EP1911901B1 - Dividing wall - Google Patents

Dividing wall Download PDF

Info

Publication number
EP1911901B1
EP1911901B1 EP07018453A EP07018453A EP1911901B1 EP 1911901 B1 EP1911901 B1 EP 1911901B1 EP 07018453 A EP07018453 A EP 07018453A EP 07018453 A EP07018453 A EP 07018453A EP 1911901 B1 EP1911901 B1 EP 1911901B1
Authority
EP
European Patent Office
Prior art keywords
partition according
partition
filling
piece
another
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP07018453A
Other languages
German (de)
French (fr)
Other versions
EP1911901A2 (en
EP1911901A3 (en
Inventor
Nino F. Moretti
Josef Karcher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stones & More & Co KG GmbH
Original Assignee
Stones & More & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE202006016423U external-priority patent/DE202006016423U1/en
Priority claimed from DE102007015861A external-priority patent/DE102007015861A1/en
Application filed by Stones & More & Co KG GmbH filed Critical Stones & More & Co KG GmbH
Publication of EP1911901A2 publication Critical patent/EP1911901A2/en
Publication of EP1911901A3 publication Critical patent/EP1911901A3/en
Application granted granted Critical
Publication of EP1911901B1 publication Critical patent/EP1911901B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/02Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic specially adapted for sustaining vegetation or for accommodating plants ; Embankment-type or crib-type noise barriers; Retaining walls specially adapted to absorb or reflect noise
    • E01F8/021Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic specially adapted for sustaining vegetation or for accommodating plants ; Embankment-type or crib-type noise barriers; Retaining walls specially adapted to absorb or reflect noise with integral support structure
    • E01F8/025Gabion-type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements

Definitions

  • the invention relates to a partition of at least one module two vertically oriented carriers and two attached between the carriers side panels to form a filling volume.
  • box-shaped boxes called gabions, made of wide-meshed steel mesh which are filled with rubble stones and serve as screens or retaining walls. Due to the wide-meshed nature of the steel mesh filling is possible only with relatively large stones.
  • the boxes have no foundation, so that they have to be sufficiently stable by their own weight, usually have a width of at least 50 cm. This has the disadvantage that they can hardly be used, for example, as fencing for a residential property, especially in densely populated areas.
  • each a grid mat is firmly bolted with known from the grid mesh fencing steel posts to form a cavity for receiving the filling. Due to the mechanical stability of the posts a narrow spatial extent in height and length is given. When filling with filler of small grain size, the use of an additional, close-meshed grid is proposed.
  • a wall device in which two grating elements arranged at a distance from one another are each screwed independently of one another on a plurality of T-carriers to mutually facing inner sides of the T-carriers.
  • the US-A-5 528 876 discloses a wall structure consisting of one of a plurality of vertically arranged grid frame, at the front and rear respectively a steel net is fixed to form a filling volume.
  • the DE-U-91 11 782 discloses a noise barrier formed of several juxtaposed modules, in which spaced, grid-shaped fabrics of steel or iron grid mats are each mounted in spaced-apart frame parts.
  • the frame parts are formed from interconnected spars, between which the strings are hung.
  • the invention is based on the object to provide a statically designed for high loads partition for receiving solid, preferably pourable materials that can be used versatile on the one hand, and on the other hand easily and inexpensively.
  • the structure should be adaptable in its dimensions to the local conditions, in particular its width should also be narrow, e.g. be executable in a width of 10 cm.
  • the clear width of the filling volume of a partition wall should be optimized. It should be filled with different solid materials of different size or grain size.
  • the field of application should include the use as a screen, fencing, retaining wall at Abböschept, foreclosure between terraced houses, border of carports or the like.
  • a dividing wall is designed as a modular construction with at least one module consisting of two vertically oriented carriers and two side parts mounted between the carriers to form a filling volume which is at least partially filled with solid filling material, in each case on both carriers at opposite receiving surfaces an end-side portion of a side part is attached, wherein the receiving surfaces and end portions fixed by bracing the end-side areas against each other and the nature of the side parts are adapted to the properties of the filling material.
  • the carriers can be formed in a manner known per se and adapted to the static conditions on site.
  • the carriers can be formed in a manner known per se and adapted to the static conditions on site.
  • such supports may be made of different materials, such as stainless steel, steel that may be protected against corrosion by galvanizing, paint, or the like, or natural materials such as stone and engineering stone-like materials such as concrete and the like. the latter being able to be reinforced, and combinations thereof.
  • the side parts can be designed to form the filling volume.
  • the side panels can be closed.
  • grids or fabrics can be used that can be made of wood, plastic, natural materials or metal depending on the expected load.
  • metal mesh such as spot welded mesh or steel mesh. These can be protected against corrosion, for example painted, passivated or provided with a protective coating or consist of corrosion-resistant material such as stainless steel. Galvanized steel meshes have proved to be particularly advantageous.
  • Solid materials such as sand, gravel, quarry stones and the like, as well as earth, which can, for example, carry a fouling, may preferably serve as filling material.
  • color pigments can serve, it can be different colored Beds from appropriate minerals are used.
  • the partitions corresponding filling materials can be selected.
  • the filling volume is completely filled according to the invention. In order to adapt to the installation situation and to achieve optical effects, the filling space may also be partially filled.
  • the attachment of the end-side regions to the outermost abutment surfaces of the carriers used is therefore advantageous for the largest possible width of the filling volume.
  • the end-side portions of two gratings are attached to a double-T carrier on the opposite sides.
  • the open and the closed side of the carrier can serve as a contact surface.
  • the side panels are not bolted directly to the carriers but only braced against each other under clamping of the wearer. In this way, almost all carrier types and materials can be used without much effort and do not need to be prepared correspondingly consuming for the appropriate use. Only means adapted to the side parts have to be provided for bracing the end regions of the side parts. Furthermore, the installation effort can be reduced on site, since such a method of attachment is largely independent of the height of the partition to be built. There are not appropriate to be provided before or on site for fixing the side parts in a screw in carrier to be provided holes. Rather, only a corresponding amount of means adapted to the height and statics for tensioning the side parts along the vertical extent of the carrier needs to be used.
  • suitable means for clamping all facilities that are able to maintain the train of the side parts under load while maintaining the filling material by maintaining a predetermined width.
  • brackets can be used to clamp the two side parts against the carrier. These may be formed in one piece and at least in each case encompass a grid bar of an end region of a grid or a corresponding recess a closed side part outside the filling volume. In this case, these brackets can be prefabricated and pre-bent of metal, for example of rod or strip material, so that they are bent on site in the state of tension or brought without further bending by approximating the side parts in the unfilled filling volume in mounting position.
  • a further embodiment of a means for clamping the two side parts can be formed by two clamps, wherein in each case a clamp attached to at least two bars of the two grids on the opposite side of the filling volume of the grid and through the filling volume with a means for clamping the two brackets connected is.
  • the means for clamping can be a screw introduced into the clamp, which finds its counter bearing in a nut arranged or attached to the other clamp.
  • the screw connection can also be formed by a threaded pin, which is screwed into the brackets introduced internal thread. It is understood that any combination of these possibilities can be interlinked. Even constructions, such as those used in formwork construction of the concrete construction trade, can be used.
  • brackets or similar bracing means can be used to avoid bulging under load of the filling material in other areas of the side parts to a predetermined spacing of these.
  • the partition of the invention comprises the use of one or more modules of the type described in more detail above, these modules can be strung together and only two side panels and a carrier are necessary to expand a partition.
  • the middle carrier serve as a receptacle for two grids of each module.
  • attachments can be provided on at least one module, which have functions that expand the usability of the partition.
  • seating, roof projections, brackets and the like may be provided.
  • functional units such as seating, shelters and the like can be designed.
  • Be particularly advantageous elements made of metal have proven that attached to the two supports, for example, screwed, braced and / or mounted, as a support for constructions with other materials such as wood, glass and / or plastics in a similar designed as for example embossed shape serve. In this way, for example, seating with steel cheeks and wood pads can be displayed.
  • roofing metal wood or plastic profiles can be attached to the partition wall, preferably on the support and be covered with appropriate roofing materials such as plates made of glass, plastic or sheets, bricks, or other roofing materials. It is understood that further attachments such as garbage containers, stop or signboards, lighting fixtures and the like are also included in the inventive idea.
  • FIG. 1 schematically shows a front view and FIG. 3 a cross section of a preferred embodiment of a module 1 of a partition wall according to the invention with two vertically oriented beams 2a, 2b, on which two side parts, designed as a steel mesh mats 5a, 5b are arranged, of which FIG. 1 only the front steel grid mat 5a is visible.
  • the beams 2a, 2b receive the steel mesh mats 5a, 5b by pressing against the beams 2a, 2b through, in FIG. 1 not shown and in FIG. 3 only indicated means 6 - such as in the FIGS. 5 and 6 shown as braces - are strained.
  • the fixing takes place by means of a frictional connection on the carriers, which depends on the surface roughness of the carriers and the end regions of the steel mesh mats with which the carrier comes into contact.
  • the mating surfaces between steel grid mats and beams may also include projections or tabs which may additionally have forces for holding or fixing the parts together.
  • the means 6 are mounted according to the required strength of the frictional connection in the necessary number. To prevent bulging of the steel lattice mats 5a, 5b, the number of necessary means 6 or differently configured means 6a between the two end-side regions along the extension of the steel lattice mats 5a, 5b distributed over the steel grid surfaces to secure a defined distance of these.
  • the carriers 2 a, 2 b can be formed from materials necessary for the necessary stability FIG. 3 It will be seen that the carrier 2a is made of solid material, for example a reinforced concrete pillar, which may be clad with natural stones, and the carrier 2b is a double-T carrier.
  • the beams 2a, 2b each have a support part 3a, 3b, to which the steel mesh mats 5a, 5b are accommodated, and a foundation part 4a, 4b, which is grounded or anchored in the ground.
  • the steel mesh mats 5a, 5b, the beams 2a, 2b and a lower boundary formed by the soil or a soil - such as in FIG. 14 shown - limit a generally open at the top, but also coverable gap, which serves as a filling volume 7 for solid, preferably pourable material.
  • the grid spacing of steel grid mats can be adapted to the grain of the filling material. It is preferably 2.5 cm. In this way can be dispensed with costly and assembly-consuming intermediate grid.
  • the steel mesh mats 5a, 5b preferably have a format between 1 to 5 meters high and up to 5 meters, preferably 2.5 meters wide.
  • the supports 2a, 2b preferably have a height of 1.5 to 6 meters and, for example, a cross section of 10x10 cm or 10x15 cm.
  • FIG. 2 schematically shows a front view and FIG. 4 a cross section through a partition 100 with two juxtaposed modules 1 ( Figure).
  • Figure 1 For such a construction of doubled length, only three carriers 2a, 2b, 2c are necessary, which can be brought to almost any length by further cultivation of modules.
  • supports 2c it may be advantageous to use supports 2c in a design whose width allows the steel mesh mats 5a, 5b to be impacted, if necessary while maintaining a desired spacing. If the carrier is to be kept small with respect to its width, two steel lattice mats 5a or 5b following one another in the length of the dividing wall 100 can also be mounted overlapping.
  • the formed filling volume of the individual modules can be completely or partially filled with filling material 7a.
  • the individual modules - even a free-standing module 1 according to the FIGS. 1 and 3 - be designed freely or identically in terms of shape and color of the filling.
  • the nature of the side panels can be varied over the individual modules.
  • a coarser grid may be used than in a subsequent module with finer grain size, or the color, such as the type of metallic luster or the metal surface, may be adapted to the character of the filling which differs from module to module.
  • modules 1 of the FIGS. 1 and 3 not only be combined in line with partitions 100. Rather, diverse, angled and adapted to the course of the terrain forms of partitions can be advantageous. In a corresponding embodiment of a carrier and partitions are conceivable in which emanating from a carrier, three or more modules. On slopes, it may be advantageous to adapt the side panels from module to module on the hillside and offset from the adjacent side walls offset in height.
  • FIG. 5 shows a preferred embodiment of a bracket 6c, preferably made of galvanized steel or stainless steel, between two opposite, vertical or horizontal aligned bars 10 of the steel grid mats 5a, 5b ( FIG. 2 ) can be used to clamp this against the carrier 2a, 2b, 2c or as a spacer against a bulging of the steel mesh mats.
  • the clip 6c can be made of round or strip material or the like and has a straight part 8 for bridging the distance between the parallel arranged, the filling volume defining steel grid mats 5a, 5b with two molded hooks 9, the rods 10 of the steel lattice mats 5a , 5b.
  • the radius of curvature of the hooks 9 is adapted to the bars 10 and the mesh size.
  • FIG. 6 shows a further preferred embodiment of a clip as a multi-part holder 6d with two profile parts 11 with the bars 10 adapted profiles 12, each engaging from the outside in one or more - in the case shown in two - bars 10 of the steel mesh mats 5a, 5b and by means of a connection , which here is a screw with a nut 13 and a screw 14, which passes through the two profile parts and braced against each other during screwing.
  • a connection which here is a screw with a nut 13 and a screw 14, which passes through the two profile parts and braced against each other during screwing.
  • the carrier 2b is designed as a double-T carrier.
  • the steel grid mats are advantageously attached to the outside of the parallel support surfaces.
  • In the inside of the carrier cheeks guided steel mesh mats must be additionally provided for bracing with an abutment on which they can be supported against each other and allow only greatly narrowed filling volumes.
  • an embodiment of an inside guide of the steel mesh mats in the carrier can be carried out if the advantages, for example an aesthetic specification, outweigh the disadvantages mentioned.
  • the double-T-carrier 2b is preferably made of galvanized steel or stainless steel.
  • FIG. 8 shows a rectangular in cross-section support 2d of a reinforcing core made of reinforced concrete and a complete veneer on its four sides is made of natural stone.
  • FIG. 9 shows a preferred embodiment of a rectangular in cross section formed carrier 2e, which is composed of two uniform natural stone elements.
  • the joined surfaces of the natural stone elements are advantageously provided with reinforcement fabric.
  • FIGS. 10, 11 and 12 show various embodiments of a foundation or attachment of the carrier 2f, 2g, 2h of a partition according to the invention in or on the ground or other ground surface.
  • FIG. 10 shows an attachment of the carrier 2f on a solid floor material 15, preferably concrete, which may also be embedded as a foundation on site already in the ground.
  • the underside of the carrier 2f is mounted on a plate 16, for example welded to the plate 16.
  • the plate 16 is firmly connected to the soil material, for example - as shown here - screwed by means of screws 17 and not shown, introduced into the soil dowels.
  • FIG. 11 shows a preferred attachment of the carrier 2g, which is embedded with the foundation part 4 in a concrete foundation. It may be advantageous to introduce the carrier 2g on site in non-hardened concrete mass and let it harden. However, the carrier can also be delivered with a factory-installed concrete foundation.
  • FIG. 12 shows one with the carrier 2f of FIG. 10 similar carrier 2h, wherein dispensed with a welding of the plate 19 and a receptacle 18 for the carrier 2h connected to the plate 19, preferably welded.
  • This embodiment has the particular advantage that even non-metallic support can be applied to an already existing on-site foundation.
  • partition walls provided with this invention can be easily degraded and made adjustable.
  • FIG. 13 shows a U-shaped spacer 6e with a bottom portion 20 and two adjoining the bottom part cheeks 21, preferably made of galvanized steel or stainless steel.
  • a plurality of these spacers 6e are attached to the underside of the steel mesh mats 5a, 5b (FIG. FIG. 1 ) and thus limit the filling volume of the partition downwards, in particular if in a corresponding installation situation the floor to the steel mesh mats has a relatively large distance. This is particularly advantageous if the filling volume of the partition should not extend to the ground, because this is about uneven or a distance of the filling volume to the soil to be met. In addition, it increases the stability of the structure according to the invention.
  • FIG. 14 shows a plan view of a section of a partition according to the invention, with the arranged in the longitudinal course of the steel mesh mats spacers 6e of FIG. 13 is provided.
  • the spacers 6e are introduced between vertical bars 10 and with their cheeks 21 in horizontal bars 22 of the mounted opposite steel lattice mats.
  • the steel mats are each provided with two parallel horizontal bars 22, between which each of the cheeks 21 (FIGS. FIG. 13 ) of the spacers are hung.
  • the spacers may also be formed lattice-shaped. With continuous attachment of these spacers along the full length of the steel mesh mats, the spacers form a bottom for receiving the bulk material.
  • FIG. 15 shows a module 1 of a partition with an attachment, which is in the form of a seat 25.
  • the seat 25 is formed from two cheeks 26 which are connected at the ends to the brackets 2a, 2b and which are spread by a plane spanned by these, which forms the seat cover in the form of boards 27 connecting the two cheeks along their length.
  • the cheeks 26 may be positively and / or frictionally connected to the carriers 2a, 2b, for example, they may be screwed, riveted, locked, braced, welded or suspended in the carrier, in which case the carrier may have corresponding recesses. It is understood that the cheeks may be supported against the ground.
  • cheeks on beams connecting the modules can also accommodate boards of adjacent modules.
  • the embodiment of this embodiment is not restrictive with respect to other advantageous attachments to see the partitions. Rather, other configurations of seating arrangements can also be provided with backrests. Other additional or alternative attachments such as roofs, billboards, information boards, storage facilities, for example, for leaflets and the like, receptacles such as waste containers can be provided. Furthermore, plant troughs can be provided, which are fastened to the carriers and / or hooked into the grids 5. Thus, it may be advantageous to connect plant troughs and seating to a unit with the partitions.
  • the plant troughs fastened to the separating grid or erected in front of it can serve as a bearing surface for the seating areas, for example in the form of the boards 27 shown.
  • the boards can be supported or secured by further cheeks 26 on the carriers or the grid 5.

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Revetment (AREA)
  • Details Of Rigid Or Semi-Rigid Containers (AREA)
  • Acyclic And Carbocyclic Compounds In Medicinal Compositions (AREA)
  • Paper (AREA)
  • Thermally Insulated Containers For Foods (AREA)

Abstract

The dividing wall has a modular structure, where at least one module (1) is composed of two vertical supports (2a,2b) with two side sections (5a) held by carriers (3a,3b) between them forming a space to be filled with a loose solid material. The sides are mesh grids, with smaller mesh openings than the granules of the loose filling. The filling material can be sand, gravel, stone fragments, etc.

