EP2356287A2 - Monolithic foundation system with homopolymer/resistan aggregate pavement with a semi-continuous configuration - Google Patents

Monolithic foundation system with homopolymer/resistan aggregate pavement with a semi-continuous configuration

Info

Publication number
EP2356287A2
EP2356287A2 EP09773818A EP09773818A EP2356287A2 EP 2356287 A2 EP2356287 A2 EP 2356287A2 EP 09773818 A EP09773818 A EP 09773818A EP 09773818 A EP09773818 A EP 09773818A EP 2356287 A2 EP2356287 A2 EP 2356287A2
Authority
EP
European Patent Office
Prior art keywords
foundation
pavement
load transfer
joint
polystyrene blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP09773818A
Other languages
German (de)
French (fr)
Other versions
EP2356287B1 (en
Inventor
Manuel Filipe LOURENÇO SERRO
Carlos Manuel Ramos Lopes Leonardo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SPWS - Scientific Pavement World Systems LDA
SPWS SCIENT PAVEMENT WORLD SYSTEMS Lda
Original Assignee
SPWS - Scientific Pavement World Systems LDA
SPWS SCIENT PAVEMENT WORLD SYSTEMS Lda
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SPWS - Scientific Pavement World Systems LDA, SPWS SCIENT PAVEMENT WORLD SYSTEMS Lda filed Critical SPWS - Scientific Pavement World Systems LDA
Publication of EP2356287A2 publication Critical patent/EP2356287A2/en
Application granted granted Critical
Publication of EP2356287B1 publication Critical patent/EP2356287B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations

Definitions

  • This invention relates to a monolithic foundation system with homopolymer/resistant aggregate pavement with a semi -continuous configuration, more specifically to a semi- continuous cement concrete pavement having joints formed by load transfer plates, with a structural strength which, by itself, absorbs, degrades and transmit loads, while withstanding the forces exerted thereon as well as the abrasion caused thereby, without differential settlements on the joint axis, also serving as a wearing course, the said pavement being laid on a foundation which is independent of the natural soil and acting as both a base and a sub-base .
  • rigid pavements also comply with well-established rules.
  • the standards usually considered for determining the pavement characteristics are closely related to aspects such as traffic, loads, sub-bed support and drainage.
  • One of the main problems to be solved is the differential settlements between adjacent concrete slabs in pavements laid on elastic soils.
  • load transfer elements are considered which minimize the loads projected on the foundation and prevent the settlement of the slabs.
  • Another problem to be solved in the design of a rigid cement concrete pavement concerns the sealing of the joints between slabs.
  • the basic function of the sealing of the induction slot in the joints of a concrete pavement is to prevent the intrusion of water and incompressible solid materials, such as sand, small stones and other foreign substances.
  • Water infiltration through the joint has damaging effects on the durability of a pavement, essentially because it is the main cause of pumping, which consists of the deterioration of the foundation layer by expulsion of the grindings of which it is constituted, meaning that the board becomes unprotected and thus subject to degradation (this being known as the pumping phenomenon) .
  • an object of the invention is the use of a semi-continuous cement concrete pavement having joints formed by load transfer plates, with a structural strength which, by itself, absorbs, degrades and transmits loads, while withstanding the forces exerted thereon as well as the abrasion caused thereby, without differential settlements on the joint axis, also serving as a wearing course, the said pavement being laid on a foundation which is independent of the natural soil and acting as both a base and a sub-base for supporting the said semi-continuous concrete pavement .
  • the load transfer elements used by the system of the invention are basically the elements of prior art disclosed in Portuguese patent no. 102947, to which improvements have been made so that the use of polystyrene blocks in the foundations is permitted.
  • Patent PT 102947 is herein incorporated for reference purposes .
  • Figure 1 is a schematic illustration of the system of the invention
  • Figure 2 is a schematic illustration of an expansion and contraction joint
  • Figure 3 is a schematic illustration of a construction j oint ;
  • FIG. 4 is another schematic illustration of the system of the invention.
  • FIG. 5 is a perspective view of the load transfer plate of the system of the invention.
  • Figure 6 is a main elevation of the load transfer plate of the system of the invention.
  • an appropriate foundation Prior to pavement concreting, an appropriate foundation is built to receive the area of the pavement to be concreted, being comprised of several strips, each of them being formed by a sequence of slabs. In turn, the slabs must be confined by a formwork. Finally, the concreting of the slabs is carried out.
  • the foundation (1) is obtained by the application of high-density expanded polystyrene blocks which, as a homopolymer, remains stable throughout the useful life of the system and, in terms of its technical specifications (density, deformation modulus) , has a steady behaviour without modification of the Westergaard modulus: K/cm 3 .
  • the foundation (1) ensures the carrying capacity of the overall structure and must be designed to that end.
  • the polystyrene blocks having densities and dimensions according to the design are laid over the natural soil (2) . Surface levelling errors should not exceed 5 mm in a 3 m ruler. In order to obtain an appropriate formwork, it is not necessary to fill it with inert materials of various granulometries and with possible frames, as is the case in prior art .
  • base and sub-base foundation (1) used in the system of the invention since it is formed by high- density expanded polystyrene, it has specific technical characteristics which remain unaltered throughout the useful life of this material and which are essentially the following :
  • polystyrene blocks replaces the base and sub-base of conventional foundations. These blocks also provide a formwork which is suitable for a continuous concreting.
  • the level of the formworks will be according to the initial design elevation. Horizontal tolerance will be between 1 and 2 cm in length. The length of the formwork elements is limited in order to allow levelling and layout according to the design elevation.
  • the pavement (3) After the laying of the foundation (1) and consequently the formwork, the pavement (3) can be concreted according to the established work specification.
  • the concreting process comprises the following steps :
  • the layout of the longitudinal profile will be realized on site with the aid of topographic precision instruments.
  • the prescribed levels are verified by stakes placed solidly in the ground, outside the concreting corridor, at maximum intervals of 50 m, so that a rigorous longitudinal profile is formed parallel to the final elevation of the slab to be executed. In the case of curves, the distance between the stakes is reduced in order to exactly follow the profile of the design.
  • the placing of the stakes must be carried out at least one day before the concreting operation. Unless there is a local impediment, to be recognized by the inspection authority, the preparation of the joints and the placement of the load transfer plates should precede the concreting by a distance of around 50 m, in order to ensure continuous implementation .
  • the foundation In order to prevent any water absorption from the concrete to the foundation (1) , the foundation should be always covered with a sliding complex of approximately 0.2 mm and coverings of 20 cm.
  • composition of the concrete will be sent to the inspection authority to be approved thereby. It must be in compliance with the pre-established conditions for each specific project.
  • Manufacturing will preferably take place at the construction site and the equipment will have sufficient capacity to ensure a continuous laying operation.
  • the type of transport will be subject to approval by the inspection authority, whether in a cement truck mixer or in a dump truck.
  • the concrete may be laid and hand vibrated with a vibrating needle.
  • All the edges of the slabs along the formworks will have to be vibrated using a needle vibrator. Atmospheric conditions Concreting will not be permitted during days of heavy rain.
  • the surface treatment of the coating will be made by brushing the fresh concrete with brushes previously approved by the inspection authority.
  • All the transverse and longitudinal joints are provided with load transfer plates .
  • Contraction and expansion joints are according to figure 2.
  • the sawing depth is of at least 2 cm.
  • the construction joints are established at the end of each daily production or in the case of interruption of the concreting operation. As can be observed, the face of the joint must be flat and perpendicular to the surface of the coating. As soon as the concreting operation is restarted, the said joints are placed concrete against concrete, the face of the preceding slab being bathed with an anti-adherent agent, such as Antisol, in order to provide an effective separation.
  • the pavement generically illustrated as (3) is formed by several slabs (4) which are provided with load transfer plates (5) .
  • the said plates (5) are comprised of two anchors (6) with two rebars (7) for alignment of a joint inductor (8), and a ball joint (9) which, at the load support moment, rotates anticlockwise and, at the support moment generated by the load transfer plates (5) , performs a clockwise movement.
  • This ball joint (9) is positioned under the joint inductor (8) and its centre is aligned with the vertical axis of the joint formed by the said inductor (8) .
  • the said ball joint (9) releases the concrete slabs (4) from stress caused by bending/traction at the moment of load transfer, allowing the foundation (1) to be unaffected by bending moments resulting from the load and thus making the slab (4) work essentially with compression stress, thereby ensuring a safety coefficient much higher than the normal one and a long life of the foundation (1) of the slab (4) .
  • the ball joint (9) releasing the concrete slabs (4) from stress caused by bending/traction at the moment of load transfer will thus allow the said concrete slabs (4) to work for a longer period of time with compression, i.e. releasing them from permanent stress and filtering most of the vibrations caused by rolling loads.
  • the said slabs (4) will be subject to:
  • this invention relates to a pavement (3) which has been successfully tested in all kinds of adverse conditions, having now a new conception of supports for joints, which consists of providing the load transfer plates (5) with ball joints (9) which, as previously mentioned, release the concrete slabs (4) from stress caused by bending/traction at the moment of load transfer, allowing the foundation (1) to remain unaffected by bending moments resulting from the load and thus making the slab (4) work essentially with compression stress.
  • the ball joints (9) that foundations (1) with polystyrene blocks can be obtained. Joint sealing is required for protecting the foundation (1) against chemical agents/diluents.
  • the foundation (1) must be coated along its upper and lateral parts with a plastic material .
  • This material allows a reduction from about 2.5 to 0.5 in the friction coefficient of the slab (4) concrete when contracting and it also insulates the polystyrene blocks against any chemical attack resulting from spillages on the pavement surface (3) .

