EP3012574B1 - Einrichtung zur steuerbaren druckentlastung eines wirksystems - Google Patents
Einrichtung zur steuerbaren druckentlastung eines wirksystems Download PDFInfo
- Publication number
- EP3012574B1 EP3012574B1 EP15003034.4A EP15003034A EP3012574B1 EP 3012574 B1 EP3012574 B1 EP 3012574B1 EP 15003034 A EP15003034 A EP 15003034A EP 3012574 B1 EP3012574 B1 EP 3012574B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- explosive charge
- duct
- ignition
- active system
- releasing pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 239000002360 explosive Substances 0.000 claims description 36
- 230000000977 initiatory effect Effects 0.000 claims description 14
- 238000004200 deflagration Methods 0.000 claims description 8
- 238000006243 chemical reaction Methods 0.000 claims description 3
- 230000001133 acceleration Effects 0.000 claims description 2
- 230000001960 triggered effect Effects 0.000 claims description 2
- 238000000034 method Methods 0.000 claims 3
- 238000013022 venting Methods 0.000 description 8
- 238000009423 ventilation Methods 0.000 description 3
- 238000005474 detonation Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 239000011888 foil Substances 0.000 description 1
- 239000003999 initiator Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000021715 photosynthesis, light harvesting Effects 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B3/00—Blasting cartridges, i.e. case and explosive
- F42B3/22—Elements for controlling or guiding the detonation wave, e.g. tubes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B39/00—Packaging or storage of ammunition or explosive charges; Safety features thereof; Cartridge belts or bags
- F42B39/14—Explosion or fire protection arrangements on packages or ammunition
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B39/00—Packaging or storage of ammunition or explosive charges; Safety features thereof; Cartridge belts or bags
- F42B39/20—Packages or ammunition having valves for pressure-equalising; Packages or ammunition having plugs for pressure release, e.g. meltable ; Blow-out panels; Venting arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42C—AMMUNITION FUZES; ARMING OR SAFETY MEANS THEREFOR
- F42C19/00—Details of fuzes
- F42C19/08—Primers; Detonators
- F42C19/0838—Primers or igniters for the initiation or the explosive charge in a warhead
- F42C19/0842—Arrangements of a multiplicity of primers or detonators, dispersed within a warhead, for multiple mode selection
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Air Bags (AREA)
- Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
- Portable Nailing Machines And Staplers (AREA)
- Road Paving Machines (AREA)
Description
- Die Erfindung betrifft eine Einrichtung zur steuerbaren Druckentlastung eines Wirksystems, umfassend eine in einer Hülle angeordnete Sprengladung sowie eine kombinierte Zündeinrichtung für deflagrative und detonative Initiierung der Sprengladung.
- Eine wichtige Voraussetzung ist dabei jedoch, dass die deflagrative Umsetzung räumlich und zeitlich stabil abläuft. Dies ergibt sich aus den Raten der Energiedissipation im Vergleich zur Energieerzeugung, wobei verschiedene Systemparameter wie Initiierung, Sprengladungseigenschaften, sowie Verdämmung und Entlüftung der Sprengladung maßgeblich sind. Für ein spezifisches Wirkladungssystem existiert somit eine bestimmte Kombination dieser Parameter. Die vorliegende Erfindung konzentriert sich deshalb auf die notwendige Entlüftung während einer Deflagration, damit diese auch bei vollständiger Verdämmung der Wirkladung stabil ablaufen kann.
- In der Patentanmeldung
DE 10 2014 004 003 B3 ist ein Zündsystem beschrieben, das eine einstellbare Leistungsabgabe des Wirksystems vor dem Erreichen des Zieles in einem weiten Bereich ermöglicht. Hierfür wird das Verhältnis zwischen detonativer und deflagrativer Umsetzung der Sprengladung auf einen gewünschten Wert eingestellt. Dies kann mittels zweier räumlich weit beabstandeter Zündeinrichtungen erfolgen, wie dies aus dem Stand der Technik bekannt ist. Gemäß der neuen Patentanmeldung ist es vorgesehen beide Zündeinrichtungen unmittelbar nebeneinander anzuordnen. Hinsichtlich der Entlüftung des Wirksystems wird jedoch kein Hinweis auf eine wirksame Umsetzung gegeben. - Die
US 2011 / 0 203 475 A1 zeigt die vorgenannte Anordnung zweier Zündstellen mit einem unabhängig voneinander wählbaren Zündzeitpunkt. Um eine innere, entlang der Zentralachse angeordnete Sprengladung ist ein Luftraum angeordnet, der seinerseits von Röhren aus Kunststoff bzw. Metall umgeben ist. Damit kann die äußere Sprengladung auch deflagrativ initiiert werden. - Die
DE 10 2009 017 160 C2 betrifft eine Wirkladung mit drei auf der Zentralachse angeordneten Zündstellen, mit deren Hilfe nicht nur die Leistung der Wirkladung, sondern auch die Größe der radial abgegebenen Splitter einstellbar ist. Eine der Zündstellen bewirkt die Deflagration der Sprengladung. - In der
DE 100 08 914 C2 ist das Grundprinzip einer Wirkladung mit zwei auf der Zentralachse angeordneten und entgegengesetzt wirkenden Zündstellen bekannt geworden. Mittels Wahl der Zündzeitpunkte kann die detonativ abgegebene Leistung in einem sehr großen Bereich eingestellt werden.US 2003/010246 A1 offenbart eine Einrichtung zur Druckentlastung eines Wirksystems. - Der Erfindung liegt die Aufgabe zugrunde, für ein Wirksystem eine geeignete Entlüftung für den Fall der deflagrativen Umsetzung der Sprengladung anzugeben, welche eine destruktive Beeinflussung der Hülle des Wirksystems vermeidet.
- Die Aufgabe wird erfindungsgemäß dadurch gelöst, dass die Einrichtung zur Druckentlastung vor oder gleichzeitig mit der Initiierung der deflagrativen Reaktion der Sprengladung auslösbar ist, dass die Einrichtung zur Druckentlastung in der oder unmittelbar benachbart zur Zündeinrichtung angeordnet ist und dass das Mittel zur Druckentlastung wenigstens einen Kanal aufweist, der gesteuert zu öffnen ist und den Innenraum des Wirksystems mit der externen Umgebung des Wirksystems verbindet.
- Ausgestaltungen der Erfindung sind den nachgeordneten Ansprüchen zu entnehmen.
- Ausführungsbeispiele der Erfindung sind in der Zeichnung dargestellt ohne dass die Erfindung darauf eingeschränkt wäre. Sie werden im Folgenden näher beschrieben. Es zeigen:
-
Fig. 1 : eine erste Variante mit zentralem Entlüftungskanal innerhalb des Zündergehäuses, -
Fig. 2 : eine zweite Ausführungsform mit wenigstens einem außerhalb des Zündergehäuses angeordneten Entlüftungskanal, -
Fig. 3 : verschiedene Ausführungsformen des Lüftungskanals bei einem Zündergehäuse mit rundem Querschnitt. - In der
Figur 1 ist ein schematisch vereinfachter Schnitt durch eine Zündeinrichtung ZE dargestellt, die sowohl eine erste Zündstelle Z1 für detonative Initiierung als auch eine weitere Zündstelle Z2 für deflagrative Initiierung der die Zündeinrichtung ZE umgebenden Sprengladung SP umfasst. Das Gehäuse G der Zündeinrichtung ZE ist mit einem Teil der Hülle HE des Wirksystems verbunden. - Die erste Zündstelle Z1 ist im Ausführungsbeispiel als ringförmige Sprengladung S1 ausgeführt. Diese wird derart initiiert, dass ihre Vorzugswirkrichtung 1 radial zur Hauptachse H des Wirksystems verläuft, damit eine möglichst gleichmäßige Initiierung der Sprengladung SP in allen radialen Richtungen erzielt werden kann. Hierfür wird als Primärzünder beispielsweise ein erster EFI (Exploding Foil Initiator) E1 eingesetzt, der auf einer Platte P montiert ist, welche die ringförmige Sprengladung S1 auf einer Seite abdeckt. In der Platte P sind vom EFI E1 ausgehend Zündleitungen gleicher Länge vorgesehen, die zu Detonatoren D führen, die ihrerseits an der ringförmigen Sprengladung anliegen. Hierfür werden mindestens zwei gleichmäßig auf der Oberfläche der ringförmigen Sprengladung S1 verteilt angeordnete Detonatoren D eingesetzt.
