EP2604758A1 - Cage - Google Patents

Cage Download PDF

Info

Publication number
EP2604758A1
EP2604758A1 EP12006152.8A EP12006152A EP2604758A1 EP 2604758 A1 EP2604758 A1 EP 2604758A1 EP 12006152 A EP12006152 A EP 12006152A EP 2604758 A1 EP2604758 A1 EP 2604758A1
Authority
EP
European Patent Office
Prior art keywords
wall elements
shaft
wall
shaft according
grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP12006152.8A
Other languages
German (de)
English (en)
Other versions
EP2604758B1 (fr
Inventor
Hubert Bauer
Andreas Wankmüller
Josef Lohr
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Langmatz GmbH
Original Assignee
Langmatz GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=46888876&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2604758(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Langmatz GmbH filed Critical Langmatz GmbH
Priority to PL12006152T priority Critical patent/PL2604758T3/pl
Publication of EP2604758A1 publication Critical patent/EP2604758A1/fr
Application granted granted Critical
Publication of EP2604758B1 publication Critical patent/EP2604758B1/fr
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/124Shaft entirely made of synthetic material

Definitions

  • the invention relates to a shaft with a shaft wall, which is composed of wall elements.
  • the shaft is intended to be embedded in the ground and to accommodate, for example, distributors for copper and / or fiber optic cables. After inserting the shaft in a previously excavated pit, the side walls of the shaft are backfilled with soil, the shaft must withstand considerable earth pressure.
  • the present invention has for its object to provide a slot to be inserted into the ground, which can be produced at low cost.
  • the invention provides that the wall elements of the shaft are made of plastic existing hollow chamber profiles, which have a planar shape, and that the wall elements are mitred at the lateral ends and abut against each other at the corners of the shaft wall with the miter surfaces. It is not necessary, the wall elements at the corner areas to positively To connect a peripheral frame, since the wall elements are pressed firmly against each other at the 45 ° -Gehrungs vom by the earth pressure and thus form a stable rectangular shaft wall.
  • the flat, plate-shaped wall profiles can be produced by extrusion at low cost and put together with minimal effort, since they are neither screwed together at the corners nor glued.
  • the invention provides with advantage that wall elements can be arranged one above the other in order to form a shaft of the required height or depth.
  • the shaft height can be, for example 800 mm by two set of four wall elements together frames are set with a height of 400 mm each on each other.
  • the wall elements preferably have strip-shaped latching lugs on their underside or upper side and on their upper side or upper edge or lower side or lower edge of latching grooves with which wall elements arranged one above the other can be locked together.
  • the locking lugs and the locking grooves have a wall thickness such that they are elastically deformable.
  • the shaft according to the invention is to put together in an extremely simple manner, for which no tools are required.
  • the bottom wall elements can be placed on baseboards and locked with them also in the manner described above, the bottom of the baseboards should be wider than the wall thickness of the wall elements. In this way, the pressure load that the shaft exerts on the leveled and compacted before installation underground is reduced accordingly.
  • the shaft can also be placed on a base plate, e.g. be made of concrete.
  • the wall elements preferably have substantially smooth inner and outer shells connected to each other by diagonal webs and transverse webs are connected.
  • the hollow chamber profile closing edge an approximately rectangular hollow locking lug having lateral convex curvatures.
  • the wall elements have a thickness of about 50 mm.
  • top frame member On the top frame member is a steel frame can be placed, with a cast cover is lockable.
  • wall elements are held together at the corner by corner connectors, which prevent individual wall elements fall over to the outside.
  • wall elements may be provided on their insides with grooves that merge into each other at the corners, so that corner connectors are each inserted into the grooves of two adjacent wall elements. These grooves can each be formed by two projecting, mutually angled webs, between the ends of which a slot-shaped opening remains.
  • the corner joints may be at right angles to each other, in the installation position vertical webs which engage in the grooves and are interconnected by a plate-shaped portion which extends through the slot-shaped opening of the grooves.
  • corner connectors do not have the task of non-positively connected to a rectangular frame element set wall elements together, but they should only prevent falling apart of the composite shaft to the backfilling with soil at the installation site.
  • the stable cohesion of the elements is achieved by the miter areas at the corners and the earth pressure.
  • FIG. 1 shows the components of a complete manhole, which is similar to a construction kit without tools.
  • the shaft is placed on a bottom plate 1, which is placed on the leveled ground of a excavation of the soil.
  • the shaft shown contains two superimposed frame members 2, which are each composed of four wall panels 3 to form a rectangle.
  • the frame members 2 rest on four baseboards 4, which are arranged on the bottom plate 1.
  • a steel frame 5 On the composite shaft, a steel frame 5 is placed, which carries a lockable cast cover 6 with the interposition of a one-sided self-adhesive damping pad 7.
  • the steel frame can be bolted to the wall elements 3 with four wood screws.
  • the baseboards 4 and the planar wall elements 3 are hollow chamber profiles, which are preferably made in the extrusion process of PP-KV 40 (polypropylene with 40% chalk fractions).
  • the wall elements 3 have - as in particular FIG. 4 shows - cross-sectionally a rectangular outer shell 8, which are stiffened by diagonal webs 9 and transverse webs 10.
  • each wall element From the upper edge 11 of each wall element are two approximately rectangular hollow longitudinal profiles 12 from whose interspace a locking groove 13 for a likewise approximately rectangular hollow latching lug 14 of a wall element arranged above 3 forms.
  • the locking lug 14 has on the sides convex curvatures 15 which can engage elastically in concave inwardly directed bulges 16 of the longitudinal profiles 12.
  • the plate-shaped wall elements 2 are mitred at the lateral ends 17, so that the wall elements 3 can be seamlessly assembled into a rectangle.
  • the baseboards 4 have - as well as the wall elements 2 - formed between two approximately rectangular hollow sections 12 groove 13 into which the locking lugs 14 of the wall elements 2 can engage.
  • the bottom surface 18 of the baseboards 4 is wider than the wall thickness of the wall elements. 2
  • the earth pressure causes the frame elements to reliably maintain their rectangular shape, even though the miter surfaces are neither glued nor bolted together.
  • the wall elements 3 may be held at the corners of the frame members of corner connectors 19.
  • the corner connectors are preferably injection molded parts with vertical webs 20 arranged at right angles to each other, which are integrally connected at half height by a triangular flat plate 21.
  • longitudinal grooves 22 are formed, which are formed by two angled webs 23, between the ends of a slot 24 remains.
  • the corner connectors 19 are inserted with their vertical walls 20 at the corners in the merging grooves 22 of two wall elements 3. The corner connectors 19 prevent wall elements from folding outward before the completion of the installation of the shaft.
  • the wall elements may each have at least one, preferably two, chambers 25 in which reinforcing profiles (not shown) made of steel are inserted, which bear against the walls of the chambers.

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
EP12006152.8A 2011-10-25 2012-08-30 Cage Not-in-force EP2604758B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL12006152T PL2604758T3 (pl) 2011-10-25 2012-08-30 Studzienka

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102011116874.9A DE102011116874B4 (de) 2011-10-25 2011-10-25 Schacht

Publications (2)

Publication Number Publication Date
EP2604758A1 true EP2604758A1 (fr) 2013-06-19
EP2604758B1 EP2604758B1 (fr) 2014-04-09

Family

ID=46888876

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12006152.8A Not-in-force EP2604758B1 (fr) 2011-10-25 2012-08-30 Cage

Country Status (4)

Country Link
EP (1) EP2604758B1 (fr)
DE (1) DE102011116874B4 (fr)
DK (1) DK2604758T3 (fr)
PL (1) PL2604758T3 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3514287A1 (fr) 2018-01-19 2019-07-24 Langmatz GmbH Cadre pour une gouttière de câble
US20200217037A1 (en) * 2018-04-05 2020-07-09 Predl Systems North America Inc. Manhole Assembly

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10822766B1 (en) 2018-08-29 2020-11-03 Predl Systems North America Inc. Manhole saddle tee
US11374386B2 (en) 2018-10-26 2022-06-28 Afl Telecommunications Llc Foldable and/or collapsible plastic/composite utility enclosure
US11338524B1 (en) 2018-10-26 2022-05-24 Afl Telecommunications Llc Method of forming a foldable or collapsible plastic and/or composite utility enclosure
US11349281B1 (en) 2018-10-26 2022-05-31 Afl Telecommunications Llc Foldable and/or collapsible plastic/composite utility enclosure
US10968594B1 (en) 2018-11-20 2021-04-06 Predl Systems North America Inc. Manhole rehabilitation system
US11377863B1 (en) 2019-11-13 2022-07-05 Predl Systems North America Inc. Aggregate panel system
DE102022114132A1 (de) * 2022-06-03 2023-12-14 Langmatz Gmbh Schacht
DE102022114116A1 (de) * 2022-06-03 2023-12-14 Langmatz Gmbh Schacht

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2324324A (en) * 1997-03-05 1998-10-21 Mokhtar Kourgli An underground chamber
GB2325684A (en) * 1997-05-29 1998-12-02 Poletech Systems Ltd Flat pack box for access chamber
EP1881579A1 (fr) * 2006-07-21 2008-01-23 ROMOLD GmbH Chambre à câbles

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU3444797A (en) 1996-07-12 1998-02-09 Gorka Diaz Berango Modular dismountable box
DE202004018370U1 (de) 2004-11-26 2005-01-27 Optigrün international AG Kontrollschacht für ein Wasserleitsystem
GB2432169B (en) * 2005-11-09 2010-10-13 Uponor Innovation Ab Underground chamber and well member therefor
ITRA20080029U1 (it) * 2008-10-15 2010-04-16 Elettra Srl Pozzetto

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2324324A (en) * 1997-03-05 1998-10-21 Mokhtar Kourgli An underground chamber
GB2325684A (en) * 1997-05-29 1998-12-02 Poletech Systems Ltd Flat pack box for access chamber
EP1881579A1 (fr) * 2006-07-21 2008-01-23 ROMOLD GmbH Chambre à câbles

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3514287A1 (fr) 2018-01-19 2019-07-24 Langmatz GmbH Cadre pour une gouttière de câble
DE102018101153A1 (de) 2018-01-19 2019-07-25 Langmatz Gmbh Rahmen für einen Kabelschacht
US20200217037A1 (en) * 2018-04-05 2020-07-09 Predl Systems North America Inc. Manhole Assembly

Also Published As

Publication number Publication date
DE102011116874A1 (de) 2013-04-25
DE102011116874B4 (de) 2019-03-14
DK2604758T3 (da) 2014-07-14
PL2604758T3 (pl) 2014-09-30
EP2604758B1 (fr) 2014-04-09

Similar Documents

Publication Publication Date Title
EP2604758B1 (fr) Cage
DE102011117555A1 (de) Verfahren für mehrstufiges Fugenschutzsystem für Wandelemente aus Betonfertigteilen
DE10158215B4 (de) Verlegesystem für Bodenplatten
DE202013001849U1 (de) Holzbauelement
DE102007013188A1 (de) Verbindungssystem für einen mobilen Boden
DE3815140A1 (de) Fugenschalung fuer glasbauelemente, welche aus mehreren glaselementen, insbesondere glasbausteinen bestehen
EP3075908B1 (fr) Rainure de fente
DE102008053230B4 (de) Einrichtung zum Verbinden von Bauplatten, insbesondere Bodenpaneelen
DE102007030875B4 (de) Formbauteil aus Beton und Verfahren zur Herstellung eines solchen Formbauteils
EP1460177A2 (fr) Revêtement constitué de dalles en matière minérale
EP1911882A2 (fr) Système de fabrication d'un revêtement pour un toit, un sol ou analogue, sur lequel on peut marcher ou rouler.
DE202011109396U1 (de) Plattenförmige Elemente zur Verkleidung von Flächen
EP3377710B1 (fr) Joint de mur et élément en béton
EP2088240B1 (fr) Système et procédé de remplissage d'un joint entre un rail et une surface limitrophe
DE102005033834B4 (de) Holzständerwand
DE202013103285U1 (de) Dilatations- und Kontraktionsfugen bei Verkehrsflächen aus Beton
AT525399B1 (de) Tiefbauwerk für das Führen einer Leitung
DE10108705C2 (de) Sollrissfuge mit einem Fugenblech zur Beeinflussung der Rissbildung in aufgehenden Betonwänden
DE102012102515A1 (de) Wandelement
EP2937481B1 (fr) Élément de construction à isolation thermique
DE202010014071U1 (de) Systemverlegeplatte
DE202014004059U1 (de) Fertigkeller
DE2817874A1 (de) Hohlraumplattendecke aus vorgefertigten montagefaehigen stahlbeton- oder spannbetonfertigteilen
DE202019100789U1 (de) Dichtvorrichtung zur Anordnung in einer Laibung einer Gebäudeaußenwand unterhalb eines bodentiefen Fensters oder einer Tür
DE19513664A1 (de) Dämmelement zur schalldämmenden Lagerung von Gebäudeteilen

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20130717

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20140116

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 661446

Country of ref document: AT

Kind code of ref document: T

Effective date: 20140415

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502012000560

Country of ref document: DE

Effective date: 20140522

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

26 Opposition filed

Opponent name: ROMOLD GMBH

Effective date: 20140509

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: KIRKER AND CIE S.A., CH

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20140707

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 502012000560

Country of ref document: DE

Effective date: 20140509

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20140409

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

REG Reference to a national code

Ref country code: SK

Ref legal event code: T3

Ref document number: E 16644

Country of ref document: SK

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140809

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140709

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140710

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

REG Reference to a national code

Ref country code: HU

Ref legal event code: AG4A

Ref document number: E021241

Country of ref document: HU

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140811

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20150430

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140830

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140901

PLCK Communication despatched that opposition was rejected

Free format text: ORIGINAL CODE: EPIDOSNREJ1

REG Reference to a national code

Ref country code: DE

Ref legal event code: R100

Ref document number: 502012000560

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

PLBN Opposition rejected

Free format text: ORIGINAL CODE: 0009273

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: OPPOSITION REJECTED

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

27O Opposition rejected

Effective date: 20160409

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20160829

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20160826

Year of fee payment: 5

Ref country code: FI

Payment date: 20160819

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SK

Payment date: 20160825

Year of fee payment: 5

Ref country code: HU

Payment date: 20160830

Year of fee payment: 5

Ref country code: CZ

Payment date: 20160825

Year of fee payment: 5

Ref country code: SE

Payment date: 20160826

Year of fee payment: 5

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20160830

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160830

REG Reference to a national code

Ref country code: NO

Ref legal event code: MMEP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170831

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170830

Ref country code: HU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170831

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170830

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170831

REG Reference to a national code

Ref country code: SK

Ref legal event code: MM4A

Ref document number: E 16644

Country of ref document: SK

Effective date: 20170830

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170830

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170830

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140409

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20180813

Year of fee payment: 18

Ref country code: BE

Payment date: 20180821

Year of fee payment: 7

Ref country code: CH

Payment date: 20180830

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20190826

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20190816

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20190827

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20191022

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190831

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190831

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190831

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502012000560

Country of ref document: DE

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20200831

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20200901

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 661446

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200830

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200830

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210302

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190830