NL2018215B1 - Handling system, vessel and method for handling a long-length cable on said vessel - Google Patents

Handling system, vessel and method for handling a long-length cable on said vessel Download PDF

Info

Publication number
NL2018215B1
NL2018215B1 NL2018215A NL2018215A NL2018215B1 NL 2018215 B1 NL2018215 B1 NL 2018215B1 NL 2018215 A NL2018215 A NL 2018215A NL 2018215 A NL2018215 A NL 2018215A NL 2018215 B1 NL2018215 B1 NL 2018215B1
Authority
NL
Netherlands
Prior art keywords
cable
length
laying
long
vessel
Prior art date
Application number
NL2018215A
Other languages
Dutch (nl)
Inventor
Roelofs Rob
Rops Dingeman
Original Assignee
B V Twentsche Kabelfabriek
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by B V Twentsche Kabelfabriek filed Critical B V Twentsche Kabelfabriek
Priority to NL2018215A priority Critical patent/NL2018215B1/en
Priority to PCT/EP2018/051401 priority patent/WO2018138036A1/en
Priority to EP18700601.0A priority patent/EP3573914B1/en
Application granted granted Critical
Publication of NL2018215B1 publication Critical patent/NL2018215B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/76Depositing materials in cans or receptacles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/29Other loading or unloading equipment involving a continuous action, not provided in groups B63B27/22 - B63B27/28
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/12Tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/28Reciprocating or oscillating guides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H59/00Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators
    • B65H59/38Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators by regulating speed of driving mechanism of unwinding, paying-out, forwarding, winding, or depositing devices, e.g. automatically in response to variations in tension
    • B65H59/384Adjusting or controlling tension in filamentary material, e.g. for preventing snarling; Applications of tension indicators by regulating speed of driving mechanism of unwinding, paying-out, forwarding, winding, or depositing devices, e.g. automatically in response to variations in tension using electronic means
    • B65H59/385Regulating winding speed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B2035/002Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for inland waters, e.g. for use on canals or rivers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/04Cable-laying vessels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The invention relates to a handling system, a vessel and a method for handling a cable on said vessel. The vessel comprises a hull that defines an elongated an input and for an input a loopshaped laying path, an output member that is arranged for laying the cable inside the storage compartment at an storage compartment. The handling system comprises member for receiving the cable onto the vessel feeding the cable into the storage compartment at position, a laying device that is movable along output position and a first cable guide for accumulating a length of the cable between the input position and the output position, wherein the first cable guide is arranged for guiding said accumulated length of the cable along a first guide path that is variable in shape to keep the length of the cable between the input position and the output position constant or substantially constant.

