EP2951364B1 - Système de construction pour l'industrie du bâtiment - Google Patents
Système de construction pour l'industrie du bâtiment Download PDFInfo
- Publication number
- EP2951364B1 EP2951364B1 EP14707229.2A EP14707229A EP2951364B1 EP 2951364 B1 EP2951364 B1 EP 2951364B1 EP 14707229 A EP14707229 A EP 14707229A EP 2951364 B1 EP2951364 B1 EP 2951364B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pillar
- building system
- beams
- longitudinal portion
- seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title description 16
- 230000008878 coupling Effects 0.000 claims description 44
- 238000010168 coupling process Methods 0.000 claims description 44
- 238000005859 coupling reaction Methods 0.000 claims description 44
- 239000000463 material Substances 0.000 claims description 8
- 230000002787 reinforcement Effects 0.000 description 18
- 239000011150 reinforced concrete Substances 0.000 description 11
- 238000005266 casting Methods 0.000 description 9
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 229910052742 iron Inorganic materials 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000000087 stabilizing effect Effects 0.000 description 4
- 239000004567 concrete Substances 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 1
- 244000046052 Phaseolus vulgaris Species 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/48—Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
- E04B1/483—Shear dowels to be embedded in concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
- E04B2001/389—Brackets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/12—Load-carrying floor structures formed substantially of prefabricated units with wooden beams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Claims (10)
- Système de construction (10; 70; 80; 90; 110; 210; 310; 370; 410; 510) préfabriqué comprenant un pilier (12; 76; 88; 112; 118; 212; 312; 376; 412; 512) et au moins une poutre (14, 16; 72, 74; 78, 82, 84, 86; 92, 94; 114, 116; 214, 216, 218; 314, 316; 372, 374, 378, 380; 414, 416; 514, 516), préfabriquée et couplée au pilier (12; 76; 88; 112; 118; 212; 312; 376; 412; 512) dans lequel
le pilier (12; 76; 88; 112; 118; 212; 312; 376; 412; 512) comprend au moins un support (32; 132; 232; 332; 432) dans lequel un siège (38; 138; 338) est formé, au moins l'un support (32; 132; 232; 332; 432) étant totalement reçu dans le volume déterminé par le pilier, dans lequel au moins l'une poutre (14, 16; 72, 74; 78, 82, 84, 86; 92, 94; 114, 116; 214, 216, 218; 314, 316; 372, 374, 378, 380; 414, 416; 514, 516) comprend au moins une tablette rétractable (50; 150; 350; 450) dans laquelle un élément intérieur (60; 160; 354; 454) est coulissant l'au moins une tablette rétractable (50; 150; 350; 450), l'au moins une tablette rétractable (50; 150; 350; 450) étant entièrement logée dans le volume déterminé par l'au moins une poutre, de sorte que l'élément intérieur (60; 160; 354; 454) coulissant peut être fait sortir de l'au moins une tablette rétractable (50; 150; 350; 450) et entrer dans la siège (38; 138; 338) d'au moins un support (32; 132; 232; 332; 432) de sorte à coupler au moins une poutre avec le pilier;
dans lequel une fois que l'au moins une poutre 14, 16; 72, 74; 78, 82, 84, 86; 92, 94; 114, 116; 214, 216, 218; 314, 316; 372, 374, 378, 380; 414, 416; 514, 516) est fixée au pilier (12; 76; 88; 112; 118; 212; 312; 376; 412; 512) par l'élément interne (60; 160; 354; 454) coulissant, du matériau de ciment (68; 168) est coulé au moment de l'accouplement d'au moins une poutre au pilier;
caractérisé du fait qu'au moins une poutre comprend une première partie longitudinale (40 ; 91 ; 340 ; 440) et une deuxième partie longitudinale (42 ; 93 ; 343 ; 442), dans lesquelles la première partie longitudinale (40 ; 91 ; 340 ; 440) est disposée en bas par rapport à la deuxième partie longitudinale (42 ; 93 ; 342 ; 442); à l'extrémité de la deuxième partie longitudinale (342) étant comprise au moins une tablette rétractable (350); au moins une barre (344) étant comprise avec une extrémité libre filetée le long de la deuxième partie longitudinale (342), de sorte qu'au moyen d'un vissage sur ladite au moins une barre (344) au moins une barre de raccord (346) peut être fixée pour la connexion avec au moins une autre poutre. - Système de construction (10 ; 70 ; 80 ; 90 ; 110 ; 210) selon la revendication 1, dans lequel le siège (38 ; 138) formée dans l'au moins un support (32 ; 132 ; 232) comprend un dent (35) et l'élément intérieur comprend une lame (60 ; 160) dans laquelle au moins un évidement (62) est formé, de sorte que la lame (60 ; 160) une fois accueillie dans le siège (38 ; 138) soit bloquée en position au moyen de la dent (35) insérée dans l'évidement (62).
