EP2428426A1 - Method and device for generating and editing a railway signal diagram - Google Patents

Method and device for generating and editing a railway signal diagram Download PDF

Info

Publication number
EP2428426A1
EP2428426A1 EP11306133A EP11306133A EP2428426A1 EP 2428426 A1 EP2428426 A1 EP 2428426A1 EP 11306133 A EP11306133 A EP 11306133A EP 11306133 A EP11306133 A EP 11306133A EP 2428426 A1 EP2428426 A1 EP 2428426A1
Authority
EP
European Patent Office
Prior art keywords
railway
track
signaling scheme
network
rules
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP11306133A
Other languages
German (de)
French (fr)
Other versions
EP2428426B1 (en
Inventor
Aude Flore Rio
Marianne Rasoamanana
Pascal Dumont
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alstom Transport Technologies SAS
Original Assignee
Alstom Transport SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=43901582&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2428426(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Alstom Transport SA filed Critical Alstom Transport SA
Publication of EP2428426A1 publication Critical patent/EP2428426A1/en
Application granted granted Critical
Publication of EP2428426B1 publication Critical patent/EP2428426B1/en
Revoked legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L19/00Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
    • B61L19/06Interlocking devices having electrical operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/04Electrical locking and release of the route; Electrical repeat locks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/60Testing or simulation

Definitions

  • the invention also relates to a device implementing the method of generating and editing a rail signaling scheme.
  • the invention applies to the railway field and more particularly to the generation and editing of railway signaling schemes or technical plans for a railway installation.
  • the signaling scheme of a railway installation includes, in addition to the route or the plan of the tracks, topological information such as the position of the stations, rails, needles, elevations and curvature radii as well as track equipment such as fires. , signals, tags ...
  • the layout of the railway track portion is called a track plan or plan.
  • track equipment such as signaling elements
  • track equipment such as signaling elements
  • the signaling elements are free garages, signals, indications ...
  • control and interlocking tables applicable to the signals and the possible routes on the portion of the railway track are generated. These tables are very useful to the stationmaster to manage rail traffic.
  • an interlocking table for a given route comprises all the actions performed by different control devices of track equipment or signals for the purpose of authorize the passage in one direction of a railway vehicle only when all the necessary safety conditions for this movement are realized.
  • a train must not engage on a section of the track of the network if the following four sections are not free, that is to say if one of them is occupied by another railway vehicle. Therefore, it is necessary to position a panel upstream of the section of track signaling whether the train can engage or not.
  • the position of the panel is determined inter alia by the speed of trains running on the network to provide a stopping distance for the train if the following sections are not free.
  • the railway signaling scheme is generated by several operators according to their specialty. Each operator implements the railway signaling scheme with track equipment for which he is responsible and according to specific positioning rules. It can modify equipment added by other operators.
  • the rules used for generation may be different from one operator to another and are not mentioned in the final version of the railway signaling scheme.
  • the signaling scheme is conventionally implemented successively by the operators on a paper version of the channel diagram, resulting in a long process of generating the complete and definitive version of the signaling scheme.
  • the object of the invention is to provide a method and a device for generating and editing a rail signaling scheme in a standardized and automatic manner and thus enabling a reliable and rapid generation of the scheme.
  • the device for generating and editing a railway signaling scheme is adapted to implement the previous method of generating and editing a rail signaling scheme.
  • the invention relates to a device for generating and editing a railway signaling scheme intended to be shared by a plurality of services or operators involved in the realization of the signaling scheme.
  • the railway signaling diagram 50 comprises the trace 52 or diagram of a portion of a railway track network and icons 54 representing track equipment disposed on the network portion.
  • the track equipment is for example switches, traffic lights, free garages ...
  • the device according to the invention is able to automatically generate the signaling scheme by applying predefined positioning rules of integrated track equipment to the diagram, as will be detailed later.
  • the figure 2 illustrates a device 2 according to the invention which comprises a central computer 4 and a storage unit 6 connected to the central computer 4.
  • the storage unit 6 comprises a first database 10 comprising topological information of the portion of the railway track network making it possible to define the plane of lanes.
  • the second database 12 includes a plurality of positioning rules of the track equipment according to the standards and constraints of the customer. An example of a rule has been given previously.
  • first database 10 and the second database 12 can form a single database comprising both the topological information of the portion of the railway track network, the characteristics specific to each lane equipment and a plurality of lane equipment positioning rules.
  • the central computer 4 comprises calculation means 14 adapted to automatically generate a plan of railway tracks from the first database 10.
  • these calculation means 14 are adapted to automatically generate the railway signaling scheme from the generated channel plan and the positioning rules of the second database 12.
  • the device 2 further comprises a plurality of man-machine interfaces 18, such as remote terminals, each connected to the central computer 4 and adapted to choose by an operator rules of the second database to be applied, for possibly modify the generated railway signaling scheme and to display the railway signaling scheme being generated or finalized.
  • a plurality of man-machine interfaces 18, such as remote terminals each connected to the central computer 4 and adapted to choose by an operator rules of the second database to be applied, for possibly modify the generated railway signaling scheme and to display the railway signaling scheme being generated or finalized.
  • the device comprises editing means 20 of the generated railway signaling scheme, for example printing means or a plan editor of the type of AutoCAD®, commonly used in the railway field.
  • editing means 20 of the generated railway signaling scheme for example printing means or a plan editor of the type of AutoCAD®, commonly used in the railway field.
  • the device 2 is adapted to implement the method 100 for generating and editing a railway signaling scheme which will now be described with reference to FIG. figure 3 .
  • the method comprises a step 102 of entry by an operator of topological data of the portion of the railway network such as the unevenness of the portion of the railway network studied. This topological data is saved in the first database 10 of the storage unit 6.
  • This step 102 is followed by a step 104 of automatic generation by the calculation means 14 of the central computer 4 of a channel plan of the portion of the railway network from the topological data contained in the first database 10 .
  • the lane plan includes the route of the railway tracks of the portion of the rail network.
  • the method includes a step 106 of an operator choosing from a plurality of channel equipment to be arranged on the channel plane and positioning rules associated with a predefined set of channel equipment.
  • Each track equipment is associated with particular characteristics such as its position, its operating status according to standards and safety rules, an icon standardized in the railway field ... All these characteristics have been previously stored in the second database 12 of the storage unit 6.
  • the operator selects in the second database 12 a plurality of rules according to the standards, equipment to insert and constraints imposed by the client.
  • the operator selects the order of execution of the chosen rules for positioning the track equipment by classifying them by sequences of operations to be performed.
  • the method further comprises a step 110 of automatic generation by the calculation means 14 of the rail signaling scheme of the portion of the network from the selected positioning rules of the track equipment and the railway track plan.
  • the calculation means 14 calculate the position of each track equipment by means of a positioning rule chosen in the second database 12.
  • the calculation means 14 scale, in the lane plan, the icons of each lane equipment relating to their signaling according to their calculated position.
  • the calculation means 14 use the rules of the second database 12 to detect the points of the path scheme to protect and place a signal in front of it.
  • the signaling scheme thus generated then comprises the layout of the railway tracks and the track equipment inserted on it, for example: the points kilometers, points, crossings, bridges, tunnels ..., as well as their signaling elements such as signals and signs.
  • Another operator manually modifies if he wishes or if necessary at least one particular characteristic of a track equipment of the railway signaling scheme generated during a step 112.
  • the motivation of its modification and the rule or rules used are requested by the computing means 14.
  • the latter data are recorded and their date in the storage unit 6 of the device 2.
  • a step 114 is executed by the calculation means 14 in order to automatically check that the manual modification or modifications made comply with the rules chosen and the constraints of the client.
  • a step 116 of saving the generated signaling plan is executed by the central computer in the storage unit 6. During this step, the rules used to generate the signaling scheme and any changes made are also saved.
  • the respective steps 118 and 120 of the method 100 make it possible to generate automatically by the calculating means 14 on the one hand possible routes on the portion of railway tracks from the railway signaling scheme generated and on the other hand an interlocking table. for each possible route of the railway network.
  • the calculation means 14 calculate all the routes, that is to say all the paths between two signals, of the portion of the network taking into account the physical constraints, for example the track equipment encountered and then eliminates the impossible routes.
  • the interlock table is calculated by the calculation means 14 from the rules integrated in the second database 12, by deduction of the signal status conditions for each possible route of the track equipment of the railway signaling scheme.
  • the method further comprises a step 122 of editing the railway signaling scheme by the editing means 20, for example the diagram is printed on paper.
  • One of the advantages of the device 2 is that it makes it possible to ensure that all the operators working on the same railway signaling scheme to be generated use the same rules. It also ensures traceability of rule changes as manual changes are recorded.
  • the device allows the various operators to view the railway signaling scheme throughout its design to validate and / or modify in real time the different stages of his generation. This visualization makes it possible to manage the differences between the applicable rules and the choices of the customer.
  • the device makes it possible to generate and edit the interlocking tables associated with each signaling element according to the rules chosen quickly, contrary to the state of the art in which these tables can not be edited before that the signaling scheme is printed on the scale.
  • RailmL type file which is a type of swap file known in the railway domain between a plurality of devices.
  • This device and the associated method make it possible to centralize and obtain a high availability of data relating to a rail signaling scheme for the same portion of a railway network, thereby saving time and reliability.

