EP2251503B1 - Method for replacing a loadbearing wall - Google Patents
Method for replacing a loadbearing wall Download PDFInfo
- Publication number
- EP2251503B1 EP2251503B1 EP10004866.9A EP10004866A EP2251503B1 EP 2251503 B1 EP2251503 B1 EP 2251503B1 EP 10004866 A EP10004866 A EP 10004866A EP 2251503 B1 EP2251503 B1 EP 2251503B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- loadbearing
- wall
- beams
- columns
- recess
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0274—Temporary shoring of wall opening
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0229—Increasing or restoring the load-bearing capacity of building construction elements of foundations or foundation walls
Definitions
- the invention belongs in the construction field, more specifically a method for replacing a loadbearing wall on infirm soil.
- the problem underlying this invention is that often it is necessary to replace existing loadbearing walls with a beam-column system, such as to create a more spacious room in the course of reconstruction works.
- the foundation under the loadbearing walls has insufficient loadbearing capacity or depth in order to apply the concentrated extra load received from the column.
- the demolition of a loadbearing wall and building a beam-column bearing system often involves substantial working volumes, which do not justify the effect of more spacious premises. Often it is also necessary to dredge the floor beneath the level of the existing pad footing with the purpose of increasing the height of the existing plinth/basement floor.
- the underground wall of the building is the penetrating part and it is made from reinforced concrete.
- the ground wall of the building is connected to the underground wall by integration, in order to provide the ground part with higher resistance to the horizontal force that acts on the ground wall from the underground wall.
- the upper part of the steel reinforcement is used, which is in the H shape and has the bottom section positioned in the connection part of the underground wall, containing steel tubes and steel piles, and the steel reinforcement is recessed into a column of the ground wall.
- the steel reinforcement is fitted with a projecting double-end bolt and the underground cross-beam is intended for the upper part of the underground wall.
- the method for the replacement of the loadbearing wall comprises the stages: on both sides of the loadbearing wall a recess is created for the loadbearing wall, piles are driven at the bottom of the recess down to a bearing soil layer and the recess is supported by means of a temporary supporting wall.
- On-pile foundation is built on top of the driven piles, supporting the cross-beams that will be under the loadbearing columns to the foundation, after which the recess is backfilled and compacted and the temporary supporting walls removed.
- the temporary supports that support the loadbearing structures of the ceiling of all floors and are supported on the on-pile foundation are installed on both sides of the loadbearing wall, openings are cut in the loadbearing wall for the loadbearing columns and the loadbearing columns are installed on the cross-beams. Then an opening is cut in the loadbearing wall for the loadbearing beam and one loadbearing beam is mounted to the loadbearing columns on one side of the loadbearing wall and then the second loadbearing beam is mounted to the other side of the loadbearing wall, filling the gap between the loadbearing beams with a fire retardant and sound insulating material, and demolishing the section of the loadbearing wall under the loadbearing beam. The installation of loadbearing columns and beams is repeated in the next gaps between the columns as provided above, until the column-beam loadbearing system is complete and building of the rough floor can be finished.
- the figure presents the plan of a building, where the method for loadbearing wall replacement is applied.
- recess 2 is created, at the bottom of which micro piles 3 are driven until reaching a loadbearing soil layer 4.
- Recess 2 is created with a width that makes it possible for the machine that drives micro piles 3 to move and work.
- recess 2 is supported with a temporary supporting wall 6. If the level of surface water 7 reaches over the bottom of recess 2, surface water is removed from recess 2 during construction works.
- micro piles 3 After micro piles 3 are driven in, the on-pile foundation 8 from reinforced concrete is built on the piles.
- the on-pile foundation 8 from reinforced concrete is reinforced near the upper and lower level by means of steel fittings 9. Steel fittings 9 are pre-tensioned.
- Recess 2 micro piles 3 and on-pile foundation 8 are initially created on one side of loadbearing wall 1 and then to the other side of loadbearing wall 1.
- Recess 2 is created at such distance from loadbearing wall 1 that the stability of foundation 10 of the loadbearing wall would be ensured, and taking into account supporting wall 6 of recess 2.
- Cross-beams 12 that are rested on on-pile foundation 8, are installed under loadbearing columns 11 that support loadbearing wall 1. Cross-beams 12 are installed beneath the lower level 14 of the rough floor 13.
- recess 2 is backfilled and compacted with mineral soil to compacting degree 1.00.
- the temporary support walls 6 of recess 2 are removed.
- An elastic layer 15 is installed between cross-beams 12 and the lower level 14 of the rough floor 13 in order to compensate various deformations in rough floor 13 and cross-beams 12 as a result of moisture and temperature fluctuations.
- a temporary opening 16 with the width of cross-beams 12 is left in rough floor 13 for the installation of load bearing columns 11.
- load bearing wall 1 After the installation of temporary supports 18, vertical openings are cut into load bearing wall 1 for two adjacent load bearing columns 11 and the columns are installed on cross-beams 12.
- Loadbearing columns 11 are installed on cross-beams 12 by means of load-resistant anchor bolts 19.
- Load-resistant anchor bolts 19 are supplied with pressure nuts 20 for adjusting the height of load bearing columns 11.
- Loadbearing columns 11 are produced from steel tube jacket 21 and concrete core 22. With the interaction between concrete core 22 and steel tube jacket 21, i.e. load bearing column 11, the load bearing column 11 will achieve the optimum load stability and fire resistance.
- load bearing beam 23 is repeated on the other side of load bearing wall 1.
- the gap between load bearing beams 23 is filled with fire resistant and sound insulating material 26, such as with dense rock wool. Then the load bearing wall section 27 under load bearing beams 23 is demolished.
- load bearing beams 23 are covered with a fire retardant and sound insulating material 26, such as dense rock wool boards or fire resistant gypsum boards, and the temporary supports 18 are removed.
- loadbearing columns 11 and load bearing beam 23 are provided with extra tension by means of load-resistant bolts 19 and pressure nuts 20 in order to prevent deformations in loadbearing wall 1 and the load bearing structure 17 of the ceiling.
- loadbearing columns 11 and load bearing beam 23 are covered with fire resistant mixture 29, which will ensure the steel tube jacket 21 and thereby also load bearing column 11 with optimum fire resistance in interaction with concrete core 22.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
- The invention belongs in the construction field, more specifically a method for replacing a loadbearing wall on infirm soil.
- The problem underlying this invention is that often it is necessary to replace existing loadbearing walls with a beam-column system, such as to create a more spacious room in the course of reconstruction works. At this the foundation under the loadbearing walls has insufficient loadbearing capacity or depth in order to apply the concentrated extra load received from the column. The demolition of a loadbearing wall and building a beam-column bearing system often involves substantial working volumes, which do not justify the effect of more spacious premises. Often it is also necessary to dredge the floor beneath the level of the existing pad footing with the purpose of increasing the height of the existing plinth/basement floor.
- In the patent application "Building structure" (
JP2002227303 - From the technical nature, a solution presented in the patent application "Building structure" (
JP52705629 - The known solutions do not solve the problem underlying the given invention.
- The method for the replacement of the loadbearing wall comprises the stages: on both sides of the loadbearing wall a recess is created for the loadbearing wall, piles are driven at the bottom of the recess down to a bearing soil layer and the recess is supported by means of a temporary supporting wall. On-pile foundation is built on top of the driven piles, supporting the cross-beams that will be under the loadbearing columns to the foundation, after which the recess is backfilled and compacted and the temporary supporting walls removed. Then the temporary supports that support the loadbearing structures of the ceiling of all floors and are supported on the on-pile foundation are installed on both sides of the loadbearing wall, openings are cut in the loadbearing wall for the loadbearing columns and the loadbearing columns are installed on the cross-beams. Then an opening is cut in the loadbearing wall for the loadbearing beam and one loadbearing beam is mounted to the loadbearing columns on one side of the loadbearing wall and then the second loadbearing beam is mounted to the other side of the loadbearing wall, filling the gap between the loadbearing beams with a fire retardant and sound insulating material, and demolishing the section of the loadbearing wall under the loadbearing beam. The installation of loadbearing columns and beams is repeated in the next gaps between the columns as provided above, until the column-beam loadbearing system is complete and building of the rough floor can be finished.
- The figure presents the plan of a building, where the method for loadbearing wall replacement is applied.
- Next to
loadbearing wall 1, in parallel with the wall, recess 2 is created, at the bottom of whichmicro piles 3 are driven until reaching a loadbearing soil layer 4. Recess 2 is created with a width that makes it possible for the machine that drivesmicro piles 3 to move and work. Depending on the geotechnical characteristics of subsoil 5, recess 2 is supported with a temporary supportingwall 6. If the level of surface water 7 reaches over the bottom of recess 2, surface water is removed from recess 2 during construction works. - After
micro piles 3 are driven in, the on-pile foundation 8 from reinforced concrete is built on the piles. The on-pile foundation 8 from reinforced concrete is reinforced near the upper and lower level by means ofsteel fittings 9.Steel fittings 9 are pre-tensioned. Recess 2,micro piles 3 and on-pile foundation 8 are initially created on one side ofloadbearing wall 1 and then to the other side ofloadbearing wall 1. Recess 2 is created at such distance fromloadbearing wall 1 that the stability offoundation 10 of the loadbearing wall would be ensured, and taking intoaccount supporting wall 6 of recess 2. - Cross-beams 12 that are rested on on-
pile foundation 8, are installed underloadbearing columns 11 that supportloadbearing wall 1. Cross-beams 12 are installed beneath thelower level 14 of therough floor 13. - After this, recess 2 is backfilled and compacted with mineral soil to compacting degree 1.00. The
temporary support walls 6 of recess 2 are removed. Anelastic layer 15 is installed betweencross-beams 12 and thelower level 14 of therough floor 13 in order to compensate various deformations inrough floor 13 andcross-beams 12 as a result of moisture and temperature fluctuations. During the construction ofrough floor 13, atemporary opening 16 with the width ofcross-beams 12 is left inrough floor 13 for the installation ofload bearing columns 11. - Then
temporary supports 18 that will receive the load of theloadbearing structure 17 of the ceiling are installed on both sides ofload bearing wall 1 on all the floors, supporting theload bearing structure 17 of the ceiling and resting on on-pile foundation 8. - After the installation of
temporary supports 18, vertical openings are cut intoload bearing wall 1 for two adjacentload bearing columns 11 and the columns are installed oncross-beams 12.Loadbearing columns 11 are installed oncross-beams 12 by means of load-resistant anchor bolts 19. Load-resistant anchor bolts 19 are supplied withpressure nuts 20 for adjusting the height ofload bearing columns 11. -
Loadbearing columns 11 are produced fromsteel tube jacket 21 and concrete core 22. With the interaction between concrete core 22 andsteel tube jacket 21, i.e.load bearing column 11, the load bearingcolumn 11 will achieve the optimum load stability and fire resistance. - Then a hole is cut for
loadbearing beam 23 intoload bearing wall 1, for a half of its thickness, under theloadbearing structure 17 of the ceiling, and oneloadbearing beam 23 is mounted toloadbearing columns 11. After mounting thefirst loadbearing beam 23, the gap betweenload bearing beam 23 and theload bearing structure 17 of the ceiling is closed withsteel wedges 24, which will provide the load bearingbeam 23 with the initial tension to supportloadbearing wall 1 and theload bearing structure 17 of the ceiling. After wedging thefirst loadbearing beam 23, the space between theloadbearing structure 17 andload bearing beam 23 is filled with expandingassembly concrete 25 by gunning. - Then the method for the installation of
load bearing beam 23 is repeated on the other side ofload bearing wall 1. Prior to the installation of the secondload bearing beam 23 on the other side ofload bearing wall 1, the gap betweenload bearing beams 23 is filled with fire resistant and sound insulatingmaterial 26, such as with dense rock wool. Then the load bearingwall section 27 under load bearingbeams 23 is demolished. - Then the whole method for the installation of
loadbearing columns 11 and load bearingbeams 23 is repeated in the next space between the columns. After completing the whole column-beam system,load bearing beams 23 are covered with a fire retardant and sound insulatingmaterial 26, such as dense rock wool boards or fire resistant gypsum boards, and thetemporary supports 18 are removed. - Depending on the possible subsiding of
