EP1983128A1 - Cadre d'échafaudage et procédé de fabrication d'une installation de cadres d'échafaudage à partir d'au moins un cadre - Google Patents

Cadre d'échafaudage et procédé de fabrication d'une installation de cadres d'échafaudage à partir d'au moins un cadre Download PDF

Info

Publication number
EP1983128A1
EP1983128A1 EP07008045A EP07008045A EP1983128A1 EP 1983128 A1 EP1983128 A1 EP 1983128A1 EP 07008045 A EP07008045 A EP 07008045A EP 07008045 A EP07008045 A EP 07008045A EP 1983128 A1 EP1983128 A1 EP 1983128A1
Authority
EP
European Patent Office
Prior art keywords
stem
length
pipe connector
handle
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP07008045A
Other languages
German (de)
English (en)
Other versions
EP1983128B1 (fr
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wilhelm Layher Verwaltungs GmbH
Original Assignee
Wilhelm Layher Verwaltungs GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wilhelm Layher Verwaltungs GmbH filed Critical Wilhelm Layher Verwaltungs GmbH
Priority to DE202007019073U priority Critical patent/DE202007019073U1/de
Priority to AT07008045T priority patent/ATE483868T1/de
Priority to EP07008045A priority patent/EP1983128B1/fr
Priority to DE502007005263T priority patent/DE502007005263D1/de
Publication of EP1983128A1 publication Critical patent/EP1983128A1/fr
Application granted granted Critical
Publication of EP1983128B1 publication Critical patent/EP1983128B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/14Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/301Scaffolding bars or members with non-detachably fixed coupling elements for connecting bars or members which are parallel or in end-to-end relation