Abstract

The method involves inputting topological data (102) such as altitude difference, of a portion of a railway system by a user, and automatically generating a track model (104) of the portion of the railway system by a calculation unit using the data. A set of rules for positioning a track equipment e.g. signaling light, to be placed on the track model, is chosen (106) by the user. A chosen rule executing order is chosen (108) by the user. A railway signal diagram of the portion of the railway system is generated (110) by the calculation unit using the positioning rules and the track model. An independent claim is also included for a device for generating and editing a railway signal diagram, comprising a database.

Description

La présente invention concerne un procédé de génération et d'édition d'un schéma de signalisation ferroviaire, du type comprenant un schéma de voies d'une portion d'un réseau ferroviaire et des équipements de voie disposés sur la portion du réseau, chaque équipement de voie comprenant des caractéristiques particulières, le procédé comprenant les étapes suivantes :

  • entrée par un utilisateur de données topologiques de la portion du réseau ferroviaire, et
  • génération automatique par des moyens de calcul d'un schéma de voies de la portion du réseau ferroviaire à partir des données topologiques.
The present invention relates to a method for generating and editing a railway signaling scheme, of the type comprising a track diagram of a portion of a railway network and track equipment disposed on the portion of the network, each equipment pathway comprising particular features, the method comprising the steps of:
  • entry by a user of topological data of the portion of the railway network, and
  • automatic generation by calculation means of a channel diagram of the portion of the railway network from the topological data.

L'invention concerne également un dispositif mettant en oeuvre le procédé de génération et d'édition d'un schéma de signalisation ferroviaire.The invention also relates to a device implementing the method of generating and editing a rail signaling scheme.

L'invention s'applique au domaine ferroviaire et plus particulièrement à la génération et l'édition de schémas de signalisation ferroviaire ou plans techniques pour une installation ferroviaire.The invention applies to the railway field and more particularly to the generation and editing of railway signaling schemes or technical plans for a railway installation.

Le schéma de signalisation d'une installation ferroviaire regroupe en plus du tracé ou plan des voies, des informations topologiques telles que la position des gares, rails, aiguilles, les dénivelés et les rayons de courbure ainsi que les équipements de voies tels que les feux, signaux, balises...The signaling scheme of a railway installation includes, in addition to the route or the plan of the tracks, topological information such as the position of the stations, rails, needles, elevations and curvature radii as well as track equipment such as fires. , signals, tags ...

Ils sont générés en respectant des contraintes exprimées par des normes et par un client, par exemple en termes de disponibilité de la voie, de vitesse de circulation des matériels pour obtenir un certain débit.They are generated in compliance with constraints expressed by standards and by a customer, for example in terms of the availability of the track, speed of movement of the equipment to obtain a certain flow.

Classiquement, pour réaliser un schéma de signalisation ferroviaire, il faut reproduire graphiquement le tracé de la portion de voie ferroviaire selon les informations topologiques. De façon connue, le tracé de la portion de voie ferroviaire est appelé schéma ou plan de voies.Conventionally, to achieve a rail signaling scheme, it is necessary to graphically reproduce the route of the rail section portion according to the topological information. In a known manner, the layout of the railway track portion is called a track plan or plan.

Ensuite, des équipements de voie tels que des éléments de signalisation, sont positionnés sur le plan de voie, en fonction du type de matériel qui va y circuler et des normes en vigueur dans le pays. Par exemple, les éléments de signalisation sont des garages francs, des signaux, des indications...Then, track equipment such as signaling elements, are positioned on the track plan, depending on the type of equipment that will circulate and the standards in force in the country. For example, the signaling elements are free garages, signals, indications ...

Enfin, des tables de contrôles et d'enclenchements applicables aux signaux et les itinéraires possibles sur la portion de voie ferroviaire sont générés. Ces tables sont très utiles au chef de gare afin de gérer le trafic ferroviaire. Par exemple, une table d'enclenchements pour un itinéraire donné comporte l'ensemble des actions réalisées par différents organes de commande d'équipements de voie ou de signaux dans le but de n'autoriser le passage dans un sens d'un véhicule ferroviaire que lorsque toutes les conditions de sécurité nécessaires à ce mouvement sont réalisées.Finally, control and interlocking tables applicable to the signals and the possible routes on the portion of the railway track are generated. These tables are very useful to the stationmaster to manage rail traffic. For example, an interlocking table for a given route comprises all the actions performed by different control devices of track equipment or signals for the purpose of authorize the passage in one direction of a railway vehicle only when all the necessary safety conditions for this movement are realized.

