EP1870559A2 - A two-stage rock bolt and method of use - Google Patents

A two-stage rock bolt and method of use Download PDF

Info

Publication number
EP1870559A2
EP1870559A2 EP07011898A EP07011898A EP1870559A2 EP 1870559 A2 EP1870559 A2 EP 1870559A2 EP 07011898 A EP07011898 A EP 07011898A EP 07011898 A EP07011898 A EP 07011898A EP 1870559 A2 EP1870559 A2 EP 1870559A2
Authority
EP
European Patent Office
Prior art keywords
rock bolt
rock
anchor
tendon
grout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP07011898A
Other languages
German (de)
French (fr)
Other versions
EP1870559A3 (en
EP1870559B1 (en
Inventor
David James Fergusson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Minova Australia Pty Ltd
Original Assignee
Industrial Roll Formers Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2006903352A external-priority patent/AU2006903352A0/en
Application filed by Industrial Roll Formers Pty Ltd filed Critical Industrial Roll Formers Pty Ltd
Priority to EP09010175A priority Critical patent/EP2110511A1/en
Priority to PL07011898T priority patent/PL1870559T3/en
Publication of EP1870559A2 publication Critical patent/EP1870559A2/en
Publication of EP1870559A3 publication Critical patent/EP1870559A3/en
Application granted granted Critical
Publication of EP1870559B1 publication Critical patent/EP1870559B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • E21D21/0046Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts formed by a plurality of elements arranged longitudinally
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • E21D21/0066Anchoring-bolts formed by a bundle of radially arranged rigid elements

