EP2786814B1 - Method for manufacturing seamless pipe - Google Patents

Method for manufacturing seamless pipe Download PDF

Info

Publication number
EP2786814B1
EP2786814B1 EP13791398.4A EP13791398A EP2786814B1 EP 2786814 B1 EP2786814 B1 EP 2786814B1 EP 13791398 A EP13791398 A EP 13791398A EP 2786814 B1 EP2786814 B1 EP 2786814B1
Authority
EP
European Patent Office
Prior art keywords
diameter
hollow shell
seamless steel
mandrel
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP13791398.4A
Other languages
German (de)
French (fr)
Other versions
EP2786814A4 (en
EP2786814A1 (en
Inventor
Takayuki Kihara
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel and Sumitomo Metal Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumitomo Metal Corp filed Critical Nippon Steel and Sumitomo Metal Corp
Publication of EP2786814A1 publication Critical patent/EP2786814A1/en
Publication of EP2786814A4 publication Critical patent/EP2786814A4/en
Application granted granted Critical
Publication of EP2786814B1 publication Critical patent/EP2786814B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/06Making machine elements axles or shafts
    • B21K1/063Making machine elements axles or shafts hollow
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C1/00Manufacture of metal sheets, metal wire, metal rods, metal tubes by drawing
    • B21C1/16Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes
    • B21C1/22Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles
    • B21C1/24Metal drawing by machines or apparatus in which the drawing action is effected by other means than drums, e.g. by a longitudinally-moved carriage pulling or pushing the work or stock for making metal sheets, bars, or tubes specially adapted for making tubular articles by means of mandrels
    • B21C1/26Push-bench drawing

Definitions

  • the present invention relates to a method of manufacturing a seamless steel pipe which is capable of manufacturing seamless steel pipes of a wide range of sizes with high dimensional accuracy. Specifically, the present invention relates to a method of manufacturing a seamless steel pipe which includes preparing a primary hollow shell by a mandrel forging pipe-making process, and applying a push bench pipe-making process to the prepared primary hollow shell.
  • a mandrel forging pipe-making process is a process that includes: providing a hollow billet with a mandrel inserted therein; and hot working the hollow billet by open-die forging to gradually reduce the wall thickness thereof, as disclosed in Patent Literature 1, on which the preamble of claim 1 is based.
  • FR 2443884 A1 describes a manufacture of seamless metal tubes by piercing a solid blank while elongating the blank; subjecting the blank to a circumferential rolling process in a device which may be generally similar to the piercing device and which produces an elongation roughly equal to that in the piercing step; and passing the blank through a continuous rolling mill to produce a seamless tube, with the elongation produced by the rolling mill being by approximately the same factor as the combined elongation produced in the piercing and circumferential rolling steps.
  • the method can be used for large diameter tubes with relatively thin walls.
  • One advantage of a mandrel forging pipe-making process lies in the wide range of pipe sizes that can be achieved by performing repeated forging and reheating. That is, manufacture of thick-walled, large diameter seamless steel pipes is possible.
  • a disadvantage of a mandrel forging pipe-making process is poor dimensional accuracy which results from the forming by forging. Because of this, in the finish machining process after the hot pipe making process, the amount of removal by machining on the steel pipe surface is large, and therefore the yield is low.
  • An object of the present invention is to provide a method of manufacturing a seamless steel pipe which is capable of achieving high dimensional accuracy, particularly high wall thickness accuracy, as well as a wide range of manufacturable sizes (large diameter or thick-walled pipes).
  • a push bench pipe-making process is a process that includes: providing a hollow steel workpiece with a mandrel inserted therein, the hollow steel workpiece having a closed end; and push-drawing the workpiece through a die assembly to reduce the wall thickness thereof.
  • One advantage of push bench pipe-making processes is the high dimensional accuracy which is achieved by the use of inside and outside sizing tools such as a mandrel and a die assembly. Because of this, in the finish machining process, the amount of removal by machining on the pipe surface is small, and therefore the yield is high.
  • the present inventor contemplated methods that will allow seamless steel pipes prepared by a mandrel forging pipe-making process to be subjected to a push bench pipe-making process.
  • the two pipe-making methods can be utilized in combination by: subjecting a seamless steel pipe prepared by a mandrel forging pipe-making process to diameter reduction at one end portion thereof so that the outside and inside diameters of the end portion are reduced and the diameter reduced end portion can serve as a substitute for a closed end.
  • the present invention has been accomplished based on the results of the contemplation and is summarized as a method of manufacturing a seamless steel pipe according to claim 1.
  • the method of manufacturing a seamless steel pipe of the present invention is advantageous in that: it is capable of manufacturing seamless steel pipes of a wide range of sizes (large diameter or thick-walled pipes) with high dimensional accuracy, particularly with high wall thickness accuracy due to the push bench pipe-making process that is applied after the application of the mandrel forging pipe-making process.
  • the manufacturing method includes: Step 1 (mandrel forging pipe-making step); Step 2 (diameter reduction step); and Step 3 (push bench pipe-making step). Each of the steps is described below.
  • Step 1 primary hollow shells are formed by the following procedure:
  • hot forging of the hollow billet is preferably performed within a temperature range of 900°C to 1250°C.
  • FIG. 1 is a longitudinal sectional view of a primary hollow shell after being subjected to diameter reduction.
  • diameter reduction is performed on one end portion of the primary hollow shell 1 formed in Step 1, while it is being rotated, to reduce the inside and outside diameters thereof.
  • the diameter reduced portion is composed of a front end portion 1a located at the front edge of the primary hollow shell 1 and a narrowing diameter portion 1b.
  • the narrowing diameter portion 1b is located between the front end portion 1a and the body portion on which diameter reduction is not performed.
  • the front end portion 1a has a constant outside diameter and wall thickness.
  • the narrowing diameter portion 1b has inside and outside diameters that are reduced toward the front edge.
  • the diameter reduction step may be performed again as needed.
  • the method for diameter reduction not only stamping but also a method of hitting one end portion of the primary hollow shell 1 with a hammer as well as a method of rotary forging with a swager or the like may be employed.
  • FIG. 2 is a side view of a front edge portion of a mandrel to be used in the push bench pipe-making step.
  • the mandrel 2 includes: a body portion 2a having a cylindrical shape and a narrowing diameter portion 2b having a truncated cone shape disposed at the front edge of the body portion 2a.
  • the narrowing diameter portion 2b has a diameter that is reduced toward the front edge of the mandrel 2.
  • the narrowing diameter portion 2b is formed in a tapered shape.
  • the diameter reduced portion of the primary hollow shell 1 as processed in Step 2 satisfies the following formula (1) where B (mm) represents an inside diameter at the edge of the diameter reduced portion of the primary hollow shell and D (mm) represents a diameter at the front edge of the mandrel that is used in the push bench pipe-making step.
  • B (mm) represents an inside diameter at the edge of the diameter reduced portion of the primary hollow shell
  • D (mm) represents a diameter at the front edge of the mandrel that is used in the push bench pipe-making step.
  • the aim of this is to reduce the possibility that the mandrel 2 breaks through the front end portion 1a and the narrowing diameter portion 1b of the primary hollow shell 1 during the push-drawing process in Step 3 (push bench pipe-making step).
  • Cases that satisfy the formula (1) include a case in which the diameter reduced portion forms a closed end.
  • FIG. 3 is a diagram showing a configuration of a primary hollow shell, a mandrel, and a die assembly in the push bench pipe-making step.
  • the die assembly 3 may be provided as a set of a plurality of dies or a single die.
  • a tapered die is typically employed with a die semi-angle ⁇ of 10 to 20° and a die width W of 150 to 200 mm.
  • Step 3 the primary hollow shell 1 having the diameter reduced portion at one end portion thereof is provided with a mandrel 2 inserted therein and subjected to push-drawing using a push bench.
  • Step 3 is preferably divided into two steps, a sizing step and a wall thickness reduction step (hereinafter also referred to as “push bench sizing step” and “push bench wall thickness reduction step,” respectively).
  • the primary hollow shell 1 having the diameter reduced portion at one end portion thereof is provided with a mandrel 2 inserted therein and is pushed through the die assembly 3 by hot working to size the inner and outer surfaces.
  • the primary hollow shell 1 is subjected to push-drawing through a tapered die as described above with soft reduction to size the inner and outer surfaces, thereby providing a hollow shell 1 to be processed in the wall thickness reduction step.
  • the sizing step is intended to reduce longitudinal variations in the outside diameter and the wall thickness of the primary hollow shell 1 using the die assembly 3. If, for example, there are large irregularities on the outer surface of the primary hollow shell 1, the irregularities may interfere with the tapered die when the primary hollow shell 1 is pushed through the tapered die, thereby making the push-drawing operation difficult or impossible.
  • the reduction rate in the sizing step is preferably about 3 to 7%.
  • the portion of the primary hollow shell 1 to be subjected to push-drawing (the portion that was not subjected to diameter reduction) is preferably heated to a temperature ranging from 900°C to 1250°C.
  • the aim of this is to reduce the deformation resistance and facilitate the processing.
  • the diameter reduced portion is a portion against which the mandrel 2 is pressed, it is preferably cooled by water injection to minimize deformation that may occur during the push-drawing process.
  • the diameter reduced portion be kept to a temperature of 500 °C or less. Its lower limit temperature is preferably 400°C. This is because, when cooled to a low temperature, certain types of steel such as, for example, a 9% Cr steel may suffer thermal stress cracking during the martensitic transformation.
  • the wall thickness reduction step also uses a mandrel 2 and a die assembly 3 that have the same configuration as shown in FIG. 2 . In selecting the die assembly 3 to be used, it is required that it have the ability to impart a predetermined reduction to the hollow shell 1.
  • the wall thickness reduction step includes the following operations:
  • the body portion to be subjected to push-drawing is preferably heated to a temperature of 900°C to 1250°C to reduce the deformation resistance and facilitate the processing.
  • the temperature of the diameter reduced portion is preferably controlled to 500°C or less by performing water injection or the like in order to make sure that the push-drawing of the hollow shell 1 by the mandrel 2 is performed without failure. Its lower limit temperature is preferably 400°C.
  • the finishing step may include the following operations:
  • steel types suitable for the above described manufacturing method include the following three types of steel:
  • Example 1 illustrates a case in which the extension of the manufacturable size of the outside diameter was achieved.
  • a hollow billet (weight: 13850 kg) produced from high Cr ferritic heat resistant steel as described above was provided with a mandrel inserted therein, and formed into a primary hollow shell of 1250 mm in outside diameter, 1090 mm in inside diameter, 80 mm in wall thickness, and 6000 mm in length by the mandrel forging pipe-making process.
  • the resultant primary hollow shell was subjected to diameter reduction at one end portion thereof where the inside and outside diameters were reduced.
  • the resulting inside diameter B at the edge of the diameter reduced portion of the primary hollow shell was 200 mm.
  • the primary hollow shell having the diameter reduced portion at one end portion thereof was provided with a mandrel having an outside diameter of 1060 mm inserted therein. Then it was subjected to soft reduction in a push bench using a die having an inside diameter of 1240 mm, and was formed into a hollow shell with the inner and outer surfaces thereof sized.
  • the diameter D at the front edge of the mandrel was 950 mm and therefore the formula (1) as previously noted was satisfied.
  • the resultant hollow shell was subjected to push-drawing in the push bench using a mandrel having an outside diameter of 1060 mm and dies having inside diameters of 1210 mm and 1190 mm, and was formed into a seamless steel pipe.
  • the size of the manufactured seamless steel pipe was 1190 mm in outside diameter, 1060 mm in inside diameter, 65 mm in wall thickness, and 7600 mm in length. A 300 mm length of the seamless steel pipe was cut at the diameter reduced end portion, followed by heat treatment and subsequent machining of the inner and outer surfaces.
  • the seamless steel pipe manufactured in Example 1 had a size of 1190 mm in outside diameter, 1060 mm in inside diameter, and 65 mm in wall thickness and thus was a large diameter pipe. Nevertheless, it achieved a wall thickness accuracy of less than 10 mm. Subsequently, it was subjected to machining of the inner and outer surfaces, and finished into a size of 1170 mm in outside diameter, 1080 mm in inside diameter, and 45 mm in wall thickness.
  • Example 1 the amount of machining necessary for the finishing process was not more than 10 mm for both inner and outer surfaces.
  • a primary hollow shell as manufactured from the mandrel forging pipe-making process, having an outside diameter of 1250 mm, an inside diameter of 1090 mm, and a wall thickness of 80 mm, exhibited a wall thickness accuracy of more than 20 mm.
  • Example 1 Based on the above, in Example 1, the amount of machining required is 10 mm at a maximum for both inner and outer surfaces, whereas in Comparative Example, it is assumed that the amount of finish machining required exceeds 25 mm for both inner and outer surfaces. It is therefore seen that Example 1 produces an advantageous effect.
  • Example 2 illustrates a case in which the extension of the manufacturable size of the wall thickness was achieved.
  • a hollow billet (weight: 25600 kg) produced from high Cr ferritic heat resistant steel as described above was provided with a mandrel inserted therein, and formed into a primary hollow shell of 1050 mm in outside diameter, 640 mm in inside diameter, 205 mm in wall thickness, and 6000 mm in length by the mandrel forging pipe-making process.
  • the resultant primary hollow shell was subjected to diameter reduction at one end portion thereof where the inside and outside diameters were reduced.
  • the resulting inside diameter B at the edge of the diameter reduced portion of the primary hollow shell was 100 mm.
  • the primary hollow shell having the diameter reduced portion at one end portion thereof was provided with a mandrel having an outside diameter of 610 mm inserted therein. Then it was subjected to soft reduction in a push bench using a die having an inside diameter of 1040 mm, and was formed into a hollow shell with the inner and outer surfaces thereof sized.
  • the diameter D at the front edge of the mandrel was 500 mm and therefore the formula (1) as previously noted was satisfied.
  • the resultant hollow shell was subjected to push-drawing in the push bench using a mandrel having an outside diameter of 610 mm and dies having inside diameters of 1010 mm and 990 mm, and was formed into a seamless steel pipe.
  • the size of the manufactured seamless steel pipe was 990 mm in outside diameter, 610 mm in inside diameter, 190 mm in wall thickness, and 6800 mm in length. A 300 mm length of the seamless steel pipe was cut at the diameter reduced end portion, followed by heat treatment and subsequent machining of the inner and outer surfaces.
  • the seamless steel pipe manufactured in Example 2 had a size of 990 mm in outside diameter, 610 mm in inside diameter, and 190 mm in wall thickness and thus was a thick walled pipe. Nevertheless, it achieved a wall thickness accuracy of less than 10 mm. Subsequently, it was subjected to machining of the inner and outer surfaces, and finished into a size of 970 mm in outside diameter, 630 mm in inside diameter, and 170 mm in wall thickness.
  • Example 2 the amount of machining necessary for the finishing process was not more than 10 mm for both inner and outer surfaces.
  • Example 2 For comparison with Example 2, a primary hollow shell, as manufactured from the mandrel forging pipe-making process, having an outside diameter of 1050 mm, an inside diameter of 640 mm, and a wall thickness of 205 mm, was examined to find the wall thickness accuracy thereof. As with Example 1, it was found that its wall thickness accuracy was more than 20 mm.
  • Example 2 Based on the above, in Example 2, the amount of machining required is 10 mm at a maximum for both inner and outer surfaces, whereas in Comparative Example, it is assumed that the amount of finish machining required exceeds 25 mm for both inner and outer surfaces. It is therefore seen that Example 2 produces an advantageous effect.
  • FIG. 4 is a diagram illustrating a comparison of the manufacturable size of seamless steel pipes between a conventional push bench pipe-making process and Example 1 or Example 2.
  • the manufacturable size is defined herein as a size that meets the requirement of the wall thickness accuracy of 10 mm or less.
  • the largest size that was achieved in manufacturing the seamless steel pipe while meeting the wall thickness accuracy of 10 mm or less was as follows: the largest outside diameter of 850 mm or the largest wall thickness of 150 mm.
  • the manufacturable size of seamless steel pipes was extended to the largest outside diameter of 1200 mm or the largest wall thickness of 170 mm.

Description

    TECHNICAL FIELD
  • The present invention relates to a method of manufacturing a seamless steel pipe which is capable of manufacturing seamless steel pipes of a wide range of sizes with high dimensional accuracy. Specifically, the present invention relates to a method of manufacturing a seamless steel pipe which includes preparing a primary hollow shell by a mandrel forging pipe-making process, and applying a push bench pipe-making process to the prepared primary hollow shell.
  • Unless otherwise specified, the definitions of certain terms as used in this specification are as follows.
    • "Hollow billet": a billet to be subjected to Step 1 as described in this specification (mandrel forging pipe-making step). This is a billet prepared by hot piercing an ingot and forming it into a hollow shape;
    • "Primary hollow shell": a shell to be subjected to Step 2 as described in this specification (diameter reduction step). This is a shell that is formed from a hollow billet in Step 1;
    • "Hollow shell": a shell to be subjected to a push bench thickness reduction process as described in this specification. This is a shell that was subjected to sizing of the inner and outer surfaces in a push bench sizing process;
    • "Large diameter": a pipe outside diameter of 1000 mm or greater; and
    • "Dimensional accuracy": absolute values of size deviations in outside diameter and wall thickness of a finished pipe from desired sizes.
    BACKGROUND ART
  • For application in large diameter pipes such as, for example, large diameter reheat steam pipes for use in a thermal power plant, spiral steel pipes are typically employed. In recent years, large diameter pipes have been required to meet the increasing demand for higher performance such as the increase in the vapor pressure setting for large diameter reheat steam pipes for use in a thermal power plant. Accordingly, there is an increasing need for large diameter seamless steel pipes of high quality.
  • In the past, there were examples in which a mandrel forging pipe-making process was employed as a method for hot forming of large diameter seamless steel pipes.
  • A mandrel forging pipe-making process is a process that includes: providing a hollow billet with a mandrel inserted therein; and hot working the hollow billet by open-die forging to gradually reduce the wall thickness thereof, as disclosed in Patent Literature 1, on which the preamble of claim 1 is based. FR 2443884 A1 describes a manufacture of seamless metal tubes by piercing a solid blank while elongating the blank; subjecting the blank to a circumferential rolling process in a device which may be generally similar to the piercing device and which produces an elongation roughly equal to that in the piercing step; and passing the blank through a continuous rolling mill to produce a seamless tube, with the elongation produced by the rolling mill being by approximately the same factor as the combined elongation produced in the piercing and circumferential rolling steps. According to FR 2443884 A1 , the method can be used for large diameter tubes with relatively thin walls.
  • One advantage of a mandrel forging pipe-making process lies in the wide range of pipe sizes that can be achieved by performing repeated forging and reheating. That is, manufacture of thick-walled, large diameter seamless steel pipes is possible.
  • On the other hand, a disadvantage of a mandrel forging pipe-making process is poor dimensional accuracy which results from the forming by forging. Because of this, in the finish machining process after the hot pipe making process, the amount of removal by machining on the steel pipe surface is large, and therefore the yield is low.
  • CITATION LIST PATENT LITERATURE
    • PATENT LITERATURE 1: Japanese Patent Publication No. H07-22802
    • PATENT LITERATURE 2: Japanese Patent Application Publication No. S56-128611
    SUMMARY OF INVENTION TECHNICAL PROBLEM
  • An object of the present invention is to provide a method of manufacturing a seamless steel pipe which is capable of achieving high dimensional accuracy, particularly high wall thickness accuracy, as well as a wide range of manufacturable sizes (large diameter or thick-walled pipes).
  • SOLUTION TO PROBLEM
  • The present inventor turned his attention to push bench pipe-making processes, which are capable of manufacturing seamless steel pipes with high wall thickness accuracy. As disclosed in Patent Literature 2, a push bench pipe-making process is a process that includes: providing a hollow steel workpiece with a mandrel inserted therein, the hollow steel workpiece having a closed end; and push-drawing the workpiece through a die assembly to reduce the wall thickness thereof. One advantage of push bench pipe-making processes is the high dimensional accuracy which is achieved by the use of inside and outside sizing tools such as a mandrel and a die assembly. Because of this, in the finish machining process, the amount of removal by machining on the pipe surface is small, and therefore the yield is high.
  • Taking advantage of both the mandrel forging pipe-making process and the push bench pipe-making process may enable manufacture of seamless steel pipes of a wide range of sizes with high dimensional accuracy. However, in push bench pipe-making processes, it is necessary to use hollow steel workpieces that have a closed end. That is, seamless steel pipes prepared by a mandrel forging pipe-making process cannot be used in a push bench pipe-making process in the as-prepared state as a workpiece to be processed. This is because since they do not have a closed end, they cannot be pushed by a mandrel to pass through a die assembly.
  • In view of the above, the present inventor contemplated methods that will allow seamless steel pipes prepared by a mandrel forging pipe-making process to be subjected to a push bench pipe-making process. After an undue amount of trial and error, the present inventor has found that the two pipe-making methods can be utilized in combination by: subjecting a seamless steel pipe prepared by a mandrel forging pipe-making process to diameter reduction at one end portion thereof so that the outside and inside diameters of the end portion are reduced and the diameter reduced end portion can serve as a substitute for a closed end.
  • The present invention has been accomplished based on the results of the contemplation and is summarized as a method of manufacturing a seamless steel pipe according to claim 1.
  • ADVANTAGEOUS EFFECTS OF INVENTION
  • The method of manufacturing a seamless steel pipe of the present invention is advantageous in that: it is capable of manufacturing seamless steel pipes of a wide range of sizes (large diameter or thick-walled pipes) with high dimensional accuracy, particularly with high wall thickness accuracy due to the push bench pipe-making process that is applied after the application of the mandrel forging pipe-making process.
  • BRIEF DESCRIPTION OF DRAWINGS
    • [FIG. 1] FIG. 1 is a longitudinal sectional view of a primary hollow shell after being subjected to diameter reduction at one end portion thereof.
    • [FIG. 2] FIG. 2 is a side view of a front end portion of a mandrel to be used in the push bench pipe-making step.
    • [FIG. 3] FIG. 3 is a diagram showing a configuration including a primary hollow shell, a mandrel, and a die assembly in the push bench pipe-making step.
    • [FIG. 4] FIG. 4 is a diagram illustrating a comparison of the manufacturable sizes of seamless steel pipes between a conventional push bench pipe-making process and the manufacturing method of the present invention.
    DESCRIPTION OF EMBODIMENTS
  • The manufacturing method includes: Step 1 (mandrel forging pipe-making step); Step 2 (diameter reduction step); and Step 3 (push bench pipe-making step). Each of the steps is described below.
  • [Step 1 (mandrel forging pipe-making step)]
  • In Step 1, primary hollow shells are formed by the following procedure:
    1. (1) Pressing a tool having a sharpened end against a top surface of an ingot disposed with the longitudinal direction thereof oriented vertically while the tool is being rotated, and piercing the ingot into a hollow billet by hot working;
    2. (2) Arranging the hollow billet with the longitudinal direction thereof oriented horizontally and pressing a mandrel against the inner surface of the hollow billet to reduce the wall thickness thereof by hot working while the hollow billet is being rotated.
    3. (3) Repeating the above step (2) one or several times to form a primary hollow shell having a predetermined outside diameter and wall thickness.
  • In the mandrel forging pipe-making step, hot forging of the hollow billet is preferably performed within a temperature range of 900°C to 1250°C.
  • [Step 2 (diameter reduction step)]
  • FIG. 1 is a longitudinal sectional view of a primary hollow shell after being subjected to diameter reduction. In Step 2, diameter reduction is performed on one end portion of the primary hollow shell 1 formed in Step 1, while it is being rotated, to reduce the inside and outside diameters thereof.
  • The diameter reduced portion is composed of a front end portion 1a located at the front edge of the primary hollow shell 1 and a narrowing diameter portion 1b. The narrowing diameter portion 1b is located between the front end portion 1a and the body portion on which diameter reduction is not performed. The front end portion 1a has a constant outside diameter and wall thickness. The narrowing diameter portion 1b has inside and outside diameters that are reduced toward the front edge.
  • If the portion subjected to the diameter reduction step is deformed in Step 3, the diameter reduction step may be performed again as needed. As the method for diameter reduction, not only stamping but also a method of hitting one end portion of the primary hollow shell 1 with a hammer as well as a method of rotary forging with a swager or the like may be employed.
  • [Shape of the Portion Subjected to Diameter Reduction]
  • FIG. 2 is a side view of a front edge portion of a mandrel to be used in the push bench pipe-making step. The mandrel 2 includes: a body portion 2a having a cylindrical shape and a narrowing diameter portion 2b having a truncated cone shape disposed at the front edge of the body portion 2a. The narrowing diameter portion 2b has a diameter that is reduced toward the front edge of the mandrel 2. Typically, the narrowing diameter portion 2b is formed in a tapered shape.
  • The diameter reduced portion of the primary hollow shell 1 as processed in Step 2 satisfies the following formula (1) where B (mm) represents an inside diameter at the edge of the diameter reduced portion of the primary hollow shell and D (mm) represents a diameter at the front edge of the mandrel that is used in the push bench pipe-making step. The aim of this is to reduce the possibility that the mandrel 2 breaks through the front end portion 1a and the narrowing diameter portion 1b of the primary hollow shell 1 during the push-drawing process in Step 3 (push bench pipe-making step). Cases that satisfy the formula (1) include a case in which the diameter reduced portion forms a closed end. B < D / 4
    Figure imgb0001
  • [Step 3 (push bench pipe-making step)]
  • FIG. 3 is a diagram showing a configuration of a primary hollow shell, a mandrel, and a die assembly in the push bench pipe-making step. The die assembly 3 may be provided as a set of a plurality of dies or a single die. In the die assembly 3, a tapered die is typically employed with a die semi-angle α of 10 to 20° and a die width W of 150 to 200 mm.
  • In Step 3, the primary hollow shell 1 having the diameter reduced portion at one end portion thereof is provided with a mandrel 2 inserted therein and subjected to push-drawing using a push bench. Step 3 is preferably divided into two steps, a sizing step and a wall thickness reduction step (hereinafter also referred to as "push bench sizing step" and "push bench wall thickness reduction step," respectively).
  • [Sizing Step]
  • In the sizing step, the primary hollow shell 1 having the diameter reduced portion at one end portion thereof is provided with a mandrel 2 inserted therein and is pushed through the die assembly 3 by hot working to size the inner and outer surfaces. The primary hollow shell 1 is subjected to push-drawing through a tapered die as described above with soft reduction to size the inner and outer surfaces, thereby providing a hollow shell 1 to be processed in the wall thickness reduction step.
  • The sizing step is intended to reduce longitudinal variations in the outside diameter and the wall thickness of the primary hollow shell 1 using the die assembly 3. If, for example, there are large irregularities on the outer surface of the primary hollow shell 1, the irregularities may interfere with the tapered die when the primary hollow shell 1 is pushed through the tapered die, thereby making the push-drawing operation difficult or impossible.
  • The reduction rate in the sizing step is preferably about 3 to 7%.
  • In the sizing step, the portion of the primary hollow shell 1 to be subjected to push-drawing (the portion that was not subjected to diameter reduction) is preferably heated to a temperature ranging from 900°C to 1250°C. The aim of this is to reduce the deformation resistance and facilitate the processing.
  • Since the diameter reduced portion is a portion against which the mandrel 2 is pressed, it is preferably cooled by water injection to minimize deformation that may occur during the push-drawing process. In order to make sure that the push-drawing of the primary hollow shell 1 by the mandrel 2 is performed without failure, it is preferred that the diameter reduced portion be kept to a temperature of 500 °C or less. Its lower limit temperature is preferably 400°C. This is because, when cooled to a low temperature, certain types of steel such as, for example, a 9% Cr steel may suffer thermal stress cracking during the martensitic transformation.
  • [Wall Thickness Reduction Step]
  • The hollow shell 1, obtained by the push-drawing process with soft reduction in the sizing step, is processed in the wall thickness reduction step. The wall thickness reduction step also uses a mandrel 2 and a die assembly 3 that have the same configuration as shown in FIG. 2. In selecting the die assembly 3 to be used, it is required that it have the ability to impart a predetermined reduction to the hollow shell 1.
  • The wall thickness reduction step includes the following operations:
    1. (1) The hollow shell which has undergone sizing of inner and outer surfaces in the sizing step is pushed through the die assembly 3 having a smaller inside diameter by hot working, whereby it is given a predetermined reduction while the wall thickness thereof is reduced.
    2. (2) By repeating the above step (1) one or several times, it is possible to manufacture seamless steel pipes with high wall thickness accuracy. Specifically, it is possible to limit the deviation from the desired wall thickness to 10 mm or less regardless of the thickness of the wall that has been subjected to the push-drawing process.
  • In the wall thickness reduction step too, the body portion to be subjected to push-drawing is preferably heated to a temperature of 900°C to 1250°C to reduce the deformation resistance and facilitate the processing. On the other hand, the temperature of the diameter reduced portion is preferably controlled to 500°C or less by performing water injection or the like in order to make sure that the push-drawing of the hollow shell 1 by the mandrel 2 is performed without failure. Its lower limit temperature is preferably 400°C.
  • After Steps 1 to 3 as described above, a finishing process may be incorporated. The finishing step may include the following operations:
    1. (1) Cutting the diameter reduced portion of the seamless steel pipe manufactured in Step 3;
    2. (2) Heat treating the seamless steel pipe as needed after the diameter reduced portion was cut; and
    3. (3) Subjecting the resultant seamless steel pipe to a finishing process by machining or polishing the inner and outer surfaces of the steel pipe to finish it to predetermined surface properties and size.
    [Suitable Steel Type]
  • Examples of steel types suitable for the above described manufacturing method include the following three types of steel:
    1. (1) Carbon steel having a chemical composition of, by mass %, C: 0.3% or less, Si: 1% or less, Mn: 0.1 to 2%, and N: 0.02% or less, with the balance being Fe and impurities;
    2. (2) Low alloy steel having a chemical composition of, by mass %, C: 0.15% or less, Si: 1% or less, Mn: 0.1 to 2%, Cr: 0.5 to 3.0%, Ni: 0.5% or less, Mo: 0.1 to 3.0%, W: 0 to 2%, Cu: 0.1% or less, and N: 0.002 to 0.030%, with the balance being Fe and impurities; and
    3. (3) High Cr ferritic heat resistant steel having a chemical composition of, by mass %, C: 0.15% or less, Si: 1% or less, Mn: 0.1 to 2%, Cr: 8.0 to 12.5%, Ni: 1.0% or less, Mo: 0.1 to 3.0%, W: 0 to 4%, Cu: 0 to 1.5%, and N: 0.01 to 0.10%, with the balance being Fe and impurities.
    EXAMPLES
  • Set forth below are examples illustrating how it is possible to manufacture seamless steel pipes with high wall thickness accuracy and to extend the manufacturable size of seamless steel pipes.
  • (Example 1)
  • Example 1 illustrates a case in which the extension of the manufacturable size of the outside diameter was achieved.
  • 1. Pipe Making Schedule in Each Step (Mandrel Forging Pipe-Making Step)
  • A hollow billet (weight: 13850 kg) produced from high Cr ferritic heat resistant steel as described above was provided with a mandrel inserted therein, and formed into a primary hollow shell of 1250 mm in outside diameter, 1090 mm in inside diameter, 80 mm in wall thickness, and 6000 mm in length by the mandrel forging pipe-making process.
  • (Diameter Reduction Step)
  • The resultant primary hollow shell was subjected to diameter reduction at one end portion thereof where the inside and outside diameters were reduced. The resulting inside diameter B at the edge of the diameter reduced portion of the primary hollow shell was 200 mm.
  • (Push Bench Sizing Step)
  • The primary hollow shell having the diameter reduced portion at one end portion thereof was provided with a mandrel having an outside diameter of 1060 mm inserted therein. Then it was subjected to soft reduction in a push bench using a die having an inside diameter of 1240 mm, and was formed into a hollow shell with the inner and outer surfaces thereof sized. The diameter D at the front edge of the mandrel was 950 mm and therefore the formula (1) as previously noted was satisfied.
  • (Push Bench Wall Thickness Reduction Step)
  • The resultant hollow shell was subjected to push-drawing in the push bench using a mandrel having an outside diameter of 1060 mm and dies having inside diameters of 1210 mm and 1190 mm, and was formed into a seamless steel pipe.
  • (Finishing Step)
  • The size of the manufactured seamless steel pipe was 1190 mm in outside diameter, 1060 mm in inside diameter, 65 mm in wall thickness, and 7600 mm in length. A 300 mm length of the seamless steel pipe was cut at the diameter reduced end portion, followed by heat treatment and subsequent machining of the inner and outer surfaces.
  • 2. Comparison of Wall Thickness Accuracy
  • The seamless steel pipe manufactured in Example 1 had a size of 1190 mm in outside diameter, 1060 mm in inside diameter, and 65 mm in wall thickness and thus was a large diameter pipe. Nevertheless, it achieved a wall thickness accuracy of less than 10 mm. Subsequently, it was subjected to machining of the inner and outer surfaces, and finished into a size of 1170 mm in outside diameter, 1080 mm in inside diameter, and 45 mm in wall thickness.
  • That is, in Example 1, the amount of machining necessary for the finishing process was not more than 10 mm for both inner and outer surfaces.
  • For comparison with Example 1, a primary hollow shell, as manufactured from the mandrel forging pipe-making process, having an outside diameter of 1250 mm, an inside diameter of 1090 mm, and a wall thickness of 80 mm, exhibited a wall thickness accuracy of more than 20 mm.
  • Based on the above, in Example 1, the amount of machining required is 10 mm at a maximum for both inner and outer surfaces, whereas in Comparative Example, it is assumed that the amount of finish machining required exceeds 25 mm for both inner and outer surfaces. It is therefore seen that Example 1 produces an advantageous effect.
  • (Example 2)
  • Example 2 illustrates a case in which the extension of the manufacturable size of the wall thickness was achieved.
  • 1. Pipe Making Schedule in Each Step (Mandrel Forging Pipe-Making Step)
  • A hollow billet (weight: 25600 kg) produced from high Cr ferritic heat resistant steel as described above was provided with a mandrel inserted therein, and formed into a primary hollow shell of 1050 mm in outside diameter, 640 mm in inside diameter, 205 mm in wall thickness, and 6000 mm in length by the mandrel forging pipe-making process.
  • (Diameter Reduction Step)
  • The resultant primary hollow shell was subjected to diameter reduction at one end portion thereof where the inside and outside diameters were reduced. The resulting inside diameter B at the edge of the diameter reduced portion of the primary hollow shell was 100 mm.
  • (Push Bench Sizing Step)
  • The primary hollow shell having the diameter reduced portion at one end portion thereof was provided with a mandrel having an outside diameter of 610 mm inserted therein. Then it was subjected to soft reduction in a push bench using a die having an inside diameter of 1040 mm, and was formed into a hollow shell with the inner and outer surfaces thereof sized. The diameter D at the front edge of the mandrel was 500 mm and therefore the formula (1) as previously noted was satisfied.
  • (Push Bench Wall Thickness Reduction Step)
  • The resultant hollow shell was subjected to push-drawing in the push bench using a mandrel having an outside diameter of 610 mm and dies having inside diameters of 1010 mm and 990 mm, and was formed into a seamless steel pipe.
  • (Finishing Step)
  • The size of the manufactured seamless steel pipe was 990 mm in outside diameter, 610 mm in inside diameter, 190 mm in wall thickness, and 6800 mm in length. A 300 mm length of the seamless steel pipe was cut at the diameter reduced end portion, followed by heat treatment and subsequent machining of the inner and outer surfaces.
  • 2. Comparison of Wall Thickness Accuracy
  • The seamless steel pipe manufactured in Example 2 had a size of 990 mm in outside diameter, 610 mm in inside diameter, and 190 mm in wall thickness and thus was a thick walled pipe. Nevertheless, it achieved a wall thickness accuracy of less than 10 mm. Subsequently, it was subjected to machining of the inner and outer surfaces, and finished into a size of 970 mm in outside diameter, 630 mm in inside diameter, and 170 mm in wall thickness.
  • That is, in Example 2 too, the amount of machining necessary for the finishing process was not more than 10 mm for both inner and outer surfaces.
  • For comparison with Example 2, a primary hollow shell, as manufactured from the mandrel forging pipe-making process, having an outside diameter of 1050 mm, an inside diameter of 640 mm, and a wall thickness of 205 mm, was examined to find the wall thickness accuracy thereof. As with Example 1, it was found that its wall thickness accuracy was more than 20 mm.
  • Based on the above, in Example 2, the amount of machining required is 10 mm at a maximum for both inner and outer surfaces, whereas in Comparative Example, it is assumed that the amount of finish machining required exceeds 25 mm for both inner and outer surfaces. It is therefore seen that Example 2 produces an advantageous effect.
  • FIG. 4 is a diagram illustrating a comparison of the manufacturable size of seamless steel pipes between a conventional push bench pipe-making process and Example 1 or Example 2. The manufacturable size is defined herein as a size that meets the requirement of the wall thickness accuracy of 10 mm or less.
  • As can be seen from FIG. 4, when the push bench pipe-making process was employed alone (comparative example), the largest size that was achieved in manufacturing the seamless steel pipe while meeting the wall thickness accuracy of 10 mm or less was as follows: the largest outside diameter of 850 mm or the largest wall thickness of 150 mm. In contrast, in Example 1 or 2, the manufacturable size of seamless steel pipes was extended to the largest outside diameter of 1200 mm or the largest wall thickness of 170 mm.
  • INDUSTRIAL APPLICABILITY
  • With the method of manufacturing a seamless steel pipe according to the present invention, it is possible to manufacture seamless steel pipes of a wide range of sizes (large diameter or thick-walled pipes) with high dimensional accuracy, particularly with high wall thickness accuracy.
  • REFERENCE SIGNS LIST
  • 1: primary hollow shell, hollow shell, 1a: front end portion, 1b: narrowing diameter portion, 2: mandrel, 2a: body portion, 2b: narrowing diameter portion, 3: die assembly

Claims (8)

  1. A method of manufacturing a seamless steel pipe, wherein the method comprises:
    a first step of providing a hollow billet with a mandrel inserted therein and forging the hollow billet into a primary hollow shell (1) of a predetermined diameter and thickness and not having a closed end; the method being characterized in that it further comprises a second step of subjecting the primary hollow shell to diameter reduction at one end portion (1a) thereof to reduce outside and inside diameters of the end portion; and
    a third step of providing the primary hollow shell with a mandrel (2) inserted therein, the primary hollow shell having the diameter reduced portion at the one end portion thereof, and subjecting the primary hollow shell to push-drawing using a push bench, wherein
    the mandrel (2) that is used in the third step includes a body portion (2a) having a cylindrical shape and a narrowing diameter portion (2b) having a truncated cone shape disposed at a front edge of the body portion (2a), the narrowing diameter portion (2b) having a diameter that is reduced toward the front edge of the mandrel (2); and,
    in the second step, the diameter reduction is performed such that the diameter reduced portion of the primary hollow shell (1) as processed in the second step satisfies the following formula (1): B < D / 4
    Figure imgb0002
    where B represents an inside diameter (mm) at the edge of the diameter reduced portion of the primary hollow shell (1) and D represents a diameter (mm) at the front edge of the mandrel (2) that is used in the third step.
  2. The method of manufacturing a seamless steel pipe according to claim 1, wherein:
    by the push-drawing of the hollow shell in the third step, a seamless steel pipe having an outside diameter of 1000 mm or greater is manufactured.
  3. The method of manufacturing a seamless steel pipe according to any one of the preceding claims, wherein in the first step, the forging of the hollow billet is performed by hot forging within a temperature range of 900°C to 1250°C.
  4. The method of manufacturing a seamless steel pipe according to any one of the preceding claims, wherein the third step is performed by means of a tapered die with a die semi-angle α of 10 to 20° and a die width W of 150 to 200 mm.
  5. The method of manufacturing a seamless steel pipe according to any one of the preceding claims, wherein the third step comprises a sizing step, in which the primary hollow shell (1) is pushed through a die assembly (3) by hot working to size the inner and outer surfaces.
  6. The method of manufacturing a seamless steel pipe according to claim 5, wherein a reduction rate in the sizing step is about 3 to 7%.
  7. The method of manufacturing a seamless steel pipe according to any one of the claims 5 to 6, wherein the third step further comprises a wall thickness reduction step, in which the hollow shell which has undergone sizing of inner and outer surfaces in the sizing step is pushed through a die assembly having a smaller inside diameter by hot working.
  8. The method of manufacturing a seamless steel pipe according to any one of the preceding claims, wherein in the third step, the body portion (2a) to be subjected to push-drawing is heated to a temperature of 900°C to 1250°C, and wherein the temperature of the narrowing diameter portion (2b) is controlled to a temperature of 500°C or less.
EP13791398.4A 2012-05-14 2013-02-04 Method for manufacturing seamless pipe Active EP2786814B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012110569 2012-05-14
PCT/JP2013/000596 WO2013171935A1 (en) 2012-05-14 2013-02-04 Method for manufacturing seamless pipe

Publications (3)

Publication Number Publication Date
EP2786814A1 EP2786814A1 (en) 2014-10-08
EP2786814A4 EP2786814A4 (en) 2015-08-12
EP2786814B1 true EP2786814B1 (en) 2017-08-02

Family

ID=49583368

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13791398.4A Active EP2786814B1 (en) 2012-05-14 2013-02-04 Method for manufacturing seamless pipe

Country Status (5)

Country Link
EP (1) EP2786814B1 (en)
JP (1) JP5387797B1 (en)
CN (1) CN103974788B (en)
ES (1) ES2645985T3 (en)
WO (1) WO2013171935A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201700049072A1 (en) * 2017-05-05 2018-11-05 Giorgio Violi MACHINE FOR DRAWING OF TUBES, IN PARTICULAR FOR GOLDSMITH AND SILVERWARE
FR3077016B1 (en) 2018-01-22 2021-10-01 Aubert & Duval Sa METHOD OF MANUFACTURING A HOLLOW PART FROM A METAL MATERIAL AND USE OF THIS PROCESS TO MANUFACTURE A ROD OR A LANDING GEAR ROD
CN111941006B (en) * 2020-08-11 2022-06-10 宁波驶泰精密机械有限公司 Washing machine shaft waste treatment device and waste reprocessing technology
CN115041536A (en) * 2022-08-16 2022-09-13 中北大学 Extrusion forming die and method for conical cabin with end frame

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB744447A (en) * 1952-11-29 1956-02-08 Reisholz Stahl & Roehrenwerk Method of manufacturing seamless hollow bodies
FR2443884A1 (en) * 1978-12-15 1980-07-11 Vallourec MANUFACTURING OF TUBES WITHOUT WELDING OF STRONG DIAMETERS
US4577481A (en) * 1983-03-18 1986-03-25 Kocks Technik Gmbh & Co. Process for production of seamless tube and apparatus for processing seamless tube
DE19852537A1 (en) * 1998-11-05 2000-05-18 Mannesmann Ag Extrusion process for producing seamless hollow body with one closed end, involving forming closed end of hollow block when holing it, displacing material from edge towards center

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB655532A (en) * 1948-12-01 1951-07-25 Wellman Smith Owen Eng Co Ltd Improvements in or relating to the production of seamless steel tubes
GB1092717A (en) * 1964-11-18 1967-11-29 Tube Mill Holding Sa Plant and process for producing seamless tubes using a push-bench, and seamless tubes produced by the process
FR1457184A (en) * 1965-12-09 1966-07-08 Demag Ag Process and installation for the manufacture of tubes of great lengths as well as tubes conforming to those thus obtained
JPS6031563B2 (en) 1980-03-14 1985-07-23 住友金属工業株式会社 Erhardt pipe manufacturing method
US4454745A (en) * 1980-07-16 1984-06-19 Standard Tube Canada Limited Process for cold-forming a tube having a thick-walled end portion
JPS5756117A (en) * 1980-09-17 1982-04-03 Miyata Kogyo Kk Manufacturing method and apparatus for double inner butted pipe
JPS60240332A (en) * 1984-05-15 1985-11-29 Nippon Kokan Kk <Nkk> Production of seamless steel pipe having larger diameter
JPS611413A (en) * 1984-06-15 1986-01-07 Nippon Kokan Kk <Nkk> Manufacture of thick steel pipe having large diameter
DE3632522A1 (en) * 1986-09-25 1988-03-31 Kocks Technik Method and installation for the production of tube blanks
JPS63154211A (en) * 1986-12-16 1988-06-27 Sumitomo Metal Ind Ltd Manufacture of cold drawn tube
JP3283968B2 (en) 1993-06-29 2002-05-20 新日本無線株式会社 Transmission line switch
CN1055034C (en) * 1996-10-04 2000-08-02 西北有色金属研究院 Working method and device for external spiral tendon metal tube
JP4285053B2 (en) * 2003-04-11 2009-06-24 Jfeスチール株式会社 High dimensional accuracy tube and manufacturing method thereof
CN101773945A (en) * 2009-01-13 2010-07-14 中兴能源装备股份有限公司 Pipeline diameter diminishing device
CN101693260B (en) * 2009-10-09 2012-01-25 安徽工业大学 Method for drawing high-precision aluminum pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB744447A (en) * 1952-11-29 1956-02-08 Reisholz Stahl & Roehrenwerk Method of manufacturing seamless hollow bodies
FR2443884A1 (en) * 1978-12-15 1980-07-11 Vallourec MANUFACTURING OF TUBES WITHOUT WELDING OF STRONG DIAMETERS
US4577481A (en) * 1983-03-18 1986-03-25 Kocks Technik Gmbh & Co. Process for production of seamless tube and apparatus for processing seamless tube
DE19852537A1 (en) * 1998-11-05 2000-05-18 Mannesmann Ag Extrusion process for producing seamless hollow body with one closed end, involving forming closed end of hollow block when holing it, displacing material from edge towards center

Also Published As

Publication number Publication date
CN103974788A (en) 2014-08-06
EP2786814A4 (en) 2015-08-12
WO2013171935A1 (en) 2013-11-21
JP5387797B1 (en) 2014-01-15
EP2786814A1 (en) 2014-10-08
ES2645985T3 (en) 2017-12-11
CN103974788B (en) 2015-08-26
JPWO2013171935A1 (en) 2016-01-07

Similar Documents

Publication Publication Date Title
EP2241385B9 (en) Process for manufacturing ultrathin wall metallic pipe by cold drawing method
EP1884296B1 (en) Method of manufacturing ultrathin wall metallic tube by cold working method
JP2003311317A (en) Method for manufacturing seamless tube
WO2005068098A9 (en) Method for producing seamless pipe
CN106670359B (en) A kind of GH4169 alloy rings and preparation method thereof
CN104607580A (en) Forging forming technology of aluminum alloy straight-flanked ring with extra-large specification
CN103522007A (en) Method for manufacturing TC25 titanium alloy ring piece
EP2786814B1 (en) Method for manufacturing seamless pipe
WO2013179496A1 (en) Expanded metal tube manufacturing method
WO2007111131A1 (en) Process for production of seamless pipes
CN110280592B (en) Seamless tube rolling method for ultrahigh-strength alloy
JP2006341299A (en) Method for manufacturing ultra-thin wall metallic pipe by cold stretching method
CN112718910A (en) Manufacturing method of large-caliber TC4 titanium alloy thick-wall pipe
CN107012363A (en) A kind of manufacturing process of TC4 titanium alloy oil well pipes
JP6414429B2 (en) Metal tube manufacturing method
JPS60141823A (en) Production of nonmagnetic steel working member
RU2461436C1 (en) Method of producing variable cross-section thin-wall shells
CN114309383A (en) Forging process method of fine-grain 18-8 type stainless steel thick-wall ring forging
CN114260314B (en) Manufacturing method of titanium alloy seamless tube blank with diameter-thickness ratio larger than 20
CN103917307A (en) Seamless-metal-pipe manufacturing method
CN112845658B (en) Preparation method of UNS N08825 small-caliber precise seamless tube
CN114178465B (en) Manufacturing method of ultra-large caliber thick-wall seamless steel pipe
RU2638265C1 (en) METHOD OF PRODUCTION OF SEAMLESS MACHINED PIPES WITH SIZE OF 610×21-27 mm FROM STEEL OF 08Cr18N10T-S GRADE
RU2615918C1 (en) METHOD OF PRODUCING SEAMLESS MACHINED PIPES WITH 530x23-28 mm SIZE FROM THE STEEL GRADE &#34;08Х18Н10-Ш&#34;
Osadchii et al. Production of seamless pipe in a pilger mill with new groove configurations

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140502

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20150715

RIC1 Information provided on ipc code assigned before grant

Ipc: B21C 1/26 20060101AFI20150709BHEP

Ipc: B21K 1/06 20060101ALI20150709BHEP

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20160523

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170110

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

INTC Intention to grant announced (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170512

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 913885

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170815

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013024475

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20170802

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2645985

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20171211

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171102

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171103

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171102

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171202

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013024475

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20180503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180204

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180228

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180228

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180204

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180204

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180228

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180204

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 913885

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170802

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602013024475

Country of ref document: DE

Representative=s name: ZIMMERMANN & PARTNER PATENTANWAELTE MBB, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 602013024475

Country of ref document: DE

Owner name: NIPPON STEEL CORPORATION, JP

Free format text: FORMER OWNER: NIPPON STEEL & SUMITOMO METAL CORPORATION, TOKYO, JP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180204

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20200127

Year of fee payment: 8

Ref country code: SE

Payment date: 20200210

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20130204

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20200123

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170802

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170802

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 913885

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210204

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210204

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210204

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210205

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230110

Year of fee payment: 11

Ref country code: ES

Payment date: 20230310

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20230110

Year of fee payment: 11

Ref country code: DE

Payment date: 20221229

Year of fee payment: 11