Ainsi, pour répondre aux conditions de sécurité, des règles de positionnement des différents équipements de voie connues par l'homme du métier sont utilisées pour générer chaque schéma de signalisation ferroviaire.Thus, to meet the safety conditions, positioning rules of the various track equipment known to those skilled in the art are used to generate each rail signaling scheme.

Par exemple, un train ne doit pas s'engager sur un tronçon de voie du réseau si les quatre tronçons suivants ne sont pas libres, c'est-à-dire si l'un d'eux est occupé par un autre véhicule ferroviaire. Par conséquent, il est nécessaire de positionner un panneau en amont du tronçon de voie signalant si le train peut s'y engager ou non. La position du panneau est déterminée entre autre par la vitesse des trains circulant sur le réseau afin de prévoir une distance d'arrêt pour le train si les tronçons suivants ne sont pas libres.For example, a train must not engage on a section of the track of the network if the following four sections are not free, that is to say if one of them is occupied by another railway vehicle. Therefore, it is necessary to position a panel upstream of the section of track signaling whether the train can engage or not. The position of the panel is determined inter alia by the speed of trains running on the network to provide a stopping distance for the train if the following sections are not free.

Néanmoins, le schéma de signalisation ferroviaire est générer par plusieurs opérateurs en fonction de leur spécialité. Chaque opérateur implémente le schéma de signalisation ferroviaire avec des équipements de voies dont il a la charge et selon des règles de positionnement qui lui sont propres. Il peut modifier des équipements ajoutés par d'autres opérateurs.Nevertheless, the railway signaling scheme is generated by several operators according to their specialty. Each operator implements the railway signaling scheme with track equipment for which he is responsible and according to specific positioning rules. It can modify equipment added by other operators.

De plus, les règles utilisées pour la génération peuvent être différentes d'un opérateur à l'autre et ne sont pas mentionnées dans la version finale du schéma de signalisation ferroviaire.In addition, the rules used for generation may be different from one operator to another and are not mentioned in the final version of the railway signaling scheme.

En outre, classiquement le schéma de signalisation est implémenté successivement par les opérateurs sur une version papier du schéma des voies, entrainant un processus long de génération de la version complète et définitive du schéma de signalisation.In addition, the signaling scheme is conventionally implemented successively by the operators on a paper version of the channel diagram, resulting in a long process of generating the complete and definitive version of the signaling scheme.

Le but de l'invention est de fournir un procédé et un dispositif de génération et d'édition d'un schéma de signalisation ferroviaire de façon standardisée et automatique et permettant ainsi une génération fiable et rapide du schéma.The object of the invention is to provide a method and a device for generating and editing a rail signaling scheme in a standardized and automatic manner and thus enabling a reliable and rapid generation of the scheme.

A cet effet, l'invention a pour objet un procédé de génération et d'édition d'un schéma de signalisation ferroviaire du type précité, caractérisé en ce que le procédé comprend les étapes suivantes :

  • choix par l'utilisateur d'une pluralité de règles de positionnement des équipements de voie à disposer sur le schéma de voies ferroviaires, et
  • génération automatique par les moyens de calcul du schéma de signalisation ferroviaire de la portion du réseau à partir des règles de positionnement choisies des équipements de voie et du schéma de voies ferroviaires.
To this end, the subject of the invention is a method for generating and editing a railway signaling scheme of the aforementioned type, characterized in that the method comprises the following steps:
  • user choice of a plurality of positioning rules of track equipment to be arranged on the railway track diagram, and
  • automatic generation by the calculation means of the railway signaling scheme of the portion of the network from the selected positioning rules of the track equipment and the railway track diagram.

Suivant des modes particuliers de réalisation, le procédé de génération et d'édition d'un schéma de signalisation ferroviaire comporte l'une ou plusieurs des caractéristiques suivantes, prises seules ou en combinaison :

  • le procédé comprend une étape de choix par l'utilisateur de l'ordre d'exécution des règles de positionnement choisies des équipements de voie,
  • il comprend une étape de modification manuelle par un autre utilisateur d'au moins une caractéristique particulière d'un équipement de voie du schéma de signalisation ferroviaire généré par au moins un utilisateur,
  • il comprend une étape de vérification automatique de la modification manuelle selon les règles choisies,
  • il comporte une étape de sauvegarde du schéma de signalisation généré, des règles utilisées pour le générer et des modifications éventuelles apportées,
  • le procédé comprend les étapes suivantes :
    • *génération automatique par les moyens de calculs des itinéraires possibles sur la portion de voies ferroviaires à partir du schéma de signalisation ferroviaire généré, et
    • *génération automatique par les moyens de calculs d'une table d'enclenchements pour chaque itinéraire possible du réseau de voies ferroviaires.
According to particular embodiments, the method for generating and editing a railway signaling scheme comprises one or more of the following characteristics, taken alone or in combination:
  • the method comprises a step of choosing by the user of the order of execution of the chosen positioning rules of the track equipment,
  • it comprises a step of manual modification by another user of at least one particular characteristic of a track equipment of the railway signaling scheme generated by at least one user,
  • it includes a step of automatic verification of the manual modification according to the chosen rules,
  • it includes a step of saving the generated signaling scheme, the rules used to generate it and any modifications made,
  • the method comprises the following steps:
    • automatic generation by means of calculation of the possible routes on the portion of railway tracks from the railway signaling scheme generated, and
    • * automatic generation by means of calculations of an interlocking table for each possible route of the railways network.

L'invention a également pour objet un dispositif de génération et d'édition d'un schéma de signalisation ferroviaire comprenant une portion d'un réseau de voies ferroviaires et des équipements de voie disposés sur la portion de réseau, chaque équipement de voie comprenant des caractéristiques particulières, caractérisé en ce qu'il comporte :

  • une première base de données comprenant une pluralité d'informations topologiques de la portion du réseau de voies ferroviaires,
  • des moyens de calcul adaptés pour générer automatiquement un plan de voies ferroviaires à partir de la première base de données,
  • une deuxième base de données comprenant les caractéristiques et une pluralité de règles de positionnement de chaque équipement de voie,
  • au moins une interface homme-machine adaptée pour choisir les règles de la deuxième base de données à appliquer,
et en ce que les moyens de calcul sont adaptés pour générer automatiquement un schéma de signalisation ferroviaire à partir du plan de voies et des règles de positionnement choisies.The invention also relates to a device for generating and editing a railway signaling scheme comprising a portion of a railway track network and track equipment disposed on the network portion, each track equipment comprising particular features, characterized in that it comprises:
  • a first database comprising a plurality of topological information of the portion of the railway track network,
  • calculation means adapted to automatically generate a railroad plan from the first database,
  • a second database comprising the characteristics and a plurality of positioning rules of each track equipment,
  • at least one man-machine interface adapted to choose the rules of the second database to be applied,
and in that the calculation means are adapted to automatically generate a rail signaling scheme from the track plan and the chosen positioning rules.