Description

BACKGROUND
The invention relates to a handling system, a vessel, in particular a cable barge, and a method for handling a long-length cable on said vessel.
Long length cables, e.g. for use as electrical infrastructure in an offshore wind farm, are typically shipped from a factory located at a sea port by a Cable Laying Vessel or CLV. On a CLV, cables are stored on large rotating turn tables. Said cables may be conveniently manufactured at or near said sea port and loaded directly into the CLV. However, sometimes, the cables are manufactured at an inland factory and have to be transported first to the sea port via the waterways. When transporting from inland factories, the cable is wound on a reel, which is limited in size because of the width of the locks and the height of the bridges along the waterways. Hence, the length of the cable that can be transported is limited.
WO 2010/121781 A2 discloses an assembly of a plurality of winding drums for storing a long length of an electrical cable on a vessel. The winding drums are arranged coaxially in a straight line, one behind the other. The winding drums have drum discs that are provided with openings so that the drum discs can be bridged. Hence, the cable can be wound onto one of the winding drums until it is full, after which the cable is fed onto one of the adjacent winding drums to continue the winding. The assembly of winding drums allows for more length of continuous cable to be transported on a single vessel without increasing the size of the winding drums. However, the assembly is rather complex in use.
It is an object of the present invention to provide a handling system, a vessel and a method for handling a long length cable on said vessel.
SUMMARY OF THE INVENTION
According to a first aspect, the invention provides a handling system for handling a long-length cable on a vessel, wherein the vessel comprises a hull with a bow, a stern and a port side and a starboard side extending in a longitudinal direction between the bow and the stern, wherein the hull defines an elongated storage compartment, wherein the handling system comprises an input member for receiving the long-length cable onto the vessel and for feeding the long-length cable into the storage compartment in a feeding direction at an input position, wherein the handling system further comprises a laying device that is movable along a loop-shaped laying path through the storage compartment in a first laying direction parallel to the longitudinal direction along the port side and in a second laying direction opposite to the first laying direction along the starboard side, wherein the laying device comprises an output member that is arranged for laying the long-length cable inside the storage compartment at an output position that moves along said loop-shaped laying path when the laying device is moved, wherein the handling system further comprises a first cable guide for accumulating a length of the long-length cable between the input position and the output position, wherein the first cable guide is arranged for guiding said accumulated length of the long-length cable along a first guide path that is variable in shape to keep the length of the long-length cable between the input position and the output position constant or substantially constant.
By keeping the accumulated length of the longlength cable constant, the laying device can be moved in both laying directions along the loop-shaped laying path while the long-length cable can be fed continuously through the input member in the feeding direction into the storage compartment. The long-length cable can thus be continuously moved at a constant speed, even though the laying device moves in an opposite direction to the feeding direction for at least a part of the loop-shaped laying path. By allowing the laying device to move in the longitudinal direction of the vessel, large lengths of the long-length cable can be laid down with each winding, thereby increasing the capacity of the vessel.
In an embodiment thereof the first cable guide is arranged for doubling back at least a part of the accumulated length of the long-length cable in a return direction opposite to the feeding direction when the laying device is upstream of the input position in the feeding direction. Hence, the doubled-back part of the accumulated length of the long-length cable can effectively keep the overall length of the accumulated length of the long-length cable constant, even if the laying device is moving upstream of the input position.
In a further embodiment thereof the first cable guide comprises a plurality of interlinked segments that are movable with respect to each other to define the first guide path. Said interlinked segments can effectively guide the long-length cable while providing the first cable guide with the freedom of movement to keep the accumulated length constant and simultaneously allowing the long-length cable to be continuously fed through said first cable guide.
Preferably, the first cable guide is a cable carrier, preferably a chain-style cable carrier. Such a cable carrier can effectively guide the long-length cable while providing the first cable guide with the freedom of movement to keep the accumulated length constant.
In a further embodiment the feeding direction is parallel or substantially parallel to the longitudinal direction. Hence, input member and the first cable guide are all arranged to function in the longitudinal direction of the vessel.
In a further embodiment the input position is half-way along the loop-shaped laying path in the feeding direction. This ensures that the part of the accumulated length of the long-length cable that can be doubled-back in the return direction opposite to the feeding direction is sufficient to reach the opposite end of the loop-shaped laying path.
In a further embodiment the first cable guide is arranged for forming a first variably arcuate section in the first guide path that is arranged for directing the long-length cable from the feeding direction into a first guide direction towards the laying device. Hence, the longlength cable can be deflected away from the feeding direction towards the laying device.
In an embodiment thereof the laying device is arranged for receiving the long-length cable from the first cable guide in a second guide direction, wherein the first cable guide is arranged for forming a second variably arcuate section in the first guide path that is arranged for directing the long-length cable from first guide direction into said second guide direction. By providing the second variably arcuate section, the first guide path can be made to more accurately meet the direction in which the long-length cable is received into the laying device.
In an embodiment thereof the second guide direction is directed away from the output member, wherein the laying device comprises a second cable guide for guiding the long-length cable along a second guide path from the second guide direction into a third guide direction towards the output member. By initially directing the long-length cable away from the output member, the second guide between the direction so length cable
In arranged to compartment, and the in the made in path can be chosen to have a larger second guide direction and the third that the minimum bending radius of the is not exceeded.
radius guide longan embodiment thereof the laying device is vertical from the storage guide direction is upwards downwards. Hence, the bend second cable guide can be above the vessel.
extend upright or wherein the second third guide direction is long-length cable in a vertical direction
In an embodiment the comprises a freefall section directly output member in which the second vertical or substantially vertical.
cable to relax thereof the second guide path upstream guide path
The freefall of the extends section allows and/or the long-length twists prior to
In a further guide are movable with torsion comprises guide path. Said the long-length tension, e.g.
the laying at the output position.
embodiment thereof the second cable a plurality of interlinked segments that respect to each other to define the second interlinked segments can effectively guide cable while simultaneously allowing the long-length cable to continuously fed through said cable guide.
In a further embodiment the laying comprises a base and a head that is rotatable with to said wherein base about an upright the output member is with the head, wherein or vertical provided to the head is second device respect rotation axis, and rotatable together rotated when transitioning from to the second laying direction the second laying direction to Hence, the head can follow the the output member lays loop-shaped guide path.
In an embodiment thereof the head arranged to be the first laying direction and when transitioning from the first laying loop-shaped guide the long-length cable direction.
path while along said is liftable parallel to with respect to the base in a lifting direction the upright or vertical rotation axis. By lifting the head, several layers of side-by-side windings of the long-length cable can be stacked on top of each other inside the storage chamber, thereby increasing the capacity of the vessel.
In a further embodiment thereof the output member is provided with a laying arm with an output nozzle at the distal end thereof to lay the long-length cable into the storage compartment along the loop-shaped laying path, wherein the laying arm is swivable about a laying axis for laterally adjusting the output position with respect to the loop-shape laying path with each winding of the long-length cable. Said laying arm can be used to consecutive windings of the same long-length cable side-by-side in said lateral direction to form a layer of side-by-side windings.
In a further embodiment thereof the head is foldable with respect to the base about a horizontal folding axis from an active upright position into an inactive transport position. The head can be folded into the inactive transport position to reduce the height of the handling system on the vessel, so that the vessel can pass more easily under some bridges.
In a further embodiment the laying device is arranged to be moved along the loop-shaped laying path at a laying speed, wherein the laying device comprises a pulling member for pulling the long-length cable through the laying device towards the output member at a pulling speed, wherein the handling system comprises a control unit for controlling the pulling speed of the pulling member with respect to the laying speed of the laying device. This allows for controlling the behavior of the long-length cable during the laying. In particular, it has proven to be advantageous when the control unit is arranged for controlling the pulling speed to a speed smaller than the laying speed during inside-out laying of the long-length cable to pull consecutive windings of the long-length cable tightly against each other. Additionally or alternatively, it has proven advantageous when the control unit is arranged for controlling the pulling speed to a speed larger than the laying speed during outside-in laying of the long-length cable to push consecutive windings of the long-length cable tightly against each other. By pulling and pushing the long-length cable during inside-out and outside-in laying, respectively, more windings of the longlength cable can be fitted in the same area of the storage compartment.
