EP3261918B1 - Procédé utilisant un dépôt offshore flottant - Google Patents

Procédé utilisant un dépôt offshore flottant Download PDF

Info

Publication number
EP3261918B1
EP3261918B1 EP16756029.1A EP16756029A EP3261918B1 EP 3261918 B1 EP3261918 B1 EP 3261918B1 EP 16756029 A EP16756029 A EP 16756029A EP 3261918 B1 EP3261918 B1 EP 3261918B1
Authority
EP
European Patent Office
Prior art keywords
tunnel
offshore depot
floatable offshore
floatable
depot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16756029.1A
Other languages
German (de)
English (en)
Other versions
EP3261918A4 (fr
EP3261918A2 (fr
Inventor
Nicolaas Johannes Vandenworm
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jurong Shipyard Pte Ltd
Original Assignee
Jurong Shipyard Pte Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US14/630,576 external-priority patent/US9180941B1/en
Application filed by Jurong Shipyard Pte Ltd filed Critical Jurong Shipyard Pte Ltd
Publication of EP3261918A2 publication Critical patent/EP3261918A2/fr
Publication of EP3261918A4 publication Critical patent/EP3261918A4/fr
Application granted granted Critical
Publication of EP3261918B1 publication Critical patent/EP3261918B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B19/00Arrangements or adaptations of ports, doors, windows, port-holes, or other openings or covers
    • B63B19/08Ports or like openings in vessels' sides or at the vessels' bow or stern
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/04Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with single hull
    • B63B1/041Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with single hull with disk-shaped hull
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/04Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with single hull
    • B63B1/048Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with single hull with hull extending principally vertically
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C1/00Dry-docking of vessels or flying-boats
    • B63C1/02Floating docks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C1/00Dry-docking of vessels or flying-boats
    • B63C1/10Centring devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H25/00Steering; Slowing-down otherwise than by use of propulsive elements; Dynamic anchoring, i.e. positioning vessels by means of main or auxiliary propulsive elements
    • B63H25/42Steering or dynamic anchoring by propulsive elements; Steering or dynamic anchoring by propellers used therefor only; Steering or dynamic anchoring by rudders carrying propellers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B2021/001Mooring bars, yokes, or the like, e.g. comprising articulations on both ends
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/4486Floating storage vessels, other than vessels for hydrocarbon production and storage, e.g. for liquid cargo
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B39/00Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude
    • B63B39/06Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by using foils acting on ambient water
    • B63B2039/067Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by using foils acting on ambient water effecting motion dampening by means of fixed or movable resistance bodies, e.g. by bilge keels