Description

Die Erfindung betrifft eine Trennwand aus zumindest einem Modul zwei vertikal ausgerichteten Trägern und zwei zwischen den Trägern angebrachten Seitenteilen zur Bildung eines Füllvolumens.
Nach dem Stand der Technik gibt es kastenförmige Boxen, genannt Gabionen, aus weitmaschigem Stahlgittern die mit Bruchsteinen gefüllt sind und als Sichtschutzwände oder Stützmauern dienen.
Aufgrund der weitmaschigen Beschaffenheit der Stahlgitter ist eine Befüllung nur mit verhältnismäßig großen Bruchsteinen möglich. Die Boxen besitzen keine Gründung, so dass sie, um durch ihr Eigengewicht ausreichend standsicher zu sein, üblicherweise eine Breite von mindestens 50 cm aufweisen. Dies hat den Nachteil, dass sie z.B. als Einfriedung für ein Wohngrundstück insbesondere in dicht besiedelten Gebieten, kaum Anwendung finden können.
The invention relates to a partition of at least one module two vertically oriented carriers and two attached between the carriers side panels to form a filling volume.
According to the state of the art there are box-shaped boxes, called gabions, made of wide-meshed steel mesh which are filled with rubble stones and serve as screens or retaining walls.
Due to the wide-meshed nature of the steel mesh filling is possible only with relatively large stones. The boxes have no foundation, so that they have to be sufficiently stable by their own weight, usually have a width of at least 50 cm. This has the disadvantage that they can hardly be used, for example, as fencing for a residential property, especially in densely populated areas.

Weiterhin ist aus der DE 20 2006 004 980 U1 ein Schutzzaun mit Steinfüllung bekannt, bei dem je eine Gittermatte fest mit aus dem Gittermatten-Zaunbau bekannten Stahlpfosten zur Bildung eines Hohlraumes zur Aufnahme der Füllung verschraubt werden. Durch die mechanische Stabilität der Pfosten ist eine enge räumliche Ausdehnung in Höhe und Länge vorgegeben. Bei einer Befüllung mit Füllmaterial kleiner Körnung wird der Einsatz eines zusätzlichen, engmaschigen Gitters vorgeschlagen.Furthermore, from the DE 20 2006 004 980 U1 a protective fence with stone filling known in which each a grid mat is firmly bolted with known from the grid mesh fencing steel posts to form a cavity for receiving the filling. Due to the mechanical stability of the posts a narrow spatial extent in height and length is given. When filling with filler of small grain size, the use of an additional, close-meshed grid is proposed.

Aus der DE-U- 20 2006 003 299 ist weiterhin eine Wand-Vorrichtung bekannt, bei der zwei zueinander beabstandet angeordnete Gitter-Elemente jeweils unabhängig voneinander an einer Mehrzahl von T-Trägern jeweils an einander zugewandten Innenseiten der T-Träger angeschraubt sind.From the DE-U-20 2006 003 299 Furthermore, a wall device is known, in which two grating elements arranged at a distance from one another are each screwed independently of one another on a plurality of T-carriers to mutually facing inner sides of the T-carriers.

Die US-A-5 528 876 offenbart eine Wandstruktur bestehend aus einer eine Vielzahl von vertikal angeordneten Gitterrahmen, an deren Vorder- beziehungsweise Rückseite jeweils ein Stahlnetz unter Bildung eines Füllvolumens befestigt ist.The US-A-5 528 876 discloses a wall structure consisting of one of a plurality of vertically arranged grid frame, at the front and rear respectively a steel net is fixed to form a filling volume.

Die DE-U-91 11 782 offenbart eine aus mehreren aneinander gereihten Modulen gebildete Lärmschutzwand, bei der voneinander beabstandete, gitterförmige Bespannungen aus Stahl- oder Eisengittermatten jeweils in voneinander beabstandeten Rahmenteilen eingehängt sind. Hierzu sind die Rahmenteile aus miteinander verbundenen Holmen gebildet, zwischen denen die Bespannungen eingehängt werden.The DE-U-91 11 782 discloses a noise barrier formed of several juxtaposed modules, in which spaced, grid-shaped fabrics of steel or iron grid mats are each mounted in spaced-apart frame parts. For this purpose, the frame parts are formed from interconnected spars, between which the strings are hung.

Der Erfindung liegt die Aufgabe zu Grunde, eine statisch für hohe Beanspruchungen ausgelegte Trennwand zur Aufnahme von festen, bevorzugt schüttfähigen Materialien zu schaffen, die einerseits vielseitig einsetzbar, und andererseits einfach und kostengünstig erstellt werden kann. Der Aufbau soll in seinen Dimensionen den örtlichen Gegebenheiten anpassbar sein, insbesondere soll seine Breite auch schmal, z.B. in einer Breite von 10 cm ausführbar sein. Insbesondere soll die lichte Weite des Füllvolumens einer Trennwand optimiert werden. Sie soll mit verschiedenen festen Materialien unterschiedlicher Größe oder Körnung befüllbar sein. Der Einsatzbereich soll die Verwendung als Sichtschutzwand, Einfriedung, Stützmauer bei Abböschungen, Abschottung zwischen Reihenhäusern, Umrandung von Carports oder ähnliches umfassen.The invention is based on the object to provide a statically designed for high loads partition for receiving solid, preferably pourable materials that can be used versatile on the one hand, and on the other hand easily and inexpensively. The structure should be adaptable in its dimensions to the local conditions, in particular its width should also be narrow, e.g. be executable in a width of 10 cm. In particular, the clear width of the filling volume of a partition wall should be optimized. It should be filled with different solid materials of different size or grain size. The field of application should include the use as a screen, fencing, retaining wall at Abböschungen, foreclosure between terraced houses, border of carports or the like.

Diese Aufgabe wird erfindungsgemäß durch eine Trennwand gemäß den beigefügten Ansprüchen gelöst.This object is achieved by a partition according to the accompanying claims.

Erfindungsgemäß ist eine Trennwand als modularer Aufbau mit zumindest einem Modul bestehend aus zwei vertikal ausgerichteten Trägern und zwei zwischen den Trägern angebrachten Seitenteilen zur Bildung eines Füllvolumens, das zumindest teilweise mit festem Füllmaterial befüllt wird, ausgebildet, wobei an beiden Trägern an sich gegenüber liegenden Aufnahmeflächen jeweils ein endseitiger Bereich eines Seitenteils angebracht ist, wobei die Aufnahmeflächen und endseitigen Bereiche durch Verspannen der endseitigen Bereiche gegeneinander fixiert und die Beschaffenheit der Seitenteile an die Eigenschaften des Füllmaterials angepasst sind.According to the invention, a dividing wall is designed as a modular construction with at least one module consisting of two vertically oriented carriers and two side parts mounted between the carriers to form a filling volume which is at least partially filled with solid filling material, in each case on both carriers at opposite receiving surfaces an end-side portion of a side part is attached, wherein the receiving surfaces and end portions fixed by bracing the end-side areas against each other and the nature of the side parts are adapted to the properties of the filling material.

Dabei können die Träger in an sich bekannter Weise ausgebildet und an die statischen Gegebenheiten vor Ort angepasst sein. Beispielsweise sind für hohe Trennwände bis zu 3 Metern entsprechend vorzusehende Materialien und Bauformen zu wählen, die die Statik eines an sich bekannten verzinkten Zaunpfahls um ein weites übertreffen. Beispielsweise kann es notwendig sein, einen Doppel-T-Träger einer entsprechend ausgelegten Dimension zu verwenden, um die Trennwand für eine Hangabstützung einzusetzen oder Trennwände mit großen Bauhöhen zu verwirklichen, die ein entsprechendes Eigengewicht aufweisen und auf Witterungseinflüsse wie Windlasten in freistehender Umgebung abgestimmt sind.In this case, the carriers can be formed in a manner known per se and adapted to the static conditions on site. For example, for high partitions up to 3 meters in accordance to be envisaged materials and types to choose that exceed the statics of a known galvanized fence post by a far. For example, it may be necessary to use a double-T beam of a suitably dimensioned dimension to use the partition wall for slope support, or to realize bulkheads of high heights that are self-weighting and tuned to weather conditions such as wind loads in a freestanding environment.

Weiterhin können derartige Träger aus ästhetischen oder technischen Gründen in unterschiedlichen Materialien ausgeführt sein, wie zum Beispiel in Edelstahlausführung, Stahl, der gegen Korrosion durch Verzinkung, Farbanstrich oder dergleichen geschützt sein kann, oder aus Naturmaterialien wie Stein und technischem gesteinsähnlichen Materialien wie Beton und dergleichen, wobei letztere armiert sein können, sowie deren Kombinationen.Furthermore, for aesthetic or technical reasons, such supports may be made of different materials, such as stainless steel, steel that may be protected against corrosion by galvanizing, paint, or the like, or natural materials such as stone and engineering stone-like materials such as concrete and the like. the latter being able to be reinforced, and combinations thereof.

Je nach Ausführungsform können die Seitenteile zur Bildung des Füllvolumens ausgestaltet sein. Bei sehr feinem Material können die Seitenteile geschlossen sein. Bei gröberer Körnung können Gitter oder Gewebe, verwendet werden, die abhängig von der zu erwartenden Last aus Holz, Kunststoff, Naturstoffen oder Metall gebildet sein können. Bei der Verwendung von Schüttgut aus Steinen hat es sich als vorteilhaft erwiesen, Metallgitter einzusetzen, beispielsweise Punktschweißgitter oder Stahlgewebe. Diese können gegen Korrosion geschützt, beispielsweise lackiert, passiviert oder mit einem Schutzüberzug versehen sein bzw. aus korrosionsbeständigem Material wie Edelstahl bestehen. Als besonders vorteilhaft haben sich verzinkte Stahlgitter bewährt.Depending on the embodiment, the side parts can be designed to form the filling volume. For very fine material, the side panels can be closed. For coarser grit, grids or fabrics can be used that can be made of wood, plastic, natural materials or metal depending on the expected load. When using bulk material from stones, it has proved to be advantageous to use metal mesh, such as spot welded mesh or steel mesh. These can be protected against corrosion, for example painted, passivated or provided with a protective coating or consist of corrosion-resistant material such as stainless steel. Galvanized steel meshes have proved to be particularly advantageous.

Als Füllmaterial können bevorzugt feste Stoffe wie Sand, Kies, Bruchsteine und dergleichen aber auch Erde, die beispielsweise einen Bewuchs tragen kann, dienen. Zur Erzielung optischer Effekte können Farben, Farbpigmente dienen, es können unterschiedlich farbige Schüttungen aus entsprechenden Mineralien eingesetzt werden. Als Kontrast zu den Trennwänden können entsprechende Füllmaterialien gewählt werden. Das Füllvolumen wird erfindungsgemäß vollständig befüllt. Zur Angleichung an die Einbausituation und zur Erzielung optischer Effekte kann der Einfüllraum auch teilbefüllt sein.Solid materials such as sand, gravel, quarry stones and the like, as well as earth, which can, for example, carry a fouling, may preferably serve as filling material. To achieve optical effects colors, color pigments can serve, it can be different colored Beds from appropriate minerals are used. As a contrast to the partitions corresponding filling materials can be selected. The filling volume is completely filled according to the invention. In order to adapt to the installation situation and to achieve optical effects, the filling space may also be partially filled.

Als besonders vorteilhaft hat es sich erwiesen, wenn pro Seite lediglich ein Gitter verwendet wird, das an die Korngröße des Füllmaterials angepasst ist und für dieses undurchdringbar ist. Wird beispielsweise ein Tragegitter und ein innen liegendes Gitter zur Vermeidung einer Permeation des Füllmaterials verwendet, geht wertvolle lichte Weite des Füllvolumens verloren, das durch eine entsprechend ausladende Dicke kompensiert werden muss oder bezüglich den geforderten Eigenschaften, beispielsweise Sichtschutz, Schalldämmung und dergleichen unzureichend ist. Dies gilt ebenso für Konstruktionen, bei denen die Endbereiche des Trenngitters gegen Ausweichen in den Wangen eines Doppel-T-Trägers eingebracht sind. In der Regel können derartige Konstruktionen bei vergleichbarer Trägerausbildung nur schlecht mit Schüttgut befüllt werden.It has proved to be particularly advantageous if only one grid is used per side, which is adapted to the grain size of the filling material and is impenetrable for this. For example, if a support grid and an internal grid used to prevent permeation of the filling material, valuable clear width of the filling volume is lost, which must be compensated by a correspondingly bulky thickness or insufficient in terms of the required properties, such as privacy, sound insulation and the like. This also applies to constructions in which the end regions of the separating grid are introduced against deflection in the cheeks of a double-T-beam. As a rule, such constructions can be filled only poorly with bulk material with comparable carrier training.

Vorteilhaft für eine möglichst große lichte Weite des Füllvolumens ist daher die Befestigung der endseitigen Bereiche an den äußersten Anlageflächen der verwendeten Träger. Beispielsweise werden daher die endseitigen Bereiche zweier Gitter an einem Doppel-T-Träger an den gegenüberliegenden Seiten befestigt. Dabei kann die offene sowie die geschlossene Seite des Trägers als Anlagefläche dienen.The attachment of the end-side regions to the outermost abutment surfaces of the carriers used is therefore advantageous for the largest possible width of the filling volume. For example, therefore, the end-side portions of two gratings are attached to a double-T carrier on the opposite sides. The open and the closed side of the carrier can serve as a contact surface.

Die Seitenteile sind nicht direkt mit den Trägern verschraubt sondern lediglich gegeneinander unter Einspannung des Trägers verspannt. Auf diese Weise können nahezu alle Trägerarten und -materialien ohne großen Aufwand verwendet werden und brauchen nicht entsprechend aufwändig für den entsprechenden Einsatz vorbereitet zu werden. Es müssen lediglich auf die Seitenteile angepasste Mittel zum Verspannen der endseitigen Bereiche der Seitenteile vorgehalten werden. Weiterhin kann der Montageaufwand vor Ort reduziert werden, da eine derartige Befestigungsmethode weitgehend unabhängig von der Höhe der zu errichtenden Trennwand ist. Es sind nicht entsprechende, bei einer Verschraubung in Träger vorzusehende Löcher vorher oder vor Ort zur Fixierung der Seitenteile vorzusehen. Vielmehr braucht nur eine entsprechende, der Höhe und Statik angepasste Menge von Mitteln zur Verspannung der Seitenteile entlang der vertikalen Erstreckung der Träger verwendet zu werden.The side panels are not bolted directly to the carriers but only braced against each other under clamping of the wearer. In this way, almost all carrier types and materials can be used without much effort and do not need to be prepared correspondingly consuming for the appropriate use. Only means adapted to the side parts have to be provided for bracing the end regions of the side parts. Furthermore, the installation effort can be reduced on site, since such a method of attachment is largely independent of the height of the partition to be built. There are not appropriate to be provided before or on site for fixing the side parts in a screw in carrier to be provided holes. Rather, only a corresponding amount of means adapted to the height and statics for tensioning the side parts along the vertical extent of the carrier needs to be used.

Prinzipiell eignen sich als Mittel zum Verspannen alle Einrichtungen, die in der Lage sind unter Beibehaltung einer vorgegebenen Breite den Zug der Seitenteile bei Belastung durch das Füllmaterial aufzunehmen.In principle, suitable means for clamping all facilities that are able to maintain the train of the side parts under load while maintaining the filling material by maintaining a predetermined width.

Beispielsweise können zum Verspannen der beiden Seitenteile gegen die Träger Klammern verwendet werden. Diese können einstückig ausgebildet sein und zumindest jeweils einen Gitterstab eines endseitigen Bereichs eines Gitters oder eine entsprechende Ausnehmung einem geschlossenen Seitenteil außerhalb des Füllvolumens umgreifen. Dabei können diese Klammern aus Metall, beispielsweise aus Stangen- oder Bandmaterial vorgefertigt und vorgebogen sein, so dass sie vor Ort in den Verspannungszustand gebogen oder ohne weiteres Verbiegen durch Annähern der Seitenteile im unbefüllten Füllvolumen in Montageposition gebracht werden.For example, brackets can be used to clamp the two side parts against the carrier. These may be formed in one piece and at least in each case encompass a grid bar of an end region of a grid or a corresponding recess a closed side part outside the filling volume. In this case, these brackets can be prefabricated and pre-bent of metal, for example of rod or strip material, so that they are bent on site in the state of tension or brought without further bending by approximating the side parts in the unfilled filling volume in mounting position.

Ein weiteres Ausführungsbeispiel eines Mittels zum Verspannen der beiden Seitenteile kann durch zwei Klammern gebildet werden, wobei jeweils eine Klammer an zumindest zwei Gitterstäben der beiden Gitter an der dem Füllvolumen entgegengesetzten Seite des Gitters angebracht und durch das Füllvolumen hindurch mit einem Mittel zur Verspannung der beiden Klammern verbunden ist. Das Mittel zum Verspannen kann hierbei eine in die eine Klammer eingebrachte Schraube sein, die ihr Gegenlager in einer an der anderen Klammer angeordneten oder angebrachten Mutter findet. Die Schraubverbindung kann auch durch einen Gewindestift gebildet werden, der in die Klammern eingebrachte Innengewinde eingeschraubt wird. Es versteht sich, dass jede Kombination dieser Möglichkeiten miteinander verknüpft werden kann. Auch Konstruktionen, wie sie im Schalungsbau des Betonbauhandwerks verwendet werden, können eingesetzt werden.A further embodiment of a means for clamping the two side parts can be formed by two clamps, wherein in each case a clamp attached to at least two bars of the two grids on the opposite side of the filling volume of the grid and through the filling volume with a means for clamping the two brackets connected is. In this case, the means for clamping can be a screw introduced into the clamp, which finds its counter bearing in a nut arranged or attached to the other clamp. The screw connection can also be formed by a threaded pin, which is screwed into the brackets introduced internal thread. It is understood that any combination of these possibilities can be interlinked. Even constructions, such as those used in formwork construction of the concrete construction trade, can be used.

Es versteht sich weiterhin, dass insbesondere derartige Klammern oder ähnliche Verspannungsmittel zur Vermeidung einer Ausbauchung unter Last des Füllmaterials auch in weiteren Bereichen der Seitenteile zu einer vorgegebenen Beabstandung dieser eingesetzt werden können.It is further understood that in particular such brackets or similar bracing means can be used to avoid bulging under load of the filling material in other areas of the side parts to a predetermined spacing of these.

Die erfindungsgemäße Trennwand umfasst die Verwendung eines oder mehrerer Module der oben näher beschriebenen Art, wobei diese Module aneinander gereiht werden können und zur Erweiterung einer Trennwand nur noch zwei Seitenteile und ein Träger notwendig sind. Die mittleren Träger dienen dabei als Aufnahme für zwei Gitter je eines Moduls. Durch die Methode der Verspannung müssen dabei keine besonderen Vorkehrungen zur zusätzlichen Aufnahme von Seitenteilen getroffen werden. Vielmehr unterliegt bei der vorgeschlagenen Methode der Verspannung die Befestigung nur der Auswahl der Verspannungsmittel und der verwendeten Seitenteile.The partition of the invention comprises the use of one or more modules of the type described in more detail above, these modules can be strung together and only two side panels and a carrier are necessary to expand a partition. The middle carrier serve as a receptacle for two grids of each module. By the method of bracing while no special precautions for additional inclusion of side panels must be made. Rather, subject in the proposed method of bracing the attachment only the selection of the bracing and the side panels used.

Dadurch können in vorteilhafter Weise auch zu einander winkelig angeordnete Module vorgesehen werden. Die Seitenteile müssen also nicht in einer Linie von ca. 180° verlaufen sondern können in beliebigem Winkel zueinander angeordnet werden.This can be provided in an advantageous manner to each other angularly arranged modules. The side parts must therefore not run in a line of about 180 ° but can be arranged at any angle to each other.

Nach einem weiteren erfinderischen Gedanken können an zumindest einem Modul Anbauten vorgesehen sein, die über Funktionen verfügen, die Einsatzfähigkeit der Trennwand erweitern. Beispielsweise können Sitzgelegenheiten, Dachvorsprünge, Halterungen und dergleichen vorgesehen sein. Bei einer Kombination derartiger Anbauten können funktionelle Einheiten wie beispielsweise Sitzgruppen, Wartehäuschen und dergleichen gestaltet werden. Als besonders vorteilhaft haben sich Elemente aus Metall erwiesen, die an den beiden Trägern befestigt, beispielsweise verschraubt, verspannt und/oder eingehängt werden, die als Träger für Konstruktionen mit anderen Materialien wie Holz, Glas und/oder Kunststoffen in entsprechender gestalteter wie beispielsweise geprägter Form dienen. Auf diese Weise können beispielsweise Sitzgelegenheiten mit Stahlwangen und Holzauflagen dargestellt werden. Als Bedachungen können Metall-, Holz- oder Kunststoffprofile an der Trennwand, vorzugsweise an deren Träger angebracht werden und mit entsprechenden Bedachungsmaterialien wie Platten aus Glas, Kunststoff oder Blechen, Ziegeln, oder anderen Bedachungsmaterialien bedeckt werden. Es versteht sich, dass weitere Anbauten wie beispielsweise Müllbehälter, Anschlag- oder Hinweistafeln, Beleuchtungskörper und dergleichen ebenfalls von dem erfinderischen Gedanken umfasst sind.According to a further inventive concept attachments can be provided on at least one module, which have functions that expand the usability of the partition. For example, seating, roof projections, brackets and the like may be provided. With a combination of such attachments, functional units such as seating, shelters and the like can be designed. Be particularly advantageous elements made of metal have proven that attached to the two supports, for example, screwed, braced and / or mounted, as a support for constructions with other materials such as wood, glass and / or plastics in a similar designed as for example embossed shape serve. In this way, for example, seating with steel cheeks and wood pads can be displayed. As roofing metal, wood or plastic profiles can be attached to the partition wall, preferably on the support and be covered with appropriate roofing materials such as plates made of glass, plastic or sheets, bricks, or other roofing materials. It is understood that further attachments such as garbage containers, stop or signboards, lighting fixtures and the like are also included in the inventive idea.

Vorteilhafte Ausgestaltungen der Erfindung werden anhand der Figuren 1 bis 14 näher erläutert.Advantageous embodiments of the invention will be described with reference to FIGS. 1 to 14 explained in more detail.

Dabei zeigen:

Figur 1
ein vorteilhaftes Modul einer Trennwand in Frontansicht,
Figur 2
die Verbindung zweier Module zu einer verlängerten Trennwand in Frontansicht,
Figur 3
ein Modul im Querschnitt,
Figur 4
zwei Module im Querschnitt,
Figuren 5 und 6
zwei Ausgestaltungsbeispiele eines Mittels zum Verspannen der Seitenteile,
Figuren 7 bis 9
drei vorteilhafte Ausgestaltungsbeispiele von Trägern im Querschnitt,
Figuren 10 bis 12
drei vorteilhafte Träger in Seitenansicht,
Figur 13
eine vorteilhafte Ausgestaltungsform eines Abstandshalters zum Verbinden der Seitenteile an ihrem unteren Ende,
Figur 14
eine Anordnung von mehreren Mitteln gemäß Figur 13 aneinander
und
Figur 15
ein Beispiel für einen vorteilhaften Anbau an der Trennwand.
Showing:
FIG. 1
an advantageous module of a partition in front view,
FIG. 2
the connection of two modules to an extended partition in front view,
FIG. 3
a module in cross-section,
FIG. 4
two modules in cross-section,
FIGS. 5 and 6
two embodiments of a means for clamping the side parts,
FIGS. 7 to 9
three advantageous embodiments of carriers in cross section,
FIGS. 10 to 12
three advantageous carriers in side view,
FIG. 13
an advantageous embodiment of a spacer for connecting the side parts at its lower end,
FIG. 14
an arrangement of several means according to FIG. 13 together
and
FIG. 15
an example of an advantageous attachment to the partition.

Figur 1 zeigt schematisch eine Frontansicht und Figur 3 einen Querschnitt einer bevorzugten Ausführungsform eines Moduls 1 einer erfindungsgemäßen Trennwand mit zwei vertikal ausgerichteten Trägern 2a, 2b, an denen zwei Seitenteile, ausgeführt als Stahlgittermatten 5a, 5b angeordnet sind, von denen in Figur 1 nur die vordere Stahlgittermatte 5a sichtbar ist. Die Träger 2a, 2b nehmen die Stahlgittermatten 5a, 5b auf, indem sie gegen die Träger 2a, 2b durch, in Figur 1 nicht dargestellte und in Figur 3 nur angedeutete Mittel 6 - wie beispielsweise in den Figuren 5 und 6 als Klammern gezeigt - verspannt werden. Die Fixierung erfolgt mittels eines Reibschlusses an den Trägern, die von der Oberflächenrauhigkeit der Träger und der endseitigen Bereiche der Stahlgittermatten, mit denen der Träger in Berührung kommt, abhängt. Es versteht sich, dass die Berührungsflächen zwischen Stahlgittermatten und Träger auch Vorsprünge oder Nasen aufweisen können, die zusätzlich Kräfte zum Halten oder Fixieren der Teile aufeinander aufweisen können. Insbesondere kann es vorteilhaft sein, die Teile während der Montage aufeinander zu lagern oder zu sichern, indem sie beispielsweise in dafür in den Trägern ausgestaltete Haltenasen eingehängt werden. FIG. 1 schematically shows a front view and FIG. 3 a cross section of a preferred embodiment of a module 1 of a partition wall according to the invention with two vertically oriented beams 2a, 2b, on which two side parts, designed as a steel mesh mats 5a, 5b are arranged, of which FIG. 1 only the front steel grid mat 5a is visible. The beams 2a, 2b receive the steel mesh mats 5a, 5b by pressing against the beams 2a, 2b through, in FIG. 1 not shown and in FIG. 3 only indicated means 6 - such as in the FIGS. 5 and 6 shown as braces - are strained. The fixing takes place by means of a frictional connection on the carriers, which depends on the surface roughness of the carriers and the end regions of the steel mesh mats with which the carrier comes into contact. It will be understood that the mating surfaces between steel grid mats and beams may also include projections or tabs which may additionally have forces for holding or fixing the parts together. In particular, it may be advantageous to store or secure the parts during assembly, for example by being suspended in retaining lugs designed for this purpose in the supports.

Die Mittel 6 werden entsprechend der geforderten Festigkeit des Reibschlusses in der notwendigen Anzahl angebracht. Zur Verhinderung einer Ausbauchung der Stahlgittermatten 5a, 5b können in der Anzahl notwendige Mittel 6 oder andersartig ausgestaltete Mittel 6a zwischen den beiden endseitigen Bereichen längs der Erstreckung der Stahlgittermatten 5a, 5b zur Sicherung eines definierten Abstands dieser voneinander über die Stahlgitterflächen verteilt angebracht werden.The means 6 are mounted according to the required strength of the frictional connection in the necessary number. To prevent bulging of the steel lattice mats 5a, 5b, the number of necessary means 6 or differently configured means 6a between the two end-side regions along the extension of the steel lattice mats 5a, 5b distributed over the steel grid surfaces to secure a defined distance of these.

Die Träger 2a, 2b können aus für die notwendige Standkraft notwendigen Materialien gebildet sein, aus Figur 3 wird ersichtlich, dass der Träger 2a aus Vollmaterial, beispielsweise einem armierten Betonpfeiler, der mit Natursteinen verkleidet sein kann, besteht und der Träger 2b ein Doppel-T-Träger ist. Die Träger 2a, 2b weisen jeweils einen Tragteil 3a, 3b, an dem die Stahlgittermatten 5a, 5b aufgenommen sind und einen Gründungsteil 4a, 4b auf, der in der Erde gegründet beziehungsweise verankert ist.The carriers 2 a, 2 b can be formed from materials necessary for the necessary stability FIG. 3 It will be seen that the carrier 2a is made of solid material, for example a reinforced concrete pillar, which may be clad with natural stones, and the carrier 2b is a double-T carrier. The beams 2a, 2b each have a support part 3a, 3b, to which the steel mesh mats 5a, 5b are accommodated, and a foundation part 4a, 4b, which is grounded or anchored in the ground.

Die Stahlgittermatten 5a, 5b, die Träger 2a, 2b und eine untere Begrenzung, die vom Erdreich oder einem Boden - wie beispielsweise in Figur 14 gezeigt - begrenzen einen in der Regel nach oben offenen, aber auch abdeckbaren Zwischenraum, der als Füllvolumen 7 für festes, bevorzugt schüttfähiges Material dient. Der Gitterabstand der Stahlgittermatten kann der Körnung des Füllmaterials angepasst werden. Bevorzugterweise beträgt er 2,5 cm. Auf diese Weise kann auf kostenintensive und montageaufwändige Zwischengitter verzichtet werden. Die Stahlgittermatten 5a, 5b weisen bevorzugterweise ein Format zwischen 1 bis 5 Meter Höhe und bis zu 5 Meter, vorzugsweise 2,5 Meter Breite auf. Die Träger 2a, 2b weisen bevorzugterweise eine Höhe von 1,5 bis 6 Meter und beispielsweise einen Querschnitt von 10x10 cm oder 10x15 cm auf.The steel mesh mats 5a, 5b, the beams 2a, 2b and a lower boundary formed by the soil or a soil - such as in FIG. 14 shown - limit a generally open at the top, but also coverable gap, which serves as a filling volume 7 for solid, preferably pourable material. The grid spacing of steel grid mats can be adapted to the grain of the filling material. It is preferably 2.5 cm. In this way can be dispensed with costly and assembly-consuming intermediate grid. The steel mesh mats 5a, 5b preferably have a format between 1 to 5 meters high and up to 5 meters, preferably 2.5 meters wide. The supports 2a, 2b preferably have a height of 1.5 to 6 meters and, for example, a cross section of 10x10 cm or 10x15 cm.

Figur 2 zeigt schematisch eine Frontansicht und Figur 4 einen Querschnitt durch eine Trennwand 100 mit zwei aneinander gereihten Modulen 1 (Figur). Für einen derartigen Aufbau verdoppelter Länge sind nur drei Träger 2a, 2b, 2c notwendig, der durch weiteren Anbau von Modulen auf quasi beliebige Länge gebracht werden kann. Zur Verbindung zweier Module kann es vorteilhaft sein, Träger 2c in einer Bauart zu verwenden, deren Breite es zulässt, die Stahlgittermatten 5a, 5b auf Stoß, gegebenenfalls unter Einhaltung eines gewünschten Abstandes zu verarbeiten. Soll der Träger bezüglich seiner Breite gering gehalten werden, können zwei in der Länge der Trennwand 100 aufeinander folgenden Stahlgittermatten 5a oder 5b auch überlappend montiert werden. FIG. 2 schematically shows a front view and FIG. 4 a cross section through a partition 100 with two juxtaposed modules 1 (Figure). For such a construction of doubled length, only three carriers 2a, 2b, 2c are necessary, which can be brought to almost any length by further cultivation of modules. To connect two modules, it may be advantageous to use supports 2c in a design whose width allows the steel mesh mats 5a, 5b to be impacted, if necessary while maintaining a desired spacing. If the carrier is to be kept small with respect to its width, two steel lattice mats 5a or 5b following one another in the length of the dividing wall 100 can also be mounted overlapping.

Das gebildete Füllvolumen der einzelnen Module kann mit Füllmaterial 7a vollständig oder teilweise befüllt werden. Dabei können die einzelnen Module - auch ein freistehendes Modul 1 nach den Figuren 1 und 3 - für sich in Form und Farbe der Befüllung frei oder identisch gestaltet werden. Auch die Beschaffenheit der Seitenteile kann über die einzelnen Module variiert werden. So kann beispielsweise bei grober Körnung eines Moduls ein gröberes Gitter als in einem nachfolgenden Modul mit feinerer Körnung verwendet werden oder die Farbe wie beispielsweise Art des Metallglanzes oder - der Metalloberfläche an den Charakter der von Modul zu Modul verschiedenen Befüllung angeglichen werden.The formed filling volume of the individual modules can be completely or partially filled with filling material 7a. The individual modules - even a free-standing module 1 according to the FIGS. 1 and 3 - be designed freely or identically in terms of shape and color of the filling. Also, the nature of the side panels can be varied over the individual modules. Thus, for coarse grain size of a module, for example, a coarser grid may be used than in a subsequent module with finer grain size, or the color, such as the type of metallic luster or the metal surface, may be adapted to the character of the filling which differs from module to module.

Des weitern können die Module 1 der Figuren 1 und 3 nicht nur in Linie zu Trennwänden 100 kombiniert werden. Vielmehr können vielfältige, gewinkelte und dem Verlauf des Geländes angepasste Formen von Trennwänden vorteilhaft sein. Bei einer entsprechenden Ausgestaltung eines Trägers sind auch Trennwände vorstellbar, bei denen von einem Träger drei oder mehr Module ausgehen. In Hanglagen kann es vorteilhaft sein die Seitenteile von Modul zu Modul an die Hanglage anzupassen und gegenüber den benachbarten Seitenwänden in der Höhe versetzt anzuordnen.Furthermore, the modules 1 of the FIGS. 1 and 3 not only be combined in line with partitions 100. Rather, diverse, angled and adapted to the course of the terrain forms of partitions can be advantageous. In a corresponding embodiment of a carrier and partitions are conceivable in which emanating from a carrier, three or more modules. On slopes, it may be advantageous to adapt the side panels from module to module on the hillside and offset from the adjacent side walls offset in height.

Figur 5 zeigt eine bevorzugte Ausführungsform einer Klammer 6c, bevorzugt aus verzinktem Stahl oder Edelstahl, die zwischen zwei gegenüberliegenden, vertikal oder horizontal ausgerichteten Stäben 10 der Stahlgittermatten 5a, 5b (Figur 2) zur Verspannung dieser gegen den Träger 2a, 2b, 2c oder als Distanzhalter gegen eine Ausbauchung der Stahlgittermatten verwendet werden können. Die Klammer 6c kann aus Rund-, Bandmaterial oder dergleichen gefertigt sein und weist einen geraden Teil 8 zum Überbrücken der Distanz zwischen den parallel zueinander angeordneten, das Füllvolumen festlegenden Stahlgittermatten 5a, 5b mit zwei angeformten Haken 9 auf, die die Stäbe 10 der Stahlgittermatten 5a, 5b umgreifen. Der Krümmungsradius der Haken 9 ist den Gitterstäben 10 und der Maschenweite angepasst. Die Klammern 6c werden vorteilhafterweise vor dem Befüllen des Füllvolumens unter Vorspannung montiert. Dabei ist die Ausdehnung und Form der Haken 9 so angepasst, dass die bei der Vorspannung aufzuwendende Kraft gering und ein selbständiges Aushängen des Hakens erschwert beziehungsweise unmöglich gemacht wird.
Figur 6 zeigt eine weiter bevorzugte Ausführungsform einer Klammer als mehrteilige Halterung 6d mit zwei Profilteilen 11 mit den Gitterstäben 10 angepassten Profilen 12, die jeweils von außen in eine oder mehrere - im gezeigten Fall in zwei - Gitterstäbe 10 der Stahlgittermatten 5a, 5b eingreifen und mittels einer Verbindung, die hier eine Schraubverbindung mit einer Mutter 13 und einer Schraube 14 ist, die die beiden Profilteile durchgreift und gegeneinander beim Verschrauben verspannt.
Die Figuren 7 bis 9 zeigen unterschiedliche vorteilhafte Ausgestaltung von Trägern 2b, 2d, 2e im Querschnitt. Der Träger 2b ist als Doppel-T-Träger ausgebildet. Die Stahlgittermatten werden vorteilhafterweise an der Außenseite der parallel verlaufenden Trägerflächen befestigt. In die Innenseite der Trägerwangen geführte Stahlgittermatten müssen zum Verspannen zusätzlich mit einem Gegenlager versehen werden, an dem sie sich gegeneinander abstützen können und erlauben lediglich stark verschmälerte Füllvolumina. Für spezielle Anforderung kann aber eine Ausführung einer innenseitigen Führung der Stahlgittermatten im Träger ausgeführt werden, wenn die Vorteile, beispielsweise eine ästhetische Vorgabe, die genannten Nachteile aufwiegen. Der Doppel-T-Träger 2b besteht bevorzugterweise aus verzinktem Stahl oder Edelstahl.
FIG. 5 shows a preferred embodiment of a bracket 6c, preferably made of galvanized steel or stainless steel, between two opposite, vertical or horizontal aligned bars 10 of the steel grid mats 5a, 5b ( FIG. 2 ) can be used to clamp this against the carrier 2a, 2b, 2c or as a spacer against a bulging of the steel mesh mats. The clip 6c can be made of round or strip material or the like and has a straight part 8 for bridging the distance between the parallel arranged, the filling volume defining steel grid mats 5a, 5b with two molded hooks 9, the rods 10 of the steel lattice mats 5a , 5b. The radius of curvature of the hooks 9 is adapted to the bars 10 and the mesh size. The brackets 6c are advantageously mounted under pre-tensioning before filling the filling volume. The extent and shape of the hooks 9 is adapted so that the force to be expended during the pretensioning is low and an independent unhooking of the hook is made difficult or impossible.
FIG. 6 shows a further preferred embodiment of a clip as a multi-part holder 6d with two profile parts 11 with the bars 10 adapted profiles 12, each engaging from the outside in one or more - in the case shown in two - bars 10 of the steel mesh mats 5a, 5b and by means of a connection , which here is a screw with a nut 13 and a screw 14, which passes through the two profile parts and braced against each other during screwing.
The FIGS. 7 to 9 show different advantageous embodiment of beams 2b, 2d, 2e in cross section. The carrier 2b is designed as a double-T carrier. The steel grid mats are advantageously attached to the outside of the parallel support surfaces. In the inside of the carrier cheeks guided steel mesh mats must be additionally provided for bracing with an abutment on which they can be supported against each other and allow only greatly narrowed filling volumes. For special requirements, however, an embodiment of an inside guide of the steel mesh mats in the carrier can be carried out if the advantages, for example an aesthetic specification, outweigh the disadvantages mentioned. The double-T-carrier 2b is preferably made of galvanized steel or stainless steel.

Figur 8 zeigt einen im Querschnitt rechteckigen Träger 2d aus einem Bewehrungskem aus Stahlbeton und einer vollständigen Verblendung an seinen vier Seiten aus Naturstein gebildet ist. FIG. 8 shows a rectangular in cross-section support 2d of a reinforcing core made of reinforced concrete and a complete veneer on its four sides is made of natural stone.

Figur 9 zeigt eine bevorzugte Ausführungsform eines im Querschnitt rechteckig ausgebildeten Trägers 2e, der aus zwei gleichförmigen Natursteinelementen zusammengefügt ist. Die zusammengefügten Flächen der Natursteinelemente sind vorteilhafterweise mit Bewehrungsgewebe versehen. FIG. 9 shows a preferred embodiment of a rectangular in cross section formed carrier 2e, which is composed of two uniform natural stone elements. The joined surfaces of the natural stone elements are advantageously provided with reinforcement fabric.

Die Figuren 10, 11 und 12 zeigen verschiedene Ausführungsformen einer Gründung oder Befestigung der Träger 2f, 2g, 2h einer erfindungsgemäßen Trennwand im oder auf dem Erdreich oder einer sonstigen Bodenfläche.
Figur 10 zeigt eine Befestigung des Trägers 2f auf einem festen Bodenmaterial 15, bevorzugt Beton, das auch als Fundament bauseitig bereits im Boden eingelassen sein kann. Die Unterseite des Trägers 2f ist auf einer Platte 16 angebracht, beispielsweise mit der Platte 16 verschweißt. Die Platte 16 wird mit dem Bodenmaterial fest verbunden, beispielsweise - wie hier gezeigt - mittels Schrauben 17 und nicht gezeigten, in das Bodenmaterial eingebrachten Dübeln verschraubt.
Figur 11 zeigt eine bevorzugte Befestigung des Trägers 2g, der mit dem Gründungsteil 4 in ein Betonfundament eingelassen ist. Dabei kann es vorteilhaft sein, den Träger 2g vor Ort in nicht abgebundene Betonmasse einzubringen und diese aushärten zu lassen. Der Träger kann aber auch mit werksseitig angebrachtem Betonfundament geliefert werden.
The FIGS. 10, 11 and 12 show various embodiments of a foundation or attachment of the carrier 2f, 2g, 2h of a partition according to the invention in or on the ground or other ground surface.
FIG. 10 shows an attachment of the carrier 2f on a solid floor material 15, preferably concrete, which may also be embedded as a foundation on site already in the ground. The underside of the carrier 2f is mounted on a plate 16, for example welded to the plate 16. The plate 16 is firmly connected to the soil material, for example - as shown here - screwed by means of screws 17 and not shown, introduced into the soil dowels.
FIG. 11 shows a preferred attachment of the carrier 2g, which is embedded with the foundation part 4 in a concrete foundation. It may be advantageous to introduce the carrier 2g on site in non-hardened concrete mass and let it harden. However, the carrier can also be delivered with a factory-installed concrete foundation.

Figur 12 zeigt einen mit dem Träger 2f der Figur 10 ähnlichen Träger 2h, wobei auf eine Anschweißung der Platte 19 verzichtet und eine Aufnahme 18 für den Träger 2h mit der Platte 19 verbunden, vorzugsweise verschweißt ist. Diese Ausführung hat insbesondere den Vorteil, dass auch nichtmetallische Träger auf einem bereits bauseitig vorhandenen Fundament aufgebracht werden können. Außerdem können damit versehene erfindungsgemäße Trennwände leicht abbaubar und verstellbar ausgestaltet werden. FIG. 12 shows one with the carrier 2f of FIG. 10 similar carrier 2h, wherein dispensed with a welding of the plate 19 and a receptacle 18 for the carrier 2h connected to the plate 19, preferably welded. This embodiment has the particular advantage that even non-metallic support can be applied to an already existing on-site foundation. In addition, partition walls provided with this invention can be easily degraded and made adjustable.

Figur 13 zeigt einen U-förmigen Abstandshalter 6e mit einem Bodenteil 20 und zwei sich an das Bodenteil anschließende Wangen 21, bevorzugt aus verzinktem Stahl oder Edelstahl. In einer bevorzugten Ausführungsform einer erfindungsgemäßen Trennwand werden mehrere dieser Abstandshalter 6e an der Unterseite der Stahlgittermatten 5a, 5b (Figur 1) befestigt und begrenzen damit das Füllvolumen der Trennwand nach unten, insbesondere wenn in einer entsprechenden Einbausituation der Boden zu den Stahlgittermatten eine verhältnismäßig großen Abstand hat. Dies ist insbesondere dann vorteilhaft, wenn das Füllvolumen der Trennwand nicht bis zum Erdreich reichen soll, weil dieser etwa uneben ist oder ein Abstand des Füllvolumens zum Erdreich eingehalten werden soll. Zudem erhöht sie die Stabilität des erfindungsgemäßen Aufbaus. FIG. 13 shows a U-shaped spacer 6e with a bottom portion 20 and two adjoining the bottom part cheeks 21, preferably made of galvanized steel or stainless steel. In a preferred embodiment of a partition according to the invention, a plurality of these spacers 6e are attached to the underside of the steel mesh mats 5a, 5b (FIG. FIG. 1 ) and thus limit the filling volume of the partition downwards, in particular if in a corresponding installation situation the floor to the steel mesh mats has a relatively large distance. This is particularly advantageous if the filling volume of the partition should not extend to the ground, because this is about uneven or a distance of the filling volume to the soil to be met. In addition, it increases the stability of the structure according to the invention.

Figur 14 zeigt eine Draufsicht auf einen Ausschnitt einer erfindungsgemäßen Trennwand, die mit den im Längsverlauf der Stahlgittermatten aneinander angeordneten Abstandshaltern 6e der Figur 13 versehen ist. Dabei werden die Abstandshalter 6e zwischen vertikalen Gitterstäben 10 eingebracht und mit deren Wangen 21 in horizontale Stäbe 22 der sich gegenüberliegenden Stahlgittermatten eingehängt. Im gezeigten Ausführungsbeispiel sind die Stahlmatten jeweils mit zwei parallel angeordneten horizontalen Gitterstäben 22 versehen, zwischen die jeweils die Wangen 21 (Figur 13) der Abstandshalter eingehängt werden. Die Abstandshalter können auch gitterförmig ausgebildet sein. Bei durchgehender Anbringung dieser Abstandshalter auf der vollen Länge der Stahlgittermatten bilden die Abstandshalter einen Boden zur Aufnahme des Schüttgutes. FIG. 14 shows a plan view of a section of a partition according to the invention, with the arranged in the longitudinal course of the steel mesh mats spacers 6e of FIG. 13 is provided. The spacers 6e are introduced between vertical bars 10 and with their cheeks 21 in horizontal bars 22 of the mounted opposite steel lattice mats. In the illustrated embodiment, the steel mats are each provided with two parallel horizontal bars 22, between which each of the cheeks 21 (FIGS. FIG. 13 ) of the spacers are hung. The spacers may also be formed lattice-shaped. With continuous attachment of these spacers along the full length of the steel mesh mats, the spacers form a bottom for receiving the bulk material.

Figur 15 zeigt ein Modul 1 einer Trennwand mit einem Anbau, der in Form einer Sitzbank 25 ausgebildet ist. In dem gezeigten Ausführungsbeispiel ist die Sitzbank 25 aus zwei mit den Trägern 2a, 2b endseitig verbundenen, sich von einer von diesen aufgespannten Ebene abspreizenden Wangen 26 gebildet, die entlang ihrer Länge die Sitzauflage in Form von beide Wangen verbindenden Brettern 27 gebildet. Die Wangen 26 können mit den Trägern 2a, 2b form- und/oder reibschlüssig verbunden sein, beispielsweise können sie verschraubt, vernietet, verrastet, verspannt, verschweißt oder in die Träger eingehängt sein, wobei in diesem Fall der Träger über entsprechende Ausnehmungen verfügen kann. Es versteht sich, dass die Wangen gegen den Boden abgestützt sein können. Um Sitzgelegenheiten über mehrere Module bilden zu bilden, können Wangen an die Module verbindenden Trägern auch Bretter angrenzender Module aufnehmen. Insgesamt ist die Ausgestaltung dieser Ausführungsform nicht einschränkend in Bezug auf weitere vorteilhafte Anbauten an die Trennwände zu sehen. Vielmehr können andere Ausgestaltungen von Sitzgelegenheiten auch mit Lehnen vorgesehen sein. Weitere zusätzliche oder alternative Anbauten wie Dächer, Anschlagtafeln, Informationstafeln, Ablagemöglichkeiten beispielsweise für Prospekte und dergleichen, Aufnahmebehälter wie Abfallbehälter können vorgesehen sein. Desweiteren können Pflanztröge vorgesehen sein, die an den Trägern befestigt werden und/oder in die Gitter 5 eingehängt werden. So kann es vorteilhaft sein, Pflanztröge und Sitzgelegenheiten zu einer Einheit mit den Trennwänden zu verbinden. Dabei können in einer besonders vorteilhaften Ausgestaltung am Trenngitter befestigte oder vor diesem aufgestellte Pflanztröge als Auflagefläche für die Sitzgelegenheiten beispielsweise in Form der dargestellten Bretter 27 dienen. Die Bretter können über weitere Wangen 26 an den Trägern oder dem Gitter 5 abgestützt beziehungsweise befestigt sein. FIG. 15 shows a module 1 of a partition with an attachment, which is in the form of a seat 25. In the exemplary embodiment shown, the seat 25 is formed from two cheeks 26 which are connected at the ends to the brackets 2a, 2b and which are spread by a plane spanned by these, which forms the seat cover in the form of boards 27 connecting the two cheeks along their length. The cheeks 26 may be positively and / or frictionally connected to the carriers 2a, 2b, for example, they may be screwed, riveted, locked, braced, welded or suspended in the carrier, in which case the carrier may have corresponding recesses. It is understood that the cheeks may be supported against the ground. In order to form seating over several modules, cheeks on beams connecting the modules can also accommodate boards of adjacent modules. Overall, the embodiment of this embodiment is not restrictive with respect to other advantageous attachments to see the partitions. Rather, other configurations of seating arrangements can also be provided with backrests. Other additional or alternative attachments such as roofs, billboards, information boards, storage facilities, for example, for leaflets and the like, receptacles such as waste containers can be provided. Furthermore, plant troughs can be provided, which are fastened to the carriers and / or hooked into the grids 5. Thus, it may be advantageous to connect plant troughs and seating to a unit with the partitions. In this case, in a particularly advantageous embodiment, the plant troughs fastened to the separating grid or erected in front of it can serve as a bearing surface for the seating areas, for example in the form of the boards 27 shown. The boards can be supported or secured by further cheeks 26 on the carriers or the grid 5.

Claims (15)

  1. Partition as a modular set-up with at least one module consisting of two vertically oriented bearers (2a, 2b) and of two side parts (5a, 5b) which are mounted between the bearers, form a filling volume (7) which is filled at least partially with solid filling material, and are adapted to the properties of the filling material, wherein in each case an end region of one of the side parts is mounted on the two bearers (2a, 2b) on reception faces lying opposite one another and the reception faces and end regions are fixed to one another as a result of the bracing of the end regions, characterized in that the side parts (5a, 5b) are braced with respect to one another, clamping the bearer.
  2. Partition according to Claim 1, characterized in that the side part is a lattice and the filling material is bulk stock.
  3. Partition according to Claim 2, characterized in that the mesh width of the lattice is smaller than the grain size of the bulk stock.
  4. Partition according to one of Claims 1 to 3, characterized in that cramps (6c) are used for bracing the two side parts.
  5. Partition according to Claim 4, characterized in that the cramps (6c) are in one piece and surround in each case at least one bar of an end region outside the filling volume.
  6. Partition according to Claim 4, characterized in that in each case a cramp is arranged on at least two lattice bars of the two lattices, on that side of the lattice which is opposite to the filling volume, and is connected through the filling volume to a means for bracing the two cramps.
  7. Partition according to Claim 6, characterized in that the cramps are braced with respect to one another by means of a screw connection.
  8. Partition according to one of Claims 1 to 7, characterized in that a partition is formed by a plurality of modules lined up with one another.
  9. Partition according to Claim 8, characterized in that the modules are arranged at an angle to one another.
  10. Partition according to one of Claims 1 to 9, characterized in that at least one module has a built-on piece pointing away from the module.
  11. Partition according to Claim 10, characterized in that the built-on piece is a sitting bench.
  12. Partition according to either one of Claims 10 and 11, characterized in that the built-on piece is a roofing.
  13. Partition according to one of Claims 10 to 12, characterized in that the built-on piece is a side wall.
  14. Partition according to one of Claims 10 to 13, characterized in that the built-on piece is a plant trough.
  15. Partition according to Claim 14, characterized in that at least two plant troughs form in each case a receptacle for a sitting bench.
EP07018453A 2006-10-04 2007-09-20 Dividing wall Not-in-force EP1911901B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE202006015278 2006-10-04
DE202006016423U DE202006016423U1 (en) 2006-10-04 2006-10-20 Dividing wall for use as fencing in residential site, has side parts with end region attached at retaining surfaces of supports, where condition of side parts is adapted to characteristics of filling material
DE102007015861A DE102007015861A1 (en) 2007-04-02 2007-04-02 Modular dividing wall has two mesh sides, held by supports, with the space between them filled with loose solid materials

Publications (3)

Publication Number Publication Date
EP1911901A2 EP1911901A2 (en) 2008-04-16
EP1911901A3 EP1911901A3 (en) 2009-07-29
EP1911901B1 true EP1911901B1 (en) 2010-03-10

Family

ID=38870303

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07018453A Not-in-force EP1911901B1 (en) 2006-10-04 2007-09-20 Dividing wall

Country Status (4)

Country Link
EP (1) EP1911901B1 (en)
AT (1) ATE460543T1 (en)
DE (1) DE502007003064D1 (en)
ES (1) ES2342735T3 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT508153B1 (en) * 2009-07-15 2010-11-15 Scherf Juergen NOISE ELEMENT
IT1399328B1 (en) * 2010-03-29 2013-04-16 Top Ct Porfido S R L MODULAR PANEL IN GRANULES OF RESINED STONE.
US8567475B2 (en) 2011-05-04 2013-10-29 Kenneth Eugene Boone Overhead gate systems
DE102016005247A1 (en) * 2016-04-29 2017-11-02 Bellissa Haas GmbH grid connector
GB2552658A (en) * 2016-08-01 2018-02-07 Crh Fencing & Security Group (Uk) Ltd Double sided wire mesh security fence

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9111782U1 (en) * 1991-09-22 1992-01-16 Ökustik GmbH, 6720 Speyer Noise barrier consisting of a plurality of frame parts
US5528876A (en) * 1994-05-09 1996-06-25 Lu; Sin-Yuan Wall structure for buildings
DE20113388U1 (en) * 2001-08-11 2001-10-18 Vos, Martin de, 46397 Bocholt Noise barrier made of fence elements
DE202006003299U1 (en) * 2006-03-02 2006-05-11 Führle, Gottfried Method for constructing wire mesh cage for infill retaining wall has the mesh frame secured by attached vertical profile supports with lower ends embedded into concrete
DE202006004980U1 (en) 2006-03-27 2006-06-14 Hens, Reinhold Protective fence used as a visual, wind and sound protective fence comprises trellis mats screwed to both sides of a steel post with the hollow space produced filled with rolled, lava or basalt gravel or other suitable filler material

Also Published As

Publication number Publication date
ES2342735T3 (en) 2010-07-13
EP1911901A2 (en) 2008-04-16
EP1911901A3 (en) 2009-07-29
ATE460543T1 (en) 2010-03-15
DE502007003064D1 (en) 2010-04-22

Similar Documents

Publication Publication Date Title
EP1925739B1 (en) Wall with panels and posts
EP1911901B1 (en) Dividing wall
DE202008012263U1 (en) Wall covering with filling material
DE202006016423U1 (en) Dividing wall for use as fencing in residential site, has side parts with end region attached at retaining surfaces of supports, where condition of side parts is adapted to characteristics of filling material
DE202007016495U1 (en) Wall with panels and posts
DE202006017921U1 (en) Wall comprises boards spaced from one another with filling inbetween and fixed by screw clamp to wire lattice posts anchored in ground
EP2163706A2 (en) Wall cladding with filling material
DE102008024459A1 (en) Two-shell component for constructing plantable steep slopes formed of several layers
DE102009037978B4 (en) Shoring for a photovoltaic open-space plant and method for mounting a shoring
DE102007015861A1 (en) Modular dividing wall has two mesh sides, held by supports, with the space between them filled with loose solid materials
EP2302145B1 (en) Gabion
EP3346058A1 (en) Gabion wall module and method for producing a gabion wall with at least one gabion wall module
DE202005018509U1 (en) Fence has mesh grids supported on posts to define interspace filled with bulk loose materials such as natural stones
EP1739250B1 (en) Support for hanging a façade covering with metal wire basket
DE202009015905U1 (en) Noise barrier in combination with photovoltaic modules
DE102009041730A1 (en) Bracket for fixing at least one panel to a mounting base
DE102006055635A1 (en) Wall for protecting visibility, sound and wind has panels forming two sides of a wall and posts anchored on the side of a base and set with a clearance from each other in the longitudinal direction of the wall
DE102009041731A1 (en) Wall pillar for use in private garden, has fastening areas with opening formed as non-circular opening, elongated hole or round hole, and reference area with metal foil recess to watch filling material received at wall filling space
DE19938676A1 (en) Sound protection wall, in particular, for driveways comprises a frame which is attached to foundation and supports noise protection plates held against the frame
DE202007012268U1 (en) Screen wall
AT512570A2 (en) Railing and walkable roof
DE202012101217U1 (en) inclined structure
DE3332076A1 (en) Noise protection wall made of refuse material
DE202011103216U1 (en) Mount for waters with a riverbank
DE202016008259U1 (en) Support device with a mesh lattice box

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

RIC1 Information provided on ipc code assigned before grant

Ipc: E04B 2/68 20060101AFI20080110BHEP

Ipc: E01F 8/02 20060101ALI20090625BHEP

17P Request for examination filed

Effective date: 20090707

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 502007003064

Country of ref document: DE

Date of ref document: 20100422

Kind code of ref document: P

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20100310

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2342735

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20100310

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100611

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100610

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100710

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100712

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

26N No opposition filed

Effective date: 20101213

BERE Be: lapsed

Owner name: STONES & MORE G.M.B.H. & CO. KG

Effective date: 20100930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20110920

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110920

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100911

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100310

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20120924

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20120924

Year of fee payment: 6

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20150708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130920

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130921

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20180925

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20190923

Year of fee payment: 13

Ref country code: IT

Payment date: 20190920

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20190924

Year of fee payment: 13

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 460543

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190920

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190920

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200930

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200930

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20221018

Year of fee payment: 16

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200920

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502007003064

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES