EP3119971B1 - System and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the warming zone - Google Patents

System and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the warming zone Download PDF

Info

Publication number
EP3119971B1
EP3119971B1 EP14806743.2A EP14806743A EP3119971B1 EP 3119971 B1 EP3119971 B1 EP 3119971B1 EP 14806743 A EP14806743 A EP 14806743A EP 3119971 B1 EP3119971 B1 EP 3119971B1
Authority
EP
European Patent Office
Prior art keywords
wall
anchors
anchor
window
montage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP14806743.2A
Other languages
German (de)
French (fr)
Other versions
EP3119971A2 (en
Inventor
Artur BORUSZEWSKI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ergo Plus Polska
Original Assignee
Ergo Plus Polska
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ergo Plus Polska filed Critical Ergo Plus Polska
Priority to PL14806743T priority Critical patent/PL3119971T3/en
Publication of EP3119971A2 publication Critical patent/EP3119971A2/en
Application granted granted Critical
Publication of EP3119971B1 publication Critical patent/EP3119971B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/60Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means
    • E06B1/6015Anchoring means
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/02Base frames, i.e. template frames for openings in walls or the like, provided with means for securing a further rigidly-mounted frame; Special adaptations of frames to be fixed therein

Definitions

  • a subject of this invention are system of mounting, sealing and thermal insulation of windows, facades and doors profitably in the building warming zone and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the jamb building warming zone.
  • Developed invention includes complex system of solutions for mounting, regulation, insulation and thermal insulation, waterproofing and vapor proofing the window, which at the same time is vapor permeable and is leading away any possible vapor outside, according to rules of gases diffusion.
  • Elaborated system and method are designed for installation of windows, facades and doors made both out of PVC as well as out of aluminum or wood, beside of their width and weight.
  • Supports are settled in slots incised or mason at the corners of the bearing wall in a such way that plane of the dragging wall support is leaning on outer side of bearing wall mounted with an extra support anchor.
  • Window frame with doorstep lath is placed above insulating layer, on the upper plane and tightened against dragging support salience. Oblique cut of the insulation makes room for low-resilience PU foam which is bounding window frame with bearing wall and is also insulating periphery.
  • DE 20 2006 018203 U1 discloses a system for mounting, sealing and thermal insulating of windows, façades and doors favourably in the building warming zone, wherein it comprises beams with anchors, the beams are for being placed around a window opening, wherein the anchors are arranged in two rows, and the peripheral anchors from one row are for mounting in the window opening, and the peripheral anchors from the other row are for mounting to the wall.
  • That objective was realized by developing a system of mounting , insulating and thermic isolation of window, facades and door favorably in building warming zone, which is characterized by a fact that basic elements used in this method are beams with anchors inside of it, which are placed around bodied holes of the building. Anchors are so to say placed in two rows, and peripheral parts of one of anchor row is mounted in window hole and other row of anchor peripheral parts is mounted to the wall and an integral part of the beam is a hard, waterproof, longitudinal, spacer chunk.
  • anchors are deployed in the beam according to the load, which beam is supposed to carry, usually every 250mm.
  • each anchor is adapted to carry a load of 150kg, which means that beam is adapted to carry a load of 600kg per 1 meter of its length.
  • beam can have different cross-section, including square, rectangular, triangular and polygonal.
  • width of metal anchor is from 50 to 90mm, relatively from 100 to 150mm to the wall in warming zone.
  • each anchor described above can be made with block of plastic material, metal or wood which has any shape and is cut out of a chunk or which is made out of plastic material, metal or wood which has any shape and is made by extrusion, wherein block are embedded in the beam.
  • block is made favorably out of plastic material, especially out of PVC, ABS, PE or PP, relatively out of metal, wood or another hard material.
  • anchors are anchors with hinged joint mounted in the window hole and hinged joint mounted to the wall or anchor with hinged joint mounted in the window hole and stiff joint mounted to the wall, or anchor with stiff joint mounted in the window hole and hinged joint mounted to the wall, or anchor with stiff joint mounted in the window hole and stiff joint mounted to the wall, or anchor with hinged joint mounted in the window hole and extendable element mounted to the wall, or anchor with extendable element mounted in the window hole and hinged joint mounted to the wall, or anchor with extendable element mounted in the window hole and extendable element mounted to the wall, or anchor with extendable element mounted in the window hole and stiff joint mounted to the wall, or anchor with stiff joint mounted in the window hole and extendable element mounted to the wall.
  • peripheral parts of the anchor those which are not embedded in the beam - independently of the fact if it is a stiff joint, hinged joint or extendable element - there are two holes, which can be oval, in which montage screws are entered. Then those screws are entered into the wall through the anchor via double or triple nut.
  • triple nut consists so to say out of three following nuts-screws, which have thread on their outside circumference in the same direction as the thread on outside circumference of the montage screw, whereas inside circumference of these nuts have their threads in opposite directions.
  • montage screw screwed in which is fixing the anchor to the wall, and favorably there is an extra blockade with spikes, which block in the hole preventing the montage screw from withdrawal.
  • part of the anchor - that part which is embedded in the beam - is at least one pipe, made favorably from metal or plastic material, placed perpendicularly to that side of the beam which will face the frame of the mounted element, which stabilizes anchor in the beam and by which montage screw will be inserted, then it will go through the beam into the frame of mounted element (either window frame, door frame or facade frame). After then it is being sealed and covered.
  • washer placed which favorably is 1,0mm or 2,0mm or 5,0mm or 10,0mm in thickness.
  • beam with anchors embedded in it is made by filling suitable mold with foamed plastic material, in a process where head is being slowly pulled from the most inside part of the mold to the outside and it is covering anchors with material.
  • the filling material is favorably foamed EPDM or foamed PE or foamed polystyrene or foamed polyurethane or styrodur or foamed PVC or polystyrene or hard Styrofoam or composite made out of polyurethane and glass fiber with density higher than 100kg/m 3 or composite made out of polyurethane and glass fiber and mineral wool with density higher than 100kg/m 3 or another foamed and stiff material which has closed cells, favorably with density from 40 kg/m 3 to 100 kg/m 3 .
  • the integral part of the beam which is a hard, waterproof, longitudinal, spacer chunk is made out of material made from compressed wood dust and plastic material which is polyurethane or foamed PVC or hard Styrofoam or styrodur or composite made out of polyurethane and glass fiber with density higher than 100kg/m 3 or composite made out of polyurethane and glass fiber and mineral wool with density higher than 100kg/m 3 or another foamed and stiff material which has closed cells, favorably with density from 40 kg/m 3 to 100 kg/m 3 .
  • band wherein the top side and outside and also down side of the beam is covered with outside band which is vapor permeable but waterproof, but the inner side of the beam is covered with inner band which is waterproof and vapor proof.
  • waterproof and vapor permeable outside band is a band favorably with vapor permeability factor ⁇ from 30 to 30.000 and it is usually made on a base of fleece and EPDM
  • inner band is a waterproof and vapor proof band, favorably with vapor permeability factor ⁇ from 90.000 to 300.000 or ⁇ 3.000.000 and similary it is usually made on a base of fleece and EPDM.
  • the lath is made from waterproof and vapor permeable material, favorably it is foamed EPDM or foamed PE or expanding band 300 Pa or expanding band 600 Pa or combination of expanding bands 300 Pa and 600 Pa.
  • both longitudinal edges of spacer chunk, which are being the top part of the beam - are filled with expanding band, favorably 300 Pa, which is sealing contact area of the spacer chunk and most extended parts of window profile.
  • cushioning strap which is favorably made out of foamed EPDM or foamed PE or expanding band 300 Pa or low pressure PUR foam or adhesive mortar.
  • Anchors which optionally are retractable or extendable, allow to be easily bended, which lets you transport it very comfortably because you can put twice more beams on one pallet than you would be able to if you had stiff anchors. Introducing the bending anchors is also very helpful during the montage. Wherein the usage of stiff anchors during the montage has its own pros, because it allows you to join each beam together before securing it in window hole.
  • the System provides an ability to put any number of the anchors in the beam, according to the projected and expected strength of the beam. They can be mounted each 30, 40cm or at any distance between them, wherein they are adjusted to carry any, predicted load per one meter of length, the more that strength of the anchors can be planned and adjusted by choosing its thickness. Side beams and upper beams aren't carrying such loads as lower beam, and that's why their parameters can be lowered and different.
