EP1886265A1 - Procede pour planifier, documenter et effectuer la maintenance d'installations ou similaires - Google Patents
Procede pour planifier, documenter et effectuer la maintenance d'installations ou similairesInfo
- Publication number
- EP1886265A1 EP1886265A1 EP06725502A EP06725502A EP1886265A1 EP 1886265 A1 EP1886265 A1 EP 1886265A1 EP 06725502 A EP06725502 A EP 06725502A EP 06725502 A EP06725502 A EP 06725502A EP 1886265 A1 EP1886265 A1 EP 1886265A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- information
- modules
- variants
- maintenance
- collected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
Definitions
- the invention relates to a method for planning, documentation and implementation of the maintenance of equipment or the like and for documentation and description of equipment or the like.
- the object of the invention is to propose a method which allows an in-depth and comprehensive planning of systems or the like and also provides detailed documentation, instructions, maintenance, resource and cost plans, as well as sound statements about the availability of the respective system. This object is achieved in that the essential information about all modules of the system are brought together.
- the information about assemblies and variants of assemblies include maintenance intervals, triggering events, maintenance periods and / or downtimes of the respective assembly or variant.
- upcoming maintenance or soon due service work which may include, for example, the replacement of parts, put on operational downtime of the equipment.
- the conditions of use can be essential factors for the evaluation of the collected information. For example, it is conceivable that under certain conditions of use, for example, the wear or the maintenance intensity of certain assemblies increases. This can be taken into account for the scheduled maintenance, cost, resources, etc. Also, it can be optimized to minimize wear or maintenance.
- Another very advantageous embodiment of the invention lies in the fact that by linking the information collected, in particular from the information about the modules assigned to a system or variants of modules and associated with the modules or variants of modules information individually to the respective system tailored documentation is created.
- Another very advantageous embodiment of the invention lies in the fact that by linking the information collected, in particular from the information about the modules assigned to a system or variants of modules and associated with the modules or variants of modules information individually to the respective system tailored maintenance plans are created.
- Such maintenance plans can not only consider plant-specific conditions, but also special operating conditions.
- Another very advantageous development of the invention is also to be seen in the fact that by linking the information collected, in particular from the information about a system associated assemblies or variants of modules and associated with the modules or variants of modules information individually on the tailored plant spare parts requirements planning are created.
- Another very advantageous development of the invention is also to be seen in that individually by linking the collected information, in particular from the information about a plant associated assemblies or variants of modules and the assemblies or variants of modules information on the specific calculations are made on default probabilities.
- An extremely advantageous embodiment of the invention is also present when the method is carried out on a computer.
- the management of the collected data is considerably simplified by the use of a database system.
- Another very advantageous embodiment of the invention is also to be seen in the fact that the method as a link between conventional maintenance planning, Documentation systems, editorial systems, manufacturing and the respective users and service technicians is trained.
- the maintenance work to be carried out can, if possible, be planned for precisely these downtimes in order to avoid additional downtimes as far as possible.
- plans can be drawn up which, in the case of certain work in progress, assign other, soon to be completed works that are only executed when these first works have been carried out. In this way, the workflows can be significantly optimized, even when maintenance is required.
- the operation of the plant can be optimized, for example, in terms of throughput and / or maintenance frequency on the basis of the collected information and the calculated probabilities for, for example, failure frequencies.
- documentation and / or maintenance documents can essentially be created at the touch of a button and, if necessary, transferred to other programs for further processing.
- the documentation can be further processed and made accessible by means of a publishing system, in particular a desktop publishing system.
- All plans drawn up in the planning phase can continue to be used after the construction and delivery of the system and allow the plant to be operationally controlled with regard to relevant parameters, but also with regard to work and maintenance etc.. Furthermore, already performed maintenance and events can be integrated into the process, so that they can be taken into account for upcoming events, maintenance, failure probabilities or cost, spare parts and personnel planning. In addition, machine conditions required for the work can be taken into account.
- the maintenance data can be passed, for example, to various maintenance systems.
- the aforementioned maintenance also includes repairs and repairs or the like.
- the maintenance planning can also be adjusted by variants formed to different environmental or operating conditions, such as on different processed materials or the like.
