EP2102432A1 - Module de pont - Google Patents

Module de pont

Info

Publication number
EP2102432A1
EP2102432A1 EP08705090A EP08705090A EP2102432A1 EP 2102432 A1 EP2102432 A1 EP 2102432A1 EP 08705090 A EP08705090 A EP 08705090A EP 08705090 A EP08705090 A EP 08705090A EP 2102432 A1 EP2102432 A1 EP 2102432A1
Authority
EP
European Patent Office
Prior art keywords
bridge
bridge module
floor
module
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP08705090A
Other languages
German (de)
English (en)
Inventor
Dick Buitendijk
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XSPlatforms Holding BV
Original Assignee
Xsplatforms BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xsplatforms BV filed Critical Xsplatforms BV
Publication of EP2102432A1 publication Critical patent/EP2102432A1/fr
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/4998Combined manufacture including applying or shaping of fluent material

Definitions

  • the invention relates to a bridge module for a suspension bridge installation, comprising an elongated floor and two upright side sections, which are connected to the lengthwise edges of the floor.
  • Such a bridge module is generally known.
  • the known bridge module is composed of separate sections, such as girders, floor, side sections and rests, which can be disconnected from each other. In constructing the known bridge module all these sections must be connected together, a process that needs time.
  • An objective of the invention is to provide a bridge module of the type described in the preamble which can be set up more quickly.
  • the bridge module according to the invention is characterised in that the side sections are hinged to the floor.
  • the side sections can be folded against the floor, so that the bridge module can be easily transported and occupies little space when folded up.
  • only the side sections have to be folded up, so that hardly any time is needed.
  • An embodiment of the bridge module according to the invention is characterised in that the hinges are made so that the side sections can only be folded towards the floor in a direction towards each other.
  • a further embodiment of the bridge module according to the invention is characterised in thatthe hinges preferably comprise two extrusion pieces that can be pushed into each other, and which can be turned at least 90 degrees with respect to each.
  • each side section is made from one extrusion piece with cut-out openings, which extrusion piece is one of the extrusion pieces of one of the hinges.
  • the floor also preferably comprises two girders with a plastic plate between them, which girders are each formed from one extrusion piece and one of the extrusion pieces is one of the hinges.
  • a still further embodiment of the bridge module according to the invention is characterised in that the bridge module also comprises rests, which are present at a distance above the side sections and are connected to the side sections by elastic bands.
  • the invention also relates to a suspension bridge installation comprising a bridge module according to the invention.
  • the invention is characterised in that the suspension bridge installation also comprises a work cage, which can be connected to an end of the bridge module or can be installed between two bridge modules, which work cage comprises a floor, which when connected to the bridge module is connected to the floor of the bridge module, and which work cage comprises a box on one side and is provided on the other sides with connecting devices for connection to a bridge module and for the connection of an end rest to the work cage.
  • the suspension bridge installation has at least two work cages, between which there are one or more bridge modules.
  • the suspension bridge installation can be suspended on a tackling device with these work cages.
  • the sides of the work cage to which no bridge module is connected can be closed off with an end rest.
  • this work cage can also be used with bridge modules other than the one according to the invention, and mat this work cage can therefore also be protected independently of the design of the bridge module.
  • Another embodiment of the suspension bridge installation according to the invention is characterised in that the suspension bridge installation also comprises a tackling unit, which is provided with a box with a tackling mechanism therein, which tackling unit is also provided with connecting devices for connecting the tackling unit to an end or a side of the bridge module.
  • this tackling unit can also be used with bridge modules other than the one according to the invention, and that this tackling unit can therefore also be protected independently of the design of the bridge module.
  • the tackling unit here forms a composite whole of tackling mechanism and connecting devices so that the tackling mechanism can be easily connected to the bridge module. Providing the tackling unit with wheels allows it to be used as a trolley, which can be easily moved.
  • the connecting devices comprise preferably bottom and top connecting elements, and two prongs that extend at right angles to the box and are connected to the bottom connecting elements.
  • suspension bridge installation also comprises a tackling unit, which is provided with a cage frame with a tackling mechanism therein, which is fastened to the cage frame, which cage frame is provided with connecting devices for connection to the bridge module.
  • the cage frame protects the tackling unit from damage if it inadvertently falls.
  • this tackling unit can also be used with bridge modules other than the one according to the invention, and that this tackling unit can therefore also be protected independently of the design of the bridge module.
  • This tackling unit also here forms a composite whole of tackling mechanism and connecting devices so that the tackling mechanism can be easily connected to the bridge module. Also providing this tackling unit with wheels allows it to be used as a trolley, which can be easily moved.
  • suspension bridge installation also comprises at least one connecting module, which can connect the bridge module to a further bridge module or a work cage belonging to the suspension bridge installation, which connecting module comprises a bottom section with four upright connecting pins for engaging holes in the floor of the bridge module and the further bridge module and/or work cage, and two legs, to which the side sections and the rests can be connected.
  • each leg comprises two sections that are hinged together, and which can be locked together with a locking pin, which locking pin can be moved to clamp in a hole in one of the sections. This means separate pins are not needed to lock the sections together.
  • Figure 1 shows an embodiment of the bridge module according to the invention in cross-section when folded out