  • fig.1 - shows beams with unfolded anchors - in perspective view
  • fig.2 - shows cross section of square shaped beam settled on the wall
  • fig.3 - shows cross section of rectangular shaped beam settled on the wall
  • fig.4 - shows cross section of triangular shaped beam settled on the wall
  • fig.5 - show cross section of polygonal beam settled on the wall
  • fig.6 - shows metal anchor with two hinged joints
  • fig.7 - shows metal anchor with one hinged joint and one extending element
  • fig.8 - shows metal anchor with two extending elements
  • fig.9 - shows metal anchor with two hinged joints and plastic material chunk
  • fig.10 - shows vertical cross-section of the triple nut
  • fig.11 - shows triple nut - top view
  • fig.12 - shows vertical cross-section of the double nut
  • fig.13 - shows spacer for under the anchor
  • Anchors 2 are distributed in the beam 1 according to the loads which are supposed to be carried by the beam 1, favorably each 250mm. Technical parameters of those elements are chosen so each anchor 2 can carry a load of 150kg, which means that beam 1 can carry 600kg per one meter of its length. Distributing anchors 2 each 250mm allows easy division of the beam 1 into 30 or 60cm sections. That, easy to count and project ability to cut a beam 1 allows building any size of window, for example 10 x 10m, which gives the possibility of building facades construction, not only windows, which other system can't provide.
  • Metal anchors 2 are adapter to mount windows, doors, and facades out of PVC, aluminium and wood and then their optimal width is from 50 to 90mm or relatively from 100 to 150mm to the wall in the warming zone.
  • anchors 2 in our system with trebly resolved joints, which can be: stiff joints 3 or hinged joints 4 relatively extending elements 5.
  • Each of the anchors 2 described above has an option of using plastic chunk 6, relatively metal or wood or another hard material, which can be cut and has any shape, or has an option of using plastic chunk which is extruded and has any shape, wherein chunks 6 are embedded in the beam 1.
  • Chunk 6 is made favourably out of plastic material, for example:
  • Anchors 2 are embedded in the beam 1 so to say in two rows. Configuration of the joints and extending elements 5 in the anchor 2 is free, yet always - if it is hinged joint 4 then after unfolding, and if it is extended element 5 then after its protrusion - peripheral elements of the anchor 2 from one of the row is mounted in the window hole, and from the second row to the wall 7. Therefore beam 1 is equipped with two rows of anchors 2 for example:
  • stiff joint 3 of the anchor 2 In the system, there is predicted a possibility to use stiff joint 3 of the anchor 2. Whereas other anchors 2 with moving joints, both with hinged joint 4 and extending element, allow to fold during the transportation and remain folded during the first phase of the montage, during the settling of the beam 1 around the window hole. Wherein axle of rotation of hinged joint 4 is parallel to the edge of the beam 1, and a part of extending element 5 is perpendicular.
  • Triple nut 10 contains so to say of three separate nuts-screws, which have thread on their outside circumference in the same direction as the thread on outside circumference of the montage screw 9, whereas inside circumference of these nuts have their threads in opposite directions, so that while screwing in the montage screw 9 they squeeze together to the anchor. Thanks to the triple nut 10 there is a way to regulate any height of the anchor 2 to the wall 7. Wherein construction of the triple nut 10 allows control being done with all three elements of the triple nut 10. The task of its outer part is to fasten all three parts of the triple nut 10 stiffly to the tin anchor 2,and stiffening with anchors 2 plane.
  • washers 12 are helpful, in which there are at least two cavities 13 done on the longer edge of the washer 12, relatively both on the longer and shorter edge of the washer 12. Washers 12 allow smooth height regulation, and if you move them using hole 8, which favorably longer, in which you screw montage screw 9, without fastening as hard as you can. Then you can move it in any direction, after that in the smaller hole 8 screw it in:
  • anchors 2 are placed in beams 1 in two rows.
  • One row contains anchors 2, which will be put on the hole in the wall 7, in which you want to put window etc.
  • second row of the anchors 2 is being used to put montage screws 15 inside of them allowing to secure beams 1 with element between them, which beams 1 are surrounding.
  • the task of anchor 2 is on one side - to fix beams to the wall 7, and on the other side beams 1 to window frame, or another mounted element between beams 1.
  • Part of the anchor 2 - that part, which is embedded in the beam - is at least one, made favorably out of metal or plastic material tube 16, which stabilizes anchor 2 in the beam, and simultaneously so to say cover the sector which secures anchor 2 with window frame, because it allows convenient insertion into the tube 16 - that is into embedded in the beam 1 anchor 2, and then via the beam 1 into the window frame - securing screw 15, which is screwed into window frame or door frame or facade frame.
  • Tube 16 allows deep insertion from the outside - in this case from the bottom - securing screw 15, which is inserted so to say from the outside to the inside of build window hole. Tube 16 creates some kind of a distance to the securing screw 15, making it easier to secure beam 1 to the window frame. Length of the tube 16 is chosen to make it easy to screw screws in using wrenches, cordless screwdriver. Practically it means that securing screw 15 is already in the tube 16 by the manufacturer of the beam 1, during the montage it is easy, fast and deep and stable to screw securing screw 15 into the window frame, door frame or facade frame. After screwing in the securing screw 15 tube 16 is sealed and covered.
  • spacing washers 12 for example thermal insulating, that have various thickness, which will overcome any inequalities in the wall 7, and will provide extra thermal insulation.
  • Washers 12 optimal thicknesses are 1,0mm or 2,0mm or 5,0mm or 10,0mm.
  • Juxtaposition of the developed and described elements allows regulation of the position of the beam 1 according to the wall 7, using three ways of regulations: using spacing washers 12, using properly regulated triple nut 10 or relatively using double nut 11.
  • Beam 1 with anchors 2 embedded in it - with properly chosen joints - is made by filling proper mold starting from the most inside part of it slowly extracting the head to the most outside part of the mold, covering everything with foamed plastic material, filling the mold and embedding anchors 2 in the beam 1.
  • the material used is:
  • Integral part of the beam 1 is hard, waterproof, longitudinal, spacer chunk 17, which task is to lock mounted element frame, for example window frame, which basing on the spacer chunk 17 will not fall out, even if they aren't fixed properly yet.
  • Spacer chunk 17 is made out of material, which favourably is made out of:
  • Entire beam 1 with spacer chunk 17 is covered with band, wherein the top side and outside and also down side of the beam 1 is covered with outside band 18 which is vapor permeable but waterproof, but the inner side of the beam 1 is covered with inner band 19 which is waterproof and vapor proof.
  • Both bands were chosen according to rules of gasses diffusion. They allow vapor to go outside, but prevent getting water inside the room and thereby creating vapor and water proof insulation of the room.
  • Waterproof and vapor permeable outside band 18 is a band with favorably vapor permeability factor ⁇ from 30 to 30.000 and is usually made based on fleece and EPDM.
  • inner band 19 is a waterproof and vapor proof band, favorably vapor permeability factor ⁇ from 90.000 to 300.000 and similarly is usually made based on fleece and EPDM.
  • Lath 20 is made out of waterproof and vapor permeable material, and favorably it is:
  • both longitudinal edges of spacer chunk, which are being the top part of the beam - are filled with expanding band, favorably 300 Pa, which is sealing contact area of the spacer chunk and most extended parts of window profile.
  • Tubes 16 which were used to insert montage screws are sealed and covered.
  • Described way can also be done by doing everything in different order of doing tasks. And so, way of montage, sealing and thermal insulation of windows, facades and doors favorably in the building warming zone, is being done by doing specific task - order of this task can be changed - which do not require any previous preparations, or technical knowledge.
  • the work is started by dismantling window sash, to leave window frame alone.
  • module is: leveled an set vertically, and next you secure it to the window hole, on the window hole or to the wall 7 with montage screws 9, then you secure window frame to it using securing screws 15, relatively in reverse order described module is secured to the window frame using securing screw 15, then it is being leveled and set vertically and using montage screws secure it to the window hole, in the window hole or to the wall 7, wherein in both cases, if such described module is missing beam 1c or 1d - those beams are placed and secured to the wall 7 and window frame using montage screws 9 and securing screws 15, while being on stage of connecting elements together favorably you properly level them out and make sure they are vertical by using washers 12 and triple nut 10 relatively using double nut 11, and tubes 16 which were used to insert screws are sealed and covered.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Door And Window Frames Mounted To Openings (AREA)
  • Wing Frames And Configurations (AREA)
  • Special Wing (AREA)

