to above the support plane (A) at the inside of the second circumferential wall (28, 128), wherein the input member (30) is arranged to convey the long-length cable (9) through said underpass (34) into the storage compartment (25) .
  17. Method for handling a long-length cable (9) on a vessel (2, 102, 202) according to any one of the preceding claims, wherein the method comprises the steps of:
    - receiving the long-length cable (9) onto the vessel (2, 102, 202) through the input member (30) and feeding the long-length cable (9) with the input member (42, 140) into the storage compartment (25) at an input position (B);
    - moving the laying device (4, 104) along the loop-shaped laying path (P) through the storage compartment (25) while using the output member (42, 140) to lay the long-length cable (9) inside the storage compartment (25) at the output position (C), wherein said output position (C) moves along said loop-shaped laying path (P) when the laying device (3, 103) is moved;
    - using the first cable guide (6) for accumulating a length of the long-length cable (9) between the input position (B) and the output position (C) and guiding said accumulated length of the long-length cable (9) along the first guide path; and
    - variably shaping said first guide path to keep the length of the long-length cable (9) between the input position (B) and the output position (C) constant or substantially constant.
  18. Method according to claim 17, wherein the method comprises the step of moving the laying device (4, 104) along the loop-shaped laying path (P) at a laying speed (V2), wherein the laying device (4, 104) comprises a pulling member (45) for pulling the long-length cable (9) through the laying device (4, 104) towards the output member (42, 140) at a pulling speed (V3), wherein the method further comprises the step of controlling the pulling speed (V3) to a speed smaller than the laying speed (V2) during inside-out laying of the long-length cable (9), preferably wherein the method further comprises the step of controlling the pulling speed (V3) to a speed larger than the laying speed (V2) during outside-in laying of the long-length cable (9).
EP18700601.0A 2017-01-24 2018-01-22 Vessel and method for handling a long-length cable on said vessel Active EP3573914B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2018215A NL2018215B1 (en) 2017-01-24 2017-01-24 Handling system, vessel and method for handling a long-length cable on said vessel
PCT/EP2018/051401 WO2018138036A1 (en) 2017-01-24 2018-01-22 Handling system, vessel and method for handling a long-length cable on said vessel

Publications (2)

Publication Number Publication Date
EP3573914A1 EP3573914A1 (en) 2019-12-04
EP3573914B1 true EP3573914B1 (en) 2022-04-20

Family

ID=58054483

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18700601.0A Active EP3573914B1 (en) 2017-01-24 2018-01-22 Vessel and method for handling a long-length cable on said vessel

Country Status (3)

Country Link
EP (1) EP3573914B1 (en)
NL (1) NL2018215B1 (en)
WO (1) WO2018138036A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110539853A (en) * 2019-09-11 2019-12-06 北京海瑞兴能源科技有限责任公司 Cable laying ship deck arrangement and construction method for laying long-distance sand shores and submarine cables
CN113697590B (en) * 2021-09-13 2023-02-10 江苏亨通海洋光网系统有限公司 Device for large-length sea cable delivery
CN114243576A (en) * 2021-12-22 2022-03-25 武昌船舶重工集团有限公司 Cable laying device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB989876A (en) * 1960-07-01 1965-04-22 Western Electric Co Storage apparatus for cable apparatus-housings
US5902072A (en) * 1995-09-13 1999-05-11 Regional Fabricators, Inc. Modular seismic cable handling system with knockdown container
US5624207A (en) * 1995-09-13 1997-04-29 Regional Fabricators, Inc. Ocean bottom cable handling system and method of using same
US8942059B2 (en) * 2008-09-19 2015-01-27 Optoplan As Container system for seismic cable and stations
DE102009018852A1 (en) 2009-04-24 2010-12-02 Nkt Cables Gmbh Arrangement for storing long lengths of a flexible article
WO2014116463A1 (en) * 2013-01-14 2014-07-31 Smart Pipe Company, Inc. Coiling continuous pipelines for transport and installation
BE1021791B1 (en) * 2013-10-18 2016-01-18 Jan De Nul, Naamloze Vennootschap A device for winding and unwinding a cable and a method for winding a cable

Also Published As

Publication number Publication date
WO2018138036A1 (en) 2018-08-02
NL2018215B1 (en) 2018-08-01
EP3573914A1 (en) 2019-12-04

Similar Documents

Publication Publication Date Title
EP3573914B1 (en) Vessel and method for handling a long-length cable on said vessel
US8172480B2 (en) Node storage, deployment and retrieval system
DK2622248T3 (en) DEVICE AND PROCEDURE FOR SELECTING AN OBJECTS OF A VESSEL
US20140061558A1 (en) Level winding drum winch
US3630461A (en) Supply reel for continuous laying of pipelines
JPH0133396B2 (en)
DK2529455T3 (en) Injury Prevention in underwater cables and the like elements during laying or picking up
CN110352160B (en) Apparatus and method for releasing elongated flexible articles from a ship
EP2578913A1 (en) Flexible product reel cartridge
US10024461B2 (en) System and method for handling reels for laying elongated members on the bed of a body of water, auxiliary structure, and laying vessel
KR101567915B1 (en) Apparatus for transporting submarine cable of ship and method thereof
ES2474124T3 (en) Storage and deployment unit for a rolling element and handling procedure for a rolling element
NL2018179B1 (en) Device and method for reeling in a cable from a source and temporarily storing the cable
AU2009280950A1 (en) Methods and apparatus for transporting chain
JP2007031089A (en) Winch device for cable to be laid on water bottom
NL2012137C2 (en) Manufacturing of a subsea pipeline and spooling said pipeline onto a reel of a pipelaying vessel at a spoolbase.
KR20220037075A (en) Apparatus for supporting fender
NL2018963B1 (en) System and method for open water cable laying and repair
NL2008456C2 (en) Improved reeling system.
JPS64287B2 (en)
JPS63103787A (en) Mooring device of barge to dredger
CN114955744A (en) Cable connection system for ship shore power supply and use method thereof
JPH05262280A (en) Conveying device for mooring buoy for ocean observation ship
JPH01126120A (en) Submarine cable pickup and removal method

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190722

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20201006

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 35/00 20200101ALI20211014BHEP

Ipc: B63B 35/04 20060101ALI20211014BHEP

Ipc: B65H 59/38 20060101ALI20211014BHEP

Ipc: B65H 57/28 20060101ALI20211014BHEP

Ipc: B65H 57/12 20060101ALI20211014BHEP

Ipc: B63B 27/00 20060101ALI20211014BHEP

Ipc: B65H 54/76 20060101AFI20211014BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20211124

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018034099

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1485027

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220515

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220420

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1485027

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220420

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220822

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220720

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220721

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220720

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220820

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602018034099

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20230123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602018034099

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230122

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230122

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230131

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230122

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230801

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230131

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230122

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420