Definitions

  • the present embodiments generally relate to a method using floatable offshore buoyant vessels, platforms, caissons, buoys, spars, or other structures used for supporting offshore oil and gas operations.
  • Stable offshore depots for supporting offshore oil and gas operations are known in the art.
  • Offshore production structures which can be vessels, platforms, caissons, buoys, or spars, for example, each typically, include a buoyant hull that supports a superstructure.
  • the buoyant hull includes internal compartmentalization for ballasting and storage, and the superstructure provides drilling and production equipment, helipads, crew living quarters, and the like.
  • a floating structure is subject to environmental forces of wind, waves, ice, tides, and current. These environmental forces result in accelerations, displacements and oscillatory motions of the structure.
  • the response of a floating structure to such environmental forces is affected not only by its hull design and superstructure, but also by its mooring system and any appendages.
  • a floating structure has several design requirements: Adequate reserve buoyancy to safely support the weight of the superstructure and payload, stability under all conditions, and good seakeeping characteristics. With respect to the good seakeeping requirement, the ability to reduce vertical heave is very desirable. Heave motions can create tension variations in mooring systems, which can cause fatigue and failure. Large heave motions increase danger in launching and recovery of small boats and helicopters and loading and offloading stores and personnel.
  • the seakeeping characteristics of a floatable offshore depot are influenced by a number of factors, including the waterplane area, the hull profile, and the natural period of motion of the floating structure. It is very desirable that the natural period of the floating structure be either significantly greater than or significantly less than the wave periods of the sea in which the structure is located, so as to decouple substantially the motion of the structure from the wave motion.
  • Vessel design involves balancing competing factors to arrive at an optimal solution for a given set of factors. Cost, constructability, survivability, utility, and installation concerns are among many considerations in vessel design. Design parameters of the floating structure include the draft, the waterplane area, the draft rate of change, the location of the center of gravity (“CG”), the location of the center of buoyancy (“CB”), the metacentric height (“GM”), the sail area, and the total mass.
  • Design parameters of the floating structure include the draft, the waterplane area, the draft rate of change, the location of the center of gravity (“CG”), the location of the center of buoyancy (“CB”), the metacentric height (“GM”), the sail area, and the total mass.
  • the total mass includes added mass i.e., the mass of the water around the buoyant hull of the floating structure that is forced to move as the floating structure moves.
  • Appendages connected to the structure of the buoyant hull for increasing added mass are a cost effective way to fine tune structure response and performance characteristics when subjected to the environmental forces.
  • a structure that is symmetric about a vertical axis is generally less subject to yaw forces.
  • wave-induced lateral surge forces also increase.
  • a floating structure may be modeled as a spring with a natural period of motion in the heave and surge directions. The natural period of motion in a particular direction is inversely proportional to the stiffness of the structure in that direction. As the total mass (including added mass) of the structure increases, the natural periods of motion of the structure become longer.
  • tension leg platforms are advantageous, because they have the added benefit of being substantially heave restrained.
  • tension leg platforms are costly structures and, accordingly, are not feasible for use in all situations.
  • Self-stability i.e., stability not dependent on the mooring system
  • Self-stability may be achieved by creating a large waterplane area.
  • the center of buoyancy of the submerged hull shifts to provide a righting moment.
  • the center of gravity may be above the center of buoyancy, the structure can nevertheless remain stable under relatively large angles of heel.
  • the heave seakeeping characteristics of a large waterplane area in the wave zone are generally undesirable.
  • Inherent self-stability is provided when the center of gravity is located below the center of buoyancy.
  • the combined weight of the superstructure, buoyant hull, payload, ballast and other elements may be arranged to lower the center of gravity, but such an arrangement may be difficult to achieve.
  • One method to lower the center of gravity is the addition of fixed ballast below the center of buoyancy to counterbalance the weight of superstructure and payload.
  • Structural fixed ballast such as pig iron, iron ore, and concrete, are placed within or attached to the buoyant hull structure. The advantage of such a ballast arrangement is that stability may be achieved without adverse effect on seakeeping performance due to a large waterplane area.
  • Self-stable structures have the advantage of stability independent of the function of mooring system. Although the heave seakeeping characteristics of self-stabilizing floating structures are generally inferior to those of tendon-based platforms, self-stabilizing structures may nonetheless be preferable in many situations due to higher costs of tendon-based structures.
  • Prior art discloses an offshore platform that employs a retractable center column.
  • the center column is raised above the keel level to allow the platform to be pulled through shallow waters en-route to a deep water installation site.
  • the center column is lowered to extend below the keel level to improve vessel stability by lowering the center of gravity.
  • the center column also provides pitch damping for the structure.
  • the center column adds complexity and cost to the construction of the platform.
  • Drilling and production platforms with a cylindrical hull wherein the structure has a center of gravity located above the center of buoyancy and therefore relies on a large waterplane area for stability, with a concomitant diminished heave seakeeping characteristic.
  • the structure has a circumferential recess formed about the buoyant hull near the keel for pitch and roll damping, the location and profile of such a recess has little effect in dampening heave.
  • a prior art document, US 8869727 discloses a buoyant structure for operationally supporting offshore exploration, drilling, production, and storage installations, wherein the prevention of injuries to personnel from equipment falling off the buoyant structure is by providing a tunnel to contain and protect watercraft for receiving personnel within the buoyant structure.
  • WO 2013022484 discloses an offshore depot having a tunnel that provides a sheltered area inside hull for safe and easy launching/docking of boats and embarkation/debarkation of personnel, as well as a boatlift assembly disposed within the tunnel capable of lifting a boat 1 to 2 meters or more so as to eliminate any heave and roll of the boat with respect to the depot, thereby establishing a safe condition in which to embark and debark passengers.
  • the present embodiments relate to a method using a floatable offshore depot for supporting offshore oil and gas operations.
  • the current method relates to a stable moored floatable offshore depot, such as would be used for safe handling, staging, and transportation of personnel, supplies, boats, and helicopters
  • the embodiments of the method enable safe entry of a watercraft into the floatable offshore depot in both harsh and benign offshore water environments, with 1,22 metres (4 feet) to 12,20 metres (40 feet) seas.
  • the embodiments of the method prevent injuries to personnel from equipment falling off the floatable offshore depot by providing a tunnel to contain and protect watercraft for receiving personnel within the floatable offshore depot.
  • the embodiments of the method provide the floatable offshore depot located in an offshore field that enables a quick exit from the offshore structure by many personnel simultaneously, in the case of an approaching hurricane, tsunami, or any other natural disaster.
  • the embodiments of the method provide a means to quickly transfer many personnel, such as from 200 people to 500 people safely from an adjacent platform on fire to the floatable offshore depot in less than 1 hour.
  • the embodiments of the method enable the floatable offshore structure to be towed to an offshore disaster and operate as a command center to facilitate in the control of a disaster, and can act as a hospital or triage center.
  • the embodiments relate to a method using the floatable offshore depot to provide a sheltered area using a tunnel for safe and easy launching/docking of watercraft and for safe and easy embarkation/debarkation of personnel using an internal dock side of a tunnel.
  • the additional uses of the floatable offshore depot provide a sheltered area using a tunnel for transferring equipment between a watercraft and the floatable offshore depot.
  • the floatable offshore depot can have an internal dock side of tunnel.
  • the floatable offshore depot can have a buoyant hull that can be circular, oval, elliptical, or polygonal.
  • the floatable offshore depot can have: a keel; a main deck; and at least two connected sections between the keel and the main deck.
  • the at least two connected sections can be joined in a series and symmetrical about a vertical axis.
  • the at least two connected sections can extend downwardly from the main deck toward the keel.
  • the connected sections can have at least two of: an upper cylindrical side section, a transition section, and a lower cylindrical section.
  • the tunnel when the floatable offshore depot can be at an operational depth, can have a tunnel opening to an exterior of the buoyant hull.