piles 3, on-pile foundation 8 andcross-beam 12 as a result of the compacting of load bearing soil 4 and subsoil 5 and reduced tension inload bearing columns 11,loadbearing columns 11 andload bearing beam 23 are provided with extra tension by means of load-resistant bolts 19 andpressure nuts 20 in order to prevent deformations inloadbearing wall 1 and theload bearing structure 17 of the ceiling. When the subsiding ofpiles 3, on-pile foundation 8 andcross-beam 12 has ended, the gap betweenloadbearing column 11 andcross-beam 12 is cast withprestressed concrete 28, andrough floor 13 is completed. Prior to the finishing ofload bearing columns 11 andloadbearing beam 23, loadbearing columns are covered with fireresistant mixture 29, which will ensure thesteel tube jacket 21 and thereby also load bearingcolumn 11 with optimum fire resistance in interaction with concrete core 22.
Claims (6)
- Method for replacing a loadbearing wall, executed in a building that comprises a loadbearing wall, loadbearing columns supporting the loadbearing wall, foundation of the loadbearing wall, steel tubes and steel piles, comprising of the stages: cross-beams are installed in the foundation of the loadbearing wall, under the loadbearing columns that support the loadbearing wall, characterized in that
a recess (2) is created next to the loadbearing wall (1), micro-piles (3) are driven at the bottom of the recess until a loadbearing layer (4), and the recess (2) is supported with a temporary supporting wall (6);
on-pile foundation (8) is built on top of the driven piles (3), it is reinforced with steel reinforcement (9) and the steel reinforcement (9) is pre-tensioned;
the recess (2), piles (3) and on-pile foundation (8) are created initially on one side of the loadbearing wall (1) and then on the other side of the loadbearing wall (1);
the cross-beams (12) installed under the loadbearing columns (11) that support the loadbearing wall (1) are rested on the on-pile foundation (8), whereat the cross-beams (12) are installed below the lower surface (14) of the rough floor (13);
the recess (2) is backfilled and compacted, apd the temporary supporting walls (6) of the recess (2) are removed;
an elastic layer (15) is installed between the cross-beams (12) and the lower surface (14) of the rough floor;
the temporary supports (18) that receive the load of the loadbearing structures (17) of the cellings of the floors and rest on the on-pile foundation (8) are installed;
vertical openings are cut into the loadbearing wall (1) for two loadbearing columns (11) that are installed on cross-beams (12) by means of anchor bolts (19), while the anchor bofts are supplied with pressure nuts (20) that adjust the height of the loadbearing column (1);
openings are cut for the loadbearing beams (23) into the loadbearing wall (1) by a half of its thickness, under the ceiling structure (17), and one of the loadbearing beams (23) is mounted to the loadbearing columns (11), and the gap between the first loadbearing beam (23) and the ceiling structures (17) is closed by wedging with steel wedges (24), and the gap is filled with expanding assembly concrete (25);
the second loadbearing beam (23) is installed to the other side of the loadbearing wall (1), whereas the space between the loadbearing beams (23) is filled with a fire retardant and sound insulating material (26) and the section of the loadbearing wall (27) under the loadbearing beams (23) is demolished prior to the installation of the second loadbearing beam (23);
then the previous mounting of loadbearing columns (11) and loadbearing beams (23) is repeated in the following spaces between columns;
when the whole column-beam system is complete, the loadbearing beams (23) are covered with a fire retardant and sound insulating material (26) and the temporary supports (18) are removed;
loadbearing columns (11) and the loadbearing beam (23) is provided with extra tension by means of bolts (19) and pressure nuts (20);
when the subsiding of piles (3), on-pile foundation (8) and cross-beam has ended, the gap between the loadbearing column (11) and cross-beam (12) is cast with prestressed concrete (28) and the rough floor (13) is finished. - Method according to claim 1, characterized in that the recess (2) is created at such distance from the loadbearing wall (1) that the stability of the loadbearing wall is ensured, and the recess (2) is created with such width that it would be possible for machines to move and work in the recess.
- Method according to claim 1, characterized in that the backfill of the recess is compacted with mineral soil to compacting degree 1.00.
- Method according to claim 1, characterized in that the loadbearing columns (11) are produced from a steel tube jacket (21) and a concrete core (22).
- Method according to claim 1, characterized in that rock wool and fire resistant gypsum are used as the fire retardant and sound insulating material (26).
- Method according to claim 1, characterized in that prior to the finishing of the loadbearing columns (11) and loadbearing beams (23), the loadbearing columns (11) are coated with a fire-retardant mixture (29).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EEU200900045U EE00888U1 (en) | 2009-05-08 | 2009-05-08 | Carrier replacement method |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2251503A2 EP2251503A2 (en) | 2010-11-17 |
EP2251503A3 EP2251503A3 (en) | 2013-10-30 |
EP2251503B1 true EP2251503B1 (en) | 2014-10-01 |
Family
ID=41528913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10004866.9A Not-in-force EP2251503B1 (en) | 2009-05-08 | 2010-05-07 | Method for replacing a loadbearing wall |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2251503B1 (en) |
EE (1) | EE00888U1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104863380A (en) * | 2015-05-20 | 2015-08-26 | 中建三局第二建设工程有限责任公司 | Overall replacement system for original building shock-insulation support and construction method |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2584989C1 (en) * | 2015-03-11 | 2016-05-27 | Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" | Device for amplification of bearing structures |
CN107724559B (en) * | 2017-10-23 | 2019-07-05 | 南京百西思建筑科技有限公司 | Existing building base isolation reinforcement construction process |
CN109403654B (en) * | 2018-11-05 | 2021-03-26 | 广东赛力克建筑技术工程有限公司 | Underpinning and reinforcing method for existing building structure |
CN111962901A (en) * | 2020-08-14 | 2020-11-20 | 山东金城建设有限公司 | Existing masonry structure reconstruction construction method |
CN112482819A (en) * | 2020-12-07 | 2021-03-12 | 苏州达康建筑科技有限公司 | Method and structure for replacing concrete vertical member |
CN114457842A (en) * | 2022-02-24 | 2022-05-10 | 郎溪浩稳建设工程有限公司 | Open cut method subway construction structure mechanics retaining wall reinforcing beam post |
CN114517596B (en) * | 2022-03-10 | 2024-04-02 | 山东省建筑科学研究院有限公司 | Prestress pin key connection structure of prefabricated wallboard and masonry wall |
CN117868556B (en) * | 2024-03-13 | 2024-06-25 | 北京建工四建工程建设有限公司 | Building dismantling and modifying support system taking building as bearing member |
CN117967092B (en) * | 2024-03-13 | 2024-09-17 | 北京建工四建工程建设有限公司 | Construction method for removing and modifying building without temporary support of building |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57205629A (en) | 1981-06-09 | 1982-12-16 | Kajima Corp | Building structure |
JP2002227303A (en) | 2001-01-29 | 2002-08-14 | Takenaka Komuten Co Ltd | Structure of building |
DE20317225U1 (en) * | 2003-11-08 | 2004-01-08 | Schöck Entwicklungsgesellschaft mbH | Construction element for force transfer, especially for retrofitting between two building parts during building renovation, has a wedge shape consisting of an outer covering element and a pressure-stable filling material |
GB0409215D0 (en) * | 2004-04-24 | 2004-05-26 | Janjic Srdan | Tensioned structural propping system |
-
2009
- 2009-05-08 EE EEU200900045U patent/EE00888U1/en not_active IP Right Cessation
-
2010
- 2010-05-07 EP EP10004866.9A patent/EP2251503B1/en not_active Not-in-force
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104863380A (en) * | 2015-05-20 | 2015-08-26 | 中建三局第二建设工程有限责任公司 | Overall replacement system for original building shock-insulation support and construction method |
Also Published As
Publication number | Publication date |
---|---|
EP2251503A3 (en) | 2013-10-30 |
EE00888U1 (en) | 2010-01-15 |
EP2251503A2 (en) | 2010-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2251503B1 (en) | Method for replacing a loadbearing wall | |
CN112962663B (en) | Construction method for narrow outer enclosure space of deep foundation | |