Description

  • A subject of this invention are system of mounting, sealing and thermal insulation of windows, facades and doors profitably in the building warming zone and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the jamb building warming zone. Developed invention includes complex system of solutions for mounting, regulation, insulation and thermal insulation, waterproofing and vapor proofing the window, which at the same time is vapor permeable and is leading away any possible vapor outside, according to rules of gases diffusion. Elaborated system and method are designed for installation of windows, facades and doors made both out of PVC as well as out of aluminum or wood, beside of their width and weight.
  • So far there are many known constructions and methods of mounting window joinery in windows openings.
  • Out of polish description of the patent application nr of the application P-384409 (published BUP nr 17/2009) there is known "Method of mounting window frames in jambs and support for mounting window frames in the jambs". The method of mounting window frames in the jambs lies in the fact that window frame is positioned on at least two supports, permanently embedded in bearing wall and insulating layer. Each support has a shape of crossed high T-section and is divided into two unequal parts by dragging wall which is perpendicular to upper plane and axis of support wall. Dragging wall, during the installation of windows, is leaned on inner bearing wall or outer façade wall of three layer wall. Above dragging wall there is setting lath, parallel to upper plane of the support and sticking above it. Window frame footing is positioned above insulating layer, on upper plane of the support and is leaned on outer vertical wall of setting lath.
  • Out of polish description of the patent application nr of the application PL-214536 (published BUP nr 22/2010) there is known "Sunroof with fastening section". This window main feature is that fastening section has two parallel arms, wherein one of the arms, mounted to roof construction, is entirely located below lower plane of window jamb and at the same time below upper plane of rafter, and other arm which is mounted to jamb is covered with insulating element.
  • Yet another solution was shown in polish description of the patent application nr of the application Ru-66073 entitled "Window with outer lining" (published BUP number 04/2012). The subject of a utility model is a window with outer lining, containing jamb and wing, which frames are made out of plastic and have vertical and oblique plane covered with lining made out of aluminum, except that each of linings has a hitch shaped along the edge which are used to mount it to edge of the vertical plane and to the edge of oblique plane. It is also glued on the inner side to the oblique plane of the covered frame. The glue is distributed constantly along edge of the oblique plane and in proximity of the edge of oblique plane.
  • Out of Polish description of the patent application nr of the application P-392912 (published BUP number 11/2012) there is also known "Method of founding and mounting window frames in jambs and support for founding window frames in jambs". It based on a fact that window frame with doorstep lath fixed to it is settled on at least two supports, permanently embedded in bearing wall and insulating layer, after previously cutting that layer slantwise right near the wall. Each support has a shape of crossed high T-section and is dived into two unequal parts by dragging wall which is perpendicular to upper plane and axis of support. Supports are settled in slots incised or mason at the corners of the bearing wall in a such way that plane of the dragging wall support is leaning on outer side of bearing wall mounted with an extra support anchor. Window frame with doorstep lath is placed above insulating layer, on the upper plane and tightened against dragging support salience. Oblique cut of the insulation makes room for low-resilience PU foam which is bounding window frame with bearing wall and is also insulating periphery.
  • DE 20 2006 018203 U1 discloses a system for mounting, sealing and thermal insulating of windows, façades and doors favourably in the building warming zone, wherein it comprises beams with anchors, the beams are for being placed around a window opening, wherein the anchors are arranged in two rows, and the peripheral anchors from one row are for mounting in the window opening, and the peripheral anchors from the other row are for mounting to the wall.
  • DE 20 2006 018203 U1 thereby discloses all the features of the preamble of claim 1. Objective of elaborated invention is creating a complex, complete and universal system and way of building window, door and shop windows holes, which would minimize heat permeation and would be also user friendly and easy to install.
  • That objective was realized by developing a system of mounting , insulating and thermic isolation of window, facades and door favorably in building warming zone, which is characterized by a fact that basic elements used in this method are beams with anchors inside of it, which are placed around bodied holes of the building. Anchors are so to say placed in two rows, and peripheral parts of one of anchor row is mounted in window hole and other row of anchor peripheral parts is mounted to the wall and an integral part of the beam is a hard, waterproof, longitudinal, spacer chunk. Favorably anchors are deployed in the beam according to the load, which beam is supposed to carry, usually every 250mm.
  • Favorably each anchor is adapted to carry a load of 150kg, which means that beam is adapted to carry a load of 600kg per 1 meter of its length.
  • Favorably in the system it is foreseen that beam can have different cross-section, including square, rectangular, triangular and polygonal.
  • Favorably optimal width of metal anchor is from 50 to 90mm, relatively from 100 to 150mm to the wall in warming zone.
  • Favorably in the system it is foreseen, that there is a way of using different anchors, with trebly joints, which can be stiff joints or hinge joints, relatively extendable elements, wherein each anchor described above can be made with block of plastic material, metal or wood which has any shape and is cut out of a chunk or which is made out of plastic material, metal or wood which has any shape and is made by extrusion, wherein block are embedded in the beam.
  • Favorably block is made favorably out of plastic material, especially out of PVC, ABS, PE or PP, relatively out of metal, wood or another hard material.
  • Favorably anchors, are anchors with hinged joint mounted in the window hole and hinged joint mounted to the wall or anchor with hinged joint mounted in the window hole and stiff joint mounted to the wall, or anchor with stiff joint mounted in the window hole and hinged joint mounted to the wall, or anchor with stiff joint mounted in the window hole and stiff joint mounted to the wall, or anchor with hinged joint mounted in the window hole and extendable element mounted to the wall, or anchor with extendable element mounted in the window hole and hinged joint mounted to the wall, or anchor with extendable element mounted in the window hole and extendable element mounted to the wall, or anchor with extendable element mounted in the window hole and stiff joint mounted to the wall, or anchor with stiff joint mounted in the window hole and extendable element mounted to the wall.
  • Favorably, in the peripheral parts of the anchor, those which are not embedded in the beam - independently of the fact if it is a stiff joint, hinged joint or extendable element - there are two holes, which can be oval, in which montage screws are entered. Then those screws are entered into the wall through the anchor via double or triple nut.
  • Favorably triple nut consists so to say out of three following nuts-screws, which have thread on their outside circumference in the same direction as the thread on outside circumference of the montage screw, whereas inside circumference of these nuts have their threads in opposite directions.
  • Favorably between the anchor and the wall there are placed some washers, in which there are at least two recesses, made on the side of the longer edge of the washer, relatively both on the longer and shorter edge of the washer.
  • Favorably in the middle part of the double nut there is montage screw screwed in, which is fixing the anchor to the wall, and favorably there is an extra blockade with spikes, which block in the hole preventing the montage screw from withdrawal.
  • Favorably part of the anchor - that part which is embedded in the beam - is at least one pipe, made favorably from metal or plastic material, placed perpendicularly to that side of the beam which will face the frame of the mounted element, which stabilizes anchor in the beam and by which montage screw will be inserted, then it will go through the beam into the frame of mounted element (either window frame, door frame or facade frame). After then it is being sealed and covered.