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Foundations (AREA)
  • Building Environments (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

This invention relates to a monolithic foundation (1) system with homopolymer /resist ant aggregate pavement with a semi-continuous configuration, which uses a pavement with load transfer elements (5) for the induction of joints. It is essentially characterized in that it comprises a foundation (1) having high-density expanded polystyrene blocks, which supports a semi -continuous cement concrete pavement, the pavement formwork being formed by the polystyrene blocks of the foundation. Each one of the load transfer plates (5) is comprised of two anchors (6) with two rebars (7) for alignment of a joint inductor (8), and a ball joint (9) which, at the load support moment, rotates anticlockwise and, at the support moment generated by the load transfer plates, performs a clockwise movement. The said ball joint releases the concrete slabs (4) from stress caused by bending/traction at the moment of load transfer, allowing the foundation to be unaffected by bending moments resulting from the load and thus making the slab (4) work essentially with compression stress. The existence of the said ball joints enables the foundation to be obtained by the said polystyrene blocks.

Description

DESCRIPTION
"MONOLITHIC FOUNDATION SYSTEM WITH HOMOPOLYMER/RESISTANT AGGREGATE PAVEMENT WITH A SEMI-CONTINUOUS CONFIGURATION"
Scope of the invention
This invention relates to a monolithic foundation system with homopolymer/resistant aggregate pavement with a semi -continuous configuration, more specifically to a semi- continuous cement concrete pavement having joints formed by load transfer plates, with a structural strength which, by itself, absorbs, degrades and transmit loads, while withstanding the forces exerted thereon as well as the abrasion caused thereby, without differential settlements on the joint axis, also serving as a wearing course, the said pavement being laid on a foundation which is independent of the natural soil and acting as both a base and a sub-base .
Prior art
Today, surfaces intended namely for large public areas and mainly for roads and airports can be made with rigid and flexible pavements. Cement concrete pavements and bituminous pavements are already known, each of them having its own implementation rules in accordance with the materials employed.
In the case of rigid pavements, special attention must be given to the occurrence of sudden changes in the characteristics of the sub-bed, particularly to the presence of expansive soils and thick layers of soft clay. In this type of pavement, for the above mentioned reasons, special attention is given to the foundations. Therefore, several materials are used, such as a stable form of stones, pebbles, gravel and grit and sand with variable thickness, and/or other materials such as cement boards. However, the cleaning of the soil must be previously carried out as far as its vegetable layer is concerned, with the subsequent levelling of the soil for the laying of the several layers comprising the foundation.
There are various methods for calculating the foundation, which take into consideration the foundation categories, the land classes, the materials used for the bed layer and constitution of the platform. This results in complex foundations which are not always able to maintain the desired integrity.
All of the aforementioned types of pavements require a specific foundation for supporting them.
Furthermore, rigid pavements also comply with well-established rules. The standards usually considered for determining the pavement characteristics are closely related to aspects such as traffic, loads, sub-bed support and drainage. One of the main problems to be solved is the differential settlements between adjacent concrete slabs in pavements laid on elastic soils. For this purpose, load transfer elements are considered which minimize the loads projected on the foundation and prevent the settlement of the slabs. Another problem to be solved in the design of a rigid cement concrete pavement concerns the sealing of the joints between slabs. The basic function of the sealing of the induction slot in the joints of a concrete pavement is to prevent the intrusion of water and incompressible solid materials, such as sand, small stones and other foreign substances. Water infiltration through the joint has damaging effects on the durability of a pavement, essentially because it is the main cause of pumping, which consists of the deterioration of the foundation layer by expulsion of the grindings of which it is constituted, meaning that the board becomes unprotected and thus subject to degradation (this being known as the pumping phenomenon) .
Summary of the invention
In order to solve and/or minimize the aforementioned inconveniences, the applicants have devised a monolithic system of foundation/pavement, which uses a foundation comprised of polystyrene blocks and a pavement having special load transfer elements. Therefore, an object of the invention is the use of a semi-continuous cement concrete pavement having joints formed by load transfer plates, with a structural strength which, by itself, absorbs, degrades and transmits loads, while withstanding the forces exerted thereon as well as the abrasion caused thereby, without differential settlements on the joint axis, also serving as a wearing course, the said pavement being laid on a foundation which is independent of the natural soil and acting as both a base and a sub-base for supporting the said semi-continuous concrete pavement .
The load transfer elements used by the system of the invention are basically the elements of prior art disclosed in Portuguese patent no. 102947, to which improvements have been made so that the use of polystyrene blocks in the foundations is permitted. Patent PT 102947 is herein incorporated for reference purposes .
Brief description of the drawings
The description hereunder is based on the attached drawings which, without any restrictive character, represent the following:
Figure 1 is a schematic illustration of the system of the invention;
Figure 2 is a schematic illustration of an expansion and contraction joint;
Figure 3 is a schematic illustration of a construction j oint ;
Figure 4 is another schematic illustration of the system of the invention;
Figure 5 is a perspective view of the load transfer plate of the system of the invention; and
Figure 6 is a main elevation of the load transfer plate of the system of the invention.
Detailed description of the invention
Prior to pavement concreting, an appropriate foundation is built to receive the area of the pavement to be concreted, being comprised of several strips, each of them being formed by a sequence of slabs. In turn, the slabs must be confined by a formwork. Finally, the concreting of the slabs is carried out.
As can be observed in the figures, the foundation (1) is obtained by the application of high-density expanded polystyrene blocks which, as a homopolymer, remains stable throughout the useful life of the system and, in terms of its technical specifications (density, deformation modulus) , has a steady behaviour without modification of the Westergaard modulus: K/cm3. The foundation (1) ensures the carrying capacity of the overall structure and must be designed to that end. The polystyrene blocks having densities and dimensions according to the design are laid over the natural soil (2) . Surface levelling errors should not exceed 5 mm in a 3 m ruler. In order to obtain an appropriate formwork, it is not necessary to fill it with inert materials of various granulometries and with possible frames, as is the case in prior art .
With the base and sub-base foundation (1) used in the system of the invention, since it is formed by high- density expanded polystyrene, it has specific technical characteristics which remain unaltered throughout the useful life of this material and which are essentially the following :
- Maintaining its physical and chemical properties
- Preserving density / weight / volume,
- Maintaining the elasticity and deformation modulus (Kg / cm3)
- Not altering its properties with the thermal gradient
- Remaining sealed
- Maintaining a uniform support
- Useful life of more than 100 years
Reducing the friction coefficient at the moment of concrete contraction
- Allowing manual laying without the aid of heavy machinery
- Serving as a formwork, for the purpose of concreting the pavement (3)
- Providing slopes for water runoff
- In special circumstances, a box opening is not required
- Providing gutters for water runoff
- Using pumped concrete, which permits the laying of the concrete with high slumps
- Simplifying the laying of the concrete because, since it is pumped, it allows easier access to the concreting corridor
- Increasing the speed of execution
The use of polystyrene blocks replaces the base and sub-base of conventional foundations. These blocks also provide a formwork which is suitable for a continuous concreting. The level of the formworks will be according to the initial design elevation. Horizontal tolerance will be between 1 and 2 cm in length. The length of the formwork elements is limited in order to allow levelling and layout according to the design elevation.
After the laying of the foundation (1) and consequently the formwork, the pavement (3) can be concreted according to the established work specification.
The concreting process comprises the following steps :
Preparation
The layout of the longitudinal profile will be realized on site with the aid of topographic precision instruments. The prescribed levels are verified by stakes placed solidly in the ground, outside the concreting corridor, at maximum intervals of 50 m, so that a rigorous longitudinal profile is formed parallel to the final elevation of the slab to be executed. In the case of curves, the distance between the stakes is reduced in order to exactly follow the profile of the design. The placing of the stakes must be carried out at least one day before the concreting operation. Unless there is a local impediment, to be recognized by the inspection authority, the preparation of the joints and the placement of the load transfer plates should precede the concreting by a distance of around 50 m, in order to ensure continuous implementation .
The release of water on the surface will be ensured by a draining system which will be implemented simultaneously with the laying of the foundation (1) (polystyrene blocks) .
Preparation of the concreting corridor against water leakages from the concrete
In order to prevent any water absorption from the concrete to the foundation (1) , the foundation should be always covered with a sliding complex of approximately 0.2 mm and coverings of 20 cm.
Composition of the concrete
The composition of the concrete will be sent to the inspection authority to be approved thereby. It must be in compliance with the pre-established conditions for each specific project.
Manufacturing, transport and on-site implementation
Manufacturing
Manufacturing will preferably take place at the construction site and the equipment will have sufficient capacity to ensure a continuous laying operation.
Transport
The type of transport will be subject to approval by the inspection authority, whether in a cement truck mixer or in a dump truck.
On-site implementation
On- site implementation will be carried out with vibratory equipment, possibly complemented by a corrective ruler.
All surface charges or recharges are prohibited.
In special locations, the concrete may be laid and hand vibrated with a vibrating needle.
All the edges of the slabs along the formworks will have to be vibrated using a needle vibrator. Atmospheric conditions Concreting will not be permitted during days of heavy rain.
Surface treatment
The surface treatment of the coating will be made by brushing the fresh concrete with brushes previously approved by the inspection authority.
Transverse and longitudinal joints
All the transverse and longitudinal joints are provided with load transfer plates .
Contraction and expansion joints are according to figure 2. The sawing depth is of at least 2 cm.
Construction joints
These are according to figure 3. The construction joints are established at the end of each daily production or in the case of interruption of the concreting operation. As can be observed, the face of the joint must be flat and perpendicular to the surface of the coating. As soon as the concreting operation is restarted, the said joints are placed concrete against concrete, the face of the preceding slab being bathed with an anti-adherent agent, such as Antisol, in order to provide an effective separation. The pavement generically illustrated as (3) is formed by several slabs (4) which are provided with load transfer plates (5) . The said plates (5) are comprised of two anchors (6) with two rebars (7) for alignment of a joint inductor (8), and a ball joint (9) which, at the load support moment, rotates anticlockwise and, at the support moment generated by the load transfer plates (5) , performs a clockwise movement. This ball joint (9) is positioned under the joint inductor (8) and its centre is aligned with the vertical axis of the joint formed by the said inductor (8) .
The said ball joint (9) releases the concrete slabs (4) from stress caused by bending/traction at the moment of load transfer, allowing the foundation (1) to be unaffected by bending moments resulting from the load and thus making the slab (4) work essentially with compression stress, thereby ensuring a safety coefficient much higher than the normal one and a long life of the foundation (1) of the slab (4) . The ball joint (9) releasing the concrete slabs (4) from stress caused by bending/traction at the moment of load transfer will thus allow the said concrete slabs (4) to work for a longer period of time with compression, i.e. releasing them from permanent stress and filtering most of the vibrations caused by rolling loads.
The geometric features of the slabs (4) are as follows : - Nominal thickness: variable (conditioned by the forces to be exerted thereon)
- Side-grade: usually 2% (see cross-sectional profiles of the design)
- Nominal length: from 5 to 8 m (conditioned by the forces to be exerted thereon)
- Nominal width: from 5 to 8 m (conditioned by the forces to be exerted thereon)
The said slabs (4) will be subject to:
1 - Occasional rolling and static loads;
2 - Horizontal stress caused by concrete contraction;
3 - Horizontal stress caused by friction;
4 - Breaking of slabs (4) caused by the supports on the joints axis due to load transmission; and
5 - Liquid or water infiltration phenomena, such as the pumping phenomenon.
In conclusion, this invention relates to a pavement (3) which has been successfully tested in all kinds of adverse conditions, having now a new conception of supports for joints, which consists of providing the load transfer plates (5) with ball joints (9) which, as previously mentioned, release the concrete slabs (4) from stress caused by bending/traction at the moment of load transfer, allowing the foundation (1) to remain unaffected by bending moments resulting from the load and thus making the slab (4) work essentially with compression stress. In fact, it is due to the ball joints (9) that foundations (1) with polystyrene blocks can be obtained. Joint sealing is required for protecting the foundation (1) against chemical agents/diluents. This sealing is guaranteed by placement of the joint inductor (8), which has a certain slope for water (liquid) runoff, together with the use of a silicone-type insulating material (with two components) injected on the joint over the inductor (8) in order to provide complete insulation.
Likewise, the foundation (1) must be coated along its upper and lateral parts with a plastic material . This material allows a reduction from about 2.5 to 0.5 in the friction coefficient of the slab (4) concrete when contracting and it also insulates the polystyrene blocks against any chemical attack resulting from spillages on the pavement surface (3) .
ECONOMIC ASPECTS
With this system of the invention, it is possible to reduce costs by constructing and using these pavements, as opposed to the conventional solutions, such as for example :
- it is not necessary to invest in heavy machinery for a box opening;
- excavations;
- application of selected inert materials;
- spreading of materials;
- compactation of inert materials; - levelling of inert materials;
i.e. all the work relating to the laying of selected soils to build a foundation (1) (base and sub-base) .
Considering that the foundation (1) can be laid manually, the whole building concept relating to the base and sub-base for the laying of pavements (3) is profoundly revolutionized.
The durability (useful life of more than 100 years) with the complete absence of maintenance operations will release financial resources, both in public and private entities, for investment in other areas which are also a priority.
The low investment required for this technology, together with its long durability, makes it accessible to all entities which carry out work of this nature.
Lisbon, 30th January 2009

Claims

1. A monolithic foundation system with homopolymer/resistant aggregate pavement with a semi- continuous configuration, which uses a pavement with load transfer elements for the induction of joints, characterized in that it comprises a foundation (1) having high-density expanded polystyrene blocks, which supports a semi-continuous cement concrete pavement, the pavement formwork being formed by the polystyrene blocks of the foundation (1) .
2. A monolithic foundation/pavement system according to claim 1, characterized in that the polystyrene blocks having dimensions as established in the design are manually laid.
3. A monolithic foundation/pavement system according to claim 1, characterized by a load transfer plate (5) comprised of two anchors (6) with two rebars (7) for alignment of a joint inductor (8) and a ball joint (9) which, at the load support moment, rotates anticlockwise and, at the support moment generated by the load transfer plates (5), performs a clockwise movement.
4. A method for the execution of a foundation/pavement according to claim 3, characterized in that the said ball joint (9) releases the concrete slabs from stress caused by bending/traction at the moment of load transfer, allowing the foundation (1) to remain unaffected by bending moments resulting from the load and thus making the slab work essentially with compression stress .
5. A method for the execution of a foundation/pavement according to claims 3 and 4, characterized in that the said ball joint (9) is positioned under the joint inductor (8) and its centre is aligned with the vertical axis of the joint formed by the said inductor (8) .
6. A method for the execution of a foundation/pavement according to the previous claims, characterized in that the joint is sealed for protecting the foundation (1) against chemical agents/diluents, having a silicone-type insulating material injected over the inductor (8) in order to provide complete insulation.
7. A method for the execution of a foundation/pavement according to the previous claims, characterized in that the foundation (1) is coated along its upper and lateral parts with a plastic material, in order to reduce from about 2.5 to 0.5 the friction coefficient of the slab concrete when contracting and simultaneously protect the polystyrene blocks from possible spillages of liquids at the surface.
Lisbon, 30th July 2009
EP09773818.1A 2008-07-04 2009-07-03 Monolithic foundation system Not-in-force EP2356287B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PT104125A PT104125B (en) 2008-07-04 2008-07-04 MONOLITHIC SYSTEM OF FOUNDATION IN HOMOPOLÍMERO / PAVIMENTO IN RESISTANT AGGREGATES IN SEMI-CONTINUOUS CONFIGURATION
PCT/PT2009/000039 WO2010002285A2 (en) 2008-07-04 2009-07-03 Monolithic foundation system with homopolymer/resistan aggregate pavement with a semi -continuous configuration

Publications (2)

Publication Number Publication Date
EP2356287A2 true EP2356287A2 (en) 2011-08-17
EP2356287B1 EP2356287B1 (en) 2015-06-03

Family

ID=41064548

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09773818.1A Not-in-force EP2356287B1 (en) 2008-07-04 2009-07-03 Monolithic foundation system

Country Status (18)

Country Link
US (1) US20110170950A1 (en)
EP (1) EP2356287B1 (en)
JP (1) JP2012503112A (en)
KR (1) KR20110038669A (en)
CN (1) CN102388189B (en)
AU (1) AU2009266512A1 (en)
BR (1) BRPI0915370B1 (en)
CA (1) CA2729779A1 (en)
CL (1) CL2011000003A1 (en)
CO (1) CO6341497A2 (en)
EC (1) ECSP11010799A (en)
IL (1) IL210422A (en)
MA (1) MA32430B1 (en)
PE (1) PE20110234A1 (en)
PT (2) PT104125B (en)
RU (1) RU2509841C2 (en)
UA (1) UA101505C2 (en)
WO (1) WO2010002285A2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10352004B2 (en) * 2014-05-28 2019-07-16 MOREIRA SERRO, Afonso Load transmission device
CN108642986B (en) * 2018-07-25 2023-11-07 辽宁工程技术大学 Anchor cable structure for controlling uneven settlement of half-dike half-cut base and construction method

Family Cites Families (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1874589A (en) * 1929-06-07 1932-08-30 Older Clifford Joint for pavements or the like
US2045089A (en) * 1933-08-30 1936-06-23 Charles E Kyte Expansion joint
US2125857A (en) * 1934-06-02 1938-08-02 Albert C Fischer Paving and expansion joint structure
US2108393A (en) * 1935-07-01 1938-02-15 Truscon Steel Co Dowel means for roadway expansion joints
US2093718A (en) * 1935-12-04 1937-09-21 Fremont Wynne Oscar Joint construction
US2201824A (en) * 1938-01-15 1940-05-21 American Steel & Wire Co Pavement joint
US2355771A (en) * 1939-11-27 1944-08-15 Texas Foundries Inc Load transfer device and tie bar
US2509663A (en) * 1945-03-28 1950-05-30 Texas Foundries Inc Load transfer device
US2482836A (en) * 1945-09-28 1949-09-27 American Steel & Wire Co Transload device
US3194350A (en) * 1963-05-21 1965-07-13 Kelsey Hayes Co Automatic adjuster for disk brakes
US3403754A (en) * 1967-04-27 1968-10-01 Int Harvester Co Brake return and automatic adjustment means
JPS6233761Y2 (en) * 1979-10-29 1987-08-29
JPS60178006U (en) * 1984-04-28 1985-11-26 澤田 三郎 Slip bar for concrete structures
US4648739A (en) * 1985-03-20 1987-03-10 Thomsen Bernard D Load transfer cell assembly for concrete pavement transverse joints
SU1414913A1 (en) * 1987-01-21 1988-08-07 А.В.Ярмолинска , О.М.Табачник и М.Ю.Барбанель Seam for road or airfield paving
JPH0452274Y2 (en) * 1987-05-21 1992-12-09
JPH01105602U (en) * 1988-01-08 1989-07-17
US4784516A (en) * 1988-02-10 1988-11-15 Harco Research, Inc. Traffic bearing expansion joint cover and method of preparing same
US5366319A (en) * 1993-02-04 1994-11-22 Kansas State University Research Foundation Expansion joint assembly having load transfer capacity
FR2747705B1 (en) * 1996-04-18 1998-05-29 Screg LIGHT FILL
RU2164976C1 (en) * 1999-08-23 2001-04-10 Открытое акционерное общество "Научно-исследовательский институт транспортного строительства (ЦНИИС)" Movement joint of bridge roadway
US6367591B1 (en) * 1999-12-21 2002-04-09 Caterpillar Inc. Automatic brake clearance adjuster
JP2001207401A (en) * 2000-01-21 2001-08-03 Taisei Corp Method of constructing grade separated crossing
US7806624B2 (en) * 2000-09-29 2010-10-05 Tripstop Technologies Pty Ltd Pavement joint
WO2002035025A1 (en) * 2000-10-25 2002-05-02 Fletcher Building Holdings Limited Floor structures
US6460214B1 (en) * 2001-03-27 2002-10-08 Ming-Huang Chang Vibration resistive instant responding roadway or bridge expansion joint and construction method of the same
PT102947A (en) 2003-05-08 2004-11-30 Adelino Augusto Tavares MACHINE FOR PHYSIOTHERAPY AND REHABILITATION
JP4192255B2 (en) * 2003-07-23 2008-12-10 株式会社カネカ Widened embankment structure
US6926463B2 (en) * 2003-08-13 2005-08-09 Lee A. Shaw Disk plate concrete dowel system
GB0325813D0 (en) * 2003-11-05 2003-12-10 Winter William Sacrificial shutter
JP4506316B2 (en) * 2004-07-13 2010-07-21 ナラサキ産業株式会社 Road leveling structure
US7244076B2 (en) * 2004-07-19 2007-07-17 Bend Industries, Inc. Method for installing paving blocks
CN100427686C (en) * 2004-10-11 2008-10-22 中铁四局集团第一工程有限公司 Method for landfilling roadbed in high earth fill on groundwork of soft soil
EP1945863A1 (en) * 2005-10-10 2008-07-23 NIELSEN, Bjarne Oerum Method and foundation system for the transfer and spreading of load from a building structure onto stable layers
JP4528266B2 (en) * 2006-02-03 2010-08-18 ダウ化工株式会社 Light-weight piece embankment structure
RU2318947C2 (en) * 2006-02-28 2008-03-10 Московский автомобильно-дорожный институт (Государственный технический университет) Road paving construction method
US8206059B1 (en) * 2011-09-14 2012-06-26 Southgate Herbert F Load transfer assembly

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2010002285A2 *

Also Published As

Publication number Publication date
KR20110038669A (en) 2011-04-14
IL210422A0 (en) 2011-03-31
CL2011000003A1 (en) 2011-09-16
BRPI0915370A2 (en) 2015-11-03
PT104125A (en) 2010-01-04
UA101505C2 (en) 2013-04-10
EP2356287B1 (en) 2015-06-03
CA2729779A1 (en) 2010-01-07
AU2009266512A1 (en) 2010-01-07
CN102388189A (en) 2012-03-21
IL210422A (en) 2013-11-28
WO2010002285A3 (en) 2012-03-08
RU2509841C2 (en) 2014-03-20
WO2010002285A2 (en) 2010-01-07
PT104125B (en) 2010-05-28
RU2010154175A (en) 2012-08-10
CO6341497A2 (en) 2011-11-21
PT2356287E (en) 2015-10-14
MA32430B1 (en) 2011-06-01
JP2012503112A (en) 2012-02-02
CN102388189B (en) 2014-08-06
US20110170950A1 (en) 2011-07-14
BRPI0915370B1 (en) 2018-11-21
PE20110234A1 (en) 2011-04-11
ECSP11010799A (en) 2011-07-29

Similar Documents

Publication Publication Date Title
CN108103871B (en) Construction method of roadbed foam concrete filling technology adjacent to existing subway facility
EP2356287B1 (en) Monolithic foundation system
US20110110717A1 (en) Structure for Supporting Vehicular Traffic
CN111501959B (en) Combined cast-in-situ drainage ditch and construction method
CN114318991B (en) Highway bench back structure in plain area, highway structure and construction method
CN217479998U (en) Culvert structure
CN116145739B (en) Vibration reduction structure of wood formwork of bottom plate without dismantling and construction method of vibration reduction structure
RU2345191C2 (en) Unstable ground thermostructural foundation
RU2812390C1 (en) Method for constructing reinforced concrete road surface from reinforced concrete sleepers and reinforced concrete road surface from reinforced concrete sleepers laid in this way (embodiments)
CN117604935A (en) Wave wall and drainage box culvert combined structure capable of reducing road surface filling and construction method thereof
CN115822059A (en) Double integral type resin concrete ditch of heavy load-bearing road
RU1697U1 (en) FUNDAMENTALS
CN114439018A (en) Bridge and culvert abutment hanging plate support type foam light soil backfill construction method
SITES BID NO. 1841
CN118166825A (en) Tower crane foundation construction method for high-water-level soft soil foundation
CN116397477A (en) Stepped permeable decompression porous light embankment structure and construction method
CN117513082A (en) Anti-deformation construction method for concrete heavy-load road surface
CN116732835A (en) Suspended roadbed structure and construction method
CN117026720A (en) Pavement subbase layer construction method based on precast beam field concrete panel
KR20210108262A (en) Road side ditch repair method
CN117926652A (en) Overhead road protection device and construction method thereof
Deneko A review on the construction joints in reinforced concrete structures
CN117027039A (en) Construction method of large-scale petroleum storage tank ring beam concrete foundation
Quinn Foyle Bridge: construction of foundations and viaduct.
Beinbrech et al. Cushion foundations: Rigid expanded polystyrene foam as a deforming and cushioning layer

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

DAX Request for extension of the european patent (deleted)
RTI1 Title (correction)

Free format text: MONOLITHIC FOUNDATION SYSTEM

R17D Deferred search report published (corrected)

Effective date: 20120308

RBV Designated contracting states (corrected)

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

17P Request for examination filed

Effective date: 20120511

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150126

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 730011

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150715

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009031574

Country of ref document: DE

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20150831

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 730011

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150903

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20150603

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150903

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602009031574

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151003

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: RO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150603

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160202

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150731

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150731

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20160331

26N No opposition filed

Effective date: 20160304

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20150903

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150803

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150703

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150903

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20090703

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150703

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150603

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20200117

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20200702

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210703