EP2088113A2 - Combined lifting device for people and loads - Google Patents

Combined lifting device for people and loads Download PDF

Info

Publication number
EP2088113A2
EP2088113A2 EP09000621A EP09000621A EP2088113A2 EP 2088113 A2 EP2088113 A2 EP 2088113A2 EP 09000621 A EP09000621 A EP 09000621A EP 09000621 A EP09000621 A EP 09000621A EP 2088113 A2 EP2088113 A2 EP 2088113A2
Authority
EP
European Patent Office
Prior art keywords
lifting device
boom
crane
crane arm
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP09000621A
Other languages
German (de)
French (fr)
Other versions
EP2088113A3 (en
Inventor
Dieter Gündel
Andreas Hans
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hans-Hebetechnik+Metallbau-GmbH
Original Assignee
Hans-Hebetechnik+Metallbau-GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hans-Hebetechnik+Metallbau-GmbH filed Critical Hans-Hebetechnik+Metallbau-GmbH
Publication of EP2088113A2 publication Critical patent/EP2088113A2/en
Publication of EP2088113A3 publication Critical patent/EP2088113A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62BDEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
    • A62B1/00Devices for lowering persons from buildings or the like
    • A62B1/06Devices for lowering persons from buildings or the like by making use of rope-lowering devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/16Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements

Definitions

  • the invention relates to a combined lifting device for persons and loads, consisting of mountable individual components with a winch and a fall arrester with designedhub worn (HSG-R) and with a rotatable crane column having an angle-adjustable at the upper end of the column head crane arm and a telescopic boom, in particular for personal security in shafts or the like and for the transport of loads without the change of the lifting device.
  • HSG-R designed to mountable individual components with a winch and a fall arrester with designedhub worn by the column head crane arm and with a rotatable crane column having an angle-adjustable at the upper end of the column head crane arm and a telescopic boom, in particular for personal security in shafts or the like and for the transport of loads without the change of the lifting device.
  • Lifting devices for personal security or for the transport of loads are generally portable lifting devices with a jib crane with a delivery device and with a support means in conjunction with a base member.
  • One in the DE 4327919 A1 described lifting device can be stationed at different locations in a supply device to a respective stationary base element with a bearing plate.
  • the slewing crane is portable and composed of assembled individual sections.
  • the lightweight portable crane is designed for a maximum load of 1000 kg. If the jib crane consists of a single section, the load capacity is limited according to the weight and its construction. With a larger number of portable and mountable individual sections, the lifting capacity of the slewing crane can be increased. The problem is thus to design a slewing crane in lightweight construction such that the carrying capacity is as large as possible with a low transport cost of the individual components.
  • the slewing crane after DE 4327919 A1 consists of individual portable and mountable sections with a swivel housing with the support rollers arranged thereon, a pull rod and a triangular arm with the telescopic boom, whose underside is designed as a hollow profile.
  • the upper bar of the triangular jib like the drawbar, consists of parallel angular profiles or hollow sections.
  • the telescopic boom is a square profile into which a second hollow profile can be inserted.
  • a disadvantage is the production and assembly of the telescoping hollow sections, which are usually not available fitting. In addition, only a small weight saving can be achieved by two mating hollow sections.
  • the lifting device can receive a belay device with a thoughthub observed for persons.
  • the lifting device on a mobile support frame with at least three held on a common center footrests.
  • a personal rescue device is provided, which can be disassembled if necessary.
  • the additional personal rescue device increases the possible use of the lifting device.
  • the crane device and the personal rescue device are arranged at a horizontal distance from each other to ensure trouble-free operation. The transport of persons is not allowed.
  • a combined lifting device with a tripod for striking and supporting a personal safety device is proposed, which is easy to transport.
  • the use of the lifting device is provided in manhole structures that are entered by persons. Manhole entrances to well chambers, pumping stations, water-bearing shafts and other subterranean structures are usually made by ladders. According to the current safety regulations, ladders longer than 3 m may only be used with fall protection. In sewage shafts must be provided because of the risk of lack of oxygen, carbon monoxide or fermentation gas to a notedhub issued.
  • the invention aims a combined lifting device in lightweight construction, which is easily and effortlessly portable and suitable both for personal security for secure transport of persons and for the transport of loads without the change of the lifting device.
  • the object is achieved by a lifting device with a rotatable crane column, wherein the angle-adjustable crane arm and the telescopic boom consists of two different sized profiles and the individual components are mounted by means of a connector to which a fall arrester with designedhub worn (HSG-R) and a for the passenger transport modified winch is arranged.
  • the lifting device with a much smaller profile for the boom allows lightweight construction and easier transport and construction.
  • Lifting device shown consists essentially of three individual components mountable with a rotatable crane column 1 and with a pivotally mounted on the upper end of the column head 2 crane arm 3, which has a telescopic boom 4.
  • the individual components are assembled by means of plug connections.
  • the crane column 1 is rotatably mounted in a bottom plate 5 with a pivot bearing about a vertical axis in a horizontal pivoting range of 360 °.
  • the crane column 1 is tubular in cross-section and is inserted into a bearing sleeve 6 of the bottom plate 5. Above the bearing sleeve 6 is located to guide the crane column 1, a centering ring 7 with a handle, through which the penetration of water and dirt is prevented.
  • the rotational movement of the crane column 1 is locked with a arranged in the amount of the centering ring 7 locking lever 8, which engages in a arranged on the bearing sleeve 6 locking plate 9 with recesses under the influence of gravity.
  • the locking recesses are arranged in the circumferential direction at a distance of 45 °, so that the rotational movement of the crane column 1 can be locked in corresponding intervals.
  • a fork-shaped column head 2 for receiving the angle-adjustable crane arm 3 is arranged.
  • the crane arm 3 is provided at the designated location with a corresponding bore 11.
  • the bore 11 is arranged in the rear third of the crane arm 3, so that the larger part is over the center of gravity also expansive.
  • two tie rods 13 are hinged at the end with fixing bolts 14 which are fixedly connected to the crane column 1. By the tie rods 13 of the crane arm 3 is held in the angled position.
  • the adjustment of the inclination of the crane arm 3 takes place with the pivot pin 12 in the column head 2, with the crane arm 3 is staked at different heights. Since the end pivot point of the crane arm 3 is fixedly connected to the crane column 1 via the tie rods 13, this is at different inclination of the crane arm 3 substantially always in the same altitude. As a result, the operation of the cranes 3 arranged winch 15 is facilitated. Otherwise, if the pivot point for adjusting the inclination of the crane arm 3 in the column head 2, the altitude of the winch 15 is constantly changing.
  • the crane arm 3 consists of a commercially available preferably rectangular hollow profile or square profile, the end is partially closed with a support plate 16 for the winch 15 and the front side on the opposite end with a top plate 17 in the lower part of the opening.
  • the top plate 17 is further formed in the lower portion as a stop means with an attachment point for a power-driven hoist.
  • the telescopic boom 4 is a displaceable square profile.
  • the square profile of the boom 4 has a much smaller dimension than the square profile of the crane arm 3, resulting in a significant weight saving results.
  • the smaller square profile of the boom 4 is favorable for a change in length, because the boom 4 can be easily moved in the square profile of the crane arm 3.
  • the boom 4 is thus also easily mountable by means of this connector.
  • the head plate 17 of the crane arm 3 has a U-shaped cutout 21 which corresponds to the dimensions of the square profile of the boom 4.
  • the boom 4 is therefore not guided directly in the inner wall of the square profile of the crane arm 3, but in the U - shaped cutout 21.
  • a spacer plate 22 is the second The spacer plate 22 keeps the boom 4 at a distance from the square profile of the crane arm 3.
  • the spacer plate 22 at the insertion end is arranged in the upper half of the opening of the boom 4 on projecting.
  • the projection is dimensioned according to the internal dimensions of the square profile of the crane arm 3 such that the boom 4 can be easily moved with little play.
  • the insertion of the boom 4 in the chamfer 18 is carried out by lifting the boom head 25 to the spacer plate 22 which is arranged on the upper inner edge of the crane arm 3 stop bar 19 is under attack. Thereafter, the boom 4 can be lowered and inserted into the square profile of the crane arm 3.
  • Absteckbohronne 26 are provided near the top plate 17 of the crane arm 3 and on the length of the boom 4, which are staked with a Absteckbolzen 27.
  • the extraction of the boom 4 is limited in the outermost position by the stop bar 19 so that it can not be accidentally pulled out.
  • the complete removal of the boom 4 takes place in the reverse order of installation by the boom head 25 is raised.
  • the arrangement of the spacer plate 22 has the additional advantage that the support load of the telescopic boom 4 is not derived via the Absteckbolzen 27 but on the spacer plate 22.
  • the Absteckbolzen 27 is not loaded and has only a backup function.
  • the Absteckbolzen 27 does not need to be specially designed as a wear part for this reason.
  • the spacer plate 22 also causes the lateral guidance of the boom 4 in the square of the crane arm. 3
  • the pulley axis 29 is secured with the cover plate 31.
  • the pulley axis 29 has on both sides on the protruding from the boom head 25 side a circumferential groove 32 in the sheet thickness of the cover plate 31.
  • the cover plate 31 is provided at the right angles bent sides with an inclined to the axis of the boom 4 extending oblique slot 33 which is inserted into the groove 32 of the pulley axis 29 obliquely from top to bottom.
  • a securing bolt 34 is provided with a bolt lock 35 through which the cover plate 31 is immovably and secured to the boom 4 is connected.
  • the cover plate 31 Due to the inclined arrangement of the oblique slot 33, the cover plate 31 can not be moved in this way and the pulley shaft 29 is securely fixed. At the same time the release of the cover plate 31 is technically easy to plug and without any screw possible. The ropes 23 are then free and can be removed from the pulleys 28.
  • a conventional winch 15 with a drivable cylindrical winch drum 36 is used.
  • Conventional winches are not suitable for passenger transport, because for winches for transporting persons a cable guide or pressing device and a winch drum 36 with a rope groove 40 is prescribed for the orderly winding of the cable turns. For this reason, a cable groove 40 for receiving the cable 23 is formed in the lateral surface of the winch drum 36.
  • the winch 15 is driven by a hand crank via a not further shown worm gear and additionally has an automatically incident brake.
  • the worm gear has due to the self-locking property an additional safety function in terms of blocking the direction of movement. This design allows for the transport of persons a sufficiently high level of security.
  • the winch 15 is further modified so that it meets the safety requirements for suspended people receiving means.
  • the winch drum 36 has a left pulley 37 and a right flange 38.
  • the pulley 37 and the flanged wheel 38 are firmly welded in the embodiment with the winch drum 36.
  • the winch drum 36 is modified so that the originally right sheave 37 is replaced by the flanged wheel 38.
  • the winch drum 36 has a larger groove-free portion 39, so that the flange 38 at a greater distance from the right front side of Winch drum 36 can be mounted.
  • the flanged wheel 38 has a rope passage 41 for the cable 23. The cable 23 is thus wound through the flanged wheel 38 on the groove-free portion 39 of the winch drum 36 with at least two cable turns and continued through the cable bore 43 in the direction of the axis.
  • the end of the rope 23 is provided with an in FIG. 5 indicated rope clamp 42 attached to the winch drum 36.
  • a winch 15 for passenger transport must be at least two turns on the winch drum 36 after unwinding of the cable 23. This is necessarily ensured by the modified winch 15.
  • a fall arrester with designedhub sensible (HSG-R) 24 arranged for persons. This can be ensured without the change of the lifting device, a transport of loads or people.
  • the proposed combined lifting device also allows the protection of persons in structures with climbing aid in addition to the transport of loads.
  • a person can be lowered or lifted in shafts or on walls without climbing assistance including the fall arrester with rescue lifting device (HSG-R) 24.
  • HSG-R fall arrester with rescue lifting device
  • material transport can also be done with a power-driven hoist at the attachment point of the head plate 17.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Jib Cranes (AREA)

Abstract

The combination lifting cevive has a mountable individual components with a cable winch (15) and a height lock device with recovery lifting device (24) and a rotating crane pillars (1), which has an angle-adjustable crane arm (3) on the upper end of the pillar head (2) and a telescopic boom (4). The angle-adjustable crane arm and telescopic boom consist of two different sizes of profiles and the individual components are mounted by a plug connection, on which height lock device with recovery lifting device and a modified cable winch is provided for transport of persons.

Description

Die Erfindung betrifft eine kombinierte Hebeeinrichtung für Personen und Lasten, bestehend aus montierbaren Einzelkomponenten mit einer Seilwinde und einem Höhensicherungsgerät mit Rettungshubeinrichtung (HSG-R) sowie mit einer drehbaren Kransäule, die einen an dem oberen Ende des Säulenkopfes winkelverstellbaren Kranarm sowie einen teleskopierbaren Ausleger aufweist, insbesondere zur Personensicherung in Schächten oder dergleichen sowie zum Transport von Lasten ohne den Wechsel des Hubgerätes.The invention relates to a combined lifting device for persons and loads, consisting of mountable individual components with a winch and a fall arrester with Rettungshubeinrichtung (HSG-R) and with a rotatable crane column having an angle-adjustable at the upper end of the column head crane arm and a telescopic boom, in particular for personal security in shafts or the like and for the transport of loads without the change of the lifting device.

Hebeeinrichtungen zur Personensicherung oder zum Transport von Lasten sind in der Regel transportable Hubgeräte mit einem Schwenkkran mit einer Auslegevorrichtung und mit einem Tragemittel in Verbindung mit einem Basiselement. Eine in der DE 4327919 A1 beschriebene Hebevorrichtung kann an verschiedenen Stellen in einer Versorgungseinrichtung an jeweils einem ortsfesten Basiselement mit einer Lagerplatte stationiert werden. Der Schwenkkran ist tragbar und aus montierbaren Einzelsektionen zusammengesetzt. Der tragbare Schwenkkran in Leichtbauweise ist für eine maximale Traglast von 1000 kg ausgelegt. Wenn der Schwenkkran aus einer einzigen Sektion besteht, ist die Tragkraft entsprechend dem Gewicht und seiner Konstruktion eingeschränkt. Bei einer größeren Anzahl der tragbaren und montierbaren Einzelsektionen kann die Hubkraft des Schwenkkranes erhöht werden. Das Problem liegt damit darin, einen Schwenkkran in Leichtbauweise derart auszubilden, dass die Tragkraft bei einem geringen Transportaufwand der Einzelkomponenten möglichst groß ist.Lifting devices for personal security or for the transport of loads are generally portable lifting devices with a jib crane with a delivery device and with a support means in conjunction with a base member. One in the DE 4327919 A1 described lifting device can be stationed at different locations in a supply device to a respective stationary base element with a bearing plate. The slewing crane is portable and composed of assembled individual sections. The lightweight portable crane is designed for a maximum load of 1000 kg. If the jib crane consists of a single section, the load capacity is limited according to the weight and its construction. With a larger number of portable and mountable individual sections, the lifting capacity of the slewing crane can be increased. The problem is thus to design a slewing crane in lightweight construction such that the carrying capacity is as large as possible with a low transport cost of the individual components.

Der Schwenkkran nach DE 4327919 A1 besteht aus einzelnen tragbaren und montierbaren Sektionen mit einem Schwenkgehäuse mit den daran angeordneten Tragrollen, einer Zugstange und einem Dreiecksausleger mit dem Teleskopausleger, dessen Unterseite als ein Hohlprofil ausgebildet ist. Die obere Stange des Dreiecksauslegers besteht ebenso wie die Zugstange aus parallel verlaufenden Winkelprofilen oder Hohlprofilen. Der Teleskopausleger ist ein Vierkantprofil, in das ein zweites Hohlprofil einschiebbar ist. Nachteilig ist die Herstellung und der Zusammenbau der ineinander zu schiebenden Hohlprofile, die meist nicht passend erhältlich sind. Zudem kann durch zwei ineinander passende Hohlprofile nur eine geringe Gewichtsersparnis erzielt werden. Als Zusatzausstattung kann die Hebeeinrichtung ein Sicherungsgerät mit einer Rettungshubeinrichtung für Personen erhalten.The slewing crane after DE 4327919 A1 consists of individual portable and mountable sections with a swivel housing with the support rollers arranged thereon, a pull rod and a triangular arm with the telescopic boom, whose underside is designed as a hollow profile. The upper bar of the triangular jib, like the drawbar, consists of parallel angular profiles or hollow sections. The telescopic boom is a square profile into which a second hollow profile can be inserted. A disadvantage is the production and assembly of the telescoping hollow sections, which are usually not available fitting. In addition, only a small weight saving can be achieved by two mating hollow sections. As an additional equipment, the lifting device can receive a belay device with a Rettungshubeinrichtung for persons.

In der DE 29723710 U1 weist die Hebevorrichtung ein fahrbares Traggestell mit wenigstens drei an einem gemeinsamen Mittelstück gehaltenen Fußstützen auf. Zusätzlich zu der Kranvorrichtung für das Heben und Senken einer Last ist ein Personenrettungsgerät vorgesehen, das gegebenenfalls demontiert werden kann. Durch das zusätzliche Personenrettungsgerät wird die Einsatzmöglichkeit der Hebevorrichtung erhöht. Die Kranvorrichtung und das Personenrettungsgerät sind in einem horizontalen Abstand voneinander angeordnet, um einen störungsfreien Betriebsablauf zu gewährleisten. Der Transport von Personen ist nicht erlaubt.In the DE 29723710 U1 the lifting device on a mobile support frame with at least three held on a common center footrests. In addition to the crane device for lifting and lowering a load, a personal rescue device is provided, which can be disassembled if necessary. The additional personal rescue device increases the possible use of the lifting device. The crane device and the personal rescue device are arranged at a horizontal distance from each other to ensure trouble-free operation. The transport of persons is not allowed.

In der DE 202005015821 U1 wird desgleichen eine kombinierte Hebevorrichtung mit einem Dreibein zum Anschlagen und Abstützen eines Personenrettungsgerätes vorgeschlagen, die leicht transportierbar ist. Die Verwendung der Hebevorrichtung ist in Schachtbauwerken vorgesehen, die von Personen betreten werden. Schachteinstiege zu Brunnenstuben, Pumpwerken, wasserführenden Schächten und andere unter dem Erdreich angeordnete Bauwerke werden in der Regel über Steigleitern begangen. Nach den geltenden Sicherheitsvorschriften dürfen Steigleitern mit mehr als 3 m Länge nur mit einer Absturzsicherung begangen werden. Bei Abwasserschächten muss wegen der Gefahr von Sauerstoffmangel, Kohlenmonoxid oder Faulgasen dazu eine Rettungshubeinrichtung vorgesehen sein.In the DE 202005015821 U1 Similarly, a combined lifting device with a tripod for striking and supporting a personal safety device is proposed, which is easy to transport. The use of the lifting device is provided in manhole structures that are entered by persons. Manhole entrances to well chambers, pumping stations, water-bearing shafts and other subterranean structures are usually made by ladders. According to the current safety regulations, ladders longer than 3 m may only be used with fall protection. In sewage shafts must be provided because of the risk of lack of oxygen, carbon monoxide or fermentation gas to a Rettungshubeinrichtung.

Die Erfindung bezweckt eine kombinierte Hebeeinrichtung in Leichtbauweise, die einfach sowie mühelos transportabel und sowohl zur Personensicherung zum gesicherten Transport von Personen als auch zum Transport von Lasten ohne den Wechsel des Hubgerätes geeignet ist.The invention aims a combined lifting device in lightweight construction, which is easily and effortlessly portable and suitable both for personal security for secure transport of persons and for the transport of loads without the change of the lifting device.

Erfindungsgemäß wird die Aufgabe durch eine Hebeeinrichtung mit einer drehbaren Kransäule gelöst, wobei der winkelverstellbare Kranarm sowie der teleskopierbare Ausleger aus zwei unterschiedlich großen Profilen besteht und die Einzelkomponenten mittels einer Steckverbindung montiert sind, an denen ein Höhensicherungsgerät mit Rettungshubeinrichtung (HSG-R) und eine für den Personentransport modifizierte Seilwinde angeordnet ist. Die Hebeeinrichtung mit einem wesentlich kleineren Profil für den Ausleger ermöglicht die Leichtbauweise und einen einfacheren Transport und Aufbau.According to the invention the object is achieved by a lifting device with a rotatable crane column, wherein the angle-adjustable crane arm and the telescopic boom consists of two different sized profiles and the individual components are mounted by means of a connector to which a fall arrester with Rettungshubeinrichtung (HSG-R) and a for the passenger transport modified winch is arranged. The lifting device with a much smaller profile for the boom allows lightweight construction and easier transport and construction.

Zusätzlich kann die Montage der Einzelkomponenten der Hebeeinrichtung durch Steckverbindungen vereinfacht werden, was im nachfolgenden weiter erläutert werden soll.In addition, the assembly of the individual components of the lifting device can be simplified by connectors, which will be further explained in the following.

Die Erfindung wird nachstehend anhand eines Ausführungsbeispiels unter Bezugnahme auf die Zeichnungen näher erläutert. Vorteilhafte Ausgestaltungen der Erfindung ergeben sich aus den Unteransprüchen. Im Einzelnen zeigt

Figur 1
eine Zusammenstellungszeichnung der Hebeeinrichtung,
Figur 2
eine Übersichtsdarstellung der Einzelkomponenten der Hebeeinrichtung,
Figur 3
eine Einzelteilzeichnung mit dem Auslegerkopf des Auslegers nach Figur 2,
Figur 4
einen Querschnitt durch die Windentrommel und
Figur 5
eine Seitenansicht der Windentrommel nach Figur 4 mit der Bordscheibe in schematischer Darstellung.
The invention will be explained below with reference to an embodiment with reference to the drawings. Advantageous embodiments of the invention will become apparent from the dependent claims. In detail shows
FIG. 1
an assembly drawing of the lifting device,
FIG. 2
an overview of the individual components of the lifting device,
FIG. 3
an item drawing with the boom head of the boom behind FIG. 2 .
FIG. 4
a cross section through the winch drum and
FIG. 5
a side view of the winch drum after FIG. 4 with the flange in a schematic representation.

Die in Figur 1 dargestellte Hebeeinrichtung besteht im Wesentlichen aus drei montierbaren Einzelkomponenten mit einer drehbaren Kransäule 1 und mit einem an dem oberen Ende des Säulenkopfes 2 schwenkbar angeordneten Kranarm 3, der einen teleskopierbaren Ausleger 4 aufweist. Die Einzelkomponenten sind mittels Steckverbindungen zusammengefügt. Die Kransäule 1 ist in einer Bodenplatte 5 mit einem Schwenklager um eine senkrechte Achse drehbar in einem horizontalen Schwenkbereich von 360 ° gelagert. Die Kransäule 1 ist im Querschnitt rohrförmig und wird in eine Lagerhülse 6 der Bodenplatte 5 eingesteckt. Oberhalb der Lagerhülse 6 befindet sich zur Führung der Kransäule 1 ein Zentrierring 7 mit Übergriff, durch den das Eindringen von Wasser und Schmutz verhindert wird.In the FIG. 1 Lifting device shown consists essentially of three individual components mountable with a rotatable crane column 1 and with a pivotally mounted on the upper end of the column head 2 crane arm 3, which has a telescopic boom 4. The individual components are assembled by means of plug connections. The crane column 1 is rotatably mounted in a bottom plate 5 with a pivot bearing about a vertical axis in a horizontal pivoting range of 360 °. The crane column 1 is tubular in cross-section and is inserted into a bearing sleeve 6 of the bottom plate 5. Above the bearing sleeve 6 is located to guide the crane column 1, a centering ring 7 with a handle, through which the penetration of water and dirt is prevented.

Die Drehbewegung der Kransäule 1 wird mit einem in Höhe des Zentrierringes 7 angeordneten Rasthebel 8 arretiert, der in eine an der Lagerhülse 6 angeordnete Rastscheibe 9 mit Rastausnehmungen unter Einfluss der Schwerkraft einrastet. Die Rastausnehmungen sind in Umfangsrichtung in einem Abstand von 45 ° angeordnet, damit die Drehbewegung der Kransäule 1 in dementsprechenden Abständen arretiert werden kann.The rotational movement of the crane column 1 is locked with a arranged in the amount of the centering ring 7 locking lever 8, which engages in a arranged on the bearing sleeve 6 locking plate 9 with recesses under the influence of gravity. The locking recesses are arranged in the circumferential direction at a distance of 45 °, so that the rotational movement of the crane column 1 can be locked in corresponding intervals.

Am oberen Ende der Kransäule 1 ist ein gabelförmiger Säulenkopf 2 zur Aufnahme des winkelverstellbaren Kranarms 3 angeordnet. In dem Säulenkopf 2 befinden sich mehrere übereinander angeordnete Bohrungen 11 für die Aufnahme eines Schwenkbolzens 12, mit dem der Kranarm 3 in unterschiedlicher Höhe abgesteckt werden kann. Der Kranarm 3 ist an der dafür vorgesehenen Stelle mit einer korrespondierenden Bohrung 11 versehen. Mit dem Schwenkbolzen 12 ist der Kranarm 3 vertikal schwenkbar gelagert. Die Bohrung 11 ist in dem hinteren Drittel des Kranarms 3 angeordnet, damit der größere Teil über den Schwerpunkt hinaus ausladend ist. Um der Gewichtsverlagerung entgegenzuwirken sind endseitig zwei Zugstangen 13 mit Befestigungsbolzen 14 angelenkt, die mit der Kransäule 1 ortsfest verbunden sind. Durch die Zugstangen 13 wird der Kranarm 3 in der abgewinkelten Stellung gehalten.At the upper end of the crane column 1, a fork-shaped column head 2 for receiving the angle-adjustable crane arm 3 is arranged. In the column head 2 are a plurality of superimposed holes 11 for receiving a pivot pin 12, with the crane arm 3 can be staked at different heights. The crane arm 3 is provided at the designated location with a corresponding bore 11. With the Swivel pin 12, the crane arm 3 is mounted vertically pivotable. The bore 11 is arranged in the rear third of the crane arm 3, so that the larger part is over the center of gravity also expansive. In order to counteract the shift in weight, two tie rods 13 are hinged at the end with fixing bolts 14 which are fixedly connected to the crane column 1. By the tie rods 13 of the crane arm 3 is held in the angled position.

Das Einstellen der Neigung des Kranarmes 3 erfolgt mit dem Schwenkbolzen 12 in dem Säulenkopf 2, mit dem der Kranarm 3 in unterschiedlicher Höhe abgesteckt wird. Da der endseitige Schwenkpunkt des Kranarms 3 mit der Kransäule 1 über die Zugstangen 13 fest verbunden ist, befindet sich dieser bei unterschiedlicher Neigung des Kranarms 3 im Wesentlichen immer in der gleichen Höhenlage. Dadurch wird die Bedienung der am Kranarm 3 angeordneten Seilwinde 15 erleichtert. Anderenfalls, wenn sich der Schwenkpunkt für die Einstellung der Neigung des Kranarms 3 im Säulenkopf 2 befindet, wird die Höhenlage der Seilwinde 15 ständig verändert.The adjustment of the inclination of the crane arm 3 takes place with the pivot pin 12 in the column head 2, with the crane arm 3 is staked at different heights. Since the end pivot point of the crane arm 3 is fixedly connected to the crane column 1 via the tie rods 13, this is at different inclination of the crane arm 3 substantially always in the same altitude. As a result, the operation of the cranes 3 arranged winch 15 is facilitated. Otherwise, if the pivot point for adjusting the inclination of the crane arm 3 in the column head 2, the altitude of the winch 15 is constantly changing.

Der Kranarm 3 gemäß Figur 2 besteht aus einem handelsüblichen vorzugsweise rechteckigen Hohlprofil oder Vierkantprofil, das endseitig mit einer Halteplatte 16 für die Seilwinde 15 und stirnseitig auf dem gegenüberliegenden Ende mit einer Kopfplatte 17 in dem unteren Teil der Öffnung teilweise verschlossen ist. Die Kopfplatte 17 ist ferner im unteren Teilabschnitt als Anschlagmittel mit einem Anschlagpunkt für ein kraftbetriebenes Hebezeug ausgebildet. Ferner weist das Vierkantprofil an der Stirnseite des Kranarms 3 oberhalb der Kopfplatte 17 eine Abschrägung 18 mit einer an der oberen Innenkante angeordneten Anschlagleiste 19 für den teleskopierbaren Ausleger 4 auf. Der teleskopierbare Ausleger 4 ist ein verschiebbares Vierkantprofil. Das Vierkantprofil des Auslegers 4 besitzt eine wesentlich geringere Abmessung als das Vierkantprofil des Kranarms 3, woraus eine erhebliche Gewichtseinsparung resultiert. Das kleinere Vierkantprofil des Auslegers 4 ist für eine Längenänderung günstig, weil der Ausleger 4 leicht in dem Vierkantprofil des Kranarms 3 verschoben werden kann. Der Ausleger 4 ist damit außerdem problemlos mittels dieser Steckverbindung montierbar.The crane arm 3 according to FIG. 2 consists of a commercially available preferably rectangular hollow profile or square profile, the end is partially closed with a support plate 16 for the winch 15 and the front side on the opposite end with a top plate 17 in the lower part of the opening. The top plate 17 is further formed in the lower portion as a stop means with an attachment point for a power-driven hoist. Furthermore, the square profile on the front side of the crane arm 3 above the top plate 17 on a chamfer 18 with a arranged on the upper inner edge stop bar 19 for the telescopic boom 4. The telescopic boom 4 is a displaceable square profile. The square profile of the boom 4 has a much smaller dimension than the square profile of the crane arm 3, resulting in a significant weight saving results. The smaller square profile of the boom 4 is favorable for a change in length, because the boom 4 can be easily moved in the square profile of the crane arm 3. The boom 4 is thus also easily mountable by means of this connector.

Hierzu weist die Kopfplatte 17 des Kranarms 3 einen U - förmigen Ausschnitt 21 auf, der den Abmessungen des Vierkantprofils des Auslegers 4 entspricht. Der Ausleger 4 wird daher nicht unmittelbar in der Innenwandung des Vierkantprofils des Kranarms 3, sondern in dem U - förmigen Ausschnitt 21 geführt. Eine Distanzplatte 22 befindet sich als zweites Führungselement an dem Einsteckende des Auslegers 4. Die Distanzplatte 22 hält den Ausleger 4 innen auf Distanz zu dem Vierkantprofil des Kranarms 3. Die Distanzplatte 22 am Einsteckende ist in der oberen Hälfte der Öffnung des Auslegers 4 überstehend angeordnet. Der Überstand ist entsprechend den Innenabmessungen des Vierkantprofils des Kranarms 3 derart bemessen, dass sich der Ausleger 4 bei geringem Spiel leicht verschieben lässt.For this purpose, the head plate 17 of the crane arm 3 has a U-shaped cutout 21 which corresponds to the dimensions of the square profile of the boom 4. The boom 4 is therefore not guided directly in the inner wall of the square profile of the crane arm 3, but in the U - shaped cutout 21. A spacer plate 22 is the second The spacer plate 22 keeps the boom 4 at a distance from the square profile of the crane arm 3. The spacer plate 22 at the insertion end is arranged in the upper half of the opening of the boom 4 on projecting. The projection is dimensioned according to the internal dimensions of the square profile of the crane arm 3 such that the boom 4 can be easily moved with little play.

Das Einstecken des Auslegers 4 in die Abschrägung 18 erfolgt durch Anheben des Auslegerkopfes 25 bis mit der Distanzplatte 22 die an der oberen Innenkante des Kranarms 3 angeordnete Anschlagleiste 19 untergriffen wird. Danach kann der Ausleger 4 abgesenkt und in das Vierkantprofil des Kranarms 3 eingeschoben werden.The insertion of the boom 4 in the chamfer 18 is carried out by lifting the boom head 25 to the spacer plate 22 which is arranged on the upper inner edge of the crane arm 3 stop bar 19 is under attack. Thereafter, the boom 4 can be lowered and inserted into the square profile of the crane arm 3.

Zum Abstecken der Einschublänge sind Absteckbohrungen 26 nahe der Kopfplatte 17 des Kranarms 3 und auf der Länge des Auslegers 4 vorgesehen, die mit einem Absteckbolzen 27 abgesteckt werden. Das Herausziehen des Auslegers 4 wird in der äußersten Stellung durch die Anschlagleiste 19 begrenzt, damit dieser nicht unbeabsichtigt herausgezogen werden kann. Das vollständige Herausnehmen des Auslegers 4 erfolgt in der umgekehrten Reihenfolge wie beim Einbau, indem der Auslegerkopf 25 angehoben wird.For staking out the insertion length Absteckbohrungen 26 are provided near the top plate 17 of the crane arm 3 and on the length of the boom 4, which are staked with a Absteckbolzen 27. The extraction of the boom 4 is limited in the outermost position by the stop bar 19 so that it can not be accidentally pulled out. The complete removal of the boom 4 takes place in the reverse order of installation by the boom head 25 is raised.

Die Anordnung der Distanzplatte 22 hat darüber hinaus den Vorteil, dass die Stützlast des teleskopierbaren Auslegers 4 nicht über den Absteckbolzen 27 sondern über die Distanzplatte 22 abgeleitet wird. Der Absteckbolzen 27 wird nicht belastet und hat lediglich eine Sicherungsfunktion. Der Absteckbolzen 27 muss aus diesem Grund nicht speziell als ein Verschleißteil ausgebildet werden. Die Distanzplatte 22 bewirkt auch die seitliche Führung des Auslegers 4 in dem Vierkant des Kranarms 3.The arrangement of the spacer plate 22 has the additional advantage that the support load of the telescopic boom 4 is not derived via the Absteckbolzen 27 but on the spacer plate 22. The Absteckbolzen 27 is not loaded and has only a backup function. The Absteckbolzen 27 does not need to be specially designed as a wear part for this reason. The spacer plate 22 also causes the lateral guidance of the boom 4 in the square of the crane arm. 3

In dem in Figur 3 dargestellten Auslegerkopf 25, entsprechend der Einzelheit A in Figur 2, sind zur Umlenkung der Seile 23 für die Seilwinde 15 und des Höhensicherungsgerätes mit Rettungshubeinrichtung (HSG-R) 24 zwei Seilrollen 28 angeordnet, die mit einer gemeinsamen, gegen Verdrehung gesicherten Seilrollenachse 29 gelagert sind. Die Sicherung der Seilführung erfolgt gemäß Figur 3 mit einem geschlitzten Anschlagblech 20 für die Seilhaken. Zur Abdeckung der Seilrollen 28 ist ein zweifach rechtwinklig abgebogenes, den Auslegerkopf 25 umschließendes Abdeckblech 31 vorgesehen, das frontseitig mit einem Stimblech 30 verschlossen ist. Das Abdeckblech 31 mit dem Stimblech 30 ist in einem geringen Abstand zu den Seilrollen 28 angeordnet und verhindert, dass ein Seil 23 von der Seilrolle 28 herabfallen kann.In the in FIG. 3 illustrated boom head 25, corresponding to the detail A in FIG. 2 , 24 two pulleys 28 are arranged for deflecting the cables 23 for the winch 15 and the fall arrester with Rettungshubeinrichtung (HSG-R), which are mounted with a common, secured against rotation pulley axis 29. The securing of the cable guide takes place according to FIG. 3 with a slotted stop plate 20 for the cable hooks. To cover the pulleys 28 is a doubly bent at right angles, the boom head 25 enclosing cover 31 is provided, which is closed at the front with a Stimblech 30. The cover plate 31 with the end plate 30 is arranged at a small distance from the pulleys 28 and prevents a cable 23 from falling off the pulley 28.

Darüber hinaus wird mit dem Abdeckblech 31 die Seilrollenachse 29 gesichert. Die Seilrollenachse 29 weist beidseitig auf der aus dem Auslegerkopf 25 hervorstehenden Seite eine umlaufende Nut 32 in der Blechdicke des Abdeckblechs 31 auf. Das Abdeckblech 31 ist an den rechtwinklig abgebogenen Seiten mit einem geneigt zur Achse des Auslegers 4 verlaufenden Schrägschlitz 33 versehen, der in die Nut 32 der Seilrollenachse 29 schräg von oben nach unten eingeführt wird. Zum Festmachen des Abdeckblechs 31 ist ein Sicherungsbolzen 34 mit einer Bolzensicherung 35 vorgesehen, durch den das Abdeckblech 31 unverrückbar und gesichert mit dem Ausleger 4 verbunden ist. Durch die geneigte Anordnung des Schrägschlitzes 33 kann das Abdeckblech 31 auf diese Weise nicht mehr bewegt werden und die Seilrollenachse 29 ist sicher fixiert. Gleichzeitig ist das Lösen des Abdeckblechs 31 stecktechnisch leicht und ohne jegliche Schraubverbindung möglich. Die Seile 23 liegen dann frei und können von den Seilrollen 28 abgenommen werden.In addition, the pulley axis 29 is secured with the cover plate 31. The pulley axis 29 has on both sides on the protruding from the boom head 25 side a circumferential groove 32 in the sheet thickness of the cover plate 31. The cover plate 31 is provided at the right angles bent sides with an inclined to the axis of the boom 4 extending oblique slot 33 which is inserted into the groove 32 of the pulley axis 29 obliquely from top to bottom. For fixing the cover plate 31, a securing bolt 34 is provided with a bolt lock 35 through which the cover plate 31 is immovably and secured to the boom 4 is connected. Due to the inclined arrangement of the oblique slot 33, the cover plate 31 can not be moved in this way and the pulley shaft 29 is securely fixed. At the same time the release of the cover plate 31 is technically easy to plug and without any screw possible. The ropes 23 are then free and can be removed from the pulleys 28.

Für das Heben und Senken von Lasten wird nach Figur 4 eine herkömmliche Seilwinde 15 mit einer antreibbaren zylindrischen Windentrommel 36 eingesetzt. Herkömmliche Handwinden sind für den Personentransport nicht geeignet, weil für Winden zum Transport von Personen eine Seilführung oder Andrückvorrichtung und eine Windentrommel 36 mit einer Seilrille 40 zum geordneten Aufspulen der Seilwindungen vorgeschrieben ist. In die Mantelfläche der Windentrommel 36 wird aus diesem Grund eine Seilrille 40 für die Aufnahme des Seils 23 eingeformt. Die Seilwinde 15 wird mit einer Handkurbel über ein nicht weiter dargestelltes Schneckengetriebe angetrieben und besitzt zusätzlich eine automatisch einfallende Bremse. Das Schneckengetriebe hat aufgrund der Selbsthemmungseigenschaft eine zusätzliche Sicherheitsfunktion in Hinsicht auf die Sperrung der Bewegungsrichtung. Diese Ausführung ermöglicht beim Transport von Personen eine ausreichend hohe Sicherheit. Für den Transport von Personen ist die Seilwinde 15 weiterhin derart modifiziert, dass diese den Sicherheitsanforderungen für hängende Personenaufnahmemittel entspricht.For lifting and lowering of loads is after FIG. 4 a conventional winch 15 with a drivable cylindrical winch drum 36 is used. Conventional winches are not suitable for passenger transport, because for winches for transporting persons a cable guide or pressing device and a winch drum 36 with a rope groove 40 is prescribed for the orderly winding of the cable turns. For this reason, a cable groove 40 for receiving the cable 23 is formed in the lateral surface of the winch drum 36. The winch 15 is driven by a hand crank via a not further shown worm gear and additionally has an automatically incident brake. The worm gear has due to the self-locking property an additional safety function in terms of blocking the direction of movement. This design allows for the transport of persons a sufficiently high level of security. For the transport of persons, the winch 15 is further modified so that it meets the safety requirements for suspended people receiving means.

Nach Figur 4 weist die Windentrommel 36 eine linke Seilscheibe 37 und eine rechte Bordscheibe 38 auf. Die Seilscheibe 37 und die Bordscheibe 38 sind in dem Ausführungsbeispiel mit der Windentrommel 36 fest verschweißt. Die Windentrommel 36 ist dahingehend modifiziert, dass die ursprünglich rechte Seilscheibe 37 durch die Bordscheibe 38 ersetzt wird. Dazu weist die Windentrommel 36 einen größeren rillenfreien Abschnitt 39 auf, damit die Bordscheibe 38 in einem größeren Abstand von der rechten Frontseite der Windentrommel 36 montiert werden kann. Ferner weist die Bordscheibe 38 einen Seildurchlass 41 für das Seil 23 auf. Das Seil 23 wird damit durch die Bordscheibe 38 hindurch auf dem rillenfreien Abschnitt 39 der Windentrommel 36 mit mindestens zwei Seilwindungen gewickelt und durch die Seilbohrung 43 in Richtung Achse weitergeführt.To FIG. 4 the winch drum 36 has a left pulley 37 and a right flange 38. The pulley 37 and the flanged wheel 38 are firmly welded in the embodiment with the winch drum 36. The winch drum 36 is modified so that the originally right sheave 37 is replaced by the flanged wheel 38. For this purpose, the winch drum 36 has a larger groove-free portion 39, so that the flange 38 at a greater distance from the right front side of Winch drum 36 can be mounted. Furthermore, the flanged wheel 38 has a rope passage 41 for the cable 23. The cable 23 is thus wound through the flanged wheel 38 on the groove-free portion 39 of the winch drum 36 with at least two cable turns and continued through the cable bore 43 in the direction of the axis.

Das Ende des Seils 23 wird mit einer in Figur 5 angedeuteten Seilklemme 42 an der Windentrommel 36 befestigt. Damit ist den derzeit geltenden Sicherheitsanforderungen für hängende Personenaufnahmemittel Rechnung getragen. Bei einer Seilwinde 15 zum Personentransport müssen sich nach dem Abspulen des Seils 23 mindestens noch zwei Windungen auf der Windentrommel 36 befinden. Dies wird durch die modifizierte Seilwinde 15 zwingend gewährleistet. Zusätzlich wird neben der Seilwinde 15 in an sich bekannter Weise ein Höhensicherungsgerät mit Rettungshubeinrichtung (HSG-R) 24 für Personen angeordnet. Damit kann ohne den Wechsel des Hubgerätes ein Transport von Lasten oder Personen gewährleistet werden. Die vorgeschlagene kombinierte Hebeeinrichtung ermöglicht neben dem Transport von Lasten außerdem die Sicherung von Personen in Bauwerken mit Steighilfe. Mit der Hebeeinrichtung kann eine Person unter Einbeziehung des Höhensicherungsgeräts mit Rettungshubeinrichtung (HSG-R) 24 in Schächten oder an Wänden ohne Steighilfe abgelassen oder gehoben werden. Ohne Einbeziehung der Seilwinde 15 oder des Höhensicherungsgeräts mit Rettungshubeinrichtung (HSG-R) 24 kann ein Materialtransport auch mit einem kraftbetriebenen Hebezeug am Anschlagpunkt des Kopfbleches 17 erfolgen.The end of the rope 23 is provided with an in FIG. 5 indicated rope clamp 42 attached to the winch drum 36. This takes into account the current safety requirements for suspended equipment. In a winch 15 for passenger transport must be at least two turns on the winch drum 36 after unwinding of the cable 23. This is necessarily ensured by the modified winch 15. In addition, in addition to the winch 15 in a conventional manner, a fall arrester with Rettungshubeinrichtung (HSG-R) 24 arranged for persons. This can be ensured without the change of the lifting device, a transport of loads or people. The proposed combined lifting device also allows the protection of persons in structures with climbing aid in addition to the transport of loads. With the lifting device, a person can be lowered or lifted in shafts or on walls without climbing assistance including the fall arrester with rescue lifting device (HSG-R) 24. Without inclusion of the winch 15 or the fall arrester with Rettungshubeinrichtung (HSG-R) 24 material transport can also be done with a power-driven hoist at the attachment point of the head plate 17.

Claims (11)

Kombinierte Hebeeinrichtung für Personen und Lasten, bestehend aus montierbaren Einzelkomponenten mit einer Seilwinde (15) und einem Höhensicherungsgerät mit Rettungshubeinrichtung (HSG-R) (24) sowie mit einer drehbaren Kransäule (3), die einen an dem oberen Ende des Säulenkopfes (2) winkelverstellbaren Kranarm (3) sowie einen teleskopierbaren Ausleger (4) aufweist, insbesondere zur Personensicherung in Schächten oder dergleichen sowie zum Transport von Lasten ohne den Wechsel des Hubgerätes, dadurch gekennzeichnet, dass der winkelverstellbare Kranarm (3) sowie der teleskopierbare Ausleger (4) aus zwei unterschiedlich großen Profilen besteht und die Einzelkomponenten mittels einer Steckverbindung montiert sind, an denen ein Höhensicherungsgerät mit Rettungshubeinrichtung (HSG-R) (24) und eine für den Personentransport modifizierte Seilwinde (15) angeordnet ist.Combined lifting device for persons and loads, consisting of mountable individual components with a winch (15) and a fall arrester with Rettungshubeinrichtung (HSG-R) (24) and with a rotatable crane column (3), one at the upper end of the column head (2) angle-adjustable crane arm (3) and a telescopic boom (4), in particular for personal security in shafts or the like, and for transporting loads without the change of the lifting device, characterized in that the angle-adjustable crane arm (3) and the telescopic boom (4) consists of two different sized profiles and the individual components are mounted by means of a connector on which a fall arrester with Rettungshubeinrichtung (HSG-R) (24) and a passenger transport modified winch (15) is arranged. Kombinierte Hebeeinrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Kranarm (3) aus einem handelsüblichen vorzugsweise rechteckigen Hohlprofil oder Vierkantprofil besteht, das endseitig mit einer Halteplatte (16) für die Seilwinde (15) und stirnseitig auf dem gegenüberliegenden Ende mit einer Kopfplatte (17) im unteren Teil der Öffnung teilweise verschlossen ist, wobei die Kopfplatte (17) einen U - förmigen Ausschnitt (21) in den Abmessungen des Vierkantprofils des Auslegers (4) aufweist und das Vierkantprofil an der Stirnseite des Kranarms (3) oberhalb der Kopfplatte (17) eine Abschrägung (18) besitzt, die mit einer an der oberen Innenkante angeordneten Anschlagleiste (19) für den teleskopierbaren Ausleger (4) versehen ist.Combined lifting device according to claim 1, characterized in that the crane arm (3) consists of a commercially available preferably rectangular hollow profile or square profile, the end with a retaining plate (16) for the winch (15) and the front side on the opposite end with a top plate (17 ) is partially closed in the lower part of the opening, wherein the head plate (17) has a U - shaped cutout (21) in the dimensions of the square profile of the cantilever (4) and the square profile on the front side of the crane arm (3) above the top plate ( 17) has a chamfer (18) which is provided with a arranged on the upper inner edge stop bar (19) for the telescopic boom (4). Kombinierte Hebeeinrichtung nach Anspruch 1 bis 2, dadurch gekennzeichnet, dass der teleskopierbare Ausleger (4) als zweites Führungselement zur Führung und Krafteinleitung eine mit einem Überstand angeordnete Distanzplatte (22) an dem Einsteckende aufweist, mit der die obere Hälfte der Einstecköffnung des Auslegers (4) überstehend verschlossen ist, wobei der Überstand entsprechend den Innenabmessungen des Vierkantprofils des Kranarms (3) ausgebildet ist.Combined lifting device according to claim 1 to 2, characterized in that the telescopic boom (4) as a second guide element for guiding and force introduction has a projection arranged with a distance plate (22) at the insertion, with the upper half of the insertion of the boom (4 ) is closed standing over, wherein the supernatant is formed according to the inner dimensions of the square profile of the crane arm (3). Kombinierte Hebeeinrichtung nach Anspruch 1 bis 3, dadurch gekennzeichnet, dass am oberen Ende der Kransäule (1) ein gabelförmiger Säulenkopf (2) zur Aufnahme des winkelverstellbaren Kranarms (3) angeordnet und mit mehreren übereinander angeordneten Bohrungen (10) für die Aufnahme eines Schwenkbolzens (12) zum Abstecken des Kranarms (3) in unterschiedlicher Höhe versehen ist, wobei der endseitige Schwenkpunkt des Kranarms (3) mit der Kransäule (1) über Zugstangen (13) ortsfest verbunden ist.Combined lifting device according to claim 1 to 3, characterized in that at the upper end of the crane column (1) a fork-shaped column head (2) for receiving the angle-adjustable crane arm (3) and arranged with a plurality of superimposed holes (10) for receiving a pivot pin ( 12) for staking out the crane arm (3) is provided at different heights, wherein the end-side pivot point of the crane arm (3) with the crane column (1) via tie rods (13) is fixedly connected. Kombinierte Hebeeinrichtung nach Anspruch 1 bis 4, dadurch gekennzeichnet, dass die in einer Bodenplatte (5) mit einem Schwenklager um eine senkrechte Achse in einem horizontalen Schwenkbereich von 360 ° drehbar gelagerte Kransäule (1) im Querschnitt rohrförmig und in eine Lagerhülse (6) der Bodenplatte (5) eingesteckt ist, wobei sich oberhalb der Lagerhülse (6) zur Führung der Kransäule (1) ein Zentrierring (7) mit Übergriff befindet.Combined lifting device according to claim 1 to 4, characterized in that in a bottom plate (5) with a pivot bearing about a vertical axis in a horizontal pivoting range of 360 ° rotatably mounted crane column (1) in cross-section tubular and in a bearing sleeve (6) Bottom plate (5) is inserted, wherein above the bearing sleeve (6) for guiding the crane column (1) is a centering ring (7) with overgrip. Kombinierte Hebeeinrichtung nach Anspruch 1 bis 5, dadurch gekennzeichnet, dass die Drehbewegung der Kransäule (1) mit einem in Höhe des Zentrierringes (7) angeordneten Rasthebel (8) arretiert ist, der in eine an der Lagerhülse (6) angeordnete Rastscheibe (9) mit Rastausnehmungen in einem Abstand von 45 ° in Umfangsrichtung unter Einfluss der Schwerkraft einrastet.Combined lifting device according to claim 1 to 5, characterized in that the rotational movement of the crane column (1) with a height of the centering ring (7) arranged latching lever (8) is locked, in a on the bearing sleeve (6) arranged latching disc (9) engages with recesses at a distance of 45 ° in the circumferential direction under the influence of gravity. Kombinierte Hebeeinrichtung nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass in dem Auslegerkopf (25) zur Umlenkung der Seile (23) für die Seilwinde (15) und das Höhensicherungsgerät mit Rettungshubeinrichtung (HSG-R) (24) zwei mit einer gemeinsamen Seilrollenachse (29) gelagerte Seilrollen (28) angeordnet sind, die mit einem den Auslegerkopf (25) umschließenden Abdeckblech (31) abgedeckt sind, wobei beidseitig auf der aus dem Auslegerkopf (25) hervorstehenden Seite der Seilrollenachse (29) eine umlaufende Nut (32) in der Blechdicke des Abdeckblechs (31) angeordnet und das Abdeckblech (31) an den rechtwinklig abgebogenen Seiten mit einem geneigt zur Achse des Auslegers (4) verlaufenden Schrägschlitz (33) versehen ist, der in die Nut (32) der Seilrollenachse (29) eingeführt ist.Combined lifting device according to one of claims 1 to 6, characterized in that in the boom head (25) for deflecting the cables (23) for the winch (15) and the fall arrester with Rettungshubeinrichtung (HSG-R) (24) two with a common Pulley rollers (28) are mounted, which are covered by a cover plate (31) surrounding the boom head (25), wherein a circumferential groove (32) is formed on both sides of the pulley axle (29) protruding from the boom head (25) ) in the sheet thickness of the cover plate (31) and the cover plate (31) is provided at the right angles bent sides with an inclined to the axis of the boom (4) extending oblique slot (33) in the groove (32) of the pulley axis (29 ) is introduced. Kombinierte Hebeeinrichtung nach Anspruch 7, dadurch gekennzeichnet, dass zum Festmachen des mit dem Auslegerkopf (25) steckverbundenen Abdeckblechs (31) ein Sicherungsbolzen (34) mit einer Bolzensicherung (35) vorgesehen ist, durch den das Abdeckblech (31) in Verbindung mit dem Schrägschlitz (33) fest mit dem Ausleger (4) verbunden ist.Combined lifting device according to claim 7, characterized in that a securing bolt (34) with a bolt securing device (35) is provided for fastening the cover plate (31) plug-connected to the boom head (25) through which the cover plate (31) in conjunction with the inclined slot (33) is firmly connected to the boom (4). Kombinierte Hebeeinrichtung nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass für das Heben und Senken von Lasten eine modifizierte Seilwinde (15) mit einer Handkurbel und eine über ein Schneckengetriebe antreibbare zylindrische Windentrommel (36) vorgesehen ist, die mit einer Seilrille (40), einer Bremse und einer Seilandrückeinrichtung zum geordneten Aufspulen der Seilwindungen versehen ist.Combined lifting device according to one of claims 1 to 8, characterized in that for lifting and lowering of loads a modified winch (15) with a hand crank and a worm gear driven cylindrical winch drum (36) is provided with a rope groove (40 ), a brake and a Seilandrückeinrichtung is provided for the orderly winding of the cable turns. Kombinierte Hebeeinrichtung nach Anspruch 9, dadurch gekennzeichnet, dass die Windentrommel (36) eine linke Seilscheibe (37) aufweist und eine rechte Bordscheibe (38) vorhanden ist, die auf einem rillenfreien Abschnitt (39) in einem größeren Abstand von der rechten Frontseite der Windentrommel (36) montiert und mit einen Seildurchlass (41) für das Seil (23) versehen ist.Combined lifting device according to claim 9, characterized in that the winch drum (36) has a left pulley (37) and a right flange (38) is provided on a groove-free portion (39) at a greater distance from the right front side of the winch drum (36) mounted and provided with a rope passage (41) for the rope (23). Kombinierte Hebeeinrichtung nach Anspruch 9 bis 10, dadurch gekennzeichnet, dass das Seil (23) durch den Seildurchlass (41) der Bordscheibe (38) hindurch auf dem rillenfreien Abschnitt (39) der Windentrommel (36) mit mindestens zwei Seilwindungen weitergeführt und mit seinem Ende durch die Seilbohrung (43) geführt sowie mit einer Seilklemme (42) befestigt ist.Combined lifting device according to claim 9 to 10, characterized in that the cable (23) through the rope passage (41) of the flange (38) on the groove-free portion (39) of the winch drum (36) continued with at least two cable turns and with its end passed through the cable bore (43) and secured with a cable clamp (42).
EP09000621A 2008-02-08 2009-01-17 Combined lifting device for people and loads Withdrawn EP2088113A3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200820001827 DE202008001827U1 (en) 2008-02-08 2008-02-08 Combined lifting device for persons and loads

Publications (2)

Publication Number Publication Date
EP2088113A2 true EP2088113A2 (en) 2009-08-12
EP2088113A3 EP2088113A3 (en) 2011-10-26

Family

ID=39311715

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09000621A Withdrawn EP2088113A3 (en) 2008-02-08 2009-01-17 Combined lifting device for people and loads

Country Status (2)

Country Link
EP (1) EP2088113A3 (en)
DE (1) DE202008001827U1 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102180411A (en) * 2010-11-12 2011-09-14 吴江市麒麟起重机械有限公司 Pillar lifting rotary arm crane
CN103010965A (en) * 2012-11-23 2013-04-03 安徽省电力公司阜阳供电公司 Special tool of 110kVGW4-type for hoisting switch blades and porcelain bottles
CN104803296A (en) * 2015-03-31 2015-07-29 成都聚智工业设计有限公司 Minitype hoisting machine for civil construction
CN105129624A (en) * 2015-08-26 2015-12-09 长治市永华机械有限公司 Lifting hook of hydraulic support
CN105129625A (en) * 2015-08-26 2015-12-09 长治市永华机械有限公司 Dual-power multifunctional crawler-type underground telpher
CN107089605A (en) * 2017-06-27 2017-08-25 彭利辉 A kind of construction boom hoisting
CN107337113A (en) * 2017-07-24 2017-11-10 长兴能工机械有限公司 A kind of cable channel cover plate carrier
DE102017009291A1 (en) * 2017-10-06 2019-04-11 Senvion Gmbh Winch mounting frame and winch assembly
CN112249931A (en) * 2020-10-20 2021-01-22 德清博发智能科技有限公司 Mechanical lifting type engineering machinery transfer device
EP3687892A4 (en) * 2017-09-27 2021-07-14 Shane Michael Smith Man overboard rescue system
AU2020104271B4 (en) * 2020-12-23 2021-11-11 Sayfa R&D Pty Ltd A Davit Assembly
US20220348442A1 (en) * 2021-05-01 2022-11-03 Alexander Andrew, Inc. Dba Falltech Confined space tripod pulley improvements
CN117049393A (en) * 2023-08-15 2023-11-14 河南五建建设集团有限公司 Adjusting device for hoisting prefabricated small box girder

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2458850C1 (en) * 2011-03-15 2012-08-20 Государственное образовательное учреждение высшего профессионального образования Марийский государственный технический университет Hoisting machine jig
CN105819345A (en) * 2016-06-05 2016-08-03 王春明 Crane for construction
CN106081953A (en) * 2016-08-17 2016-11-09 王杨 A kind of electric power hoisting apparatus easy to use
CN107381374A (en) * 2017-09-09 2017-11-24 枣庄市鑫山矿山机械制造有限公司 Feeder
CN108178073A (en) * 2018-01-08 2018-06-19 国网辽宁省电力有限公司鞍山供电公司 A kind of station Universal hoisting equipment
CN108689313A (en) * 2018-06-27 2018-10-23 国网安徽省电力有限公司滁州供电公司 A kind of list column machinery lifting device
CN108639988A (en) * 2018-06-27 2018-10-12 国网安徽省电力有限公司滁州供电公司 Transfer device with drawing and pulling type pedestal
CN108502765A (en) * 2018-06-27 2018-09-07 国网安徽省电力有限公司滁州供电公司 A kind of transfer device for power system device
CN111498712A (en) * 2020-04-26 2020-08-07 南宁学院 Oil cylinder detection and lifting device
CN111547627B (en) * 2020-05-28 2021-01-22 宝应县跃翔电子有限公司 Cart capable of automatically operating, loading and unloading

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4327919A1 (en) 1992-08-21 1994-02-24 Brockmann Gmbh Portable, swivelling jib crane for maintenance of process plant, waterworks etc. - is transported to critical locations which are equipped with pedestals having bearing plate on which crane can be quickly and easily mounted.
DE29723710U1 (en) 1996-05-07 1999-01-28 Josef Martin Metallverarbeitun Lifting device
DE202005015821U1 (en) 2005-10-08 2006-01-19 Brockmann, Heinrich Installation to fix and support a personal safety device for use in a shaft has two poles whose lower ends can be fixed to rails on shaft access directly or using connecting part with variable horizontal gap between them

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3719403A (en) * 1970-11-17 1973-03-06 Kidde & Co Walter Crane boom having wear pads
US5211526A (en) * 1992-02-28 1993-05-18 Larry Robinette Mobile crane
US5445487A (en) * 1993-12-07 1995-08-29 Koscinski, Jr.; Stanley Boom lift apparatus mountable to different support structures
US5975499A (en) * 1996-10-28 1999-11-02 Ostrobrod; Meyer Quadrapod safety support for fall protection systems

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4327919A1 (en) 1992-08-21 1994-02-24 Brockmann Gmbh Portable, swivelling jib crane for maintenance of process plant, waterworks etc. - is transported to critical locations which are equipped with pedestals having bearing plate on which crane can be quickly and easily mounted.
DE29723710U1 (en) 1996-05-07 1999-01-28 Josef Martin Metallverarbeitun Lifting device
DE202005015821U1 (en) 2005-10-08 2006-01-19 Brockmann, Heinrich Installation to fix and support a personal safety device for use in a shaft has two poles whose lower ends can be fixed to rails on shaft access directly or using connecting part with variable horizontal gap between them

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102180411B (en) * 2010-11-12 2013-05-15 吴江市麒麟起重机械有限公司 Pillar lifting rotary arm crane
CN102180411A (en) * 2010-11-12 2011-09-14 吴江市麒麟起重机械有限公司 Pillar lifting rotary arm crane
CN103010965A (en) * 2012-11-23 2013-04-03 安徽省电力公司阜阳供电公司 Special tool of 110kVGW4-type for hoisting switch blades and porcelain bottles
CN104803296A (en) * 2015-03-31 2015-07-29 成都聚智工业设计有限公司 Minitype hoisting machine for civil construction
CN105129624B (en) * 2015-08-26 2017-12-12 长治市永华机械有限公司 Hydraulic support hook
CN105129624A (en) * 2015-08-26 2015-12-09 长治市永华机械有限公司 Lifting hook of hydraulic support
CN105129625A (en) * 2015-08-26 2015-12-09 长治市永华机械有限公司 Dual-power multifunctional crawler-type underground telpher
CN105129625B (en) * 2015-08-26 2017-11-10 长治市永华机械有限公司 Double dynamical multifunction caterpillar underground telpher
CN107089605A (en) * 2017-06-27 2017-08-25 彭利辉 A kind of construction boom hoisting
CN107337113A (en) * 2017-07-24 2017-11-10 长兴能工机械有限公司 A kind of cable channel cover plate carrier
EP3687892A4 (en) * 2017-09-27 2021-07-14 Shane Michael Smith Man overboard rescue system
DE102017009291A1 (en) * 2017-10-06 2019-04-11 Senvion Gmbh Winch mounting frame and winch assembly
CN112249931A (en) * 2020-10-20 2021-01-22 德清博发智能科技有限公司 Mechanical lifting type engineering machinery transfer device
AU2020104271B4 (en) * 2020-12-23 2021-11-11 Sayfa R&D Pty Ltd A Davit Assembly
US20220348442A1 (en) * 2021-05-01 2022-11-03 Alexander Andrew, Inc. Dba Falltech Confined space tripod pulley improvements
CN117049393A (en) * 2023-08-15 2023-11-14 河南五建建设集团有限公司 Adjusting device for hoisting prefabricated small box girder
CN117049393B (en) * 2023-08-15 2024-05-07 河南五建建设集团有限公司 Adjusting device for hoisting prefabricated small box girder

Also Published As

Publication number Publication date
DE202008001827U1 (en) 2008-04-17
EP2088113A3 (en) 2011-10-26

Similar Documents

Publication Publication Date Title
EP2088113A2 (en) Combined lifting device for people and loads
DE60313594T2 (en) LIFTING DEVICE FOR USE ON A MANHOLE
EP2426077A1 (en) Crane
EP3466866B1 (en) Winch mounting frame and winch assembly
DE202012012884U1 (en) hoist
DE3018560A1 (en) SUPPORT FOR ROPE DISCS AT THE HEAD END OF AN ARM OR EXTENSION
EP2848574B1 (en) Small dismountable and displaceable crane for use on construction sites
DE3112702A1 (en) LIFTING DEVICE FOR AN OFFSHORE CONSTRUCTION
DE10351257B4 (en) Arrangement of a slab table concrete formwork below a concrete slab and apparatus and method for moving the slab table
DE4141688A1 (en) Flag pole with low noise hoisting operator - has channel section guide for slider which is attached to flag
DE102008027230B3 (en) Masts system for lifting or moving loads, has telescopic main mast, on its free end, where pivotable jib boom is fitted, and detent is provided on jib boom for latching or unlatching interlocking
EP1063368B1 (en) Work platform
DE19634160B4 (en) hoist
DE3307892C2 (en) Tower crane with jib and counter jib
EP0649811A2 (en) Mounting-walkway for building lifts
AT1454U1 (en) LIFTING DEVICE
CH667447A5 (en) TURNING TURN TURNING CRANE.
EP3378821A1 (en) Device for protecting individuals in an elevator shaft against falling objects
EP3169943B1 (en) Fastening device for fastening at least one solar collector, method for fastening a solar collector, and method for dismounting a solar collector
DE2101842B2 (en) TOWER CRANE
EP2690053B1 (en) Safety device for a working machine.
DE102021113863A1 (en) Manhole safety device
DE4221915A1 (en) Tower crane with self assembly design - has rotating base of tower with boom on height adjustable platform hauled up tower and secured
DE3146829C2 (en) Inside access device for large containers
EP0175052A1 (en) Slewing tower crane

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

RIC1 Information provided on ipc code assigned before grant

Ipc: B66C 23/16 20060101AFI20110916BHEP

17P Request for examination filed

Effective date: 20111123

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20130111

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Effective date: 20130521