- the method according to the invention relates not only to the maintenance planning but also to the documentation or description of the plant or of plant components.
- specific service information can be added or provided for the respective maintenance work.
- one-time inputs are not only usable for a system, but due to the modularization and variant formation universally applicable to a variety of systems, so that the amount of work for the provision of information for the respective individual system is reduced. This has been one of the biggest problems, especially in individual manufacturing plants, for example for the automotive industry. Up to now, it has only been possible to integrate the necessary maintenance requirements into a conventional maintenance planning system with great effort. There was still no documentation and service information available that was mostly managed in other systems such as SAP. Traditional maintenance planning was often done with SAP PM / CS.
- the process according to the invention often eliminates the need for the most extensive, comprehensive description and service information libraries which were very difficult to handle. Rather, the equipment manufacturers were approached with questions and asked for information. This is rendered unnecessary by the integration and demand-based information compilation made possible by the method according to the invention, which saves considerable costs both on the part of the plant manufacturer and on the part of the plant operator. In addition, system downtimes are shortened because the information is available immediately and without waiting times.
- the method according to the invention enables the complete integration of planning, production, documentation, operation and maintenance of installations by adding to each At any point in time, the necessary information can be easily filtered out of a complete database and made available.
- inventive method also allows feedback from the plant operation to the manufacturer, so that lessons learned from this can be incorporated into the construction of new facilities.
- These new systems can thus be optimized with regard to service friendliness, downtimes etc.
- the method according to the invention makes it possible to obtain useful feedback only through the extensive collection of information, operating data and events, by means of which the maintenance strategy and / or the operating parameters can be constantly optimized even in the case of already existing systems.
- the method relies on data obtained from sensors as well as data entered by operating and service personnel.
- TCO total cost of ownership
- the Total Cost Of Ownership also includes damage events and repairs.
- estimated damage incidents and their repair duration are determined in accordance with the individual data recorded for each individual component.
- a mean error probability (MTBF) of the component and also of the entire system can be determined.
- MTBF mean error probability
- an O-ring can be installed in an assembly, which usually has a service life of 1000 operating hours.
- an early change of the O-ring can be planned as part of the overall planning and, on the other hand, the cost of the change (MTTR) can be taken into account and included in the TCO.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200510015023 DE102005015023A1 (de) | 2005-03-31 | 2005-03-31 | Verfahren zur Planung, Dokumentation und Durchführung der Wartung von Anlagen oder dergleichen |
PCT/EP2006/061256 WO2006103296A2 (fr) | 2005-03-31 | 2006-03-31 | Procede pour planifier, documenter et effectuer la maintenance d'installations ou similaires |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1886265A1 true EP1886265A1 (fr) | 2008-02-13 |
Family
ID=36698772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP06725502A Ceased EP1886265A1 (fr) | 2005-03-31 | 2006-03-31 | Procede pour planifier, documenter et effectuer la maintenance d'installations ou similaires |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1886265A1 (fr) |
DE (1) | DE102005015023A1 (fr) |
WO (1) | WO2006103296A2 (fr) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2503422A3 (fr) * | 2011-03-23 | 2017-03-08 | Robert Bosch GmbH | Procédé de fonctionnement et d'entretien d'un système de production de chaleur et/ou de froid |