  • the tunnel can be dimensioned to receive a watercraft.
  • the watercraft can be a ferry, a workboat, a vessel up to 183 metres (600 feet) in length with or without propulsion, such as a barge.
  • the watercraft can also be a submarine.
  • the watercraft can have different buoyant hull shapes, such as catamaran, trimaran, monohull, hovercraft, or even a hydrofoil.
  • the tunnel can receive a dirigible, also known as a ZEPPLIN TM .
  • Figure 1 illustrates the floatable offshore depot 10 for operationally supporting offshore exploration, drilling, production, and storage installations according to one or more embodiments.
  • the floatable offshore depot 10 is shown floating moored to a seabed 312.
  • the floatable offshore depot includes a buoyant hull 12, which can carry a superstructure 13 thereon.
  • the superstructure 13 can include a diverse collection of equipment and structures, such as living quarters for a crew, equipment storage, a heliport, and a myriad of other structures, systems, and equipment, depending on the type of offshore operations to be supported.
  • At least one crane 53 can be mounted to the superstructure 13.
  • the buoyant hull 12 can be moored to the seabed by a plurality of catenary mooring lines 16a-16o.
  • the superstructure 13 is shown supporting at least one take-off and landing surface 54a and 54b.
  • the at least one take-off and landing surface 54a and 54b is shown as a heliport.
  • the superstructure 13 can include an aircraft hangar 50.
  • the aircraft hangar can hold at least one take-off and landing aircraft 400a, 400b, and 400c.
  • a control tower 51 can be built on the superstructure 13.
  • the control tower can have a dynamic positioning system 57.
  • the floatable offshore depot 10 can have a tunnel opening 31 for a tunnel formed in the buoyant hull 12.
  • the tunnel opening 31 can receive water while the floatable offshore depot 10 can be at an operational depth 71.
  • the floatable offshore depot 10 can have at least one closable door 34b.
  • the tunnel can be constructed to provide for selective isolation of said tunnel from said exterior; whereby the tunnel can be operable in either a wet condition or a dry condition while the floatable offshore depot 10 floats in a body of water.
  • the floatable offshore depot 10 can have a unique shape.
  • the buoyant hull 12 of the floatable offshore depot 10 can have a main deck 12a, which can be circular; and a height H. Extending downwardly from the main deck 12a can be an upper frustoconical portion (shown as a combination of components).
  • the upper frustoconical portion can have an upper cylindrical side section 12b.
  • the upper cylindrical side section 12b can extend downwardly from main deck 12a.
  • the floatable offshore depot 10 also can have a lower frustoconical side section 12d extending downwardly from the upper conical section 12c which can flare outwardly. Both the upper conical section 12c and the lower frustoconical side section 12d can be below the operational depth 71.
  • the upper cylindrical side section 12b can connect to a transition section 12g.
  • a lower cylindrical section 12e can extend downwardly from the lower frustoconical side section 12d, which can have a matching keel 12f.
  • the floatable offshore depot 10 can have at least one fin-shaped appendage 84a and 84b.
  • the floatable offshore depot 10 can be configured to transition from a floating orientation having the floating operational depth 71 or a floating transit depth.
  • the floatable offshore depot can be a seagoing vessel.
  • Figure 2 shows that the upper conical section 12c can have a substantially greater vertical height H1 than the lower frustoconical section 12d shown as H2.
  • the upper cylindrical side section 12b can have a slightly greater vertical height H3 than the lower cylindrical section 12e shown as H4.
  • the upper cylindrical side section 12b can connect to transition section 12g so as to provide for a main deck of greater radius than the hull radius and a main deck which can be round, square, or another shape.
  • Transition section 12g can be located above the operational depth 71.
  • a tunnel 30 can have the at least one closable door 34a and 34b that alternatively or in combination, can provide for weather and water protection to the tunnel 30.
  • Fin-shaped appendage 84 can be attached to a lower and an outer portion of the exterior of the buoyant hull.
  • the tunnel 30 can have a plurality of dynamic movable tendering mechanisms 24d and 24h disposed within and connected to tunnel sides.
  • the tunnel can have a tunnel floor 35 that can accept water when the floatable offshore depot can be at the operational depth 71.
  • the tunnel floor 35 enables creation of a dry dock environment within the buoyant hull 12 when the tunnel 30 can be drained of water.
  • the plurality of dynamic movable tendering mechanisms 24d and 24h can be oriented above the tunnel floor 35 and can have portions that can be positioned both above the operational depth 71 and extend below the operational depth 71 inside the tunnel 30.
  • the at least one closable door 34a and 34b can close over the tunnel opening 31.
  • the main deck 12a, the upper cylindrical side section 12b, the transition section 12g, the upper conical section 12c, the lower frustoconical side section 12d, the lower cylindrical section 12e, and the matching keel 12f can be all co-axial with a common vertical axis 100.
  • the buoyant hull 12 can be characterized by an ellipsoidal cross section when taken perpendicular to the vertical axis 100 at any elevation.
  • the dynamic response of the buoyant hull 12 can be independent of wave direction (when neglecting any asymmetries in the mooring system, risers, and underwater appendages), thereby minimizing wave-induced yaw forces.
  • the conical form of the buoyant hull 12 can be structurally efficient, offering a high payload and storage volume per ton of steel when compared to traditional ship-shaped offshore structures.
  • the buoyant hull 12 can have ellipsoidal walls which can be ellipsoidal in radial cross-section, but such shape can be approximated using a large number of flat metal plates rather than bending plates into a desired curvature.
  • an ellipsoidal hull planform is preferred, a polygonal hull planform can be used according to alternative embodiments.
  • the buoyant hull 12 can be circular, oval, or elliptical forming the ellipsoidal planform.
  • An elliptical shape can be advantageous when the floatable offshore depot can be moored closely adjacent to another offshore platform so as to allow gangway passage between the two structures.
  • An elliptical hull can minimize or eliminate wave interference.
  • the specific design of the upper conical section 12c and the lower frustoconical side section 12d generates a significant amount of radiation damping resulting in almost no heave amplification for any wave period, as described below.
  • the upper conical section 12c can be located in the wave zone. At operational depth 71, the waterline can be located on the upper conical section 12c just below the intersection with the upper cylindrical side section 12b.
  • the upper conical section 12c can slope at an angle (a) with respect to the vertical axis 100 from 10 degrees to 15 degrees.
  • the inward flare before reaching the waterline can significantly dampen downward heave, because a downward motion of the buoyant hull 12 increases the waterplane area.
  • the buoyant hull area normal to the vertical axis 100 that breaks the water's surface will increase with downward hull motion, and such increased area can be subject to the opposing resistance of the air and or water interface. It has been found that from 10 degrees to 15 degrees of flare provides a desirable amount of damping of downward heave without sacrificing too much storage volume for the vessel.
  • the lower frustoconical side section 12d dampens upward heave.
  • the lower frustoconical side section 12d can be located below the wave zone (about 30 meters below the waterline). Because the entire lower frustoconical side section 12d can be below the water surface, a greater area (normal to the vertical axis 100) can be desired to achieve upward damping. Accordingly, the first diameter D 1 of the lower hull section can be greater than the second diameter D 2 of the upper conical section 12c.
  • the lower frustoconical side section 12d can slope at an angle (g) with respect to the vertical axis 100 from 55 degrees to 65 degrees.
  • the lower section can flare outwardly at an angle greater than or equal to 55 degrees to provide greater inertia for heave roll and pitch motions.
  • the increased mass contributes to natural periods for heave pitch and roll above the expected wave energy.
  • the upper bound of 65 degrees can be based on avoiding abrupt changes in stability during initial ballasting on installation. That is, the lower frustoconical side section 12d can be perpendicular to the vertical axis 100 and achieve a desired amount of upward heave damping, but such a hull profile would result in an undesirable stepchange in stability during initial ballasting on installation.
  • the connection point between the upper frustoconical portion 14 and the lower frustoconical side section 12d can have a third diameter D 3 smaller than the first diameter D 1 and second diameters D 2 .
  • the floating transit depth 70 represents the waterline of the buoyant hull 12 while it is being transited to an operational offshore position.
  • the floating transit depth is known in the art to reduce the amount of energy required to transit a buoyant vessel across distances on the water by decreasing the profile of floating offshore depot which contacts the water.
  • the floating transit depth can be roughly the intersection of lower frustoconical side section 12d and lower cylindrical section 12e.
  • weather and wind conditions can provide need for a different floating transit depth to meet safety guidelines or to achieve a rapid deployment from one position on the water to another.
  • the floatable offshore depot can have the buoyant hull with a low center of gravity 87, the low center of gravity providing an inherent stability to the structure.
  • the buoyant hull can be characterized by a positive metacenter.
  • Stiff vessels can be typically characterized by abrupt jerky accelerations as the large righting moments counter pitch and roll.
  • orientation of the fixed ballast or fluid ballast increases the natural period of the floatable offshore depot to above the period of the most common waves, thereby limiting wave-induced acceleration in all degrees of freedom.
  • the floatable offshore depot can have a plurality of thrusters 99a, 99b, 99c, and 99d for use with dynamic positioning.
  • the fin-shaped appendage 84a can have the shape of a right triangle in a vertical cross-section, where the right angle can be located adjacent a lower most outer side wall of the lower cylindrical section 12e of the buoyant hull 12, such that a bottom edge 184 of the triangle shape can be co-planar with the matching keel 12f.
  • a hypotenuse of the triangle shape can extend from a distal end of the bottom edge 184 of the triangle shape upwards and inwards to attach to the outer side wall of the lower cylindrical section 12e.
  • bottom edge 184 can extend radially outward a distance that can be about half the vertical height of the lower cylindrical section 12e, with the hypotenuse attaching to the lower cylindrical section 12e about one quarter up the vertical height of the lower cylindrical section 12e from keel level.
  • the bottom edge 184 of the at least one fin-shaped appendage 84a can extend radially outwardly.
  • the at least one fin-shaped appendage 84a is shown, defining a given radial coverage, a plurality of fin-shaped appendages defining more or less radial coverage can be used to vary the amount of added mass as required. Added mass can be desirable depending upon the requirements of a particular floating structure. Added mass however, can be generally the least expensive method of increasing the mass of a floating structure for purposes of influencing the natural period of motion.
  • Figure 3 shows the floatable offshore depot 10 with the main deck 12a and the superstructure 13 over the main deck.
  • the at least one crane 53 is shown mounted to the superstructure 13.
  • the floatable offshore depot 10 can include the at least one take-off and landing surface 54b and 54c, such as heliports which enable the at least one take-off and landing aircraft 400b and 400c, such as a plurality of helicopters or similar take-off and landing aircraft, to take off and land simultaneously on the plurality of take-off and landing surfaces, instead of sequentially.
  • aircraft as used herein can be helicopters, short takeoff and landing craft, dirigibles, drones, balloons, and similar craft. In embodiments, the aircraft can be remote controlled.
  • the at least one take-off and landing surfaces 54b and 54c can each be mounted on pedestals extending from the buoyant hull of the floating offshore depot.
  • a pedestal can support the at least one take-off and landing surface 54b and 54c.
  • the at least one take-off and landing surfaces 54b and 54c can be mounted to the main deck 12a or transitioned through the superstructure 13 in part or in whole, such as an overhang or a supported overhang supported on the main deck 12a.
  • a watercraft 200 is in the tunnel having come into the tunnel through the tunnel opening 31 and is positioned between the tunnel sides, of which a first tunnel side 202 is labeled.
  • a boat lift 41 is also shown in the tunnel, which can raise the watercraft above the operational depth in the tunnel.
  • the tunnel opening 31 is shown with two doors, each door having at least one door fender 38a and 38b for mitigating damage to a watercraft attempting to enter the tunnel, but not hitting the doors.
  • the floatable offshore depot 10 can have the at least one door fender 38a and 38b positioned at a location that is either: (i) within the tunnel to reduce wave action and provide clearance guidance to the watercraft or (ii) outside the tunnel opening 31 enabling self-guiding of the watercraft 200 into the tunnel or at both locations (i) and (ii) simultaneously while reducing wave action.
  • the at least one door fender 38a and 38b can allow the watercraft 200 to impact the at least one door fender 38a and 38b safely if the pilot cannot enter the tunnel directly due to at least one of large wave and high current movement from a location exterior of the buoyant hull 12.
  • the floatable offshore depot 10 can have at least one self-guiding stabbing dock shape 79.
  • the plurality of catenary mooring lines 16a-16o are shown coming from the main deck 12a.
  • a berthing facility 60 is shown in the buoyant hull 12 in the portion of the transition section 12g.
  • the transition section 12g is shown connected to the upper conical section 12c and the upper cylindrical side section 12b.
  • Accommodations 55 are also shown on the superstructure.
  • Figure 4A shows the watercraft 200 entering the tunnel 30 between the first tunnel side 202 and a second tunnel side 204 and connecting to the plurality of dynamic movable tendering mechanisms 24a-24h.
  • Proximate to the tunnel opening can be closable doors 34a and 34b which can be sliding pocket doors to provide either a weathertight or watertight protection of the tunnel from the exterior environment.
  • a starboard side 206 hull of the watercraft and a port side 208 hull of the watercraft are also shown.
  • Figure 4A shows the tunnel 30 for safe and easy launching/docking of watercraft 200 and embarkation/debarkation of personnel having an internal dock side 29 which allows personnel to step off, like a dock, or equipment to be stored.
  • the tunnel 30 is also depicted with a lower tapering surface 81 which can create a "beach like" effect rising out of the water. Also depicted is the watercraft 200 inside a portion of the tunnel between the first tunnel side 202 and the second tunnel side 204 and connecting to the plurality of dynamic movable tendering mechanisms 24a-24h.
  • the at least one closable door 34a and 34b are also shown along with the watercraft having the port side 208 and the starboard side 206.
  • Figure 4B shows the watercraft 200 inside a portion of the tunnel between the first tunnel side 202 and the second tunnel side 204 and connecting to the plurality of dynamic movable tendering mechanisms 24a-24h.
  • the plurality of dynamic moveable tendering mechanisms 24g and 24h are shown contacting the port side 208 hull of the watercraft 200.
  • Dynamic moveable tendering mechanisms 24c and 24d are seen contacting the starboard side 206 hull of the watercraft 200.
  • the at least one closable door 34a and 34b are also shown.
  • Figure 4C shows the watercraft 200 in the tunnel between the first tunnel side 202 and the second tunnel side 204 and connecting to the plurality of dynamic movable tendering mechanisms 24a-24h and also connected to a gangway 77.
  • Proximate to the tunnel opening can be the at least one closable door 34a and 34b which can be sliding pocket doors oriented in a closed position providing either a weathertight or watertight protection of the tunnel from the exterior environment.
  • the plurality of the dynamic moveable tendering mechanisms 24a-24h are shown in contact with the buoyant hull of the watercraft on both the starboard side 206 and the watercraft port side 208.
  • a lower tapering surface 81 is also shown.
  • FIG. 5A shows one of the plurality of the dynamic movable tendering mechanisms 24a.
  • Each of the plurality of dynamic movable tendering mechanisms can have a pair of parallel arms 39a and 39b mounted to the first tunnel side or the second tunnel side.
  • At least one tunnel fender 45 can connect to the pair of parallel arms 39a and 39b on the sides of the parallel arms opposite the first tunnel side or the second tunnel side.
  • a plate 43 can be mounted to the pair of parallel arms 39a and 39b and between the at least one tunnel fender 45 and the first tunnel side 202.
  • the plate 43 can be mounted above the tunnel floor 35 and positioned to extend above an operational depth 71 in the tunnel and below the operational depth 71 in the tunnel simultaneously.
  • the plate 43 can be configured to dampen movement of the watercraft as the watercraft moves from side to side in the tunnel.
  • the plate 43 and the entire plurality of the dynamic movable tendering mechanism can prevent damage to the ship hull, and push a watercraft away from a ship hull without breaking towards the tunnel center.
  • the embodiments can allow a vessel to bounce in the tunnel without damage.
  • a plurality of pivot anchors 44a and 44b can connect one of the parallel arms 39a and 39b to either tunnel side 202 and 204.
  • Each of the plurality of pivot anchors 44a and 44b can enable the plate 43 to swing from a collapsed orientation against the tunnel sides to an extended orientation at an angle 62, which can be up to 90 degrees from a plane 61 of the wall enabling the plate 43 on the one of the pair of parallel arms 39a and 39b and the at least one tunnel fender 45 to simultaneously (i) shield the tunnel from waves and water sloshing effects, (ii) absorb kinetic energy of the watercraft as the watercraft moves in the tunnel, and (iii) apply a force to push against the watercraft keeping the watercraft away from the side of the tunnel.
  • a plurality of fender pivots 47a and 47b are shown, wherein each of the plurality of fender pivots 47a and 47b can form a connection between each of the parallel arms 39a and 39b and the at least one tunnel fender 45.
  • Each fender pivot can allow the fender to pivot from one side of the parallel arm to an opposite side of the parallel arm through at least 90 degrees as the watercraft contacts the at least one tunnel fender 45.
  • a plurality of openings 52a-52ae in the plate 43 can reduce wave action.
  • Each of the plurality of openings 52a-52ae can have a diameter from 0.1 of a meter to 2 meters.
  • the openings 52a-52ae can be ellipses.
  • At least one hydraulic cylinder 28a and 28b can be connected to each parallel arm for providing resistance to watercraft pressure on the fender and for extending and retracting the plate from the tunnel sides.
  • Figure 5B shows one of the pair of parallel arms 39a mounted to a first tunnel side 202 in a collapsed position.
  • One of the pair of parallel arms 39a can be connected to one of a plurality of pivot anchors 44a that engages the first tunnel side 202.
  • At least one of the plurality of fender pivots 47a can be mounted on the one of the pair of parallel arms opposite the one of a plurality of pivot anchors 44a.
  • the at least one tunnel fender 45 can be mounted to the at least one of the plurality of fender pivots 47a.
  • the plate 43 can be attached to the one of the pair of parallel arms 39a.
  • the at least one hydraulic cylinder 28a can be attached to the parallel arm and the tunnel wall.
  • Figure 5C shows the plate 43 with the plurality of openings 52a-52ag that can be ellipsoidal in shape.
  • the plate 43 is shown mounted above the tunnel floor 35.
  • the plate 43 can extend both above and below the operational depth 71.
  • the first tunnel side 202, the plurality of pivot anchors 44a and 44b, the parallel arms 39a and 39b, the plurality of fender pivots 47a and 47b, the tunnel 30, and the at least one fender 45 is also shown.
  • Figure 5D shows an embodiment of a dynamic moveable tendering mechanism formed from a frame 74 instead of the plate.
  • the frame 74 can have a pair of intersecting tubulars 75a and 75b that form openings 76a and 76b for allowing water to pass while water in the tunnel is at an operational depth 71.
  • the first tunnel side 202, the tunnel floor 35, the plurality of pivot anchors 44a and 44b, the pair of parallel arms 39a and 39b, the plurality of fender pivots 47a and 47b, and the at least one tunnel fender 45 is shown.
  • Figure 6 depicts a perspective view of a boatlift assembly of the floatable offshore depot disposed within the tunnel.
  • a boatlift assembly 40 can be disposed within tunnel.
  • the boatlift assembly 40 can include a boat lift assembly frame 42 carrying chocks 144 that can be positioned and arranged for supporting the watercraft 200.
  • the boatlift assembly frame 42 can be formed of I-beams in a rectangular shape, which can be approximately 15 meters by 40 meters with a safe working load from 200 tons to 300 tons.
  • the boatlift assembly frame 42 can be suitable for hoisting a fast transport unit ("FTU"), such as an aluminum water-jet-propulsion trimaran crew boat capable of transporting up to 200 persons with a transit speed of up to 74 km/h (40 knots).
  • FTU fast transport unit
  • a drive assembly 46 which can include rack and pinion gearing, piston-cylinder arrangements, or a system of running rigging, for example, raises and lowers the boatlift assembly frame 42 with its payload.
  • Boatlift assembly can be capable of lifting the watercraft 200 from 1 meter to 2 meters or more so as to eliminate any heave and roll of the watercraft 200 with respect to the floatable offshore depot, thereby establishing a safe condition in which to embark and debark passengers.
  • high pressure air and/or water nozzles can be disposed at various points in tunnel below water in order to air raid the water column, thereby influencing the wave and the localized swell action within tunnel.
  • the floatable offshore depot can be ballasted to lower its position in the water to allow the watercraft 200 to enter the tunnel. Once the watercraft 200 can be positioned above appropriate chocks, the floatable offshore depot can be deballasted, thereby raising the floatable offshore depot further out of the water, draining water from the tunnel, and causing the watercraft 200 to be seated in its chocks in a dry dock condition.
  • Figure 7 which shows an embodiment not falling within the scope of protection of the present invention, depicts an elevation side view in partial cross section of the buoyant hull of the floatable offshore depot 10, showing a plurality of baffles 37a - 37h for reducing waves within the tunnel 30.
  • the floatable offshore depot 10 which can be configured to be floatable to transition from a floating orientation having the floating operational depth 71 or a floating transit depth 70 to be in a ballasted orientation resting on a seabed 312.
  • Pedestals 88a, 88b, and 88c are depicted supporting the at least one take-off and landing surface, which can be mounted to the main deck or transitioned through the superstructure in part or in whole, such as an overhang or a supported overhang supported on the main deck.
  • a plurality of take-off and landing aircraft 400a, 400b, and 400c are shown.
  • Thresholds 33 are depicted disposed at or near the entrances of the tunnel 30, which can reduce wave energy entering the tunnel 30. At least one of the plurality of baffles 37a-37h can be included on the tunnel floor 35 to further reduce the propensity for sloshing within the tunnel 30.
  • the tunnel 30 can be formed within or through buoyant hull 12 at the waterline.
  • the tunnel 30 can provide a sheltered area inside the buoyant hull 12 for safe and easy launching/docking of boats and embarkation/debarkation of personnel.
  • the tunnel 30 can have the lower tapering surface 81 that provides a "beach effect" that absorbs most of the surface wave energy at the tunnel entrance(s), thereby reducing slamming and harmonic effects on boats when traversing or moored within the tunnel 30.
  • the tunnel 30 can optionally be part of or include a moon pool that opens through the matching keel 12f.
  • the moon pool if provided, can be open to the sea below, using grating to prevent objects from falling there through, for example, or it can be closeable by a watertight hatch, if desired.
  • An open moon pool can provide slightly better overall motion response.
  • the tunnel 30 can have, at every entrance, at least one closeable door.
  • the at least one closeable door can be watertight or weathertight, that can be opened and closed as required.
  • the at least one closeable door 34a and 34b can also function as a guiding and stabbing system, because the at least one closeable door 34a and 34b can be fitted with robust rubber fenders to reduce potential damage to the buoyant hull 12 and the watercraft should impact occur.
  • the interior of the tunnel 30 can include fenders to facilitate docking.
  • the tunnel 30 with the tunnel floor 35 can be drained using, for example, a gravity based draining system or high capacity pumps located in the pump room of the floatable offshore depot, so as to create a dry dock environment within the buoyant hull 12.
  • Weathertight doors which can include openings below the waterline, can be used in place of watertight doors to allow controlled circulation of water between the tunnel 30 and the exterior.
  • the at least one closeable door 34a and 34b can be hinged, or can slide vertically or horizontally as is known in the art.
  • the tunnel 30 can include a single branch or multiple branches with multiple penetrations through the buoyant hull 12.
  • the tunnel 30 can include straight, curved, tapering sections and intersections in a variety of elevations and configurations.
  • Figure 8 which shows an embodiment not falling within the scope of protection of the present invention, depicts an elevation side view in partial cross section of the buoyant hull of the floatable offshore depot showing a plurality of baffles 37a - 37h for reducing waves within the tunnel 30.
  • the floatable offshore depot 10 which can be configured to be floatable to transition from a floating orientation having the floating operational depth 71.
  • the thresholds 33 are depicted disposed at or near the entrances of the tunnel 30, which can reduce wave energy entering the tunnel 30. At least one of the plurality of baffles 37a-37h can be included on the tunnel floor 35 to further reduce the propensity for sloshing within the tunnel 30.
  • the tunnel 30 can be formed within or through the buoyant hull 12 at the waterline.
  • the tunnel 30 can provide a sheltered area inside the buoyant hull 12 for safe and easy launching/docking of boats and embarkation/debarkation of personnel.
  • the tunnel 30 can have the lower tapering surface 81 that provides a "beach effect" that absorbs most of the surface wave energy at the tunnel entrance(s), thereby reducing slamming and harmonic effects on boats when traversing or moored within the tunnel 30.
  • the tunnel 30 can optionally be part of or include the moon pool that can open through the matching keel 12f.
  • the moon pool if provided, can be open to the sea below, using grating 152 to prevent objects from falling there through, for example, or it can be closeable by a watertight hatch, if desired.
  • An open moon pool can provide slightly better overall motion response.
  • the tunnel 30 can have, at every entrance, at least one closeable door.
  • the at least one closeable door can be watertight or weathertight, that can be opened and closed as required.
  • the at least one closeable door 34a and 34b can also function as a guiding and stabbing system, because the at least one closeable door 34a and 34b can be fitted with robust rubber fenders to reduce potential damage to the buoyant hull 12 and the watercraft should impact occur.
  • the interior of the tunnel 30 can include fenders to facilitate docking.
  • the tunnel 30 with the tunnel floor 35 can be drained using, for example, the gravity based draining system or high capacity pumps located in the pump room of the floatable offshore depot, so as to create a dry dock environment within the buoyant hull 12.
  • Weathertight doors which can include openings below the waterline, can be used in place of watertight doors to allow controlled circulation of water between the tunnel 30 and the exterior.
  • the at least one closeable door 34a and 34b can be hinged, or can slide vertically or horizontally as is known in the art.
  • Figure 9 depicts a horizontal cross section taken through the buoyant hull of the floatable offshore depot showing a straight tunnel formed completely there through.
  • the tunnel 30 can be a straight tunnel that passes completely through the buoyant hull 12 on a diameter.
