EP2932521A1 - Sicherungsautomat mit hilfskurzschluss - Google Patents
Sicherungsautomat mit hilfskurzschlussInfo
- Publication number
- EP2932521A1 EP2932521A1 EP13814880.4A EP13814880A EP2932521A1 EP 2932521 A1 EP2932521 A1 EP 2932521A1 EP 13814880 A EP13814880 A EP 13814880A EP 2932521 A1 EP2932521 A1 EP 2932521A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- circuit breaker
- current
- automatic circuit
- monitoring
- designed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H71/00—Details of the protective switches or relays covered by groups H01H73/00 - H01H83/00
- H01H71/10—Operating or release mechanisms
- H01H71/12—Automatic release mechanisms with or without manual release
- H01H71/40—Combined electrothermal and electromagnetic mechanisms
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H89/00—Combinations of two or more different basic types of electric switches, relays, selectors and emergency protective devices, not covered by any single one of the other main groups of this subclass
- H01H89/04—Combination of a thermally actuated switch with a manually operated switch
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F7/00—Magnets
- H01F7/06—Electromagnets; Actuators including electromagnets
- H01F7/08—Electromagnets; Actuators including electromagnets with armatures
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H33/00—High-tension or heavy-current switches with arc-extinguishing or arc-preventing means
- H01H33/02—Details
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H71/00—Details of the protective switches or relays covered by groups H01H73/00 - H01H83/00
- H01H71/10—Operating or release mechanisms
- H01H71/12—Automatic release mechanisms with or without manual release
- H01H71/14—Electrothermal mechanisms
- H01H71/16—Electrothermal mechanisms with bimetal element
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H71/00—Details of the protective switches or relays covered by groups H01H73/00 - H01H83/00
- H01H71/10—Operating or release mechanisms
- H01H71/1009—Interconnected mechanisms
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H89/00—Combinations of two or more different basic types of electric switches, relays, selectors and emergency protective devices, not covered by any single one of the other main groups of this subclass
Definitions
- the present invention relates to a
- Circuit breaker for protecting a phase with an input terminal, an output terminal, a current path electrically connecting the input terminal and the output terminal, a separation device incorporated in the
- Rung is arranged and designed to interrupt this in one operation, and a
- Monitoring device that is designed to monitor the current in the current path and upon detection of a
- the invention relates to a fuse arrangement with a plurality of above-mentioned circuit breaker for the
- Such safety devices can as circuit breakers or as
- Such a circuit breaker is connected to its input terminal to a power source. Its output terminal is connected to the load, with the input terminal and the output terminal connected via a current path. In the current path, a separator is arranged, the
- the separator is usually designed as a switch, more precisely as an opener.
- the monitoring device that monitors the current in the current path. When detecting an overcurrent by the monitoring device is the
- the separator can be additionally operated manually to cancel or bring the interruption.
- circuit breakers are usually carried out with extinguishing chambers, in which the arc
- the arc is divided by quenching plates and interrupted.
- Switch-off time to extinction of the arc is in known circuit breakers at least 4 ms. During this time, however, damage or even destruction of the load connected to the output terminal of the circuit breaker can occur. In multi-phase supply systems, each phase is protected with such a circuit breaker.
- Switching devices oversized which is associated with increased costs and can lead to additional losses. This leads to a design conflict in applications with high peak currents, such as may occur when starting up motors. Also, each individual dimensioning of the system is required.
- the invention is therefore the object of a
- Input terminal and the output terminal electrically conductively connects, a disconnecting device, which is arranged in the current path and designed to interrupt this on actuation, a discharge terminal, a discharge path, which at one end to the current path between the
- each phase is secured with a circuit breaker and the circuit breakers are coupled together.
- the basic idea of the present invention is thus to provide a circuit breaker which ensures reliable protection of downstream loads from overcurrents by the connection of continuous current and short-circuit current, and whose protective effect occurs particularly rapidly by currents during the switching of the separator by occurring arcs on the discharge terminal be derived.
- the circuit breaker thus has two
- the currents during the switching of the separating device can flow off after switching the connecting device via the discharge terminal, so that the protective function of the circuit breaker already occurs very quickly. Depending on the switching times of the connection device times can be in the
- the monitoring device for the monitoring device for the monitoring device.
- Connecting device executed. Particularly preferred is a simultaneous actuation of the separating device and the connecting device by the
- the circuit breaker is with its input terminal with a power supply and at its output terminal with a load, which is an electrical switching device
- the discharge terminal is
- the separating device is preferably designed as an opener for interrupting the current path.
- Connecting device is usually designed as a closer for connecting through the Ableitpfades.
- the Ableitklemmen are preferably with a ground or a PE conductor
- the discharge terminal can be connected to a different phase or a synthetic star point.
- Monitoring device a bi-metal switch for
- Monitoring device a magnetic switch for
- Short-circuit current monitoring has. Accordingly, a magnetic quick release as short-circuit protection for fast processes, ie fast peak currents, respectively.
- the sensitivity of the short-circuit protection can be achieved by the property of the magnetic material.
- the time course of the magnetic field corresponds to a hysteresis curve.
- a magnetic field is generated by the overcurrent, so that with the aid of a relay coil and armature actuation can take place.
- Automatic circuit breaker has a coupling device with which the separating device and the connecting device are coupled for common operation, and the
- the coupling device can in principle be designed as desired.
- the coupling device may be an electrical or electronic coupling device.
- the coupling device is a
- the actuation of the coupling device is effected by a relay.
- Automatic circuit breaker has an actuating element which is actuated by the monitoring device during an actuation, so that the actuation is recognizable from the outside.
- the actuating element with the
- the circuit breaker can be manually operated to disconnect a downstream load from the power supply.
- the circuit breaker can be manually operated to disconnect a downstream load from the power supply.
- Transferring automatic circuit breakers The mechanical coupling is particularly reliable and easy to manufacture.
- Automatic circuit breakers are mechanically coupled to each other via a coupling element.
- the mechanical coupling is particularly reliable and allows easy
- Coupling element formed as a separate component for attachment to the actuators. This can be the
- Coupling the circuit breakers are flexible.
- available circuit breakers can readily be coupled together, so that at any time a fuse arrangement can be formed.
- a fuse arrangement can be formed.
- Coupling element a manual actuator for manual
- the fuse arrangement can also be operated manually according to the operation of the circuit breaker to the load of the power supply for all phases
- the manual actuator for manual operation is carried out both for the common separation of the current paths of the individual circuit breakers as well as for interconnecting the current paths, according to the function of the actuating element of the circuit breaker.
- the hand actuator such as
- Safety arrangement designed as an integral device.
- FIG. 1 is a circuit diagram with a fuse arrangement, which is arranged between a multi-phase power supply and a multi-phase load,
- Fig. 2 is a detail view of the circuit diagram of Fig. 1, in which only a circuit breaker of
- FIG. 3 is a detail view of the circuit diagram of Fig. 2, in which the circuit breaker shown in Fig. 2 is shown in detail
- Fig. 4 is a diagram of a load current waveform at
- FIG. 5 is a diagram of a load current waveform at
- FIG. 6 is a diagram showing the current waveforms in the current path, the discharge path and the output terminal of the circuit breaker.
- FIGS 1 to 3 show an inventive
- Safety arrangement 1 with a plurality
- the fuse arrangement 1 is connected on the input side to a polyphase power supply 3 or supply line, each phase 4, 5, 6 being secured by a circuit breaker 2.
- Each automatic circuit breaker 2 is designed to protect a phase 4, 5, 6 and has an input terminal 7, an output terminal 8 and a discharge terminal 9.
- Automatic circuit breakers 2 are with their input terminal 7 each with a phase 4, 5, 6 and with their
- the load 10 is a multi-phase load, which is exemplified here by an electronic switching device.
- Discharge terminals 9 are each connected to a ground 11.
- the input terminal 7 and the output terminal 8 are electrically connected via a current path 12.
- the current path 12 are a
- the separator 13 is an opener
- the monitoring device 14 is
- the circuit breaker 2 also has a discharge path 15 which is connected at its one end to the current path 12 between the separator 13 and the output terminal 8 and at its other end to the discharge terminal 9.
- a connecting device 16 is arranged, which is designed to connect through the discharge path 15 in an actuation. Accordingly, the
- Connecting device 16 designed as normally open.
- the separating device 13 and the connecting device 16 are coupled to a common operation with a coupling device 17.
- Embodiment is a mechanical coupling device 17. With the coupling device 17, an actuating element is connected, which upon actuation of the
- Coupling device 17 is also actuated, so that the operation from the outside, i. from outside the
- Coupling device 17 and thus separating device 13 and the connecting device 16 are executed.
- the monitoring device 14 is executed at
- the monitoring device 14 has a bimetal switch 19 for continuous current monitoring in order to detect an excessive line current as an overcurrent.
- the monitoring device 14 has a
- Magnetic switch 20 with a magnetic quick release as short-circuit protection for fast operations to monitor a short-circuit current as overcurrent.
- Magnetic switch 20 is generated by the overcurrent of a magnetic field, so that with the aid of a relay coil and armature actuation of the coupling device 17 is carried out.
- Figures 4 and 5 show schematically the breakdown of the current I k through the output terminal 8 for a
- Embodiment The current is in the conventional circuit breaker only after about 4 ms to one
- FIG. 6 shows the operation of the circuit breaker 2 in detail.
- the automatic circuit breakers 2 are mechanically coupled to one another via a coupling element 21. Due to the mechanical coupling, the
- Automatic circuit breakers 2 mutually transmit an operation by their respective monitoring device 14 to the other circuit breakers 2.
- the coupling element 21 in this embodiment is designed as a separate component, which is connected in a manner not shown here in detail with the actuators of the three circuit breakers 2.
- the coupling element 21 is provided with a
- Manual actuator 22 for manual operation of the coupled circuit breakers 2 executed.
- the hand actuator 22 is designed for manual actuation both for the common disconnection and interconnection of the current paths 12, wherein the manual operation is recognizable from the outside via the hand actuator 22.
- Embodiment is the fuse arrangement 1 as
Landscapes
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Emergency Protection Circuit Devices (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102012112435.3A DE102012112435B4 (de) | 2012-12-17 | 2012-12-17 | Sicherungsautomat mit Hilfskurzschluss und Sicherungsanordnung mit einer Mehrzahl solcher Sicherungsautomaten |
| PCT/EP2013/076971 WO2014095918A1 (de) | 2012-12-17 | 2013-12-17 | Sicherungsautomat mit hilfskurzschluss |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP2932521A1 true EP2932521A1 (de) | 2015-10-21 |
| EP2932521B1 EP2932521B1 (de) | 2017-09-27 |
Family
ID=49886894
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP13814880.4A Active EP2932521B1 (de) | 2012-12-17 | 2013-12-17 | Sicherungsautomat mit hilfskurzschluss |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20150348734A1 (de) |
| EP (1) | EP2932521B1 (de) |
| KR (1) | KR20150084048A (de) |
| CN (1) | CN104871281B (de) |
| DE (1) | DE102012112435B4 (de) |
| RU (1) | RU2015128479A (de) |
| WO (1) | WO2014095918A1 (de) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2019121333A1 (en) | 2017-12-18 | 2019-06-27 | Abb Schweiz Ag | Method of consolidating a wound body |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3278349B1 (de) * | 2015-03-31 | 2020-09-16 | Eaton Intelligent Power Limited | Schaltschrankanordnung mit verbesserter ausschaltung bei überlast |
| CN105762036B (zh) * | 2016-03-29 | 2017-10-20 | 东南大学 | 一种基于涡流自触发的模块化多电平换流器直流侧断路器 |
| CN105823984B (zh) * | 2016-05-16 | 2018-09-14 | 山东省产品质量检验研究院 | 一种隔离开关短路接通试验辅助装置及应用 |
| BE1026445B1 (de) * | 2018-07-05 | 2020-02-04 | Phoenix Contact Gmbh & Co | Geräteschutzschalter mit intelligenter Grenzwertermittlung |
| US11398361B2 (en) * | 2019-09-30 | 2022-07-26 | Rockwell Automation Technologies, Inc. | Systems and methods for automatically configuring point-on-wave settings in a relay device |
| CN112133610B (zh) * | 2020-09-16 | 2023-01-31 | 华翔翔能科技股份有限公司 | 一种具有可视化功能的智能断路器 |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2610951C3 (de) * | 1976-03-16 | 1980-09-18 | Brown, Boveri & Cie Ag, 6800 Mannheim | Schutzschalter |
| US4110719A (en) * | 1977-04-11 | 1978-08-29 | Mechanical Products | Three phase circuit breaker |
| US4184186A (en) * | 1977-09-06 | 1980-01-15 | General Electric Company | Current limiting device for an electric power system |
| DE2944619C2 (de) * | 1979-11-05 | 1984-03-29 | Brown, Boveri & Cie Ag, 6800 Mannheim | Selbstschalter |
| DE2945683A1 (de) * | 1979-11-13 | 1981-05-21 | Brown, Boveri & Cie Ag, 6800 Mannheim | Leitungsschalter |
| DE3575823D1 (de) * | 1984-08-27 | 1990-03-08 | Siemens Ag | Elektrische installationsanlage mit ueberspannungsschutz. |
| NL9102057A (nl) * | 1991-12-10 | 1993-07-01 | Holec Syst & Componenten | Selectieve automatische beveiligingsschakelaar. |
| AT410867B (de) * | 2001-04-06 | 2003-08-25 | Siemens Ag Oesterreich | Spannungsversorgung mit abschaltsicherung |
| WO2010099903A1 (de) * | 2009-03-04 | 2010-09-10 | Jozef Smrkolj | Mehrpoliger elektrischer selbstschalter |
| DE102010048188B4 (de) * | 2010-10-13 | 2020-11-12 | Phoenix Contact Gmbh & Co. Kg | Akkumulator-Kontrollvorrichtung, sowie Verfahren und System zur elektrischen Hilfsversorgung |
-
2012
- 2012-12-17 DE DE102012112435.3A patent/DE102012112435B4/de active Active
-
2013
- 2013-12-17 KR KR1020157015454A patent/KR20150084048A/ko not_active Ceased
- 2013-12-17 RU RU2015128479A patent/RU2015128479A/ru not_active Application Discontinuation
- 2013-12-17 CN CN201380066141.7A patent/CN104871281B/zh active Active
- 2013-12-17 EP EP13814880.4A patent/EP2932521B1/de active Active
- 2013-12-17 US US14/652,722 patent/US20150348734A1/en not_active Abandoned
- 2013-12-17 WO PCT/EP2013/076971 patent/WO2014095918A1/de not_active Ceased
Non-Patent Citations (2)
| Title |
|---|
| None * |
| See also references of WO2014095918A1 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2019121333A1 (en) | 2017-12-18 | 2019-06-27 | Abb Schweiz Ag | Method of consolidating a wound body |
Also Published As
| Publication number | Publication date |
|---|---|
| US20150348734A1 (en) | 2015-12-03 |
| DE102012112435A1 (de) | 2014-06-18 |
| CN104871281A (zh) | 2015-08-26 |
| EP2932521B1 (de) | 2017-09-27 |
| WO2014095918A1 (de) | 2014-06-26 |
| KR20150084048A (ko) | 2015-07-21 |
| DE102012112435B4 (de) | 2015-12-10 |
| CN104871281B (zh) | 2018-06-01 |
| RU2015128479A (ru) | 2017-01-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3987559B1 (de) | Schutzschaltgerät, schutzschaltsystem und verfahren | |
| EP2932521B1 (de) | Sicherungsautomat mit hilfskurzschluss | |
| DE102014215280B3 (de) | Kombiniertes Überspannungsschutzgerät mit einer integrierten Funkenstrecke | |
| EP2686928B1 (de) | Elektrische vorrichtung für den kurzschlussschutz einer drehstromlast in einem drehstromsystem | |
| EP3061111B1 (de) | Vorrichtung und verfahren zum schalten eines gleichstromes | |
| DE102014001708A1 (de) | Hochvoltbordnetz eines Kraftfahrzeugs | |
| EP3091550A1 (de) | Hybride sachalteinrichtung | |
| DE102016113773A1 (de) | Schmelzsicherung | |
| DE102008013448A1 (de) | Überspannungsableiter mit einem Gehäuse und mindestens einem Ableitelement, insbesondere einem Varistor | |
| EP3189536B1 (de) | Schalteinrichtung für überspannungsschutzgeräte | |
| EP3525227B1 (de) | Netzspannungsunabhängiges fehlerstrom-schutzschaltgerät und montageverfahren | |
| DE102013012578B4 (de) | Vorrichtung zum Absichern einer elektrischen Leitung sowie Verfahren zum Betreiben einer auf einer elektrischen Leitung angeordneten Vorrichtung | |
| DE102014215282B3 (de) | Kombiniertes Überspannungsschutzgerät mit einer integrierten Funkenstrecke | |
| EP0261606A2 (de) | Schutzschaltungsanordnung | |
| EP3347959B1 (de) | Anordnung zur sicheren, von schaltgeräten oder vorsicherungen unabhängigen, netzseitigen abtrennung von überspannungsschutzeinrichtungen im fall kritischer betriebszustände | |
| EP2672595B1 (de) | Schaltungsanordnung und Verfahren zur Gleichstromunterbrechung | |
| DE102009031138B4 (de) | Schalteinrichtung | |
| EP4167413A1 (de) | Trennschaltanordnung zur absicherung eines fahrzeug-bordnetzes | |
| DE102008047256A1 (de) | Gesteuerte Hochspannungssicherung und Hochspannungsschalter-/Sicherungskombination | |
| DE19521497A1 (de) | Überstromschutzschaltung | |
| DE102015106867A1 (de) | Auslösung eines Erdungsschalters einer Schaltanlage | |
| EP4213175B1 (de) | Niederspannungs-schutzschaltgerät mit einer leiterplatte und einem spannungsabgriff und montageverfahren | |
| EP4274041B1 (de) | Modulares isolierstoffgehäuse und mehrpoliges modulares reiheneinbaugerät | |
| DE102005006100B4 (de) | Sicherheitsschaltung und Verfahren zur Absicherung einer elektronischen Schaltungsanordnung vor Beschädigung bei Verpolung einer angeschlossenen Energieversorgungseinheit | |
| LU505555B1 (de) | Trennschalter |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20150618 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAX | Request for extension of the european patent (deleted) | ||
| 17Q | First examination report despatched |
Effective date: 20160727 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20170411 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 932717 Country of ref document: AT Kind code of ref document: T Effective date: 20171015 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502013008462 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 5 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20170927 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171228 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180127 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20171220 Year of fee payment: 5 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502013008462 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20171227 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| 26N | No opposition filed |
Effective date: 20180628 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171217 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20171231 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171217 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171227 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171231 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171231 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171231 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20131217 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181217 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 932717 Country of ref document: AT Kind code of ref document: T Effective date: 20181217 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181217 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170927 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230424 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20251230 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20260220 Year of fee payment: 13 |