EP2095048B1 - Verfahren und vorrichtung zum trocknen eines polymers - Google Patents

Verfahren und vorrichtung zum trocknen eines polymers Download PDF

Info

Publication number
EP2095048B1
EP2095048B1 EP07857471.2A EP07857471A EP2095048B1 EP 2095048 B1 EP2095048 B1 EP 2095048B1 EP 07857471 A EP07857471 A EP 07857471A EP 2095048 B1 EP2095048 B1 EP 2095048B1
Authority
EP
European Patent Office
Prior art keywords
polymer
drying chamber
drying
inert gas
stream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP07857471.2A
Other languages
English (en)
French (fr)
Other versions
EP2095048A2 (de
Inventor
Giuseppe Penzo
Roberto Rinaldi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Basell Poliolefine Italia SRL
Original Assignee
Basell Poliolefine Italia SRL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Basell Poliolefine Italia SRL filed Critical Basell Poliolefine Italia SRL
Priority to EP07857471.2A priority Critical patent/EP2095048B1/de
Publication of EP2095048A2 publication Critical patent/EP2095048A2/de
Application granted granted Critical
Publication of EP2095048B1 publication Critical patent/EP2095048B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B3/00Drying solid materials or objects by processes involving the application of heat
    • F26B3/02Drying solid materials or objects by processes involving the application of heat by convection, i.e. heat being conveyed from a heat source to the materials or objects to be dried by a gas or vapour, e.g. air
    • F26B3/06Drying solid materials or objects by processes involving the application of heat by convection, i.e. heat being conveyed from a heat source to the materials or objects to be dried by a gas or vapour, e.g. air the gas or vapour flowing through the materials or objects to be dried
    • F26B3/08Drying solid materials or objects by processes involving the application of heat by convection, i.e. heat being conveyed from a heat source to the materials or objects to be dried by a gas or vapour, e.g. air the gas or vapour flowing through the materials or objects to be dried so as to loosen them, e.g. to form a fluidised bed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B13/00Conditioning or physical treatment of the material to be shaped
    • B29B13/06Conditioning or physical treatment of the material to be shaped by drying
    • B29B13/065Conditioning or physical treatment of the material to be shaped by drying of powder or pellets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B9/00Making granules
    • B29B9/16Auxiliary treatment of granules
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B21/00Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
    • F26B21/14Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects using gases or vapours other than air or steam, e.g. inert gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B9/00Machines or apparatus for drying solid materials or objects at rest or with only local agitation; Domestic airing cupboards
    • F26B9/06Machines or apparatus for drying solid materials or objects at rest or with only local agitation; Domestic airing cupboards in stationary drums or chambers