  • the at least one of the fin-shaped appendage 84a-84d can be used for creating added mass and for reducing heave and otherwise steadying the floatable offshore depot 10.
  • a plurality of fin-shaped appendages 84a-84d can be attached to a lower and outer portion of lower cylindrical side section of the buoyant hull 12.
  • the plurality of fin-shaped appendages 84a-84d can have at least four fin-shaped appendages separated from each other by gaps.
  • a gap 86 is shown to accommodate one of the plurality of catenary mooring lines 16a on the exterior of buoyant hull 12 without contact with the plurality of fin-shaped appendages 84a-84d.
  • the plurality of catenary mooring lines 16a-16p is also shown.
  • Figure 10 depicts a horizontal cross section taken through the buoyant hull 12 of the floatable offshore depot according to one or more embodiments.
  • the tunnel 30 can be a cruciform shaped tunnel, which can have entrances formed through the buoyant hull 12 at ninety degree intervals.
  • the cruciform shape 89 creates a plurality of tunnel openings 31a-31d in the buoyant hull 12 of the floatable offshore depot.
  • the tunnel 30 provides four entrances disposed at ninety-degree intervals about buoyant hull 12.
  • the floatable offshore depot can be ideally moored so that at least one of the plurality of tunnel openings 31a-31d can be leeward of prevailing winds, waves and currents.
  • Each of the plurality of tunnel opening 31a-31d can be formed in the buoyant hull to the exterior for the tunnel 30.
  • Each of the tunnel openings of the plurality of tunnel openings 31a-31d can have at least one tunnel fender 45a-45l.
  • the at least one fin-shaped appendage 84a-84d is depicted along with the plurality of catenary mooring lines 16a-16p.
  • the gap 86 is shown to accommodate the one of the plurality of catenary mooring lines 16a on the exterior of the buoyant hull 12 without contact with the at least one fin-shaped appendages 84a-84d.
  • Figure 11 depicts a top view of a Y-shaped tunnel in the buoyant hull of the floatable offshore depot.
  • the tunnel 30 can be in a Y-shaped in the buoyant hull 12 with the tunnel opening 31a, in communication with a first branch 36a and a second branch 36b going to an additional tunnel opening 31b and 31c respectively.
  • the fast transport unit FTU or similar watercraft can arrive in the proximity of the moored and stable floatable offshore depot.
  • the watercraft ideally can approach the entrance to the tunnel which can be the tunnel entrance most sheltered from the effects of wind, waves, and current. If not already in a flooded state, the tunnel can be flooded.
  • the at least one closeable door can be opened, and the watercraft can then enter the tunnel under its own power.
  • the at least one door fender and the at least one self-guiding stabbing dock shape of tunnel the tunnel can provide safe and reliable clearance guidance. More than one self-guiding stabbing dock shape can be used.
  • the at least one tunnel fender can eliminate or drastically reduce riding and bouncing of the watercraft against the internal dock side of the tunnel. After the watercraft clears the entrance, the at least one closeable door can be shut to reduce wave, wind and swell effects from the outer environmental conditions.
  • the watercraft can then align over the boatlift assembly, optionally aided by the use of controlled and monitored underwater cameras and transporter systems. The watercraft can then be lifted by the boatlift assembly as desired. The reverse procedure can be used to launch the watercraft.
  • the floatable offshore depot can be designed and sized to meet the requirements of any particular application.
  • the dimensions can be scaled using the well-known Froude scaling technique.
  • the dimensions of the tunnel which can be scaled as appropriate, are approximately 17 meters wide by 21 meters high. Such dimensions are appropriate for the tri-hull FTUs described above.
  • the floatable offshore depot can have a floating transit depth and an operational depth, wherein the operational depth can be achieved using ballast pumps and filling ballast tanks in the buoyant hull with water after moving the structure at floating transit depth to an operational location.
  • the floating transit depth can be from about 7 meters to about 15 meters, and the operational depth can be from about 45 meters to about 65 meters.
  • the tunnel can be out of the water during transit.
  • a straight, a curved, or a tapering section in the buoyant hull forms the tunnel.
  • the method provides a resort including gaming and/or entertainment on the floatable offshore depot.
  • the method provides military staging site on the floatable offshore depot.
  • the plates, the at least one closable door, and the buoyant hull can be made from steel.
  • the floatable offshore depot can have the lower frustoconical side section extending downwardly from the upper cylindrical side section.
  • the floatable offshore depot comprises a frustoconical side section between the transition section and the lower frustoconical side section.
  • the method can use the floatable offshore depot to provide a sheltered area inside the buoyant hull using a tunnel for safe and easy launching/docking of watercraft and embarkation/debarkation of personnel using an internal dock side of tunnel and to provide a sheltered area inside the buoyant hull for transferring equipment between the watercraft and the floatable offshore depot using an internal dock side of tunnel.
  • the method can use the floatable offshore depot having a buoyant hull with a hull planform that is circular, oval, elliptical, or polygonal.
  • the buoyant hull can have a matching keel and a main deck.
  • between the buoyant hull and main deck can be at least two connected sections joined in series and symmetric about a vertical axis.
  • the connected sections can extend downwardly from the main deck toward the matching keel, and can have at least two of: the upper cylindrical side section, the transition section, and the lower cylindrical section.
  • the buoyant hull can have a tunnel at an operational depth.
  • the tunnel can have a tunnel opening in the buoyant hull opening to an exterior of the buoyant hull and dimensioned so as to receive a watercraft.
  • the floatable offshore depot can have a lower frustoconical side section to extend downwardly from the upper cylindrical side section.
  • the floatable offshore depot can have an upper conical section between the transition section and the lower frustoconical side section.
  • the floatable offshore depot provides for selective isolation of said tunnel from said exterior; whereby said tunnel can be operable in either a wet condition or a dry condition while said floatable offshore depot floats in a body of water.
  • the floatable offshore depot can be configured to keep the tunnel in either a wet condition or a dry condition while the floatable offshore depot floats in a body of water.
  • the floatable offshore depot can have a second tunnel opening in the buoyant hull to an exterior of the buoyant hull for the tunnel.
  • the floatable offshore depot can have the first and the second branches for the tunnel, wherein each branch can penetrate through the buoyant hull.
  • the floatable offshore depot can have a cruciform shape for the tunnel creating a plurality of tunnel openings in the buoyant hull.
  • the floatable offshore depot can have: the main deck configured to carry a superstructure thereon; and said superstructure can include at least one member selected from the group consisting of: the berthing facility, the accommodations, the at least one heliport, the at least one crane, the control tower, and the at least one aircraft hangar.
  • the floatable offshore depot can have: optional baffles to reduce waves within the tunnel.
  • the floatable offshore depot can have: the moon pool configured to engage the tunnel with the moon pool configured to open through the matching keel.
  • the floatable offshore depot can have the at least one tunnel fenders disposed within the tunnel to reduce wave action and provide clearance guidance to the watercraft and outside the tunnel opening enabling self-guiding of the watercraft into the tunnel.
  • the floatable offshore depot can have a self-guiding stabbing dock shape for the tunnel.
  • the floatable offshore depot can have the gangway for traversing between the structure and an adjacent structure.
  • the floatable offshore depot can have a buoyant hull with a low center of gravity providing an inherent stability to the structure.
  • the floatable offshore depot can have at least one fin-shaped appendage attached to a lower portion and an outer portion of the exterior of the buoyant hull.
  • the floatable offshore depot can have the lower tapering surface at an entrance of the tunnel, providing a "beach effect" that absorbs most of a surface wave's energy.
  • the floatable offshore depot can have a tunnel floor with the floatable offshore depot adapted for draining the tunnel so as to create a dry dock environment within the buoyant hull.
  • the floatable offshore depot a straight, a curved, or a tapering section in the buoyant hull forming the tunnel.
  • the floatable offshore depot can have the plurality of thrusters and the plurality of catenary mooring lines to either dynamic moor the floatable offshore depot to the seabed or to provide dynamic positioning while in communication with a global positioning system.
  • the floatable offshore depot can be configured to float on a body of water as well as to ballast down and sit on a seabed.
  • this particular floatable offshore depot can be adapted to both float at two different levels as well as sit on a seabed for differing operational and transiting uses.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Transportation (AREA)
  • Earth Drilling (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
  • Revetment (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Tents Or Canopies (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Wind Motors (AREA)