- Système de construction (10 ; 70 ; 80 ; 90 ; 110 ; 210) selon l'une des revendications précédentes, dans lequel l'au moins une poutre comprend une première partie longitudinale (40 ; 91) à l'extrémité de laquelle l'au moins une tablette rétractable (50 ; 150) est comprise et une deuxième partie longitudinale (42 ; 93) le long de laquelle au moins une barre (44 ; 144) avec une extrémité libre filetée est disposée, de sorte qu'au moyen d'un vissage au moins è ladite barre (44 ; 144) une barre de raccordement (46 ; 146) peut être fixée pour la connexion d'au moins une autre poutre.
- Système de construction (310 ; 370 ; 410 ; 510) selon la revendication 1, dans lequel l'au moins un support comprend une plaque (334) en forme de C avec une partie inférieure horizontale (335), une partie supérieure horizontale (336) et une partie latérale verticale (337) dans laquelle l'ouverture de passage (338) est formée.
- Système de construction (10 ; 70 ; 80 ; 90 ; 110 ; 210 ; 310 ; 370 ; 410 ; 510) selon l'une des revendications 3 à 4, dans lequel au moins une barre de continuité (66 ; 166 ; 366 ; 466) est reliée avec une extrémité à une barre de raccordement (46 ; 146 ; 346 ; 446) d'une première poutre et avec l'extrémité opposée à une barre de raccordement (46 ; 146 ; 346 ; 446) d'une deuxième poutre.
- Système de construction (90) selon l'une des revendications précédentes, dans lequel au moins un gaillard est disposé au-dessus de la première partie longitudinale (91), en continuité avec la deuxième partie longitudinale (93).
- Système de construction (210) selon l'une des revendications précédentes, dans lequel dans au moins une poutre (214, 240, 244) au moins un siège (244) est formé latéralement pour recevoir l'extrémité d'une petite poutre (246) pour planchers.
- Système de construction (210) selon la revendication précédente, dans lequel la petite poutre (246) comprend au moins sur une de ses extrémités un élément extensible (248) comprenant un étrier (252) mobile adapté pour être forcé hors de l'élément extensible (248) pour reposer sur un siège (244) d'au moins une poutre (214, 240, 244).
- Système de construction (510) selon une des revendications précédentes, dans lequel sur au moins une poutre (514, 516) au moins un élément en bois est fixé par au moins un étrier (552) à fin d'obtenir un plancher en bois.
- Système de construction (410) selon une des revendications précédentes, dans lequel un étrier de fixation (456) est fixé d'un côté sur la partie supérieure (442) de la première poutre (414) et/ou de la deuxième poutre (416) et de l'autre sur le pilier (412) de sorte à obtenir ainsi une première fixation à sec entre ladite première poutre (414) et/ou ladite deuxième poutre (416) et le pilier (412).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT000022A ITVR20130022A1 (it) | 2013-01-29 | 2013-01-29 | Sistema di costruzione nel settore edile |
ITVR20130032 ITVR20130032U1 (it) | 2013-07-11 | 2013-07-11 | Sistema di costruzione perfezionato per il settore edile |
PCT/IB2014/058637 WO2014118713A1 (fr) | 2013-01-29 | 2014-01-29 | Système de construction pour industrie de la construction |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2951364A1 EP2951364A1 (fr) | 2015-12-09 |
EP2951364B1 true EP2951364B1 (fr) | 2018-03-14 |
Family
ID=50189740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14707229.2A Active EP2951364B1 (fr) | 2013-01-29 | 2014-01-29 | Système de construction pour l'industrie du bâtiment |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2951364B1 (fr) |
WO (1) | WO2014118713A1 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112177217A (zh) * | 2020-09-09 | 2021-01-05 | 山东汇富建设集团建筑工业有限公司 | 一种预应力混凝土桁架叠合板及其制作方法 |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10024047B2 (en) | 2015-08-17 | 2018-07-17 | Tindall Corporation | Method and apparatus for constructing a concrete structure |
US10619342B2 (en) | 2017-02-15 | 2020-04-14 | Tindall Corporation | Methods and apparatuses for constructing a concrete structure |
CN107165272B (zh) * | 2017-06-22 | 2024-01-30 | 中国建筑股份有限公司 | 预应力装配式混凝土框架节点连接结构及其施工方法 |
JP7012525B2 (ja) * | 2017-12-19 | 2022-01-28 | 清水建設株式会社 | 梁構造 |
IT201800021541A1 (it) * | 2018-12-31 | 2019-03-31 | Bressaglia Pierangela | Mezzo di ancoraggio perfezionato per un sistema di ancoraggio regolabile di pareti prefabbricate alla struttura portante di un edificio |
JP7227801B2 (ja) * | 2019-03-14 | 2023-02-22 | 三井住友建設株式会社 | 鉄筋継手構造とこれを用いた建物、及び鉄筋継手構造の施工方法 |
CN110029729B (zh) * | 2019-04-04 | 2021-03-12 | 山东大学 | 一种预制钢筋混凝土主梁与次梁的拼接节点及施工方法 |
CN110644662A (zh) * | 2019-09-16 | 2020-01-03 | 佛山建装建筑科技有限公司 | 一种基于受力的预制无梁楼盖叠合板及其拆分方法 |
CN110725399A (zh) * | 2019-10-15 | 2020-01-24 | 广州瀚阳工程咨询有限公司 | 一种装配式建筑纵横梁连接节点的实施方法 |
US11951652B2 (en) | 2020-01-21 | 2024-04-09 | Tindall Corporation | Grout vacuum systems and methods |
ES1275081Y (es) * | 2021-04-22 | 2021-10-22 | Elastic Potential S L | Viga de hormigon y sistema que comprende a dicha viga |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4736621A (fr) * | 1971-04-15 | 1972-11-29 | Misawa Homes Co | |
FR2229825A1 (en) * | 1973-05-14 | 1974-12-13 | Saret | Reinforced concrete uprights and girders - have metal attachments on recessed plates moulded into the concrete |