Suivant un mode particulier de réalisation, le dispositif de génération et d'édition d'un schéma de signalisation ferroviaire est adapté pour mettre en oeuvre le procédé précédent de génération et d'édition d'un schéma de signalisation ferroviaire.According to a particular embodiment, the device for generating and editing a railway signaling scheme is adapted to implement the previous method of generating and editing a rail signaling scheme.

L'invention sera mieux comprise à la lecture de la description qui va suivre, donnée uniquement à titre d'exemple, et faite en se référant aux dessins, sur lesquels :

  • la figure 1 est un schéma synoptique d'un exemple de schéma de signalisation,
  • la figure 2 est un schéma synoptique d'un mode de réalisation d'un dispositif de génération et d'édition d'un schéma de signalisation ferroviaire selon l'invention, et
  • la figure 3 est un schéma bloc illustrant un procédé de génération et d'édition d'un schéma de signalisation ferroviaire mis en oeuvre par le dispositif de la figure 2.
The invention will be better understood on reading the description which follows, given solely by way of example, and with reference to the drawings, in which:
  • the figure 1 is a block diagram of an example signaling scheme,
  • the figure 2 is a block diagram of an embodiment of a device for generating and editing a railway signaling scheme according to the invention, and
  • the figure 3 is a block diagram illustrating a method of generating and editing a railway signaling scheme implemented by the device of the figure 2 .

L'invention concerne un dispositif de génération et d'édition d'un schéma de signalisation ferroviaire destiné à être partagé par une pluralité de services ou d'opérateurs impliqués dans la réalisation du schéma de signalisation.The invention relates to a device for generating and editing a railway signaling scheme intended to be shared by a plurality of services or operators involved in the realization of the signaling scheme.

En regard de la figure 1, le schéma de signalisation ferroviaire 50 comprend le tracé 52 ou schéma d'une portion d'un réseau de voies ferroviaires et des icônes 54 représentant des équipements de voie disposés sur la portion de réseau. De façon connue, les équipements de voie sont par exemple des aiguillages, des feux de signalisation, des garages francs...With regard to the figure 1 , the railway signaling diagram 50 comprises the trace 52 or diagram of a portion of a railway track network and icons 54 representing track equipment disposed on the network portion. In known manner, the track equipment is for example switches, traffic lights, free garages ...

Le dispositif selon l'invention est propre à générer de façon automatique le schéma de signalisation en appliquant des règles de positionnement prédéfinies d'équipements de voies intégrés au schéma, comme cela va être détaillé par la suite.The device according to the invention is able to automatically generate the signaling scheme by applying predefined positioning rules of integrated track equipment to the diagram, as will be detailed later.

La figure 2 illustre un dispositif 2 selon l'invention qui comprend un ordinateur central 4 et une unité de stockage 6 connectée à l'ordinateur central 4.The figure 2 illustrates a device 2 according to the invention which comprises a central computer 4 and a storage unit 6 connected to the central computer 4.

L'unité de stockage 6 comporte une première base de données 10 comprenant des informations topologiques de la portion du réseau de voies ferroviaires permettant de définir le plan de voies.The storage unit 6 comprises a first database 10 comprising topological information of the portion of the railway track network making it possible to define the plane of lanes.

Elle comprend en outre une deuxième base de données 12 comportant des caractéristiques propre à chaque équipement de voies, par exemple, le nom de l'équipement, sa position, les types et les états de l'équipement de voie par exemple pour un aiguillage, un feu de signalisation...It further comprises a second database 12 having characteristics specific to each track equipment, for example, the name of the equipment, its position, the types and the states of the track equipment, for example for a switch, a traffic light...

En outre, la deuxième base de données 12 comprend une pluralité de règles de positionnement des équipements de voies en fonction des normes et des contraintes du client. Un exemple de règle a été donné précédemment.In addition, the second database 12 includes a plurality of positioning rules of the track equipment according to the standards and constraints of the customer. An example of a rule has been given previously.

Bien entendu, la première base de données 10 et la deuxième base de données 12 peuvent former une unique base de données comportant à la fois les informations topologiques de la portion du réseau de voies ferroviaires, les caractéristiques propre à chaque équipement de voies et une pluralité de règles de positionnement des équipements de voies.Of course, the first database 10 and the second database 12 can form a single database comprising both the topological information of the portion of the railway track network, the characteristics specific to each lane equipment and a plurality of lane equipment positioning rules.

L'ordinateur central 4 comporte des moyens de calcul 14 adaptés pour générer automatiquement un plan de voies ferroviaires à partir de la première base de données 10.The central computer 4 comprises calculation means 14 adapted to automatically generate a plan of railway tracks from the first database 10.

En outre, ces moyens de calcul 14 sont adaptés pour générer automatiquement le schéma de signalisation ferroviaire à partir du plan de voies générés et des règles de positionnement de la deuxième base de données 12.In addition, these calculation means 14 are adapted to automatically generate the railway signaling scheme from the generated channel plan and the positioning rules of the second database 12.

Le dispositif 2 comprend en outre une pluralité d'interfaces homme-machine 18, telles que des terminaux distants, chacune étant connectée à l'ordinateur central 4 et adaptées pour choisir par un opérateur des règles de la deuxième base de données à appliquer, pour modifier éventuellement le schéma de signalisation ferroviaire généré et pour afficher le schéma de signalisation ferroviaire en cours de génération ou finalisé.The device 2 further comprises a plurality of man-machine interfaces 18, such as remote terminals, each connected to the central computer 4 and adapted to choose by an operator rules of the second database to be applied, for possibly modify the generated railway signaling scheme and to display the railway signaling scheme being generated or finalized.

Bien entendu un nombre quelconque d'interfaces homme-machine 18 peut être envisagé, trois étant représentées sur cette figure.Of course, any number of human-machine interfaces 18 can be envisaged, three being represented in this figure.

De plus, le dispositif comporte des moyens d'édition 20 du schéma de signalisation ferroviaire généré, par exemple des moyens d'impression ou un éditeur de plans du type d'AutoCAD®, couramment utilisé dans le domaine ferroviaire.In addition, the device comprises editing means 20 of the generated railway signaling scheme, for example printing means or a plan editor of the type of AutoCAD®, commonly used in the railway field.

Le dispositif 2 selon l'invention est adapté pour mettre en oeuvre le procédé 100 de génération et d'édition d'un schéma de signalisation ferroviaire qui va maintenant être décrit en regard de la figure 3.The device 2 according to the invention is adapted to implement the method 100 for generating and editing a railway signaling scheme which will now be described with reference to FIG. figure 3 .

Le procédé comprend une étape 102 d'entrée par un opérateur de données topologiques de la portion du réseau ferroviaire telles que les dénivelés de la portion du réseau ferroviaire étudié. Ces données topologiques sont sauvegardées dans la première base de données 10 de l'unité de stockage 6.The method comprises a step 102 of entry by an operator of topological data of the portion of the railway network such as the unevenness of the portion of the railway network studied. This topological data is saved in the first database 10 of the storage unit 6.

Cette étape 102 est suivie d'une étape 104 de génération automatique par les moyens de calcul 14 de l'ordinateur central 4 d'un plan des voies de la portion du réseau ferroviaire à partir des données topologiques contenues dans la première base de données 10.This step 102 is followed by a step 104 of automatic generation by the calculation means 14 of the central computer 4 of a channel plan of the portion of the railway network from the topological data contained in the first database 10 .

Le plan de voies comporte le tracé des voies ferroviaires de la portion du réseau ferroviaire.The lane plan includes the route of the railway tracks of the portion of the rail network.

En outre, le procédé comporte une étape 106 de choix par un opérateur d'une pluralité d'équipements de voie à disposer sur le plan de voies et des règles de positionnement associées à un ensemble prédéfini d'équipements de voies. Chaque équipement de voie est associé à des caractéristiques particulières telles que sa position, son état de fonctionnement en fonction de normes et de règles de sécurité, un icône standardisé dans le domaine ferroviaire... Toutes ces caractéristiques ont été stockées préalablement dans la deuxième base de données 12 de l'unité de stockage 6.In addition, the method includes a step 106 of an operator choosing from a plurality of channel equipment to be arranged on the channel plane and positioning rules associated with a predefined set of channel equipment. Each track equipment is associated with particular characteristics such as its position, its operating status according to standards and safety rules, an icon standardized in the railway field ... All these characteristics have been previously stored in the second database 12 of the storage unit 6.

Par exemple, l'opérateur sélectionne dans la deuxième base de données 12 une pluralité de règles en fonction des normes, des équipements à insérer et des contraintes imposées par le client.For example, the operator selects in the second database 12 a plurality of rules according to the standards, equipment to insert and constraints imposed by the client.

Ensuite, au cours d'une étape 108, l'opérateur choisit l'ordre d'exécution des règles choisies de positionnement des équipements de voie en les classant par séquences d'opérations à effectuer.Then, during a step 108, the operator selects the order of execution of the chosen rules for positioning the track equipment by classifying them by sequences of operations to be performed.

Par exemple, de façon connue la première séquence concerne les garages francs :

  1. 1. Calcul d'une distance pointe d'aiguille :garage franc pour un type d'aiguille donné et enregistrement de la valeur dans l'unité de stockage 6.
  2. 2. Positionnement d'un garage franc à la distance calculée de chaque aiguille du schéma
For example, in a known manner the first sequence concerns free garages:
  1. 1. Calculation of a needle tip distance: free garage for a given needle type and recording of the value in the storage unit 6.
  2. 2. Positioning a free garage at the calculated distance of each drawing needle

D'autres séquences de règles concernent la définition des points du réseau ferroviaire à protéger (garage franc, aiguille...), la génération des signaux d'arrêt et d'avertissement et le calcul de la position des panneaux de signalisation des signaux...Other sequences of rules concern the definition of points of the railway network to be protected (free garage, needle ...), the generation of stop and warning signals and the calculation of the position of the signal signs. ..

Au cours de cette étape l'opérateur peut modifier des caractéristiques de certaines règles enregistrées dans l'unité de stockage 6.During this step the operator can modify characteristics of certain rules recorded in the storage unit 6.

Le procédé comprend en outre une étape 110 de génération automatique par les moyens de calcul 14 du schéma de signalisation ferroviaire de la portion du réseau à partir des règles de positionnement choisies des équipements de voie et du plan de voies ferroviaires.The method further comprises a step 110 of automatic generation by the calculation means 14 of the rail signaling scheme of the portion of the network from the selected positioning rules of the track equipment and the railway track plan.

En particulier, les moyens de calcul 14 calculent la position de chaque équipement de voie au moyen d'une règle de positionnement choisie dans la deuxième base de données 12.In particular, the calculation means 14 calculate the position of each track equipment by means of a positioning rule chosen in the second database 12.

Les moyens de calcul 14 insèrent à l'échelle, dans le plan de voies les icônes de chaque équipement de voies relatifs à leurs signalisation en fonction de leur position calculée.The calculation means 14 scale, in the lane plan, the icons of each lane equipment relating to their signaling according to their calculated position.

Pour cela, les moyens de calcul 14 utilisent les règles de la deuxième base de données 12 pour détecter les points du schéma de voies à protéger et placer un signal devant celui-ci.For this, the calculation means 14 use the rules of the second database 12 to detect the points of the path scheme to protect and place a signal in front of it.

En outre, ils découpent la portion du réseau en zones entre deux signaux successifs.In addition, they cut the portion of the network into zones between two successive signals.

Le schéma de signalisation ainsi généré comporte alors le tracé des voies ferroviaires et les équipements de voies insérés sur celui-ci, par exemple : les points kilométriques, aiguillages, passages à niveau, ponts, tunnels..., ainsi que leurs éléments de signalisation tels que les signaux et panneaux de signalisation.The signaling scheme thus generated then comprises the layout of the railway tracks and the track equipment inserted on it, for example: the points kilometers, points, crossings, bridges, tunnels ..., as well as their signaling elements such as signals and signs.

Un autre opérateur modifie manuellement s'il le souhaite ou si nécessaire au moins une caractéristique particulière d'un équipement de voie du schéma de signalisation ferroviaire généré au cours d'une étape 112. Au cours de cette étape, la motivation de sa modification et la ou les règles utilisées lui sont demandées par les moyens de calcul 14. Ces dernières données sont enregistrées ainsi que leur date dans l'unité de stockage 6 du dispositif 2.Another operator manually modifies if he wishes or if necessary at least one particular characteristic of a track equipment of the railway signaling scheme generated during a step 112. During this step, the motivation of its modification and the rule or rules used are requested by the computing means 14. The latter data are recorded and their date in the storage unit 6 of the device 2.

Par la suite, une étape 114 est exécutée par les moyens de calcul 14 afin de vérifier automatiquement que la ou les modifications manuelles apportées sont conformes aux règles choisies et aux contraintes du client.Subsequently, a step 114 is executed by the calculation means 14 in order to automatically check that the manual modification or modifications made comply with the rules chosen and the constraints of the client.

Si les règles de positionnement ont été respectées, une étape 116 de sauvegarde du plan de signalisation généré est exécutée par l'ordinateur central dans l'unité de stockage 6. Au cours de cette étape, les règles utilisées pour générer le schéma de signalisation et les modifications éventuelles apportées sont également sauvegardées.If the positioning rules have been respected, a step 116 of saving the generated signaling plan is executed by the central computer in the storage unit 6. During this step, the rules used to generate the signaling scheme and any changes made are also saved.

Des étapes respectives 118 et 120 du procédé 100 permettent de générer automatique par les moyens de calcul 14 d'une part des itinéraires possibles sur la portion de voies ferroviaires à partir du schéma de signalisation ferroviaire généré et d'autre part une table d'enclenchements pour chaque itinéraire possible du réseau de voies ferroviaires.The respective steps 118 and 120 of the method 100 make it possible to generate automatically by the calculating means 14 on the one hand possible routes on the portion of railway tracks from the railway signaling scheme generated and on the other hand an interlocking table. for each possible route of the railway network.

Les moyens de calcul 14 calculent tous les itinéraires, c'est-à-dire tous les parcours entre deux signaux, de la portion du réseau en tenant compte des contraintes physiques, par exemple les équipements de voie rencontrés puis élimine les itinéraires impossibles.The calculation means 14 calculate all the routes, that is to say all the paths between two signals, of the portion of the network taking into account the physical constraints, for example the track equipment encountered and then eliminates the impossible routes.

La table d'enclenchements est calculée par les moyens de calcul 14 à partir des règles intégrées à la deuxième base de données 12, par déduction des conditions d'état des signaux pour chaque itinéraire possible des équipements de voie du schéma de signalisation ferroviaire.The interlock table is calculated by the calculation means 14 from the rules integrated in the second database 12, by deduction of the signal status conditions for each possible route of the track equipment of the railway signaling scheme.

Le procédé comporte en outre une étape 122 d'édition du schéma de signalisation ferroviaire par les moyens d'édition 20, par exemple le schéma est imprimé sur du papier.The method further comprises a step 122 of editing the railway signaling scheme by the editing means 20, for example the diagram is printed on paper.

Un des avantages du dispositif 2 est qu'il permet de s'assurer que tous les opérateurs travaillant sur un même schéma de signalisation ferroviaire à générer utilisent les mêmes règles. Il assure également une traçabilité de la modification des règles puisque les modifications manuelles sont enregistrées.One of the advantages of the device 2 is that it makes it possible to ensure that all the operators working on the same railway signaling scheme to be generated use the same rules. It also ensures traceability of rule changes as manual changes are recorded.

En outre, le dispositif permet aux différents d'opérateurs de visualiser le schéma de signalisation ferroviaire tout au long de sa conception pour valider et/ou modifier en temps réel les différentes étapes de sa génération. Cette visualisation permet de gérer les écarts entre les règles applicables et les choix du client.In addition, the device allows the various operators to view the railway signaling scheme throughout its design to validate and / or modify in real time the different stages of his generation. This visualization makes it possible to manage the differences between the applicable rules and the choices of the customer.

De plus, le dispositif permet de générer et d'éditer les tables d'enclenchements associées à chaque élément de signalisation en fonction des règles choisies de façon rapide, contrairement à l'état de la technique dans lequel ces tables ne peuvent pas être éditées avant que le schéma de signalisation ne soit imprimé à l'échelle.In addition, the device makes it possible to generate and edit the interlocking tables associated with each signaling element according to the rules chosen quickly, contrary to the state of the art in which these tables can not be edited before that the signaling scheme is printed on the scale.

En outre, le schéma de signalisation ferroviaire édité est complet et vérifié.In addition, the published railway signaling scheme is complete and verified.

Toutes ces données sont éditables dans un fichier du type RailmL, qui est un type de fichier d'échange connu du domaine ferroviaire entre une pluralité de dispositifs.All these data are editable in a RailmL type file, which is a type of swap file known in the railway domain between a plurality of devices.

Ce dispositif et le procédé associé permettent de centraliser et d'obtenir une grande disponibilité des données concernant un schéma de signalisation ferroviaire d'une même portion d'un réseau ferroviaire, engendrant ainsi un gain de temps et de fiabilité.This device and the associated method make it possible to centralize and obtain a high availability of data relating to a rail signaling scheme for the same portion of a railway network, thereby saving time and reliability.

Claims (8)

Procédé (100) de génération et d'édition d'un schéma de signalisation ferroviaire comprenant un schéma de voies d'une portion d'un réseau ferroviaire et des équipements de voie disposés sur la portion du réseau, chaque équipement de voie comprenant des caractéristiques particulières, le procédé comprenant les étapes suivantes : - entrée (102) par un utilisateur de données topologiques de la portion du réseau ferroviaire, et - génération (104) automatique par des moyens de calcul (14) d'un schéma de voies de la portion du réseau ferroviaire à partir des données topologiques,
le procédé étant caractérisé en ce qu'il comprend les étapes suivantes :
- choix (106) par l'utilisateur d'une pluralité de règles de positionnement des équipements de voie à disposer sur le schéma de voies ferroviaires, et - génération (110) automatique par les moyens de calcul (14) du schéma de signalisation ferroviaire de la portion du réseau à partir des règles de positionnement choisies des équipements de voie et du schéma de voies ferroviaires.
Method (100) for generating and editing a railway signaling scheme comprising a track diagram of a portion of a railway network and track equipment disposed on the portion of the network, each track equipment including features particular, the method comprising the following steps: input (102) by a user of topological data of the portion of the railway network, and automatic generation (104) by calculation means (14) of a channel diagram of the portion of the railway network from the topological data,
the method being characterized in that it comprises the following steps:
choice (106) by the user of a plurality of positioning rules of the track equipment to be arranged on the railway track diagram, and - Automatic generation (110) by the calculation means (14) of the rail signaling scheme of the portion of the network from the selected positioning rules of the track equipment and the railway track diagram.
Procédé de génération et d'édition d'un schéma de signalisation ferroviaire selon la revendication 1, caractérisé en ce qu'il comprend une étape (108) de choix par l'utilisateur de l'ordre d'exécution des règles de positionnement choisies des équipements de voie.A method of generating and editing a railway signaling scheme according to claim 1, characterized in that it comprises a step (108) of choice by the user of the execution order of the selected positioning rules of the track equipment. Procédé selon l'une quelconque des revendications 1 et 2, caractérisé en ce qu'il comprend une étape (112) de modification manuelle par un autre utilisateur d'au moins une caractéristique particulière d'un équipement de voie du schéma de signalisation ferroviaire généré par au moins un utilisateur.Method according to any one of claims 1 and 2, characterized in that it comprises a step (112) of manual modification by another user of at least one particular characteristic of a track equipment of the generated railway signaling scheme by at least one user. Procédé selon la revendication 3, caractérisé en ce qu'il comprend une étape (114) de vérification automatique de la modification manuelle selon les règles choisies.Method according to claim 3, characterized in that it comprises a step (114) of automatic verification of the manual modification according to the rules chosen. Procédé selon l'une quelconque des revendications 3 et 4, caractérisé en ce qu'il comprend une étape de sauvegarde (116) du schéma de signalisation généré, des règles utilisées pour le générer, des modifications éventuelles apportées.Method according to any one of claims 3 and 4, characterized in that it comprises a step of saving (116) the generated signaling scheme, the rules used to generate it, any modifications made. Procédé selon l'une quelconque des revendications 1 à 5, caractérisé en ce qu'il comprend les étapes suivantes : - génération (118) automatique par les moyens de calculs des itinéraires possibles sur la portion de voies ferroviaires à partir du schéma de signalisation ferroviaire généré, et - génération (120) automatique par les moyens de calculs d'une table d'enclenchements pour chaque itinéraire possible du réseau de voies ferroviaires. Process according to any one of claims 1 to 5, characterized in that it comprises the following steps: automatic generation (118) by calculating means of possible routes on the portion of railway tracks from the generated railway signaling scheme, and - Automatic generation (120) by means of calculations of an interlocking table for each possible route of the railway track network. Dispositif (2) de génération et d'édition d'un schéma de signalisation ferroviaire comprenant une portion d'un réseau de voies ferroviaires et des équipements de voie disposés sur la portion de réseau, chaque équipement de voie comprenant des caractéristiques particulières, caractérisé en ce qu'il comporte : - une première base de données (10) comprenant une pluralité d'informations topologiques de la portion du réseau de voies ferroviaires, - des moyens de calcul (14) adaptés pour générer automatiquement un plan de voies ferroviaires à partir de la première base de données, - une deuxième base de données (12) comprenant les caractéristiques et une pluralité de règles de positionnement de chaque équipement de voie, - au moins une interface homme-machine (18) adaptée pour choisir les règles de la deuxième base de données à appliquer,
et en ce que les moyens de calcul (14) sont adaptés pour générer automatiquement un schéma de signalisation ferroviaire à partir du plan de voies et des règles de positionnement choisies.
Device (2) for generating and editing a railway signaling scheme comprising a portion of a railway track network and track equipment disposed on the network portion, each track equipment including particular features , characterized in what it includes: a first database (10) comprising a plurality of topological information of the portion of the railway track network, computing means (14) adapted to automatically generate a railway track plan from the first database, a second database (12) comprising the characteristics and a plurality of positioning rules of each track equipment, at least one man-machine interface adapted to choose the rules of the second database to be applied,
and in that the calculation means (14) are adapted to automatically generate a rail signaling scheme from the track plan and the chosen positioning rules.
Dispositif (2) de génération et d'édition d'un schéma de signalisation ferroviaire selon la revendication 7, caractérisé en ce qu'il est adapté pour mettre en oeuvre le procédé (100) selon l'une quelconque des revendications 1 à 6.Device (2) for generating and editing a railway signaling scheme according to Claim 7, characterized in that it is suitable for implementing the method (100) according to any one of Claims 1 to 6.
EP11306133.7A 2010-09-13 2011-09-12 Method and device for generating and editing a railway signal diagram Revoked EP2428426B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1057256A FR2964635B1 (en) 2010-09-13 2010-09-13 METHOD AND DEVICE FOR GENERATING AND EDITING A RAILWAY SIGNALING SCHEME

Publications (2)

Publication Number Publication Date
EP2428426A1 true EP2428426A1 (en) 2012-03-14
EP2428426B1 EP2428426B1 (en) 2013-05-01

Family

ID=43901582

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11306133.7A Revoked EP2428426B1 (en) 2010-09-13 2011-09-12 Method and device for generating and editing a railway signal diagram

Country Status (6)

Country Link
US (1) US8781803B2 (en)
EP (1) EP2428426B1 (en)
AU (1) AU2011223999B2 (en)
BR (1) BRPI1106924A8 (en)
ES (1) ES2422561T3 (en)
FR (1) FR2964635B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102887159A (en) * 2012-09-25 2013-01-23 中国铁道科学研究院 Method and device for railway vehicle tracking and planned reporting
CN105835912A (en) * 2016-04-06 2016-08-10 北京交通大学 Urban rail transit operation simulation system and method
CN110450825A (en) * 2019-08-01 2019-11-15 西南交通大学 Urban railway transit train progress control method
CN110920697A (en) * 2019-12-09 2020-03-27 交控科技股份有限公司 Automatic generation method and device for ATS station yard graph

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102975743B (en) * 2012-11-28 2015-04-08 北京交控科技有限公司 Method for automatically arranging trackside equipment
AU2015100253B4 (en) * 2015-03-03 2015-09-17 4Tek Pty Ltd Rail Systems Mark-Up Language
CN112208586B (en) * 2020-09-08 2022-10-18 通号城市轨道交通技术有限公司 Interlocking table generation method and device and readable storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003070537A1 (en) * 2002-02-22 2003-08-28 Alstom Ferroviaria S.P.A. Method and device of generating logic control units for railroad station-based vital computer apparatuses
DE10147459A1 (en) * 2001-09-17 2005-06-30 Siemens Ag Track section ends positioning method for railway traffic system, involves determining ends of track sections on discreet points at which minimal lengths of compartment portions of two successive trains attain least value
DE102005034252A1 (en) * 2005-07-18 2007-02-01 Siemens Ag Rail topology automatic project engineering errors recognition method, involves specifying interrelation of representation of positioning plan normal by drive unit configuration conditions, where plan is valid, when condition is fulfilled

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7092894B1 (en) * 1994-09-01 2006-08-15 Harris Corporation Cost reactive scheduler and method
US6125311A (en) * 1997-12-31 2000-09-26 Maryland Technology Corporation Railway operation monitoring and diagnosing systems

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10147459A1 (en) * 2001-09-17 2005-06-30 Siemens Ag Track section ends positioning method for railway traffic system, involves determining ends of track sections on discreet points at which minimal lengths of compartment portions of two successive trains attain least value
WO2003070537A1 (en) * 2002-02-22 2003-08-28 Alstom Ferroviaria S.P.A. Method and device of generating logic control units for railroad station-based vital computer apparatuses
DE102005034252A1 (en) * 2005-07-18 2007-02-01 Siemens Ag Rail topology automatic project engineering errors recognition method, involves specifying interrelation of representation of positioning plan normal by drive unit configuration conditions, where plan is valid, when condition is fulfilled