In a further embodiment the input member comprises a beam that is arranged to be placed at the bow or the stern of the vessel and that is arranged to be swivable about an upright or vertical swivel axis between a first loading orientation parallel to the feeding direction, a second loading orientation transverse and/or perpendicular to the feeding direction and any loading orientation therein between. The loading orientation can be chosen conveniently. The first loading orientation may for instance be used for loading or unloading in line with the feeding direction, e.g. to another vessel or when the draught of the fully loaded vessel makes it impossible to deliver the long-length cable directly onto the quay. The second loading orientation can be used to load or unload the long-length cable directly onto the quay.
In a further embodiment the long-length cable is fed onto the vessel via the input member at an input speed, wherein the input member comprises a dancer roller for measuring said input speed. The dancer roller allows for keeping the tension in the long-length cable constant, despite changes in the input speed. Moreover, by measuring the position of the dancer roller, a signal indicative of the input speed can be obtained, which can be used by the handling system to optimize the loading and/or unloading of the long-length cable.
In a further embodiment the output member of the laying device is arranged for pulling the long-length cable out of the storage compartment and wherein the input member is arranged for paying out the long-length cable during an unloading mode of the handling system. The handling system has been described above in relation to the loading process. It will however be apparent to one skilled in the art that unloading merely involves using the handling system in reverse order.
According to a second aspect, the invention provides a vessel, in particular a cable barge, comprising the aforementioned handling system, wherein the vessel comprises a hull with a bow, a stern and a port side and a starboard side extending in a longitudinal direction between the bow and the stern, wherein the hull defines an elongated storage compartment. The vessel includes the aforementioned handling system and thus has the same advantageous effects, which will not be repeated hereafter for reasons of conciseness.
In an embodiment thereof the loop-shaped laying path comprises a first straight section extending parallel to the longitudinal direction along the port side, a second straight section extending parallel direction along the starboard side to the longitudinal and a first corner section and a second corner section connecting the first straight section to the second straight section at the bow and the stern, respectively, of the vessel.
In an embodiment thereof the laying device comprises a base and a head that is rotatable with respect to said base about a vertical rotation axis, wherein the rotation axis is located at the center between the first straight section and the second straight section. By having the rotation axis at said center location, the laying device can be easily rotated between the first straight section and the second straight section.
In a further embodiment thereof the first corner section and the second corner section are semicircular arcs. Hence, when rotating the head about the rotation axis, the output member can accurately follow the semicircular arcs at the respective corner sections.
In a further embodiment thereof the first straight section and the second straight section extend over at least fifty meters. Hence, a considerable length of the long-length cable can be stored along each straight section.
In a further embodiment thereof the storage compartment comprises a bottom wall that defines a support plane for receiving the long-length cable in a plurality of side-by-side windings along the loop-shaped laying path, a first circumferential wall and a second circumferential wall upright from said bottom wall and extending on the outside and the inside, respectively, of the loop-shaped laying path, to define a first loop-shaped storage chamber for containing said plurality of side-by-side windings along the loop-shaped laying path. Said first storage chamber can be used to securely store the windings of the long-length cable while keeping the central area of the storage compartment free from said windings.
In an embodiment thereof the first circumferential wall and the second circumferential wall have a height with respect to the support plane of at least three meters and preferably at least four meters for receiving a plurality of layers of side-by-side windings of the long-length cable within said height. The higher the circumferential walls, the higher the capacity of the first storage chamber.
In a further embodiment thereof the first loopshaped storage chamber is wider at the bottom than at the top. Hence, more windings of the long-length cable can be stored towards the bottom. This increases the capacity of the first storage chamber. By increasing the width of the first storage chamber towards the bottom, the stability of the vessel can be ensured.
In a further embodiment thereof the storage compartment comprises a third circumferential wall spaced apart from and extending on the inside of the second circumferential wall to define a second loop-shaped storage chamber. Said second storage chamber can be used to store a second long-length cable within the same vessel.
In a further embodiment thereof the input member is arranged for receiving the long-length cable onto the vessel on the outside of the first circumferential wall, wherein the input member comprises an underpass extending from above the support plane at the outside of the first circumferential wall, underneath the support plane between the first circumferential wall and the second circumferential wall to above the support plane at the inside of the second circumferential wall, wherein the input member is arranged to convey the long-length cable through said underpass into the storage compartment. Said underpass allows the long-length cable to be fed into the storage compartment below the support plane, and thus without hindering the storage of the windings of the longlength cable in the first storage chamber.
According to a third aspect, the invention provides a method for handling a long-length cable on the aforementioned vessel, wherein the method comprises the steps of:
receiving the long-length cable onto the vessel through the input member and feeding the long-length cable with the input member into the storage compartment at an input position;
moving the laying device along the loopshaped laying path through the storage compartment while using the output member to lay the long-length cable inside the storage compartment at the output position, wherein said output position moves along said loop-shaped laying path when the laying device is moved;
using the first cable guide for accumulating a length of the long-length cable between the input position and the output position and guiding said accumulated length of the long-length cable along the first guide path; and variably shaping said first guide path to keep the length of the long-length cable between the input position and the output position constant or substantially constant.
The method describes the active operation of the previously discussed handling system on the previously discussed vessel. Hence, the method has the same advantageous effects as described before. These advantages will not be repeated hereafter for reasons of conciseness.
In a preferred embodiment the method comprises the step of moving the laying device along the loop-shaped laying path at a laying speed, wherein the laying device comprises a pulling member for pulling the long-length cable through the laying device towards the output member at a pulling speed, wherein the method further comprises the step of controlling the pulling speed to a speed smaller than the laying speed during inside-out laying of the long-length cable.
Preferably, the method further comprises the step of controlling the pulling speed to a speed larger than the laying speed during outside-in laying of the long-length cable .
The various aspects and features described and shown in the specification can be applied, individually, wherever possible. These individual aspects, in particular the aspects and features described in the attached dependent claims, can be made subject of divisional patent applications .
BRIEF DESCRIPTION OF THE DRAWINGS
The invention will be elucidated on the basis of an exemplary embodiment shown in the attached schematic drawings, in which:
figure 1 shows an isometric view of cable factory and a vessel, in particular a cable barge, moored in the vicinity of said cable factory, wherein the vessel is provided with a handling system according to a first embodiment of the invention;
figure 2 shows the vessel and the handling system of figure 1 in more detail;
figures 3 and 4 shows top views of the handling system in operation during inside-out winding of a longlength cable on said vessel;
figure 5 shows a top view of the handling system in operation during outside-in winding of a long-length cable on said vessel;
figures 6 and 7 show cross sections of the vessel along the lines VI-VI and VII-VII in figures 3 and 4, respectively;
figure 8 shows a cross section of the vessel along the line VIII-VIII in figure 3;
figure 9 shows a cross section of an alternative vessel and an alternative handling system according to a second embodiment of the invention;
figure 10 shows a side view of a part of the handling system in an inactive transport position; and figure 11 shows a further alternative vessel according to a second embodiment of the invention.
DETAILED DESCRIPTION OF THE INVENTION
Figure 1 shows a cable factory 1 for producing a long-length cable 9 and a vessel 2, in particular a cable barge, moored in the vicinity of said cable factory 1 for receiving and storing the long-length cable 9 from the cable factory 1 for transport. A long-length cable is a cable with a continuous length of at least ten kilometers, preferably at least fifty kilometers and most preferably at least one-hundred kilometers and a weight of more than 500 metric Ton for a single cable. Said long-length cable 9 is typically intended for use in electrical infrastructure,
e.g. in an offshore wind farm. In this example, the cable factory 1 is located inland. Said long-length cable 9 has to be transported in an efficient manner via the waterways from the inland cable factory 1 to a port at sea side where a CLV can take over the cable or temporary land storage is organized. Locks and bridges along the waterways limit the width and height, respectively, of the vessel 2.
As shown in more detail in figure 2, the vessel 2 according to a first embodiment of the invention comprises a hull 20 with a bow 21 and a stern 22. The hull 20 further has a port side 23 and a starboard side 24 extending in a longitudinal direction L between the bow 21 and the stern
22. The hull 20 defines an elongated storage compartment 25 for receiving the long-length cable 9 in a manner that will be described in more detail hereafter. The storage compartment 25 comprises a bottom wall 26 that defines a support plane A, as shown in figures 6 and 7, for supporting the long-length cable 9. As shown in figure 2, the storage compartment 25 is further provided with a first circumferential wall 27 and a second circumferential wall 28 extending upright from said bottom wall 26 to define a first loop-shaped storage chamber 29.
The storage compartment 25 has a width W of at least six meters and a length N of at least fifty meters. In this exemplary embodiment, the circumferential walls 27, 28 have a height H of at least four meters.
The vessel 2 is provided with handling system 3 for handling the long-length cable 9 on said vessel 2. The handling includes loading, storing and unloading of said long-length cable 9. The handling system 3 will first be described in relation to the loading process. It will however be apparent to one skilled in the art that unloading merely involves using the handling system 3 in reverse order.
As shown in figures 2-8, the handling system 3 comprises an input member 30 for receiving the long-length cable 9 onto the vessel 2 and for feeding the long-length cable 9 into the storage compartment 25 at an input position B. The input member 30 is preferably arranged for feeding the compartment direction F longitudinal figure 2, the arranged to be vessel 2 and long-length cable 9 into the 25 at the input position parallel or substantially direction L of the vessel
B at a parallel
2. As shown input member 30 comprises a placed at the bow that is arranged upright or vertical swivel axis or the storage feeding to the in beam 31 that is stern 22 of the to be swivable about an
S between a first loading orientation (shown in dashed lines) parallel to the feeding direction F, a second loading orientation transverse and/or perpendicular to the feeding direction F any loading orientation therein between. The first loading orientation may be used for loading or unloading in line with the feeding direction F, e.g. to another vessel (not shown) or when the draught of the fully loaded vessel 2 makes it impossible to deliver the long-length cable 9 directly onto the quay.
As best seen in figures 6 and 7, the input member further comprises a dancer roller 32. The long-length cable 9 is fed onto the vessel 2 via the input member 30 at an input speed VI. This input speed VI may not always be constant. By measuring the position of the dancer roller 32, a signal indicative of the input speed VI can be obtained, which can be used by the handling system 3 to adapt the—optimize—fefee loading and/or unloading speed of the long-length cable 9.
The input member 30 further comprises an input channel 33 for guiding the long-length cable 9 from the beam 31 into the storage compartment 25. The input channel extends from the beam 31 at the bow 21 or the stern 22 of the vessel 2 downwards towards the support plane A of the storage compartment 25, yet still on the outside of the first circumferential wall 27. The input member 30 is provided with an underpass 34 in the input channel 33 that extends from above the support plane A at the outside of the first circumferential wall 27, underneath the support plane A between the first circumferential wall 27 and the second circumferential wall 28 to above the support plane A at the inside of the second circumferential wall 28. By having said underpass 34, the long-length cable 9 can be conveyed at least partially underneath the support plane A at the first storage chamber 29 into the part of the storage compartment 25 inside the second circumferential wall 28. The input channel 33 continues downstream of the underpass 34 in the feeding direction F up to the input position B.
As shown in figures 3, 4 and 5, the handling system 3 further comprises a laying device 4 that is arranged for receiving the long-length cable 9 from the input member 30 and for laying the long-length cable 9 in a plurality of windings along a loop-shaped laying path P inside the first storage chamber 29. In particular, the laying device 4 is movable through the first storage chamber 29 along said loop-shaped laying path P in a first laying direction DI parallel to the longitudinal direction L along the port side 23 and in a second laying direction D2 opposite to the first laying direction DI along the starboard side 24. The laying device 4 is arranged to be moved along the loop-shaped laying path P at a laying speed V2 that is equal or substantially equal to the input speed VI.
The loop-shaped laying path P comprises a first straight section Pl extending parallel to the longitudinal direction L along the port side 23, a second straight section P2 extending parallel to the longitudinal direction L along the starboard side 24 and a first corner section P3 and a second corner section P4 connecting the first straight section Pl to the second straight section P2 at the bow 21 and the stern 22, respectively, of the vessel 2. The first corner section P3 and the second corner section P4 are semicircular or one-hundred-and-eighty degree arcs. The first straight section Pl and the second straight section P2 preferably extend over at least fifty meters, most preferably over at least seventy-five meters. Hence, the long-length cable 9 can be wound inside the storage chamber 25 along the loop-shaped laying path P with relatively long windings extending straight along a substantial part of the port side 23 and the starboard side 24 of the vessel 2. In particular, each winding may store a length of the long-length cable 9 of at least one-hundred meters, preferably at least two-hundred meters and most preferably at least two-hundred-and-fifty meters.
As best seen in figure 8, the laying device 4 comprises a base 40 and a head 41 that is rotatable with respect to said base 40 about an upright or vertical rotation axis R. The laying device 4 is provided with an output member 42 at the head 41 for laying the long-length cable 9 in the storage compartment 25 along the loop-shaped laying path P. The head 41 is arranged to be rotated about the rotation axis R when transitioning from the first laying direction DI to the second laying direction D2 at the first corner section P3 between figures 3 and 4 and when transitioning from the second laying direction D2 to the first laying direction DI at the second corner section P4. During said rotation, the head 41 is rotated over onehundred-and-eighty degrees to move the output member 42 from one straight section Pl, P2 to the other straight section Pl, P2 at the respective corner section P3, P4 while the output member 42 follows the loop-shaped laying path P.
As best seen in figure 8, the output member 42 comprises a laying arm 43 with an output nozzle 44 at the distal end thereof to lay the long-length cable 9 into the storage compartment 25 along the loop-shaped laying path P. The laying arm 43 has an arc that allows for tangentially laying the long-length cable 9 into the storage compartment 25, parallel to the support plane A. The laying arm 43 is swivable about a laying axis T for adjusting the output position B laterally with respect to the loop-shaped laying path P with each winding, e.g. in a direction towards or away from the center of the storage compartment 25. In particular, during inside-out laying of the long-length cable 9, the laying arm 43 is swiveled about the laying axis T from the second circumferential wall 28 towards the first circumferential wall 27 with increments that correspond to the thickness of the long-length cable 9. Similarly, during outside-in laying of the long-length cable 9, the laying arm 43 is swiveled about the laying axis T from the first circumferential wall 27 towards the second circumferential wall 28 with similar increments. In this manner, the long-length cable 9 can be accurately laid into the storage compartment 25 in stacked layers of sideby-side windings.
To facilitate the stacking of the layers, as shown in figure 8, the head 41 is liftable with respect to the base 40 in a lifting direction Y parallel to the rotation axis R, e.g. with the use of pistons. After a layer has been completed, the head 41 is lifted over a distance that is equal to the thickness of a layer to stack another layer on top of the previously completed layer. The head 41 is liftable to such an extent that the full height H of the first storage compartment 29 between the first circumferential wall 27 and the second circumferential wall 28 can be filled, thereby fully utilizing the capacity of the first storage chamber 29.
As shown in figures 6 and 7, the handling system 3 comprises a first cable guide 6 for accumulating a length of the long-length cable 9 between the input position B and the output position C. The first cable guide 6 is arranged for guiding said accumulated length along a first guide path that is variable in shape to keep the length between the input position B and the output position C constant or substantially constant. More in particular, the first cable guide 6 is arranged for doubling back at least a part of the accumulated length of the long-length cable 9 in a return direction E opposite to the feeding direction F when the laying device 4 is upstream of the input position B in the feeding direction F. The input position B is preferably located half-way along the loop-shaped laying path P in the feeding direction F. Hence, the accumulated length of the long-length cable 9 can be doubled back along at least half of the loop-shaped laying path P.
Note that while the first cable guide 6 accumulates a constant length of the long-length cable 9, said long-length cable 9 is continuously fed via the input member 30 at the input speed VI through the input position B, through the first cable guide 6 along the first guide path, through the laying device 4 and out of the output member 42 at the output position C into the first storage chamber 29. Hence, although the accumulated length of the long-length cable 9 may be kept constant, the long-length cable 9 itself is continuously moving relative to the first cable guide 6.
The first cable guide 6 comprises a plurality of interlinked segments 60 that are movable with respect to each other to define the first guide path. Preferably, the first cable guide 6 is a cable carrier, preferably a chainstyle cable carrier. The interlinked segments 60 have a limited freedom of rotation with respect to each other, so that the interlinked segments 60 can only form an arc with a minimum radius of at least two meters. This can prevent that the long-length cable 9 is bend beyond its minimum bending radius .
The first cable guide 6 is arranged for forming a first variably arcuate section 61 in the first guide path. Said first variably arcuate section 61 is arranged for directing the long-length cable 9 from the feeding direction F into a first guide direction KI towards the laying device 4. The first variably arcuate section 61 can be shaped and/or rolled-up into an arc of up to onehundred-and-eighty degrees such that the first guide direction KI is opposite to the feeding direction F. As best seen in figure 7, the handling system 3 is provided with a plurality of guide supports 65 for supporting the first cable guide 6, preferably at regular intervals, with respect to the vessel 2 when a considerable part of the accumulated length of the long-length cable 9 is doubled back in said first guide direction KI. Hence, the weight of the first cable guide 6 and the long-length cable 9 carried therein can be reliably supported along the entire first guide path.