DE102013226186A1 (de) | 2013-12-17 | 2015-06-18 | Evonik Industries Ag | Verfahren zur Instandhaltung von Betriebsmitteln großtechnischer Anlagen oder Fabrikationsstätten |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2667413B1 (fr) * | 1990-09-28 | 1994-08-26 | France Etat Armement | Procede et dispositif electronique de surveillance et d'archivage d'informations concernant les ensembles et sous-ensembles electroniques, electriques, mecaniques. |
DE10117809A1 (de) * | 2001-04-10 | 2002-10-17 | Bosch Gmbh Robert | System und Verfahren zum Erfassen von Informationen |
-
2005
- 2005-03-31 DE DE200510015023 patent/DE102005015023A1/de not_active Withdrawn
-
2006
- 2006-03-31 WO PCT/EP2006/061256 patent/WO2006103296A2/fr not_active Application Discontinuation
- 2006-03-31 EP EP06725502A patent/EP1886265A1/fr not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
DE102005015023A1 (de) | 2006-10-12 |
WO2006103296A2 (fr) | 2006-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE202016008937U1 (de) | Systeme zur Analyse von Herstellungsparametern | |
DE102019209110A1 (de) | Industrielle Anlage, insbesondere Anlage der metallerzeugenden Industrie oder der Aluminium- oder Stahlindustrie und Verfahren zum Betreiben einer industriellen Anlage, insbesondere einer Anlage der metallerzeugenden Industrie oder der Aluminium- oder Stahlindustrie | |
EP2574997B1 (fr) | Procédé de réglage d'un état de fonctionnement | |
WO2009015885A1 (fr) | Procédé et système pour établir un plan de production destiné à une installation de production | |
EP3623890A1 (fr) | Procédé de surveillance d'une pluralité d'installations techniques | |
EP1886265A1 (fr) | Procede pour planifier, documenter et effectuer la maintenance d'installations ou similaires | |
DE102017005674B4 (de) | Zellenfertigungssystem mit Fertigungszelle für autonome Fertigung | |
EP3951524A1 (fr) | Procédé de fonctionnement d'un système et système couplé doté d'un nombre de stations de production destinés à la fabrication d'un produit | |
DE10258655A1 (de) | Verfahren und System zur dynamischen, modellbasierten Planung und Optimierung von Produktionsprozessen, sowie zur Ablaufplanerstellung | |
DE10102051A1 (de) | Verfahren zur Planung einer Reparatur von mobilen Arbeitsmaschinen | |
EP2574996B1 (fr) | Procédé de détermination de l'état de la charge partielle d'un système | |
EP0852769B1 (fr) | Procede permettant l'ordonnancement et/ou l'activation de ressources en fonction de la situation | |
DE102008063684A1 (de) | Basisaktivität, Verfahren zur Bestimmung von Basisaktivitäten sowie ein Verfahren und System zur automatisierten Generierung von Workflows | |
DE102007031693A1 (de) | Basisaktivität, Verfahren zur Bestimmung von Basisaktivitäten sowie ein Verfahren und System zur automatisierten Generierung von Workflows | |
WO2003056480A2 (fr) | Procede et systeme permettant une planification dynamique et fondee sur modeles et une optimisation de processus de production, ainsi que l'elaboration de plans de deroulement | |
EP1839240A1 (fr) | Procede et module d'ordonnancement | |
EP1380908A2 (fr) | Système pour la configuration automatique de logiciel de commande | |
DE102021201887A1 (de) | System, Verfahren und Computerprogramm zur betriebswirtschaftlichen Optimierung eines Prozesses in einer Produktionsanlage, insbesondere einer Produktionsanlage der metallerzeugenden Industrie, der nicht-Eisen- oder Stahlindustrie oder der Vorlegierungsherstellung | |
EP1527400A1 (fr) | Procede de commande assistee par ordinateur de processus de production | |
DE102021210234A1 (de) | System, Verfahren und Computerprogramm zur Optimierung eines Herstellungsprozesses in einer industriellen Produktionsanlage, insbesondere einer Anlage der metallerzeugenden Industrie, der nicht-Eisen- oder Stahlindustrie oder der Vorlegierungsherstellung | |
EP1610194A2 (fr) | Procédé et système pour fournir, selon le contexte, des informations sur des produits | |
DE10202624B4 (de) | System zur zentralen Verwaltung, Speicherung und Bereitstellung von Informationen über Bauteile eines Herstellungsprozesses sowie dessen Verwendung | |
DE102007060281A1 (de) | Verfahren und Einrichtung zur selektiven Ausgabe von Alarmmeldungen eines technischen Anlagenbetriebes | |
EP1093038B1 (fr) | Dispositif et procédé de traitement des données importantes pour contrôler le processus d'une installation technique | |
DE102015116305A1 (de) | Werkzeugmaschinenauftragsverwaltungsvorrichtung |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20071031 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
17Q | First examination report despatched |
Effective date: 20080331 |
|
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED |
|
18R | Application refused |
Effective date: 20090530 |