NO321443B1 (no) * | 2004-06-30 | 2006-05-08 | Sb Produksjon As | Sammenforingssystem, enkeltelementer og fremgangsmate for bruk av dette |
US8011147B2 (en) * | 2006-09-11 | 2011-09-06 | Hanlon John W | Building system using modular precast concrete components |
IT1391215B1 (it) * | 2008-09-30 | 2011-11-18 | Avanzini Prefabbricati S P A | Dispositivo di collegamento tra pilastri e travi prefabbricate |
-
2014
- 2014-01-29 WO PCT/IB2014/058637 patent/WO2014118713A1/fr active Application Filing
- 2014-01-29 EP EP14707229.2A patent/EP2951364B1/fr active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112177217A (zh) * | 2020-09-09 | 2021-01-05 | 山东汇富建设集团建筑工业有限公司 | 一种预应力混凝土桁架叠合板及其制作方法 |
Also Published As
Publication number | Publication date |
---|---|
EP2951364A1 (fr) | 2015-12-09 |
WO2014118713A1 (fr) | 2014-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2951364B1 (fr) | Système de construction pour l'industrie du bâtiment | |
US7281357B2 (en) | Prefabricated components for making floor slabs, floors and walls with exposed wood beams for small buildings | |
US10494807B2 (en) | Construction of the prefabricated column and beam type | |
EP2739799A1 (fr) | Structure de construction de parois monolithiques pré-coulées et de dalles entre étages | |
WO2010047570A1 (fr) | Bloc en bois à double paroi et procédé de construction d'une paroi avec ledit bloc | |
US10837167B2 (en) | Construction of the prefabricated column and beam type | |
DE19714626A1 (de) | Wandsystem mit Schalungselementen, die variabel kombinierbar sind | |
KR100706641B1 (ko) | 건축물 기둥 보강구조 | |
KR200366493Y1 (ko) | 압축 시멘트판과 강재 샛기둥을 사용한 고정식 거푸집패널 시스템 | |
KR101357280B1 (ko) | 여러 층의 동시 시공이 가능한 다층1절 피씨 기둥과 이를 이용한 피씨 복합화 공법 | |
MX2012002674A (es) | Techo a base de bloques aligerados y su metodo de construccion. | |
ITVR20130022A1 (it) | Sistema di costruzione nel settore edile | |
US10808411B2 (en) | Formwork assembly with interlocking side frame members | |
GB2140053A (en) | Building system | |
KR102167446B1 (ko) | 한옥 콘크리트 초익공 및 이를 이용한 한옥 콘크리트 초익공 시공방법 | |
KR101165587B1 (ko) | 토목 건축용 다용도 패널 | |
US1729293A (en) | Concrete wall construction | |
KR101894510B1 (ko) | 라멘형 구조체 | |
NL8503110A (nl) | Gebouw en stabiliteitswand daarvoor. | |
US20200071943A1 (en) | Secure holding spacer units for permanent formworks | |
JPS6223936Y2 (fr) | ||
JPS6039379Y2 (ja) | 梁フレ−ム | |
AT164137B (de) | Baustein mit planen Wand- und profilierten Stoßflächen und damit hergestellter Fachwerksbau | |
KR20160108776A (ko) | 천정 벽돌과 이를 적용한 건축물의 천정 구조물 및 그 시공 방법 | |
KR101554208B1 (ko) | 콘크리트 타설용 거푸집 지지체 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20150722 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20170104 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602014022294 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: E04B0001210000 Ipc: E04B0005170000 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04B 5/17 20060101AFI20170817BHEP Ipc: E04B 1/21 20060101ALI20170817BHEP Ipc: E04B 1/38 20060101ALI20170817BHEP Ipc: E04B 5/12 20060101ALI20170817BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
INTG | Intention to grant announced |
Effective date: 20170929 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: BUILDING SERVICE DI CENZON FRANCESCO E POMINI GIOR |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 979025 Country of ref document: AT Kind code of ref document: T Effective date: 20180315 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014022294 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: RO Ref legal event code: EPE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180314 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180614 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 979025 Country of ref document: AT Kind code of ref document: T Effective date: 20180314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180615 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180614 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602014022294 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180716 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 |
|
26N | No opposition filed |
Effective date: 20181217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602014022294 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20190129 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190129 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190131 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190801 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190129 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190129 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190129 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180714 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140129 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: RO Payment date: 20220128 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180314 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20230125 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20230112 Year of fee payment: 10 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230129 |