  • Figure 2 shows bridge modules folded up and stacked on top of each other;
  • Figure 3 shows a hinge of the bridge module;
  • Figure 4 shows a side section with a girder of the bridge module;
  • Figure 5 shows the connection between a rest and the side section
  • Figure 6 shows an embodiment of a connecting module of the suspension bridge installation according to the invention
  • Figure 7 shows a leg of the connecting module in side elevation
  • Figure 8 shows the leg in perspective, seen from above
  • Figure 9 shows a work cage of a first embodiment of the suspension bridge installation according to the invention.
  • Figures 10 and 11 show a second embodiment of the suspension bridge installation according to the invention in various elevations
  • Figures 12, 13 and 14 show the tackling unit of the suspension bridge installation shown in figures 10 and 11 in various elevations;
  • Figures 15 and 16 show a third embodiment of the suspension bridge installation according to the invention in front and side elevation respectively.
  • Figures 17, 18 and 19 show the tackling unit of the suspension bridge installation shown in figures 15 and 16 in various elevations.
  • FIGS 1 and 2 show an embodiment of the bridge module according to the invention in cross-section, when folded out and folded up respectively.
  • the bridge module 1 has an elongated floor 3 and two upright side sections 5, which are hinged to lengthwise edges 7 to the floor.
  • Each hinge 9, see figure 3 is formed by two extrusion pieces 11 and 13 that can be pushed into each other, and is made so that the side sections 5 can only be folded towards the floor in a direction towards each other 3.
  • One of these extrusion pieces 13 has a circular cylinder 15 and a concentric semi-circular wall 17 at a distance from it.
  • the other extrusion piece 11 has a further semi-circular wall 19, which is concentric to the cylinder and can be pushed into the space between the cylinder 15 and the wall 17.
  • the extrusion pieces 11, 13 can be turned 90 degrees with respect to each other.
  • Each side section 5 is made of one extrusion piece 21 with cut-out openings 23, see figure 4, in which a section 11 of the extrusion piece 21 forms a section of one of the hinges 9.
  • the edges 7 of the floor 3 are formed by girders, between which there is a plastic plate 25, see figure 1.
  • the girders are each formed by one extrusion piece 13, which forms the other section of the hinges 9.
  • the bridge module 1 also has rests 27, which are connected to the side sections 5 with elastic bands 29, see figure 5. In the folded-up position shown in figure 2, the rests 27 are on the side sections 5. In the folded-out position shown in figure 1, the rests are at a distance from the side sections 5 and are not shown in figure 1.
  • FIG 6 shows a connecting module 31 of the suspension bridge installation according to the invention in perspective.
  • This connecting module can connect two bridge modules to each other or can connect a bridge module to a work cage (see figure 9).
  • the connecting module 31 has a bottom section 33 with four upright connecting pins 35 for engaging holes in the floor of the bridge module and the work cage.
  • the connecting module also has two legs 37, which are fastened on the bottom section 33 and to which the side sections and the rests can be connected.
  • Each leg 37 has two sections 37A and 37B that are hinged together, and which can be locked together by a locking pin 39, see figure 7.
  • the locking pin 39 can be pushed to clamp in a hole in the section 37B and is thereby integrated with the leg, so that no separate locking pin is needed.
  • Figure 8 shows the leg 37 from the top.
  • the pins 41 are for connection to the side sections of the bridge module and the pins 43 are for connection to the rests.
  • FIG 9 shows a work cage of a first embodiment of the suspension bridge installation according to the invention.
  • This work cage 45 can be connected to an end of the bridge module or can be installed between two bridge modules, in which the bridge modules are in line with or at an angle of 90 degrees to each other, in which latter case the work cage forms a corner piece.
  • the work cage 45 has a floor 48, which when connected to the bridge module is connected to the floor of the bridge module, and a box 47 that is present on a side of the floor, in which there are connecting devices (upright pins on the floor, as with the connecting module) on the other sides for connection to abridge module and to connect an end rest to the work cage.
  • the suspension bridge installation preferably has two work cages between which there are one or more bridge modules. The suspension bridge installation can be suspended on a roof beam by these work cages, which are also tackling devices. The sides of the work cage, to which no bridge module is connected, can be closed off by an end rest 49.
  • FIGS 10 and 11 show a second embodiment of the suspension bridge installation according to the invention in various elevations.
  • This suspension bridge installation 51 has a bridge module 53 and two tackling units 55.
  • Each tackling unit is provided with a box 57 with a tackling mechanism therein (not visible).
  • Two wheels 59 are fastened to the bottom of the box.
  • the tackling units 55 are also provided with devices for connection to an end or a side of the bridge module 53. These connecting devices are formed by bottom and top connecting elements 61 and 63, see figures 12 and 13. Prongs 65 can be connected to the bottom connecting elements 63, see figure 14, so that the connection to the bridge module 53 can be stronger, particularly if the tackling unit 55 is connected to a side of the bridge module. These prongs 65, which are here hollow, protrude at right angles to the box 57.
  • the tackling unit 55 is used as a trolley, which is easy to move.
  • Figures 15 and 16 show a third embodiment of the suspension bridge installation according to the invention in front and side elevation respectively. This suspension bridge installation 71 also has a bridge module 73 and two tackling units 75.
  • Each tackling unit is provided with a cage frame 77 with a tackling mechanism 79 therein, which is fastened to the cage frame, see figure 16.
  • Two wheels 81 are fastened to the bottom of the cage frame 77.
  • the cage frame 77 is provided with connecting devices 83 for connection to an auxiliary frame 85, which is connected to the bridge module 73.
  • Figures 17 and 18 show the tackling unit 75 in various elevations and figure 19 shows the tackling unit 75 with a scaffold pipe 87 connected to it.
  • the tackling unit 75 can be easily wheeled by grasping this scaffold pipe 87.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Vehicle Step Arrangements And Article Storage (AREA)