  • Favorably in the part between beams and frame of mounted element, or between the anchor and the wall, there is washer placed, which favorably is 1,0mm or 2,0mm or 5,0mm or 10,0mm in thickness.
  • Favorably beam with anchors embedded in it is made by filling suitable mold with foamed plastic material, in a process where head is being slowly pulled from the most inside part of the mold to the outside and it is covering anchors with material. The filling material is favorably foamed EPDM or foamed PE or foamed polystyrene or foamed polyurethane or styrodur or foamed PVC or polystyrene or hard Styrofoam or composite made out of polyurethane and glass fiber with density higher than 100kg/m3 or composite made out of polyurethane and glass fiber and mineral wool with density higher than 100kg/m3 or another foamed and stiff material which has closed cells, favorably with density from 40 kg/m3 to 100 kg/m3.
  • Favorably the integral part of the beam which is a hard, waterproof, longitudinal, spacer chunk is made out of material made from compressed wood dust and plastic material which is polyurethane or foamed PVC or hard Styrofoam or styrodur or composite made out of polyurethane and glass fiber with density higher than 100kg/m3 or composite made out of polyurethane and glass fiber and mineral wool with density higher than 100kg/m3 or another foamed and stiff material which has closed cells, favorably with density from 40 kg/m3 to 100 kg/m3.
  • Favorably entire beam with spacer chunk is covered with band, wherein the top side and outside and also down side of the beam is covered with outside band which is vapor permeable but waterproof, but the inner side of the beam is covered with inner band which is waterproof and vapor proof.
  • Favorably waterproof and vapor permeable outside band is a band favorably with vapor permeability factor µ from 30 to 30.000 and it is usually made on a base of fleece and EPDM, while inner band is a waterproof and vapor proof band, favorably with vapor permeability factor µ from 90.000 to 300.000 or µ±3.000.000 and similary it is usually made on a base of fleece and EPDM.
  • Favorably on spacer chunk there is placed extra cushioning and sealing lath, on which window profile is mounted, wherein the lath is made from waterproof and vapor permeable material, favorably it is foamed EPDM or foamed PE or expanding band 300 Pa or expanding band 600 Pa or combination of expanding bands 300 Pa and 600 Pa.
  • Favorably both longitudinal edges of spacer chunk, which are being the top part of the beam - are filled with expanding band, favorably 300 Pa, which is sealing contact area of the spacer chunk and most extended parts of window profile.
  • Favorably between beam and the wall there is and cushioning strap, which is favorably made out of foamed EPDM or foamed PE or expanding band 300 Pa or low pressure PUR foam or adhesive mortar.
  • The essence of the development of this method is that its realization is being started from dismantling window sash, then you cut lower beam to the window width favorably reduced by 10mm, then it is leveled and slided into elevation according to the project. You are also initially regulating, screwing the montage screws into most far holes of the peripheral anchors, regulate it with washer and triple relatively double nut and then secure it to the wall, next you measure the height of the mounted element, for example window, then add thickness of the lower beam to it and subtract favorably 5mm - this is how long two side beams, placed on the sides of the window hole, should be. Side beam is secured to the wall, verticality and leveling is checked, then its insertion is regulated according to the project of the elevation, next it window frame is put and screw are screwed into it, starting from joining lower beam to side beams. Then you measure width of the window and favorably add two lower beam thicknesses and side beam thicknesses - this is how long the upper beam should be. Upper beam is placed on the top of window hole and screwed into upper window frame and two side beams. At the end window sash is mounted, wherein the order of measuring and cutting each beam fragment is not specified.
  • The essence of the development of this method is that you do some steps in sequence - wherein the sequence can be changed. You start from dismantling the window sash, then you measure lower beam to the width of window subtracted by 10mm and you cut the beam. Then you measure two beams to the height of the window adding thickness of the beam to it and subtracting 5mm from it, then you cut it, wherein beam will be placed on the sides of window hole. After that you measure a width of the window adding two thicknesses of the beam to it and then you cut the beam. Next part of the montage is done according to one of the schemes: described elements which are two beams are precisely joined together keeping in mind that you need to keep 90 degree angle, forming an "L" shape, described elements which are three beams precisely joined together keeping in mind that you need to keep 90 degree angle, forming an "U" shape or described elements which are four beams precisely joined together, keeping in mind that you need to keep 90 degree angle, forming an "O" shape. Module joined like that is then leveled and set vertically. After that you secure it with montage screw to the wall, on the window hole, or in it, then using montage screws it is secured to the window frame, relatively in the reverse order described order: is joined together using screws with window frame, then it is being leveled and placed vertically, after that you secure it inside window hole, on it, or to the wall using montage screws, wherein in both cases, if module described like that is missing one beam - that beam is added and joined with wall, window frame and window hole. During that step you favorably precisely level it and check whether it is vertical, you make sure that is secured properly using washer and triple nut, relatively double nut, tube, through which screws were moved in are sealed.
  • Developed system of montage, sealing, and thermal insulation of window, facades and door favorably in the warming zone - is using elements, which allow the process of building glassed holes in the wall very easy and possible to do even for unqualified worker. This system is reliable and if you keep basic precision always leads to splendid results. The only term of splendid result is to properly level lower beam and to keep side beams vertical.
  • Transportation is very convenient for that system, montage also. Anchors, which optionally are retractable or extendable, allow to be easily bended, which lets you transport it very comfortably because you can put twice more beams on one pallet than you would be able to if you had stiff anchors. Introducing the bending anchors is also very helpful during the montage. Wherein the usage of stiff anchors during the montage has its own pros, because it allows you to join each beam together before securing it in window hole.
  • System provides an ability to put any number of the anchors in the beam, according to the projected and expected strength of the beam. They can be mounted each 30, 40cm or at any distance between them, wherein they are adjusted to carry any, predicted load per one meter of length, the more that strength of the anchors can be planned and adjusted by choosing its thickness. Side beams and upper beams aren't carrying such loads as lower beam, and that's why their parameters can be lowered and different.
  • Both construction of each element and materials used to make them - eliminate possibility of creating thermal bridges between the surroundings and inside of the building.
  • So far there weren't known any complex system of elements allowing full montage of window, doors and facades. System like that wasn't even assumed, because it was thought that building window hole should be a sum of separate stages of work, organized independently, usually done by different special team and independently prepared employees.
  • Described complete and multi-option system is reliable and easy to implement.
  • System of mounting, sealing and thermal insulating of windows, doors and facades is presented on the drawing on which fig.1 - shows beams with unfolded anchors - in perspective view, fig.2 - shows cross section of square shaped beam settled on the wall, fig.3 - shows cross section of rectangular shaped beam settled on the wall, fig.4 - shows cross section of triangular shaped beam settled on the wall, fig.5 - show cross section of polygonal beam settled on the wall, fig.6 - shows metal anchor with two hinged joints, fig.7 - shows metal anchor with one hinged joint and one extending element, fig.8 - shows metal anchor with two extending elements, fig.9 - shows metal anchor with two hinged joints and plastic material chunk, fig.10 - shows vertical cross-section of the triple nut, fig.11 - shows triple nut - top view, fig.12 - shows vertical cross-section of the double nut, fig.13 - shows spacer for under the anchor, fig.14 - also shows spacer for under the anchor, fig.15 - shows vertical cross-section of the double nut being placed in the anchor, fig.16 - shows vertical cross-section of the double nut placed in the anchor, fig.17 - shows example of mounting a PVC profile on the lower beam, fig.18 - shows diagram drawing showing order and way of montage of the system according to the invention.
  • According to further described way, while using described system, you mount, seal and insulate thermally favorably in the building warming zone.
  • Basic elements used in that way are beams 1 with anchors 2 embedded in them, which are placed around window hole.
  • Anchors 2 are distributed in the beam 1 according to the loads which are supposed to be carried by the beam 1, favorably each 250mm. Technical parameters of those elements are chosen so each anchor 2 can carry a load of 150kg, which means that beam 1 can carry 600kg per one meter of its length. Distributing anchors 2 each 250mm allows easy division of the beam 1 into 30 or 60cm sections. That, easy to count and project ability to cut a beam 1 allows building any size of window, for example 10 x 10m, which gives the possibility of building facades construction, not only windows, which other system can't provide.
  • In the system there are predicted beams 1 with different cross-sections, for example square, rectangular or triangular and others.
  • Metal anchors 2 are adapter to mount windows, doors, and facades out of PVC, aluminium and wood and then their optimal width is from 50 to 90mm or relatively from 100 to 150mm to the wall in the warming zone.
  • We provided a possibility to use different types of anchors 2 in our system with trebly resolved joints, which can be: stiff joints 3 or hinged joints 4 relatively extending elements 5. Each of the anchors 2 described above has an option of using plastic chunk 6, relatively metal or wood or another hard material, which can be cut and has any shape, or has an option of using plastic chunk which is extruded and has any shape, wherein chunks 6 are embedded in the beam 1. Chunk 6 is made favourably out of plastic material, for example:
    • PVC
    • ABS
    • PE
    • PP
    • Relatively from another type of plastic material
  • Anchors 2 are embedded in the beam 1 so to say in two rows. Configuration of the joints and extending elements 5 in the anchor 2 is free, yet always - if it is hinged joint 4 then after unfolding, and if it is extended element 5 then after its protrusion - peripheral elements of the anchor 2 from one of the row is mounted in the window hole, and from the second row to the wall 7. Therefore beam 1 is equipped with two rows of anchors 2 for example:
    • With hinged joint 4 mounted in the window hole and hinged joint 4 mounted to the wall 7
    • With hinged joint 4 mounted in the window hole and stiff joint 3 mounted to the wall 7
    • With stiff joint 3 mounted in the window hole and hinged joint 4 mounted to the wall 7
    • With stiff joint 3 mounted in the window hole and stiff joint 3 mounted to the wall 7
    • With hinged joint 4 mounted in the window hole and extending element 5 mounted to the wall 7
    • With extending element 5 mounted in the window hole and hinged joint 4 mounted to the wall 7
    • With extending element 5 mounted in the window hole and extending element 5 mounted to the wall 7
    • With extending element 5 mounted in the window hole and stiff joint 3 mounted to the wall 7
    • With stiff joint 3 mounted in the window hole and extending element 5 mounted to the wall 7
  • In the system, there is predicted a possibility to use stiff joint 3 of the anchor 2. Whereas other anchors 2 with moving joints, both with hinged joint 4 and extending element, allow to fold during the transportation and remain folded during the first phase of the montage, during the settling of the beam 1 around the window hole. Wherein axle of rotation of hinged joint 4 is parallel to the edge of the beam 1, and a part of extending element 5 is perpendicular. As it is shown on the drawing, in the not embedded (peripheral) parts of the anchor- independently if they are outside parts of the stiff joint 3, or hinged joint 5, or extending element 5 - favourably there are made two holes 8, which can be oval, thanks to that, during the montage of the anchor 2 you can choose a spot to secure it, in the bounds of the holes 8. Montage screws 9 are put through anchor 2 to the wall 7 via triple nut 10 or double nut 11. Triple nut 10 contains so to say of three separate nuts-screws, which have thread on their outside circumference in the same direction as the thread on outside circumference of the montage screw 9, whereas inside circumference of these nuts have their threads in opposite directions, so that while screwing in the montage screw 9 they squeeze together to the anchor. Thanks to the triple nut 10 there is a way to regulate any height of the anchor 2 to the wall 7. Wherein construction of the triple nut 10 allows control being done with all three elements of the triple nut 10. The task of its outer part is to fasten all three parts of the triple nut 10 stiffly to the tin anchor 2,and stiffening with anchors 2 plane. Additionally in the optimal placing of the anchor 2 to the wall 7 washers 12 are helpful, in which there are at least two cavities 13 done on the longer edge of the washer 12, relatively both on the longer and shorter edge of the washer 12. Washers 12 allow smooth height regulation, and if you move them using hole 8, which favorably longer, in which you screw montage screw 9, without fastening as hard as you can. Then you can move it in any direction, after that in the smaller hole 8 screw it in:
  • A little bit differently we constructed a double nut 11, because its outer part has spikes 14, in a shape of small pins, which are thin enough to "fall" into hole 8 and block their selves in the hole 8 in the peripheral part of the anchor 2. That element also allows smooth regulation of whole beam 1 (up, down, right, left). Middle part of the double nut 11 is projected in such a way that you can screw montage screw 9 securing anchor 2 to the wall 7. I doesn't interfere with turning any other part of the double nut 11. Spikes 14 are some kind of a blockade, which block itself in the hole 8, preventing the montage screw 9 from withdrawal.
  • As described below, way of mounting, sealing and thermal insulating, is done by fastening - on the outside part of the window hole and around it - beams 1, which via anchors 2 are secured using montage screws 9 to the outside part of the wall 7 in the warming zone, relatively partially in the warming zone and partially in the window hole.
  • As shown on the drawings and described above, anchors 2 are placed in beams 1 in two rows. One row contains anchors 2, which will be put on the hole in the wall 7, in which you want to put window etc. Whereas second row of the anchors 2 is being used to put montage screws 15 inside of them allowing to secure beams 1 with element between them, which beams 1 are surrounding.
  • The task of anchor 2 is on one side - to fix beams to the wall 7, and on the other side beams 1 to window frame, or another mounted element between beams 1. To make it possible there is necessary to surely secure anchors 2 with beams 1. Part of the anchor 2 - that part, which is embedded in the beam - is at least one, made favorably out of metal or plastic material tube 16, which stabilizes anchor 2 in the beam, and simultaneously so to say cover the sector which secures anchor 2 with window frame, because it allows convenient insertion into the tube 16 - that is into embedded in the beam 1 anchor 2, and then via the beam 1 into the window frame - securing screw 15, which is screwed into window frame or door frame or facade frame. On the drawings it is shown placing of the lower beam 1, on which there is placed horizontally, lower window frame. Tube 16 allows deep insertion from the outside - in this case from the bottom - securing screw 15, which is inserted so to say from the outside to the inside of build window hole. Tube 16 creates some kind of a distance to the securing screw 15, making it easier to secure beam 1 to the window frame. Length of the tube 16 is chosen to make it easy to screw screws in using wrenches, cordless screwdriver. Practically it means that securing screw 15 is already in the tube 16 by the manufacturer of the beam 1, during the montage it is easy, fast and deep and stable to screw securing screw 15 into the window frame, door frame or facade frame. After screwing in the securing screw 15 tube 16 is sealed and covered.