Claims (15)

  1. Procédé d'utilisation d'un dépôt offshore flottant (10), le procédé comprenant :
    a. la fourniture d'une zone abritée à l'intérieur d'une coque flottante (12) conçue comme un tunnel (30) pour le lancement ou l'amarrage sûr et facile d'un bateau (200), dans lequel le tunnel (30) comprend un premier côté de tunnel (202) et un second côté de tunnel (204) entre lesquels l'embarcation (200) est reçue ;
    b. la fourniture d'un côté de quai interne (29) à l'intérieur du tunnel (30) pour l'embarquement ou le débarquement du personnel, dans lequel le premier côté de tunnel (202) est situé sur un premier côté du côté de quai interne (29) et le tunnel (30) comprend en outre une surface effilée inférieure (81) située sur un second côté du côté de quai interne (29) opposé au premier côté ;
    c. la fourniture de la zone abritée à l'intérieur de la coque flottante (12) conçue comme le tunnel (30) avec le côté de quai interne (29) pour transférer l'équipement entre l'embarcation (200) et le dépôt offshore flottant (10) ;
    dans lequel le côté de quai interne (29) permet au personnel de descendre comme un quai, ou à l'équipement d'être stocké ;
    dans lequel le dépôt offshore flottant (10) comprend :
    (i) la coque flottante (12) avec une forme plane de coque qui est circulaire, ovale, elliptique ou polygonale ;
    (ii) une quille assortie (12f) et un pont principal (12a), dans lequel le pont principal (12a) et la quille assortie (12f) sont conçus pour la stabilité au large ;
    (iii) une pluralité de mécanismes de ravitaillement mobiles dynamiques (24a-24h) disposés à l'intérieur et raccordés au premier côté de tunnel (202) et au second côté de tunnel (204), dans lequel la pluralité de mécanismes de ravitaillement mobiles dynamiques (24a-24h) est disposée de façon espacée l'un de l'autre le long d'au moins une partie du premier côté de tunnel (202) et du second côté de tunnel (204) ; et
    (iv) au moins deux sections raccordées venant en prise entre la quille correspondante (12f) et le pont principal (12a), les au moins deux sections raccordées étant jointes en série et symétriques autour d'un axe vertical (100) avec les au moins deux sections raccordées s'étendant vers le bas depuis le pont principal (12a) vers la quille correspondante (12f), les au moins deux sections raccordées comprenant au moins deux :
    1. d'une section latérale cylindrique supérieure (12b) ;
    2. d'une section de transition (12g) ; et
    3. d'une section cylindrique inférieure (12e) ; et
    dans lequel le tunnel (30) de la coque flottante (12) formé à l'intérieur de la coque flottante (12) pour recevoir l'embarcation (200) lorsque la coque flottante (12) est à une profondeur opérationnelle flottante (71), le tunnel (30) comprenant : une ouverture de tunnel (31) dans la coque flottante (12) s'ouvrant sur un extérieur de la coque flottante (12) et dimensionnée de manière à recevoir l'embarcation (200) ; et en outre dans lequel le dépôt offshore flottant (10) est conçu pour pouvoir flotter pour passer de la profondeur opérationnelle flottante (71) ou d'une profondeur de transit flottante (70) au repos sur un fond marin (312).
  2. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend une section latérale tronconique inférieure (12d) pour s'étendre vers le bas à partir de la section latérale cylindrique supérieure (12b).
  3. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend une section conique supérieure (12c) entre la section de transition (12g) et la section latérale tronconique inférieure (12d).
  4. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) permet une isolation sélective du tunnel (30) de l'extérieur de la coque flottante (12), dans lequel le tunnel (30) peut fonctionner dans un état humide ou un état sec tandis que le dépôt offshore flottant (10) flotte ou repose sur le fond marin (312).
  5. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend une ouverture de tunnel supplémentaire (31b, 31c) dans la coque flottante (12) vers l'extérieur de la coque flottante (12).
  6. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend au moins une branche (36a, 36b) pour le tunnel (30), dans lequel chaque branche (36a, 36b) présente une ouverture de tunnel supplémentaire (31b, 31c) .
  7. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend une forme cruciforme (89) pour le tunnel (30) créant une pluralité d'ouvertures de tunnel (31) dans la coque flottante (12).
  8. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend le pont principal (12a) conçu pour porter une superstructure (13), dans lequel la superstructure (13) comporte au moins un élément sélectionné dans le groupe constitué : d'une installation d'accostage (60), de logements (55), d'une surface de décollage et d'atterrissage (54a-54c), d'une grue (53), d'une tour de contrôle (51), d'un hangar à avions (50), d'un complexe comprenant des jeux et/ou des divertissements, et d'un site de rassemblement militaire.
  9. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend une pluralité de chicanes (37a-37h) pour réduire les vagues à l'intérieur du tunnel (30) .
  10. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend un bassin central conçu pour venir en prise fluidiquement dans le tunnel (30) et pour s'ouvrir à travers la quille correspondante (12f).
  11. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend une pluralité de défenses, dans lequel la pluralité de défenses est au moins une défense de porte (38a, 38b) et au moins une défense de tunnel (45) positionnée à un emplacement à l'intérieur du tunnel (30) pour réduire l'action des vagues et fournir un guidage de dégagement à l'embarcation (200) et à l'extérieur de l'ouverture du tunnel (31) permettant l'auto-guidage de l'embarcation (200) dans le tunnel (30) ; ou dans lequel le dépôt offshore flottant (10) comprend une forme de quai d'amarrage autoguidé (79) pour le tunnel (30) .
  12. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend une passerelle (77) de traversée entre le dépôt offshore flottant (10) et une structure adjacente ; ou dans lequel le dépôt offshore flottant (10) comprend la coque flottante (12) avec un centre de gravité bas (87) fournissant une stabilité inhérente au dépôt offshore flottant (10).
  13. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend au moins un appendice en forme d'aileron (84a-84d) attaché à une partie inférieure et externe de l'extérieur de la coque flottante (12).
  14. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend un plancher de tunnel (35) permettant la création d'un environnement de cale sèche à l'intérieur de la coque flottante (12) lorsque le tunnel (30) est vidé de l'eau ; ou dans lequel le dépôt offshore flottant (10) comprend au moins l'une : d'une section droite, incurvée ou effilée dans la coque flottante (12) formant au moins l'un : du premier côté de tunnel (202) et du second côté de tunnel (204).
  15. Procédé selon la revendication 1, dans lequel le dépôt offshore flottant (10) comprend une pluralité de propulseurs (99a-99d) et une pluralité de lignes d'amarrage caténaires (16a-16o) pour amarrer dynamiquement le dépôt offshore flottant (10) ou le fond marin (312) ou positionner dynamiquement le dépôt offshore flottant (10) tout en étant en communication avec un système de positionnement dynamique (57) ; ou dans lequel le dépôt offshore flottant (10) comprend une pluralité de surfaces de décollage et d'atterrissage (54a-54c), dans lequel chacune des surfaces de décollage et d'atterrissage (54a-54c) est conçue pour permettre à une pluralité d'aéronefs de décollage et d'atterrissage (400a-400c) de décoller et d'atterrir simultanément à partir de l'une de la pluralité de surfaces de décollage et d'atterrissage (54a-54c).
EP16756029.1A 2015-02-24 2016-01-27 Procédé utilisant un dépôt offshore flottant Active EP3261918B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US14/630,576 US9180941B1 (en) 2009-11-08 2015-02-24 Method using a floatable offshore depot
PCT/US2016/015163 WO2016137644A2 (fr) 2015-02-24 2016-01-27 Procédé utilisant un dépôt offshore flottant

Publications (3)

Publication Number Publication Date
EP3261918A2 EP3261918A2 (fr) 2018-01-03
EP3261918A4 EP3261918A4 (fr) 2018-11-07
EP3261918B1 true EP3261918B1 (fr) 2023-06-07

Family

ID=56789691

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16756029.1A Active EP3261918B1 (fr) 2015-02-24 2016-01-27 Procédé utilisant un dépôt offshore flottant

Country Status (13)

Country Link
EP (1) EP3261918B1 (fr)
KR (1) KR102365572B1 (fr)
CN (1) CN107249978B (fr)
AU (1) AU2016223269B2 (fr)
BR (1) BR112017017982B8 (fr)
CA (1) CA2966036C (fr)
IL (1) IL251983A0 (fr)
MX (1) MX2017006313A (fr)
MY (1) MY192128A (fr)
PH (1) PH12017500847A1 (fr)
RU (1) RU2683920C2 (fr)
SG (1) SG11201706647RA (fr)
WO (1) WO2016137644A2 (fr)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10093394B2 (en) * 2009-11-08 2018-10-09 Jurong Shipyard Pte Ltd. Method for offshore floating petroleum production, storage and offloading with a buoyant structure
US8662000B2 (en) * 2009-11-08 2014-03-04 Ssp Technologies, Inc. Stable offshore floating depot
CN106703502A (zh) * 2017-01-05 2017-05-24 广东工业大学 一种集成式海上综合服务系统
CA3082826A1 (fr) * 2017-11-22 2019-05-31 Jurong Shipyard Pte Ltd Procede de production, de stockage et de dechargement flottants de petrole en mer avec une structure flottante
CN110239673B (zh) * 2019-06-25 2020-08-04 南京蒽天捷能源科技有限公司 具有动力定位装置的可移动浮式液货过驳海工平台及过驳方法
KR102420828B1 (ko) * 2020-11-27 2022-07-14 한윤혜 선박

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4640214A (en) * 1985-01-18 1987-02-03 Bruns John H Modular multi-storage building
BR8606370A (pt) * 1986-12-22 1988-07-12 Petroleo Brasileiro Sa Estrutura flutuante de apoio oceanico fechada
NO972820L (no) * 1997-06-18 1998-12-21 Pevatec As Bevegelsesabsorberende overf°ringssystem
BR0009912A (pt) * 1999-04-21 2003-01-07 Ope Inc Estrutura flutuante ao largo da costa para utilização com água
US6761508B1 (en) * 1999-04-21 2004-07-13 Ope, Inc. Satellite separator platform(SSP)
US7958835B2 (en) * 2007-01-01 2011-06-14 Nagan Srinivasan Offshore floating production, storage, and off-loading vessel for use in ice-covered and clear water applications
CN201593181U (zh) * 2009-10-16 2010-09-29 抚州市临川白勇海洋工程有限公司 自升式海上风电机组安装平台
US8869727B1 (en) * 2009-11-08 2014-10-28 Ssp Technologies, Inc. Buoyant structure
US8662000B2 (en) * 2009-11-08 2014-03-04 Ssp Technologies, Inc. Stable offshore floating depot
DK2496469T3 (en) * 2009-11-08 2018-10-22 Jurong Shipyard Pte Ltd Liquid offshore structure for drilling, manufacturing, storage and unloading
RU2591780C2 (ru) * 2010-07-08 2016-07-20 Итрек Б.В. Полупогружное плавучее основание и способ его эксплуатации
CN203172870U (zh) * 2013-01-28 2013-09-04 中国石油天然气股份有限公司 一种模块化移动式人工岛

Also Published As

Publication number Publication date
BR112017017982B1 (pt) 2023-03-28
MY192128A (en) 2022-07-29
WO2016137644A3 (fr) 2016-10-20
WO2016137644A2 (fr) 2016-09-01
KR102365572B1 (ko) 2022-02-21
CN107249978B (zh) 2020-03-13
SG11201706647RA (en) 2017-09-28
RU2683920C2 (ru) 2019-04-02
AU2016223269B2 (en) 2020-01-23
BR112017017982A2 (pt) 2018-04-10
CA2966036C (fr) 2022-12-13
EP3261918A4 (fr) 2018-11-07
PH12017500847A1 (en) 2017-10-30
EP3261918A2 (fr) 2018-01-03
MX2017006313A (es) 2018-02-16
RU2017133090A (ru) 2019-03-25
BR112017017982B8 (pt) 2023-05-02
CA2966036A1 (fr) 2016-09-01
RU2017133090A3 (fr) 2019-03-25
IL251983A0 (en) 2017-06-29
KR20170121183A (ko) 2017-11-01
AU2016223269A1 (en) 2017-05-18
CN107249978A (zh) 2017-10-13

Similar Documents

Publication Publication Date Title
EP2741955B1 (fr) Dépôt offshore flottant stable
US9180941B1 (en) Method using a floatable offshore depot
EP3261918B1 (fr) Procédé utilisant un dépôt offshore flottant
KR20120079447A (ko) 근해 부력식 시추, 생산, 저장 및 하역 구조물
US10843776B2 (en) Buoyant structure
US8869727B1 (en) Buoyant structure
US10300993B2 (en) Buoyant structure with a plurality of tunnels and fins
US9415843B1 (en) Floating driller
WO2015088745A1 (fr) Structure flottante
US20160031534A1 (en) Buoyant structure
WO2013149312A1 (fr) Terminal océanique flottant avec système d'atténuation de conditions environnementales - soft
OA18204A (en) Buoyant structure

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170922

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20181008

RIC1 Information provided on ipc code assigned before grant

Ipc: B63C 1/10 20060101ALI20181001BHEP

Ipc: B63B 27/30 20060101ALI20181001BHEP

Ipc: B63B 35/44 20060101AFI20181001BHEP

Ipc: B63C 1/02 20060101ALI20181001BHEP

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: JURONG SHIPYARD PTE. LTD.

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20211125

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20230125

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1574232

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230615

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016079951

Country of ref document: DE

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230612

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20230607

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

Ref country code: NO

Ref legal event code: CREP

Representative=s name: BRYN AARFLOT AS, STORTINGSGATA 8, 0161 OSLO, NORGE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20230607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1574232

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230908

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231007

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231009

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231007

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016079951

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240126

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

26N No opposition filed

Effective date: 20240308

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20240125

Year of fee payment: 9

Ref country code: FR

Payment date: 20240126

Year of fee payment: 9

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602016079951

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230607

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240801

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240131