Abstract

L'invention se rapporte à un module de pont (1). Le module de pont a une plate-forme (3) et deux sections latérales dressées (5), qui sont articulées à des bordures (7) selon la longueur de la plate-forme. Chaque articulation (9) est formée par deux pièces d'extrusion (11) et (13) qui peuvent être poussées l'une dans l'autre, et est faite de telle sorte que les sections latérales (5) peuvent uniquement être pliées vers la plate-forme dans une direction l'une vers l'autre (3). Chaque section latérale (5) est faite d'une pièce d'extrusion (21), une section (11) de la pièce d'extrusion (21) formant une section des articulations (9). Les bordures (7) de la plate-forme (3) sont formées par des poutres, entre lesquelles se trouve une plaque (25) en matière plastique. Les poutres sont chacune formées d'une pièce d'extrusion (13), qui forme l'autre section des articulations (9).
EP08705090A 2007-01-10 2008-01-10 Module de pont Withdrawn EP2102432A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2000425A NL2000425C1 (nl) 2007-01-10 2007-01-10 Brugmodule voor een hangbruginstallatie, alsmede hangbruginstallatie voorzien van de brugmodule.
PCT/NL2008/050021 WO2008085051A1 (fr) 2007-01-10 2008-01-10 Module de pont

Publications (1)

Publication Number Publication Date
EP2102432A1 true EP2102432A1 (fr) 2009-09-23

Family

ID=39246776

Family Applications (1)

Application Number Title Priority Date Filing Date
EP08705090A Withdrawn EP2102432A1 (fr) 2007-01-10 2008-01-10 Module de pont

Country Status (8)

Country Link
US (2) US20090321185A1 (fr)
EP (1) EP2102432A1 (fr)
JP (1) JP5538900B2 (fr)
CN (1) CN101680232A (fr)
AU (1) AU2008203985B2 (fr)
CA (1) CA2675294A1 (fr)
NL (1) NL2000425C1 (fr)
WO (1) WO2008085051A1 (fr)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845884B (zh) * 2010-05-21 2012-01-11 四川华山建筑有限公司 附着升降脚手架的同步升降控制方法
NL2022888B1 (en) 2019-04-05 2020-10-08 Altrex Bv Platform for a suspension bridge

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0964127A1 (fr) * 1998-06-12 1999-12-15 Fit Carrosserie (Société Anonyme) Porte sectionnelle de fermeture

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US498178A (en) * 1893-05-23 William valentine leonard
US1462541A (en) * 1923-04-13 1923-07-24 Richard D Gallagher Portable bridge
US2507965A (en) * 1946-05-25 1950-05-16 Gen Motors Corp Hinge
US3359594A (en) * 1965-04-02 1967-12-26 Pastoor Beno Johannes Folding closures
GB1205591A (en) * 1967-04-17 1970-09-16 Stephens And Carter Ltd Sectional working platforms or stagings
US3907066A (en) * 1974-06-21 1975-09-23 Robert E Newton Wing-type scaffold system
US4315345A (en) * 1980-01-03 1982-02-16 Schijf Hendrikus J Profiled hinge joint
FR2669474B1 (fr) * 1990-11-19 1993-06-18 Electricite De France Nacelle heliportee modulable, destinee a etre deposee sur des cables aeriens.
FR2675964B1 (fr) * 1991-04-29 1995-03-10 Electricite De France Nacelle heliportee et procede de remplacement d'un manchon sur un cable aerien.
US5617931A (en) * 1994-08-11 1997-04-08 L. E. Zygmun And Company, Inc. Modular scaffolding system
CA2147199A1 (fr) * 1995-04-18 1996-10-19 Vittorio De Zen Elements extrudes articules et portes pliantes constituees de tels elements
EP0824166A3 (fr) * 1996-08-14 1998-10-28 Krupp Fördertechnik GmbH Pont à tablier inférieur
JP3617740B2 (ja) * 1996-09-10 2005-02-09 日精株式会社 エレベータ式駐車装置における組立式ゴンドラ
JP4147340B2 (ja) * 2000-04-03 2008-09-10 長谷川工業株式会社 管材緊結装置
BE1013678A3 (nl) * 2000-09-20 2002-06-04 Power Climber Bv Met Beperkte Verbeteringen aan hangbruggen.
US6513862B2 (en) * 2000-11-17 2003-02-04 Fukuvi Usa, Inc. Door panel and door assembly
US20070163731A1 (en) * 2006-01-17 2007-07-19 Chiu Jou Aluminium Co., Ltd. Overlap of one pair of semicircles for the folding combining structure
US7607513B1 (en) * 2007-11-29 2009-10-27 Elmo Rojas Telescoping lifting hand truck with a folding platform

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0964127A1 (fr) * 1998-06-12 1999-12-15 Fit Carrosserie (Société Anonyme) Porte sectionnelle de fermeture

Also Published As

Publication number Publication date
US20130153337A1 (en) 2013-06-20
JP2010515845A (ja) 2010-05-13
CN101680232A (zh) 2010-03-24
JP5538900B2 (ja) 2014-07-02
NL2000425C1 (nl) 2008-07-11
AU2008203985A1 (en) 2008-07-17
US20090321185A1 (en) 2009-12-31
AU2008203985B2 (en) 2014-02-20
CA2675294A1 (fr) 2008-07-17
WO2008085051A1 (fr) 2008-07-17

Similar Documents

Publication Publication Date Title
US7628563B2 (en) Fitting for a T-slot structure
US10344436B2 (en) Modular access structure
US7556054B2 (en) Foldable frame element and system with tension lock
CA2901871C (fr) Structure de plancher articulee pour chassis de scene mobile
US20070193190A1 (en) Reinforced and bolted rack truss
US10378201B2 (en) Collapsible modular building
CA2460472A1 (fr) Chevalet de sciage pliant
CN104602995A (zh) 具有自承的承载支架的高架输送装置
US20090321185A1 (en) Bridge module
US20130233851A1 (en) Secondary Containment System Using Modular Panels
NL2015450B1 (en) Ultra Large Crane, Mast Section therefore, and Method for Erecting such Hoisting Device.
US11047524B2 (en) Modular support frame for LED panels and LED wall comprising such a support frame
US20040123406A1 (en) Collapsible bridge and method of making and using same
CN205100104U (zh) 一种折叠式栈桥桥面板
CN103011033A (zh) 高空平台系统及包含该高空平台系统的工程机械
WO2015020662A1 (fr) Ensemble d'intégration de structure d'accès, et systèmes et procédés d'accès intégrés l'utilisant
NO337317B1 (no) Sammenleggbar, langstrakt bærekonstruksjonsmodul og en sammenleggbar, langstrakt modulær bjelkekonstruksjon.
US20170152877A1 (en) System for Safely Assembling Washing Machines for Vehicles
EP2843157B1 (fr) Système de plateforme modulaire avec un chariot
JP2009024471A (ja) ディスプレイアッセンブリー、トラス構造体、袖看板に応用可能な折りたたみ梯子形ユニット
KR102469207B1 (ko) 접철식 작업대
CN218029231U (zh) 提升式折叠板房结构
CN212054450U (zh) 一种多用型电工梯
JP2011219965A (ja) 建設機械
US20220205234A1 (en) Rapid assembly construction modules and methods for use

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20090810

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: XSPLATFORMS HOLDING B.V.

17Q First examination report despatched

Effective date: 20130628

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn