EP3106608B1 - A tunneling machine and a method of excavating a tunnel - Google Patents
A tunneling machine and a method of excavating a tunnel Download PDFInfo
- Publication number
- EP3106608B1 EP3106608B1 EP16174897.5A EP16174897A EP3106608B1 EP 3106608 B1 EP3106608 B1 EP 3106608B1 EP 16174897 A EP16174897 A EP 16174897A EP 3106608 B1 EP3106608 B1 EP 3106608B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- buffer tank
- conveyor
- frame
- particulate material
- tunneling machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005641 tunneling Effects 0.000 title claims description 75
- 238000000034 method Methods 0.000 title claims description 14
- 239000002689 soil Substances 0.000 claims description 87
- 239000011236 particulate material Substances 0.000 claims description 67
- 238000005553 drilling Methods 0.000 claims description 11
- 239000000463 material Substances 0.000 description 18
- 230000032258 transport Effects 0.000 description 10
- 239000004576 sand Substances 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000010438 granite Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
Definitions
- the present invention relates to a tunneling machine and a method of excavating a tunnel.
- Tunneling machines also known as tunnel boring machines (TBM) are frequently used when building subterranean tunnels.
- TBM tunnel boring machines
- Such tunnels may be use in particular for creating underground rail systems, but other purposes are equally feasible such as tunnels for road vehicles and tunnels for larger sewage- and water systems or similar utilities.
- Such tunnels may extend from about 10 meters to several kilometers and having a width of from about a meter up to several meters or even some tens of meters.
- Tunneling machines typically comprise an elongated frame having approximately the same width as the tunnel to be excavated.
- the tunneling machine is inserted into the tunnel by means of an actuator.
- the front of the tunneling machine comprises an excavating mechanism which is capable of removing material from the tunnel front.
- the material comprises soil, rock, sand and other materials found in the earth. The material will be in the form of a particulate material after being removed from the tunnel wall by the excavating mechanism.
- the particulate material must be transported away from the excavating mechanism and out of the tunnel in order to clear the tunnel pipe segment and allow the tunneling machine to advance forward into the tunnel.
- the particulate material is transported to the rear end of the elongated frame by means of a conveying mechanism, and thereafter the particulate material is loaded onto a soil transporter.
- the soil transporter When the soil transporter is fully loaded with particulate material, the boring activities are interrupted and the soil transporter is moved through the tunnel to the outside, where the particular material is off-loaded at a suitable location whereupon the soil transporter is returned to the rear end of the frame and the boring process may be re-started.
- US 4 353 676 A relates to a storage bunker for tunnel boring.
- the storage bunker received the discharge form a boring machine allowing the boring machine to operate continuously.
- US 2 753 971 A relates to a material gathering, receiving storing and delivering apparatus.
- the apparatus receives material substantially continuously and discharges it at controlled rate into a shuttle car.
- WO 95/30065 relates to a device for driving a tunnel or drain pipe.
- the device comprises a thick matter pump which pumps the soil from a sealable stone trap adjacent a cutting chamber of the drive head to the outside.
- WO 2008/043511 relates to a tunneling machine with a transport system.
- the machine comprises a transport band for transporting material away from the drilling head.
- EP 0 114 452 A1 relates to a machine for digging a tunnel.
- the machine comprises a screw conveyor for transporting material away from the drilling head.
- DE 30 15 319 relates to a tunneling machine which has a transport band.
- US 3 574 405 relates to an apparatus for continuous excavation of tunnels.
- the apparatus comprises a conveyor which conveys material to carriages.
- DE 28 40 280 relates to a tunneling machine which has a conveyor operating at two different velocities being a first slow velocity when the transport wagon is away from the tunneling machine and a faster velocity when the transport wagon is located adjacent the tunneling machine.
- DE 34 34 936 relates to a digging machine having a transport band and US 4 767 253 relates to a tunnel cleaning train having a distributor.
- tunneling machine must be stopped when the soil transporter is away from the loading position at the rear end of the frame of the tunneling machine, i.e. when the soil transporter is off-loading or moving.
- the problem is non-significant, since the distances between the rear end of the frame and the outside of the tunnel pipe segment is small.
- the time needed for transporting the soil transporter between the loading station at the rear end of the frame and the unloading station outside the tunnel pipe segment becomes significant. The time period when the tunneling machine is stopped and cannot work increases accordingly.
- DE 28 40 280 provides a kind of solution to the present problem, however, the amount of particulate material which may be removed from the tunnel wall when the soil transporter is away from the loading position is limited by the size of the conveyor.
- a tunneling machine comprising an elongated frame for being inserted into a work area inside a tunnel or an unfinished tunnel, the frame defining a front end and a rear end, the tunneling machine further comprising:
- a tunnel pipe segment is in the present context construed to be the work area inside the tunnel or the unfinished tunnel.
- the front wall is the location in the tunnel pipe segment where the tunnel pipe segment should be extended.
- the frame holds all equipment necessary for the tunneling machine to operate.
- the actuator typically interacts with the side wall or the rear wall of the tunnel pipe segment and pushes the frame toward the end wall of the tunnel.
- the excavating mechanism is pushed against the end wall of the tunnel pipe segment in order to loosen the material and may thus differ depending on the type of material encountered in the ground.
- the particulate material excavated by the excavating mechanism is transported to the buffer tank by means of the first conveyor.
- the first conveyor may be a belt conveyor, a screw conveyor, a bucket conveyor or the like.
- the buffer tank is off-loaded into a soil transporter.
- the soil transporter comprises a storage compartment for storing the particulate material and a number of wheels for allowing the soil transporter to move.
- the soil transporter is moved to the outside of the tunnel pipe segment and the particulate material is off-loaded at an appropriate location. Normally only one soil transporter is used due to the limited space inside the tunnel pipe segment.
- the buffer tank should have an appropriate size in order to be able to accumulate all particulate material generated by the excavating mechanism while the soil transporter is away from the rear end of the frame of the tunneling machine.
- the buffer tank is again off-loaded into the soil transporter and the soil transporter returns to the outside of the tunnel pipe segment for off-loading the particulate material.