As shown in figure 6 and 7, the laying device 4 is provided with a second cable guide 7 at the head 41 that is arranged for receiving the long-length cable 9 from the first cable guide 6 in a second guide direction K2 along a second guide path into a third guide direction K3 towards the output member 42. The second cable guide 7 rotates together with the head 41 about the upright or vertical rotation axis R to direct the long-length cable 9 towards the output member 42 as the laying device 4 is moved along the loop-shaped laying path P. As best seen in figure 8, the second guide direction K2 is directed away from the output member 42. In this exemplary embodiment, the laying device 4 is arranged to extend upright or vertical from the storage compartment 25. As such, the second guide direction K2 is upwards and the third guide direction K3 is downwards. The second cable guide 7 extends over an arc of at least one-hundred-and-eighty degrees from the upward second guide direction K2 to the downward third guide direction K3.
The second guide direction K2 is different from the first guide direction KI defined by the first variably arcuate section 61 of the first cable guide 6. The first cable guide 6 is therefore arranged for forming a second variably arcuate section 62 in the first guide path that is arranged for directing the long-length cable 9 from first guide direction KI into said second guide direction K2 towards and into the laying device 4. Hence, the longlength cable 9 can be fed tangentially from the input position B through the first guide member 6 into the second guide member 7.
Like the first cable guide 6, the second cable guide 7 comprises a plurality of interlinked segments 70 that are movable with respect to each other to define the second guide path. Preferably, the second cable guide 7 is a cable carrier, preferably a chain-style cable carrier. The interlinked segments 70 have a limited freedom of rotation with respect to each other, so that the interlinked segments 70 can only form an arc with a minimum radius of at least two meters. This can prevent that the long-length cable 9 is bend beyond its minimum bending radius .
In figures 6, 7 and 8, the laying device 4 is shown in an active upright position in which a considerable part of the laying device 4 extends above and/or protrudes upwards from the storage compartment 2 5 to above the deck of the vessel 2. In this active upright position, the vessel 2 may not be able to pass under some lower bridges. Hence, the head 41 is foldable with respect to the base 40 member about a horizontal folding axis M from the active upright position, as shown in figures 6, 7 and 8, into an inactive transport position as shown in figure 10. The folding axis M may extend parallel to the feeding direction F, in which case the head 41 is folded down in a lateral direction with respect to the longitudinal direction L of the vessel 2, or perpendicular to the feeding direction F, in which case the head 41 is folded down in the longitudinal direction L.
As shown in figure 8, the laying device 4 further comprises a pulling member 45 for pulling the long-length cable 9 through the laying device 4 towards the output member 42 at a pulling speed V3. The handling system 3 comprises a control unit 8 for controlling the pulling speed V3 of the pulling member 45. In particular, the control unit 8 is arranged for controlling the laying speed V2 and/or the pulling speed V3 such that the pulling speed V3 is smaller than the laying speed V2 during inside-out laying of the long-length cable 9 to pull consecutive windings of the long-length cable 9 tightly against each other, in particular at the corner sections P3, P4 of the loop-shaped laying path P. Similarly, the control unit 8 is arranged for controlling the laying speed V2 and/or the pulling speed V3 such that the pulling speed V3 is larger than the laying speed VI during outside-in laying of the long-length cable 9 to push consecutive windings of the long-length cable 9 tightly against each other, in particular at the corner sections P3, P4 of the loop-shaped laying path P.
A method for handling a long-length cable 9 on the previously discussed vessel 2, using the aforementioned handling system 3, will be elucidated below with reference to figures 1-8.
Figure 1 shows the situation in which the longlength cable 9 is being manufactured in the factory 1 and is subsequently fed by a feeding system from the factory 1 to the vessel 2. At the vessel 2, the input member 30 of the handling system 3 receives the long-length cable 9 from the factory 1 of the vessel and guides it into in the manner as the storage compartment 25 described before .
As shown cable 9 is compartment situation is fed by at and 6, the long-length into the in figures the input member input position B. In figure shown in which the laying device 4 has storage
3, the already laid two windings of the long-length cable 9 into the first storage compartment 29 along the loop-shaped storage path P and has started to lay a third winding of the long-length cable 9 on the outside of the previously laid windings of the same long-length cable 9. In figure 3, the laying device 4 has just moved through the second corner section P4 of the loop-shaped laying path P and is now ready to move at the laying speed V2 in the first laying direction DI along the first straight section Pl at the portside 23 of the vessel 2. As the laying device 4 moves in the first laying direction DI towards and beyond the input position B, the first cable guide 6 doubles back the long-length cable 9 in the return direction R opposite to the feeding direction F to keep the accumulated length of the longlength cable 9 between the stationary input position B and the continuously moving output position C constant.
Figures 4 and 7 shows the situation in which the laying device 4 has completed laying the third winding of the long-length cable 9. The head 41 of the laying device 4 has been rotated about the rotation axis R through the first corner section P3 and is now ready to move in the second laying direction D2 along the second straight section P2 at the starboard side 24 of the vessel 3. The doubled back length of the long-length cable 9 in the first cable guide 6 is now gradually rolled back in the feeding direction F, again to keep the accumulated length of the long-length cable 9 between the stationary input position B and the continuously moving output position C constant.
Figure 5 shows the situation after a first layer of windings of the long-length cable 9 has been completed and the laying device 4 has started a new layer of windings of the long-length cable 9 on top of the previously completed windings. For this purpose, the laying device 4 has been lifted in the lifting direction Y as shown in figure 7. This process can be continued until the first storage chamber 29 is completely filled.
Figure 9 shows an alternative vessel 102 according to a second embodiment of the invention. The alternative vessel 102 differs from the previously discussed vessel 2 in that the circumferential walls 127, 128 that form the first storage compartment 129 are not parallel. Instead, they are spaced apart further at near the bottom wall 126 than at the top. Hence, the alternative first storage chamber 129 is wider at or near the bottom wall 126 than at the top. This allows for more side-by-side windings of the long-length cable 9 towards the bottom, thereby increasing the capacity of the first storage chamber 129.
Figure 9 further shows an alternative handling system 103 according to a second embodiment of the invention that can be applied individually or together with the aforementioned alternative first storage compartment 129. The alternative handling system 103 differs from the previously discussed handling system 3 in that the second cable guide 107 of the laying device 104 follows a second guide path that includes a freefall section 171 directly upstream of the output member 140. In said freefall section 171 the second guide path extends vertical or substantially vertical, preferably over at least three meters, most preferably over at least five meters, to allow the longlength cable 9 to relax tension, e.g. torsion and/or twists in the long-length cable 9 prior to the laying at the output position C.
Figure 11 shows a further alternative vessel 202 according to a third embodiment of the invention. The further alternative vessel 202 differs from the vessel 2 according to the first embodiment of the invention only in that it is provided with a third circumferential wall 228 in the storage compartment 25. Said third circumferential wall 228 is spaced apart from of the second circumferential and extending on the inside wall 28 to define a second loop-shaped storage chamber alternative loop-shaped shaped laying path P chamber 29.
The second
229 be used to store an laying in the path first loop-shaped additional shown). slightly
The radius of said second smaller than the radius extending along an Z adjacent to looploop-shaped storage storage chamber 229 can long-length cable (not storage chamber 229 is of the first storage chamber 29 at the corner sections P3, P4. Hence, the second storage chamber 229 would probably be used for thinner cables that can bend to smaller radii.
The vessel 2 may comprises means for performing post-loading tests, such as time domain reflector (TDR) and/or optical time domain reflector (OTDR) measurements on the loaded long-length cable 9. The vessel 2 may further comprises electronic means to further measure, log and/or control various parameters, such as - but not limited to input speed VI, pulling speed V2, laying speed V3, temperature and acceleration or deceleration of the vessel 2 as a whole.
It is to be understood that the above description is included to illustrate the operation of the preferred embodiments and is not meant to limit the scope of the invention. From the above discussion, many variations will be apparent to one skilled in the art that would yet be encompassed by the scope of the present invention.
In summary, the invention relates to a handling system, a vessel and a method for handling a cable on said vessel. The vessel comprises a hull that defines an elongated storage compartment. The handling system comprises an input member for receiving the cable onto the vessel and for feeding the cable into the storage compartment at an input position, a laying device that is movable along a loop-shaped laying path, an output member that is arranged for laying the cable inside the storage compartment at an output position and a first cable guide for accumulating a length of the cable between the input position and the output position, wherein the first cable guide is arranged for guiding said accumulated length of the cable along a first guide path that is variable in shape to keep the length of the cable between the input position and the output position constant or substantially constant.

Claims (35)

CONCLUSIESCONCLUSIONS 1 of1 or 1. Hanteersysteem kabel met een lange lengte vaartuig een romp omvat met een bakboordzijde en een langsrichting uitstrekken, opslagcompartiment bepaalt, invoerdeel omvat voor het voor het hanteren van een op een vaartuig, waarbij het een boeg, een achtersteven en stuurboordzijde tussen de die zich in een waarbij boeg en de de achtersteven romp waarbij het een en voor het toevoeren met de van de bij verder langs een een het opslagcompartiment invoerpositie, waarbij leginrichting omvat een lusvormige legbaan door in een het die het aan langgerekt hanteersysteem een ontvangen van de kabel lange lengte op het vaartuig kabel met de lange lengte in toevoerrichting hanteersysteem beweegbaar is opslagcompartiment in een eerste legrichting evenwijdig de langsrichting langs de bakboordzijde en in een tweede legrichting tegengesteld aan stuurboordzijde, waarbij de omvat dat is ingericht voor lange lengte uitvoerpositie wanneer de binnen het die beweegt leginrichting hanteersysteem verder het accumuleren van ( lengte waarbij geleiden lange is in de eerste legrichting langs de leginrichting een uitvoerdeel het leggen van de kabel met de opslagcompartiment langs de lusvormige bewogen wordt, waarbij een eerste kabelgeleiding omvat een lengte van de kabel met de invoerpositie en kabelgeleiding is van de geaccumuleerde lengte langs een eerste vorm teneinde de lengte tussen de invoerpositie tussen de de eerste lengte geleidingsbaan de kabel van lengte constant of in hoofdzaak constant te bij een legbaan het voor lange de uitvoerpositie, ingericht voor het van de kabel met de die variabel met de lange en de uitvoerpositie houden.A handling system cable with a long-length vessel comprising a hull with a port side and extending in a longitudinal direction, defining a storage compartment, and comprising an input part for handling a vessel, a bow, a stern and a starboard side between those one in which the bow and the stern hull in which the feed-in with the of the bee further along a storage compartment input position, wherein the laying device comprises a loop-shaped lay-through in an elongated handling system receiving the cable long length on the vessel cable with the long length feed system handling system, the storage compartment is movable in a first laying direction parallel to the longitudinal direction along the port side and in a second laying direction opposite to starboard side, the comprising being arranged for a long-length output position when the laying device moves within it handling system further the battery mulation of (length at which guide is long in the first laying direction along the laying device) an output part laying of the cable with the storage compartment is moved along the loop-shaped, wherein a first cable guide comprises a length of the cable with the input position and cable guide is of the accumulated length along a first form in order to increase the length between the input position between the first length guide path and the cable of length constant or substantially constant at a laying track for the long output position, arranged for connecting the cable with the variable variable with the long and hold the output position. 2, onderling elkaar die ten opzichte van de eerste geleidingsbaan te conclusies, kabeldrager kettingtype.2, mutually each other that to claim with respect to the first guideway, cable carrier chain type. 2. Hanteersysteem volgens conclusie 1, waarbij de eerste kabelgeleiding is ingericht voor het laten terugkeren van ten minste een gedeelte van de geaccumuleerde lengte van de kabel met de lange lengte in een terugkeerrichting tegengesteld aan de toevoerrichting leginrichting stroomopwaarts is in de toevoerrichting.The handling system of claim 1, wherein the first cable guide is adapted to return at least a portion of the accumulated length of the cable with the long length in a return direction opposite to the feed direction laying device upstream in the feed direction. Hanteersysteem volgens conclusie waarbij de eerste kabelgeleiding een meervoud van geschakelde beweegbaar bepalen.Handling system according to claim wherein the first cable guide defines a plurality of switched movably. 3.3. segmenten omvat zijn teneinde van desegments are included in order to 4.4. wanneer de invoerpositiewhen the input position 5.5. Hanteersysteem waarbij is, bij de volgens eerste voorkeur een één der voorgaande kabelgeleiding kabeldrager van een hetHandling system in which, according to first preference, one of the foregoing cable guides is a cable carrier of a cable Hanteersysteem volgens waarbij de één der voorgaande toevoerrichting evenwijdig of in conclusies, hoofdzaak evenwijdig aan de langsrichting is.Handling system according to which the one of the preceding feed directions is parallel or in claims, substantially parallel to the longitudinal direction. 6. Hanteersysteem volgens één der voorgaande conclusies, waarbij de invoerpositie halverwege langs de lusvormige legbaan is in de toevoerrichting.A handling system according to any one of the preceding claims, wherein the input position is halfway along the loop-shaped shelf in the feed direction. 7. Hanteersysteem volgens één der conclusies, waarbij de eerste kabelgeleiding is voor het vormen van een eerste variabel gekromde de eerste geleidingsbaan die is ingericht voor het richten van de kabel met de lange lengte vanuit de toevoerrichting voorgaande ingericht sectie in tot in een eerste geleidingsrichting in de richting van de leginrichting.A handling system according to any one of the claims, wherein the first cable guide is for forming a first variably curved the first guide track adapted to direct the cable with the long length from the feed direction arranged section into a first guide direction in the direction of the laying device. 8. Hanteersysteem volgens conclusie 7, waarbij de leginrichting is ingericht voor het ontvangen van de kabel met de lange lengte vanuit de eerste kabelgeleiding in een tweede geleidingsrichting, waarbij de eerste kabelgeleiding is ingericht voor het vormen van een tweede variabel gekromde sectie in de eerste geleidingsbaan die is ingericht voor het richten van de kabel met de lange lengte vanuit de eerste geleidingsrichting tot in de tweede geleidingsrichting.The handling system of claim 7, wherein the laying device is adapted to receive the long-length cable from the first cable guide in a second guide direction, the first cable guide being adapted to form a second variably curved section in the first guide path which is adapted to direct the cable with the long length from the first guiding direction to the second guiding direction. 9. Hanteersysteem volgens conclusie 8, waarbij de tweede geleidingsrichting afgericht is van het uitvoerdeel, waarbij de leginrichting een tweede kabelgeleiding omvat voor het geleiden van de kabel met de lange lengte langs een tweede geleidingsbaan vanuit de tweede geleidingsrichting tot in een derde geleidingsrichting in de richting van het uitvoerdeel.The handling system according to claim 8, wherein the second guiding direction is directed away from the output part, wherein the laying device comprises a second cable guide for guiding the long-length cable along a second guide path from the second guide direction to a third guide direction in the direction of the export part. 10. Hanteersysteem volgens conclusie 9, waarbij de leginrichting is ingericht teneinde zich opstaand of verticaal uit te strekken vanuit het opslagcompartiment, waarbij de tweede geleidingsrichting opwaarts is en de derde geleidingsrichting neerwaarts is.The handling system of claim 9, wherein the laying device is arranged to extend vertically or vertically from the storage compartment, wherein the second guiding direction is upward and the third guiding direction is downward. 11. Hanteersysteem volgens conclusie 10, waarbij de tweede geleidingsbaan een vrije val sectie omvat direct stroomopwaarts van het uitvoerdeel waarin de tweede geleidingsbaan zich verticaal of in hoofdzaak verticaal uitstrekt.The handling system of claim 10, wherein the second guide track comprises a free fall section directly upstream of the output part wherein the second guide track extends vertically or substantially vertically. 12. Hanteersysteem volgens één der conclusies 911, waarbij de tweede kabelgeleiding een meervoud van onderling geschakelde segmenten omvat die ten opzichte van elkaar beweegbaar zijn teneinde de tweede geleidingsbaan te bepalen.The handling system of any one of claims 911, wherein the second cable guide comprises a plurality of mutually interconnected segments that are movable relative to each other to determine the second guide path. 13. Hanteersysteem volgens één der voorgaande conclusies, waarbij de leginrichting een basis en een kop omvat die roteerbaar is ten opzichte van de basis rond een opstaande of verticale rotatiehartlijn, waarbij het uitvoerdeel is verschaft aan en roteerbaar samen met de kop, waarbij de kop is ingericht teneinde geroteerd te worden wanneer wordt overgegaan van de eerste legrichting naar de tweede legrichting en wanneer wordt overgegaan van de tweede legrichting naar de eerste legrichting.A handling system according to any one of the preceding claims, wherein the laying device comprises a base and a head that is rotatable relative to the base about an upright or vertical axis of rotation, wherein the output part is provided to and rotatable together with the head, the head being arranged to be rotated when switching from the first laying direction to the second laying direction and when switching from the second laying direction to the first laying direction. 14. Hanteersysteem volgens conclusie 13, waarbij de kop hefbaar is ten opzichte van de basis in een hefrichting evenwijdig aan de opstaande of verticale rotatiehartlij n.The handling system of claim 13, wherein the head is liftable with respect to the base in a lifting direction parallel to the upright or vertical axis of rotation. 15. Hanteersysteem volgens conclusie 13 of 14, waarbij het uitvoerdeel is voorzien van een legarm met een uitvoermondstuk aan het distale uiteinde daarvan teneinde de kabel met de lange lengte in het opslagcompartiment te leggen langs de lusvormige legbaan, waarbij de legarm zwenkbaar is rond een leghartlijn voor het lateraal aanpassen van de uitvoerpositie ten opzichte van de lusvormige legbaan met elke wikkeling van de kabel met de lange lengte.The handling system according to claim 13 or 14, wherein the output part is provided with a laying arm with an output nozzle at the distal end thereof for laying the long-length cable in the storage compartment along the loop-shaped laying track, the laying arm being pivotable around a laying axis for laterally adjusting the output position with respect to the loop-shaped shelf with each winding of the long-length cable. 16. Hanteersysteem volgens één der conclusies 1315, waarbij de kop vouwbaar is ten opzichte van de basis rond een horizontale vouwhartlijn vanuit een actieve opstaande positie tot in een inactieve transportpositie.The handling system of any one of claims 1315, wherein the head is foldable with respect to the base about a horizontal folding axis from an active upright position to an inactive transport position. 17. Hanteersysteem volgens één der voorgaande conclusies, waarbij de leginrichting is ingericht teneinde bewogen te worden langs de lusvormige legbaan op een legsnelheid, waarbij de leginrichting een trekdeel omvat voor het trekken van de kabel met de lange lengte door de leginrichting in de richting van het uitvoerdeel op een treksnelheid, waarbij het hanteersysteem een regeleenheid omvat voor het regelen van de treksnelheid van het trekdeel ten opzichte van de legsnelheid van de leginrichting.A handling system according to any one of the preceding claims, wherein the laying device is arranged to be moved along the loop-shaped laying track at a laying speed, the laying device comprising a pulling part for pulling the long-length cable through the laying device in the direction of the laying device. output part at a pulling speed, wherein the handling system comprises a control unit for controlling the pulling speed of the pulling part relative to the laying speed of the laying device. 18. Hanteersysteem volgens conclusie 17, waarbij de regeleenheid is ingericht voor het regelen van de treksnelheid naar een snelheid kleiner dan de legsnelheid gedurende van binnen naar buiten leggen van de kabel met de lange lengte.The handling system according to claim 17, wherein the control unit is adapted to control the pulling speed to a speed smaller than the laying speed during the long-length laying of the cable from the inside to the outside. 19. Hanteersysteem volgens conclusie 17 of 18, waarbij de regeleenheid is ingericht voor het regelen van de treksnelheid naar een snelheid hoger dan de legsnelheid gedurende het van buiten naar binnen leggen van de kabel met de lange lengte.The handling system according to claim 17 or 18, wherein the control unit is adapted to control the pulling speed to a speed higher than the laying speed during the long-length laying of the cable from the outside to the inside. 