  • During the montage of the beam 1 with anchors 2 to the window frame it is possible to also use spacing washers 12, for example thermal insulating, that have various thickness, which will overcome any inequalities in the wall 7, and will provide extra thermal insulation. Washers 12 optimal thicknesses are 1,0mm or 2,0mm or 5,0mm or 10,0mm.
  • Construction of the whole system, including beams 1 and anchors 2 imposes such a way of securing it to the wall 7, that every element is carrying forces, which vector is perpendicular to the axis of the securing element, which means that they are subjected to shear strength and not to flexural or grab strength. That means that strength of developed system is as big as possible.
  • Thanks to such simple yet functional construction of the anchors 2 and cooperating with them elements, during the montage, it doesn't matter if there are any inequalities in the wall or window hole.
  • Juxtaposition of the developed and described elements allows regulation of the position of the beam 1 according to the wall 7, using three ways of regulations: using spacing washers 12, using properly regulated triple nut 10 or relatively using double nut 11.
  • Beam 1 with anchors 2 embedded in it - with properly chosen joints - is made by filling proper mold starting from the most inside part of it slowly extracting the head to the most outside part of the mold, covering everything with foamed plastic material, filling the mold and embedding anchors 2 in the beam 1. Favorably the material used is:
    • foamed EPDM
    • foamed PE
    • foamed polyurethane
    • foamed polystyrene
    • styrodur
    • foamed PVC
    • polystyrene
    • hard Styrofoam
    • composite containing out of polyurethane and glass fiber with density higher than 100kg/m3
    • composite containing out of polyurethane and glass fibre and mineral wool with density higher than 100kg/m3
    • another foamed stiff material with closed cells, favourably with density from 40 to 100kg/m3
  • Integral part of the beam 1 is hard, waterproof, longitudinal, spacer chunk 17, which task is to lock mounted element frame, for example window frame, which basing on the spacer chunk 17 will not fall out, even if they aren't fixed properly yet.
  • Spacer chunk 17 is made out of material, which favourably is made out of:
    • compressed wood dust and plastic material with polyurethane
    • polystyrene
    • foamed PVC
    • hard Styrofoam
    • styrodur
    • composite consisting of polyurethane and glass fiber with density higher than 100kg/m3
    • composite consisting of polyurethane and glass fibre and mineral wool with density higher than 100kg/m3
    • another foamed stiff material with closed cells, favourably with density from 40 to 100kg/m3
  • Entire beam 1 with spacer chunk 17 is covered with band, wherein the top side and outside and also down side of the beam 1 is covered with outside band 18 which is vapor permeable but waterproof, but the inner side of the beam 1 is covered with inner band 19 which is waterproof and vapor proof. Both bands were chosen according to rules of gasses diffusion. They allow vapor to go outside, but prevent getting water inside the room and thereby creating vapor and water proof insulation of the room. Waterproof and vapor permeable outside band 18 is a band with favorably vapor permeability factor µ from 30 to 30.000 and is usually made based on fleece and EPDM. Whereas inner band 19, is a waterproof and vapor proof band, favorably vapor permeability factor µ from 90.000 to 300.000 and similarly is usually made based on fleece and EPDM.
  • On the spacer chunk 17 there is also extra cushioning and sealing lath 20, on which mounted profile will be placed. Lath 20 is made out of waterproof and vapor permeable material, and favorably it is:
    • foamed EPDM
    • foamed PE
    • expanding band 300 Pa
    • expanding band 600 Pa
    • combination of expanding bands 300 Pa and 600 Pa
  • Favorably both longitudinal edges of spacer chunk, which are being the top part of the beam - are filled with expanding band, favorably 300 Pa, which is sealing contact area of the spacer chunk and most extended parts of window profile.
  • Between beam 1 and a wall 7 there is an cushioning strip 22 which favorably is made out of :
    • foamed EPDM
    • foamed PE
    • low pressure PUR foam
    • adhesive mortar
  • Way of montage, sealing and thermal insulation of windows, facades and door favorably in the building warming zone, is being done by doing specified task, which do not require any previous preparations, or technical knowledge. The work is started by dismantling window sash, to leave window frame alone.
  • Then you cut lower beam 1a to the width of the window subtracted by 10mm, then it is leveled and slided into elevation according to the project. You are also regulating it, screwing montage screws 9 into border holes with oval cross section, then you regulate it with washers 12 and tripe nut 10, relatively double nut 11 and secure it to the wall 7.
  • Next, you measure height of the window, add height of the lower beam la and subtract 5mm - this is the length you cut the side beams 1b, 1c, which will be placed on the side of window hole, of which side beam 1b is secured to the wall 7, then you check if it is vertical and level, next you adapt it into sliding slot in the building elevation. Afterwards you put in window frame and screw in montage screws 15, starting from connecting lower beam 1a, then side beam 1b.
  • Subsequently you measure width of the window and add two widths of beam 1a and beam 1b-that's the length of the beam 1d, which will be placed on the top of the window hole.
  • Then you screw beam 1c to the other side of beam 1a and to the window frame.
  • Respectively screw upper beam 1d to the side beams 1b and 1c. Tubes 16 which were used to insert montage screws are sealed and covered.
  • Described way can also be done by doing everything in different order of doing tasks. And so, way of montage, sealing and thermal insulation of windows, facades and doors favorably in the building warming zone, is being done by doing specific task - order of this task can be changed - which do not require any previous preparations, or technical knowledge. The work is started by dismantling window sash, to leave window frame alone.
  • Then:
    • You measure lower beam 1a to the width of the window subtracted by 10mm, and cut it
    • You measure two beam 1b and 1c to the height of the window, adding height of the lower beam 1a and favorably subtracting 5mm. Then you cut beams to length. Those beams will be placed on the sides of window hole.
    • You measure beam 1d to the width of the window, adding two thicknesses of beams 1a and 1b, intended for placing on the side of the window - this is the length of the beam 1d you should cut. It will be placed on the top of the window hole.
  • Next stage of described way is done by choosing one of options listed below:
    • described elements, which are beam 1a and 1b also beam 1c and 1d, are precisely connected together keeping in mind that there must be 90 degree angle between them, into two "L" shaped modules
    • described elements, which are beam 1a and 1b also beam 1c, are precisely connected together keeping in mind that there must be 90 degree angle between them, into two "U" shaped module
    • described elements, which are beam 1a and 1b also beam 1c and 1d, are precisely connected together keeping in mind that there must be 90 degree angle between them, into two "O" shaped module
  • And that module is: leveled an set vertically, and next you secure it to the window hole, on the window hole or to the wall 7 with montage screws 9, then you secure window frame to it using securing screws 15, relatively in reverse order described module is secured to the window frame using securing screw 15, then it is being leveled and set vertically and using montage screws secure it to the window hole, in the window hole or to the wall 7, wherein in both cases, if such described module is missing beam 1c or 1d - those beams are placed and secured to the wall 7 and window frame using montage screws 9 and securing screws 15, while being on stage of connecting elements together favorably you properly level them out and make sure they are vertical by using washers 12 and triple nut 10 relatively using double nut 11, and tubes 16 which were used to insert screws are sealed and covered.
  • List of items
    1. 1. Beam (1a -lower beam, 1b and 1c - side beam, 1d-upper beam)
    2. 2. Anchor
    3. 3. Stiff joint
    4. 4. Hinged joint
    5. 5. Extending element
    6. 6. Chunk
    7. 7. Wall
    8. 8. Hole
    9. 9. Montage screw
    10. 10. Triple nut
    11. 11. Double nut
    12. 12. Washer
    13. 13. Cavities (in the washer)
    14. 14. Spikes (in the double nut)
    15. 15. Montage screw (beam to the frame)
    16. 16. Tube (embedded in the beam)
    17. 17. Spacer chunk
    18. 18. Outer band
    19. 19. Inner band
    20. 20. Lath (on spacer chunk)
    21. 21. Expanding band (on the edge of spacer chunk)
    22. 22. Strip (cushioning, placed between beam and wall)

