EP2775030A1 - Anordnung zum Trocknen einer Tissuepapierbahn und Verfahren zum Zurückgewinnen von Dampf beim Trocknen einer Tissuepapierbahn - Google Patents
Anordnung zum Trocknen einer Tissuepapierbahn und Verfahren zum Zurückgewinnen von Dampf beim Trocknen einer Tissuepapierbahn Download PDFInfo
- Publication number
- EP2775030A1 EP2775030A1 EP20130158017 EP13158017A EP2775030A1 EP 2775030 A1 EP2775030 A1 EP 2775030A1 EP 20130158017 EP20130158017 EP 20130158017 EP 13158017 A EP13158017 A EP 13158017A EP 2775030 A1 EP2775030 A1 EP 2775030A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- steam
- pressure
- collector tank
- condensate
- yankee cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001035 drying Methods 0.000 title claims abstract description 86
- 238000000034 method Methods 0.000 title claims abstract description 20
- 239000002699 waste material Substances 0.000 claims abstract description 39
- 238000012546 transfer Methods 0.000 claims abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 53
- 230000003247 decreasing effect Effects 0.000 claims description 8
- 230000001419 dependent effect Effects 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims description 4
- 230000001105 regulatory effect Effects 0.000 claims description 4
- 238000010438 heat treatment Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 238000012886 linear function Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000002918 waste heat Substances 0.000 description 1
Images
Classifications
-
- D—TEXTILES; PAPER
- D21—PAPER-MAKING; PRODUCTION OF CELLULOSE
- D21F—PAPER-MAKING MACHINES; METHODS OF PRODUCING PAPER THEREON
- D21F5/00—Dryer section of machines for making continuous webs of paper
- D21F5/18—Drying webs by hot air
- D21F5/181—Drying webs by hot air on Yankee cylinder
-
- D—TEXTILES; PAPER
- D21—PAPER-MAKING; PRODUCTION OF CELLULOSE
- D21F—PAPER-MAKING MACHINES; METHODS OF PRODUCING PAPER THEREON
- D21F5/00—Dryer section of machines for making continuous webs of paper
- D21F5/20—Waste heat recovery
Definitions
- the present invention relates to an arrangement for drying a tissue paper web and to a method of recapturing steam during drying of a tissue paper web.
- tissue paper machine it is a common practice to form a paper web in a forming section and pass the newly formed paper web to a Yankee drying cylinder which is heated from the inside by means of hot steam.
- the tissue paper web On the Yankee drying cylinder, the tissue paper web is dried by heat when most of the water in the web is caused to evaporate when the tissue paper web contacts the hot outer surface of the Yankee drying cylinder such that heat energy is transferred from the surface of the Yankee drying cylinder to the tissue paper web.
- the ready-dried tissue paper web is typically creped from the surface of the Yankee drying cylinder and brought to a reel-up where it is wound to a paper roll.
- a hot air hood may be arranged at the outer circumference of the Yankee drying cylinder. During operation, the hot air hood blows hot air towards the surface of the Yankee drying cylinder. Examples of such arrangements with a hot air hood are disclosed in, for example, EP 1 027 495 B1 or US patent No. 8196314 .
- the condensate be pressurized to a level which substantially corresponds to the pressure level in the fresh steam network that supplies fresh steam, that the condensate be vaporized at that pressure by heat energy taken from waste hot air and subsequently fed back into the fresh steam network.
- the fresh steam network is then used as a buffer from which steam can be fed to the Yankee drying cylinder.
- the inventive arrangement for drying a tissue paper web comprises a fresh steam network, a Yankee cylinder which is connected to the fresh steam network in such a way that it is capable of receiving steam from the fresh steam network and a hot air hood at the outer circumference of the Yankee cylinder.
- the hot air hood is arranged to let hot air flow against the outer circumference of the Yankee cylinder.
- the inventive arrangement further comprises a first condensate pipe for removing condensate from the Yankee cylinder and a condensate separator connected to the first condensate pipe such that the condensate separator can receive condensate from the Yankee cylinder.
- a steam generator that is arranged to receive condensate from the condensate separator and a pump arranged to convey condensate from the condensate separator to the steam generator and increase the pressure of the condensate to a level exceeds the pressure level in the Yankee cylinder and at which higher pressure level the condensate water is evaporated.
- the arrangement further comprises a waste air conduit connected to the air hood for conducting waste air out of the air hood and a heat exchanger arranged to transfer heat energy from the waste air conduit to the steam generator such that condensate in the steam generator is heated (and such that it evaporates).
- a first steam conduit is connected to the steam generator such that steam can be passed from the steam generator and subsequently sent to the Yankee cylinder.
- the arrangement further comprises a steam collector tank that is arranged to receive steam from the steam generator via the first steam conduit and the steam collector tank is connected to the Yankee cylinder such that steam can be passed from the steam collector tank to the Yankee cylinder.
- at least one sensor is arranged to detect a selected property of the steam and water that is being circulated through the arrangement.
- the selected property is a property which is directly or indirectly dependent on the pressure in the steam collector tank and the arrangement comprises a control system that is set to control the pressure in the steam collector tank such that the selected property is kept within predetermined limits.
- the control system is also set such that the pressure in the steam collector tank is kept at a level that is lower than the level of the pressure in the fresh steam network.
- the steam collector tank is preferably connected to the fresh steam network such that it can receive pressurized steam from the fresh steam network.
- the Yankee cylinder is then connected to the fresh steam network through (via) the steam collector tank.
- property should be understood as referring to such properties of gas and fluids as pressure, temperature, speed, mass flow, density or similar properties.
- the pressure in the steam collector tank is itself considered to be a property which is directly dependent on the pressure in the steam collector tank. Therefore, the expression "a property which is directly or indirectly dependent on the pressure in the steam collector tank” could mean simply “the pressure in the steam collector tank” and in one embodiment, this is the meaning.
- a control valve would be arranged in the second steam conduit and a logic control unit would be connected to the control valve in the second steam conduit. The logic control unit may then be set to control the control valve in the second steam conduit and thereby also the pressure in the steam collector tank.
- a steam evacuation conduit leads from the condensate separator to a thermocompressor which is connected to the steam collector tank such that it can receive motive steam from the steam collector tank.
- a first cylinder steam supply conduit leads from the thermocompressor to the Yankee cylinder.
- a second cylinder steam supply conduit leads from the steam collector tank to the Yankee cylinder, either directly or via the first cylinder steam supply conduit.
- a control valve may optionally be arranged in the second cylinder steam supply conduit such that the flow of steam through the second cylinder steam supply conduit can be regulated or shut off.
- the selected property is the speed of the steam in either of the first cylinder steam supply conduit or the steam evacuation conduit or the speed of the motive steam that is fed from the steam collector tank to the thermocompressor.
- the selected property is a difference in pressure between the steam that is fed into the Yankee cylinder and the condensate that is removed from the Yankee cylinder.
- the at least one sensor must include a pressure sensor for detecting the pressure in the steam collector tank since, in all embodiments, the pressure in the collector tank must be controlled such that it remains lower than the pressure in the fresh steam network.
- the expression “at least one sensor” means “one or several sensors of which at least one is a pressure sensor arranged for detecting the pressure in the steam collector tank”.
- the selected property is the pressure in the steam collector tank.
- the at least one sensor is then a pressure sensor that detects the pressure in the steam collector tank.
- the logic control logic control unit is then set to keep the pressure in the steam collector tank at a level that is selected to be higher than the pressure in the Yankee cylinder but lower than the pressure in the fresh steam network.
- the pressure in the Yankee cylinder is set to remain at a first pressure level and the logic control unit is set to control the pressure in the steam collector tank such that the pressure in the steam collector tank is kept at a second pressure level that is lower than the pressure in the fresh steam network but higher than the first pressure level.
- the logic control unit is set to keep the pressure in the steam collector tank at a level that is 1.5 - 2 times higher than the pressure in the Yankee drying cylinder (i.e. the selected pressure in the Yankee drying cylinder).
- a one-way valve may advantageously be arranged in the second steam conduit such that steam cannot pass from the steam collector tank to the fresh steam network.
- a sensor may be arranged to detect the pressure in at least one of the first or the second cylinder steam supply conduit. This sensor may then advantageously be connected to a control unit that is arranged to control the thermocompressor.
- the invention also relates to a method for recapturing steam during drying of a tissue paper web with a Yankee cylinder which is heated by steam and connected to a fresh steam network that operates at an elevated pressure level and wherein a hot air hood lets hot air flow against an outer circumference of the Yankee cylinder.
- the inventive method comprises removing condensate from the Yankee cylinder and passing the condensate to a condensate separator where condensate water is separated from steam.
- the method further comprises pressurizing the condensate water to a pressure level that exceeds the pressure level in the Yankee cylinder and passing the condensate water to a steam generator.
- the steam generator hot waste air that has been taken from the hot air hood is used to heat condensate water in the steam generator such that the condensate water is caused to evaporate.
- the steam generated in the steam generator is then fed to the Yankee cylinder.
- the condensate water is pressurized to a pressure that is higher than the pressure in the Yankee cylinder but lower than the pressure in the fresh steam network such that the condensate water is evaporated in the steam generator at this pressure.
- the steam that has been generated in the steam generator is fed to a steam collector tank in which the pressure level is controlled such that it is lower than the pressure level in the fresh steam network. From the steam collector tank, steam is subsequently fed to the Yankee cylinder.
- a selected property of the condensate water and steam that is circulated is detected.
- the property that is detected is a property that is directly or indirectly dependent on the pressure in the steam collector tank and the pressure in the steam collector tank is controlled/regulated such that the selected property is kept within predetermined limits.
- the pressure in the steam collector tank is controlled by supplying more or less steam from the fresh steam network to the steam collector tank to such an amount that the selected property is kept within the predetermined limits.
- the selected property is the pressure in the steam collector tank.
- the pressure in the steam collector tank is detected (i.e. measured) and a flow of pressurized steam from the fresh steam network to the steam collector tank is increased or decreased in response to the detected pressure in the steam collector tank such that the pressure in the steam collector tank remains within predetermined limits.
- the pressure in the steam collector tank is preferably controlled such that it exceeds the pressure in the Yankee cylinder by a predetermined factor which predetermined factor is preferably in the range of 1.5 - 2.0.
- the pressure in the steam collector tank is thus controlled such that it is lower than the pressure in the fresh steam network but higher than the pressure in the Yankee drying cylinder.
- a steam evacuation conduit leads away steam from the condensate separator.
- the steam that is taken from the condensate separator can advantageously be fed to a thermocompressor which receives motive steam from the steam collector tank.
- the motive steam is mixed with the steam from the condensate separator and the resulting mixture is then sent to the Yankee cylinder.
- Steam may optionally also be sent directly from the steam collector tank to the Yankee cylinder without passing any thermocompressor.
- the selected property is the speed of either the steam which is passing from the condensate separator to the thermocompressor, the speed of the motive steam reaching the thermocompressor or the speed of the mixture of motive steam and steam coming from the condensate separator.
- the selected property may be a difference in pressure between the steam that is fed into the Yankee cylinder and the condensate that is removed from the Yankee cylinder.
- Figure 1 is a purely schematic representation of the inventive arrangement.
- the inventive arrangement 1 for drying a tissue paper web comprises a fresh steam network 2.
- the fresh steam network 2 is supplied with steam from a source of steam which may typically be a main boiler.
- the fresh steam network 2 typically includes one or several conduits which may be formed by pipes.
- the steam in the fresh steam network 2 is pressurized.
- the pressure in the fresh steam network may have different values but in many cases, the pressure may realistically be 12 bar - 20 bar.
- a realistic value for the pressure in the fresh steam network may be, for example, 16 bar.
- the inventive arrangement also comprises a Yankee cylinder 3 which is connected to the fresh steam network 2 in such a way that it is capable of receiving steam from the fresh steam network 2.
- the Yankee drying cylinder 3 will be heated by hot steam and the heat will be transferred to a newly formed wet web of tissue paper such that water in the web is evaporated.
- a doctor blade would typically be arranged to act against the outer surface of the Yankee drying cylinder to crepe the paper web from the surface of the Yankee drying cylinder.
- the outer surface i.e. the outer circumference of the Yankee drying cylinder, is typically a smooth surface.
- a hot air hood 4 is placed at the outer circumference 5 of the Yankee cylinder 3 and the hot air hood is arranged to let hot air flow against the outer circumference 5 of the Yankee cylinder 3.
- the hot air hood may be designed in, for example, substantially the same way as disclosed in US patent No. 5784804 but other designs are of course also possible.
- Figure 1 the air hood 4 is showed below the Yankee drying cylinder. It should be understood that Figure 1 is a schematic representation. In real machines, the air hood 4 would (usually but not necessarily) be arranged above the Yankee drying cylinder 3.
- a first condensate pipe 6 is connected to the Yankee drying cylinder for removing condensate from the Yankee cylinder 3 and a condensate separator 7 is connected to the first condensate pipe 6 such that the condensate separator 7 can receive condensate from the Yankee cylinder 3.
- a steam generator 9 is arranged to receive condensate from the condensate separator 7 and a pump 10 is arranged to convey condensate from the condensate separator 7 to the steam generator 9 and increase the pressure of the condensate to a level that exceeds the pressure in the Yankee cylinder 3.
- the pump 10 may be arranged in a pipe or conduit 8 that connects the condensate separator 7 and the steam generator 9.
- a one-way valve 40 may optionally be arranged in the conduit 8 to prevent condensate from passing back from the steam generator 9 towards the pump 10.
- a control valve 39 may also be placed in the conduit 8 at a point between the pump 10 and the steam generator 9.
- a waste air conduit 11 is connected to the air hood 4 and the waste air conduit is arranged to conduct waste air out of the air hood 4.
- the waste air conduit 11 leads to the steam generator 9 and more specifically to a heat exchanger 12 that is arranged to transfer heat energy from the waste air conduit 11 to the steam generator 9 (i.e. to the condensate water in the steam generator) such that condensate in the steam generator 9 is heated.
- the heat exchanger 12 and the steam generator 9 will normally be integrated with each other and that the heat exchanger 12 (or a part of the heat exchanger 12) may advantageously be placed inside the steam generator 9.
- a first steam conduit 16 is connected to the steam generator 9 such that steam can be passed from the steam generator 9 and subsequently sent to the Yankee cylinder 3.
- the hot waste air may optionally bypass the steam generator 9 and the heat exchanger 12 through a by-pass conduit 13.
- a valve 14 may be placed in the by-pass conduit 13 such that the amount of waste air that passes through the by-pass conduit can be controlled (i.e. increased or decreased) or entirely shut off.
- a further valve 15 may also be placed in the part of the waste air conduit that leads to the heat exchanger 12.
- Waste air that has passed (or bypassed) the heat exchanger can be used for heating purposes or be sent into the atmosphere.
- the by-pass conduit 13 for the hot waste air and the valves 14, 15 offer a possibility to regulate/control the amount of heat that is transferred to the condensate water by means of the heat exchanger 12.
- the valves 14, 15 may be dampers that are arranged to move together such that, when one opens, the other closes and vice versa. When the damper 14 opens, the damper 15 closes and vice versa.
- the valves 14, 15 need not necessarily be dampers and they need not necessarily be arranged to move together even if that is advantageous. Any valves 14, 15 that can be used to control the flow of air (i.e. for increasing or decreasing the flow of air) can be used.
- waste air conduit 11 there may be more than one waste air conduit 11 and that the expression "a waste air conduit” should be understood as “at least one waste air conduit” although embodiments with only a single waste air conduit are possible. In embodiments with more than one waste air conduit 11, it may be so that all waste air conduits lead to the heat exchanger 12 in the steam generator 9 but it is also possible that one or several waste air conduits lead waste air to some other destination, for example for heating purposes. However, at least one waste air conduit 11 must lead to the heat exchanger 12 in the steam generator 9.
- the pump 10 is set to pressurize the condensate water to a level that exceeds the pressure in the Yankee cylinder 3 such that the condensate water in the steam generator 9 is evaporated at this elevated pressure.
- the arrangement 1 also comprises a steam collector tank 18 arranged to receive steam from the steam generator 9 via the first steam conduit 16.
- the steam collector tank 18 is in turn connected to the Yankee cylinder 3 (directly or indirectly) such that steam can be passed from the steam collector tank 18 to the Yankee cylinder 3.
- the inventive arrangement comprises at least one sensor 19 that is arranged to detect a selected property of the steam and water that is being circulated through the arrangement 1.
- the property being detected is a property which is dependent directly or indirectly on the pressure in the steam collector tank 18.
- the arrangement 1 comprises a control system 20 that is set to control the pressure in the steam collector tank 18 such that the selected property is kept within predetermined limits.
- the at least one sensor 19 is arranged to give a signal to the control system 20 which signal corresponds to the value of the detected property such that the control system 20 will control the pressure in the collector tank 18 in response to this signal.
- the pump 10 should raise the pressure of the condensate water to a level that exceeds the pressure in the Yankee drying cylinder 3 and it should be able to raise the pressure to such a level that the steam that is generated in the steam generator 9 can reach the steam collector tank 18. It should be understood that it is the pressure in the steam collector tank 18 that determines the level of the pressure in the steam generator 9. From the steam generator 9 to the steam collector tank 18, there is an inevitable pressure loss in the first steam conduit 16. The pump 10 must be able to raise the pressure of the condensate to a level which is the sum of the pressure in the steam collector tank and the inevitable pressure loss (pressure drop). The actual flow of steam will depend on where the pump curve of the pump 10 meets the system curve of the conduits.
- the pump 10 Since the pressure in the steam collector tank 18 is kept at a level which is higher than the pressure in the Yankee drying cylinder but less than the pressure in the fresh steam network, the pump 10 must be able to raise the pressure of the condensate to this level and slightly higher to compensate for pressure loss. During operation, the pump 10 will pressurize the condensate water in the steam generator 9 to a level that exceeds the pressure in the Yankee drying cylinder but which is lower than the pressure in the fresh steam network 2.
- the pump 10 may of course be a pump which, in principle, is capable of pressurizing water even to levels above the pressure in the fresh steam network but, since the pump 10 feeds the steam generator 9 and since the steam generator 9 is connected to the steam collector tank 18, the pressure in the steam generator is determined by the pressure in the steam collector tank and the pressure at which condensate water is vaporized is thus determined by the pressure in the steam collector tank 18 which is kept lower than the pressure in the fresh steam network 2 by the control system 20. It can thus be appreciated that the pump 10 will only pressurize the condensate water to a level that corresponds to the sum of the pressure in the steam collector tank 18 and the pressure loss between the steam generator 9 and the steam collector tank 18. With other words, it can thus be stated that the pump 10 is arranged to pressurize the condensate water to a pressure level at which the condensate water is able to enter the steam generator 9.
- a one-way valve 17 may be placed in the first steam conduit 16 to prevent steam from passing from the steam collector tank 18 towards the steam generator 9.
- the Yankee cylinder 3 is connected to the fresh steam network 2 through the steam collector tank 18.
- the control system 20 that is set to control the pressure in the steam collector tank 18 comprises a second steam conduit 21 leading from the fresh steam network 2 to the steam collector tank 18 such that the steam collector tank 18 is connected to the fresh steam network 2.
- the control system further comprises a control valve 22 that is arranged in the second steam conduit 21.
- a logic control unit 23 is connected to the control valve 22 in the second steam conduit 21 and the logic control unit 23 is set to control the control valve 22 in the second steam conduit 21 and thereby the pressure in the steam collector tank 18.
- a steam evacuation conduit 24 leads from the condensate separator 7 to a thermocompressor 27 which is connected to the steam collector tank 18 such that it can receive motive steam from the steam collector tank 18.
- a first cylinder steam supply 29 conduit leads from the thermocompressor 27 to the Yankee cylinder 3 such that a mixture of motive steam and steam from the condensate separator 7 can be supplied to the Yankee cylinder.
- a control valve 25 may optionally be placed in the steam evacuation conduit 24 to regulate the amount of steam passing that way.
- a one-way valve 26 may also be placed in the steam evacuation conduit to ensure that steam does not pass back towards the condensate separator 7.
- steam may be sent to the atmosphere through an exit conduit 28 which may have a control valve that can be more or less open or completely shut off such that no steam can exit that way.
- a part of the condensate water from the condensate separator 7 may be removed through an evacuation conduit 36 and used for other purposes than steam recovery.
- the evacuation conduit may have a control valve 38 and a one-way valve 37 that prevents condensate water to flow back towards the condensate separator.
- Embodiments are conceivable in which all steam that passes from the steam collector tank 18 goes through the thermocompressor 27 as motive steam.
- a second cylinder steam supply conduit 30 that leads from the steam collector tank 18 to the Yankee cylinder 3 without passing the thermocompressor.
- Such a second cylinder steam supply conduit can pass directly to the Yankee cylinder but it may be suitable to connect it to the first cylinder steam supply conduit 29 at some point downstream of the thermocompressor 27 such that the Yankee drying cylinder 3 only receives steam through one conduit.
- a control valve 31 is arranged in the second cylinder steam supply conduit 30 such that the flow of steam through the second cylinder steam supply conduit 30 can be regulated or shut off.
- a throttle valve 32 may be placed in the second cylinder steam supply conduit such that the pressure of the steam is reduced to the level required for the Yankee drying cylinder.
- the selected property which is detected by the at least one sensor is the pressure in the steam collector tank 18.
- the at least one sensor 19 is then a pressure sensor that detects the pressure in the steam collector tank 18 and the logic control unit 23 is set to keep the pressure in the steam collector tank 18 at a level that is selected to be higher than the pressure in the Yankee cylinder 3 but lower than the pressure in the fresh steam network 2.
- this works in such a way that the pressure in the Yankee drying cylinder 3 is set to remain at a suitable first pressure level and the logic control unit 23 is then set to control the pressure in the steam collector tank 18 such that the pressure in the steam collector tank 18 is kept at a second pressure level that is lower than the pressure in the fresh steam network 2 but higher than the first pressure level.
- the logic control unit 23 is set to keep the pressure in the steam collector tank at a level that is 1.5 - 2 times higher than the selected pressure for the Yankee drying cylinder.
- This control principle can be further explained with reference to Figure 2 .
- the horizontal axis represents the selected pressure in the Yankee drying cylinder while the vertical axis represents the pressure level that must be kept in the steam collector tank 18.
- control system 20 is set to keep the pressure in the steam collector tank at a level that is lower than the pressure in the fresh steam network 2.
- control of the pressure in the steam collector tank 18 based on the selected Yankee pressure may function in many different ways.
- One way is the following.
- a sensor 34 may be arranged to detect the pressure in one of the two cylinder steam supply conduits 29, 30 that supply steam to the Yankee.
- the sensor 34 is suitably placed downstream of the throttle valve 32 which is located in the second cylinder steam supply conduit 30 such that pressure is measured at a point where the pressure is lower than in the steam collector tank 18.
- a further valve 31 may also be placed in the second cylinder steam supply conduit 30. Downstream of the valve 31, the pressure may be even lower than after the throttle valve 32 and the pressure sensor 34 may be placed downstream of the valve 31.
- the pressure sensor 34 is arranged at a point immediately before the steam enters the Yankee drying cylinder 3 itself.
- the pressure sensor 34 could be placed inside the Yankee drying cylinder.
- the pressure sensor 34 measures/detects the actual value of the pressure of the steam inside the Yankee drying cylinder 3 or at a point shortly before the steam enters the Yankee drying cylinder 3.
- the sensor 34 is connected to a control unit 35 that is arranged to control the thermocompressor 27.
- the control unit 35 is suitably programmed to maintain a set value for the pressure in the Yankee drying cylinder 3 and the control unit 35 can be set or programmed to maintain this value.
- the control unit 35 could be, for example, a computer and the set values for pressure in the Yankee drying cylinder 3 can be fed into the control unit 35 in a conventional way, for example by means of a keybord. It should be understood that the control unit 35 is able to communicate with the thermocompressor 27. If the control unit 35 receives a signal from the pressure sensor 34 that indicates that steam pressure in the Yankee drying cylinder 3 is too low (i.e. that the pressure in the Yankee drying cylinder is below the set value), the control unit 35 can cause the thermocompressor to supply more motive steam such that the pressure of the steam in the Yankee drying cylinder increases.
- the control unit 35 can cause the thermocompressor to reduce the amount of motive steam until the pressure detected by the pressure sensor 34 has reached the set value.
- control unit 35 could be connected to a control valve 31 in the second cylinder steam supply conduit 30 and arranged to control the control valve 31 so that more or less steam comes through the second cylinder steam supply conduit 30. In this way, the pressure level in the Yankee drying cylinder 3 can be controlled and kept at a set value.
- control unit 35 could be arranged to control both the thermocompressor 27 and the control valve 31 that is arranged in the second cylinder steam supply conduit 30. If the signal from the pressure sensor 34 indicates that the pressure in the Yankee drying cylinder 3 is too low, first the thermocompressor 27 may be allowed to let through more motive steam. If that should be insufficient, the control unit 35 may cause the control valve 31 to also let more steam through from the steam collector tank 18.
- the logic control unit 23 can be set to maintain pressure in the steam collector tank 18 at a level which is higher than the pressure which has been set for the Yankee drying cylinder but lower than the pressure in the fresh steam network 2.
- the control unit 35 could advantageously (but not necessarily) be in communication with the logic control unit 23 that controls the control valve 22 in the second steam conduit 21 that connects the fresh steam network 2 to the steam collector tank 18.
- this can then be automatically communicated to the logic control unit 23 such that the pressure in the steam collector tank 18 is directly determined as a function of the set pressure level in the Yankee drying cylinder 3.
- control unit 35 is set to maintain the pressure in the Yankee drying cylinder 3 at a set value
- this set value can be communicated by the control unit 35 to the logic control unit 23.
- the logic control unit 23 can then determine what the pressure in the steam collector tank 18 must be according to an algorithm programmed into the logic control unit 23, for example that pressure in the steam collector tank 18 should be determined as the set value for the Yankee drying cylinder 3 multiplied with a constant.
- the control system 20 is set to keep the pressure in the steam collector tank 18 at a lower level than the pressure in the fresh steam network.
- the control system 20 is set to control the pressure in the steam collector tank 18 such that a selected property is kept within predetermined limits. In practice, this means that the control system 20 will ensure that pressure in the steam collector tank 18 is kept at a level that is higher than the pressure in the Yankee drying cylinder 3 but lower than the pressure in the fresh steam network 2, even in such embodiments where the selected property which is to be kept within predetermined limits is not directly based on the pressure in the Yankee drying cylinder 3. Since the control system 20 is set to keep the pressure in the steam collector tank 18 at a level that is lower than the level of the pressure in the fresh steam network, it follows that the at least one sensor must include a pressure sensor for detecting the pressure in the steam collector tank.
- the selected property is the pressure in the steam collector tank itself and wherein the pressure in the steam collector tank is controlled such that it is higher than the pressure in the Yankee drying cylinder 3 but lower than the pressure in the fresh steam network 2.
- the horizontal axis represents the pressure which is set for the Yankee drying cylinder 2 ("Yankee pressure") while the vertical axis represents the pressure in the steam collector tank 18 ("Collector pressure").
- the desired pressure level in the steam collector tank 18 is preferably controlled to be a linear function of the set pressure level in the Yankee drying cylinder 3.
- the pressure of the steam collector tank 18 has been set to be 2 times higher than the pressure in the Yankee drying cylinder.
- a highest limit for the pressure in the steam collector is set to be lower than the pressure in the fresh steam network.
- the pressure level in the steam collector tank increases linearly with the set pressure level in the Yankee drying cylinder but only up to a maximum level which is lower than the pressure level in the fresh steam network 2.
- Figure 2 illustrates a case where it is assumed that the pressure in the fresh steam network is 16 bar.
- the highest permissible pressure in the steam collector tank 18 should be lower than the pressure in the fresh steam network 2 and preferably at least 1 bar lower.
- the pressure in the steam collector tank increases as a function of the pressure which has been set for the Yankee drying cylinder 3.
- the pressure in the steam collector is determined as Yankee pressure multiplied with a constant and the constant may preferably be somewhere in the range 1.5 - 2.
- the constant may have values outside the range 1.5 - 2.0 but it must necessarily be higher than 1.0.
- the constant may have values up to 3.0 ore even above 3.0 but control is deemed to be easier if the constant lies in the range of 1.5 - 2.0.
- the pressure level in the steam collector tank does not have to vary linearly with the set Yankee pressure, it could also follow some other curve as long as the pressure in the steam collector tank is higher than the pressure in the Yankee drying cylinder but lower than the pressure in the fresh steam network.
- control unit 35 may be in communication with the logic control unit 23.
- one and the same unit performs the function of both the control unit 35 and the logic control unit 23.
- the logic control unit 23 that is connected to the control valve 22 in the second steam conduit 21 is connected to the at least one sensor 19.
- the at least one sensor 19 is a pressure sensor that detects (i.e. measures) the value of the pressure in the steam collector tank 18. If the pressure detected in the steam collector tank is too low, this will be noticed by the logic control unit 23 since it receives signals from the at least one sensor 19 that indicate the actual pressure in the steam collector tank 18. If the pressure in the steam collector tank 18 is found to be below the correct value, the logic control unit 23 will cause the control valve 22 to open up more such that more steam at high pressure will flow from the fresh steam network to the steam collector tank 18 such that the pressure in the steam collector tank increases.
- the logic control unit will instead cause the control valve 22 to reduce or shut off the flow of steam from the fresh steam network to the steam collector tank 18 such that the pressure in the steam collector tank 18 decreases until it reaches a correct value.
- a different control principle could be used which is illustrated by Figure 3 .
- the selected property on which control is based could be the speed of the steam passing through the first cylinder steam supply conduit 29. This could mean that a speed sensor is placed in the first cylinder steam supply conduit 29. The speed sensor communicates with the logic control unit 23. If the speed of the steam is too low, the logic control unit 23 acts to open the control valve 22 such that pressure in the steam collector tank 18 increases. The increased pressure in the steam collector tank 18 will increase the flow of motive steam through the thermocompressor 27 such that the speed of the steam increases.
- pressure in the steam collector tank 18 can be decreased if the speed that is detected exceeds a set value. It is to be understood that, also in this embodiment, the pressure in the steam collector tank 18 is kept below the pressure in the fresh steam network 2 and pressure in the steam collector tank 18 is still being monitored by a sensor in contact with the logic control unit.
- the horizontal axis may represent the speed (or mass flow) of blow-through steam, i.e. the steam passing through the steam evacuation conduit 24 while the vertical axis represents the pressure in the steam collector tank 18 (collector pressure). It can be seen that increasing pressure in the steam collector tank 18 results in an increased flow of steam in the steam evacuation conduit 24. If the speed of the steam in the steam evacuation conduit 24 is too low, the control system 20 may act to increase the pressure in the steam collector tank 18 but only up to a level which is less than the pressure level in the fresh steam network 2. Suitably, the pressure in the steam collector tank 18 should be kept at least 1 bar lower than the pressure in the fresh steam network 2.
- the speed sensor can be placed in the steam evacuation conduit 24 or it could be placed in a conduit 41 for motive steam which conduit connects the steam collector tank 18 with the thermocompressor 27 such that the thermocompressor can receive motive steam from the steam collector tank 18. If the motive pressure is increased and more motive steam is used, this will suck more steam through the steam evacuation conduit 24 such that the speed of the steam in the steam evacuation conduit 24 increases.
- the most advantageous place to measure the speed of the steam is actually considered by the inventor to be the steam evacuation conduit 24 since the speed of the steam in that conduit is a good indicator of the prevailing conditions in the system but speed or mass flow of the steam may optionally or alternatively also be measured in one or several of the other steam conduits 29, 30 41.
- the selected property is a difference in pressure between the steam that is fed into the Yankee cylinder 3 and the condensate that is removed from the Yankee cylinder 3.
- a pressure sensor may be placed in the steam supply conduit at a point immediately before the steam enters the Yankee drying cylinder and another pressure sensor may be placed in the first condensate pipe 6 that leads condensate away from the Yankee drying cylinder 3.
- Both pressure sensors may suitably be connected to the logic control unit 23 such that the logic control unit 23 can determine the difference in pressure before and after the Yankee drying cylinder 3.
- the logic control unit is set to maintain a certain pressure difference (i.e. pressure drop over the Yankee drying cylinder).
- the pressure in the steam collector tank 18 is increased or decreased until the pressure difference over the Yankee drying cylinder reaches a correct value.
- the horizontal axis represents differential pressure (DP), i.e. the difference in pressure before and after the Yankee drying cylinder.
- DP differential pressure
- the control system 20 acts such that the pressure in the collector tank (collector pressure) is increased or decreased such that the desired pressure difference is reached but the pressure in the steam collector tank 18 is still not allowed to reach the same level as the pressure in the fresh steam network 2.
- the pressure in the steam collector tank 18 should be kept at least 1 bar lower than the pressure in the fresh steam network 2.
- steam should preferably be prevented from passing from the steam collector tank 18 to the fresh steam network 2. This can normally be prevented by control of the pressure levels but, as a precaution, a one-way valve 33 may optionally arranged in the second steam conduit 21 such that steam cannot be pass from the steam collector tank 18 to the fresh steam network 2.
- the inventive method will be apparent from the above given description of the inventive arrangement.
- steam is recaptured during drying of a tissue web with a Yankee cylinder 3 which is heated by steam and connected to a fresh steam network 2 that operates at an elevated pressure level.
- the hot air hood 4 lets hot air flow against the outer circumference 5 of the Yankee cylinder 3.
- Condensate is removed (together with steam) from the Yankee cylinder 3 through the first condensate pipe 6 and the condensate is passed to the condensate separator 7 where condensate water is separated from steam.
- the condensate water is pressurized to a pressure level that exceeds the pressure level in the Yankee cylinder 3 and passed to the steam generator 9.
- the Yankee pressure may be, for example, 6 bar and the pressure in the fresh steam network 2 may be 16 bar.
- the condensate water may be pressurized to a pressure of 9 - 12 bar before it is sent to the steam generator 9.
- the condensate water may correspondingly be pressurized to higher levels but it cannot be pressurized to a level substantially higher than the pressure in the steam collector tank 18 and the pressure in the steam collector tank 18 must be lower than in the fresh steam network 2.
- the condensate should be pressurized to a level that is at least 1 bar less than the pressure level in the fresh steam network 2. If the pressure in the fresh steam network 2 is 16 bar, the condensate water cannot be pressurized to substantially more than 15 bar.
- Hot waste air is taken from the hot air hood 4 and used to heat condensate water in the steam generator 9 such that the pressurized condensate water is caused to evaporate at the pressure level to which it has been brought.
- the steam generated in the steam generator 9 is then fed to the Yankee cylinder 3.
- the steam generated in the steam generator 9 is then fed to a steam collector tank 18 in which the pressure is lower than the pressure level in the fresh steam network 2 but higher than the pressure level in the Yankee cylinder 3.
- the pressure in the steam collector tank 18 will normally be substantially the same as the pressure level in the steam generator 9 (actually, the pressure in the steam collector tank 18 is slightly higher in order to compensate for pressure losses between the steam generator 9 and the steam collector tank 18).
- steam is subsequently fed to the Yankee cylinder 3 through at least one cylinder steam supply conduit 29, 30.
- a selected property of the condensate water and steam for example pressure, speed or a difference in pressure
- the pressure in the steam collector tank 18 is then controlled in a way that has been explained above such that the selected property is kept within predetermined limits.
- the pressure in the steam collector tank 18 is controlled by simply supplying more or less steam from the fresh steam network 2 to the steam collector tank 18 to such an amount that the selected property is kept within the predetermined limits.
- the pressure in the steam collector tank may be controlled by other means, for example by compression.
- first steam conduit 16 may be very short or even so short that the steam collector tank 18 is practically directly connected to the steam generator 9.
- the first steam conduit 16 may be, for example, an integrated part of the steam generator 9 that is adapted for connection to the steam collector tank 18.
- pressure levels indicated refer to overpressure, i.e. the pressure that exceeds the atmospheric pressure.
- overpressure i.e. the pressure that exceeds the atmospheric pressure.
- inventive arrangement has been termed an arrangement for drying a tissue paper web, it may equally well be termed an arrangement for recapturing steam during drying of a tissue paper web.
- inventive method may thus include such method steps that would be the inevitable consequence of using the inventive arrangement, regardless of whether such steps have been explicitly mentioned or not.
- the invention offers the advantage that a buffer of steam can be made available in the steam collector tank which can be used to supply the Yankee drying cylinder with steam according to the actual requirements of the Yankee.
- This buffer is not entirely independent of the fresh steam network but it is less sensitive to such variations in the pressure that may occur in the fresh steam network as a result of boiler problems. As a result, the risk of unwanted fluctuations in Yankee heating is reduced at the same time as heat energy can be recovered.
- the present invention also offers yet another advantage, namely that more steam can be generated by the heat energy in the waste air from the hot air hood.
- the reason for this is that a greater part of the heat energy in the hot air becomes available.
- the air can in principle deliver heat energy until the air is cooled down to the saturation temperature of the condensate. In practical cases, this is not a realistic option since the heat exchanger would have to be very large and since there would be a risk of water droplets in the steam.
- the hot air can only be cooled down to a temperature that is 15°C - 25°C above the saturation temperature of the condensate water. If the pressure in the fresh steam network is 16 bar and if evaporated steam is to be fed back into the fresh steam network, the steam must also have a pressure of at least 16 bar. The saturation temperature of water at 16 bar is 204°C. This means that, in practice, the air from the hot air hood 4 can only be cooled down to about 219°C or perhaps only down to 229°C.
- the ingoing temperature of the waste air may vary but in many realistic cases, it may be in the range of 350°C - 500°C.
- the saturation temperature of the condensate water will be 175°C and the waste air can be cooled in the heat exchanger to a temperature that may even be below 200°C, perhaps as low as 190°C. This means that a larger amount of heat energy is delivered to the condensate water compared to the case where the water is pressurized to a higher pressure level.
- the present invention provides both a buffer that is less sensitive to pressure fluctuations in the fresh steam network and also an effective way of using the heat energy in the waste air from the hot air hood.
Landscapes
- Paper (AREA)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13158017.7A EP2775030B1 (de) | 2013-03-06 | 2013-03-06 | Anordnung zum Trocknen einer Tissuepapierbahn und Verfahren zum Zurückgewinnen von Dampf beim Trocknen einer Tissuepapierbahn |
PCT/EP2014/054034 WO2014135484A1 (en) | 2013-03-06 | 2014-03-03 | An arrangement for drying a tissue paper web and a method for recapturing steam during drying of a tissue paper web |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13158017.7A EP2775030B1 (de) | 2013-03-06 | 2013-03-06 | Anordnung zum Trocknen einer Tissuepapierbahn und Verfahren zum Zurückgewinnen von Dampf beim Trocknen einer Tissuepapierbahn |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2775030A1 true EP2775030A1 (de) | 2014-09-10 |
EP2775030B1 EP2775030B1 (de) | 2015-09-09 |
Family
ID=47832972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13158017.7A Active EP2775030B1 (de) | 2013-03-06 | 2013-03-06 | Anordnung zum Trocknen einer Tissuepapierbahn und Verfahren zum Zurückgewinnen von Dampf beim Trocknen einer Tissuepapierbahn |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2775030B1 (de) |
WO (1) | WO2014135484A1 (de) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3150761A1 (de) | 2015-09-29 | 2017-04-05 | Voith Patent GmbH | Vorrichtung und verfahren zur trocknung einer faserstoffbahn unter verwendung einer dampfrückgewinnung |
CN109577063A (zh) * | 2018-11-09 | 2019-04-05 | 上海交通大学 | 一种纸机烘干部的计算机集散控制系统 |
WO2019091802A1 (de) | 2017-11-10 | 2019-05-16 | Voith Patent Gmbh | Vorrichtung zur versorgung eines dampfverbrauchers und verfahren zur dampfrückgewinnung eines dampfverbrauchers |
DE102018107068A1 (de) | 2018-03-26 | 2019-09-26 | Voith Patent Gmbh | Vorrichtung und Verfahren zur Trocknung einer Faserstoffbahn unter Verwendung einer Dampfrückgewinnung |
IT202100012182A1 (it) * | 2021-05-12 | 2022-11-12 | Mevas S R L | Sistema di asciugatura ed essiccazione per la produzione di materiale cartaceo nastriforme con recupero dei vapori |
IT202100013277A1 (it) * | 2021-05-21 | 2022-11-21 | Andritz Novimpianti S R L | Sistema per la generazione di vapore in un impianto per la produzione di materiale cartaceo nastriforme |
SE2230174A1 (en) * | 2022-06-01 | 2023-12-02 | Valmet Oy | A machine for producing a fibrous web |
WO2024061705A1 (de) * | 2022-09-23 | 2024-03-28 | Voith Patent Gmbh | Maschine und verfahren zu deren betrieb für die herstellung oder behandlung einer faserstoffbahn mit einer wärmepumpe |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016086250A2 (de) | 2014-12-01 | 2016-06-09 | Georg Michael Ickinger | Trockenzylinder als koaxialer doppelzylinder und ringspalt |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3501584A1 (de) | 1984-02-10 | 1985-08-14 | Maschinenfabrik Andritz Ag, Graz | Einrichtung an der trockenpartie von papiermaschinen |
US5784804A (en) | 1996-03-25 | 1998-07-28 | Asea Brown Boveri, Inc. | Yankee hood with integral air heating system |
EP1027495B1 (de) | 1997-10-31 | 2004-04-07 | Kimberly-Clark Worldwide, Inc. | Verfahren zur herstellung von tissuepapier auf einer modifizierten konventionellen nasspressmaschine |
WO2010091765A1 (de) | 2009-02-11 | 2010-08-19 | Sca Hygiene Products Ab | Vorrichtung und verfahren zum trocknen einer tissuepapierbahn mit dampfrückgewinnung |
DE102010041231A1 (de) * | 2010-05-19 | 2011-11-24 | Voith Patent Gmbh | Verfahren und Vorrichtung zum Verfahren zur Wärmerückgewinnung für eine Trockenpartie einer Maschine zur Herstellung einer Faserstoffbahn |
US8196314B2 (en) | 2007-02-13 | 2012-06-12 | Voith Patent Gmbh | Apparatus for drying a fibrous web |
-
2013
- 2013-03-06 EP EP13158017.7A patent/EP2775030B1/de active Active
-
2014
- 2014-03-03 WO PCT/EP2014/054034 patent/WO2014135484A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3501584A1 (de) | 1984-02-10 | 1985-08-14 | Maschinenfabrik Andritz Ag, Graz | Einrichtung an der trockenpartie von papiermaschinen |
US5784804A (en) | 1996-03-25 | 1998-07-28 | Asea Brown Boveri, Inc. | Yankee hood with integral air heating system |
EP1027495B1 (de) | 1997-10-31 | 2004-04-07 | Kimberly-Clark Worldwide, Inc. | Verfahren zur herstellung von tissuepapier auf einer modifizierten konventionellen nasspressmaschine |
US8196314B2 (en) | 2007-02-13 | 2012-06-12 | Voith Patent Gmbh | Apparatus for drying a fibrous web |
WO2010091765A1 (de) | 2009-02-11 | 2010-08-19 | Sca Hygiene Products Ab | Vorrichtung und verfahren zum trocknen einer tissuepapierbahn mit dampfrückgewinnung |
DE102010041231A1 (de) * | 2010-05-19 | 2011-11-24 | Voith Patent Gmbh | Verfahren und Vorrichtung zum Verfahren zur Wärmerückgewinnung für eine Trockenpartie einer Maschine zur Herstellung einer Faserstoffbahn |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3150761A1 (de) | 2015-09-29 | 2017-04-05 | Voith Patent GmbH | Vorrichtung und verfahren zur trocknung einer faserstoffbahn unter verwendung einer dampfrückgewinnung |
WO2019091802A1 (de) | 2017-11-10 | 2019-05-16 | Voith Patent Gmbh | Vorrichtung zur versorgung eines dampfverbrauchers und verfahren zur dampfrückgewinnung eines dampfverbrauchers |
DE102017126372A1 (de) | 2017-11-10 | 2019-05-16 | Voith Patent Gmbh | Vorrichtung und Verfahren zur Trocknung einer Faserstoffbahn unter Verwendung einer Dampfrückgewinnung |
DE102018107068A1 (de) | 2018-03-26 | 2019-09-26 | Voith Patent Gmbh | Vorrichtung und Verfahren zur Trocknung einer Faserstoffbahn unter Verwendung einer Dampfrückgewinnung |
CN109577063A (zh) * | 2018-11-09 | 2019-04-05 | 上海交通大学 | 一种纸机烘干部的计算机集散控制系统 |
IT202100012182A1 (it) * | 2021-05-12 | 2022-11-12 | Mevas S R L | Sistema di asciugatura ed essiccazione per la produzione di materiale cartaceo nastriforme con recupero dei vapori |
EP4089230A1 (de) | 2021-05-12 | 2022-11-16 | Mevas S.r.l. | Verfahren und anlage zum trocknen von papier |
IT202100013277A1 (it) * | 2021-05-21 | 2022-11-21 | Andritz Novimpianti S R L | Sistema per la generazione di vapore in un impianto per la produzione di materiale cartaceo nastriforme |
EP4092186A1 (de) | 2021-05-21 | 2022-11-23 | ANDRITZ Novimpianti S.r.l. | Anlage zur dampferzeugung in einer anlage zur herstellung eines bahnförmigen papiermaterials |
SE2230174A1 (en) * | 2022-06-01 | 2023-12-02 | Valmet Oy | A machine for producing a fibrous web |
SE546211C2 (en) * | 2022-06-01 | 2024-07-02 | Valmet Oy | A machine for producing a fibrous web |
WO2024061705A1 (de) * | 2022-09-23 | 2024-03-28 | Voith Patent Gmbh | Maschine und verfahren zu deren betrieb für die herstellung oder behandlung einer faserstoffbahn mit einer wärmepumpe |
Also Published As
Publication number | Publication date |
---|---|
WO2014135484A1 (en) | 2014-09-12 |
EP2775030B1 (de) | 2015-09-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2775030B1 (de) | Anordnung zum Trocknen einer Tissuepapierbahn und Verfahren zum Zurückgewinnen von Dampf beim Trocknen einer Tissuepapierbahn | |
JP5230683B2 (ja) | 高温ドレン回収システム | |
US8429832B2 (en) | Utilization of waste heat in the dryer section of paper machines | |
CA2750937C (en) | Device and method for drying a tissue paper web using steam recovery | |
US9702084B2 (en) | Process and a machine for making a tissue paper web | |
EP2298988B1 (de) | Trocknungsanordnung für Anlagen zur Herstellung von Papierbahnen | |
JP2009517562A (ja) | 化学セルロースパルプの生産に関連したチップの蒸気前処理システム及び方法 | |
JP2008298308A (ja) | 給水予熱ボイラ | |
JP2012067970A (ja) | ドレン回収システム | |
US10533284B2 (en) | Method for operation of a heating group subsystem, and heating group subsystem | |
CN106461207B (zh) | 排水回收装置 | |
CN106247297B (zh) | 一种船用旁通回收复合补水供汽系统 | |
BR112021012941A2 (pt) | Método e arranjo de controle para uso na recuperação de calor a partir de gás residual, e, sistema de recuperação de calor | |
CN102251430B (zh) | 一种造纸用压光机的加热装置 | |
SE541292C2 (en) | A machine for making a tissue paper web and a method of operating such a machine | |
JP2006063886A (ja) | 火力発電プラント | |
JP4371959B2 (ja) | ボイラー用加熱脱気装置 | |
EP4245911B1 (de) | System und verfahren zur steuerung von prozessflüssigkeiten in einer anlage zur herstellung von bahnförmigem papiermaterial | |
CN202164501U (zh) | 一种造纸用压光机的加热装置 | |
KR101928677B1 (ko) | 보일러, 콤바인드 사이클 플랜트 및 보일러의 운전 방법 | |
US1531744A (en) | Steam drying system | |
JP2017198365A (ja) | 熱回収システム | |
JP6248754B2 (ja) | ボイラシステム | |
JP6265002B2 (ja) | ボイラシステム | |
JP2023024646A (ja) | 給水制御装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20130306 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
R17P | Request for examination filed (corrected) |
Effective date: 20150107 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: D21F 5/18 20060101AFI20150413BHEP Ipc: D21F 5/20 20060101ALI20150413BHEP |
|
INTG | Intention to grant announced |
Effective date: 20150427 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 748230 Country of ref document: AT Kind code of ref document: T Effective date: 20150915 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013002879 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20150909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151209 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151210 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160109 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160111 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013002879 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20160610 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160306 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20161130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20170306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130306 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 748230 Country of ref document: AT Kind code of ref document: T Effective date: 20150909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150909 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230513 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20240319 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240319 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20240321 Year of fee payment: 12 |