20. Hanteersysteem volgens één der voorgaande conclusies, waarbij het invoerdeel een balk omvat die is ingericht teneinde geplaatst te worden bij de boeg of de achtersteven van het vaartuig en die is ingericht teneinde zwenkbaar te zijn rond een opstaande of verticale zwenkhartlijn tussen een eerste laadoriëntatie evenwijdig aan de toevoerrichting, een tweede laadoriëntatie dwars en/of loodrecht op de toevoerrichting en elke laadoriëntatie daartussen.A handling system according to any one of the preceding claims, wherein the input part comprises a beam which is arranged to be placed at the bow or stern of the vessel and which is arranged to be pivotable around an upright or vertical pivot axis between a first loading orientation parallel at the feed direction, a second load orientation transverse and / or perpendicular to the feed direction and each load orientation therebetween. 21. Hanteersysteem volgens één der voorgaande conclusies, waarbij de kabel met de lange lengte toegevoerd wordt op het vaartuig via het invoerdeel op een invoersnelheid, waarbij het invoerdeel een dansrol omvat voor het meten van de invoersnelheid.A handling system according to any one of the preceding claims, wherein the long-length cable is supplied to the vessel via the input part at an input speed, the input part comprising a dance roll for measuring the input speed. 22. Hanteersysteem volgens één der voorgaande conclusies, waarbij het uitvoerdeel van de leginrichting is ingericht voor het trekken van de kabel met de lange lengte uit het opslagcompartiment en waarbij het invoerdeel is ingericht voor het afgeven van de kabel met de lange lengte gedurende een uitlaadmodus van het hanteersysteem.A handling system according to any one of the preceding claims, wherein the output part of the laying device is adapted to pull the cable with the long length out of the storage compartment and wherein the input part is arranged to dispense the cable with the long length during a discharge mode of the handling system. 23. Vaartuig, in het bijzonder een kabelduwbak, omvattend het hanteersysteem volgens één der voorgaande conclusies, waarbij het vaartuig een romp omvat met een boeg, een achtersteven en een bakboordzijde en een stuurboordzijde die zich uitstrekken in een langsrichting tussen de boeg en de achtersteven, waarbij de romp een langgerekt opslagcompartiment bepaalt.A vessel, in particular a cable push box, comprising the handling system according to any one of the preceding claims, wherein the vessel comprises a hull with a bow, a stern and a port side and a starboard side that extend in a longitudinal direction between the bow and the stern, wherein the hull defines an elongated storage compartment. 24. Vaartuig volgens conclusie 23, waarbij de lusvormige legbaan een eerste rechte sectie omvat die zich uitstrekt evenwijdig aan de langsrichting langs de bakboordzijde, een tweede rechte sectie die zich uitstrekt evenwijdig aan de langsrichting langs de stuurboordzijde en een eerste hoek sectie en een tweede hoeksectie die de eerste rechte sectie en de tweede rechte sectie bij respectievelijk de boeg en de achtersteven van het vaartuig verbinden.A vessel according to claim 23, wherein the loop-shaped shelf comprises a first straight section extending parallel to the longitudinal direction along the port side, a second straight section extending parallel to the longitudinal direction along the starboard side and a first corner section and a second corner section connecting the first straight section and the second straight section at the bow and stern of the vessel, respectively. 25. Vaartuig volgens conclusie 24, waarbij de leginrichting een basis en een kop omvat die roteerbaar is ten opzichte van de basis rond een verticale rotatiehartlijn, waarbij de rotatiehartlijn gelegen is bij het midden tussen de eerste rechte sectie en de tweede rechte sectie.The vessel of claim 24, wherein the laying device comprises a base and a head rotatable relative to the base about a vertical axis of rotation, the axis of rotation being located at the center between the first straight section and the second straight section. 26. Vaartuig volgens conclusie 24 of 25, waarbij de eerste hoek sectie en de tweede hoek sectie halfcirkelvormige bogen zijn.The vessel of claim 24 or 25, wherein the first corner section and the second corner section are semicircular arcs. 27. Vaartuig volgens één der conclusies 24-26, waarbij de eerste rechte sectie en de tweede rechte sectie zich over ten minste vijftig meter uitstrekken.27. Vessel as claimed in any of the claims 24-26, wherein the first straight section and the second straight section extend over at least fifty meters. 28. Vaartuig volgens één der conclusies 23-27, waarbij het opslagcompartiment een bodemwand omvat dat een ondersteuningsvlak bepaalt voor het ontvangen van de kabel met de lange lengte in een meervoud van naast elkaar gelegen wikkelingen langs de lusvormige legbaan, een eerste omtrekswand en een tweede omtrekswand die opstaan vanaf de bodemwand en die zich uitstrekken aan respectievelijk de buitenzijde en de binnenzijde van de lusvormige legbaan, teneinde een eerste lusvormige opslagkamer te vormen voor het bevatten van het meervoud van naast elkaar gelegen wikkelingen langs de lusvormige legbaanA vessel according to any of claims 23-27, wherein the storage compartment comprises a bottom wall defining a support surface for receiving the long-length cable in a plurality of adjacent windings along the loop-shaped shelf, a first circumferential wall and a second circumferential wall rising from the bottom wall and extending on the outside and the inside of the loop-shaped web, respectively, to form a first loop-shaped storage chamber for containing the plurality of adjacent turns along the loop-shaped web 29. Vaartuig volgens conclusie 28, waarbij de eerste omtrekswand en de tweede omtrekswand een hoogte hebben ten opzichte van het ondersteuningsvlak van ten minste drie meter en bij voorkeur ten minste vier meter voor het ontvangen van een meervoud van lagen van de naast elkaar gelegen wikkelingen van de kabel met de lange lengte binnen de hoogte.The vessel of claim 28, wherein the first circumferential wall and the second circumferential wall have a height of at least three meters with respect to the supporting surface and preferably at least four meters for receiving a plurality of layers of the adjacent windings of the cable with the long length within the height. 30. Vaartuig volgens conclusie 28 of 29, waarbij de eerste lusvormige opslagkamer breder is bij de bodem dan bij de bovenzijde.30. Vessel according to claim 28 or 29, wherein the first loop-shaped storage chamber is wider at the bottom than at the top. 31. Vaartuig volgens één der conclusies 28-30, waarbij het opslagcompartiment een derde omtrekswand omvat die op afstand gelegen is van en zich uitstrekt aan de binnenzijde van de tweede omtrekswand teneinde een tweede lusvormige opslagkamer te vormen.The vessel of any one of claims 28-30, wherein the storage compartment comprises a third peripheral wall that is spaced from and extends on the inside of the second peripheral wall to form a second loop-shaped storage chamber. 32. Vaartuig volgens één der conclusies 28-31, waarbij het invoerdeel is ingericht voor het ontvangen van de kabel met de lange lengte op het vaartuig aan de buitenzijde van de eerste omtrekswand, waarbij het invoerdeel een onderdoorgang omvat die zich uitstrekt vanaf boven het ondersteuningsvlak aan de buitenzijde van de eerste omtrekswand, onder het ondersteuningsvlak tussen de eerste omtrekswand en de tweede omtrekswand naar boven het ondersteuningsvlak aan de binnenzijde van de tweede omtrekswand, waarbij het invoerdeel is ingericht teneinde de kabel met de lange lengte door de onderdoorgang te transporteren tot in het opslagcompartiment.A vessel according to any of claims 28-31, wherein the input portion is adapted to receive the long-length cable on the vessel on the outside of the first circumferential wall, the input portion comprising an underpass extending from above the support surface on the outside of the first circumferential wall, below the supporting surface between the first circumferential wall and the second circumferential wall, above the supporting surface on the inside of the second circumferential wall, the input part being adapted to transport the long-length cable through the underpass the storage compartment. 33. Werkwijze voor het hanteren van een kabel met een lange lengte op een vaartuig volgens één der conclusies 23-32, waarbij de werkwijze de stappen omvat van:A method for handling a long-length cable on a vessel according to any of claims 23-32, wherein the method comprises the steps of: het ontvangen van de kabel met de lange lengte op het vaartuig door het invoerdeel en het toevoeren van de kabel met de lange lengte met het invoerdeel tot in het opslagcompartiment bij een invoerpositie;receiving the long-length cable on the vessel through the input portion and feeding the long-length cable with the input portion into the storage compartment at an input position; het bewegen van de leginrichting langs de lusvormige legbaan door het opslagcompartiment terwijl het uitvoerdeel gebruikt wordt teneinde de kabel met de lange lengte binnen het opslagcompartiment te leggen bij de uitvoerpositie, waarbij de uitvoerpositie langs de lusvormige legbaan beweegt wanneer de leginrichting wordt bewogen;moving the laying device along the looped web through the storage compartment while the output member is used to lay the long-length cable within the storage compartment at the output position, the output position moving along the looped web when the laying device is moved; het gebruiken van de eerste kabelgeleiding voor het accumuleren van een lengte van de kabel met de lange lengte tussen de invoerpositie en de uitvoerpositie en voor het geleiden van de geaccumuleerde lengte van de kabel met de lange lengte langs de eerste geleidingsbaan; en het variabel vormen van de eerste geleidingsbaan teneinde de lengte van de kabel met de lange lengte tussen de invoerpositie en de uitvoerpositie constant of in hoofdzaak constant te houden.using the first cable guide to accumulate a length of the cable with the long length between the input position and the output position and to guide the accumulated length of the cable with the long length along the first guide path; and variably forming the first guide track to keep the length of the cable with the long length between the input position and the output position constant or substantially constant. 34. Werkwijze volgens conclusie 33, waarbij de werkwijze de stap omvat van het bewegen van de leginrichting langs de lusvormige legbaan op een legsnelheid, waarbij de leginrichting een trekdeel omvat voor het trekken van de kabel met de lange lengte door de leginrichting in de richting van het uitvoerdeel op een treksnelheid, waarbij de werkwijze verder de stap omvat van het regelen van de treksnelheid naar een snelheid kleiner dan de legsnelheid gedurende het van binnen naar buiten leggen van de kabel met de lange lengte.A method according to claim 33, wherein the method comprises the step of moving the laying device along the loop-shaped laying track at a laying speed, the laying device comprising a pulling part for pulling the long-length cable through the laying device in the direction of the output part at a pulling speed, the method further comprising the step of controlling the pulling speed to a speed less than the laying speed during the long-length laying of the cable from the inside to the outside. 35. Werkwijze volgens conclusie 34, waarbij de werkwijze verder de stap omvat van het regelen van de treksnelheid naar een snelheid hoger dan de legsnelheid gedurende het van buiten naar binnen leggen van de kabel 5 met de lange lengte.The method of claim 34, wherein the method further comprises the step of controlling the pulling speed to a speed higher than the laying speed during the long-length laying of the cable 5 from the outside to the inside. -o-o-o-o-o-o-o-o- ί-o-o-o-o-o-o-o-o- ί LlLl 104104 126126
NL2018215A 2017-01-24 2017-01-24 Handling system, vessel and method for handling a long-length cable on said vessel NL2018215B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
NL2018215A NL2018215B1 (en) 2017-01-24 2017-01-24 Handling system, vessel and method for handling a long-length cable on said vessel
PCT/EP2018/051401 WO2018138036A1 (en) 2017-01-24 2018-01-22 Handling system, vessel and method for handling a long-length cable on said vessel
EP18700601.0A EP3573914B1 (en) 2017-01-24 2018-01-22 Vessel and method for handling a long-length cable on said vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2018215A NL2018215B1 (en) 2017-01-24 2017-01-24 Handling system, vessel and method for handling a long-length cable on said vessel

Publications (1)

Publication Number Publication Date
NL2018215B1 true NL2018215B1 (en) 2018-08-01

Family

ID=58054483

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2018215A NL2018215B1 (en) 2017-01-24 2017-01-24 Handling system, vessel and method for handling a long-length cable on said vessel

Country Status (3)

Country Link
EP (1) EP3573914B1 (en)
NL (1) NL2018215B1 (en)
WO (1) WO2018138036A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113697590A (en) * 2021-09-13 2021-11-26 江苏亨通海洋光网系统有限公司 Device for large-length sea cable delivery

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110539853A (en) * 2019-09-11 2019-12-06 北京海瑞兴能源科技有限责任公司 Cable laying ship deck arrangement and construction method for laying long-distance sand shores and submarine cables

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB989876A (en) * 1960-07-01 1965-04-22 Western Electric Co Storage apparatus for cable apparatus-housings
US5624207A (en) * 1995-09-13 1997-04-29 Regional Fabricators, Inc. Ocean bottom cable handling system and method of using same
US5902072A (en) * 1995-09-13 1999-05-11 Regional Fabricators, Inc. Modular seismic cable handling system with knockdown container
EP2166380A2 (en) * 2008-09-19 2010-03-24 Optoplan AS Container system for seismic cable and stations
US20140197264A1 (en) * 2013-01-14 2014-07-17 Smart Pipe Company, Inc. Inventive system and methods for coiling in non stress inducing position for continuous pipelines of small and large diameters, reduced in profile or round, for transport and storage and installation
EP2862828A1 (en) * 2013-10-18 2015-04-22 Ondernemingen Jan De Nul, naamloze vennootchap A device for winding up and unwinding a cable and method for winding up a cable

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009018852A1 (en) 2009-04-24 2010-12-02 Nkt Cables Gmbh Arrangement for storing long lengths of a flexible article

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB989876A (en) * 1960-07-01 1965-04-22 Western Electric Co Storage apparatus for cable apparatus-housings
US5624207A (en) * 1995-09-13 1997-04-29 Regional Fabricators, Inc. Ocean bottom cable handling system and method of using same
US5902072A (en) * 1995-09-13 1999-05-11 Regional Fabricators, Inc. Modular seismic cable handling system with knockdown container
EP2166380A2 (en) * 2008-09-19 2010-03-24 Optoplan AS Container system for seismic cable and stations
US20140197264A1 (en) * 2013-01-14 2014-07-17 Smart Pipe Company, Inc. Inventive system and methods for coiling in non stress inducing position for continuous pipelines of small and large diameters, reduced in profile or round, for transport and storage and installation
EP2862828A1 (en) * 2013-10-18 2015-04-22 Ondernemingen Jan De Nul, naamloze vennootchap A device for winding up and unwinding a cable and method for winding up a cable

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113697590A (en) * 2021-09-13 2021-11-26 江苏亨通海洋光网系统有限公司 Device for large-length sea cable delivery

Also Published As

Publication number Publication date
EP3573914B1 (en) 2022-04-20
WO2018138036A1 (en) 2018-08-02
EP3573914A1 (en) 2019-12-04

Similar Documents

Publication Publication Date Title
NL2018215B1 (en) Handling system, vessel and method for handling a long-length cable on said vessel
ES2289398T3 (en) STORAGE DRUM TO STORE DENSELY WELDING WIRE.
DK2622248T3 (en) DEVICE AND PROCEDURE FOR SELECTING AN OBJECTS OF A VESSEL
KR101571939B1 (en) Ship having a deck comprising a cavity with a built-in rotary plate
EP2797830B1 (en) Deep water knuckle boom crane
AU707333B2 (en) Apparatus and method for winding, transporting, and unwinding conveyor belt
KR101335265B1 (en) Pipe supply equipment
DK2529455T3 (en) Injury Prevention in underwater cables and the like elements during laying or picking up
EP1539584B1 (en) Interlacing device for a palletising machine and palletising machine equipped with one such device
CN110352160B (en) Apparatus and method for releasing elongated flexible articles from a ship
US8347592B2 (en) Device for manufacturing sandbags
KR101141599B1 (en) Crane and ship loading thereof
US20120148348A1 (en) System for reeling pipeline
ES2474124T3 (en) Storage and deployment unit for a rolling element and handling procedure for a rolling element
KR102124388B1 (en) Freight distribution cable robot system having a pulley and freight distribution method using it
NL2018179B1 (en) Device and method for reeling in a cable from a source and temporarily storing the cable
RU2057701C1 (en) Device for loading and unloading of packed loads
KR20190123957A (en) Multi cable robot freight distribution system and freight distribution method using it
KR20220037075A (en) Apparatus for supporting fender
AU2009280950A1 (en) Methods and apparatus for transporting chain
EP2540654B1 (en) Ship to shore crane installation with offset cranes
WO1994011287A1 (en) Loading and unloading device for vessels
NL2018963B1 (en) System and method for open water cable laying and repair
NL2024241B1 (en) Vessel and method for offshore cable laying
NL2008834C2 (en) CABLE FOR A WINCH DEVICE, DRUM AND WINCH DEVICE FOR LOWERING AND / OR LIFTING LOADS IN WATER, SHIP PROVIDED THEREOF AND METHOD FOR THAT.