EP2366962B1 - Boiler unit - Google Patents

Boiler unit Download PDF

Info

Publication number
EP2366962B1
EP2366962B1 EP10186215.9A EP10186215A EP2366962B1 EP 2366962 B1 EP2366962 B1 EP 2366962B1 EP 10186215 A EP10186215 A EP 10186215A EP 2366962 B1 EP2366962 B1 EP 2366962B1
Authority
EP
European Patent Office
Prior art keywords
boiler
unit
assembly
manifold
boiler unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP10186215.9A
Other languages
German (de)
French (fr)
Other versions
EP2366962A1 (en
Inventor
Luke Chamberlain
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP2366962A1 publication Critical patent/EP2366962A1/en
Application granted granted Critical
Publication of EP2366962B1 publication Critical patent/EP2366962B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/08Packaged or self-contained boilers, i.e. water heaters with control devices and pump in a single unit
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/02Casings; Cover lids; Ornamental panels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/06Arrangement of mountings or supports for heaters, e.g. boilers, other than space heating radiators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/12Arrangements for connecting heaters to circulation pipes
    • F24H9/13Arrangements for connecting heaters to circulation pipes for water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2035Arrangement or mounting of control or safety devices for water heaters using fluid fuel

Definitions

  • the present invention relates to a boiler assembly comprising a removable boiler unit and in particular, although not exclusively, to a removable domestic boiler and a method for servicing and maintaining a boiler unit.
  • GB2246848 A of Baxi Partnership Limited discloses a gas boiler assembly comprising a flue assembly adapted to be permanently mounted on a building, and a removable boiler unit adapted to be removably mounted on the flue assembly. Water, gas and electricity connections are provided on the flue assembly for connection to the boiler unit, when mounted in position on the flue assembly.
  • EP0784192 discloses an appliance for heating water, which includes a manifold unit and a boiler unit, and the units are arranged to be detachably connectable to each other by way of rapid-connect couplings.
  • This document shows an assembly as defined in the preamble of claim 1.
  • a boiler assembly comprising a removable boiler unit detachably connected to a manifold unit, the arrangement being such that the manifold unit provides the boiler unit with a connection interface to a pipework system, characterised in that the boiler unit and the manifold unit each comprising respective means to isolate the connection, and wherein the isolation means are configured to prevent the flow of a fluid through the connection prior to removal of the boiler unit from the manifold unit.
  • the boiler unit is preferably a self contained unit comprising the components required for the production of heat, the components being a fan motor, a fan pressure switch, a burner unit, a heat exchanger, a fluid pump, a gas valve and a PCB control box.
  • the boiler unit is preferably a self contained unit comprising the components required for the production of hot water, the components being a fan motor, a fan pressure switch, a burner unit, a heat exchanger, a fluid pump, a gas valve and a PCB control box.
  • the boiler unit is preferably a self contained unit comprising the components required for the production of domestic heat and domestic hot water.
  • connection interface comprises a plurality of connections between the boiler unit and the manifold unit.
  • the pipework system may incorporate a fluid supply and a fluid return, each being connected to the boiler unit via the manifold unit.
  • connection interface The connections of the connection interface are preferably quick release connections.
  • the isolation means is preferably located at the front of the boiler assembly.
  • the location of the isolation means at the front of the boiler assembly provides easy access to the isolation means.
  • the boiler assembly is preferably capable of being wall mounted or floor standing.
  • the location of the isolation means at the front of the boiler assembly facilitate the boiler assembly being wall mounted or floor standing.
  • the manifold unit comprises guide means for guiding the boiler during removal and re-assembly.
  • the guide means helps to ensure that the connections between the boiler unit and the manifold unit are in the correct location in the assembled state.
  • the boiler assembly preferably comprises a support rail for supporting the boiler unit during removal and re-assembly.
  • the boiler assembly preferably comprises security means for preventing unauthorised removal of the boiler unit.