Definitions

  • the invention relates to a process and apparatus for drying polymer particles with a high efficiency and low residence times.
  • the invention relates to a process and apparatus for drying polyolefin granules in the finishing section of a polymerization plant for the olefin polymerization.
  • a Ziegler-Natta catalyst comprises a solid catalytic component based on a transition metal compound, such as a titanium tetrachloride, and an organometallic compound acting as the catalyst activator, such as an aluminium alkyl compound.
  • the olefin polymerization when the olefin polymerization is carried out in the gas-phase, the presence of inert gases, such as propane, isobutane, isopentane or other saturated aliphatic hydrocarbons, has mainly the function of contributing to dissipate the heat generated inside the reactor from the polymerization reaction. Even these alkanes of low volatility may remain occluded and dissolved in the polyolefins particles.
  • inert gases such as propane, isobutane, isopentane or other saturated aliphatic hydrocarbons
  • Some processes are known for treating polymers with nitrogen and/or steam to remove the unreacted monomers and other volatile compounds from the polymer particles discharged from the reactor.
  • US 4,731,438 teaches a method for treating polymers by using a stream of N 2 and water, in which the stripping agent is essentially N 2 , while water has the function of deactivating the catalyst residues.
  • a polymer is introduced at the top of a vertical vessel, so as to form a polymer bed descending through the vessel in plug flow conditions.
  • the nitrogen stream containing water is fed to the bottom of the vertical vessel.
  • GB1,178,252 A discloses an apparatus where control of flow of granular solid through downcomer tubes between fluidised beds supported on perforated screens 8 is achieved by gas passing into the bottom of the tubes and up through perforated plates, which gas fluidises the solid in the tubes.
  • the apparatus may be used for the removal of SO2 from flue gases by adsorption on to a catalyst.
  • US 5,199,184 A discloses a drier for the drying of plastics granules consisting of a vertically arranged tube which simultaneously forms the jacket of the effervescent bed chamber of the crystallizer and of the chamber of the drier.
  • the crystallizer and drier are connected to one another via an aeration surface which is provided with pneumatic means whose permeability decreases in the direction of flow of the granules.
  • BE680,474 discloses a process for the desiccation of aggregates of wet synthetic materials, consisting of batchwise pre-drying the granulate, via the sticky or plastic state, in a fluid bed dryer without grate and to complete its desiccation continuously at high temperature in a desiccator tank serving simultaneously as an intermediate reservoir.
  • US5,797,989 discloses an apparatus for the continuous crystallization of polyester material.
  • the apparatus operates to improve the residence behavior of the material and the process. This is achieved by a circular apparatus having a gas inlet and gas outlet and product entry and product outlet, the product entry and product outlet are arranged concentrically and parallel to the axis of the apparatus.
  • a product outlet device is arranged so that it is axially displaceable.
  • FR1,352,614 discloses a process for drying plastic granules.
  • the granule descends in a continuous manner under the action of gravity, and in countercurrent with the gaseous drying fluid injected at the hub of conduits or through grids, so that is dried by contact with this fluid.
  • US5119570 discloses a process for crystallizing polyester granules in two fluidized beds connected in series and fed into a baffle device for post-comminuting the small agglomerates.
  • the first fluidized bed is a bubbling fluidized bed with mixing characteristics
  • the second fluidized bed is a fluidized bed having a piston flow characteristic.
  • US 4,314,053 and EP 0 341 540 also discloses processes into which polymers are treated with a stream of N 2 enriched with steam, in an amount that the stripping agent is essentially nitrogen.
  • the stripping agent is essentially nitrogen.
  • limits and drawbacks of the above methods derive from the difficulty in separating the low molecular weight monomers from nitrogen, so that complex, bulky and expensive apparatuses are required in the monomer recovery section of the polymerization plant. Therefore, the recovery and recycle of the unreacted monomers to the polymerization reactor becomes expensive and complex.
  • EP 0 808 850 and EP 1 348 721 disclose methods for reducing the odor development in olefin polymers obtained by polymerization reactions catalyzed by means of metallocene catalysts.
  • the ligands having a cyclopentadienyl skeleton are sources of odor development.
  • Said ligands can be efficiently removed by a method including a step of contacting the polyolefin with a ligand decomposer, such as water or alcohol, to decompose the residual ligands contained in the polyolefin, and then a step of removing the decomposed ligands by heating said polyolefin in a stream of inert gas, preferably nitrogen.
  • US 4,332,933 describes a method for treating a polymer powder to reduce its content of catalyst residues and volatile compounds.
  • This method comprises flowing a stream of superheated steam at a temperature from 105 to 140°C over the polymer powder, and maintaining the polymer at said temperatures, so as to prevent any steam condensation.
  • a stream of superheated steam is continuously introduced at the bottom of a vessel containing the polymer particles in fluidized conditions.
  • the heat required to increase the temperature of the polymer to the temperature of 105-140°C is supplied to the system by suitable heat exchangers immersed in the fluidized polymer bed.
  • the vessel walls are heated by external jackets in order to prevent the steam condensation.
  • the required high temperatures to avoid the steam condensation and also the presence of heat exchangers protruding inside the polymer bed make this treatment completely not suitable to be applied to the finishing of sticky polymers, which would easily adhere to the internal heat exchangers and to the reactor walls.
  • the Applicant has now found a process and apparatus capable of drying polymer particles with an improved efficiency, at considerably low residence times of the polymer inside the drying apparatus.
  • the particular design of the drying apparatus of the invention greatly increases the overall efficiency of water removal from polymer granules, thus obtaining a dried polymer even if the residence times of the polymer are short.
  • a flow of hot inert gas maintains the polymer granules in fluidisation conditions inside the first drying chamber, while the polymer descends in plug flow conditions along the second drying chamber.
  • the presence of two distinct drying chambers and the different flow conditions kept in said two drying chambers allow the overall residence time required to complete the water removal to be greatly reduced, thus reducing the overall size of the drier.
  • the first drying chamber has a higher size than the second drying chamber: establishing polymer fluidization conditions in said first chamber the removal of water from the polymer occurs in a short average residence time, which is a typical feature of driers operating by means of fluidization of the particles to be dried.
  • the apparatus of the invention solves the above technical problem with the provision of, downstream the first drying chamber, a second drying chamber in which the polymer particles are not in fluidization conditions, but are forced to descend by gravity in a "plug flow" contacting a second stream of a dry inert gas.
  • the "plug flow” conditions ensure that the contact times with the drying gas are substantially equal for all the polymer particles, so that the water removal can be substantially completed for all the particles, even those not efficiently dried in the first drying chamber.
  • the drying apparatus of present invention allows to perform the drying of polymer particles with an improved efficiency and in short residence times.
  • most of the water impregnating the polymer is removed in the first drying chamber operating in fluidization conditions.
  • a weight fraction from about 0.8 to about 0.95 of the total water is removed in the first drying chamber.
  • the remaining part of water is removed from the polymer in the second drying chamber operating in a "plug flow".
  • the fluidization conditions established in the first chamber allows to remove most of the water from the polymer with a very short residence time: the average residence time in the annular chamber generally ranges from 1 to 6 minutes, preferably from 2 to 5 minutes.
  • the tubular body forming the second drying chamber is designed with a reduced volume, so that, even if "plug flow conditions" are established, the residence time of the polymer results similarly low: the average residence time in the second drying chamber ranges from 2 to 15 minutes, preferably from 5 to 10 minutes.
  • the polymer has an overall residence time in the drying apparatus of the invention comprised between about 3 and about 20 min, preferably between 5 and 15 minutes. Moreover, owing to the particular flow conditions of the polymer, it is possible to avoid channelling, ensuring a complete removal of water from the polymer.
  • a typical industrial application of the process and apparatus of instant invention is the drying of polymer particles coming from the finishing section of a polymerization plant, particularly from a treatment of polymer steaming, according to which the produced polyolefin is countercurrently contacted with a stream of steam in order to remove away the unreacted monomers dissolved in the polymer particles.
  • the polymer particles come from steaming at a temperature ranging from 85°C to 110°C.
  • a stream of dry inert gas is used in the process of the invention at a temperature comprised between about 85°C and 115°C, said temperature being selected taking into account the particular polymer treated, so as to avoid any softening of the polymer, and subsequently any obstruction in the drier.
  • a temperature comprised between about 85°C and 115°C, said temperature being selected taking into account the particular polymer treated, so as to avoid any softening of the polymer, and subsequently any obstruction in the drier.
  • nitrogen is used as the dry inert gas.
  • the amount of dry inert gas fed to the annular chamber generally represents from 70 to 95% by volume of the total feed of inert gas to the drying apparatus.
  • a stream of nitrogen enriched with steam is discharged as a by-product from the drying apparatus of the invention.
  • Said impure nitrogen is subjected to compression and successive cooling to condensate water, and after the condensate has been separated off in a liquid separator, the purified nitrogen is heated in a heat exchanger at the suitable temperature and again reintroduced at the bottom of the drier, thus forming a hot nitrogen closed loop. Accordingly, the separation of the removed water from the nitrogen is technically simple and does not require expensive separation steps.
  • the polymer particles coming from the drying process of the invention contain water in a negligible amount and therefore may be transferred, without any risk, to the successive downstream steps, such as extrusion and pelletization.
  • Fig. 1 a plant for producing polyolefins, such as propylene homopolymers or copolymers.
  • the polymerization reaction may be performed in a single or in multiple step, or in any one of the known methods, for example as described in EP 517 183 .
  • finishing apparatuses 100 used in a finishing zone of a plant for producing polymers, the finishing apparatuses comprising a flash chamber 1, a first vessel 4 in which the polymer is treated with saturated steam, a second vessel 8 in which the polymer is dried with dry nitrogen.
  • a product B containing polymer granules is discharged from a polymerization process performed in the gas phase, or alternatively, in the liquid phase.
  • the product B comprises polymer granules together with the unreacted monomers and catalysts residues, which must be removed from the polymer using the finishing process of the invention.
  • the polymer granules have preferably a spherical shape, with dimensions of about 0.3-4 mm, great roughness, and therefore high specific surface.
  • crystalline polymers are treated in the flash chamber 1
  • a temperature of about 100-110°C may be reached, on the other hand if very sticky polymers are treated, the temperature may be maintained at about 60-90°C.
  • the temperature in the flash chamber 1 is kept at values such to avoid the softening of the polymer powder. Owing to the above mentioned operative conditions, a part of the gaseous phase present in the product B, mainly the unreacted monomers, are volatilized from the solid polymer.
  • the gases separated from the product B leave the flash chamber 1 through the gas line 2 from the upper zone of the chamber 1, and are recycled by the recycle line R to the polymerization reactor after compression, whereas the polymer P leaves the bottom of the flash chamber 1 via the feed line 3 and is fed at the top of a steamer 4 to carry out the steaming step (1) of present invention.
  • the saturated steam V is fed through the steam line 5.
  • Volatile gaseous compounds G released from the polymer P, are extracted from the head of the steamer 4 via line 6. A purified polymer P' is discharged from the bottom of the steamer 4.
  • the gaseous compounds G contain steam, unreacted monomers, and high boiling catalyst components coming from the catalyst system.
  • the separation of the gaseous components from the steam is simple and efficient: it may be carried out according to known methods, and does not require bulky or complex apparatuses. Such separation allows, from one hand, the recover and recycle of the unreacted monomers to the polymerization reactor and, on the other hand, to obtain water.
  • the stream G is firstly fed to a cyclone separator 101 for separating therefrom fine polymer particles entrained with the gaseous stream G. Said fine particles are reintroduced into the steamer 4, whilst the gaseous compounds are fed to a condenser 102, in which the gaseous compounds are cooled to cause the condensation of the steam and heavier hydrocarbons, so as to obtain a gaseous fraction G' and a condensed fraction C.
  • the gaseous fraction G' is fed to a compressor 103 and then to a drier 104 and thereafter mixed with the gas line 2 coming from the flash chamber 1, and hence recycled back to the polymerization reactor through the recycle line R.
  • the condensed fraction C is fed to a gravity separator 105 in which the high molecular weight hydrocarbons 106 are separated from the aqueous phase W1.
  • the aqueous phase W1 can be discharged in a water reservoir after being purified from the presence of residual hydrocarbons.
  • the polymer P' withdrawn from the bottom of the steamer 4 is fed via line 7 to the head portion 8a of a drier 8, whilst a flow of dry inert gas, preferably dry nitrogen, is fed to the bottom portion of the drier 8 via lines N1 and N2.
  • the dry inert gas allows to remove from the polymer particles the steam previously condensed on the polymer granules in the steamer 4.
  • a dried polymer P" is discharged from the bottom of the drier 8 through line 10. From the upper zone of the drier 8 a gaseous stream 9' is obtained, said gaseous stream containing mainly nitrogen, together with steam.
  • the gaseous stream 9' is then fed to a further cyclone separator 107, in which the fine particles are separated from the gas: said fines are recycled to the top of the drier 8, whilst the gaseous phase 109 is fed to a further condenser 108, in which the steam is condensed and separated as water W2 from the nitrogen.
  • the obtained stream of water W2 may be discharged in the water reservoir, while nitrogen is sent via line G" to the compressor 110, heated by means of heat exchanger 111, and then recycled via lines N1 and N2 at the bottom part of the drier 8.
  • the polymer P" discharged from the drier 8 is free from water, volatile compounds and catalyst residues, has a high degree of purity, and may be processed in subsequent processing operations.
  • the polymer P" is almost at the same temperature of the product B fed to the finishing process, and may be used in downstream processes without being subjected to any other treatment.
  • Fig. 2 shows a schematic front view of the drying apparatus of the invention.
  • the drier 8 is provided with a head portion 8a, a first drying chamber 83 having a substantially annular shape, a velocity reduction zone 84 interposed between the head portion 8a and the first drying chamber 83, and a tubular body 85 with a diameter D5 lower than the diameter D4 of the first drying chamber 83.
  • the polymer particles are maintained inside the first drying chamber 83 in fluidization conditions by the upwardly flow of dry nitrogen fed to the bottom of the drier 8.
  • the velocity reduction zone 84 is shaped so as to diverge from the first drying chamber 83 to the head portion 8a: this allows to reduce the velocity of the fluidizing gas, thus minimizing the fraction of fines which may be entrained by the gas through the outlet 9'.
  • the polymer particles P' enriched with condensed steam in the steamer 4 of Fig 1 , are fed to the drier 8 by means of a long feed conduit 87, which protrudes inside the velocity reduction zone 84 of the drier 8.
  • the feed conduit 87 is particularly prolonged in order to convey the polymer particles directly in the middle region of the first drying chamber 83, thus minimizing the amount of solid particles eventually entrained with the upward flow of gas exiting through the gas outlet 9'.
  • a first stream N 1 of nitrogen, as the drying gas, is fed to the drier 8 at an inlet 88 arranged at the bottom of the first drying chamber 83. Said first stream of nitrogen is distributed in the chamber 83 through a first distribution grid 89 having an annular shape.
  • a second stream N 2 of dry nitrogen is fed at the inlet 98 arranged at the bottom of the tubular body 85 and is distributed in the tubular body 85 through a second distribution grid 91.
  • the distribution grid 91 is tilted, with respect to the horizontal direction x, of angle ⁇ 2 greater than the rest angle ⁇ of the dried polymer: this allows the descent of the polymer P' due to gravity and prevents obstructions in the bottom of the tubular body 85.
  • Both the first distribution grid 89 and the second distribution grid 91 are provided with a plurality of distribution holes for distributing respectively the first stream N1 and the second stream N2 of dry nitrogen in the drier 8.
  • the tubular body 85 has a substantially cylindrical shape and is concentric to the first drying chamber 83.
  • the arrangement of the tubular body inside the drier 8 allow two distinct drying chambers to be identified: a first drying chamber represented by the annular chamber 83 and a second drying chamber arranged inside the tubular body 85.
  • the upper part of the tubular body 85 extends above the first distribution grid 89, while the lower part of the tubular body 85 protrudes downwardly below the first distribution grid 89.
  • the second drying chamber is arranged downstream the first drying chamber, i.e. the polymer particles flow firstly in the annular chamber 83 and successively along the tubular body 85.
  • the polymer is dried while is subjected to fluidization conditions by the upward flow of dry nitrogen coming through the first distribution grid 89.
  • the second drying chamber i.e inside the tubular body 85, the polymer particles flow downward substantially in plug flow conditions encountering the second stream of dry nitrogen fed via the inlet 98 in Fig. 2 .
  • the polymer entering the drier 8 fills the annular chamber 83 up to a certain level, that is kept almost constant, forming a fluidized polymer bed C' that is fluidized by the flow of nitrogen, which diffuses homogeneously into the polymer bed C', so contacting almost each granule of polymer and keeping the polymer in fluidization in the annular chamber 83.
  • the flow of nitrogen flows upward with a cyclonic motion, as indicated by the arrows F6 in Figure 3 , so spiralling up into the annular chamber 83.
  • a notching 86 is provided in the upper end of the tubular body 85. Due to turbulent, random motion at which the polymer particles are subjected, some of them enter the notching 86, thus passing from the annular chamber 83 into the tubular body 85. Inside the tubular body 85 the polymer is not more subjected to fluidization conditions, so that it can fall downward in a plug flow.