Definitions

  • the invention relates to a scaffold setting frame made of metal, preferably U-, H- or H-shaped, having a first stem having a length and a second stem having a length and having at least one between the first stem and the thereto, preferably substantially parallel, extending second stem transversely, preferably perpendicularly, to the first stem and to the second stem extending transverse arm, in particular cross bar is designed, wherein the transverse arm permanently, preferably by welding, bending and torsionally rigid to or with the first stem and attached to the second post, the first post having a first stem portion extending in a direction away from the transverse arm, and the second stem having a second stem portion extending from the transverse arm Viewed from substantially in the same direction, wherein the first stem part and the second stem part together with de m transverse arm one pointing in the direction of substantially the same direction Stem portions open U- or L-shaped frame structure is formed, and wherein the first stem and the second stem each having a first end portion and a second end portion, where
  • the invention relates to a method for producing a Gerüstrahmenan extract containing at least one such scaffolding frame.
  • Such scaffolding frames in particular those in which both stems each have an equal length, have been known for decades from practice and have proven ideal for the construction of scaffolding, especially scaffolding.
  • Particularly advantageous embodiments of such scaffolding frame are in the still unpublished European patent application no. 06021346.9 and the still unpublished German utility model application No. 20 2006 015 586.4 disclosed, wherein the content of these patent applications for the sake of simplicity at this point is fully incorporated in this protective right. Accordingly, therefore, the invention treated in the context of the European patent application in question may also be embodied with features as they appear from the above-mentioned two unpublished patent applications.
  • the Gerüststellrahmen arising from these two unpublished applications for protection have at least one U- or L-shaped frame structure consisting of two substantially mutually parallel handle parts and a permanent, preferably by welding, fixed cross arm, and the erected at vertical scaffolding frame after is open at the top or bottom.
  • the two stems of this framework positioning frames are therefore not permanently connected to one another in a region between the ends of the handle parts of the respective frame structure pointing in substantially the same direction and the transverse arm. It is understood, however, that the stems of these or such scaffolding frames, including those of the scaffolding frame according to the invention, in the said end region and connecting elements for releasably connecting at least one further transverse arm, in particular transverse bar, may have.
  • outwardly or upwardly and / or downwardly open scaffolding frame can lead to a bending of the stem parts of the frame structure in rough field use, for example, when falling of the scaffolding frame, so then the affected scaffold frame, not without a prior judging, ie not without a bending back of the affected stem part or the affected stem parts, on another scaffolding frame, in particular on another similar scaffolding frame configured, is repluggable. So far bent or distorted scaffold frames had previously been directed on site or in a workshop with the help of separate devices or devices. This is time consuming and costly.
  • This object is preferably achieved firstly by a scaffolding setting frame having the features mentioned above, in particular by the length of the first tube connector of the first handle being different from the length of the second tube connector of the second handle, and the length of the first handle being of the length of the first handle second stem differs and / or that the length of the first stem differs from the length of the second stem by an amount that is smaller than the outer diameter of the second end portion of the first stem and / or smaller than the outer diameter of the second end portion of the second stem.
  • the above-mentioned object can be achieved by a scaffolding frame with the features of claim 1 and by a method with the features of claim 26.
  • the first stem at a distance from a free end of the first pipe connector has a, preferably annular, first support surface for supporting one end of a attachable first further stem
  • the second stem at a distance from a free end of the second tubular connector has a, preferably annular, second support surface for supporting one end of an attachable second further stem, wherein the distance of the first support surface from the free end of the first tube connector corresponding length of the first tube connector from the distance of the second support surface of the free End of the second pipe connector corresponding length of the second pipe connector.
  • the length of the first tube connector differs from the length of the second tube connector by an amount that is smaller than the outer diameter of the second end region of the first stem and / or smaller than the outer diameter of the second end region of the second stem ,
  • the length of the first pipe connector differs from the length of the second pipe connector and / or the length of the first stem is different from the length of the second stem by an amount which is smaller than the outer diameter of the second second end portion of the first post and / or smaller than the outer diameter of the second end portion of the second post and greater than 2 percent of the outer diameter of the second end portion of the first post and / or greater than 2 percent of the outer diameter of the second end portion of second stalk.
  • the length of the first stem differs from the length of the second stem and / or the length of the first tubular connector differs from the length of the second tubular connector by an amount that is less than 50 percent of the outer diameter of the second stem End portion of the first stem and / or is less than 50 percent of the outer diameter of the second end portion of the second stem and greater than 10 percent of the outer diameter of the second end portion of the first stem and / or greater than 10 percent of the outer diameter of the second end portion of the second stalk.
  • the length of the first stem differs from the length of the second stem and / or the length of the first tubular connector differs from the length of the second tubular connector by an amount that is smaller than 50 millimeters and larger than 2 millimeters.
  • the length of the first stem differs from the length of the second stem and / or the length of the first tubular connector differs from the length of the second tubular connector by an amount that is less than 25 millimeters and larger than 5 millimeters.
  • the length of the first stem differs from the length of the second stem and / or the length of the first tubular connector differs from the length of the second tubular connector by an amount which is approximately 10 millimeters.
  • the first pipe connector has at its free end a chamfer having a width and that the second pipe connector has at its free end a chamfer having a width, wherein the length of the first stem of the length of the second stem and / or the length of the first tube connector from the length of the second tube connector by an amount which is smaller than the width of the chamfer of the first tube connector and / or smaller than the width of the chamfer of the second tube connector.
  • the first tube connector has at its free end a chamfer having a width and that the second tube connector has at its free end a chamfer having a width, wherein the width of the chamfer of a tube connector of the tube connector of the width of the chamfer of the other tube connector by an amount greater than 13 percent and less than 87 percent of the width of the chamfer of the longer tube connector.
  • such a scaffold setting frame can be provided that the width of the chamfer of a pipe connector of the pipe connector of the width of Differentiate bevel of the other pipe connector by an amount that is greater than 30 percent and that is smaller than 80 percent of the width of the chamfer of the longer pipe connector.
  • the width of the chamfer of a pipe connector of the pipe connector differ from the width of the chamfer of the other pipe connector by an amount which is greater than 5 millimeters and which is smaller than 12 millimeters.
  • the width of the chamfer of a pipe connector of the pipe connector is smaller by about 10 millimeters than the width of the chamfer of the other pipe connector.
  • the chamfer having a reduced width of the one pipe connector is reduced by cutting, in particular by sawing, a pipe connector having a chamfer at its free end, preferably corresponding to the other pipe connector.
  • the chamfer having a reduced width of a pipe connector of a stem is achieved by forming a reduced length stem tube by means of or in a forming tool, which is also for producing a chamfer of a pipe connector of a longer stem by forming a stalk tube having a non-reduced or longer length, wherein preferably its width is not reduced relative to the width of the chamfer of the shorter-length stalk tube, or that the reduced-width chamfer of a pipe connector is achieved by forming a reduced-length pipe connector pipe by means of or in a forming tool, which is also for producing a chamfer of a longer pipe connector by forming an unreduced or greater length serving pipe connector tube, preferably whose width is not reduced compared to the width of the chamfer of the shorter length having a pipe connector.
  • first pipe connector is integrally connected to a thereto adjacent stalk piece of the first stem and that the second pipe joint is integrally connected to a thereto adjacent stalk piece of the second stem.
  • first pipe connector is connected as a separate part with an adjacent thereto stem piece of the first stem, preferably pressed
  • second pipe connector is connected as a separate part with an adjacent thereto stem piece of the second stem, preferably pressed
  • first tube connector has an outer diameter which is smaller than the outer diameter of the first stem in its remaining stem areas and in that the second tube connector has an outer diameter which is smaller than the outer diameter of the second stem in its remaining stem areas.
  • transverse arm to be permanently fastened or connected to or in the vicinity of an end region of the first shaft and / or for the transverse arm to be in the region or in the vicinity of an end region of the second shaft or permanently attached or connected thereto.
  • the transverse arm in the region or in the vicinity of the first pipe connector is permanently attached to or connected to the first handle and / or that the transverse arm in the area or in the vicinity of the second pipe connector or permanently attached or connected to the second handle.
  • the length of the first stem part is greater than 60 percent of the length of the first stem, preferably greater than 80 percent of the length of the first stem, in particular about 1.9 meters, and / or that the length of the second stem portion is greater than 60 percent of the length of the second stem, preferably greater than 80 percent of the length of the second stem, in particular about 1.9 meters.
  • the transverse arm in the region of the center of the first handle is permanently attached or connected to it and / or that the transverse arm is permanently fastened or connected in the region of the middle of the second handle ,
  • the length of the first stem part is greater than 30 percent of the length of the first stem, preferably greater than 40 percent of the length of the first stem, in particular about 1 meter and / or that the length of the second stem part is greater than 30 percent of the length of the second stem, preferably greater than 40 percent of the length of the second stem, in particular about 1 meter.
  • the handle parts of the U-shaped frame structure extending substantially in the same direction viewed from the transverse arm have a substantially equal length.
  • the invention also relates to a scaffolding frame assembly comprising at least one scaffolding setting frame, preferably according to at least one of claims 1 to 25, which is mounted on a scaffolding frame, in particular a scaffold setting frame, preferably a scaffolding setting frame according to at least one of claims 1 to 25.
  • a scaffolding frame assembly can be provided that the first handle of the scaffolding frame, either with insertion of a first intermediate handle or without insertion of a first intermediate handle, preferably immediately, is plugged onto a first handle of Gerüstrahmens, and that the second handle of the scaffold rack either under insertion a second intermediate post or without insertion of a second intermediate post, preferably immediately, is attached to a second post of Ger ⁇ strahmens.
  • the invention also relates to a method for producing a scaffolding frame assembly of the type described above, in particular according to one of claims 26 or 27, which is characterized in that first of all the first handle part of the first handle of the scaffold setting frame is placed far on the first stem of the scaffolding frame or on the first intermediate stalk, that by manual exertion of lateral forces on the second stem portion of the second stem of the framework positioning frame, a free end of the second stem portion of the second stem of the scaffolding frame relative to a free end of the second stem of Germestrahmens or the second intermediate handle is movable into a Aufsteckwolf, in which the free end of the second handle portion of the scaffolding frame and the free end of the second stem of the scaffolding frame or the second intermediate handle are opposite, so that an attachment of the second handle part of the second handle the Gerüststellrahmens on the second handle of the scaffolding frame or on the second intermediate handle is possible, and then by manual exercise of lateral forces on the second handle part of the second stem of the scaffold setting frame, the free
  • the invention also relates to a scaffold, in particular a scaffolding, which has at least four vertical stems, on which, preferably at least one covering unit, in particular a scaffold floor, horizontal bar elements and / or at least one diagonal element, for stiffening the framework, are mounted, and with at least a scaffolding frame, in particular of the type described above, preferably according to one of claims 1 to 25, and / or with at least one scaffolding frame arrangement, in particular of the type described above, preferably according to one of claims 26 or 27.
  • a scaffold in particular a scaffolding, which has at least four vertical stems, on which, preferably at least one covering unit, in particular a scaffold floor, horizontal bar elements and / or at least one diagonal element, for stiffening the framework, are mounted, and with at least a scaffolding frame, in particular of the type described above, preferably according to one of claims 1 to 25, and / or with at least one scaffolding frame arrangement, in particular of the type described above, preferably according to one of claims 26 or 27.
  • frame 20 is made of a plurality of scaffolding frame 21 according to the invention; 21.1, 21.2, wherein in each case a second scaffold positioning frame 21.2 is attached to a first scaffold positioning frame 21.1.
  • Each scaffolding frame 21; 21.1, 21.2 consists of two stems 32; 32.1, 32.2, namely from a first handle 32.1 and from a substantially parallel thereto second handle 32.2 as well as from one of these stems 32.1, 32.2 respectively transversely, here approximately perpendicular, extending transverse arm 35, which at the first handle 32.1 and at the second handle 32.2 is permanently fixed by welding to form a H- or U-shaped frame.
  • the framework 2U consists of a plurality of at least four stems 32; 32.1, 32.2.
  • stems 32; 32.1, 32.2 For stiffening the framework 20, at least two of the stems 32.1, 32.2 of two adjacent framework staging frames 21, which are assigned to a common floor, here the lower tier 47.1, are stiffened by a preferably bar-shaped diagonal element 26.
  • Each stem 32; 32.1, 32.2 here has at least two fasteners 38 arranged at a vertical distance from each other for connecting fall protection means, in particular railing elements 28. In the embodiment shown, two substantially parallel railing elements 28 are attached to the fastening means 38 of the outer stems 32.1 here.
  • the other or inner stems 32.2 may be placed, for example, in the immediate vicinity of a wall, not shown, for example of a building, so that then on this side of the frame 20, the fall protection means 28 can be omitted.
  • Each stem 32; 32.1, 32.2 is here attached to a so-called initial piece 27, which is usually designed with an upwardly pointing pipe socket.
  • the inner diameter of this pipe socket is slightly larger than the outer diameter 58.1, 58.2 of the lower end of the stem Stems 32; 32.1, 32.2, so that the stems 32; 32.1, 32.2 can each be inserted into one of these pipe sockets of the starting pieces 27.
  • the initial pieces 27 are usually provided with a spindle and a spindle nut screwed thereon, whereby a height or level adjustment of the stems 32; 32.1, 32.2 can be achieved.
  • Each start piece 27 here has a perforated disc 30 which is provided with openings 71.
  • connection nodes 29 are also referred to as connection nodes 29.
  • the longitudinal bars 24 and the transverse bars 25 are thereby wedged in pairs in such a way that of two parallel longitudinal bars 24 and two perpendicular thereto, but mutually parallel crossbars 25, a stable rectangular base frame is constructed.
  • FIG. 2 A first exemplary embodiment of a scaffold setting frame 21 'according to the invention is shown in FIG. 2 shown.
  • This is here H- or U-shaped, with a length 34.1 having a first handle 32.1 and having a length 34.2 having second handle 32.2 and with at least one between the first handle 32.1 and the second handle extending substantially parallel thereto 32.2 transversely, here perpendicular, to the first handle 32.1 and the second handle 32.2 extending transverse arm 35.1 designed, which is permanently fixed by welding bending and torsionally rigid to the first handle 32.1 and to the second handle 32.2.
  • the first handle 32.1 has a first handle part 39.1, which extends from the transverse arm 35.1 viewed in a direction 43.1 and the second handle 32.2 has a second handle portion 39.2, viewed from the transverse arm 35.1 from substantially in the same direction 43.2 extends.
  • the first handle part 39.1 and the second handle part 39.2 together with the transverse arm 35.1 form a frame structure 50.1 which is open in the direction 44 of the two handle parts 39.1, 39.2 pointing in the same direction 43.1, 43.2, here U-shaped frame structure 50.1.
  • the first stem 32.1 and the second stem 32.2 each have a first upper end region 51.1, 52.1 and a second lower end region 51.2, 52.2.
  • the first end region 51.1 of the first stem 32.1 is designed as a first tube connector 54.1 having a length 55.1, which extends in a direction 45.1 viewed from the transverse arm 35.1 and the first end region 52.1 of the second stem 32.1 is second as a length 55.2
  • Pipe connector 54.2 designed, which extends from the transverse arm 35.1 from substantially extends in the same direction 46.1.
  • the length 55.1 of the first tube connector 54.1 of the first stem 32.1 differs from the length 55.2 of the second tube connector 54.2 of the second stem 32.2, in the exemplary embodiment shown in the figures such that the length 55.1 of the first pipe connector 54.1 is slightly longer than the length 55.2 of the second pipe connector 54.2.
  • the length 55.1 of the first pipe connector 54.1 corresponds to the distance between the free end 36.2 of the first pipe connector 54.1 and the first stem 32.1 and an annular support surface 41.1 and the length 55.2 of the second pipe connector 54.2 corresponds to the distance between the free end 37.2 of the second pipe connector 54.2 or the second handle 32.2 and an annular second support surface 41.2.
  • the support surfaces 41.1 and 41.2 each delimit a Stitzwulst, which is produced in the embodiments shown by a forming process, in particular by a compression process, in which case the respective pipe connector 54.1 and 54.2 integral with the adjoining respective stem piece 65.1 and 65.2 of the respective stem 32.1 or 32.2 is connected.
  • the distance of the support surface 41.1 from the lower end 36.1 of the first handle 32.1 and the distance 42.2 of the support surface 41.2 from the lower end 37.1 of the second handle 32.2 is the same size and is here about 2 meters.
  • the length 40.1 of the first stem part 39.1 or the distance of the longitudinal axis 73 of the transverse arm 35.1 from the lower end 36.1 of the first stem 32.1 and the length 40.2 of the second stem portion 39.2 of the second stem 32.2 or the distance of the longitudinal axis 73 of the transverse arm 35.1 of the lower end 37.1 of the second handle 32.2, here is also the same size and here is about 1.9 meters.
  • this has a perforated disc 30 and also the second stem 32.2 has a perforated disc 30 at a corresponding distance 40.2 from its lower end 36.2. This, too, as Rosette designated perforated disc surrounds the respective stem 32.1, 32.2 each fully.
  • Such known from the prior art perforated discs 30 have a number of preferably eight perforations 71, wherein preferably four of the openings 71 are designed as small openings 71.1 and preferably four other openings 71 are designed as large openings 71.2.
  • the openings 71; 71.1, 71.2 are each arranged in such a way around the circumference of the respective stem 32 that small openings 71.1 and large openings 71.2 alternate, with their radially outwardly extending longitudinal axes are each arranged at a circumferential angle of 45 degrees to each other here.
  • the transverse arm 35.1 formed here with a round tube has in each case a connection head 75.1, 75.2 at its two ends.
  • the first connection head 75.1 is firmly welded both to the perforated disc 30 of the first shaft 32.1 and to the first shaft 32.1
  • the second connection head 75.2 is firmly welded to the perforated disc 30 of the second shaft 32.2 and to the second shaft 32.2.
  • Each connection head 75.1, 75.2 has an upper head part 78 and a lower head part 79, between which, in the unwelded state, a horizontal slit 81 is formed, whose upper and lower slit surfaces extend parallel to the longitudinal axis 73 of the transverse arm 35.1.
  • the upper head part 78 has two upper side wall parts 82.1 and 82.2 and the lower head part 79 has two lower side wall parts 83.1 and 83.2.
  • the upper side wall parts 82.1 and 82.2 and the lower side wall parts 83.1 and 83.2 are each bounded by vertical outer surfaces, each including a wedge angle 77, which is preferably about 43 to 45 degrees ( FIGS. 3 and 4 ).
  • the Side wall parts 82.1, 82.2 and 83.1, 83.2 arranged such that they run to form a wedge-shaped connection head 75.1, 75.2, preferably on the stem and disk center 76.
  • the first pipe connector 54.1 has a different cross-section with respect to the second end region 71.2 of the first shaft 32.1, and also the second pipe connector 54.2 of the second shaft 32.2 has a different cross-section with respect to its second end region 52.2.
  • the two tube connectors 54.1 and 54.2 with the exception of the end and transition regions, have the outer diameters 61.1 and 61.2, which are the same size here.
  • the outer diameters 61.1 and 61.2 of the tube connectors 54.1 and 54.2 are slightly smaller than the inner diameters 59.2 of the stems 32.1 and 32.2 in the region of their respective lower ends 36.1 and 37.1, ie in the second end region 51.2 of the first stem 32.1 and in the second end region 52.2 of the second Stalks 32.2.
  • each stem 32 preferably a similar scaffold positioning frame 21 'are plugged, as for example in FIG. 1 is shown.
  • FIGS. 6 to 10 show a second embodiment of a scaffold setting frame 21 "according to the invention, which compared to the previously related to the FIGS. 2 to 5 described scaffolding frame 21 'exclusively by the design of the designed here as a U-profile tube cross arm 35.2 and the detail training whose connection heads 175.1 and 175.2 and their detailed connection to the two stems 32.1 and 32.2 differs. Accordingly, therefore, the two stems 32.1 and 32.2 and their tube connectors 54.1 and 54.2 and attached to the stems 32.1 and 32.2 perforated discs 30 and the fasteners 38 of the scaffolding frame 21 are "the same design as in the scaffold rack frame 21 ' like parts with the same reference numerals as in the frame rack 21 '.
  • connection heads 175.1 and 175.2 each have a lower head part 179 which is formed with a formed by forming, in particular pressing, over which on the respective connection head 175 adjacent underside of the U-profile tube 35.2 bulged out down squish and support profile 176.1 and 176.2.
  • the U-profile pipes disclosed there provide better support to the stems 32.1 and 32.2 of the scaffold positioning frame 21 'and in particular to a larger one Bending stiffness in the region of the connection node 29 'is achieved against bending of the handle parts 39.1 and 39.2 relative to the transverse arm 35.2.
  • Such a crimping and supporting profile 176.1, 176.2 can be produced in a particularly simple and cost-effective manner during the production of the respective connection head 175.1 or 175.2.
  • the Figures 11 a and 11 b show end sections of the two stems 32.1 and 32.2 in the region of their upper end regions 51.1 and 52.1.
  • the FIG. 11 a shows a designed with a conventional pipe connector 54.1 end 51.1 in the Figures 2 and 6 Stems 32.1.
  • This pipe connector 54.1 has a circular ring cross-section and an outer diameter 61.1, which is slightly smaller than that in the Figures 5 and 10 shown inner diameter 59.2 of the lower end portion 51.2 of the first handle 32.1.
  • the pipe connector 54.1 has at its free end 36.2 on a forwardly tapered pipe end.
  • a chamfer 36.2 which has a width 64.1 from here about 15 millimeters.
  • the pipe connector 54.1 has a length 55.1, which is here about 165 millimeters, which corresponds to the distance of the free end 36.2 of the pipe connector 54.1 and the stem 32.1 to the annular support surface 41.1.
  • this chamfer 63.2 with a reduced width 64.2 it is preferable to start from a stalk tube having a reduced length, which is shaped by means of or in a forming tool, not shown in the figures, which is also used to produce the wider chamfer 63.1 of the pipe connector 54.1 of FIG longer stem 63.1 by forming a non-reduced or larger length having stem tube is used.
  • a pipe connector 54.1 shown corresponds.
  • the chamfer of such a pipe connector can be cut in a particularly simple and cost-effective manner, for example sawed off, so as to obtain a cut-to-length chamfer with a correspondingly reduced width of a correspondingly shorter pipe connector.
  • the shorter tube connector 54.2 has a slightly smaller length 55.2 than the tube connector 54.1, which is about 155 millimeters here. Accordingly, the length 34.2 of the second tube connector 54.2 having second handle 32.2 compared to the length 34.1 of the first tube connector 51.1 having first stem 32.1 is slightly reduced, by an amount which the difference of the length 55.1 of the first tube connector 54.1 and the length 55.2 of the second tube connector 54.2 or the difference of the width 64.1 of the first chamfer 63.1 of the first tube connector 54.1 and the width 64.2 of the second chamfer 63.2 of the second tube connector 54.2 corresponds and which is about 10 millimeters here.
  • the stems 32.1 and 32.2 have in one of their respective lower ends 36.1, 37.1 up to the respective support surface 41.1 and 41.2 reaching stem portions, except for the area of the annular support surfaces 41.1 and 41.2 limited annular beads, an outer diameter 58.1 and 58.2, the here is the same size and here is about 48.3 millimeters.
  • the outer diameter 61.2 of the second pipe connector 54.2 corresponds to the outer diameter 61.1 of the pipe connector 54.1 and is therefore likewise slightly smaller than the inner diameter 59.2 of the second shaft 32.2 in the region of its lower end region 52.2.
  • FIGS. 12 a to 12 i show schematic views of various embodiments of the invention Gerüststellrahmen 12, which are all configured here with different lengths of pipe connectors 54.1 and 54.2. Such a configuration with a different length 55.1, 55.2 having pipe connectors 54.1, 54.2 prefers. Because then, when a succession of several similar scaffolding frame 21; 21.1, 21.2 on each other, the ends of a second frame rack 21.2, which are réellestecken on the associated ends of a first frame rack 21.1, supported in the mounted state on the respective support surfaces 41.1 and 41.2 of the first frame rack 21.1. It is understood, however, that alternatively, instead of different lengths of pipe connector, the lengths of the respective stems can be correspondingly different. Also, combinations of different lengths having pipe connectors on the one hand and different remaining lengths having stems are conceivable.
  • FIGS. 1 to 11 b shown embodiments of inventive scaffolding frame 21; 21.1, 21.2; 21 ', 21 "are in FIG. 12 a again schematically reproduced, so that reference can be made in this respect to the above statements.
  • FIG. 12b shows a schematic view of a similar U-shaped frame rack, but in contrast to the in FIG. 12 a schematically shown scaffolding frame the two different length pipe connectors 54.1 and 54.2 are respectively arranged at the lower end of the stems stems 32.1 and 32.2.
  • the Figure 12 c shows a schematic view of a similar scaffolding frame as the Figure 12 a , however, extend in the case of in FIG. 12c shown scaffolding frame the two different length pipe connector 54.1 and 54.2 viewed from the cross arm 35 from in opposite directions 45.1 and 46.2 away from it.
  • FIG. 12 e shows a schematic view of an H-shaped scaffolding frame, in which the two different length pipe connectors are designed and arranged the same, as in the in FIG. 12 a skeleton frame shown schematically.
  • this H-shaped scaffolding frame unlike in the FIGS. 12a to 12d shown scaffolding frame of the transverse arm 35 is arranged approximately in the region of the center of the two stems 32.1 and 32.2.
  • a distinguishing feature of the in Figs iguren 12 a to 12e schematically shown scaffolding frame is that the distance between the respective support surface 41.1, 41.2 and the respective, facing away from the respective pipe connector 54.1, 54.2 away stalk end of the stems 32.1 and 32.2, based on the respective scaffolding frame, is substantially the same size. In the case of these scaffolding positioning frames, therefore, the different lengths of the respective posts 32.1 and 32.2 result essentially only or exclusively from the different lengths of the tube connectors 54.1 and 54.2.
  • the Figures 12 f and 12 g show in each case schematic views of an H-shaped frame rack. This can, for the purpose of building a Gerhstrahmenan extract of several stacked scaffolding frame and / or for the purpose of building a scaffold, to be supplemented by an intermediate handle 33 which in the Figures 12 f and 12 g each shown dotted.
  • the two different length pipe connectors 54.1 and 54.2 each in the same direction 45.2, 46.2, respectively, each down.
  • the two pipe connectors 54.1 and 54.2 in opposite directions 45.1 and 46.2.
  • each two substantially the same length having stem parts of the stems 32.1 and 32.2 are provided, which together with the respective transverse arm 35 form a U-shaped frame structure.
  • the stem parts in the Figures 12 h and 12 i schematically shown H- or S-shaped scaffolding frame each having an L-shaped frame structure.
  • FIGS. 12 a to 12 i shown embodiments only show a part of the present invention possible different embodiments of scaffolding frame according to the invention, so that therefore also further advantageous constructions of scaffolding frame within the scope of this invention are conceivable.
  • scaffolding arrangements 22 are produced (cf. FIG. 1 ).
  • the stems are preferably 32.1, 32.2 or stem ends of a scaffolding frame 21.2 invention on the stems 32.1, 32.2 or the stem ends of a, preferably located underneath and preferably similar scaffolding frame 21.1 attached, so as the example of FIG. 1 outgoing scaffolding assembly 22 is illustrated.
  • a deformed or bent scaffold positioning frame can be arranged in a particularly simple manner, despite the deformation or bending, on a further scaffolding frame or scaffolding setting frame, in particular on a similar scaffold positioning frame. Attach.
  • FIGS. 1 to 12 i with differently long pipe connectors 54.1 and 54.2 designed scaffolding frame 21; 21.1, 21.2; 21 ', 21 "this can be done as follows:
  • the first stem part 39.1 of the first stem 32.1 of a second framework frame 21.2 to be stowed on a first frame staging frame 21.1 can be plugged onto the first, longer tube connector 54.1 of the first stem 32.1 of the first frame staging frame 21.1 by manually applying transverse forces to the second stem part 39.2 of the second handle 32.2 of the second frame rack 21.2 the free end 37.1 of the second handle portion 39.2 of the second handle 32.2 of the second frame rack 21.2 relative to the free end 37.2 of the second handle 32.2 and the second, shorter tube connector 54.2 of the first frame rack 21.1 into a Aufsteck ein can be moved, in which the free end 37.1 of the second handle part 39.2 of the second frame rack 21.2 and the free end 37.2 of the second handle 32.2 of the first frame rack 21.1 are opposite, so that plugging and the second handle portion 39.2 of the second Stem 32.2 of the second frame rack 21.2 on the second handle 32.2 of the first frame rack 21.1 is possible.
  • the free end 37.1 of the second stem part 39.2 of the second stem 32.2 of the second framework positioning frame 21.2 is relative to the free end 37.2 of the second stem by manual exertion of lateral forces on the second stem part 39.2 of the second stem 32.2 of the second framework positioning frame 21.2 32.2 of the first frame rack 21.2 moved to the slip-on, so that then the second handle part 39.2 of the second handle 32.2 of the second Gerüststellrahmens 21.2 on the second handle 37.2 of the first frame rack 21.1 is plugged or plugged.
  • stems 32.1 When setting up this frame rack 21; 21.1, 21.2 containing scaffold 20 are preferably the longer stems 32.1, ie here those stems 32.1, each having the longer pipe connector 54.1, each set up as outer or wandferne stems 32.1, while the other stems 32.2, which each have a correspondingly shorter length , So here each have the shorter pipe connector 54.2, be placed inside or close to the wall.
  • the scaffold erector in a simple manner manually by exerting lateral forces on the here near wall or inner handle 32.2 of ceremonisteckenden scaffolding frame 21.2 in the direction of the first stem 32.1 of this scaffolding frame 21.2 away, so for example in the direction of an immediately adjacent wall, in a Aufsteck ein be pressed, in which also a plugging of the second handle 32.2 of the second frame rack 21.2 on the shorter pipe connector 54.2 of the second handle 32.2 of the first frame rack 21.1 is possible, so that subsequently by manual exercise of forces acting in the direction of gravity of the second handle 32.2 of the second frame rack 21.2 together with the transverse arm 35 and the first handle 32.1 of this scaffold rack 21.2, and consequently this scaffolding rack 21.2 total, completely on the underlying scaffold rack 21.1 can be plugged.
  • both the lower end 36.1 of the first handle 32.1 and the lower end 37.1 of the second handle 32.2 of the scaffolding mounting frame 21.2 lie on the respective support surface 41.1 or 41.2 of the handles 32.1 and 32.2 of the first and lower scaffold positioning frames 21.1, respectively , Consequently, therefore, the second or upper frame rack 21.2 can be securely supported in the fully plugged state with both handle ends 36.1 and 37.1 on the support surfaces 41.1 and 41.2 of the stems 32.1 and 32.2 of the underlying or first scaffold rack 21.1.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Vehicle Step Arrangements And Article Storage (AREA)
EP07008045A 2007-04-18 2007-04-18 Cadre d'échafaudage et procédé de fabrication d'une installation de cadres d'échafaudage à partir d'au moins un cadre Active EP1983128B1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE202007019073U DE202007019073U1 (de) 2007-04-18 2007-04-18 Gerüststellrahmen
AT07008045T ATE483868T1 (de) 2007-04-18 2007-04-18 Gerüststellrahmen und verfahren zur herstellung einer gerüstrahmenanordnung aus wenigstens einem gerüststellrahmen
EP07008045A EP1983128B1 (fr) 2007-04-18 2007-04-18 Cadre d'échafaudage et procédé de fabrication d'une installation de cadres d'échafaudage à partir d'au moins un cadre
DE502007005263T DE502007005263D1 (de) 2007-04-18 2007-04-18 Gerüststellrahmen und Verfahren zur Herstellung einer Gerüstrahmenanordnung aus wenigstens einem Gerüststellrahmen

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP07008045A EP1983128B1 (fr) 2007-04-18 2007-04-18 Cadre d'échafaudage et procédé de fabrication d'une installation de cadres d'échafaudage à partir d'au moins un cadre

Publications (2)

Publication Number Publication Date
EP1983128A1 true EP1983128A1 (fr) 2008-10-22
EP1983128B1 EP1983128B1 (fr) 2010-10-06

Family

ID=38474306

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07008045A Active EP1983128B1 (fr) 2007-04-18 2007-04-18 Cadre d'échafaudage et procédé de fabrication d'une installation de cadres d'échafaudage à partir d'au moins un cadre

Country Status (3)

Country Link
EP (1) EP1983128B1 (fr)
AT (1) ATE483868T1 (fr)
DE (2) DE202007019073U1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3087805A1 (fr) * 2018-10-29 2020-05-01 Entrepose Echafaudages Noeud pour une structure de service et structure de service comprenant un tel noeud

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013108326A1 (de) 2013-08-02 2015-02-05 Peri Gmbh Gerüstrohr eines Baugerüsts und Gerüstelement
DE102016204696A1 (de) * 2016-03-22 2017-09-28 Peri Gmbh Gerüstelement mit einem Knotenpunkt und Baugerüst mit einem solchen Gerüstelement
DE102017220696A1 (de) 2017-11-20 2019-05-23 Peri Gmbh Gerüststiel, Baugerüst und Verfahren zur Herstellung eines Gerüststiels

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1181679A (fr) * 1957-08-27 1959-06-17 Système d'échafaudage tubulaire télescopique
FR1320858A (fr) * 1962-01-31 1963-03-15 Assemblages rigides, tels qu'échafaudages, passerelles, rayonnages ou analogues, perfectionnés
DE2654439A1 (de) * 1976-12-01 1978-06-08 Rossi Luigi Dr Verfahren zur herstellung einer loesbaren steckverbindung und steckverbindung hergestellt nach dem verfahren
FR2529931A1 (fr) * 1982-07-06 1984-01-13 Self Lock Echafaudages Element de construction d'echafaudage prefabrique a compensation automatique de jeux
EP0605034A2 (fr) * 1992-12-28 1994-07-06 SGB HOLDINGS LTD.for these Research & Development Dept. Holland Construction d'échafaudage, en particulier moyen pour la jonction de deux ou plusieurs tubes verticaux

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1911907B1 (fr) 2006-10-11 2015-12-23 Wilhelm Layher Verwaltungs-GmbH Elément de cadre vertical en métal
DE202006015586U1 (de) 2006-10-11 2008-02-21 Wilhelm Layher Verwaltungs-Gmbh Vertikalrahmenelement aus Metall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1181679A (fr) * 1957-08-27 1959-06-17 Système d'échafaudage tubulaire télescopique
FR1320858A (fr) * 1962-01-31 1963-03-15 Assemblages rigides, tels qu'échafaudages, passerelles, rayonnages ou analogues, perfectionnés
DE2654439A1 (de) * 1976-12-01 1978-06-08 Rossi Luigi Dr Verfahren zur herstellung einer loesbaren steckverbindung und steckverbindung hergestellt nach dem verfahren
FR2529931A1 (fr) * 1982-07-06 1984-01-13 Self Lock Echafaudages Element de construction d'echafaudage prefabrique a compensation automatique de jeux
EP0605034A2 (fr) * 1992-12-28 1994-07-06 SGB HOLDINGS LTD.for these Research & Development Dept. Holland Construction d'échafaudage, en particulier moyen pour la jonction de deux ou plusieurs tubes verticaux

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3087805A1 (fr) * 2018-10-29 2020-05-01 Entrepose Echafaudages Noeud pour une structure de service et structure de service comprenant un tel noeud

Also Published As

Publication number Publication date
ATE483868T1 (de) 2010-10-15
DE202007019073U1 (de) 2010-05-20
EP1983128B1 (fr) 2010-10-06
DE502007005263D1 (de) 2010-11-18

Similar Documents

Publication Publication Date Title
EP2527566B1 (fr) Montant
WO2008043339A1 (fr) Cadre vertical en métal
EP3775433B1 (fr) Agencement de connexion
EP3464753A1 (fr) Module de support vertical pour tour d'échafaudage pour charges lourdes
DE102021101768A1 (de) Anordnung von gerüstbauteilen
EP1911907B1 (fr) Elément de cadre vertical en métal
EP1983128B1 (fr) Cadre d'échafaudage et procédé de fabrication d'une installation de cadres d'échafaudage à partir d'au moins un cadre
DE3505174A1 (de) Zusatzvorrichtung fuer einen von bauhandwerkern zu verwendenden stuetzbock
DE10305158A1 (de) Geländervorrichtung für ein Baugerüst
DE3539653C2 (fr)
DE3804306C2 (fr)
DE2910467A1 (de) Vorrichtung zur veraenderung der hoehe der staender eines geruestturmes
DE2727448A1 (de) Rohrgeruest
DE2949403A1 (de) Geruest und zugehoeriges querelement
DE202005003790U1 (de) Fahrbares Schalgerüst
EP3477017B1 (fr) Cadre d'échafaudage à sécurité d'escalade
DE7524017U (de) Geruestbau - schutzgelaender
DE102020132056A1 (de) Geländerholm, Modulgerüst, Verfahren zum Errichten eines Modulgerüsts sowie Verwendung eines Geländerholms in einem Modulgerüst
WO2024099495A1 (fr) Agencement de composants d'échafaudage pour un échafaudage
DE20318433U1 (de) Geländereinrichtung für den zeitweiligen Seitenschutz eines Baugerüstes
DE20320517U1 (de) Höhenverstellbarer Stützbock
DE29615404U1 (de) Bockaufsatz für Bockgerüste
DE2945601C2 (de) Abstützriegel als zusätzliches Auflager für die Dielen einer Arbeitsbühne eines Stahlrohrgerüstes
DE3639697A1 (de) Geruest, insbesondere baugeruest
DE2934424C2 (fr)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

17P Request for examination filed

Effective date: 20081212

17Q First examination report despatched

Effective date: 20090528

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 502007005263

Country of ref document: DE

Date of ref document: 20101118

Kind code of ref document: P

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20101006

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20101006

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110206

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110106

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110207

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110117

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

26N No opposition filed

Effective date: 20110707

BERE Be: lapsed

Owner name: WILHELM LAYHER VERWALTUNGS-GMBH

Effective date: 20110430

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502007005263

Country of ref document: DE

Effective date: 20110707

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110430

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20110418

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20111230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110430

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110430

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110502

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110418

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110418

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 483868

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120418

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120418

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20101006

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230502

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230418

Year of fee payment: 17