  • the boiler assembly may comprise a remote management system whereby the management system is in communication with the boiler assembly via a modem, the boiler assembly providing analysis information to the management system.
  • the management system may be used to monitor one or more boiler assembly(ies) remotely and detect potential faults.
  • a heating system characterised in that the system comprises a boiler assembly according to the first aspect of the present invention.
  • a method of servicing or repairing a boiler unit of a boiler assembly characterised by the method comprising detaching and removing a first boiler unit from a manifold unit; then replacing the first boiler unit with a second boiler unit and connecting the second boiler unit to the manifold unit.
  • the heating system may be used while the first boiler unit is being serviced or repaired.
  • a boiler assembly 1 comprises a removable domestic boiler unit 2 detachably connected to a manifold unit 4, the arrangement being such that the manifold unit 4 provides the boiler unit 2 with a connection interface to a heating pipework system (not shown).
  • the boiler unit 2 may be quickly and simply removed from the manifold unit 4 and taken away to be serviced or repaired. In order that the heating system may be used while the servicing is being carried out a replacement boiler unit is connected to the manifold unit 4.
  • the boiler unit 2 is a box-like shape comprising a removable front panel 8; two removable side panels 10, 12 each being formed with a handle recess 13; a removable top panel 14; a base panel 16 and a back panel 18.
  • the removable panels of the manifold unit 4 are secured to the unit by a number of screws 20 (not shown in some Figures).
  • the front panel 8 comprises a security lock 22, which helps to prevent unauthorised access to the boiler unit 2.
  • any suitable security device may be used to prevent unauthorised access to the boiler unit 2.
  • a rectangular instrumentation panel 24 that comprises a pressure gauge 26 and a timer 28 for turning the boiler unit 2 on and off.
  • the timer 28 may also be used to indicate when a service is due or to indicate a fault.
  • the boiler unit 2 contains an array of standard elements normally found in a domestic boiler including a burner unit 30, a heat exchanger 31, a combustion chamber 32, a fluid pump 34, a pressure switch 36 for a fan, a gas valve 38, a diverter valve 40 for the heat exchanger 31, a water pressure switch 42 and a PCB control box 44.
  • the boiler unit 2 also comprises series of pipe connections 46.
  • the pipe connections 46 are used as water inlet and water outlet ports for the boiler unit 2.
  • One or more of the pipe connections 46 may be used as a gas feed port for the burner 30.
  • the correct rating and design of the connections and the internal pipework would be chosen for the different functions of the connections 46 and internal pipework. Attached to each connection 46 there is an isolation valve 48 (see Figure 1 ).
  • a guide channel 50 Disposed at each corner of the boiler unit 2 there is a guide channel 50 each of which extend from the back panel 18 in a direction towards the front of the boiler unit 2.
  • the back panel 18 is also formed with an electrical plug element 54, and a circular port 52 that provides an exhaust for a flue of the boiler unit 2.
  • the manifold unit 4 is a substantially L-shaped structure comprising a rectangular rear box section 60 and a rectangular base section 62.
  • the rear box section 60 contains an expansion chamber 64 that is used for the pipework, which contains the heated water.
  • An upper region of the rear box section 60 is formed with an electrical socket 67 and a flue port 66 for the exhaust gases of the boiler unit 2.
  • the uppermost panel 70 of the rear box section 60 if formed with a series of circular holes 72.
  • One or more pipes of the heating pipework system may use the holes 72 for access into the manifold.
  • the uppermost panel 70 is also formed with a push-out circular section 74, which may be removed to allow access by an exhaust flue (not shown).
  • the manifold unit 4 comprises four guide rails 76 extending in a direction substantially parallel to the base section 62. In the assembled state of the boiler assembly the rails 76 are received by the channels 50 of the boiler unit 2 and help provide support for the boiler unit 2.
  • the base section 62 comprises a series of pipelines 78 the respective distal ends of which are held on a horizontal bracket 80. Connected to the respective distal ends of the pipelines 78 are respective isolation valves 82. In the assembled state the isolation valves 82 of the manifold unit 4 are connected to the isolation valves 48 of the boiler unit 2 (see Figure 1 ).
  • the boiler assembly 1 may be fitted to an existing domestic heating system or alternatively a whole new heating pipework network may be fitted and connected to the boiler assembly 1.
  • the manifold unit 4 is fixed to the wall or floor of the building.
  • the various water pipes of the heating network are connected to the manifold unit 4. If the boiler unit 2 uses gas then the gas pipe is connected to the manifold unit 4 and the gas exhaust flue is connected to the manifold unit 4.
  • any type of boiler may be used, such as an electric boiler or an oil boiler.
  • the boiler unit 2 receives electrical power via the electrical plug 54 and socket 67.
  • the maintenance person isolates the heating pipework system from the boiler unit 2 and the gas supply by closing the isolation valves 48 and 82.
  • the connections between the respective isolation valves 48 and 82 are undone.
  • the boiler unit 2 is then easily removed from the manifold unit 4 using the handles 13.
  • the guide channels 50 slide on the rails 76, the electrical connection between plug 54 and the socket 67 is broken and the connection between the circular port 52 and the flue port 66 is broken. There is no need to remove the front panel 8 of the boiler unit 2 as the work is carried out off-site.
  • a replacement boiler unit may be assembled onto the manifold unit 4 and all the connections made so that the heating system may be used while the original boiler unit is being serviced off-site.
  • a particular benefit of the manifold unit 4 is that some of the elements of a boiler assembly, such as the expansion chamber 64 and the exhaust flue port 66, which do not normally require servicing may be contained in the manifold unit 4.
  • the boiler unit 2 may contain only those elements that require regular servicing or are likely to need repair. The other elements of a domestic boiler assembly can be left behind when the boiler unit 2 is taken away.
  • the boiler unit may comprise a device to measure pressure within one or more of the elements of the boiler assembly, a device for analysing moisture within the boiler unit and a device for measuring the various gases within the boiler assembly.
  • the information from these various devices can be relayed to a remote computer management system via a modem.
  • the computer management system monitors the information received from the devices. Any faults or potential faults are logged and such information may be used by a service technician.
  • the boiler assembly may comprise a remote management system whereby in use the management system is in communication with the boiler assembly via a modem, the boiler assembly providing analysis information to the management system.
  • the management system may be used to monitor one or more boiler assembly(ies) remotely and detect potential faults.
  • a boiler unit comprises a removable boiler unit that is detachably connected to a pipework system via a connection interface comprising quick release connections.
  • the pipework system comprises isolation valve adjacent to the connections of the pipework system.
  • the boiler unit may also comprise isolation valves adjacent to the connections.
  • the isolation valves are used to prevent the flow of a fluid through the connections and they may be used to stop the flow of a fluid through the connections prior to the removal of the boiler unit from the pipework system.
  • the connection interface may comprise an electrical power connection for providing the boiler unit with a power supply and a gas pipe connection for providing the boiler unit with a connection to a gas inlet pipe.
  • the connection interface may also comprise an exhaust connection for providing the boiler unit with a connection to a gas outlet duct.
  • a replacement boiler unit may be connected to the pipework system so that the heating system may be used while the original boiler unit is being serviced off-site.
  • a boiler assembly 1 comprises a removable domestic boiler unit 2 detachably connected to a manifold unit 4, the arrangement being such that the manifold unit 4 provides the boiler unit 2 with a connection interface to a heating pipework system (not shown).
  • the manifold unit 4 comprises four guide rails 90 extending in a direction substantially parallel to the base section 62.
  • the rails 90 are received by channels 95 of the boiler 7 unit 2 and help provide support for the boiler unit 2.
  • the guide rails 90 are each attached to the manifold at one of their respective end so forming a cantilever.
  • the guide rails 90 each have a circular cross section.
  • the distal end 91 of each guide rail 90 is a cone shape to aid the insertion into the respective channels 95.
  • the boiler assembly 1 also comprises two removable support rails 94.
  • the support rails 94 have an L-shaped vertical cross section and are used during the assembly and disassembly of the boiler unit 2 from the manifold unit 4 to provide support of the boiler unit 2. In the assembled state the support rails 94 can be removed from boiler assembly 1.

