EP2041017A1 - Method for assembling a tower crane - Google Patents

Method for assembling a tower crane

Info

Publication number
EP2041017A1
EP2041017A1 EP07786000A EP07786000A EP2041017A1 EP 2041017 A1 EP2041017 A1 EP 2041017A1 EP 07786000 A EP07786000 A EP 07786000A EP 07786000 A EP07786000 A EP 07786000A EP 2041017 A1 EP2041017 A1 EP 2041017A1
Authority
EP
European Patent Office
Prior art keywords
tower crane
jib
lifting arm
counter
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP07786000A
Other languages
German (de)
French (fr)
Other versions
EP2041017B1 (en
Inventor
Thomas Herse
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wolffkran AG
Original Assignee
Wolffkran GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wolffkran GmbH filed Critical Wolffkran GmbH
Publication of EP2041017A1 publication Critical patent/EP2041017A1/en
Application granted granted Critical
Publication of EP2041017B1 publication Critical patent/EP2041017B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail

Definitions

  • the invention relates to a method for mounting a centerless tower crane (in particular tower crane) and a towerless tower crane, which can be mounted according to the method of the invention, comprising: a tower crane base with a point base; a jib system comprising: a jib, a lifting boom mounted on the lifting jib, a trolley mounted on the jib, a hauled on the jib hoist rope, a sheared on the lifting boom Katzfahrseil; and a counter-jib.
  • Assembly of a jib system separate from the tower crane base comprising the steps of: • providing a jib;
  • CONFIRMATION COPY • mounting a hoist on the lifting arm
  • the advantage here is that the lifting arm system can already be mounted during the construction of the crane base, for example, on the ground and all Einschers can be made on the ground, thereby eliminating the driving of the lifting arm to the top by an assembly worker for shearing the ropes.
  • the mounting of the boom system on the tower crane base is to be made quickly, so that the total assembly time of the tower crane is significantly reduced.
  • An advantageous embodiment of the invention provides that the lifting arm is composed of individual modules. This assembly of individual modules facilitates the transport of the components of the tower crane to the installation site.
  • the solution according to the invention provides that the lifting boom system is designed so that the tower crane is stable after installation of the lifting boom system and prior to assembly of the counter-jib.
  • the assembly time is reduced considerably.
  • a further advantageous teaching of the invention provides that the lifting arm is composed of individual modules.
  • the invention proves to be particularly advantageous when the tower crane is a tower crane.
  • FIG. 1 shows a side view of a lifting boom system according to the invention
  • Figure 2 is a schematic representation of the assembly of the lifting arm according to the invention according to Figure 1 and
  • Figure 3 is a schematic representation of the assembly of a counter-jib.
  • FIG 1 shows a side view of a lifting boom system 10 according to the invention, consisting of several individual segments 17a to 17f, which form the lifting arm 17.
  • the Katzfahrseil 15 is shown in Figure 1 already in the sheared state.
  • the Katzfahrseil 15 is connected to a trolley 14 and a trolley 12, which is shown here with a lower bottle.
  • On the side of the lifting jib 17 facing the crane there is a stop device 18 for attachment to the tower lower crane 20.
  • a lifting mechanism 11 is arranged, which is connected to a hoist rope 13, which is already sunk in FIG.
  • a fixed point 16 for the hoist rope 13 is in communication with the lower block of the trolley 12 and the fixed point sixteenth
  • FIG. 2 shows the assembly of the lifting arm system 10 with the tower lower part 20.
  • the lower crane part 20 comprises a base plate 22, on which a height-adjustable tower 23 is mounted, at the upper end of which a slewing mechanism 25 with a rotatable pivoting part (rotating frame) 24 is located. Also arranged there is the tip base 21.
  • the lifting boom system 10 which has been raised by a mobile crane vehicle 30 to the desired height, lowered in the direction of arrow A on the crane base 20 and then connected to the crane base 20 , Subsequently, the mobile crane vehicle 30 is separated from the lifting boom system 10 and the resulting sub-crane, consisting of the crane base 20 and the lifting boom system 10, is free, since the design of the components was specifically made for this purpose.
  • the lifting boom system 10 mounted in FIG. 2 corresponds to that explained in FIG. All of the drives, moving parts, and ropes necessary for them are already fully assembled within the system 10 and, apart from minor adjustments, are operational after the power has been previously provided.
  • a counter-jib 40 is mounted. This is shown in FIG.
  • the counterjib 40 has already been lifted by the mobile crane vehicle 30 to the desired height.
  • the counter-jib 40 is then brought in the direction of arrow B to the lifting arm and connected thereto.
  • the connection arises for example by the attachment of bolts.
  • counterweights can be mounted.
  • the power supply is provided for the drives located on the lifting arm 10 and the tower crane 100 is ready for use after further fine tuning.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Jib Cranes (AREA)

Abstract

The invention relates to a method for assembling a tipless tower crane and to a tipless tower crane which can be assembled in accordance with the method according to the invention. The method according to the invention permits more rapid assembly of the tower crane and at the same time reduces the risk, in particular for the assembly worker who has to undertake the reeving operations on the hoisting jib head (16), or even eliminates said operations. The tower crane according to the invention which can be assembled by the method according to the invention can be assembled as a result in a substantially shorter time. The method according to the invention has the following steps: constructing a lower tower crane part (20) to the desired height as far as a lower tip part (21); assembling a hoisting jib system (10) separately from the lower tower crane part (20), subsequently constructing a counter-jib (40) and connecting the counter-jib (40) to the crane parts (10, 20) already assembled.

Description

Verfahren zur Montage eines Turmkranes Method for assembling a tower crane
Die Erfindung betrifft ein Verfahren zur Montage eines spitzenlosen Turmkranes (insbesondere Turmdrehkranes) und einen spitzenlosen Turmkran, der gemäß dem erfindungsgemäßen Verfahren montierbar ist, aufweisend: ein Turmkranunterteil mit einem Spitzenunterteil; ein Hubauslegersystem aufweisend: einen Hubausleger, ein am Hubausleger montiertes Hubwerk, ein am Hubausleger montiertes Katzfahrwerk, ein am Hubausleger eingeschertes Hubseil, ein am Hubausleger eingeschertes Katzfahrseil; und einen Gegenausleger.The invention relates to a method for mounting a centerless tower crane (in particular tower crane) and a towerless tower crane, which can be mounted according to the method of the invention, comprising: a tower crane base with a point base; a jib system comprising: a jib, a lifting boom mounted on the lifting jib, a trolley mounted on the jib, a hauled on the jib hoist rope, a sheared on the lifting boom Katzfahrseil; and a counter-jib.
Die Montage eines Turmkrans erfolgt bisher so, dass das Kranunterteil mit Spitzenunterteil und Turmspitze montiert wird und anschließend daran zuerst der Gegenausleger mit Hubwerk und dann der Hubausleger mit Katzfahrwerk montiert werden. Anschließend wird das am Gegenausleger befindliche Hubwerk eingeschert. Die Einscherarbeiten machen es erforderlich, dass zum Einscheren ein Montagearbeiter zur Spitze des Hubauslegers gelangt, um dort die Einscherung vorzunehmen. Dieses Verbringen und das anschließende Einscheren in durchaus luftigen Höhen sind zeitaufwendig und für den ausführenden Montagearbeiter mit nicht unerheblichen Risiken verbunden.The installation of a tower crane is done so far, that the crane base is mounted with tip base and spire and then first the counter-jib with hoist and then the lifting boom with trolley are mounted. Subsequently, the hoisting gear located on the counter-boom is sheared. The Einscherarbeiten make it necessary that for shearing an assembly worker reaches the top of the lifting arm to make there the shearing. This spending and the subsequent cutting in quite airy heights are time consuming and associated with considerable risks for the exporting assembly worker.
Es ist daher Aufgabe der vorliegenden Erfindung, ein Verfahren bereit zu stellen, mit dem eine schnellere Montage des Turmkrans möglich ist und gleichzeitig das Risiko insbesondere für den Montagearbeiter, der die Einschervorgänge an der Hubauslegerspitze vornehmen muss, reduziert bzw. sogar beseitigt werden kann. Des Weiteren ist es Aufgabe der Erfindung, einen Turmkran bereitzustellen, der mit dem erfindungsgemäßen Verfahren montierbar ist.It is therefore an object of the present invention to provide a method with which a faster installation of the tower crane is possible and at the same time reduces the risk especially for the assembly worker who has to make the Einschervorgänge on the Hubauslegerspitze, or even eliminated. Furthermore, it is an object of the invention to provide a tower crane which can be mounted using the method according to the invention.
Die Aufgabe hinsichtlich des Verfahrens wird dadurch gelöst, dass das Verfahren die folgenden Schritte aufweist:The object with regard to the method is achieved by the method comprising the following steps:
Aufbauen eine Turmkranunterteils bis zu einem Spitzenunterteil in gewünschter Höhe;Build a tower crane base up to a point base at the desired height;
Zusammensetzen eines Hubauslegersystem getrennt vom Turmkranunterteil aufweisend die Schritte: • Bereitstellen eines Hubauslegers;Assembly of a jib system separate from the tower crane base, comprising the steps of: • providing a jib;
BESTÄTIGUNGSKOPIE • Montieren eines Hubwerks am Hubausleger;CONFIRMATION COPY • mounting a hoist on the lifting arm;
• Montieren eines Katzfahrwerks am Hubausleger;• Mount a trolley on the lifting arm;
• Einscheren eines Hubseils des Hubwerks am Hubausleger;• shearing a lifting cable of the hoist on the lifting arm;
• Einscheren eines Katzfahrseils am Hubausleger; Verbinden des Hubauslegersystems mit dem Spitzenunterteil und anschließend Aufbauen eines Gegenauslegers und Verbinden des Gegenauslegers mit den bereits montierten Kranteilen.• shearing a trolley rope on the lifting arm; Connecting the lifting arm system with the tip base and then building a counter-jib and connecting the counter jib with the already mounted crane parts.
Vorteilhaft dabei ist, dass das Hubauslegersystem bereits während des Aufbaus des Kranunterteils beispielsweise am Boden montiert werden kann und sämtliche Einscherarbeiten am Boden vorgenommen werden können, wodurch das Befahren des Hubauslegers bis zur Spitze durch einen Montagearbeiter zum Einscheren der Seile wegfällt. Das Montieren des Auslegersystems am Turmkranunterteil ist schnell vorzunehmen, so dass sich die Gesamtmontagezeit des Turmkranes erheblich reduziert.The advantage here is that the lifting arm system can already be mounted during the construction of the crane base, for example, on the ground and all Einscherarbeiten can be made on the ground, thereby eliminating the driving of the lifting arm to the top by an assembly worker for shearing the ropes. The mounting of the boom system on the tower crane base is to be made quickly, so that the total assembly time of the tower crane is significantly reduced.
Eine vorteilhafte Ausführungsform der Erfindung sieht vor, dass der Hubausleger aus einzelnen Modulen zusammengesetzt wird. Dieses Zusammensetzen aus einzelnen Modulen erleichtert den Antransport der Bestandteile des Turmkranes zum Montageort.An advantageous embodiment of the invention provides that the lifting arm is composed of individual modules. This assembly of individual modules facilitates the transport of the components of the tower crane to the installation site.
Hinsichtlich des erfindungsgemäßen spitzenlosen Turmkranes sieht die erfindungsgemäße Lösung vor, dass das Hubauslegersystem so ausgelegt ist, dass der Turmkran nach Montage des Hubauslegersystems und vor der Montage des Gegenauslegers stabil steht. Durch ein gezieltes Auslegen des Hubauslegersystem dahingehend, dass ein stabiler Stand nach der Montage möglich ist, bevor ein Gegenausleger montiert wird, reduziert sich die Montagezeit erheblich.With regard to the centerless tower crane according to the invention, the solution according to the invention provides that the lifting boom system is designed so that the tower crane is stable after installation of the lifting boom system and prior to assembly of the counter-jib. By a targeted design of the lifting arm system to the effect that a stable state after installation is possible before a counter-jib is mounted, the assembly time is reduced considerably.
Eine weitere vorteilhafte Lehre der Erfindung sieht vor, dass der Hubausleger aus einzelnen Modulen zusammengesetzt ist. Als besonders vorteilhaft erweist sich die Erfindung, wenn es sich bei dem Turmkran um einen Turmdrehkran handelt.A further advantageous teaching of the invention provides that the lifting arm is composed of individual modules. The invention proves to be particularly advantageous when the tower crane is a tower crane.
Weitere Vorteile der Erfindung werden anhand der nachfolgend für eine bevorzugte Ausführungsform gestalteten Zeichnung näher erläutert. Dabei zeigt:Further advantages of the invention will be explained in more detail with reference to the drawing designed below for a preferred embodiment. Showing:
Figur 1 eine Seitenansicht eines erfindungsgemäßen Hubauslegersystems, Figur 2 eine schematische Darstellung der Montage des erfindungsgemäßen Hubauslegers gemäß Figur 1 undFIG. 1 shows a side view of a lifting boom system according to the invention, Figure 2 is a schematic representation of the assembly of the lifting arm according to the invention according to Figure 1 and
Figur 3 eine schematische Darstellung der Montage eines Gegenauslegers.Figure 3 is a schematic representation of the assembly of a counter-jib.
Figur 1 zeigt eine Seitenansicht eines erfindungsgemäßen Hubauslegersystems 10, bestehend aus mehreren Einzelsegmenten 17a bis 17f, die den Hubausleger 17 bilden. Das Katzfahrseil 15 ist in Figur 1 bereits im eingescherten Zustand dargestellt. Das Katzfahrseil 15 ist mit einem Katzfahrwerk 14 und einer Laufkatze 12 verbunden, die hier mit einer Unterflasche dargestellt ist. An der dem Kran unterhalb zugewandten Seite des Hubauslegers 17 befindet sich eine Anschlagvorrichtung 18 zur Befestigung mit dem Turmunterkran 20. Hier ist ebenfalls ein Hubwerk 11 angeordnet, das mit einem in Figur 1 bereits eingeschert dargestellten Hubseil 13 verbunden ist. An der von einem Kranunterteil 20 abgewandten Seite befindet sich ein Festpunkt 16 für das Hubseil 13. Das Hubseil 13 steht in Verbindung mit der Unterflasche der Laufkatze 12 und dem Festpunkt 16.Figure 1 shows a side view of a lifting boom system 10 according to the invention, consisting of several individual segments 17a to 17f, which form the lifting arm 17. The Katzfahrseil 15 is shown in Figure 1 already in the sheared state. The Katzfahrseil 15 is connected to a trolley 14 and a trolley 12, which is shown here with a lower bottle. On the side of the lifting jib 17 facing the crane, there is a stop device 18 for attachment to the tower lower crane 20. Here, too, a lifting mechanism 11 is arranged, which is connected to a hoist rope 13, which is already sunk in FIG. At the side facing away from a crane base 20 side is a fixed point 16 for the hoist rope 13. The hoist rope 13 is in communication with the lower block of the trolley 12 and the fixed point sixteenth
In Figur 2 ist die Montage des Hubauslegersystems 10 mit dem Turmunterteil 20 dargestellt. Das Kranunterteil 20 umfasst eine Grundplatte 22, auf der ein seiner Höhe anpassbaren Turm 23 angebracht ist, an dessen oberen Ende sich ein Schwenkwerk 25 mit einem drehbaren Schwenkteil (Drehrahmen) 24 befindet. Ebenfalls dort angeordnet ist das Spitzenunterteil 21. Auf dem oberen Ende wird, wie dargestellt, das Hubauslegersystem 10, das durch einen mobiles Kranfahrzeug 30 auf die gewünschte Höhe angehoben worden ist, in Pfeilrichtung A auf das Kranunterteil 20 abgesenkt und anschließend mit dem Kranunterteil 20 verbunden. Anschließend wird das mobile Kranfahrzeug 30 von dem Hubauslegersystem 10 getrennt und der so entstehende Teilkran, bestehend aus dem Kranunterteil 20 und dem Hubauslegersystem 10, steht frei, da die Auslegung der Bauteile hierfür speziell vorgenommen wurde. Das in der Figur 2 montierte Hubauslegersystem 10 entspricht dem in der Figur 1 erklärten. Sämtliche Antriebe, bewegliche Teile und die dafür notwendigen Seile befinden sich bereits vollständig montiert innerhalb des Systems 10 und sind abgesehen von kleineren Einstellarbeiten einsatzfähig, nachdem die Energie zuvor bereitgestellt wurde. Um sicherzustellen, dass die Standstabilität des Turmkranes auch im Volllastbetrieb gewährleistet ist, wird ein Gegenausleger 40 montiert. Dieses ist in Figur 3 dargestellt. Der Gegenausleger 40 ist vom mobilen Kranfahrzeug 30 bereits auf die gewünschte Höhe angehoben worden. Der Gegenausleger 40 wird dann in Pfeilrichtung B an den Hubausleger herangeführt und mit diesem verbunden. Das Verbinden entsteht beispielsweise durch das Anbringen von Bolzen. Anschließend können noch Gegengewichte montiert werden. Anschließend wird die Energieversorgung für den am Hubausleger 10 befindlichen Antrieben bereitgestellt und der Turmdrehkran 100 ist nach weiteren Feineinstellarbeiten einsatzbereit. FIG. 2 shows the assembly of the lifting arm system 10 with the tower lower part 20. The lower crane part 20 comprises a base plate 22, on which a height-adjustable tower 23 is mounted, at the upper end of which a slewing mechanism 25 with a rotatable pivoting part (rotating frame) 24 is located. Also arranged there is the tip base 21. At the upper end, as shown, the lifting boom system 10, which has been raised by a mobile crane vehicle 30 to the desired height, lowered in the direction of arrow A on the crane base 20 and then connected to the crane base 20 , Subsequently, the mobile crane vehicle 30 is separated from the lifting boom system 10 and the resulting sub-crane, consisting of the crane base 20 and the lifting boom system 10, is free, since the design of the components was specifically made for this purpose. The lifting boom system 10 mounted in FIG. 2 corresponds to that explained in FIG. All of the drives, moving parts, and ropes necessary for them are already fully assembled within the system 10 and, apart from minor adjustments, are operational after the power has been previously provided. To ensure that the stability of the tower crane is guaranteed even in full load operation, a counter-jib 40 is mounted. This is shown in FIG. The counterjib 40 has already been lifted by the mobile crane vehicle 30 to the desired height. The counter-jib 40 is then brought in the direction of arrow B to the lifting arm and connected thereto. The connection arises for example by the attachment of bolts. Afterwards counterweights can be mounted. Subsequently, the power supply is provided for the drives located on the lifting arm 10 and the tower crane 100 is ready for use after further fine tuning.
BezugszeichenlisteLIST OF REFERENCE NUMBERS
100 Turmdrehkran100 tower crane
10 Hubauslegersystem10 lifting boom system
11 Hubwerk11 hoist
12 Laufkatze12 trolley
13 Hubseil13 hoist rope
14 Katzfahrwerk14 cat landing gear
15 Katzfahrseil15 cat rope
16 Festpunkt16 fixed point
17 Hubausleger17 lifting boom
17a - - 17f Hubauslegersegment17a - - 17f lifting boom segment
18 Anschlagvorrichtung18 stop device
20 Kranunterteil20 crane base
21 Spitzenunterteil21 lace base
22 Grundplatte22 base plate
23 Turm23 tower
24 Schwenkteil24 swivel part
25 Schwenkwerk25 swing mechanism
30 mobiles Kranfahrzeug30 mobile crane vehicle
40 Gegenausleger40 counter-jib
41 Gegengewicht41 counterweight
A Montagerichtung HubauslegersystemA Mounting direction Lifting arm system
B Montagerichtung Gegenausleger B Mounting direction counter-jib

Claims

Patentansprüche claims
1. Verfahren zur Montage eines spitzenlosen Turmkranes (100) aufweisend die Schritte:A method of assembling a towerless tower crane (100) comprising the steps of:
- Aufbauen eine Turmkranunterteils (20) bis zu einem Spitzenunterteil (21 ) in gewünschter Höhe;- Build a tower crane base (20) up to a tip base (21) at the desired height;
- Zusammensetzen eines Hubauslegersystems (10) getrennt vom Turmkranunterteil (20) aufweisend die Schritte:- Assembling a lifting arm system (10) separate from the tower crane base (20) comprising the steps:
• Bereitstellen eines Hubauslegers (17);• providing a lifting arm (17);
• Montieren eines Hubwerks (11 ) am Hubausleger (17);• mounting a hoist (11) on the lifting arm (17);
• Montieren eines Katzfahrwerks (14) am Hubausleger (17);• mounting a trolley (14) on the lifting arm (17);
• Einscheren eines Hubseils (13) des Hubwerks am Hubausleger (17);• shearing a hoist rope (13) of the hoist on the lifting arm (17);
• Einscheren eines Katzfahrseils (15) am Hubausleger (17);• shearing a trolley rope (15) on the lifting arm (17);
- Verbinden des Hubauslegersystems (10) mit dem Spitzenunterteil (21 );- Connecting the lifting arm system (10) with the tip lower part (21);
- anschließend Aufbauen eines Gegenauslegers (40) und Verbinden des Gegenauslegers (40) mit dem bereits montierten Kranteilen (10, 20).- Subsequently, building a counter jib (40) and connecting the counter jib (40) with the already mounted crane parts (10, 20).
2. Verfahren gemäß Anspruch 1 , dadurch gekennzeichnet, dass der Hubausleger (17) aus einzelnen Modulen (17a - 17f) zusammengesetzt wird.2. The method according to claim 1, characterized in that the lifting arm (17) from individual modules (17a - 17f) is composed.
3. Verfahren gemäß Anspruch 1 oder 2, dadurch gekennzeichnet, dass am Gegenausleger (40) ein Gegengewicht (41 ) montiert wird, wobei die Montage vor oder nach dem Verbinden des Gegenauslegers (40) mit den übrigen Kranteilen (10, 20) erfolgt.3. The method according to claim 1 or 2, characterized in that on the counter-jib (40) a counterweight (41) is mounted, wherein the assembly before or after the connection of the counter jib (40) with the other crane parts (10, 20).
4. Verfahren gemäß einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass es sich bei dem Turmkran (100) um einen Turmdrehkran handelt.4. The method according to any one of claims 1 to 3, characterized in that it is the tower crane (100) is a tower crane.
5. Spitzenloser Turmkran, der nach einem der Ansprüche 1 bis 4 montierbar ist, aufweisend:5. A centreless tower crane mountable according to any one of claims 1 to 4, comprising:
- ein Turmkranunterteil (20) mit einem Spitzenunterteil (21 ),a tower crane lower part (20) with a point lower part (21),
- ein Hubauslegersystem (10) aufweisend: • einen Hubausleger (17) ,- A lifting arm system (10) comprising: A lifting boom (17),
• ein am Hubausleger (17) montiertes Hubwerk (11 ),A hoist (11) mounted on the lifting arm (17),
• ein am Hubausleger (17) montiertes Katzfahrwerk (14),A trolley (14) mounted on the lifting arm (17),
• ein am Hubausleger (17) eingeschertes Hubseil (13),A hoisting rope (13) hooked in on the lifting arm (17),
• ein am Hubausleger (17) eingeschertes Katzfahrseil (15) und - einen Gegenausleger (40), dadurch gekennzeichnet, dass das Hubauslegersystem (17) so ausgelegt ist, dass der Turmkran (100) nach Montage des Hubauslegersystems (17) und vor der Montage des Gegenauslegers (40) stabil steht.• a trolley jib (15), which has been retracted on the lifting jib (17), and - a counter jib (40), characterized in that the lifting jib system (17) is designed such that the tower crane (100) after assembly of the lifting jib system (17) and before assembly of the counterpart (40) is stable.
6. Turmkran gemäß Anspruch 5, dadurch gekennzeichnet, dass der Hubausleger (17) aus einzelnen Modulen (17a - 17f) zusammensetzbar ist.6. tower crane according to claim 5, characterized in that the lifting arm (17) of individual modules (17a - 17f) is assembled.
7. Turmkran gemäß Anspruch 5 oder 6, dadurch gekennzeichnet, dass am Gegenausleger (40) ein Gegengewicht (41 ) montierbar ist, wobei die Montage vor oder nach dem Verbinden des Gegenauslegers (40) mit dem übrigen Kranteilen erfolgt.7. tower crane according to claim 5 or 6, characterized in that on the counter-jib (40) a counterweight (41) can be mounted, wherein the assembly takes place before or after connecting the counter jib (40) with the other crane parts.
8. Turmkran gemäß einem der Ansprüche 5 bis 7, dadurch gekennzeichnet, dass es sich bei dem Turmkran (100) um einen Turmdrehkran handelt. 8. Tower crane according to one of claims 5 to 7, characterized in that it is the tower crane (100) is a tower crane.
EP07786000A 2006-07-11 2007-07-11 Method for assembling a tower crane Active EP2041017B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102006032321A DE102006032321A1 (en) 2006-07-11 2006-07-11 Method for assembling a tower crane
PCT/EP2007/006168 WO2008006573A1 (en) 2006-07-11 2007-07-11 Method for assembling a tower crane

Publications (2)

Publication Number Publication Date
EP2041017A1 true EP2041017A1 (en) 2009-04-01
EP2041017B1 EP2041017B1 (en) 2012-04-18

Family

ID=38477354

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07786000A Active EP2041017B1 (en) 2006-07-11 2007-07-11 Method for assembling a tower crane

Country Status (5)

Country Link
EP (1) EP2041017B1 (en)
AT (1) ATE554043T1 (en)
DE (1) DE102006032321A1 (en)
ES (1) ES2388151T3 (en)
WO (1) WO2008006573A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019043156A1 (en) * 2017-09-01 2019-03-07 Liebherr-Werk Biberach Gmbh Rotary tower crane
WO2020052931A1 (en) 2018-09-13 2020-03-19 Liebherr-Werk Biberach Gmbh Crane
RU2773757C2 (en) * 2017-09-01 2022-06-10 Либхерр-Верк Биберах Гмбх Rotary-tower crane

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2374015B1 (en) * 2009-02-05 2012-10-30 Linden Comansa, S.L. CRANE TOWER CRANE.
CN106115514A (en) * 2016-08-31 2016-11-16 徐工集团工程机械股份有限公司 Jib and crane

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE337089B (en) * 1970-01-27 1971-07-26 Linden Alimak Ab
SE394881B (en) * 1974-09-02 1977-07-18 Linden Alimak Ab KIT FOR DAMPING OF SWING AT CONSTRUCTIONS, EXV BUILDING CRANES AND DEVICE FOR THIS
DE3147942A1 (en) * 1981-12-03 1983-06-16 Liebherr-Werk Biberach Gmbh, 7950 Biberach Method of erecting a tower crane rotating at the top, and a tower crane for carrying out such a method
JP4587413B2 (en) * 1999-12-21 2010-11-24 日本建設工業株式会社 Jib crane
ITMI20031503A1 (en) * 2003-07-22 2005-01-23 San Marco Internat S R L TOWER CRANE WITH ARM AND CONTRABRACC WITHOUT SUPPORTING TIRES
DE102005018522B4 (en) * 2005-04-20 2008-09-04 Burgdorf, Frank, Dipl.-Ing. Device for changing the counterweight distance of a tower crane, without changing the counter-jib

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2008006573A1 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019043156A1 (en) * 2017-09-01 2019-03-07 Liebherr-Werk Biberach Gmbh Rotary tower crane
RU2773757C2 (en) * 2017-09-01 2022-06-10 Либхерр-Верк Биберах Гмбх Rotary-tower crane
US11459217B2 (en) 2017-09-01 2022-10-04 Liebherr-Werk Biberach Gmbh Rotary tower crane
WO2020052931A1 (en) 2018-09-13 2020-03-19 Liebherr-Werk Biberach Gmbh Crane

Also Published As

Publication number Publication date
WO2008006573A1 (en) 2008-01-17
ATE554043T1 (en) 2012-05-15
EP2041017B1 (en) 2012-04-18
ES2388151T3 (en) 2012-10-09
DE102006032321A1 (en) 2008-01-17

Similar Documents

Publication Publication Date Title
DE60129237T2 (en) Method for attaching a crane to a windmill
EP2072812B1 (en) Method and attachment for handling a rotor hub of a wind turbine
DE102009056245B4 (en) Wind turbine with lifting device
EP2137093B1 (en) Method for installing an auxiliary boom to a main boom on a mobile crane
DE102013011489A1 (en) Tower Crane
EP2344752B1 (en) Method for transporting a rotor blade of a wind power plant and transport device for conducting the method
DE2525867A1 (en) CRANE
DE202010003269U1 (en) crane
DE2208777A1 (en) SCISSOR LIFT
EP1577550A2 (en) Method for provisioning a winch on a wind energy plant and device for carrying out this method
EP2041017B1 (en) Method for assembling a tower crane
DE102016222211A1 (en) lift assembly
WO2010094536A2 (en) Conveying device for the assembly of a tower
DE202011001850U1 (en) crane
DE102008013688A1 (en) Method for lifting heavy loads in powerhouse of wind energy plant, involves laterally adjusting lifting unit in powerhouse of wind energy plant
DE10028513A1 (en) Method and device for erecting a wind turbine to generate electric power stabilizes a crane boom by a support fastened to a wind turbine tower or a heavy lifting auxiliary crane on the top of the tower.
EP2197778A1 (en) Auxiliary device for setting up the lower and upper luffing supports of an adjustable auxiliary boom of a mobile crane
DE102007028778A1 (en) Lattice tower crane for dam, has rotating assembly arranged on chassis, and rotating platform mounted on rotating assembly via distance pipe, where main extension arm and derrick extension arm are arranged on rotating platform
DE102014001870B4 (en) mobile crane
AT510921B1 (en) Device for transporting loads or persons
WO2020089151A1 (en) Port crane having an improved drive system
DE102016010913B4 (en) System for handling lattice pieces
DE202013006584U1 (en) Ballast device for generating a winch bias
EP2377800A1 (en) Method for assembling a display unit on a rotating tower crane
DE3307892A1 (en) Tower slewing crane with jib and counter-jib

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20090107

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: WOLFFKRAN AG

17Q First examination report despatched

Effective date: 20110520

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

DAX Request for extension of the european patent (deleted)
GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 554043

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120515

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502007009735

Country of ref document: DE

Effective date: 20120614

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: FREI PATENTANWALTSBUERO AG

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20120418

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2388151

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20121009

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120818

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120820

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120719

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120731

26N No opposition filed

Effective date: 20130121

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502007009735

Country of ref document: DE

Effective date: 20130121

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120711

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120718

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120418

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120711

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070711

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 502007009735

Country of ref document: DE

Representative=s name: DREISS PATENTANWAELTE PARTG MBB, DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCAR

Free format text: NEW ADDRESS: POSTFACH, 8032 ZUERICH (CH)

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20230720

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20230731

Year of fee payment: 17

Ref country code: GB

Payment date: 20230711

Year of fee payment: 17

Ref country code: ES

Payment date: 20230821

Year of fee payment: 17

Ref country code: CH

Payment date: 20230802

Year of fee payment: 17

Ref country code: AT

Payment date: 20230718

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230724

Year of fee payment: 17

Ref country code: FR

Payment date: 20230720

Year of fee payment: 17

Ref country code: DE

Payment date: 20230912

Year of fee payment: 17

Ref country code: BE

Payment date: 20230719

Year of fee payment: 17