- a sloping bottom will make it easier to empty the buffer tank in the limited space within the tunnel pipe segment.
- the buffer tank may comprise a conveyor which is operating to move the particulate material from the buffer tank to the storage compartment of the soil transporter when the soil transporter is adjacent the rear end of the frame of the tunnel excavating machine.
- the second conveyor stops and the soil transporter proceeds to the outside of the tunnel pipe segment for off-loading the particulate material.
- the second conveyor is restarted to transport the particulate material which has accumulated in the buffer tank to the storage compartment of the soil transporter.
- the buffer tank may be completely emptied without moving or tilting the buffer tank.
- the conveyor part inside the buffer tank may operate independently of the conveyor part outside the buffer tank
- the excavating mechanism constitutes an excavator.
- An excavator may be used for digging into loose materials such as sand etc. It may be controlled by an operator situated adjacent the front end of the frame.
- the excavating mechanism constitutes a drilling head.
- a drilling head may be used for hard materials such as granite etc.
- the drilling head comprises a rotating boring head comprising disc cutters.
- the primary conveyor constitutes a carrier comprising a linear actuator, a beam connected to the linear actuator and extending within the buffer tank above the sloping bottom, and a plurality of pivotable plates extending from the beam towards the sloping bottom.
- the pivotable plates are pivoable between a substantially vertical orientation and a substantially horizontal orientation pointing towards the soil transporter.
- the second conveyor is a screw conveyor.
- a screw conveyor is advantageous to use for transporting the particulate material since it requires only a small amount of space.
- the second conveyor is operating with a higher velocity than the first conveyor.
- the second conveyor should be able to transport the particulate material from the buffer tank to the storage compartment of the soil transporter at a much higher velocity than the excavating mechanism generates particulate material and the first conveyor transports particulate material from the excavating mechanism to the buffer tank.
- the soil transporter is driven by a cable.
- the soil transporter may have its own drive mechanism, however, preferably the soil transporter may be driven by a cable which is connected to a drive mechanism, such as an electrical motor, located on the frame and/or outside the tunnel pipe segment. In this way the weight of the soil transporter is reduced since it must not include the drive mechanism.
- the soil transporter has a storage compartment corresponding to the storage volume of the buffer tank. In this way the complete volume of particulate material in the buffer tank may be transferred to the storage compartment of the soil transporter.
- the tunneling machine further comprises a mechanism for introducing concrete tunnel segments into the tunnel segment.
- the tunneling machine also has the capability of lining the tunnel pipe segment by introducing concrete tunnel segments into the tunnel pipe segment.
- the frame is thus resting on the concrete tunnel segments, which may be continuously pushed into the tunnel pipe segment as the excavating mechanism clears a new portion of the tunnel pipe segment.
- the soil transporter is adapted to move a specific volume of particulate material from the rear end of the frame to the outside of the tunnel pipe segment, unload the particulate material and move from the outside of the tunnel pipe segment to the rear end of the frame at approximately the same time as it takes to fill the buffer tank with the specific volume of particulate material.
- the velocity of the soil transporter may thus be adapted to the length of the tunnel pipe segment. Operating the soil transporter at high velocity will require more energy and thus at the beginning of the excavating process, the soil transporter may travel at a lower velocity, thereby requiring less amount of energy to operate.
- the actuator is a hydraulic actuator having a counter hold inside the tunnel pipe segment and/or outside the tunnel pipe segment.
- the frame of the tunneling machine may be driven into the tunnel pipe segments by hydraulic power and may either arrest itself against the side walls of the tunnel pipe segment or the rear wall of the tunnel pipe segment, i.e. a wall opposite the location of the excavating mechanism, or both, in order to push the excavating mechanism towards the end wall of the tunnel pipe segment.
- the buffer tank has a storage volume of between 1m 2 and 100m 2 . Such volumes are suitable for ensuring a continuous operation of the tunneling machine.
- a tunneling machine comprising an elongated frame for being inserted into a work area inside a tunnel or an unfinished tunnel, the frame defining a front end and a rear end, the tunneling machine further comprising:
- the above method according to the second aspect is preferably used in connection with the tunneling machine described above in connection with the first aspect.
- FIG. 1 shows a perspective view of a tunneling machine 10 according to a first background example.
- the tunneling machine 10 is located below ground inside a tunnel pipe segment 12.
- the tunneling machine 10 comprises an excavating mechanism in the form of a drilling head 14.
- the drilling head 14 is capable of loosening ground materials at the end wall A of the tunnel pipe segment 12.
- the loosened ground materials constitute a particulate material 16 which is transported to a buffer tank 18 by a first conveyor 20.
- the first conveyor 20 may constitute a screw conveyor, belt conveyor, bucket conveyor or a combination thereof as illustrated here.
- the particulate material 16 is further transported from the buffer tank 18 to a soil transporter 22 by means of a second conveyor 24.
- the soil transporter 22 constitutes a vehicle which transports the particulate material to the outside of the tunnel,
- a further conveyor as shown here is used in case the soil transporter 22 cannot reach the surface, or other plausible means may be applied, such as a lift etc.
- the tunneling machine is pushed into the tunnel pipe segment 12 by means of an actuator 26 together with concrete tunnel segments 28 which are used to line the side wall B of the tunnel pipe segment 12 and provide reinforcement of the tunnel pipe segment 12.
- the tunneling machine is thereby fixated to the concrete tunnel segment 28 and will move forward together with the row of concrete tunnel segments 28.
- the tunneling machine 10 is typically powered by hydraulics from a station 30 located outside the tunnel pipe segment 12.
- the actuator is supported by the rear wall C.
- the tunnel side wall B is used as support.
- the second conveyor 24 comprise a primary conveyor 24a inside and adjacent the bottom of the buffer tank 18 and a secondary conveyor 24b outside the buffer tank 18 leading from the buffer tank 18 to the soil transporter.
- the primary conveyor 24a is in the present embodiment a screw conveyor whereas the secondary conveyor 24b is a belt conveyor.
- FIG. 2 shows a side view of a tunneling machine 10' according to a second background example.
- the present embodiment makes use of an excavator 14'.
- An excavator 14' may be used for soft grounds such as sand.
- a drilling head as in the previous embodiment is used for harder grounds such as rock.
- FIG. 3A shows a close-up side view of the tunneling machine 10' according to the second example.
- the excavator 14' is capable of operating continuously as the particulate material 16 excavated by the excavator 14 is temporarily stored in the buffer tank 18.
- the bucket 14', the first conveyor 20, the buffer tank 18 and the second conveyor 24 are all mounted on a frame 36 which is fixated to the side wall B of the concrete tunnel pipe segment 28.
- the storage compartment 38 of the soil transporter 22 is filled with the particulate material of the buffer tank 18.
- the second conveyor 24 When the storage compartment 38 of the soil transporter 22 is filled, the second conveyor 24 is stopped and the soil transporter 22 is pulled out of the tunnel pipe segment 12 by means of the cable 32, emptied and returned to the second conveyor 24. As the soil transporter 22 returns, the second conveyor 24 is re-started. The second conveyor 24 operates at a higher velocity than the first conveyor 20 in order to quickly fill the storage compartment 38 of the soil transporter.
- FIG. 3B shows a close-up side view of the tunneling machine 10 according to the first example.
- the tunneling machine 10 is provided with a rotating drilling head 14" instead of the excavator for being able to penetrate harder soil materials.
- FIG.1 and FIG.3B show examples of the so called EPB method having a closed tunnel front
- FIG. 2 and FIG.3A show the open front method.
- FIG. 4 shows a perspective view of a rear part of a tunneling machine 10'" according to the present invention.
- the present tunneling machine 10'" is similar to the above tunneling machines except that the second conveyor 24 is enclosed from its receiving end which is located within the buffer tank 18 to its delivering end which is located above the soil transporter 22.
- the second conveyor is divided into a primary conveyor 24a located within the buffer tank 18 and extending partially outside the buffer tank 24, and a secondary conveyor 24b extending from the primary conveyor 24a to the soil transporter 22.
- the secondary conveyor 24b is in the present case a substantially enclosed screw conveyor. In this way, any spillage may be avoided.
- FIG. 5 shows a side view of the tunneling machine 10'" according to the embodiment of the present invention.
- the primary conveyor 24a reaches from the bottom of the buffer tank 18 to the outside of the buffer tank 18, whereas the secondary conveyor 24b reaches fully enclosed from the first conveyor part 24' to the soil transporter 22.
- the interconnection between the first conveyor part 24' and the second conveyor part 24" is in the present case also enclosed.
- FIG. 6 shows a side view of a tunneling machine 10"" according to a third background example.
- the buffer tank 18 is provided with a carrier 40, acting as the primary conveyor of the previous embodiments.
- the carrier 40 comprises a hydraulic linear actuator 42 which is movable in a back and forth direction as shown by the arrows.
- the actuator 42 is connected to a beam 46 extending through the buffer tank 18 at a distance from the bottom of the buffer tank 18.
- the beam 46 comprises a number of plates 46, each being pivotally connected to the beam 44 via a respective pivot 48.
- the plates 46 extend from the beam 44 in a perpendicular direction relative to the beam 44 and towards the bottom of the buffer tank 18.
- the buffer tank 18 features an opening 50 at which location, particulate material 16 will enter the secondary conveyor 24b.
- FIG. 7A shows a first view of a series of views describing the working principle of the tunneling machine 10"" according to the third example.
- the plates 46 are pivotable towards the opening 50 and non-pivotable towards the opposite direction.
- the actuator 42 moves the plates 46 towards the opening 50, the particulate material 16 will be carried along the plates 46 towards the opening 50.
- FIG. 7B shows a second view of a series of views describing the working principle of the tunneling machine 10"" according to the third example.
- the actuator 42 When the actuator 42 has reached its most contracted position, it turns and moves the plates 46 away from the opening 50. In this situation, the plates 46 will pivot and slide above the particulate material 16 which has been accumulated by the plate 46.
- FIG. 7C shows a third view of a series of views describing the working principle of the tunneling machine 10"" according to the third example.
- the present third example is particularly advantageous when conveying sand and similar fine particulate materials which may otherwise easily cause spillage and clogging.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
- The present invention relates to a tunneling machine and a method of excavating a tunnel.
- Tunneling machines, also known as tunnel boring machines (TBM) are frequently used when building subterranean tunnels. Such tunnels may be use in particular for creating underground rail systems, but other purposes are equally feasible such as tunnels for road vehicles and tunnels for larger sewage- and water systems or similar utilities. Such tunnels may extend from about 10 meters to several kilometers and having a width of from about a meter up to several meters or even some tens of meters.
- Tunneling machines typically comprise an elongated frame having approximately the same width as the tunnel to be excavated. When a tunnel pipe segment is to be excavated, the tunneling machine is inserted into the tunnel by means of an actuator. The front of the tunneling machine comprises an excavating mechanism which is capable of removing material from the tunnel front. The material comprises soil, rock, sand and other materials found in the earth. The material will be in the form of a particulate material after being removed from the tunnel wall by the excavating mechanism.
- The particulate material must be transported away from the excavating mechanism and out of the tunnel in order to clear the tunnel pipe segment and allow the tunneling machine to advance forward into the tunnel. Typically, the particulate material is transported to the rear end of the elongated frame by means of a conveying mechanism, and thereafter the particulate material is loaded onto a soil transporter. When the soil transporter is fully loaded with particulate material, the boring activities are interrupted and the soil transporter is moved through the tunnel to the outside, where the particular material is off-loaded at a suitable location whereupon the soil transporter is returned to the rear end of the frame and the boring process may be re-started.
- Several technologies exist for removing particulate material from tunneling machines. Some relevant technologies are described in the following documents:
US 4 353 676 A relates to a storage bunker for tunnel boring. The storage bunker received the discharge form a boring machine allowing the boring machine to operate continuously. -
US 2 753 971 A relates to a material gathering, receiving storing and delivering apparatus. The apparatus receives material substantially continuously and discharges it at controlled rate into a shuttle car. -
WO 95/30065 -
WO 2008/043511 relates to a tunneling machine with a transport system. The machine comprises a transport band for transporting material away from the drilling head. -
EP 0 114 452 A1 relates to a machine for digging a tunnel. The machine comprises a screw conveyor for transporting material away from the drilling head. -
DE 30 15 319 relates to a tunneling machine which has a transport band. -
US 3 574 405 relates to an apparatus for continuous excavation of tunnels. The apparatus comprises a conveyor which conveys material to carriages. -
DE 28 40 280 relates to a tunneling machine which has a conveyor operating at two different velocities being a first slow velocity when the transport wagon is away from the tunneling machine and a faster velocity when the transport wagon is located adjacent the tunneling machine. -
DE 34 34 936 relates to a digging machine having a transport band andUS 4 767 253 relates to a tunnel cleaning train having a distributor. - One problem arising when using tunneling machines as described above is that the tunneling machine must be stopped when the soil transporter is away from the loading position at the rear end of the frame of the tunneling machine, i.e. when the soil transporter is off-loading or moving. At the beginning of the tunnel pipe segment the problem is non-significant, since the distances between the rear end of the frame and the outside of the tunnel pipe segment is small. As the length of the tunnel pipe segment increases, the time needed for transporting the soil transporter between the loading station at the rear end of the frame and the unloading station outside the tunnel pipe segment becomes significant. The time period when the tunneling machine is stopped and cannot work increases accordingly.
-
DE 28 40 280 - The above object and further objects which are evident from the below detailed description are according to a first aspect of the present invention achieved by a tunneling machine comprising an elongated frame for being inserted into a work area inside a tunnel or an unfinished tunnel, the frame defining a front end and a rear end, the tunneling machine further comprising:
- an actuator for moving the frame within the work area,
- an excavating mechanism located at the front end of the frame for excavating particulate material from the work area,
- a buffer tank located between the front end and the rear end of the frame (36), the buffer tank comprises a sloping bottom,
- a first conveyor for receiving the particulate material from the excavating mechanism at the front end of the frame and transporting the particulate material to the buffer tank,
- a soil transporter for receiving the particulate material from the buffer tank at the rear end of the frame and transporting the particulate material from the rear end of the frame to the outside of the work area, and
- a second conveyor for transporting the particulate material from the buffer tank to the soil transporter, the second conveyor running only when the soil transporter is at the rear end of the frame, the second conveyor is extending from the sloping bottom of the buffer tank to the top of the soil transporter, the second conveyor comprises a primary conveyor extending within the buffer tank and reaching from the bottom of the buffer tank to the outside of the buffer tank, and a secondary conveyor extending outside the buffer tank, the secondary conveyor reaching fully enclosed from the primary conveyer to the soil transporter.
- In order to excavate a tunnel pipe segment, the tunneling machine is moved to a front wall in the tunnel pipe segment. A tunnel pipe segment is in the present context construed to be the work area inside the tunnel or the unfinished tunnel. The front wall is the location in the tunnel pipe segment where the tunnel pipe segment should be extended. The frame holds all equipment necessary for the tunneling machine to operate. The actuator typically interacts with the side wall or the rear wall of the tunnel pipe segment and pushes the frame toward the end wall of the tunnel. The excavating mechanism is pushed against the end wall of the tunnel pipe segment in order to loosen the material and may thus differ depending on the type of material encountered in the ground.
- During normal operation, the particulate material excavated by the excavating mechanism is transported to the buffer tank by means of the first conveyor. The first conveyor may be a belt conveyor, a screw conveyor, a bucket conveyor or the like. The buffer tank is off-loaded into a soil transporter. The soil transporter comprises a storage compartment for storing the particulate material and a number of wheels for allowing the soil transporter to move. When the storage compartment has been filled with particulate material, the soil transporter is moved to the outside of the tunnel pipe segment and the particulate material is off-loaded at an appropriate location. Normally only one soil transporter is used due to the limited space inside the tunnel pipe segment.
- When the soil transporter is en route between the rear end of the frame of the tunneling machine and the outside of the tunnel the excavating mechanism may continue to operate since the particulate material will simply accumulate in the buffer tank. The buffer tank should have an appropriate size in order to be able to accumulate all particulate material generated by the excavating mechanism while the soil transporter is away from the rear end of the frame of the tunneling machine. When the empty soil transporter has returned to the rear end of the frame of the tunneling machine, the buffer tank is again off-loaded into the soil transporter and the soil transporter returns to the outside of the tunnel pipe segment for off-loading the particulate material.
A sloping bottom will make it easier to empty the buffer tank in the limited space within the tunnel pipe segment. - In order to further simplify the off-loading of the particulate material from the buffer tank into the soil transporter, the buffer tank may comprise a conveyor which is operating to move the particulate material from the buffer tank to the storage compartment of the soil transporter when the soil transporter is adjacent the rear end of the frame of the tunnel excavating machine. When the storage compartment of the soil transporter is filled, the second conveyor stops and the soil transporter proceeds to the outside of the tunnel pipe segment for off-loading the particulate material. When the soil transporter returns to the rear end of the frame of the tunnel excavating machine, the second conveyor is restarted to transport the particulate material which has accumulated in the buffer tank to the storage compartment of the soil transporter.
The buffer tank may be completely emptied without moving or tilting the buffer tank. The conveyor part inside the buffer tank may operate independently of the conveyor part outside the buffer tank - According to a further embodiment of the first aspect, the excavating mechanism constitutes an excavator. An excavator may be used for digging into loose materials such as sand etc. It may be controlled by an operator situated adjacent the front end of the frame.
- According to a further embodiment of the first aspect, the excavating mechanism constitutes a drilling head. A drilling head may be used for hard materials such as granite etc. The drilling head comprises a rotating boring head comprising disc cutters.
- According to a further embodiment of the first aspect, the primary conveyor constitutes a carrier comprising a linear actuator, a beam connected to the linear actuator and extending within the buffer tank above the sloping bottom, and a plurality of pivotable plates extending from the beam towards the sloping bottom. The pivotable plates are pivoable between a substantially vertical orientation and a substantially horizontal orientation pointing towards the soil transporter. When the actuator is moved towards the soil transporter, the plates will be in the substantially vertical orientation and accumulate particulate material which will be moved towards the soil transporter by the substantially vertical plates whereas - when the actuator moves away from the outlet - the plates will pivot into the substantially vertical orientation and slip above the accumulated piles of particulate material. When the actuator is again moved towards the soil transporter, the plates will assume the substantially vertical orientation and again convey the particulate material towards the soil transporter. In this way, sand and other fine materials may be more efficiently conveyed.
- According to a further embodiment of the first aspect, the second conveyor is a screw conveyor. A screw conveyor is advantageous to use for transporting the particulate material since it requires only a small amount of space.
- According to a further embodiment of the first aspect, the second conveyor is operating with a higher velocity than the first conveyor. In order to minimize the waiting time of the soil transporter and thereby the risk of having to stop the excavating mechanism, the second conveyor should be able to transport the particulate material from the buffer tank to the storage compartment of the soil transporter at a much higher velocity than the excavating mechanism generates particulate material and the first conveyor transports particulate material from the excavating mechanism to the buffer tank.
- According to a further embodiment of the first aspect, the soil transporter is driven by a cable. The soil transporter may have its own drive mechanism, however, preferably the soil transporter may be driven by a cable which is connected to a drive mechanism, such as an electrical motor, located on the frame and/or outside the tunnel pipe segment. In this way the weight of the soil transporter is reduced since it must not include the drive mechanism.
- According to a further embodiment of the first aspect, the soil transporter has a storage compartment corresponding to the storage volume of the buffer tank. In this way the complete volume of particulate material in the buffer tank may be transferred to the storage compartment of the soil transporter.
- According to a further embodiment of the first aspect, the tunneling machine further comprises a mechanism for introducing concrete tunnel segments into the tunnel segment. Advantageously, the tunneling machine also has the capability of lining the tunnel pipe segment by introducing concrete tunnel segments into the tunnel pipe segment. Preferably, the frame is thus resting on the concrete tunnel segments, which may be continuously pushed into the tunnel pipe segment as the excavating mechanism clears a new portion of the tunnel pipe segment.
- According to a further embodiment of the first aspect, the soil transporter is adapted to move a specific volume of particulate material from the rear end of the frame to the outside of the tunnel pipe segment, unload the particulate material and move from the outside of the tunnel pipe segment to the rear end of the frame at approximately the same time as it takes to fill the buffer tank with the specific volume of particulate material. The velocity of the soil transporter may thus be adapted to the length of the tunnel pipe segment. Operating the soil transporter at high velocity will require more energy and thus at the beginning of the excavating process, the soil transporter may travel at a lower velocity, thereby requiring less amount of energy to operate.
- According to a further embodiment of the first aspect, the actuator is a hydraulic actuator having a counter hold inside the tunnel pipe segment and/or outside the tunnel pipe segment. The frame of the tunneling machine may be driven into the tunnel pipe segments by hydraulic power and may either arrest itself against the side walls of the tunnel pipe segment or the rear wall of the tunnel pipe segment, i.e. a wall opposite the location of the excavating mechanism, or both, in order to push the excavating mechanism towards the end wall of the tunnel pipe segment.
- According to a further embodiment of the first aspect, the buffer tank has a storage volume of between 1m2 and 100m2. Such volumes are suitable for ensuring a continuous operation of the tunneling machine.
- The above object and further objects which are evident from the below detailed description are according to a second aspect of the present invention achieved by a method of excavating a tunnel by using a tunneling machine comprising an elongated frame for being inserted into a work area inside a tunnel or an unfinished tunnel, the frame defining a front end and a rear end, the tunneling machine further comprising:
- an actuator,
an excavating mechanism located at the front end of the frame, - a buffer tank located between the front end and the rear end of the frame, the buffer tank comprises a sloping bottom,
- moving the frame within the work area by using the actuator,
- excavating particulate material from the tunnel wall by using the excavating mechanism, transporting the particulate material from the excavating mechanism to the buffer tank by using the first conveyor,
- receiving the particulate material from the buffer tank into the soil transporter at the rear end of the frame, and
- transporting the particulate material from the rear end of the frame to the outside of the work area.
- The above method according to the second aspect is preferably used in connection with the tunneling machine described above in connection with the first aspect.
-
-
FIG. 1 is a perspective view of a tunneling machine according to a first example not falling under the scope of protection of the present invention. -
FIG. 2 is a side view of a tunneling machine according to a second example not falling under the scope of protection of the present invention. -
FIG. 3A is a close-up side view of the tunneling machine according to the second example. -
FIG. 3B is a close-up side view of the tunneling machine according to the first example. -
FIG. 4 is a perspective view of a rear part of a tunneling machine according to an embodiment of the present invention. -
FIG. 5 is a side view of the tunneling machine according to the embodiment of the present invention. -
FIG. 6 is a side view of a tunneling machine according to a third example not falling under the scope of protection of the present invention. -
FIG. 7A is a first view of a series of views describing the working principle of the tunneling machine according to the third example. -
FIG. 7B is a second view of a series of views describing the working principle of the tunneling machine according to the third example. -
FIG. 7C is a third view of a series of views describing the working principle of the tunneling machine according to the third example. -
FIG. 1 shows a perspective view of atunneling machine 10 according to a first background example. The tunnelingmachine 10 is located below ground inside atunnel pipe segment 12. The tunnelingmachine 10 comprises an excavating mechanism in the form of adrilling head 14. Thedrilling head 14 is capable of loosening ground materials at the end wall A of thetunnel pipe segment 12. The loosened ground materials constitute aparticulate material 16 which is transported to abuffer tank 18 by afirst conveyor 20. Thefirst conveyor 20 may constitute a screw conveyor, belt conveyor, bucket conveyor or a combination thereof as illustrated here. - The
particulate material 16 is further transported from thebuffer tank 18 to asoil transporter 22 by means of a second conveyor 24. Thesoil transporter 22 constitutes a vehicle which transports the particulate material to the outside of the tunnel, Optionally, a further conveyor as shown here is used in case thesoil transporter 22 cannot reach the surface, or other plausible means may be applied, such as a lift etc. In the present embodiment the tunneling machine is pushed into thetunnel pipe segment 12 by means of anactuator 26 together withconcrete tunnel segments 28 which are used to line the side wall B of thetunnel pipe segment 12 and provide reinforcement of thetunnel pipe segment 12. The tunneling machine is thereby fixated to theconcrete tunnel segment 28 and will move forward together with the row ofconcrete tunnel segments 28. The tunnelingmachine 10 is typically powered by hydraulics from a station 30 located outside thetunnel pipe segment 12. The actuator is supported by the rear wall C. Alternatively, the tunnel side wall B is used as support. - The second conveyor 24 comprise a
primary conveyor 24a inside and adjacent the bottom of thebuffer tank 18 and asecondary conveyor 24b outside thebuffer tank 18 leading from thebuffer tank 18 to the soil transporter. Theprimary conveyor 24a is in the present embodiment a screw conveyor whereas thesecondary conveyor 24b is a belt conveyor. -
FIG. 2 shows a side view of a tunneling machine 10' according to a second background example. Instead of drilling head, the present embodiment makes use of an excavator 14'. An excavator 14' may be used for soft grounds such as sand. A drilling head as in the previous embodiment is used for harder grounds such as rock. - The soil transporter is driven in and out of the
tunnel pipe segment 12 by means of acable 32 which is connected to thesoil transporter 22 and to a motor drivenspindle 34. As thetunnel pipe segment 12 becomes longer, thesoil transporter 22 must move faster in order to be able to move to the outside of thetunnel pipe segment 12, off-load theparticulate material 16 and return to thebuffer tank 18 before thebuffer tank 18 is filled.FIG. 3A shows a close-up side view of the tunneling machine 10' according to the second example. The excavator 14' is capable of operating continuously as theparticulate material 16 excavated by theexcavator 14 is temporarily stored in thebuffer tank 18. The bucket 14', thefirst conveyor 20, thebuffer tank 18 and the second conveyor 24 are all mounted on aframe 36 which is fixated to the side wall B of the concretetunnel pipe segment 28. When thesoil transporter 22 is located adjacent the second conveyor 24, thestorage compartment 38 of thesoil transporter 22 is filled with the particulate material of thebuffer tank 18. - When the
storage compartment 38 of thesoil transporter 22 is filled, the second conveyor 24 is stopped and thesoil transporter 22 is pulled out of thetunnel pipe segment 12 by means of thecable 32, emptied and returned to the second conveyor 24. As thesoil transporter 22 returns, the second conveyor 24 is re-started. The second conveyor 24 operates at a higher velocity than thefirst conveyor 20 in order to quickly fill thestorage compartment 38 of the soil transporter. -
FIG. 3B shows a close-up side view of the tunnelingmachine 10 according to the first example. The tunnelingmachine 10 is provided with arotating drilling head 14" instead of the excavator for being able to penetrate harder soil materials. -
FIG.1 andFIG.3B show examples of the so called EPB method having a closed tunnel front, whereasFIG. 2 and FIG.3A show the open front method. There exist basically two methods of lining a tunnel. The first method named pipejacking is disclosed above and makes use of hard lining segments which are pushed into the tunnel pipe segment. The second method called segment lining uses segments which are mounted at the tunnel front, i.e. the lining string does not move. -
FIG. 4 shows a perspective view of a rear part of a tunneling machine 10'" according to the present invention. The present tunneling machine 10'" is similar to the above tunneling machines except that the second conveyor 24 is enclosed from its receiving end which is located within thebuffer tank 18 to its delivering end which is located above thesoil transporter 22. The second conveyor is divided into aprimary conveyor 24a located within thebuffer tank 18 and extending partially outside the buffer tank 24, and asecondary conveyor 24b extending from theprimary conveyor 24a to thesoil transporter 22. Thesecondary conveyor 24b is in the present case a substantially enclosed screw conveyor. In this way, any spillage may be avoided. -
FIG. 5 shows a side view of the tunneling machine 10'" according to the embodiment of the present invention. Theprimary conveyor 24a reaches from the bottom of thebuffer tank 18 to the outside of thebuffer tank 18, whereas thesecondary conveyor 24b reaches fully enclosed from the first conveyor part 24' to thesoil transporter 22. The interconnection between the first conveyor part 24' and the second conveyor part 24" is in the present case also enclosed. -
FIG. 6 shows a side view of atunneling machine 10"" according to a third background example. In thepresent tunneling machine 10"", thebuffer tank 18 is provided with acarrier 40, acting as the primary conveyor of the previous embodiments. Thecarrier 40 comprises a hydrauliclinear actuator 42 which is movable in a back and forth direction as shown by the arrows. Theactuator 42 is connected to abeam 46 extending through thebuffer tank 18 at a distance from the bottom of thebuffer tank 18. Thebeam 46 comprises a number ofplates 46, each being pivotally connected to thebeam 44 via arespective pivot 48. Theplates 46 extend from thebeam 44 in a perpendicular direction relative to thebeam 44 and towards the bottom of thebuffer tank 18. Thebuffer tank 18 features anopening 50 at which location,particulate material 16 will enter thesecondary conveyor 24b. -
FIG. 7A shows a first view of a series of views describing the working principle of the tunnelingmachine 10"" according to the third example. Theplates 46 are pivotable towards theopening 50 and non-pivotable towards the opposite direction. When theactuator 42 moves theplates 46 towards the opening 50, theparticulate material 16 will be carried along theplates 46 towards theopening 50. -
FIG. 7B shows a second view of a series of views describing the working principle of the tunnelingmachine 10"" according to the third example. - When the
actuator 42 has reached its most contracted position, it turns and moves theplates 46 away from theopening 50. In this situation, theplates 46 will pivot and slide above theparticulate material 16 which has been accumulated by theplate 46. -
FIG. 7C shows a third view of a series of views describing the working principle of the tunnelingmachine 10"" according to the third example. - When the
actuator 42 has reached its most extended position, it will again reverse towards the opening and theplates 46 will pivot back above theparticulate material 16 and carry the particulate material towards theopening 50. - The present third example is particularly advantageous when conveying sand and similar fine particulate materials which may otherwise easily cause spillage and clogging.
-
- 10.
- Tunneling machine
- 12.
- Tunnel pipe segment
- 14.
- Excavating mechanism
- 16.
- Particulate material
- 18.
- Buffer tank
- 20.
- First conveyor
- 22.
- Soil transporter
- 24.
- Second conveyor
- 24a.
- Primary conveyor
- 24b.
- Secondary conveyor
- 26.
- Actuator
- 28.
- Concrete tunnel pipe segment
- 30.
- Hydraulic station
- 32.
- Cable
- 34.
- Spindle
- 36.
- Frame
- 38.
- Storage compartment
- 40.
- Carrier
- 42.
- Hydraulic actuator
- 44.
- Beam
- 46.
- Plates
- 48.
- Pivot
- 50.
- Opening
- A.
- Tunnel front
- B.
- Tunnel side wall
- C.
- Rear wall
a soil transporter, and
a second conveyor for transporting the particulate material from the buffer tank to the soil transporter, the second conveyor running only when the soil transporter is at the rear end of the frame, the second conveyor is extending from the sloping bottom of the buffer tank to the top of the soil transporter, the second conveyor comprises a primary conveyor extending within said buffer tank and reaching from the bottom of the buffer tank to the outside of the buffer tank, and a secondary conveyor extending outside the buffer tank, the secondary conveyor reaching fully enclosed from the primary conveyer to the soil transporter,
the method comprising the steps of:
Claims (10)
- A tunneling machine (10) comprising an elongated frame (36) for being inserted into a work area (12) inside a tunnel or an unfinished tunnel, said frame (36) defining a front end and a rear end, said tunneling machine (10) further comprising:an actuator (26) for moving said frame (36) within said work area (12),an excavating mechanism (14) located at said front end of said frame (36) for excavating particulate material (16) from said work area (12),a buffer tank (18) located between said front end and said rear end of said frame (36), said buffer tank (18) comprises a sloping bottom,a first conveyor (20) for receiving said particulate material (16) from said excavating mechanism (14) at said front end of said frame (36) and transporting said particulate material (16) to said buffer tank (18),a soil transporter (22) for receiving said particulate material (16) from said buffer tank (18) at said rear end of said frame (36) and transporting said particulate material (16) from said rear end of said frame (36) to the outside of said work area (12), anda second conveyor (24) for transporting said particulate material (16) from said buffer tank (18) to said soil transporter (22), said second conveyor (24) running only when said soil transporter (22) is at said rear end of said frame (36), said second conveyor (24) is extending from said sloping bottom of said buffer tank (18) to the top of said soil transporter (22), said second conveyor (24) comprises a primary conveyor (24a) extending within said buffer tank (18) and reaching from the bottom of the buffer tank (18) to the outside of the buffer tank (18), and a secondary conveyor (24b) extending outside said buffer tank (18), said secondary conveyor (24b) reaching fully enclosed from the primary conveyer (24a) to the soil transporter (22).
- The tunneling machine (10) according to claim 1, wherein said excavating mechanism (14) constitutes an excavator or a drilling head.
- The tunneling machine (10) according to any of the preceding claims, wherein said primary conveyor (24a) constitutes a carrier comprising a linear actuator (26), a beam connected to said linear actuator (26) and extending within said buffer tank (18) above said sloping bottom, and a plurality of pivotable plates extending from said beam towards said sloping bottom.
- The tunneling machine (10) according to any of the preceding claims, wherein said second conveyor (24) is a screw conveyor.
- The tunneling machine (10) according to any of the preceding claims, wherein said second conveyor (24) is operating with a higher velocity than said first conveyor (20).
- The tunneling machine (10) according to any of the preceding claims, wherein said soil transporter (22) is driven by a cable (32).
- The tunneling machine (10) according to any of the preceding claims, wherein said soil transporter (22) has a storage compartment corresponding to the storage volume of said buffer tank (18).
- The tunneling machine (10) according to any of the preceding claims, wherein said tunneling machine (10) further comprises a mechanism for introducing concrete tunnel segments (28) into said work area (12).
- The tunneling machine (10) according to any of the preceding claims, wherein said soil transporter (22) is adapted to move a specific volume of particulate material (16) from the rear end of said frame (36) to the outside of said work area (12), unload said particulate material (16) and move from the outside of said work area (12) to the rear end of said frame (36) at approximately the same time as it takes to fill said buffer tank (18) with said specific volume of particulate material (16), and/or, wherein said actuator (26) is a hydraulic actuator having a counter hold inside said work area (12) and/or outside said work area (12), and/or, wherein said buffer tank (18) has a storage volume of between 1m2 and 100m2
- A method of excavating a tunnel by using a tunneling machine (10) comprising an elongated frame (36) for being inserted into a work area (12) inside a tunnel or an unfinished tunnel, said frame (36) defining a front end and a rear end, said tunneling machine (10) further comprising:an actuator (26),an excavating mechanism (14) located at said front end of said frame (36),a buffer tank (18) located between said front end and said rear end of said frame (36), said buffer tank (18) comprises a sloping bottom,a first conveyor (20) located between said excavating mechanism (14) and said buffer tank (18),a soil transporter (22), anda second conveyor (24) for transporting said particulate material (16) from said buffer tank (18) to said soil transporter (22), said second conveyor (24) running only when said soil transporter (22) is at said rear end of said frame (36), said second conveyor (24) is extending from said sloping bottom of said buffer tank (18) to the top of said soil transporter (22), said second conveyor (24) comprises a primary conveyor (24a) extending within said buffer tank (18) and reaching from the bottom of the buffer tank (18) to the outside of the buffer tank (18), and a secondary conveyor (24b) extending outside said buffer tank (18), said secondary conveyor (24b) reaching fully enclosed from the primary conveyer (24a) to the soil transporter (22),said method comprising the steps of:moving said frame (36) within said work area (12) by using said actuator (26),excavating particulate material (16) from said tunnel wall by using said excavating mechanism (14),transporting said particulate material (16) from said excavating mechanism (14) to said buffer tank (18) by using said first conveyor (20),receiving said particulate material (16) from said buffer tank (18) into said soil transporter (22) at said rear end of said frame (36), andtransporting said particulate material (16) from said rear end of said frame (36) to the outside of said work area (12).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP15172922 | 2015-06-19 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3106608A2 EP3106608A2 (en) | 2016-12-21 |
EP3106608A3 EP3106608A3 (en) | 2017-01-25 |
EP3106608B1 true EP3106608B1 (en) | 2021-02-24 |
Family
ID=53476722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16174897.5A Active EP3106608B1 (en) | 2015-06-19 | 2016-06-17 | A tunneling machine and a method of excavating a tunnel |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP3106608B1 (en) |
DK (1) | DK3106608T3 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424979A (en) * | 2019-08-26 | 2019-11-08 | 安徽建筑大学 | Simulate the indoor model conduit jacking of earth pressure balanced jacking construction |
CN115306416A (en) * | 2022-08-12 | 2022-11-08 | 中国铁建重工集团股份有限公司 | Mining full-face rock tunnel boring machine and initial boring method thereof |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2753971A (en) * | 1949-12-22 | 1956-07-10 | Joy Mfg Co | Material gathering, receiving, storing and delivering apparatus |
US3574405A (en) | 1968-03-15 | 1971-04-13 | Japan National Railway | Apparatus for continuous excavation of tunnels |
GB1391316A (en) * | 1972-10-27 | 1975-04-23 | Dobson Park Ind | Mining and excavating machines |
GB1570329A (en) * | 1976-02-12 | 1980-06-25 | Daiko Const | Method and apparatus for excavating horizontal tunnels |
CH612726A5 (en) * | 1978-01-03 | 1979-08-15 | Herrenknecht Martin Ingenieurb | Method and apparatus for dry tunnel driving in tube advancing |
DE3015319A1 (en) | 1980-04-22 | 1981-10-29 | Deilmann-Haniel GmbH, 4600 Dortmund | Mine gallery face debris removal machine - has shovel and swivelling conveyor belt on tracks below working platform |
US4353676A (en) * | 1980-07-21 | 1982-10-12 | Lake Shore, Inc. | Bunker for tunnel boring |
US4490086A (en) | 1981-01-09 | 1984-12-25 | General Mining Union Corporation Limited | Self propelled load distributor vehicle |
DE3368660D1 (en) | 1983-01-24 | 1987-02-05 | Standard Oil Co Ohio | Process for the preparation of a polyamide |
DE3434936A1 (en) | 1984-09-22 | 1986-04-03 | Drespa, Grischa, 4600 Dortmund | Dinting loader with rotating parting tool |
DE4415399C2 (en) | 1994-05-03 | 2003-10-30 | Putzmeister Ag | Arrangement for driving a tunnel or sewage pipe |
DE102006048823A1 (en) | 2006-10-09 | 2008-04-10 | Robbins Gmbh | Tunnel boring machine and arrangement of a tunnel boring machine with a transport system |
-
2016
- 2016-06-17 EP EP16174897.5A patent/EP3106608B1/en active Active
- 2016-06-17 DK DK16174897.5T patent/DK3106608T3/en active
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
EP3106608A3 (en) | 2017-01-25 |
DK3106608T3 (en) | 2021-04-26 |
EP3106608A2 (en) | 2016-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
USRE34620E (en) | Trenching apparatus and methods of forming inground retaining walls | |
US8770373B2 (en) | Conveyor system for continuous surface mining | |
JP5444169B2 (en) | Shield tunnel construction method | |
EP2449214B1 (en) | Forming a shaft for an underground mine | |
US8366201B2 (en) | Method for open pit bench mining | |
EP3106608B1 (en) | A tunneling machine and a method of excavating a tunnel | |
JP5584813B2 (en) | Shield tunnel construction method | |
JP6527056B2 (en) | EXPORT SYSTEM AND EXPORT METHOD OF EXCAVATOR | |
RU2654884C2 (en) | Apparatus for extracting ore from block caves and method and system therefor | |
KR100902364B1 (en) | Shield tunneling apparatus and constructing method thereof | |
AU2004216593B2 (en) | Combination panline and utility drilling or bolting unit | |
CN109751078A (en) | A kind of coal working face end trigonum device for filling and method | |
JP2002371792A (en) | Device for conveying muck excavated from inclined shaft | |
WO2020100586A1 (en) | Mining system | |
CN216588616U (en) | Material conveying device of tunnel boring equipment | |
US10017916B2 (en) | Earth working apparatus | |
JP3689227B2 (en) | Method of replacing soil removal means in tunnel excavator and tunnel excavator | |
WO2016193881A1 (en) | A loader | |
JP6973787B2 (en) | Pyroclastic system and crushing method of rock crushing | |
GB2570317A (en) | A tunnel boring apparatus, a tunnel boring machine, and a method of boring tunnels | |
RU2140542C1 (en) | Method of process filling of sections of mine field located under objects subject to protection | |
GB2027094A (en) | Mining of Minerals | |
Fuchs | Innovative concepts in underground materials handling | |
CN113216953A (en) | Rapid tunneling method for transportation roadway | |
JP2020094424A (en) | Muck hauling method at working face |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21D 9/12 20060101AFI20161219BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20170725 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180117 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20200915 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1364667 Country of ref document: AT Kind code of ref document: T Effective date: 20210315 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016052978 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20210422 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20210224 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20210224 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210624 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210525 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210524 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1364667 Country of ref document: AT Kind code of ref document: T Effective date: 20210224 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210624 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602016052978 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
26N | No opposition filed |
Effective date: 20211125 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20210617 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20210630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210617 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210617 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210617 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210624 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20160617 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20230622 Year of fee payment: 8 Ref country code: DK Payment date: 20230615 Year of fee payment: 8 Ref country code: DE Payment date: 20230621 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20230616 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210224 |