CN106193292A (en) | A kind of steel frame assembled integral reinforced concrete shear wall structure system | |
WO2011114507A1 (en) | Method of constructing underground structure to be newly built | |
KR100767952B1 (en) | Pass way construction method below the existing foundation | |
CN113697640B (en) | Finished well for integrally assembled elevator of existing multi-storey building and construction method | |
KR101727518B1 (en) | Floor system for reducing story height in top down method and top down method using the same | |
KR102396786B1 (en) | Underground expansion and top-down method of new building using reinforcement of existing underground outer wall | |
JP5865567B2 (en) | Connecting slab and its construction method | |
CN210106749U (en) | Counter-force structure of soft soil foundation super large section push pipe jacking operation | |
CN109267578B (en) | Inclined plane plain concrete structure and construction method thereof | |
JP3958319B2 (en) | Prestressed temporary construction method | |
CN112502161B (en) | Construction method of deep foundation pit supporting system | |
CN114319437A (en) | Construction method for building retaining wall structure at open-cut storey-adding vertical shaft by subsurface excavation | |
KR100767953B1 (en) | Separating method of Monowall with spandrel girders | |
JP2003003690A (en) | Base isolation building and method for base isolation of exisiting building | |
KR102181416B1 (en) | method of constructing earthquake-proof ALC house | |
KR20210090100A (en) | In a building where the underground structure is a wall structure, the shortened construction type top down construction method and structure that enables early ground frame start using temporary transfer structures | |
JP6252860B2 (en) | Construction method of seismic isolation building | |
KR101483865B1 (en) | Construction Method of Underground Structure using Composite Wale | |
KR101736009B1 (en) | Top-Down Construction Method For Underground Structure | |
CN216142027U (en) | High-performance concrete prefabricated guide wall structure | |
CN221345616U (en) | Prefabricated self-sinking foundation pit enclosure wall board | |
JP7565256B2 (en) | How to rebuild a building | |
CN111074933B (en) | Construction method of plate rib type cast-in-place anchor rod high retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME RS |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME RS |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04G 23/02 20060101AFI20130926BHEP |
|
17P | Request for examination filed |
Effective date: 20140221 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20140519 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 689644 Country of ref document: AT Kind code of ref document: T Effective date: 20141015 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602010019200 Country of ref document: DE Effective date: 20141127 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20141001 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 689644 Country of ref document: AT Kind code of ref document: T Effective date: 20141001 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150202 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150201 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150101 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150102 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602010019200 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
26N | No opposition filed |
Effective date: 20150702 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150531 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150507 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150507 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20160526 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20160526 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20160629 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20100507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602010019200 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20170507 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20180131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171201 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141001 |