  • the tubular body 85 is also provided with an opening 853 placed just above the first distribution grid 89, and having the function of emptying the annular chamber 83, in case of emergency stop.
  • the fluidization conditions in the annular chamber 83 allow most of the water condensed on the polymer granules to be removed, whilst the plug flow conditions in the tubular body 85 allows to complete the polymer drying with a high efficiency. This implies that, after short residence times, a dried polymer P" can be discharged from the outlet 10 of the drier 8.
  • Polypropylene is produced by means of slurry polymerization of the liquid monomer in a loop reactor.
  • a Ziegler-Natta catalyst is used as the polymerization catalyst, comprising:
  • Propylene is polymerized in the loop reactor using H 2 as the molecular weight regulator. No comonomer is fed to this reactor. Make-up propylene and hydrogen were continuously fed to the loop reactor. The polymerization of propylene is carried out at a temperature of 70°C and a pressure of 34 absolute bar.
  • the polypropylene slurry, continuously discharged from the loop reactor, is forced to flow inside a jacketed pipe wherein it is heated up to reach a temperature of 85°C with consequent evaporation of the liquid phase.
  • Successively the obtained stream of polypropylene and evaporated monomer is introduced in a flash tank (reference 1 in Fig.1 ), where the evaporated monomer is separated from the polymer particles.
  • 30000 Kg/h of polypropylene are continuously discharged from the bottom of the flash tank 1 and are subjected to steaming in a steamer (reference 4 in Fig. 1 ).
  • the temperature of polymer particles at the inlet of the steamer 4 is of about 70°C.
  • Saturated steam is fed mostly at the bottom of the steamer 4 with a total flow rate equal to 1800 Kg/h, corresponding to 60 Kg of steam per 1000 kg of polyolefin to be treated.
  • the polymer particles fall down by gravity along the steamer, thus contacting in a counter current the upward flow of saturated steam.
  • the operative conditions are such to maintain in the steamer a temperature of 105°C and a pressure of 1.2 absolute bar.
  • the average residence time of the polymer in the steamer is of 20 minutes.
  • about 1000 kg/h of steam are subjected to condensation, thus generating water layers around the polyolefin particles.
  • the remaining amount of saturated steam acts as the stripping agent and is discharged from the top of the steamer 4.
  • the polypropylene particles withdrawn from the bottom of the steamer are conveyed to the drying apparatus of the present invention.
  • the polypropylene particles at a temperature of 105°C enter the first drying chamber 83 of the drier 8 via the feed conduit 87.
  • the polymer particles are maintained in fluidization conditions by an upward flow of dry nitrogen.
  • About 13000 m 3 /h of dry nitrogen at a temperature of 110°C are fed via line N1 to fluidization grid 89, which is placed at the bottom part of the drying chamber 83.
  • About 2000 m 3 /h of dry nitrogen at a temperature of 110°C are fed at the inlet 98, arranged at the bottom of the tubular body 85, and are distributed in the tubular body 85 through the distribution grid 91.
  • the polymer particles flow downward substantially in plug flow conditions encountering this second stream of dry nitrogen.
  • the residence time of the polymer in the first drying chamber 83 is of only 2 minutes, while the polymer residence time inside the second drying chamber 85 is of 10 minutes.
  • the contact with dry nitrogen causes the evaporation of the water surrounding the polyolefin particles, which is also causing the cooling of the polymer particles.
  • the polyolefin temperature at the outlet of the drier 8 is lowered to the value of 78°C.
  • a stream of nitrogen enriched with steam is obtained, which is subjected to condensation to separate the steam from nitrogen.
  • the separated nitrogen is then compressed, heated in a heat exchanger and again reintroduced at the bottom of the drier 8 via feeding lines N1 and N2, thus forming a hot nitrogen closed loop.
  • a completely dried polyolefin is discharged from the outlet 10 of the drying apparatus of present invention.
  • a propylene/ethylene/1-butene copolymer is produced by means of slurry polymerization of the liquid monomers in a loop reactor.
  • the same Ziegler-Natta catalyst of Example 1 is used.
  • Propylene is the main monomer, while ethylene and 1-butene are fed to the loop reactor, so as to obtain a final propylene copolymer containing 2.5% by weight of ethylene and 4.8% by weight of 1-butene.
  • the slurry polymerization in the loop reactor is carried out at a temperature of 62°C and a pressure of 34 absolute bar.
  • the copolymer slurry continuously discharged from the loop reactor, is forced to flow inside a jacketed pipe wherein it is heated up to reach a temperature of 78°C with consequent evaporation of the liquid phase.
  • Successively the obtained stream of polypropylene and evaporated monomers is introduced in a flash tank, where the evaporated monomers are separated from the polymer particles.
  • the temperature of the polyolefin entering the steamer is of about 65°C.
  • the total flow rate of saturated steam fed to the steamer 4 is equal to 1800 Kg/h, corresponding to 90 Kg of steam per 1000 kg of polyolefin to be treated.
  • the polymer particles fall down by gravity along the steamer, thus contacting in a counter current the flow of saturated steam.
  • the operative conditions are such to maintain in the steamer a temperature of 105°C and a pressure of 1.2 absolute bar.
  • the average residence time of the polymer in the steamer is of 30 minutes.
  • the residence time of the polymer in the first drying chamber 83 is of only 3 minutes, while the polymer residence time inside the second drying chamber 85 is of 14 minutes.
  • the contact with dry nitrogen causes the evaporation of the water surrounding the polyolefin particles, which is also causing the cooling of the polymer particles.
  • the polyolefin temperature at the outlet of the drier 8 is lowered to the value of 72°C.
  • a stream of nitrogen enriched with steam is obtained, which is subjected to condensation to separate the steam from nitrogen.
  • the separated nitrogen is then compressed, heated in a heat exchanger and again reintroduced at the bottom of the drier 8 via feeding lines N1 and N2, thus forming a hot nitrogen closed loop.
  • a completely dried polyolefin is discharged from the outlet 10 of the drying apparatus of present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Microbiology (AREA)
  • Addition Polymer Or Copolymer, Post-Treatments, Or Chemical Modifications (AREA)
  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)
  • Drying Of Solid Materials (AREA)
  • Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)
  • Polymerisation Methods In General (AREA)

Claims (12)

  1. Vorrichtung zum Trocknen von Polymerpartikeln mithilfe von Inertgas, umfassend:
    - ein erstes Verteilungsgitter (89), das ausgestaltet ist, um einen ersten Strom des Inertgases zu empfangen;
    - eine erste Trocknungskammer (83), die oberhalb des ersten Verteilungsgitters (89) platziert ist, mit einer Ringform, die geeignet ist, um das Polymer mithilfe des ersten Stroms des Inertgases in verwirbeltem Zustand zu halten;
    - eine zweite Trocknungskammer, die im Inneren der ersten Trocknungskammer (83) läuft und unterhalb des ersten Verteilungsgitters (89) nach unten ragt, wobei die zweite Trocknungskammer zu der ersten Trocknungskammer (83) konzentrisch ist; dadurch gekennzeichnet, dass
    - die zweite Trocknungskammer durch einen Rohrkörper (85) gebildet ist, wobei in dem oberen Ende des Rohrkörpers eine Kerbung (86) bereitgestellt wird,
    - die Vorrichtung ferner ein zweites Verteilungsgitter (91) umfasst, das am Unterteil der zweiten Trocknungskammer angeordnet ist und ausgestaltet ist, um einen zweiten Strom des Inertgases zu empfangen.
  2. Vorrichtung nach Anspruch 1, ferner umfassend eine Geschwindigkeitsreduktionszone (84), die oberhalb der ersten Trocknungskammer (83) angeordnet ist.
  3. Vorrichtung nach Anspruch 1, wobei die Löcher des ersten Verteilungsgitters (89) so orientiert sind, dass sie Spiralbildung des Stroms des Inertgases in der ersten Trocknungskammer (83) bewirken.
  4. Vorrichtung nach Anspruch 1, wobei das zweite Verteilungsgitter (91) in Bezug auf die horizontale Richtung in einem Winkel a2 gekippt ist, der größer als der Ruhewinkel Φ des getrockneten Polymers ist.
  5. Verfahren zum Trocknen von Polymer mithilfe von Inertgas, umfassend:
    - Trocknen der Polymerpartikel in einer ersten Trocknungskammer (83) mit einer Ringform, wobei die Polymerpartikel durch einen ersten Strom des Inertgases in einem verwirbelten Zustand gehalten werden;
    - weiteres Trocknen der Polymerpartikel in einer zweiten Trocknungskammer, wobei die Polymerpartikel in einer Pfropfenströmung absteigen und einen zweiten Strom des Inertgases kontaktieren, wobei die zweite Trocknungskammer konzentrisch zu der ersten Trocknungskammer (83) ist,
    dadurch gekennzeichnet, dass
    - die zweite Trocknungskammer durch einen Rohrkörper (85) gebildet ist, wobei in dem oberen Ende des Rohrkörpers (85) eine Kerbung (86) bereitgestellt wird.
  6. Verfahren nach Anspruch 5, wobei eine Gewichtsfraktion, die 0,8 bis 0,95 des gesamten auf dem Polymer vorhandenen Wassers beträgt, in der ersten Trocknungskammer (83) entfernt wird.
  7. Verfahren nach Anspruch 5, wobei die durchschnittliche Verweilzeit des Polymers in der ersten Trocknungskammer (83) im Bereich von 1 bis 6 Minuten liegt.
  8. Verfahren nach Anspruch 5, wobei die durchschnittliche Verweilzeit des Polymers in der zweiten Trocknungskammer im Bereich von 2 bis 15 Minuten liegt.
  9. Verfahren nach Anspruch 5, wobei das zu trocknende Polymer aus einer Behandlung des Polymers mit Wasserdampf kommt.
  10. Verfahren nach Anspruch 5, wobei das Inertgas trockener Stickstoff mit einer Temperatur im Bereich von 85 °C bis 115 °C ist.
  11. Verfahren nach Anspruch 5, wobei der erste Strom des in die erste Trocknungskammer (83) eingespeisten Inertgases 70 bis 95 Gew.% der gesamten Einspeisung des Inertgases ist.
  12. Verfahren nach Anspruch 5, wobei der erste Strom des Inertgases mit einer zyklonartigen Bewegung spiralförmig aufwärts in die erste ringförmige Kammer (83) fließt.
EP07857471.2A 2006-12-29 2007-12-12 Verfahren und vorrichtung zum trocknen eines polymers Active EP2095048B1 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP07857471.2A EP2095048B1 (de) 2006-12-29 2007-12-12 Verfahren und vorrichtung zum trocknen eines polymers

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP06127348 2006-12-29
EP07857471.2A EP2095048B1 (de) 2006-12-29 2007-12-12 Verfahren und vorrichtung zum trocknen eines polymers
PCT/EP2007/063808 WO2008080788A2 (en) 2006-12-29 2007-12-12 Process and apparatus for drying a polymer

Publications (2)

Publication Number Publication Date
EP2095048A2 EP2095048A2 (de) 2009-09-02
EP2095048B1 true EP2095048B1 (de) 2019-08-21

Family

ID=39589027

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07857471.2A Active EP2095048B1 (de) 2006-12-29 2007-12-12 Verfahren und vorrichtung zum trocknen eines polymers

Country Status (10)

Country Link
EP (1) EP2095048B1 (de)
JP (1) JP2010514872A (de)
KR (1) KR101508966B1 (de)
CN (2) CN103483471B (de)
AR (1) AR064579A1 (de)
BR (1) BRPI0720857B1 (de)
CL (1) CL2007003829A1 (de)
RU (1) RU2462673C2 (de)
TW (1) TWI408326B (de)
WO (1) WO2008080788A2 (de)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014517766A (ja) * 2011-05-12 2014-07-24 グラット インジェニェーアテヒニク ゲゼルシャフト ミット ベシュレンクテル ハフツング 流動床装置内で固体を連続処理するための設備
CN103968644A (zh) * 2014-05-13 2014-08-06 张家港欣阳化纤有限公司 一种化纤纺丝干燥装置及其干燥工艺
WO2016180597A1 (de) * 2015-05-08 2016-11-17 Basf Se Herstellungsverfahren zur herstellung wasserabsorbierender polymerartikel und bandtrockner
WO2016210169A1 (en) 2015-06-23 2016-12-29 Bepex International, Llc Process and system for processing aqueous solutions
EP3416989B1 (de) 2016-02-15 2019-06-12 Basell Polyolefine GmbH Verfahren zur herstellung eines getrockneten pulvers
CA3118016A1 (en) * 2018-11-01 2020-05-07 Danmarks Tekniske Universitet A slurry drying plant, a method for drying slurry and use of a slurry drying plant
CN111635467A (zh) * 2020-04-30 2020-09-08 浙江卫星能源有限公司 聚烯烃粉料后处理装置及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1352614A (fr) * 1963-04-04 1964-02-14 Metallgesellschaft Ag Procédé pour le séchage de granulés de matière plastique
BE680474A (de) * 1965-05-05 1966-10-17
US5119570A (en) * 1988-12-23 1992-06-09 Buhler Ag Method for continuously crystalizing polyester material
US5797989A (en) * 1995-01-09 1998-08-25 Buehler Ag Apparatus for the continuous crystallization of polyester materials

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2668041A (en) * 1949-04-12 1954-02-02 Knibbs Norman Victor Syndney Heat treatment of finely divided solids
US2728642A (en) * 1952-06-09 1955-12-27 Tide Water Associated Oil Comp Gas-solids contacting apparatus
GB873832A (en) * 1956-08-15 1961-07-26 Gas Council Method of and apparatus for carrying out reactions between gases and liquids or fusible solids in fluidised beds
FR1478224A (fr) * 1965-05-05 1967-04-21 Metallgesellschaft Ag Procédé et installation pour le traitement, notamment pour la cristallisation, de granules amorphes en matière plastique avec des gaz très chauds
GB1178252A (en) * 1966-11-16 1970-01-21 Head Wrightson & Co Ltd Improvements in or relating to Multi-Stage Gas-Fluidisable Bed Installations.
US3529359A (en) * 1968-05-11 1970-09-22 Okawara Mfg Fluidized drying apparatus
CA941983A (en) * 1968-12-19 1974-02-12 James F. Zievers Continuous ion exchange system
JPS6045646B2 (ja) * 1978-06-29 1985-10-11 住友化学工業株式会社 ポリα−オレフインの乾燥法
SU1241043A1 (ru) * 1984-02-27 1986-06-30 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Сахарной Промышленности Аппарат дл тепловой обработки сыпучих материалов
CH665473A5 (en) * 1985-07-18 1988-05-13 Schweizerische Viscose Crystallising and drying PET polymer granules - by feeding continuously into rising current of hot air where dust is removed and dried prod. falls out
JPH03137486A (ja) * 1989-10-20 1991-06-12 Nippon Steel Corp 粉粒体の乾燥・分級方法
US5470387A (en) * 1994-03-07 1995-11-28 Niro A/S Continuous multicell process and apparatus for particle coating including particle recirculation
US5688910A (en) * 1995-09-26 1997-11-18 Union Carbide Chemicals & Plastics Technology Corporation Process and apparatus for removing unpolymerized gaseous monomers from olefin polymers
DE19709517A1 (de) * 1997-03-10 1998-09-17 Hoechst Trevira Gmbh & Co Kg Vorrichtung zur Kristallisation von Polymergranulaten sowie Verfahren zur Kristallisation von Polymergranulaten
JP2001012850A (ja) * 1999-06-30 2001-01-19 Kudo Kensetsu Kk 乾燥処理装置
JP3824890B2 (ja) * 2001-07-06 2006-09-20 共和真空技術株式会社 凍結乾燥した食品・薬品類の乾燥バルクの粉砕装置
CA2472028C (en) * 2002-02-01 2010-03-30 Pfizer Products Inc. Method for making homogeneous spray-dried solid amorphous drug dispersions utilizing modified spray-drying apparatus
CA2591823A1 (en) * 2004-12-20 2006-06-29 Basell Poliolefine Italia S.R.L. Process and apparatus for the polymerization of propylene
CN104262514A (zh) * 2006-12-29 2015-01-07 巴塞尔聚烯烃意大利有限责任公司 聚烯烃后处理方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1352614A (fr) * 1963-04-04 1964-02-14 Metallgesellschaft Ag Procédé pour le séchage de granulés de matière plastique
BE680474A (de) * 1965-05-05 1966-10-17
US5119570A (en) * 1988-12-23 1992-06-09 Buhler Ag Method for continuously crystalizing polyester material
US5797989A (en) * 1995-01-09 1998-08-25 Buehler Ag Apparatus for the continuous crystallization of polyester materials

Also Published As

Publication number Publication date
CL2007003829A1 (es) 2008-07-11
WO2008080788A2 (en) 2008-07-10
KR101508966B1 (ko) 2015-04-06
RU2009129165A (ru) 2011-02-10
CN103483471A (zh) 2014-01-01
KR20090094011A (ko) 2009-09-02
BRPI0720857A2 (pt) 2014-07-01
EP2095048A2 (de) 2009-09-02
TW200844387A (en) 2008-11-16
CN101573576A (zh) 2009-11-04
JP2010514872A (ja) 2010-05-06
CN103483471B (zh) 2022-02-11
RU2462673C2 (ru) 2012-09-27
BRPI0720857B1 (pt) 2019-04-02
WO2008080788A3 (en) 2008-11-20
AR064579A1 (es) 2009-04-08
TWI408326B (zh) 2013-09-11

Similar Documents

Publication Publication Date Title
EP2125905B1 (de) Verfahren zur endbehandlung von polyolefin
EP2095048B1 (de) Verfahren und vorrichtung zum trocknen eines polymers
US20100004408A1 (en) Process for the polyolefin finishing
WO2015078815A1 (en) Process for continuous polymerization of olefin monomers in a reactor
EP3341420A1 (de) Verfahren zur kontinuierlichen polymerisierung von olefinmonomeren in einem reaktor
US8314198B2 (en) Apparatus and process for gas phase fluidised bed polymerisation reaction
KR101710339B1 (ko) 폴리올레핀의 스티밍
KR101972292B1 (ko) 건조 분말의 제조 방법
CA3184511A1 (en) Screening assembly and process for screening polymer from an effluent stream at reduced levels of polymer entrainment
WO2018234350A1 (en) METHOD FOR MANUFACTURING HIGH DENSITY MULTIMODAL POLYETHYLENE
US20230374166A1 (en) Systems and techniques for polymer degassing
KR20220070258A (ko) 폴리올레핀을 제조하는 시스템 및 기상 반응기로부터 중합 생성물을 회수하는 공정

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20090604

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BASELL POLIOLEFINE ITALIA S.R.L.

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20170314

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BASELL POLIOLEFINE ITALIA S.R.L.

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BASELL POLIOLEFINE ITALIA S.R.L.

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190327

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007059094

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1170232

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190915

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191121

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191122

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191221

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200224

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602007059094

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 1170232

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190821

PG2D Information on lapse in contracting state deleted

Ref country code: IS

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

26N No opposition filed

Effective date: 20200603

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20191212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191212

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191212

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20071212

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230414

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20231215

Year of fee payment: 17

Ref country code: FR

Payment date: 20231108

Year of fee payment: 17

Ref country code: FI

Payment date: 20231129

Year of fee payment: 17

Ref country code: DE

Payment date: 20231108

Year of fee payment: 17

Ref country code: AT

Payment date: 20231128

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20231109

Year of fee payment: 17