EP2455267B2 - Installation for conveying people and method for operating same - Google Patents

Installation for conveying people and method for operating same Download PDF

Info

Publication number
EP2455267B2
EP2455267B2 EP11450110.9A EP11450110A EP2455267B2 EP 2455267 B2 EP2455267 B2 EP 2455267B2 EP 11450110 A EP11450110 A EP 11450110A EP 2455267 B2 EP2455267 B2 EP 2455267B2
Authority
EP
European Patent Office
Prior art keywords
vehicle
coupled
rope
conveying rope
clamping devices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP11450110.9A
Other languages
German (de)
French (fr)
Other versions
EP2455267A1 (en
EP2455267B1 (en
Inventor
Johann Czaloun
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Innova Patent GmbH
Original Assignee
Innova Patent GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=44925467&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2455267(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Innova Patent GmbH filed Critical Innova Patent GmbH
Publication of EP2455267A1 publication Critical patent/EP2455267A1/en
Application granted granted Critical
Publication of EP2455267B1 publication Critical patent/EP2455267B1/en
Publication of EP2455267B2 publication Critical patent/EP2455267B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B9/00Tramway or funicular systems with rigid track and cable traction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B12/00Component parts, details or accessories not provided for in groups B61B7/00 - B61B11/00
    • B61B12/12Cable grippers; Haulage clips
    • B61B12/125Cable grippers; Haulage clips for non aerial ropeways, e.g. on or under the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B13/00Other railway systems
    • B61B13/12Systems with propulsion devices between or alongside the rails, e.g. pneumatic systems
    • B61B13/127Systems with propulsion devices between or alongside the rails, e.g. pneumatic systems the propulsion device consisting of stationary driving wheels

Definitions

  • the present invention relates to a system for transporting people with at least one lane, along which several vehicles or groups of vehicles can be moved by means of self-contained conveyor ropes, with at least two consecutive conveyor ropes being provided, each of which is assigned at least one drive, making them independent can be driven from one another and to which the vehicles or vehicle groups can be coupled by means of clamping devices.
  • the present patent application is based on the object of creating a system for transporting people in which it is not necessary to arrange two successive conveyor ropes next to one another in their end regions and to provide a transversely adjustable coupling device.
  • this is achieved in that the at least two successive conveyor ropes are arranged in the longitudinal direction of the system, at least approximately in a line, that the vehicles are designed with at least two clamping devices spaced apart from one another in the longitudinal direction of the system, and that a control device is provided , through which at the transition of a vehicle from one hoisting rope to the following hoisting rope at least the first clamping device located in the direction of travel is uncoupled from the first hoisting rope and then coupled to the following hoisting rope and subsequently the at least one further clamping device is also uncoupled from the first hoisting rope and then attached the following hoist rope is coupled.
  • the control device is preferably formed by a control rail, by means of which the clamping devices located on it are brought into their open position when the vehicle moves, whereby the vehicle is uncoupled from the first hoisting rope and subsequently coupled to the following hoisting rope.
  • the control rail can be designed with preferably wedge-shaped control ramps at both ends.
  • control ramps can preferably be pivoted and adjusted in height by means of adjusting devices.
  • each of the clamping devices is preferably assigned a control roller mounted on a control lever, which runs onto the control rail, whereby the clamping devices are brought into their open positions.
  • the vehicle is preferably brought to a standstill in the area of a control rail and the conveyor ropes are also stopped, whereupon control ramps are pivoted, whereby at least the first clamping device in the direction of movement of the vehicle is coupled to the conveyor cable and the following clamping devices are uncoupled from the first conveyor cable and becomes the following Conveyor rope driven, whereupon the other clamping devices are successively coupled to the following conveyor rope.
  • the two hoisting ropes can be driven at the same speeds, the individual clamping devices being successively uncoupled from the first hoisting rope and being coupled to the following hoisting rope by moving the vehicle over a control rail.
  • a self-contained hoisting rope 1 and a second self-contained hoisting rope 2 following this approximately in a straight line are provided in a system according to the invention for transporting people.
  • a system can have any number of successive hoisting ropes in each of the directions of travel.
  • the ends of the first hoisting rope 1 are laid over rope drums 10, which are rotatably mounted about an at least approximately horizontally aligned axis, the hoisting rope 1 having an upper run 11 and a lower run 12.
  • the second hoisting rope 2 is placed at its ends over rope drums 20, which also around a at least approximately horizontally aligned axles are rotatably mounted, the second hoisting rope 2 also having an upper strand 21 and a lower strand 22.
  • At least one of the cable drums 10 and 20 is assigned a drive, by means of which the two conveyor cables 1 and 2 can be moved.
  • the two upper strands 11 and 21 of the two conveyor ropes 1 and 2 are guided over rope support rollers 13 and 23.
  • the vehicles 3 By means of the two conveyor ropes 1 and 2, several vehicles 3 can be moved along a roadway.
  • the vehicles 3 are designed with several clamping devices 31, 32, 33, 34 and 35 arranged at a distance from one another in the direction of movement, which can be coupled to the respective upper cable strands 11 and 21 of the hoisting ropes 1 and 2, whereby the vehicles 3 in the direction of the arrow A are movable.
  • a device 4 for controlling the clamping devices 31 to 35 is also provided in the area of the transition of the vehicles 3 from the first hoisting rope 1 to the following hoisting rope 2.
  • the vehicle 3 is coupled to the upper cable run 11 of the first hoisting cable 1 by means of all coupling devices 31 to 35.
  • vehicle groups can also be provided.
  • the system has a track 5, which is preferably formed by two rails and along which at least one vehicle 3 can be moved.
  • a first hoisting rope 1 is provided, which at its end shown in the drawing is guided over a deflection drum 10 and over a deflection drum 10a.
  • This first hoisting rope 1 is followed in a straight line by a second hoisting rope 2 which, at its beginning shown in the drawing, is guided over a deflection drum 20 and a deflection drum 20a.
  • the two conveyor ropes 1 and 2 each have an upper rope run 11 and 21 and a lower rope run 12 and 22, respectively.
  • the vehicle 3 is designed with pairs of clamping devices 31, 32, 33, 34 and 35, by means of which it can be coupled to the respective upper run 11 or 21 of the two conveyor ropes 1 and 2.
  • a control rail 4 is provided, at the two ends of which control ramps 41 and 42 are provided which can be pivoted about horizontal axes 43a and 44a by means of actuating cylinders 43 and 44 assigned to them.
  • the vehicle 3 When the system is in operation, the vehicle 3 is moved in the direction of arrow A in the area of the transition between the two conveyor ropes 1 and 2.
  • Control rollers of the clamping devices 31 to 34 run successively over the first control ramp 41, which is in its lower pivot position, onto the control rail 4 and onto the second control ramp 42, which is in its upper pivot position, whereby the clamping devices 31 to 34 are brought into their open position and held in this, whereas the clamping device 35 remains coupled to the first hoisting rope 1.
  • the first hoisting rope 1 In this position of the vehicle 3, the first hoisting rope 1 is stopped.
  • the first control ramp 41 is then pivoted into its upper position, as a result of which the clamping devices 35 are also uncoupled from the first hoisting rope 1. This position is in the FIG.7 and FIG.7a shown.
  • the vehicle 3 is moved further in the direction of the arrow A.
  • the clamping devices 32 to 35 also successively move into their closed position, whereby the vehicle 3 is also coupled to the second hoisting rope 2 by means of the clamping devices 32 to 35.
  • the control rail 4 is formed at its beginning and at its end with fixed control ramps 41 and 42, by which the pairs of clamping devices 31 to 35 are controlled by the movement of the vehicles 3 over the control rail 4.
  • the two Conveyor ropes 1 and 2 driven at the same speed, the vehicle 3 being moved at the speed of the two conveyor ropes 1 and 2 during the transition from the first conveyor cable 1 to the second conveyor cable 2.
  • the clamping devices 31 to 35 When driving over the control rail 4, the clamping devices 31 to 35 are successively brought into their open position by the first control ramp 41, whereby they are uncoupled from the first hoisting rope 1, and they are held in the open position by the control rail 4. As soon as they come into the area of the second control ramp 42, they are brought back into the closed position, as a result of which the vehicle 3 is coupled to the second hoisting rope 2.
  • the two conveyor ropes 1 and 2 are moved synchronously.
  • the vehicle 3 can be stopped by switching off the drives for the hoisting ropes 1 and 2 in order to enable the passengers to get on or off.
  • At least one conveyor device 6 is provided by means of which the vehicle 3 is not yet connected to the second hoisting rope 2 at the stage in which it is uncoupled from the first hoisting rope 1 and not yet connected to the second hoisting rope 2 is coupled, as long as it is moved in the direction of arrow A until it is coupled to the second hoisting rope 2.
  • the conveying device is formed by two drive motors 61, by which at least one drive roller 63 is driven via wedge rims 62 and comes into effect on a drive surface 64 of the vehicle 3.
  • the clamping devices 31 to 35 located on the vehicle 3 are designed with a control lever 7 on which a control roller 71 is mounted.
  • the control roller 71 is under the action of a compression spring 72, by means of which the clamping devices 31 to 35 are brought into their closed position.
  • the control lever 7 is adjusted against the compression spring 72 so that the clamping devices 31 to 35 reach their open position, whereby the vehicle 3 is uncoupled from the conveyor ropes.
  • the vehicle 3 is designed with a vehicle frame 81, with running wheels 82 which roll on rails 51 and 52 of the roadway 5, with guide rollers 83 and with damping elements 84.

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Handcart (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
  • Chain Conveyers (AREA)

Description

Die gegenständliche Erfindung betrifft eine Anlage zur Beförderung von Personen mit mindestens einer Fahrbahn, längs welcher mittels in sich geschlossener Förderseile mehrere Fahrzeuge bzw. Fahrzeuggruppen verfahrbar sind, wobei mindestens zwei aufeinander folgende Förderseile vorgesehen sind, welchen jeweils mindestens ein Antrieb zugeordnet ist, wodurch sie unabhängig voneinander antreibbar sind, und an welche die Fahrzeuge bzw. Fahrzeuggruppen mittels Klemmeinrichtungen ankuppelbar sind.The present invention relates to a system for transporting people with at least one lane, along which several vehicles or groups of vehicles can be moved by means of self-contained conveyor ropes, with at least two consecutive conveyor ropes being provided, each of which is assigned at least one drive, making them independent can be driven from one another and to which the vehicles or vehicle groups can be coupled by means of clamping devices.

Bekannte derartige Anlagen zur Beförderung von Personen, welche z.B. aus der EP 611220 B1 und der EP 1193153 B1 oder der EP 0 461 098 A1 bekannt sind, weisen zwei Fahrbahnen auf, längs welcher Fahrzeuge mittels in sich geschlossener Förderseile, welchen Antriebe zugeordnet sind, verfahrbar sind. Da die Fahrzeuge an die diesen zugeordneten Förderseile angekuppelt sind, wird die Bewegung der Fahrzeuge durch die Antriebe der Förderseile gesteuert. Da die Länge dieser Förderseile mit maximal etwa 2000 m begrenzt ist, ist es weiters bekannt, in jeder der beiden Fahrtrichtungen aufeinander folgend mindestens zwei in sich geschlossene Förderseile vorzusehen. Hierdurch wird es einerseits ermöglicht, derartige Anlagen zur Beförderung von Personen mit beliebigen Längen auszubilden. Da die Fahrzeuge an die einzelnen Förderseile angekuppelt sind, ist es andererseits hierdurch auch möglich, die Bewegung der einzelnen Fahrzeuge unabhängig voneinander zu steuern. Durch Abstellen des Antriebes eines der Förderseile werden somit die an dieses Förderseil angekuppelten Fahrzeuge zum Stillstand gebracht, wodurch sie von Passagieren bestiegen oder verlassen werden können.Known such systems for the transport of people who, for example, from the EP 611220 B1 and the EP 1193153 B1 or the EP 0 461 098 A1 are known, have two lanes along which vehicles can be moved by means of self-contained conveyor ropes to which drives are assigned. Since the vehicles are coupled to the conveyor ropes assigned to them, the movement of the vehicles is controlled by the drives of the conveyor ropes. Since the length of these hoisting ropes is limited to a maximum of about 2000 m, it is also known to provide at least two self-contained hoisting ropes in each of the two directions of travel. This makes it possible, on the one hand, to design such systems for transporting people of any length. Since the vehicles are coupled to the individual conveyor ropes, this also makes it possible to control the movement of the individual vehicles independently of one another. By switching off the drive of one of the hoisting ropes, the vehicles coupled to this hoisting rope are brought to a standstill, so that passengers can get on or leave them.

Bei bekannten derartigen Anlagen besteht bei der Bewegung der Fahrzeuge das Erfordernis, diese jeweils an dem in Bewegungsrichtung befindlichen Ende eines Förderseiles von diesem abzukuppeln und sie an das nachfolgende Förderseil anzukuppeln. Um dies zu ermöglichen, ist es bekannt, die Endbereiche der beiden Förderseile nebeneinander anzuordnen und weiters die mindestens eine an den Fahrzeugen vorgesehene Klemmeinrichtung gegenüber der Bewegungsrichtung quer verstellbar auszubilden. Sobald das betreffende Fahrzeug an das Ende des ersten Förderseiles gelangt ist, wird es von dem ersten Förderseil abgekuppelt, wird weiters die Klemmeinrichtung quer zum Verlauf der beiden Förderseile verstellt und wird das Fahrzeug an das anschließende Förderseil angekuppelt, wodurch es in der Folge durch dieses Förderseil bewegt wird.In known systems of this type, when the vehicles are moving, it is necessary to uncouple them at the end of a conveyor rope located in the direction of movement and to couple them to the subsequent conveyor rope. In order to make this possible, it is known to arrange the end regions of the two conveyor ropes next to one another and, furthermore, to design the at least one clamping device provided on the vehicles to be transversely adjustable with respect to the direction of movement. As soon as the vehicle in question has reached the end of the first hoisting rope, it is uncoupled from the first hoisting rope, the clamping device is also adjusted transversely to the course of the two hoisting ropes and the vehicle is coupled to the subsequent hoisting rope, causing it to pass through this hoisting rope is moved.

Der gegenständlichen Patentanmeldung liegt die Aufgabe zugrunde, eine Anlage zur Beförderung von Personen zu schaffen, bei welcher es nicht erforderlich ist, zwei aufeinander folgende Förderseile in deren Endbereichen nebeneinander anzuordnen und eine quer verstellbare Kupplungseinrichtung vorzusehen. Dies wird erfindungsgemäß dadurch erzielt, dass die mindestens zwei aufeinander folgenden Förderseile in Längsrichtung der Anlage aufeinander folgend zumindest angenähert in einer Linie angeordnet sind, dass die Fahrzeuge mit mindestens zwei in Längsrichtung der Anlage voneinander im Abstand angeordneten Klemmeinrichtungen ausgebildet sind und dass eine Steuereinrichtung vorgesehen ist, durch welche beim Übergang eines Fahrzeuges von einem Förderseil auf das folgende Förderseil mindestens die in Fahrtrichtung befindliche erste Klemmeinrichtung vom ersten Förderseil abgekuppelt und hierauf an das folgende Förderseil angekuppelt wird und in weiterer Folge die mindestens eine weitere Klemmeinrichtung gleichfalls vom ersten Förderseil abgekuppelt und hierauf an das folgende Förderseil angekuppelt wird.The present patent application is based on the object of creating a system for transporting people in which it is not necessary to arrange two successive conveyor ropes next to one another in their end regions and to provide a transversely adjustable coupling device. According to the invention, this is achieved in that the at least two successive conveyor ropes are arranged in the longitudinal direction of the system, at least approximately in a line, that the vehicles are designed with at least two clamping devices spaced apart from one another in the longitudinal direction of the system, and that a control device is provided , through which at the transition of a vehicle from one hoisting rope to the following hoisting rope at least the first clamping device located in the direction of travel is uncoupled from the first hoisting rope and then coupled to the following hoisting rope and subsequently the at least one further clamping device is also uncoupled from the first hoisting rope and then attached the following hoist rope is coupled.

Vorzugsweise ist die Steuereinrichtung durch eine Steuerschiene gebildet, durch welche bei der Bewegung des Fahrzeuges die an diesem befindlichen Klemmeinrichtungen in ihre Offenstellung gebracht werden, wodurch das Fahrzeug vom ersten Förderseil abgekuppelt und in weiterer Folge an das folgende Förderseil angekuppelt wird. Dabei kann die Steuerschiene an ihren beiden Enden mit vorzugsweise keilförmig ausgebildeten Steuerrampen ausgebildet sein.The control device is preferably formed by a control rail, by means of which the clamping devices located on it are brought into their open position when the vehicle moves, whereby the vehicle is uncoupled from the first hoisting rope and subsequently coupled to the following hoisting rope. The control rail can be designed with preferably wedge-shaped control ramps at both ends.

Vorzugsweise sind weiters die beiden Steuerrampen verschwenkbar und mittels Stelleinrichtungen höhenverstellbar.Furthermore, the two control ramps can preferably be pivoted and adjusted in height by means of adjusting devices.

Weiters ist vorzugsweise den Klemmeinrichtungen jeweils eine an einem Steuerhebel gelagerte Steuerrolle zugeordnet, welche auf die Steuerschiene aufläuft, wodurch die Klemmeinrichtungen in ihre Offenstellungen gebracht werden.Furthermore, each of the clamping devices is preferably assigned a control roller mounted on a control lever, which runs onto the control rail, whereby the clamping devices are brought into their open positions.

Vorzugsweise wird das Fahrzeug im Bereich einer Steuerschiene zum Stillstand gebracht und werden weiters auch die Förderseile angehalten, worauf Steuerrampen verschwenkt werden, wodurch mindestens die in Bewegungsrichtung des Fahrzeuges erste Klemmeinrichtung an das Förderseil angekuppelt und die folgenden Klemmeinrichtungen vom ersten Förderseil abgekuppelt werden und wird das folgende Förderseil angetrieben, worauf die weiteren Klemmeinrichtungen aufeinanderfolgend an das folgende Förderseil angekuppelt werden. Alternativ dazu können die beiden Förderseile mit gleichen Geschwindigkeiten angetrieben werden, wobei durch die Bewegung des Fahrzeuges über eine Steuerschiene hinweg die einzelnen Klemmeinrichtungen aufeinander folgend vom ersten Förderseil abgekuppelt und an das folgende Förderseil angekuppelt werden.The vehicle is preferably brought to a standstill in the area of a control rail and the conveyor ropes are also stopped, whereupon control ramps are pivoted, whereby at least the first clamping device in the direction of movement of the vehicle is coupled to the conveyor cable and the following clamping devices are uncoupled from the first conveyor cable and becomes the following Conveyor rope driven, whereupon the other clamping devices are successively coupled to the following conveyor rope. Alternatively, the two hoisting ropes can be driven at the same speeds, the individual clamping devices being successively uncoupled from the first hoisting rope and being coupled to the following hoisting rope by moving the vehicle over a control rail.

Eine erfindungsgemäße Beförderungsanlage bzw. das Betriebsverfahren sind nachstehend anhand der Zeichnungen erläutert Es zeigen:

FIG.1
einen Abschnitt einer erfindungsgemäßen Anlage zur Beförderung von Personen, in einem ersten Stadium des Überganges eines Fahrzeuges von einem ersten Förderseil auf das nachfolgende Förderseil,
FIG.1a
den Schnitt nach der Linie Ia-Ia der FIG.1,
FIG.2
den Abschnitt der Anlage gemäß FIG.1, in einem zweiten Stadium des Überganges eines Fahrzeuges von einem ersten Förderseil auf das nachfolgende Förderseil,
FIG.2a
den Schnitt nach der Linie IIa-IIa der FIG.2,
FIG.2b
den Schnitt nach der Linie IIb-IIb der FIG.2,
FIG.3
den Abschnitt der Anlage gemäß FIG.1, in einem dritten Stadium des Überganges eines Fahrzeuges von einem ersten Förderseil auf das nachfolgende Förderseil,
FIG.3a
den Schnitt nach der Linie IIIa-IIIa der FIG.3,
FIG.3b
den Schnitt nach der Linie IIIb-IIIb der FIG.3,
FIG.4
den Abschnitt der Anlage gemäß FIG.1, in einem vierten Stadium des Überganges eines Fahrzeuges von einem ersten Förderseil auf das nachfolgende Förderseil,
FIG.4a
den Schnitt nach der Linie IVa-IVa der FIG.4,
FIG.5
eine erste Ausführungsform einer Einrichtung zur Steuerung der Klemmeinrichtungen in einer erfindungsgemäßen Anlage, in einem ersten Stadium des Kupplungsvorganges, in Seitenansicht,
FIG.5a
die Einrichtung gemäß FIG.5, in gegenüber der FIG.5 vergrößertem Maßstab,
FIG.6
die Einrichtung gemäß FIG.5 in einem zweiten Stadium des Kupplungsvorganges, in Seitenansicht,
FIG.6a
die Einrichtung gemäß FIG.6, in gegenüber der FIG.6 vergrößertem Maßstab,
FIG.7
die Einrichtung gemäß FIG.5, in einem dritten Stadium des Kupplungsvorganges, in Seitenansicht,
FIG.7a
die Einrichtung gemäß FIG.7, in gegenüber der FIG.7 vergrößertem Maßstab,
FIG.8, FIG.8a, FIG.8b
eine zweite Ausführungsform einer Einrichtung zur Steuerung der Klemmeinrichtungen in einer erfindungsgemäßen Anlage, in drei aufeinander folgenden Stadien des Kupplungsvorganges, in Seitenansicht,
FIG.9
eine Ausführungsform einer Einrichtung zur Steuerung der Klemmeinrichtungen, in einer nicht erfindungsgemäßen Anlage, in Seitenansicht,
FIG.9a
die Einrichtung gemäß FIG.9, in gegenüber FIG.9 vergrößertem Maßstab,
FIG.10, FIG.10a
Querschnitte durch die Einrichtung zur Steuerung der Klemmeinrichtungen der Ausführungsformen gemäß den FIG.5 bis FIG.9a.
A conveyor system according to the invention and the operating method are explained below with reference to the drawings.
FIG.1
a section of a system according to the invention for the transport of people, in a first stage of the transition of a vehicle from a first hoisting rope to the following hoisting rope,
FIG.1a
the section along the line Ia-Ia of FIG.1 ,
FIG.2
the section of the system according to FIG.1 , in a second stage of the transition of a vehicle from a first hoisting rope to the following hoisting rope,
FIG.2a
the section along the line IIa-IIa of FIG.2 ,
FIG.2b
the section along the line IIb-IIb of FIG.2 ,
FIG.3
the section of the system according to FIG.1 , in a third stage of the transition of a vehicle from a first hoisting rope to the following hoisting rope,
FIG.3a
the section along the line IIIa-IIIa of the FIG.3 ,
FIG.3b
the section along the line IIIb-IIIb of FIG.3 ,
FIG.4
the section of the system according to FIG.1 , in a fourth stage of the transition of a vehicle from a first hoisting rope to the following hoisting rope,
FIG.4a
the section along the line IVa-IVa of the FIG.4 ,
FIG.5
a first embodiment of a device for controlling the clamping devices in a system according to the invention, in a first stage of the coupling process, in side view,
FIG.5a
the facility according to FIG.5 , in opposite of the FIG.5 enlarged scale,
FIG.6
the facility according to FIG.5 in a second stage of the coupling process, in side view,
FIG.6a
the facility according to FIG.6 , in opposite of the FIG.6 enlarged scale,
FIG.7
the facility according to FIG.5 , in a third stage of the coupling process, in side view,
FIG.7a
the facility according to FIG.7 , in opposite of the FIG.7 enlarged scale,
FIG.8, FIG.8a, FIG.8b
a second embodiment of a device for controlling the clamping devices in a system according to the invention, in three successive stages of the coupling process, in side view,
FIG.9
an embodiment of a device for controlling the clamping devices, in a system not according to the invention, in side view,
FIG.9a
the facility according to FIG.9 , in opposite FIG.9 enlarged scale,
FIG.10, FIG.10a
Cross-sections through the device for controlling the clamping devices of the embodiments according to FIGS FIG.5 to FIG.9a .

Wie dies aus den FIG.1 bis FIG.4 ersichtlich ist, sind bei einer erfindungsgemäßen Anlage zur Beförderung von Personen ein in sich geschlossenes Förderseil 1 und ein angenähert in gerader Linie an dieses folgendes zweites in sich geschlossenes Förderseil 2 vorgesehen. Eine derartige Anlage kann in jeder der Fahrtrichtungen eine beliebige Anzahl von aufeinander folgenden Förderseilen aufweisen.Like this from the FIG. 1 to FIG. 4 As can be seen, a self-contained hoisting rope 1 and a second self-contained hoisting rope 2 following this approximately in a straight line are provided in a system according to the invention for transporting people. Such a system can have any number of successive hoisting ropes in each of the directions of travel.

Das erste Förderseil 1 ist an seinen Enden über Seiltrommeln 10 gelegt, welche um eine zumindest angenähert horizontal ausgerichtete Achse verdrehbar gelagert sind, wobei das Förderseil 1 ein oberes Trum 11 und ein unteres Trum 12 aufweist. Das zweite Förderseil 2 ist an seinen Enden über Seiltrommeln 20 gelegt, welche gleichfalls um eine zumindest angenähert horizontal ausgerichtete Achse verdrehbar gelagert sind, wobei auch das zweite Förderseil 2 ein oberes Trum 21 und ein unteres Trum 22 aufweist. Zumindest einer der Seiltrommeln 10 und 20 ist jeweils ein Antrieb zugeordnet, durch welche die beiden Förderseile 1 und 2 bewegbar sind. Die beiden oberen Trume 11 und 21 der beiden Förderseile 1 und 2 sind über Seiltragrollen 13 und 23 geführt. Mittels der beiden Förderseile 1 und 2 sind längs einer Fahrbahn mehrere Fahrzeuge 3 verfahrbar. Hierfür sind die Fahrzeuge 3 mit mehreren in Bewegungsrichtung im Abstand voneinander angeordneten Klemmeinrichtungen 31, 32, 33, 34 und 35 ausgebildet, welche an die jeweils oberen Seiltrume 11 und 21 der Förderseile 1 und 2 ankuppelbar sind, wodurch die Fahrzeuge 3 in Richtung des Pfeiles A verfahrbar sind. Im Bereich des Überganges der Fahrzeuge 3 vom ersten Förderseil 1 auf das folgende Förderseil 2 ist weiters eine Einrichtung 4 zur Steuerung der Klemmeinrichtungen 31 bis 35 vorgesehen.The ends of the first hoisting rope 1 are laid over rope drums 10, which are rotatably mounted about an at least approximately horizontally aligned axis, the hoisting rope 1 having an upper run 11 and a lower run 12. The second hoisting rope 2 is placed at its ends over rope drums 20, which also around a at least approximately horizontally aligned axles are rotatably mounted, the second hoisting rope 2 also having an upper strand 21 and a lower strand 22. At least one of the cable drums 10 and 20 is assigned a drive, by means of which the two conveyor cables 1 and 2 can be moved. The two upper strands 11 and 21 of the two conveyor ropes 1 and 2 are guided over rope support rollers 13 and 23. By means of the two conveyor ropes 1 and 2, several vehicles 3 can be moved along a roadway. For this purpose, the vehicles 3 are designed with several clamping devices 31, 32, 33, 34 and 35 arranged at a distance from one another in the direction of movement, which can be coupled to the respective upper cable strands 11 and 21 of the hoisting ropes 1 and 2, whereby the vehicles 3 in the direction of the arrow A are movable. In the area of the transition of the vehicles 3 from the first hoisting rope 1 to the following hoisting rope 2, a device 4 for controlling the clamping devices 31 to 35 is also provided.

Beim Betrieb einer derartigen Anlage werden bei der Bewegung der Fahrzeuge 3 bei deren Übergang vom ersten Förderseil 1 auf das zweite Förderseil 2 aufeinander folgend die Klemmeinrichtungen 31 bis 35 geöffnet, wodurch sie vom oberen Trum 11 des ersten Förderseiles 1 abgekuppelt werden und werden sie aufeinander folgend wieder geschlossen, wodurch sie an das obere Trum 21 des zweiten Förderseiles 2 angekuppelt werden, wodurch die Fahrzeuge 3 vorerst durch das erste Förderseil 1 und in der Folge durch das zweite Förderseil 2 bewegt werden.In the operation of such a system, when the vehicles 3 move from the first hoisting rope 1 to the second hoisting rope 2, the clamping devices 31 to 35 are opened one after the other, as a result of which they are uncoupled from the upper run 11 of the first hoisting rope 1 and become one after the other closed again, whereby they are coupled to the upper run 21 of the second hoisting rope 2, whereby the vehicles 3 are initially moved by the first hoisting rope 1 and then by the second hoisting rope 2.

Bei der in FIG.1 dargestellten Betriebsphase ist das Fahrzeug 3 mittels sämtlicher Kupplungseinrichtungen 31 bis 35 an das obere Seiltrum 11 des ersten Förderseiles 1 angekuppelt.At the in FIG.1 In the operating phase shown, the vehicle 3 is coupled to the upper cable run 11 of the first hoisting cable 1 by means of all coupling devices 31 to 35.

Bei der in FIG.2 dargestellten Betriebsphase sind die Klemmeinrichtungen 31 bis 33 durch die Steuereinrichtung 4 nacheinander geöffnet worden, wogegen die Klemmeinrichtungen 34 und 35 weiterhin an das obere Seiltrum 11 des Förderseiles 1 angekuppelt sind.At the in FIG.2 The operating phase shown, the clamping devices 31 to 33 have been opened one after the other by the control device 4, whereas the clamping devices 34 and 35 are still coupled to the upper cable strand 11 of the hoisting cable 1.

Bei der in FIG.3 dargestellten Betriebsphase sind bei der weiteren Bewegung des Fahrzeuges 3 die Klemmeinrichtungen 31 bis 34 nacheinander an das obere Seiltrum 21 des zweiten Förderseiles 2 angekuppelt worden und ist die Klemmeinrichtung 35 geöffnet worden, wodurch das Fahrzeug 3 an das obere Trum 21 des zweiten Förderseiles 2 angekuppelt ist und vom oberen Trum 11 desr ersten Förderseiles 1 abgekuppelt ist.At the in FIG.3 During the further movement of the vehicle 3, the clamping devices 31 to 34 were successively coupled to the upper strand 21 of the second hoisting rope 2 and the clamping device 35 was opened, whereby the vehicle 3 is coupled to the upper strand 21 of the second hoisting rope 2 and is uncoupled from the upper run 11 of the first hoisting rope 1.

Bei der in FIG.4 dargestellten Betriebsphase sind sämtliche Klemmeinrichtungen 31 bis 35 geschlossen worden, wodurch das Fahrzeug 3 mittels sämtlicher Klemmeinrichtungen 31 bis 35 an das obere Trum 21 des zweiten Förderseiles 2 angekuppelt ist und durch dieses bewegt wird.At the in FIG.4 operating phase shown, all clamping devices 31 to 35 have been closed, whereby the vehicle 3 is coupled by means of all clamping devices 31 to 35 to the upper run 21 of the second conveyor rope 2 and is moved by this.

Anstelle von einzelnen Fahrzeugen können auch Fahrzeuggruppen vorgesehen sein.Instead of individual vehicles, vehicle groups can also be provided.

Nachstehend ist eine erste Ausführungsform einer erfindungsgemäßen Anlage näher erläutert.A first embodiment of a system according to the invention is explained in more detail below.

Wie dies aus den FIG.5 und FIG.5a ersichtlich ist, weist die Anlage eine Bahn 5 auf, welche vorzugsweise durch zwei Schienen gebildet ist und längs welcher mindestens ein Fahrzeug 3 verfahrbar ist. Hierfür ist ein erstes Förderseil 1 vorgesehen, welches an seinem in der Zeichnung dargestellten Ende über eine Umlenktrommel 10 und über eine Ablenktrommel 10a geführt ist. An dieses erste Förderseil 1 schließt in gerader Linie ein zweites Förderseil 2 an, welches an seinem in der Zeichnung dargestellten Anfang über eine Umlenktrommel 20 und über eine Ablenktrommel 20a geführt ist. Die beiden Förderseile 1 und 2 weisen jeweils ein oberes Seiltrum 11 bzw. 21 und ein unteres Seiltrum 12 bzw. 22 auf. Das Fahrzeug 3 ist mit Paaren von Klemmeinrichtungen 31, 32, 33, 34 und 35 ausgebildet, mittels welcher es an das jeweils obere Trum 11 bzw. 21 der beiden Förderseile 1 und 2 ankuppelbar ist. Zur Betätigung der Klemmeinrichtungen 31 bis 35 ist eine Steuerschiene 4 vorgesehen, an deren beiden Enden Steuerrampen 41 und 42 vorgesehen sind, welche mittels diesen zugeordneten Stellzylindern 43 und 44 um horizontale Achsen 43a und 44a verschwenkbar sind.Like this from the FIG.5 and FIG.5a As can be seen, the system has a track 5, which is preferably formed by two rails and along which at least one vehicle 3 can be moved. For this purpose, a first hoisting rope 1 is provided, which at its end shown in the drawing is guided over a deflection drum 10 and over a deflection drum 10a. This first hoisting rope 1 is followed in a straight line by a second hoisting rope 2 which, at its beginning shown in the drawing, is guided over a deflection drum 20 and a deflection drum 20a. The two conveyor ropes 1 and 2 each have an upper rope run 11 and 21 and a lower rope run 12 and 22, respectively. The vehicle 3 is designed with pairs of clamping devices 31, 32, 33, 34 and 35, by means of which it can be coupled to the respective upper run 11 or 21 of the two conveyor ropes 1 and 2. To actuate the clamping devices 31 to 35, a control rail 4 is provided, at the two ends of which control ramps 41 and 42 are provided which can be pivoted about horizontal axes 43a and 44a by means of actuating cylinders 43 and 44 assigned to them.

Im Betrieb der Anlage wird das Fahrzeug 3 in den Bereich des Überganges der beiden Förderseile 1 und 2 in Richtung des Pfeiles A bewegt. Dabei laufen Steuerrollen der Klemmeinrichtungen 31 bis 34 aufeinander folgend über die erste Steuerrampe 41, welche sich in ihrer unteren Schwenklage befindet, auf die Steuerschiene 4 und auf die zweite Steuerrampe 42, welche sich in ihrer oberen Schwenklage befindet, auf, wodurch die Klemmeinrichtungen 31 bis 34 in ihre Offenstellung gebracht und in dieser gehalten werden, wogegen die Klemmeinrichtung 35 an das erste Förderseil 1 angekuppelt bleibt. In dieser Stellung des Fahrzeuges 3 wird das erste Förderseil 1 angehalten.When the system is in operation, the vehicle 3 is moved in the direction of arrow A in the area of the transition between the two conveyor ropes 1 and 2. Control rollers of the clamping devices 31 to 34 run successively over the first control ramp 41, which is in its lower pivot position, onto the control rail 4 and onto the second control ramp 42, which is in its upper pivot position, whereby the clamping devices 31 to 34 are brought into their open position and held in this, whereas the clamping device 35 remains coupled to the first hoisting rope 1. In this position of the vehicle 3, the first hoisting rope 1 is stopped.

Es ist dies diejenige Stellung, welche in den FIG.5 und FIG.5a dargestellt ist.This is the position which is in the FIG.5 and FIG.5a is shown.

In weiterer Folge wird die zweite Steuerrampe 42 der Steuerschiene 4 in ihre untere Schwenklage verschwenkt, wodurch die Klemmeinrichtungen 31 von ihrer Offenstellung in ihre Schließstellung gelangen, wodurch das Fahrzeug 3 an das zweite Förderseil 2, welches gleichfalls nicht bewegt wird, angekuppelt wird. Diese Stellung ist in den FIG.6 und FIG.6a dargestellt.Subsequently, the second control ramp 42 of the control rail 4 is pivoted into its lower pivot position, whereby the clamping devices 31 move from their open position to their closed position, whereby the vehicle 3 is coupled to the second hoisting rope 2, which is also not moved. This position is in the FIG.6 and FIG.6a shown.

In weiterer Folge wird die erste Steuerrampe 41 in ihre obere Lage verschwenkt, wodurch auch die Klemmeinrichtungen 35 vom ersten Förderseil 1 abgekuppelt werden. Diese Stellung ist in den FIG.7 und FIG.7a dargestellt.The first control ramp 41 is then pivoted into its upper position, as a result of which the clamping devices 35 are also uncoupled from the first hoisting rope 1. This position is in the FIG.7 and FIG.7a shown.

Sobald hierauf das zweite Förderseil 2 wieder angetrieben wird, wird das Fahrzeug 3 in Richtung des Pfeiles A weiter bewegt. Hierauf gelangen aufeinander folgend auch die Klemmeinrichtungen 32 bis 35 in ihre Schließstellung, wodurch das Fahrzeug 3 auch mittels der Klemmeinrichtungen 32 bis 35 an das zweite Förderseil 2 angekuppelt wird. Bei der in den FIG.8, FIG.8a und FIG.8b dargestellten zweiten Ausführungsform ist die Steuerschiene 4 an ihrem Anfang und an ihrem Ende mit festen Steuerrampen 41 und 42 ausgebildet, durch welche die Paare der Klemmeinrichtungen 31 bis 35 durch die Bewegung der Fahrzeuge 3 über die Steuerschiene 4 gesteuert werden. Hierbei werden die beiden Förderseile 1 und 2 mit gleicher Geschwindigkeit angetrieben, wobei das Fahrzeug 3 beim Übergang vom ersten Förderseil 1 auf das zweite Förderseil 2 mit der Geschwindigkeit der beiden Förderseile 1 und 2 verfahren wird. Beim Überfahren der Steuerschiene 4 werden die Klemmeinrichtungen 31 bis 35 aufeinander folgend durch die erste Steuerrampe 41 in ihre Offenstellung gebracht, wodurch sie vom ersten Förderseil 1 abgekuppelt werden, und werden sie durch die Steuerschiene 4 in der Offenstellung gehalten. Sobald sie in den Bereich der zweiten Steuerrampe 42 gelangen, werden sie wieder in die Schließstellung gebracht, wodurch das Fahrzeug 3 an das zweite Förderseil 2 angekuppelt wird.As soon as the second hoisting rope 2 is driven again, the vehicle 3 is moved further in the direction of the arrow A. Thereupon the clamping devices 32 to 35 also successively move into their closed position, whereby the vehicle 3 is also coupled to the second hoisting rope 2 by means of the clamping devices 32 to 35. In the FIG.8, FIG.8a and FIG.8b The second embodiment shown, the control rail 4 is formed at its beginning and at its end with fixed control ramps 41 and 42, by which the pairs of clamping devices 31 to 35 are controlled by the movement of the vehicles 3 over the control rail 4. Here the two Conveyor ropes 1 and 2 driven at the same speed, the vehicle 3 being moved at the speed of the two conveyor ropes 1 and 2 during the transition from the first conveyor cable 1 to the second conveyor cable 2. When driving over the control rail 4, the clamping devices 31 to 35 are successively brought into their open position by the first control ramp 41, whereby they are uncoupled from the first hoisting rope 1, and they are held in the open position by the control rail 4. As soon as they come into the area of the second control ramp 42, they are brought back into the closed position, as a result of which the vehicle 3 is coupled to the second hoisting rope 2.

Bei dieser Ausführungsform ist es zwingend erforderlich, dass die beiden Förderseile 1 und 2 synchron bewegt werden. Das Fahrzeug 3 kann auch bei dieser Ausführungsform durch Abschalten der Antriebe für die Förderseile 1 und 2 angehalten werden, um ein Einsteigen bzw. Aussteigen der Passagiere zu ermöglichen.In this embodiment it is imperative that the two conveyor ropes 1 and 2 are moved synchronously. In this embodiment too, the vehicle 3 can be stopped by switching off the drives for the hoisting ropes 1 and 2 in order to enable the passengers to get on or off.

Bei der in den FIG.9 und FIG.9a dargestellten nicht erfindungsgemäßen Ausführungsform ist im Bereich des Überganges vom ersten Förderseil 1 auf das zweite Förderseil 2 mindestens eine Fördereinrichtung 6 vorgesehen, mittels welcher das Fahrzeug 3 in demjenigen Stadium, in welchem es vom ersten Förderseil 1 abgekuppelt ist und an das zweite Förderseil 2 noch nicht angekuppelt ist, solang in Richtung des Pfeiles A bewegt wird, bis es an das zweite Förderseil 2 angekuppelt ist. Die Fördereinrichtung ist durch zwei Antriebsmotoren 61 gebildet, durch welche über Keilrimenen 62 mindestens eine Antriebsrolle 63 angetrieben wird, welche an einer Antriebsfläche 64 des Fahrzeuges 3 zur Wirkung kommt.In the FIG.9 and FIG.9a In the area of the transition from the first hoisting rope 1 to the second hoisting rope 2, at least one conveyor device 6 is provided by means of which the vehicle 3 is not yet connected to the second hoisting rope 2 at the stage in which it is uncoupled from the first hoisting rope 1 and not yet connected to the second hoisting rope 2 is coupled, as long as it is moved in the direction of arrow A until it is coupled to the second hoisting rope 2. The conveying device is formed by two drive motors 61, by which at least one drive roller 63 is driven via wedge rims 62 and comes into effect on a drive surface 64 of the vehicle 3.

Wie dies aus den FIG.10 und FIG.10a ersichtlich ist, sind die am Fahrzeug 3 befindlichen Klemmeinrichtungen 31 bis 35 mit einem Steuerhebel 7 ausgebildet, an welchem eine Steuerrolle 71 gelagert ist. Die Steuerrolle 71 steht unter Wirkung einer Druckfeder 72, durch welche die Klemmeinrichtungen 31 bis 35 in ihre Schließstellung gebracht werden. Sobald die Steuerrolle 71 auf die Steuerschiene 4 aufläuft, wird der Steuerhebel 7 entgegen der Druckfeder 72 so verstellt, dass die Klemmeinrichtungen 31 bis 35 in ihre Offenstellung gelangen, wodurch das Fahrzeug 3 von den Förderseilen abgekuppelt wird.Like this from the FIG.10 and FIG.10a As can be seen, the clamping devices 31 to 35 located on the vehicle 3 are designed with a control lever 7 on which a control roller 71 is mounted. The control roller 71 is under the action of a compression spring 72, by means of which the clamping devices 31 to 35 are brought into their closed position. As soon as the control roller 71 runs onto the control rail 4, the control lever 7 is adjusted against the compression spring 72 so that the clamping devices 31 to 35 reach their open position, whereby the vehicle 3 is uncoupled from the conveyor ropes.

Das Fahrzeug 3 ist mit einem Fahrzeuggestell 81, mit Laufrädern 82, welche auf Schienen 51 und 52 der Fahrbahn 5 abrollen, mit Führungsrollen 83 und mit Dämpfungselementen 84 ausgebildet. The vehicle 3 is designed with a vehicle frame 81, with running wheels 82 which roll on rails 51 and 52 of the roadway 5, with guide rollers 83 and with damping elements 84.

Claims (5)

  1. An arrangement for transporting persons comprising at least one track, along which a plurality of vehicles (3) or vehicle groups, respectively, can be displaced by means of a plurality of self -contained conveying cables (1, 2), wherein provision is made for at least two consecutive conveying cables (1, 2), to which at least one drive is assigned in each case, by means of which they can be driven independent from one another, and to which the vehicles (3) or vehicle groups, respectively, can be coupled by means of clamping devices (31 to 35), characterized in that the at least two consecutive conveying ropes (1, 2) are arranged in longitudinal direction of the arrangement so as to follow one another and so as to be at least approximately arranged in a line, that the vehicles (3) or vehicle groups, respectively, are embodied with at least two clamping devices (31 to 35), which are arranged in longitudinal direction of the arrangement at a distance from one another and that provision is made for a control device (4), by means of which at least the first clamping device (31), which is located in driving direction (A), is uncoupled from the first conveying rope (1) in response to the transition of a vehicle (3) from a first conveying rope (1) to the following conveying rope (2) and is hereupon coupled to the following conveying rope (2) and the at least one further clamping device (32 to 35) is furthermore uncoupled from the first conveying rope (1) and is hereupon coupled to the following conveying rope (2) and that at the transition of a vehicle (3) from the first conveying rope (1) to the following conveying rope (2) at the same time at least one clamping device (32 to 35) is coupled to the first conveying rope (1) and at least one clamping device (31) is coupled to the following conveying rope (2).
  2. The arrangement according to patent claim 1, characterized in that the control device is formed by means of a guide rail (4), by means of which, in response to the movement of the vehicle (3), the clamping devices (31 to 35), which are located on said vehicle, are brought into their open position, whereby the vehicle (3) is uncoupled from a first conveying rope (1) and is subsequently coupled to the following conveying rope (2).
  3. The arrangement according to patent claim 2, characterized in that, at both of its ends, the guide rail (4) is embodied with control ramps (41, 42), which are preferably embodied in a wedge-shaped manner.
  4. The arrangement according to patent claim 3, characterized in that the two control ramps (41, 42) are pivotable and are height-adjustable by means of control devices (43, 44).
  5. The arrangement according to one of patent claims 2 to 4, characterized in that a control roller (71), which is supported on a control lever (7) and which runs onto the guide rail (4), is in each case assigned to the clamping devices (31 to 35), whereby the clamping devices (31 to 35) are brought into their open positions.
EP11450110.9A 2010-11-22 2011-09-01 Installation for conveying people and method for operating same Active EP2455267B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT19312010 2010-11-22

Publications (3)

Publication Number Publication Date
EP2455267A1 EP2455267A1 (en) 2012-05-23
EP2455267B1 EP2455267B1 (en) 2013-10-30
EP2455267B2 true EP2455267B2 (en) 2020-11-11

Family

ID=44925467

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11450110.9A Active EP2455267B2 (en) 2010-11-22 2011-09-01 Installation for conveying people and method for operating same

Country Status (5)

Country Link
US (1) US8418625B2 (en)
EP (1) EP2455267B2 (en)
AT (1) AT12658U8 (en)
CA (1) CA2757983C (en)
ES (1) ES2435016T5 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT12658U8 (en) * 2010-10-22 2012-11-15 Innova Patent Gmbh APPARATUS FOR TRANSPORTING PERSONS AND METHOD FOR OPERATING THIS APPENDIX
AT12659U1 (en) * 2010-11-22 2012-09-15 Innova Patent Gmbh ANNEX TO TRANSPORT PERSONS
FR2993227B1 (en) * 2012-07-10 2015-10-30 Pomagalski Sa CABLE TRANSPORTATION INSTALLATION
ITMI20130609A1 (en) * 2013-04-12 2014-10-13 Rolic Internat S A R L TROLLEY FOR ROPE TRANSPORTATION SYSTEMS AND ROPE TRANSPORTATION SYSTEM INCLUDING THIS TROLLEY
FR3013298B1 (en) * 2013-11-15 2017-08-25 Philippe Berthet-Rambaud DEVICE FOR ATTACHING A VEHICLE TO A DEVICE FOR DRIVING A TRANSPORT LINE
US10118629B2 (en) 2016-08-25 2018-11-06 Jordan Kinkead High speed transportation system
IT201600088960A1 (en) * 2016-09-01 2018-03-01 Leitner Spa ROPE TRANSPORTATION SYSTEM FOR THE TRANSPORT OF PERSONS AND METHOD TO OPERATE THIS SYSTEM
FR3069512B1 (en) * 2017-07-27 2019-08-23 Vinci Construction CABLE OR SIMILAR TRANSPORTATION SYSTEM, AND VEHICLE SUITABLE FOR SUCH INSTALLATION
US11097750B2 (en) * 2017-12-22 2021-08-24 Leitner S.P.A. Cable transportation system and method for transporting people or goods and clamp for a vehicle of a cable transportation system
CN111517050B (en) * 2019-02-03 2023-05-02 北京京东乾石科技有限公司 Transport vehicle and transmission device thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61138763A (en) 1984-12-11 1986-06-26 金井 宏之 Interior material
DE4133052A1 (en) 1991-08-19 1993-05-13 Wolf Von Bodisco Overhead railway suspended on steel rail - has all cabins stopping simultaneously at halt points and driven by draw cable loops
EP0687607A1 (en) 1994-06-16 1995-12-20 LEITNER S.p.A. Funicular system of rail and running cable type, in particular for urban transport, of the type in which the vehicles are provided with a movable jaw clamp for their coupling to and release from said running cable
EP1088729A1 (en) 1999-10-01 2001-04-04 High Technology Investments B.V. Constrained guide urban transport system

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH493353A (en) * 1968-07-08 1970-07-15 Von Roll Ag Device for clamping a transport device to a pull rope and for indicating an insufficient clamping connection
US3871303A (en) * 1974-02-25 1975-03-18 Goodyear Tire & Rubber Transportation system
FR2337067A1 (en) * 1975-12-31 1977-07-29 Poma 2000 Sa OWN SITE TRANSPORT INSTALLATION WITH TRIPLE CLAMP FOR COUPLING VEHICLES TO TRACTOR CABLES
FR2571675B1 (en) * 1984-10-15 1988-03-18 Pomagalski Sa MULTI-SECTION AIR CABLE TRANSPORTATION SYSTEM
JPS61138763U (en) * 1985-02-19 1986-08-28
EP0461098A1 (en) * 1990-06-06 1991-12-11 KONRAD DOPPELMAYR & SOHN MASCHINENFABRIK GESELLSCHAFT M.B.H. & CO. KG. Installation for transporting persons or goods
FR2701242B1 (en) * 1993-02-08 1995-04-28 Pomagalski Sa Transport facility on its own site for several track sections.
US5406891A (en) * 1993-02-16 1995-04-18 Zygmunt Alexander Kunczynski Funicular system including haul rope grip assembly
FR2715006B1 (en) * 1994-01-13 1996-03-29 Pomagalski Sa Transport installation with two overhead cables.
AT402629B (en) * 1994-03-23 1997-07-25 Doppelmayr & Sohn SYSTEM FOR THE TRANSPORT OF PERSONS AND / OR OF SYSTEM FOR THE TRANSPORT OF PERSONS AND / OR GOODS
US5445081A (en) * 1994-04-13 1995-08-29 Yantrak, Llc Transit system employing a traction belt
FR2719011B1 (en) * 1994-04-22 1996-07-12 Pomagalski Sa Transport installation with tractor cable and on-board engine.
FR2814713B1 (en) 2000-10-02 2003-02-28 Poma Otis Systemes De Transp INSTALLATION FOR MOVING TOWED VEHICLES BY CABLE
AT12658U8 (en) * 2010-10-22 2012-11-15 Innova Patent Gmbh APPARATUS FOR TRANSPORTING PERSONS AND METHOD FOR OPERATING THIS APPENDIX

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61138763A (en) 1984-12-11 1986-06-26 金井 宏之 Interior material
DE4133052A1 (en) 1991-08-19 1993-05-13 Wolf Von Bodisco Overhead railway suspended on steel rail - has all cabins stopping simultaneously at halt points and driven by draw cable loops
EP0687607A1 (en) 1994-06-16 1995-12-20 LEITNER S.p.A. Funicular system of rail and running cable type, in particular for urban transport, of the type in which the vehicles are provided with a movable jaw clamp for their coupling to and release from said running cable
EP1088729A1 (en) 1999-10-01 2001-04-04 High Technology Investments B.V. Constrained guide urban transport system

Non-Patent Citations (11)

* Cited by examiner, † Cited by third party
Title
Auszug aus Wikipedia
Eidesstattliche Versicherung Hr. Conte
Englische Übersetzung von D4-1
Englische Übersetzung von D5-3
Englische Übersetzung von D5-5
Interfacciamento con limiti di certificatione e di impiego
Konstruktionszeichnung Nr. 81-00738
Konstruktionszeichnung Nr. 81-00799
Konstruktionszeichnung Nr. 82-00866
Offenkundige Vorbenutzung welche folgende Dokumente umfasst:
Verbale delle verifiche e prove funzionali per L'apertura al publico esercizio

Also Published As

Publication number Publication date
ES2435016T3 (en) 2013-12-18
US20120125223A1 (en) 2012-05-24
AT12658U8 (en) 2012-11-15
US8418625B2 (en) 2013-04-16
EP2455267A1 (en) 2012-05-23
ES2435016T5 (en) 2021-08-05
CA2757983C (en) 2015-12-29
EP2455267B1 (en) 2013-10-30
CA2757983A1 (en) 2012-05-22
AT12658U1 (en) 2012-09-15

Similar Documents

Publication Publication Date Title
EP2455267B2 (en) Installation for conveying people and method for operating same
EP2837540B1 (en) System for conveying persons
EP2218661B1 (en) Sorting conveyor
EP1972365A2 (en) Facility for conveying persons
EP2853460B1 (en) Cable car system for conveying persons or goods
EP2072367A1 (en) Cable car system with one bearer or haulage cable
EP1767425A1 (en) Rope railway with swiveling passenger units
EP2511211B1 (en) Crossing between two transport routes for transporting flat products lying down
DE102008014831B4 (en) Device for buffering objects
AT411045B (en) ANNEX TO TRANSPORT PERSONS
EP2441636A1 (en) Assembly for moving vehicles along two tracks
DE2362680A1 (en) SYSTEM FOR PROMOTING PRINTED PRODUCTS IN A SHED STORAGE
EP0798188A1 (en) Installation for transporting persons and/or goods
EP4204271B1 (en) Parking system for a cableway
EP1878631B1 (en) Cable car system with at least one transport cable
EP2066539B1 (en) Vehicle wash system comprising a plurality of treatment units
EP0461098A1 (en) Installation for transporting persons or goods
DE10132351A1 (en) conveyor system
EP0990571A2 (en) Chair lift installation with a conveyor belt for conveying skiers into the entrance area of this installation
AT503900A2 (en) CABLE CAR WITH AT LEAST ONE SUPPLIER PART
DE10044612A1 (en) Tipping station for individual item conveyor has individual tipping modules each provided with pivot drive and at least one driven transport roller
EP3044132B1 (en) Conveying system
EP0433703A1 (en) Ropeway
EP1705770A1 (en) Method for operating an energy guiding chain and stowage gutter for performing the method
EP3081448B1 (en) Station for an aerial cableway with transport device and roof structure

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120328

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: B61B 9/00 20060101AFI20130422BHEP

Ipc: B61B 12/12 20060101ALI20130422BHEP

Ipc: B61B 13/12 20060101ALI20130422BHEP

INTG Intention to grant announced

Effective date: 20130524

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 638383

Country of ref document: AT

Kind code of ref document: T

Effective date: 20131115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2435016

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20131218

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502011001561

Country of ref document: DE

Effective date: 20131224

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20131030

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140130

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140228

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140228

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 502011001561

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

26 Opposition filed

Opponent name: LEITNER S.P.A.

Effective date: 20140730

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 502011001561

Country of ref document: DE

Effective date: 20140730

PLAF Information modified related to communication of a notice of opposition and request to file observations + time limit

Free format text: ORIGINAL CODE: EPIDOSCOBS2

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140901

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140930

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

APBM Appeal reference recorded

Free format text: ORIGINAL CODE: EPIDOSNREFNO

APBP Date of receipt of notice of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA2O

APAH Appeal reference modified

Free format text: ORIGINAL CODE: EPIDOSCREFNO

APBM Appeal reference recorded

Free format text: ORIGINAL CODE: EPIDOSNREFNO

APBP Date of receipt of notice of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA2O

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110901

APBQ Date of receipt of statement of grounds of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA3O

APBQ Date of receipt of statement of grounds of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA3O

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: INNOVA PATENT GMBH

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20131030

APBU Appeal procedure closed

Free format text: ORIGINAL CODE: EPIDOSNNOA9O

PUAH Patent maintained in amended form

Free format text: ORIGINAL CODE: 0009272

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT MAINTAINED AS AMENDED

27A Patent maintained in amended form

Effective date: 20201111

AK Designated contracting states

Kind code of ref document: B2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: DE

Ref legal event code: R102

Ref document number: 502011001561

Country of ref document: DE

REG Reference to a national code

Ref country code: ES

Ref legal event code: DC2A

Ref document number: 2435016

Country of ref document: ES

Kind code of ref document: T5

Effective date: 20210805

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20220927

Year of fee payment: 12

Ref country code: AT

Payment date: 20220920

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20220926

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20221013

Year of fee payment: 12

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230515

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20230814

Year of fee payment: 13

Ref country code: IT

Payment date: 20230908

Year of fee payment: 13

Ref country code: GB

Payment date: 20230907

Year of fee payment: 13

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502011001561

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 638383

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230901