Claims (15)

  1. System for mounting, sealing and thermal insulating of windows, facades and doors favourably in the building warming zone, characterized by comprising beams (1) with anchors (2) embedded into them, the beams (1) are for being placed around a window opening, wherein the anchors (2) are arranged in two rows, and the peripheral anchors (2) from one row are for mounting in the window opening, and the peripheral anchors (2) from the other row are for mounting to the wall (7), wherein an integral part of the beam (1) is a hard, waterproof, longitudinal, spacer chunk (17).
  2. System according to claim 1, characterized in that basic elements used in that system are beams (1) with anchors (2) embedded into them, which are placed 250mm from each other.
  3. System according to claim 1, characterized in that the beams (1) have rectangular, square, triangular or polygonal cross sections.
  4. System according to claim 1 or 2 or 3, characterized in that the anchors (2) are selected from stiff joints (3), hinged joints (4) or extending elements (5), wherein each of the anchors (2) optionally comprises achunk (6) made of plastic material or metal or wood or other hard material which is cut out and has any shape, and optionally with a chunk (6) made of plastic material or metal or other hard material, which is extruded and has any shape, wherein the chunks (6) are embedded in the beam (1).
  5. System according to claim 4, characterized in that chunk (6) is made of plastic material such as PVC, ABS, PE, PP or another hard material.
  6. System according to claims 1 to 3, characterized in that in not embedded parts of the anchors (2) selected from outer parts of extending elements (5), or hinged joints (4), or stiff joints (3) there are preferably made two holes that are preferably oval, in which montage screws (9) are inserted through the anchor (2) to the wall (7), by means of a triple nut (10) or a double nut (11).
  7. System according to claim 4, characterized in that the triple nut (10) consists of three following nuts-screws, which have thread on their outside circumference in the same direction as the thread on outside circumference of the montage screw (9), whereas inside circumference of these nuts have their threads in opposite directions.
  8. System according to claim 5, characterized in that between the anchor (2) and the wall (7) there are washers (12), in which there are at least two recesses (13), on the side of the longer edge of the washer (12), optionally both on the longer and shorter edge of the washer (12).
  9. System according to claim 4, characterized in that in the middle part of the double nut (11) there is montage screw (9) for fixing the anchor (2) to the wall (7), and preferably there is an extra blockade with spikes (14), for blocking in the hole (8) and preventing the montage screw (9) from withdrawal.
  10. System, according to claim 4, characterized in that part of the anchor (2) - that part which is embedded in the beam (1) is formed of at least one pipe (16), preferably made of metal or plastic material, and placed perpendicularly to that side of the beam (1) which is facing the frame of the mounted element, the pipe (16) stabilizes the anchor (2) in the beam (1) and through which the montage screw (15) is inserted, then it gos through the beam (1) into the frame of the mounted element formed by either a window frame, a door frame or a facade frame, whereas the pipe (16) is sealed and covered.
  11. System according to claims 1 to 8, characterized in that in the part between the beams (1) and the frame of mounted element, or between the anchor (2) and the wall (7), there is a washer (12) placed, which preferably is 1.0 mm or 2.0 mm or 5.0 mm or 10.0 mm in thickness.
  12. System according to claim 1 to 9, characterized in that the entire beam (1) with the spacer chunk (17) is covered with band, wherein the top side and outside and also down side of the beam (1) is covered with an outside band (18) which is vapor permeable and waterproof, and the inner side of the beam (1) is covered with an inner band (19) which is waterproof and vapor proof.
  13. System according to claim 12, characterized in that on the spacer chunk (17) there is placed an extra cushioning and sealing lath (20), on which window profile is mounted, wherein the lath (20) is made from waterproof and vapor permeable material.
  14. System according to claims 1 to 11, characterized in that both longitudinal edges of the spacer chunk (17), which form the top part of the beam (1) are filled with an expanding band (21), for sealing the contact area of the spacer chunk (17) and the most extended parts of the window profile.
  15. System according to claims 1 to 11, characterized in that between the beam (1) and the wall (7) there is a cushioning strap (22), which is preferably made of foamed EPDM or foamed PE or expanding band 300 Pa or low pressure PUR foam or adhesive mortar.
EP14806743.2A 2014-03-17 2014-09-05 System and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the warming zone Active EP3119971B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL14806743T PL3119971T3 (en) 2014-03-17 2014-09-05 System and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the warming zone

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PL407567A PL225701B1 (en) 2014-03-17 2014-03-17 System of fastening, sealing and thermal insulation of windows, fa�ades, doors, favourably in the area of warming, and the method of fastening, sealing and thermal insulation of windows, fa�ades, doors, favourably in the area of warming
PCT/PL2014/000101 WO2015142201A2 (en) 2014-03-17 2014-09-05 System and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the warming zone

Publications (2)

Publication Number Publication Date
EP3119971A2 EP3119971A2 (en) 2017-01-25
EP3119971B1 true EP3119971B1 (en) 2018-07-11

Family

ID=52007249

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14806743.2A Active EP3119971B1 (en) 2014-03-17 2014-09-05 System and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the warming zone

Country Status (3)

Country Link
EP (1) EP3119971B1 (en)
PL (2) PL225701B1 (en)
WO (1) WO2015142201A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3150790A1 (en) 2015-10-04 2017-04-05 MARBET Spólka z o.o. Method of joinery fitting and the set of joinery fitting elements

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017068408A1 (en) * 2015-10-19 2017-04-27 Kaminski Michal Marian Frame construction profile for closure of an opening in a construction wall, frames made of such profiles, windows or doors having such frames and a method of fastening such windows or doors, in insulating section of the walls
CN105756479A (en) * 2016-03-28 2016-07-13 安徽嘉伟新材料科技有限责任公司 Assembled building door-window mounting process combined member
PL240843B1 (en) 2016-12-24 2022-06-13 Ergo Plus Polska Spolka Z Ograniczona Odpowiedzialnoscia Frame beam of windows, doors and facades and method for producing the frame beam of windows, doors and facades
PL236131B1 (en) * 2018-01-30 2020-12-14 Ergo Plus Polska Spolka Z Ograniczona Odpowiedzialnoscia Set of assembly profiles and elements of the windows, doors or facade frames and method for assembling of windows, doors and facades
PL237813B1 (en) * 2018-03-08 2021-05-31 Janik Piotr Pik Plast The method of filling and insulating the gaps between the installed window or door frame and the wall
US11933098B1 (en) 2023-03-20 2024-03-19 Pella Corporation Fenestration unit with interior installation features and associated systems and methods

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL214536A1 (en) 1979-03-29 1980-10-06 Huta Im K
US20090211184A1 (en) * 2004-12-17 2009-08-27 Bay Industires Inc. Fins and kerfs in extruded aluminum door frames and frame elements
EP1788181A2 (en) * 2005-11-16 2007-05-23 Kurt Steineberg GmbH Frame arrangement
DE202006018203U1 (en) * 2006-12-01 2007-02-15 Bernhardt, Dieter Support console for window or door bearing, has parapet base bracket that is provided with casing, and corner reinforced console bracket, where support console is height adjustable
KR200461842Y1 (en) * 2007-10-12 2012-08-08 (주)엘지하우시스 angle for windows and doors
SE537296C2 (en) * 2010-06-22 2015-03-31 Svenska Boprodukter Ab Device for anchoring fittings to windows and doors
KR200451584Y1 (en) * 2010-07-01 2010-12-23 박수영 Extended Window Frame Support Brackets
PL66073Y1 (en) 2010-07-30 2012-08-31 Budvar Ct Społka Akcyjna Window with the outer cladding
PL217314B1 (en) 2010-11-10 2014-07-31 Krzysztof Kwiatkowski Method for the installation and mounting of window frames in the jambs and a support for installing window frames in the jambs
DE202012008857U1 (en) * 2012-09-17 2012-11-15 Ejot Baubefestigungen Gmbh Wall installation system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3150790A1 (en) 2015-10-04 2017-04-05 MARBET Spólka z o.o. Method of joinery fitting and the set of joinery fitting elements

Also Published As

Publication number Publication date
WO2015142201A3 (en) 2015-11-12
EP3119971A2 (en) 2017-01-25
PL225701B1 (en) 2017-05-31
WO2015142201A2 (en) 2015-09-24
PL3119971T3 (en) 2019-01-31
PL407567A1 (en) 2015-09-28

Similar Documents

Publication Publication Date Title
EP3119971B1 (en) System and method of mounting, sealing and thermal insulation of windows, facades and doors profitably in the warming zone
US9752319B1 (en) Building facade system
US9512665B2 (en) Universal fenestration cap system and method
US10724234B2 (en) Building facade system
US20140090321A1 (en) Modular building system utilizing composite, foam core panels
US20050005543A1 (en) Structural Element System and Structural Elements of Such System for Curtain Facades, Facade Linings, Sun Rooms, Soundproofing Walls, Fair Buildings and the Like
US4631884A (en) Building system
KR100542429B1 (en) Building using external facing material for construction
US10233635B2 (en) Temporary wall element
EP3421707B1 (en) Bay window assembly and method for installing a bay window system in a building
JP6715488B2 (en) Super large format tile unit for exterior
EP3075913B1 (en) A method for reducing moisture build-up in a cavity of a cavity wall and a foundation wedge
ES2942151T3 (en) Joinery coating and implementation procedure of such a coating
KR100478433B1 (en) A structure of windows
JPH11210152A (en) Precast concrete wall for mounting exterior panel
CA3031628A1 (en) Building facade system
AU2016202833B2 (en) Wall cladding system
EP3674496A1 (en) Building facade system
IT8948700A1 (en) STRUCTURE WITH COMPONABLE MODULAR ELEMENTS, FOR THE CONSTRUCTION OF CONTINUOUS FACADES OF BUILDINGS AND / OR FOR INSULATING COVERING OF EXISTING WALLS.
EA039260B1 (en) Wall construction for a building and method for manufacturing same
Watts Profiled Metal Cladding
CZ22593U1 (en) Wall-box frame for opening internal packing, particularly windows
ES1306701U (en) PREFABRICATED WINDOW PANEL FOR CONSTRUCTION (Machine-translation by Google Translate, not legally binding)
JP5204540B2 (en) Thermal insulation wall construction structure
RO132669A2 (en) Light modular system for facade closing

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20161014

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20180215

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

TPAC Observations filed by third parties

Free format text: ORIGINAL CODE: EPIDOSNTIPA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

TPAC Observations filed by third parties

Free format text: ORIGINAL CODE: EPIDOSNTIPA

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1017058

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602014028422

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20180711

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181111

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181012

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181011

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602014028422

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

26N No opposition filed

Effective date: 20190412

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20181011

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180911

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180930

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181011

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20190925

Year of fee payment: 6

Ref country code: LU

Payment date: 20190925

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180905

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180711

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20140905

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180711

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20201001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200905

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201001

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20230331

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230331

Year of fee payment: 9

Ref country code: DE

Payment date: 20230331

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230331

Year of fee payment: 9

Ref country code: NO

Payment date: 20230403

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20230331

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20230905

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20240402

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20240305

Year of fee payment: 10