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
AUST F ET AL: "TEST- UND SIMULATIONSSOFTWARE FUER ESTW", SIGNAL + DRAHT, TELZLAFF VERLAG GMBH. DARMSTADT, DE, vol. 99, no. 12, 1 December 2007 (2007-12-01), pages 13 - 16, XP001508256, ISSN: 0037-4997 *
BERGER J ET AL: "EURO-INTERLOCKING PILOT PROJEKT DATA PREPARATION BEI DEN OESTERREICHISCHEN BUNDESBAHNEN//DATA PREPARATION INITIAL PROJECT AT AUSTRIAN RAILWAYS", SIGNAL + DRAHT, TELZLAFF VERLAG GMBH. DARMSTADT, DE, 1 November 2005 (2005-11-01), pages 16 - 19, XP001235007, ISSN: 0037-4997 *
LODEMANN M ET AL: "Beschreibung von Eisenbahninfrastrukturen mit railML und ihre Verifikation", SIGNAL + DRAHT, TELZLAFF VERLAG GMBH. DARMSTADT, DE, vol. 102, no. 4, 1 April 2010 (2010-04-01), pages 37 - 42, XP001552657, ISSN: 0037-4997 *
PARADI F ET AL: "BEST - Betriebs und Stellwerkssimulation als Planungs und Projektierungsmittel fuer ESTW", SIGNAL + DRAHT, TELZLAFF VERLAG GMBH. DARMSTADT, DE, vol. 89, no. 6, 1 January 1997 (1997-01-01), pages 27 - 30, XP001525676, ISSN: 0037-4997 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102887159A (en) * 2012-09-25 2013-01-23 中国铁道科学研究院 Method and device for railway vehicle tracking and planned reporting
CN102887159B (en) * 2012-09-25 2015-04-22 中国铁道科学研究院 Method and device for railway vehicle tracking and planned reporting
CN105835912A (en) * 2016-04-06 2016-08-10 北京交通大学 Urban rail transit operation simulation system and method
CN105835912B (en) * 2016-04-06 2017-11-03 北京交通大学 Urban track traffic operating simulation system and method
CN110450825A (en) * 2019-08-01 2019-11-15 西南交通大学 Urban railway transit train progress control method
CN110920697A (en) * 2019-12-09 2020-03-27 交控科技股份有限公司 Automatic generation method and device for ATS station yard graph
CN110920697B (en) * 2019-12-09 2022-02-15 交控科技股份有限公司 Automatic generation method and device for ATS station yard graph

Also Published As

Publication number Publication date
ES2422561T3 (en) 2013-09-12
AU2011223999B2 (en) 2016-07-14
US20120234986A1 (en) 2012-09-20
BRPI1106924A2 (en) 2013-01-22
FR2964635B1 (en) 2014-01-03
AU2011223999A1 (en) 2012-03-29
EP2428426B1 (en) 2013-05-01
FR2964635A1 (en) 2012-03-16
US8781803B2 (en) 2014-07-15
BRPI1106924A8 (en) 2016-05-31

Similar Documents

Publication Publication Date Title
EP2428426B1 (en) Method and device for generating and editing a railway signal diagram
EP3406503B1 (en) Optimised method for managing the circulation of a train and associated cbtc signalling system
CA2374166C (en) Railway vehicle routing system
CN104616520A (en) Method and device for dynamically recording navigation trail
FR2830658A1 (en) METHOD AND SYSTEM FOR PROVIDING TAXIWAY RECOMMENDATIONS IN A NAVIGATION SYSTEM
EP3206182A1 (en) Risk management method and system for a land transportation system
CN109561387A (en) Adjust the method, apparatus and server of fence
Rouphail et al. Exploratory simulation of pedestrian crossings at roundabouts
CN104236577A (en) Information processing method and electronic equipment
CN105383522A (en) Production method and system of running route map of navigation type train
CN105185117A (en) Road travel time predicting method, system, and device
JP5183535B2 (en) Data input support device and data input support method
Yang et al. Feasibility of using a constant acceleration rate for freeway entrance ramp acceleration lane length design
Qi et al. Estimation of design lengths of left-turn lanes
CN110997449A (en) Train operation plan support system and data structure of data relating to train operation plan
CN101799296A (en) Information providing system and program of information providing method
JP2005319927A (en) Train diagram display device
CA2972298C (en) Computerised method and device for interlocking a railway route
JP2005292064A (en) Navigation system, data processing method, and computer program
EP3508395A1 (en) System and method for locating guided vehicles by axle count comparison
FR2846494A1 (en) INTER-SIGNAL PROXIMITY CHECK IN AN INTEGRATED CIRCUIT
CN108171978A (en) A kind of traffic conditions evaluation method and device
EP3623253A1 (en) Computer with improved safety situated on-board of a railway vehicle, and associated railway vehicle
TWI472719B (en) System for generating driving route based on historical ridding data and method thereof
JP2012245801A (en) Train operation command device

Legal Events

Date Code Title Description
AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120914

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: B61L 19/06 20060101ALI20121026BHEP

Ipc: B61L 21/04 20060101ALI20121026BHEP

Ipc: B61L 27/00 20060101AFI20121026BHEP

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 609732

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130515

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011001554

Country of ref document: DE

Effective date: 20130627

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2422561

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20130912

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 609732

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130501

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20130501

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130801

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130901

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130802

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130902

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130801

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

26 Opposition filed

Opponent name: SCHIENENVERKEHR SYSTEM TECHNIK GMBH/ TRAN-SYS KFT

Effective date: 20140203

Opponent name: DEUTSCHE BAHN AG

Effective date: 20140130

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 602011001554

Country of ref document: DE

Effective date: 20140130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602011001554

Country of ref document: DE

Effective date: 20140401

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PLAF Information modified related to communication of a notice of opposition and request to file observations + time limit

Free format text: ORIGINAL CODE: EPIDOSCOBS2

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130912

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140401

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: ALSTOM TRANSPORT TECHNOLOGIES

REG Reference to a national code

Ref country code: FR

Ref legal event code: TP

Owner name: ALSTOM TRANSPORT TECHNOLOGIES, FR

Effective date: 20141209

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140930

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130912

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110912

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140930

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20150917

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20150918

Year of fee payment: 5

Ref country code: FR

Payment date: 20150922

Year of fee payment: 5

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20151119 AND 20151125

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20150924

Year of fee payment: 5

REG Reference to a national code

Ref country code: DE

Ref legal event code: R064

Ref document number: 602011001554

Country of ref document: DE

Ref country code: DE

Ref legal event code: R103

Ref document number: 602011001554

Country of ref document: DE

RDAF Communication despatched that patent is revoked

Free format text: ORIGINAL CODE: EPIDOSNREV1

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: ALSTOM TRANSPORT TECHNOLOGIES

RDAG Patent revoked

Free format text: ORIGINAL CODE: 0009271

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT REVOKED

27W Patent revoked

Effective date: 20160614

GBPR Gb: patent revoked under art. 102 of the ep convention designating the uk as contracting state

Effective date: 20160614

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20160916

Year of fee payment: 6

REG Reference to a national code

Ref country code: FR

Ref legal event code: CA

Effective date: 20180103

REG Reference to a national code

Ref country code: BE

Ref legal event code: PD

Owner name: ALSTOM TRANSPORT TECHNOLOGIES SAS; FR

Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), AFFECTATION / CESSION; FORMER OWNER NAME: ALSTOM TRANSPORT SA

Effective date: 20150423

Ref country code: BE

Ref legal event code: PD

Owner name: ALSTOM TRANSPORT TECHNOLOGIES; FR

Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), AUTRE, ADRESSE; FORMER OWNER NAME: ALSTOM TRANSPORT TECHNOLOGIES

Effective date: 20171031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130501