Abstract

A boiler assembly 1 comprises a removable domestic boiler unit 2 detachably connected to a manifold unit 4, the arrangement being such that the manifold unit 4 provides the boiler unit 2 with a connection interface to a heating pipework system (not shown). The boiler unit 2 may be quickly and simply removed from the manifold unit 4 and taken away to be serviced or repaired. In order that the heating system may be used while the servicing is being carried out a replacement boiler unit is connected to the manifold unit 4. The boiler unit 2 comprises a plurality of removable panels 8; 10, 12; 14; 16 and 18. The front panel 8 comprises a security lock 22. A timer 28 is also provided for turning the boiler unit 2 on and off and to indicate when a service is due or to indicate a fault.

Description

  • The present invention relates to a boiler assembly comprising a removable boiler unit and in particular, although not exclusively, to a removable domestic boiler and a method for servicing and maintaining a boiler unit.
  • At present a domestic boiler that has broken down or requires servicing has to be worked on in-situ. This requires the maintenance person to carry a large selection of spare parts. If the repair is a complex one, the household may be without heating for a considerable period of time.
  • GB2246848 A of Baxi Partnership Limited discloses a gas boiler assembly comprising a flue assembly adapted to be permanently mounted on a building, and a removable boiler unit adapted to be removably mounted on the flue assembly. Water, gas and electricity connections are provided on the flue assembly for connection to the boiler unit, when mounted in position on the flue assembly.
  • EP0784192 discloses an appliance for heating water, which includes a manifold unit and a boiler unit, and the units are arranged to be detachably connectable to each other by way of rapid-connect couplings. This document shows an assembly as defined in the preamble of claim 1.
    According to a first aspect of the present invention there is provided a boiler assembly comprising a removable boiler unit detachably connected to a manifold unit, the arrangement being such that the manifold unit provides the boiler unit with a connection interface to a pipework system, characterised in that the boiler unit and the manifold unit each comprising respective means to isolate the connection, and wherein the isolation means are configured to prevent the flow of a fluid through the connection prior to removal of the boiler unit from the manifold unit.
  • The boiler unit is preferably a self contained unit comprising the components required for the production of heat, the components being a fan motor, a fan pressure switch, a burner unit, a heat exchanger, a fluid pump, a gas valve and a PCB control box.
  • The boiler unit is preferably a self contained unit comprising the components required for the production of hot water, the components being a fan motor, a fan pressure switch, a burner unit, a heat exchanger, a fluid pump, a gas valve and a PCB control box.
  • The boiler unit is preferably a self contained unit comprising the components required for the production of domestic heat and domestic hot water.
  • Preferably, the connection interface comprises a plurality of connections between the boiler unit and the manifold unit.
  • The pipework system may incorporate a fluid supply and a fluid return, each being connected to the boiler unit via the manifold unit.
  • The connections of the connection interface are preferably quick release connections.
  • The isolation means is preferably located at the front of the boiler assembly. The location of the isolation means at the front of the boiler assembly provides easy access to the isolation means.
  • The boiler assembly is preferably capable of being wall mounted or floor standing. The location of the isolation means at the front of the boiler assembly facilitate the boiler assembly being wall mounted or floor standing.
  • Preferably, the manifold unit comprises guide means for guiding the boiler during removal and re-assembly. The guide means helps to ensure that the connections between the boiler unit and the manifold unit are in the correct location in the assembled state.
  • The boiler assembly preferably comprises a support rail for supporting the boiler unit during removal and re-assembly.
  • The boiler assembly preferably comprises security means for preventing unauthorised removal of the boiler unit.
  • The boiler assembly may comprise a remote management system whereby the management system is in communication with the boiler assembly via a modem, the boiler assembly providing analysis information to the management system. The management system may be used to monitor one or more boiler assembly(ies) remotely and detect potential faults.
  • According to a second aspect of the present invention there is provided a heating system characterised in that the system comprises a boiler assembly according to the first aspect of the present invention.
  • According to a third aspect of the present invention there is provided a method of servicing or repairing a boiler unit of a boiler assembly according to the first aspect of the present invention, characterised by the method comprising detaching and removing a first boiler unit from a manifold unit; then replacing the first boiler unit with a second boiler unit and connecting the second boiler unit to the manifold unit.
  • By replacing the boiler unit with a second boiler unit the heating system may be used while the first boiler unit is being serviced or repaired.
  • The present invention may be carried into practice in various ways, but two embodiments will now be described by way of example only with reference to the accompanying drawings in which:
    • Figure 1 is a schematic view of a boiler assembly comprising a boiler unit and a manifold unit;
    • Figure 2 is a side view of the boiler assembly shown in Figure 1;
    • Figure 3 is an isometric front view of the boiler unit shown in Figures 1 and 2, and shows the boiler unit with a front panel removed;
    • Figure 4 is an isometric rear view of the boiler shown in Figure 3;
    • Figure 5 is an isometric front view of the manifold unit shown in Figure 1 with the boiler unit removed;
    • Figure 6 is a schematic view of a further embodiment of a boiler assembly comprising a boiler unit (shown in ghost form) partially assembled on a manifold unit;
    • Figure 7 is a side view of a corner of the manifold unit shown in Figure 6 and a support rail partially removed from the manifold unit; and
    • Figure 8 is an isometric rear view of the boiler shown in Figure 6.
  • Referring to the Figures 1 to 5, a boiler assembly 1 comprises a removable domestic boiler unit 2 detachably connected to a manifold unit 4, the arrangement being such that the manifold unit 4 provides the boiler unit 2 with a connection interface to a heating pipework system (not shown).
  • The boiler unit 2 may be quickly and simply removed from the manifold unit 4 and taken away to be serviced or repaired. In order that the heating system may be used while the servicing is being carried out a replacement boiler unit is connected to the manifold unit 4.
  • The boiler unit 2 is a box-like shape comprising a removable front panel 8; two removable side panels 10, 12 each being formed with a handle recess 13; a removable top panel 14; a base panel 16 and a back panel 18. The removable panels of the manifold unit 4 are secured to the unit by a number of screws 20 (not shown in some Figures). The front panel 8 comprises a security lock 22, which helps to prevent unauthorised access to the boiler unit 2. The skilled person will appreciate that any suitable security device may be used to prevent unauthorised access to the boiler unit 2. Disposed below the front panel 8 is a rectangular instrumentation panel 24 that comprises a pressure gauge 26 and a timer 28 for turning the boiler unit 2 on and off. The timer 28 may also be used to indicate when a service is due or to indicate a fault.
  • The boiler unit 2 contains an array of standard elements normally found in a domestic boiler including a burner unit 30, a heat exchanger 31, a combustion chamber 32, a fluid pump 34, a pressure switch 36 for a fan, a gas valve 38, a diverter valve 40 for the heat exchanger 31, a water pressure switch 42 and a PCB control box 44. The boiler unit 2 also comprises series of pipe connections 46. The pipe connections 46 are used as water inlet and water outlet ports for the boiler unit 2. One or more of the pipe connections 46 may be used as a gas feed port for the burner 30. The correct rating and design of the connections and the internal pipework would be chosen for the different functions of the connections 46 and internal pipework. Attached to each connection 46 there is an isolation valve 48 (see Figure 1).
  • Disposed at each corner of the boiler unit 2 there is a guide channel 50 each of which extend from the back panel 18 in a direction towards the front of the boiler unit 2. The back panel 18 is also formed with an electrical plug element 54, and a circular port 52 that provides an exhaust for a flue of the boiler unit 2.
  • The manifold unit 4 is a substantially L-shaped structure comprising a rectangular rear box section 60 and a rectangular base section 62. The rear box section 60 contains an expansion chamber 64 that is used for the pipework, which contains the heated water. An upper region of the rear box section 60 is formed with an electrical socket 67 and a flue port 66 for the exhaust gases of the boiler unit 2. When the boiler unit 2 is assembled on the manifold unit 4 the flue port 66 aligns and connects with the circular port 52 of the boiler unit 2 and the electrical plug element 54 of the boiler unit 2 is received by the electrical socket 67 of the manifold unit 4.
  • The uppermost panel 70 of the rear box section 60 if formed with a series of circular holes 72. One or more pipes of the heating pipework system may use the holes 72 for access into the manifold. The uppermost panel 70 is also formed with a push-out circular section 74, which may be removed to allow access by an exhaust flue (not shown).
  • The manifold unit 4 comprises four guide rails 76 extending in a direction substantially parallel to the base section 62. In the assembled state of the boiler assembly the rails 76 are received by the channels 50 of the boiler unit 2 and help provide support for the boiler unit 2.
  • The base section 62 comprises a series of pipelines 78 the respective distal ends of which are held on a horizontal bracket 80. Connected to the respective distal ends of the pipelines 78 are respective isolation valves 82. In the assembled state the isolation valves 82 of the manifold unit 4 are connected to the isolation valves 48 of the boiler unit 2 (see Figure 1).
  • The boiler assembly 1 may be fitted to an existing domestic heating system or alternatively a whole new heating pipework network may be fitted and connected to the boiler assembly 1. The manifold unit 4 is fixed to the wall or floor of the building. The various water pipes of the heating network are connected to the manifold unit 4. If the boiler unit 2 uses gas then the gas pipe is connected to the manifold unit 4 and the gas exhaust flue is connected to the manifold unit 4. The skilled person will appreciate that any type of boiler may be used, such as an electric boiler or an oil boiler. The boiler unit 2 receives electrical power via the electrical plug 54 and socket 67.
  • When the boiler unit 2 is due a service or requires repair the maintenance person isolates the heating pipework system from the boiler unit 2 and the gas supply by closing the isolation valves 48 and 82. The connections between the respective isolation valves 48 and 82 are undone. The boiler unit 2 is then easily removed from the manifold unit 4 using the handles 13. When removing the boiler unit 2 form the manifold unit 4, the guide channels 50 slide on the rails 76, the electrical connection between plug 54 and the socket 67 is broken and the connection between the circular port 52 and the flue port 66 is broken. There is no need to remove the front panel 8 of the boiler unit 2 as the work is carried out off-site.
  • Once the boiler unit 2 has been removed from the manifold unit 4 a replacement boiler unit may be assembled onto the manifold unit 4 and all the connections made so that the heating system may be used while the original boiler unit is being serviced off-site.
  • A particular benefit of the manifold unit 4 is that some of the elements of a boiler assembly, such as the expansion chamber 64 and the exhaust flue port 66, which do not normally require servicing may be contained in the manifold unit 4. The boiler unit 2 may contain only those elements that require regular servicing or are likely to need repair. The other elements of a domestic boiler assembly can be left behind when the boiler unit 2 is taken away.
  • The boiler unit may comprise a device to measure pressure within one or more of the elements of the boiler assembly, a device for analysing moisture within the boiler unit and a device for measuring the various gases within the boiler assembly. The information from these various devices can be relayed to a remote computer management system via a modem. The computer management system monitors the information received from the devices. Any faults or potential faults are logged and such information may be used by a service technician.
  • The boiler assembly may comprise a remote management system whereby in use the management system is in communication with the boiler assembly via a modem, the boiler assembly providing analysis information to the management system. The management system may be used to monitor one or more boiler assembly(ies) remotely and detect potential faults.
  • In an alternative embodiment (not shown in the Figures) a boiler unit comprises a removable boiler unit that is detachably connected to a pipework system via a connection interface comprising quick release connections. The pipework system comprises isolation valve adjacent to the connections of the pipework system. The boiler unit may also comprise isolation valves adjacent to the connections.
  • The isolation valves are used to prevent the flow of a fluid through the connections and they may be used to stop the flow of a fluid through the connections prior to the removal of the boiler unit from the pipework system. The connection interface may comprise an electrical power connection for providing the boiler unit with a power supply and a gas pipe connection for providing the boiler unit with a connection to a gas inlet pipe. The connection interface may also comprise an exhaust connection for providing the boiler unit with a connection to a gas outlet duct.
  • Once the boiler unit has been disconnected and removed from the pipework system a replacement boiler unit may be connected to the pipework system so that the heating system may be used while the original boiler unit is being serviced off-site.
  • Referring to the Figures 6 to 8, a boiler assembly 1 comprises a removable domestic boiler unit 2 detachably connected to a manifold unit 4, the arrangement being such that the manifold unit 4 provides the boiler unit 2 with a connection interface to a heating pipework system (not shown).
  • In this particular embodiment the manifold unit 4 comprises four guide rails 90 extending in a direction substantially parallel to the base section 62. In the assembled state of the boiler assembly the rails 90 are received by channels 95 of the boiler 7 unit 2 and help provide support for the boiler unit 2. The guide rails 90 are each attached to the manifold at one of their respective end so forming a cantilever. The guide rails 90 each have a circular cross section. The distal end 91 of each guide rail 90 is a cone shape to aid the insertion into the respective channels 95.
  • The boiler assembly 1 also comprises two removable support rails 94. The support rails 94 have an L-shaped vertical cross section and are used during the assembly and disassembly of the boiler unit 2 from the manifold unit 4 to provide support of the boiler unit 2. In the assembled state the support rails 94 can be removed from boiler assembly 1.

Claims (14)

  1. A boiler assembly (1) comprising a removable boiler unit (2) detachably connected to a manifold unit (4), the arrangement being such that the manifold unit (4) provides the boiler unit (2) with a connection interface to a pipework system , characterised in that the boiler unit (2) and the manifold unit (4) each comprising respective means (48, 82) to isolate the connection, and wherein the isolation means (48, 52) are configured to prevent the flow of a fluid through the connection prior to removal of the boiler unit from the manifold unit.
  2. A boiler assembly (1) as claimed in claim 1 wherein the boiler unit (2) is a self-contained unit comprising the components required for the production of heat, the components being a fan motor, a fan pressure switch (36), a burner unit (30), a heat exchanger (31), a fluid pump (34), a gas valve (38) and a PCB control box (44).
  3. A boiler assembly (1) as claimed in claim 1 wherein the boiler unit (2) is a self contained unit comprising the components required for the production of hot water, the components being a fan motor, a fan pressure switch (36), a burner unit (30), a heat exchanger (31), a fluid pump (34), a gas valve (38) and a PCB control box (44).
  4. A boiler assembly (1) as claimed in any one of claims 1 to 3 wherein, the connection interface comprises a plurality of connections between the boiler unit (2) and the manifold unit (4).
  5. A boiler assembly (1) as claimed in claim 4 wherein the pipework system incorporates a fluid supply and a fluid return, each being connected to the boiler unit (2) via the manifold unit (4).
  6. A boiler assembly (1) as claimed in any one of claims 4 or 5 wherein the connections of the connection interface are quick release connections.
  7. A boiler assembly (1) as claimed in any one of claims 1 to 6 wherein the isolation means (48) is located at the front of the boiler assembly (1).
  8. A boiler assembly (1) as claimed in any one of the preceding claims wherein the boiler assembly (1) is capable of being wall mounted or floor standing.
  9. A boiler assembly (1) as claimed in any one of the preceding claims wherein the manifold unit (4) comprises guide means (76) for guiding the boiler unit (2) during removal and re-assembly.
  10. A boiler assembly (1) as claimed in claim 1 comprising a support rail (94) for supporting the boiler unit (2) during removal and re-assembly.
  11. A boiler assembly (1) as claimed in claim 1 comprising security means for preventing unauthorised removal of the boiler unit (2).
  12. A boiler assembly (1) as claimed in any one of the preceding claims comprising a remote management system whereby the management system is in communication with the boiler assembly (1) via a modem, the boiler assembly (1) providing analysis information to the management system.
  13. A heating system comprising a boiler assembly (1) as claimed in any one of claims 1 to 12.
  14. A method of servicing or repairing a boiler unit (2) of a boiler assembly (1) according to any one of claims 1 to 12, the method comprising detaching and removing a first boiler unit (2) from a manifold unit (4); then replacing the first boiler unit (2) with a second boiler unit (2) and connecting the second boiler unit (2) to the manifold unit (4).
EP10186215.9A 2001-07-12 2002-07-11 Boiler unit Expired - Lifetime EP2366962B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GBGB0116989.5A GB0116989D0 (en) 2001-07-12 2001-07-12 Boiler unit
EP02254899A EP1275910B1 (en) 2001-07-12 2002-07-11 Boiler unit

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
EP02254899A Division EP1275910B1 (en) 2001-07-12 2002-07-11 Boiler unit
EP02254899.4 Division 2002-07-11

Publications (2)

Publication Number Publication Date
EP2366962A1 EP2366962A1 (en) 2011-09-21
EP2366962B1 true EP2366962B1 (en) 2016-09-07

Family

ID=9918351

Family Applications (2)

Application Number Title Priority Date Filing Date
EP10186215.9A Expired - Lifetime EP2366962B1 (en) 2001-07-12 2002-07-11 Boiler unit
EP02254899A Expired - Lifetime EP1275910B1 (en) 2001-07-12 2002-07-11 Boiler unit

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP02254899A Expired - Lifetime EP1275910B1 (en) 2001-07-12 2002-07-11 Boiler unit

Country Status (5)

Country Link
EP (2) EP2366962B1 (en)
AT (1) ATE501403T1 (en)
DE (1) DE60239373D1 (en)
ES (2) ES2362983T3 (en)
GB (2) GB0116989D0 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4102141A1 (en) 2021-06-11 2022-12-14 BDR Thermea Group B.V. Safety mechanism

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT503217B1 (en) * 2006-01-19 2007-11-15 Vaillant Austria Gmbh HEATER WITH ELECTRICAL CONNECTIONS
GB201016902D0 (en) 2010-10-07 2010-11-24 Chamberlain Luke A boiler assembly comprising a removable boiler unit
FR3004521B1 (en) * 2013-04-10 2016-11-04 Atlantic Climatisation Et Ventilation DEVICE FOR SUPPORTING A THERMODYNAMIC WATER HEATER, SUPPORT SYSTEM, THERMODYNAMIC WATER HEATER, AND CORRESPONDING FASTENING METHOD
GB2580007B (en) * 2018-02-09 2022-08-03 Lukey Solutions Ltd Removable boiler
FR3098570B1 (en) * 2019-07-12 2021-07-09 Bdr Thermea Group Heat pump water heater
DE102022111257A1 (en) * 2022-05-06 2023-11-09 Fingerhaus Gmbh Connection device for a heat generator in technical building equipment, heat generator arrangement in technical building equipment and method for connecting a heat generator to technical building equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19524114A1 (en) * 1995-07-03 1997-01-09 Abb Patent Gmbh Hydraulic- or pneumatic-coupling e.g. for liquid-cooled current rectifier systems of railway vehicle - has two halves, each with valve body in internal coupling chamber which presses against conical rod in decoupled state to form seal; in coupled state valve body ends press against each other

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0034312B1 (en) * 1980-02-14 1985-01-16 Aeroquip GmbH Quick-connection coupling also connectable under pressure
GB2246848B (en) * 1990-07-04 1994-05-18 Baxi Partnership Ltd Gas boiler
US5044401A (en) * 1990-11-20 1991-09-03 Parker Hannifin Corporation Integral valve and seal for a quick connect coupling
DE4407371A1 (en) * 1994-03-05 1995-09-07 Bosch Gmbh Robert Heater for space heating and domestic water heating
NL1002098C2 (en) * 1996-01-15 1997-07-16 Radson Alutherm Nv Heater.
AT411492B (en) * 1999-01-19 2004-01-26 Vaillant Gmbh ARRANGEMENT WITH A WALL HEATER

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19524114A1 (en) * 1995-07-03 1997-01-09 Abb Patent Gmbh Hydraulic- or pneumatic-coupling e.g. for liquid-cooled current rectifier systems of railway vehicle - has two halves, each with valve body in internal coupling chamber which presses against conical rod in decoupled state to form seal; in coupled state valve body ends press against each other

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4102141A1 (en) 2021-06-11 2022-12-14 BDR Thermea Group B.V. Safety mechanism
WO2022258406A1 (en) 2021-06-11 2022-12-15 Bdr Thermea Group B.V. Safety mechanism

Also Published As

Publication number Publication date
EP1275910B1 (en) 2011-03-09
DE60239373D1 (en) 2011-04-21
EP1275910A3 (en) 2003-10-22
GB2378747A (en) 2003-02-19
ES2610354T3 (en) 2017-04-27
ES2362983T3 (en) 2011-07-18
ATE501403T1 (en) 2011-03-15
EP2366962A1 (en) 2011-09-21
GB0216011D0 (en) 2002-08-21
GB2378747B (en) 2005-08-24
EP1275910A2 (en) 2003-01-15
GB0116989D0 (en) 2001-09-05

Similar Documents

Publication Publication Date Title
US7460769B2 (en) Modular water heating systems
EP2366962B1 (en) Boiler unit
GB2409895A (en) Boiler unit with isolation valves on boiler and manifold
US20200370786A1 (en) Removable Boiler
CA2619213A1 (en) Furnace burner box
WO2011025374A1 (en) Heat transport device and heat transport system
EP0784192A1 (en) Heating appliance
US9927142B2 (en) Plug and play modular comfort device and interface template adapted to said plug and play modular comfort device
JP5595053B2 (en) Heat source unit and assembly method thereof
EP2484990A2 (en) A boiler assembly comprising a removable boiler unit
NL2003542C2 (en) HEATING COMPOSITION.
US7100597B2 (en) Modular burner/blower system and method
JP2007139283A (en) Detachable air conditioner and detachable air conditioning system
JP3660206B2 (en) Water heater
GB2568072A (en) Gas Boiler Assembly and Method
JPH02263046A (en) Hot water supply and space heating device
JP2003042571A (en) Water heater stand
KR100636087B1 (en) Boiler drum
KR20230016466A (en) Heat supply apparatus
CN109708093A (en) A kind of quick descaling water gallbladder and its gas-combustion steam boiler
EP1378712A1 (en) Thermal fluid distribution assembly for one or more thermal circuits
AU2003213464A1 (en) Combined hot-water supply system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AC Divisional application: reference to earlier application

Ref document number: 1275910

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

17P Request for examination filed

Effective date: 20120629

17Q First examination report despatched

Effective date: 20130624

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20151021

INTG Intention to grant announced

Effective date: 20160308

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

RBV Designated contracting states (corrected)

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GR IE IT LI LU MC NL PT SE SK TR

AC Divisional application: reference to earlier application

Ref document number: 1275910

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GR IE IT LI LU MC NL PT SE SK TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 827243

Country of ref document: AT

Kind code of ref document: T

Effective date: 20161015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 60248348

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 827243

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161208

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2610354

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20170427

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170109

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161207

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 60248348

Country of ref document: DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 16

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

26N No opposition filed

Effective date: 20170608

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170731

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170711

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 17

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20200729

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20200813

Year of fee payment: 19

Ref country code: IE

Payment date: 20200731

Year of fee payment: 19

Ref country code: DE

Payment date: 20200831

Year of fee payment: 19

Ref country code: FR

Payment date: 20200728

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20200727

Year of fee payment: 19

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 60248348

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20210801

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210801

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210711

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210711

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20220901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210712