- Auch die weitere Zündstelle Z2 für die deflagrative Initiierung kann einen weiteren EFI E2 als Primärzünder aufweisen. Dieser wirkt dann über eine Verstärkerladung V auf eine Ladung ein, die beispielsweise als Sprengschnur SS oder besser als angepasster Sprengladungskern ausgeführt ist. Mittels der relativen Lage der Zündzeitpunkte der ersten und der weiteren Zündstelle lässt sich dann die Leistungsabgabe des Wirksystems über das Verhältnis von detonativ umgesetztem Sprengstoff zu deflagrativ umgesetzten Sprengstoff einstellen.
- Das erfindungsgemäße Mittel zur Druckentlastung ist in diesem Ausführungsbeispiel als zentraler und in Richtung der Hauptachse H des Wirksystems verlaufender rohrförmiger Kanal K ausgebildet. Dieser beginnt unmittelbar am weiteren EFI E2 und führt bis durch den genannten Teil der Hülle HE und die Öffnung O ins Freie. Somit dient dieser Kanal K zum einen zur unmittelbaren Druckentlastung nach der Zündung des weiteren EFI E2, wobei die Öffnung O des Kanals K frei gegeben wird. Zum anderen wirkt 1 die ringförmigen Sprengladung S1 nicht nur auf die Sprengladung SP, sondern sie öffnet auch den Kanal K, wodurch ebenfalls eine Druckentlastung nach außen möglich wird.
- Hinsichtlich der erforderlichen Querschnittsfläche des Kanal K gilt erfahrungsgemäß, dass wenigstens 7 mm2 und bezogen auf die mittlere Querschnittsfläche der Sprengladung SP mindestens 1/1000 davon - ohne Berücksichtigung der Dicke der Hülle beträgt. Die gilt beispielsweise für Sprengladungen mit einem Innendurchmesser von 50 mm, wobei bereits in diesem Fall eher eine Kanalquerschnittsfläche von 1/50 der Querschnittsfläche der Sprengladung angestrebt wird. Grundsätzlich gilt, dass die Querschnittsfläche der Druckentlastungsöffnung O weniger als proportional zum Durchmesser der Sprengladung SP anwächst je größer dieser Durchmesser gewählt wird.
- Grundsätzlich soll die Druckentlastungsöffnung O dort angeordnet sein, wo die Deflagration beginnt und hierdurch der Druck auch zuerst ansteigt. Dies ist in jedem Fall günstiger als eine Entlüftung über einen in der Hülle des Wirksystems angeordneten Deckel oder über Sollbruchstellen oder Öffnungen in der Hülle. Mittels der rechtzeitigen und andauernden Entlüftung über die Zeit der Deflagration wird ein Druckniveau innerhalb der Sprengladung erzielt, das eine stabile Deflagrationsreaktion aufrecht erhält.
- Entscheidend ist der Zeitpunkt der Öffnung der Druckentlastung. Dieser muss rechtzeitig vor der Initiierung der Deflagration stattfinden, damit während der hochlaufenden Deflagration ein zu rascher Druckaufbau vermieden wird. Weiterhin ist es durchaus hilfreich, schon aus Redundanzgründen wenigstens eine zweite Druckentlastungsöffnung vorzusehen, wobei die Summe der Querschnitte die angegebene Mindestquerschnittsfläche erreichen muss.
- In der
Figur 2 ist eine zweite Ausführungsform mit wenigstens einem außerhalb des Zündergehäuses G angeordneten Entlüftungskanal K dargestellt. Die Zündstellen Z1 und Z2 für die deflagrative und die detonative Initiierung der Sprengladung SP sind ebenso angeordnet wie im Ausführungsbeispiel in derFigur 1 , wobei aufgrund des Entfalls des zentralen und in Richtung der Hauptachse H des Wirksystems verlaufenden Kanals auch die Platte P mit der Zündenergieverteilung entfällt, welche die Sprengladung S1 auf einer Seite abdeckt. Es ist stattdessen ein zentraler EFI E11 auf der Hauptachse H vorgesehen. Die Initiierung der deflagrativen Umsetzung der Sprengladung SP erfolgt in gleicher Weise wie beim Ausführungsbeispiel nachFigur 1 mittels des EFI E2. - Die Druckentlastung findet hier mittels mindestens einen Lüftungskanals K statt, der in unmittelbarer Nähe zur Zündstelle Z2 für die deflagrative Initiierung beginnt und an der Außenseite des Zündergehäuses G entlang auf kurzem Weg ins Freie führt. Auch hier ist die oben genannte Mindestquerschnittsfläche einzuhalten.
- Die möglichen Ausführungsformen des Lüftungskanals K können der Bauform des Zündergehäuses angepasst werden. Beispielhaft ist in der
Figur 3 einmal eine Version mit drei rohrförmigen Kanälen K dargestellt und zum anderen eine Ausführung mit einem koaxialen auf der Außenseite des Zündergehäuses G umlaufenden Kanal K, der sich mittels Stegen oder Streben S an dem Zündergehäuse G abstützt. Auch dieser Kanal K führt über Öffnungen O in der Hülle HE des Wirksystems ins Freie. - Gemäß einer weiteren Ausführungsform ist die Öffnung (O) des Kanals (K) zeitlich steuerbar.
- Gemäß einer weiteren Ausführungsform ist die Öffnung des Kanals (K) in Abhängigkeit vom Erreichen einer wählbaren Beschleunigung, insbesondere in Richtung der Hauptachse (H) des Wirkkörpers, aktivierbar.
- Gemäß einer weiteren Ausführungsform erfolgt die Öffnung des Kanals (K) mittels wenigstens eines Gasgenerators.
Claims (6)
- Einrichtung zur steuerbaren Druckentlastung eines Wirksystems, umfassend eine in einer Hülle angeordnete Sprengladung (SP) sowie eine kombinierte Zündeinrichtung (ZE) aufweisend eine erste Zündstelle (Z1) für eine detonative Initiierung der Sprengladung (SP) und eine zweite Zündstelle (Z2) für eine deflagrative Initiierung der Sprengladung (SP),
wobei die Einrichtung zur Druckentlastung vor oder gleichzeitig mit der Initiierung der deflagrativen Reaktion der Sprengladung (SP) auslösbar ist,
wobei die Einrichtung zur Druckentlastung in der oder unmittelbar benachbart zur Zündeinrichtung angeordnet ist, und
wobei die Einrichtung zur Druckentlastung wenigstens einen Kanal (K) aufweist, der durch unmittelbare Freigabe einer Öffnung (O) des Kanals (K) durch Zündung der zweiten Zündstelle (Z2) gesteuert zu öffnen (O) ist und den Innenraum des Wirksystems mit der externen Umgebung des Wirksystems verbindet, wodurch eine Druckentlastung während der Deflagration nach außen möglich wird. - Einrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Kanal (K) einen Mindestquerschnitt aufweist, der vom Durchmesser der Sprengladung abhängt.
- Einrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Querschnittsfläche des Kanals (K) wenigstens 7 mm2 und in Abhängigkeit vom Durchmesser der Sprengladung zwischen 1/1000 und 1/50 der Querschnittsfläche der Sprengladung beträgt.
- Einrichtung nach wenigstens einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass die Öffnung (O) des Kanals (K) zeitlich steuerbar ist.
- Einrichtung nach wenigstens einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die Öffnung des Kanals (K) in Abhängigkeit vom Erreichen einer wählbaren Beschleunigung, insbesondere in Richtung der Hauptachse (H) des Wirkkörpers, aktivierbar ist.
- Einrichtung nach wenigstens einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass die Öffnung des Kanals (K) mittels wenigstens eines Gasgenerators erfolgt.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102014015877.2A DE102014015877B3 (de) | 2014-10-24 | 2014-10-24 | Einrichtung zur steuerbaren Druckentlastung eines Wirksystemes |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3012574A1 EP3012574A1 (de) | 2016-04-27 |
EP3012574B1 true EP3012574B1 (de) | 2019-03-06 |
EP3012574B8 EP3012574B8 (de) | 2019-05-15 |
Family
ID=53759191
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15003034.4A Not-in-force EP3012574B8 (de) | 2014-10-24 | 2015-10-22 | Einrichtung zur steuerbaren druckentlastung eines wirksystems |
Country Status (4)
Country | Link |
---|---|
US (1) | US9766048B2 (de) |
EP (1) | EP3012574B8 (de) |
DE (1) | DE102014015877B3 (de) |
ES (1) | ES2720278T3 (de) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8401002B2 (en) | 2005-06-22 | 2013-03-19 | Research In Motion Limited | Exchange and use of globally unique device identifiers for circuit-switched and packet switched integration |
DE102014015877B3 (de) * | 2014-10-24 | 2015-08-20 | TDW Gesellschaft für verteidigungstechnische Wirksysteme mbH | Einrichtung zur steuerbaren Druckentlastung eines Wirksystemes |
US10648785B1 (en) * | 2017-10-30 | 2020-05-12 | Northrop Grumman Innovation Systems, Inc. | Munition with controlled self neutralization |
US10801822B2 (en) * | 2018-06-29 | 2020-10-13 | Goodrich Corporation | Variable stand-off assembly |
CN113888947A (zh) * | 2021-08-31 | 2022-01-04 | 中国人民解放军陆军工程大学 | 一种大当量地下多点聚集爆炸弹坑效应模拟装置及方法 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3713359A (en) * | 1971-06-25 | 1973-01-30 | Olin Corp | Safety system for explosive powder storage bin |
US5155298A (en) * | 1991-09-30 | 1992-10-13 | The United States Of America As Represented By The Secretary Of The Navy | Thermally activated case venting safety apparatus |
US5786544A (en) * | 1994-03-02 | 1998-07-28 | State of Israel--Ministry of Defence, Armament Development Authority, Rafael | Warhead protection device during slow cook-off test |
DE10008914C2 (de) * | 2000-02-25 | 2003-06-26 | Tdw Verteidigungstech Wirksys | Sprengladung für einen Gefechtskopf |
FR2827376B1 (fr) * | 2001-07-13 | 2003-12-05 | Poudres & Explosifs Ste Nale | Allumeur de securite pour element de munition pyrotechnique susceptible d'etre soumis a un echauffement lent |
US7373885B2 (en) * | 2005-10-28 | 2008-05-20 | Lockheed Martin Corporation | Device for venting a container housing an energetic material and method of using same |
JPWO2008096905A1 (ja) | 2007-02-09 | 2010-05-27 | 財団法人 東京都医学研究機構 | 抗brak(cxcl14)ヒトモノクローナル抗体及びその用途 |
SE533045C2 (sv) * | 2008-09-09 | 2010-06-15 | Bae Systems Bofors Ab | Verkansdel med valbar initiering |
DE102009017160B3 (de) * | 2009-04-09 | 2010-08-19 | TDW Gesellschaft für verteidigungstechnische Wirksysteme mbH | Zerlegevorrichtung für die Sprengladung eines Gefechtskopfes |
US8931415B2 (en) * | 2010-07-29 | 2015-01-13 | Alliant Techsystems Inc. | Initiation systems for explosive devices, scalable output explosive devices including initiation systems, and related methods |
DE102014004003B3 (de) * | 2014-03-20 | 2014-10-30 | TDW Gesellschaft für verteidigungstechnische Wirksysteme mbH | Zündsystem für ein skalierbares Wirksystem |
DE102014015877B3 (de) * | 2014-10-24 | 2015-08-20 | TDW Gesellschaft für verteidigungstechnische Wirksysteme mbH | Einrichtung zur steuerbaren Druckentlastung eines Wirksystemes |
-
2014
- 2014-10-24 DE DE102014015877.2A patent/DE102014015877B3/de active Active
-
2015
- 2015-10-22 ES ES15003034T patent/ES2720278T3/es active Active
- 2015-10-22 EP EP15003034.4A patent/EP3012574B8/de not_active Not-in-force
- 2015-10-23 US US14/921,946 patent/US9766048B2/en not_active Expired - Fee Related
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
EP3012574B8 (de) | 2019-05-15 |
ES2720278T3 (es) | 2019-07-19 |
DE102014015877B3 (de) | 2015-08-20 |
US20160116261A1 (en) | 2016-04-28 |
US9766048B2 (en) | 2017-09-19 |
EP3012574A1 (de) | 2016-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3012574B1 (de) | Einrichtung zur steuerbaren druckentlastung eines wirksystems | |
DE817126C (de) | Vorrichtung zum Lochen von Brunnenrohren, Brunnenschachtwaenden, Brunnenauskleidungen o. dgl. | |
EP1002213A1 (de) | System zum schutz von objekten gegen geformte ladungen | |
DE102009017160B3 (de) | Zerlegevorrichtung für die Sprengladung eines Gefechtskopfes | |
EP2312259A1 (de) | Umschaltbare Ladung | |
EP3029012A2 (de) | Vorrichtung zur gesteuerten initiierung der deflagration einer sprengladung | |
EP2824414B1 (de) | Verfahren und Vorrichtung zur Leistungssteuerung eines Wirksystems | |
EP2133654A2 (de) | Verfahren und Vorrichtung zur Leistungssteuerung eines Gefechtskopfes | |
DE102005031588B3 (de) | Dosierbare Ladung eines Gefechtskopfes | |
EP3767223B1 (de) | System, insbesondere handgranate | |
EP3351890B1 (de) | Umschaltbare ladungsvarianten mit lochmuster-einlagen | |
DE2629280C1 (de) | Gefechtskopf zum Bekaempfen von Zielobjekten,insbesondere Flugzeugen,die in Schutzraeumen untergebracht sind | |
DE10222184B4 (de) | Gefechtskopf | |
EP3044535B1 (de) | Bausatz und verfahren zur herstellung einer eine hohlladung enthaltenden zerstörladung | |
EP2442066B1 (de) | Umschaltbare Wirkladung | |
DE102010027580B4 (de) | Gefechtskopf | |
DE102011010351A1 (de) | Umschaltbare Wirkladung | |
DE3717458A1 (de) | Pyrotechnisches kraftelement | |
EP2827094A1 (de) | Vorrichtung zur gesteuerten Initiierung der Deflagration einer Sprengladung | |
DE1578077C2 (de) | Gefechtskopf fuer ein Panzerabwehrgeschoss | |
DE102016122740A1 (de) | Pyrotechnischer Wirkkörper | |
DE102014214379A1 (de) | Vorrichtung zur Handhabung von Flüssigkeiten | |
EP3396302A1 (de) | Neutralisierungskörper | |
EP3625515A1 (de) | Antriebssystem für patronenmunition | |
DE10251676A1 (de) | Fokussierte Unterwasserladung |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20161011 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20170602 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20181005 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: SCHALK, HERBERT Inventor name: GRASWALD, MARKUS |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R108 Ref document number: 502015008187 Country of ref document: DE |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1105146 Country of ref document: AT Kind code of ref document: T Effective date: 20190315 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: HEPP WENGER RYFFEL AG, CH |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PK Free format text: BERICHTIGUNG B8 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R107 Ref document number: 502015008187 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20190306 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2720278 Country of ref document: ES Kind code of ref document: T3 Effective date: 20190719 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20190306 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190606 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190607 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190706 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190706 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20191023 Year of fee payment: 5 Ref country code: SE Payment date: 20191021 Year of fee payment: 5 |
|
26N | No opposition filed |
Effective date: 20191209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20191028 Year of fee payment: 5 Ref country code: ES Payment date: 20191126 Year of fee payment: 5 Ref country code: IT Payment date: 20191028 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20191021 Year of fee payment: 5 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20191021 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191022 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20191031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191022 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: MMEP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20201022 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20151022 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201023 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201022 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201022 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1105146 Country of ref document: AT Kind code of ref document: T Effective date: 20201022 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20220121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201022 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201023 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190306 |