Definitions

  • the present invention relates to tunnelling through rock subject to squeezing, and to a two-stage rock bolt suitable for use in such tunnelling.
  • the genesis of the present invention is a desire to provide both a method whereby such tunnelling can be carried out, a two-stage rock bolt for use in carrying out the method, and a method of tensioning the two-stage rock bolt.
  • a two-stage rock bolt for use in rock subject to squeezing, said rock bolt comprising a tendon, a first anchor means adapted to be anchored in a hole in said rock, and having associated therewith a pinch means through which said tendon can pass by deforming, a second anchor means including a trigger means and carried by said tendon adjacent said first anchor means, and an elongate release extending alongside said tendon from said trigger means beyond said rock, said release being operable to activate said trigger means to thereby actuate said second anchor means.
  • a method of grouting a rock bolt in a blind hole where a hollow breather tube is located alongside the rock bolt and extends between opposite ends of the hole to allow escape of air from the closed end of hole as grout is inserted into the open end of the hole said method being characterised by the step of:
  • a tunnel 1 is excavated from rock 2 which is the subject of squeezing forces indicated by arrows A.
  • steel plates 4 are located over the interior surface of the tunnel, each of the plates 4 being held in position by means of a two-stage rock bolt 5.
  • Each rock bolt 5 is positioned in a blind hole 6 which is drilled radially into the rock 2.
  • the rock bolts 5 are two-stage rock bolts in that the first stage which arises immediately after installation of the rock bolts 5 permits the intended small movement of the rock 2 so as to carry out the squeezing to the requisite extent. Thereafter, once the gaps 8 have been eliminated, the rock bolt is tensioned to its final tension which is intended to ensure that no further squeezing of the rock 2 takes place.
  • the steel plates 4 are edge abutted one against the other and thus form a suitable boundary which can be used for formwork for a concrete lining 9 indicated by broken lines in Fig. 2 and which is intended to provide the final support for the walls of the tunnel 1.
  • the steel plates 4 can support formwork which is used in the construction of the concrete lining 9.
  • Each of the rock bolts 5 in Figs. 1 and 2 has a leading end 11 and a trailing end 12.
  • Fig. 3 a longitudinal cross-section through the leading end 11 of the rock bolt 15 of a first embodiment is illustrated.
  • the rock bolt 15 has a tendon 16 formed from a cable fabricated from steel wires.
  • a portion of the tendon 16 intermediate two annular washers 17, 18 is provided with a tube 19, for example made from plastics material such as irrigation pipe extruded in high density polyethylene (HDPE).
  • HDPE high density polyethylene
  • a grout tube 21 passes through the trailing washer 17.
  • a secondary tube 22 also passes through both washers 17 and 18 and a pull cord 23 passes through the secondary tube 22.
  • the leading washer 18 is mounted on a pinch tube 25 (of the general type illustrated in Fig. 3 of US Patent No. 7,037, 046 ) which has a constricted interior passage 26 which is substantially S-shaped.
  • the pinch tube 25 is longitudinally split so as to be formed from two portions which are clamped together about the tendon 16 and held in position by means of two keeper rings 27, 28.
  • a barrel 30 Abutting the pinched tube 25 is a barrel 30 which has a tapered interior 31 which matches the taper on a frusto-conical wedge 40 which surrounds the tendon 16.
  • the leading end of the barrel 30 is machined with an annular groove 33.
  • a transversely split annular keeper 34 has a re-entrant annular flange 35 which is retained in the groove 33.
  • the two parts of the annular keeper 34 overlap and are provided with two pairs of aligned orifices through each pair of which a corresponding pin 36A (Fig. 3 or 36B Fig. 5) is retained by means of a friction fit.
  • Within the keeper 34 an O-ring 37 is retained in compression.
  • annular keeper 34 clamps on the wedge 40 and retains same in position with the internal diameter of the passage through the wedge 40 being sufficient to permit the tendon 16 to slide relative to the wedge 40.
  • An important function of the intact keeper 34 is to maintain separation between the locking taper of the wedge 40 and the barrel 30.
  • the pull cord 23 is bifurcated (Fig.6) and one portion thereof 23A is connected to the pin 36A illustrated in Fig. 3.
  • Fig. 4 the trailing end 12 of the rock bolt 15 is illustrated.
  • the trailing end of the tendon 16 passes through a central aperture 42 in the steel plate 4.
  • Abutting against the steel plate 4 is a conventional locking mechanism in the form of an internally tapered barrel 130 and a frusto-conical wedge 140 which are capable of clamping the tendon 16 so as to place same in tension.
  • the grout tube 21 passes through a corresponding opening in the plate 4 and a similar opening is provided for the pull cord 23.
  • the leading end 11 of the first embodiment of the rock bolt 15 is passed into the hole 6 to the maximum extent permitted by the length of the tendon 16.
  • the two annular washers 17 and 18 ensure that the tendon 16 is approximately centred in the blind hole 6 and also define an interior space into which grout is pumped in the direction of arrows B in Fig. 4 and C in Fig. 3.
  • the grout fills the volume between the two washers 17 and 18 and thus provides a first anchor which retains the pinch tube 25 in position.
  • the tendon 16 can be lightly tensioned and locked by means of the barrel 130 and wedge 140, thereby completing the installation process.
  • the steel plate 4 is moved to the left as seen in Fig. 4 thereby increasing the tension within the tendon 16 and forcing the tendon 16 through the interior passage 26 of the pinch tube 25.
  • This requires the tendon 16 to be deformed, and preferably elastically deformed, and typically increases the tension within the tendon 16 to approximately 50kN.
  • the pull cord 23 can be manually tugged so as to dislodge both pins 36A and 36B which retain the annular keeper 34.
  • the annular keeper 34 which now consists of two separate parts radially expands under the urging of the resilient O-ring 37 thereby permitting the wedge 40 to enter into the barrel 30 under the influence of the tension within the tendon 16. That is to say, the wedge 40 and barrel 30 are permitted by the rupturing of the keeper 34 to come closer together to form a second anchor which securely grasps the tendon 16 and is capable of withstanding significant tension, for example up to 300kN.
  • further squeezing movement of the rock 2 is prohibited and the steel plates 4 remain in their abutting configuration illustrated in Fig. 2 but do not move inwardly any further.
  • the significant tension in the tendon 16 can be created using a substantially conventional cable jack.
  • a second embodiment of the rock bolt 5 is illustrated in Fig. 5 and takes the form of a rock bolt 115, only the leading end 111 being illustrated.
  • the tendon 16, pull cord 23, pinch tube 25, barrel 30, annular keeper 34 and wedge 40 are as before.
  • a mechanical or point anchor 50 is provided.
  • the anchor 50 consists of an outer shell 51 which is preferably longitudinally split into three portions and which has a serrated exterior surface 52.
  • Located within the shell 51 is a tapered collet 53 which is urged to the left as seen in Fig. 5 by means of a spring 54 retained between a washer 55 and a nut 56.
  • the collet 53 is shaped to mate with the pinch tube 25.
  • the initial tension created within the tendon 16 following installation of the rock bolt 115 expands the shell 51 thereby anchoring the anchor 50 relative to the blind hole 6.
  • the pinch tube 25 is fixed relative to the hole 6 in the same way that the grout of Fig. 3 fixes the pinch tube 25 relative to the hole 6 in the embodiment of Fig. 3.
  • a breather tube 91 is provided which extends through the plate 4 and through the washer 18. That is, the leading end of the breather tube 91 terminates in the space between the two washers 17, 18 which is to be filled with grout (not illustrated).
  • the breather tube 91 has a pair of insulated wires 92 which run the length of the breather tube 91 and terminate at its leading end in a pair of electrical contacts 93.
  • the wires 92 terminate in a battery 98 and a light 99 preferably in the form of a light emitting diode (LED).
  • the apparatus of Fig. 6 functions as follows: Grout is pumped into the grout tube 21 as indicated by arrow B and exits from the grout tube 21 between the washers 17, 18 as indicated by arrow C. As a consequence air is expelled from between the washers 17, 18 entering the breather tube 91 as indicated by arrow D and exiting the breather tube to the rear of the plate 4 as indicated by arrow E.
  • the grout would exit from the breather tube 92 (as indicated by arrow E) thereby signalling that no more grout should be pumped into the grout tube 21.
  • the overall length of the rock bolt 215 is larger (typically 30 metres or so) the resistance of the breather tube 92 to grout passing through it prevents this simple system from working satisfactorily. Instead, grout makes its way past one or both of the washers 17, 18 into places where it is not wanted and grout continues to be pumped into the grout tube 21 for want of a stop signal.
  • Such a stop signal is provided by the wires 92.
  • the grout which is preferably water based
  • the grout conducts sufficient electric current to activate the LED 99. This signals that the pumping of the grout should stop because the space between the washers 17, 18 is now full of grout.
  • the grout tube 21, pull cord 23 and breather tube 91 are preferably not located in the one vertical plate as indicated in Fig. 6 but are preferably radially spaced with approximately 120° spacing relative to the longitudinal axis of the tendon 16.
  • the contacts 93 preferably are placed in the upper most portion of the space between the washers 17, 18 to ensure that the grout which enters into this portion of the space reaches the contacts 93 last.
  • the tendon 16 is provided by means of a cable, the tendon 16 could equally be a solid rod or a tube.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A rock bolt (15, 115, 215) able to withstand two levels of tension within its tendon (16) is disclosed. The rock bolt is used in a tunnel (1) where the rock is subject to squeezing. After an initial installation with initial tension, plates (4) carried by the rock bolts are permitted to be squeezed together. Then a higher tension is created in the tendons (16) and the plates used to construct a concrete lining (9). The rock bolt preferably has first and second anchors. The first anchor can be chemical (grout) or mechanical (50). The second anchor (30, 40) is able to be triggered (36) by a pull chord (23) after the initial squeezing has taken place. An electric circuit (92, 93) is located in a breather tube (91) to signal that no more grout should be inserted via a grout tube (21).

Description

    Field of the Invention
  • The present invention relates to tunnelling through rock subject to squeezing, and to a two-stage rock bolt suitable for use in such tunnelling.
  • Background Art
  • In some localities such as the Alps in Europe, the rock formations are not static. Instead, in the event that a tunnel is driven through the rock, then the rock is subject to "squeezing". What this means is that the rock is to some extent plastic and moves under the force or pressure applied to the rock by the overlying strata in such a way as to squeeze or reduce the cross-sectional area of the tunnel. Naturally, such rock strata is fraught with difficulty for tunnellers and is normally avoided. As a consequence, either tunnels for transport purposes, or tunnels for mining purposes, have generally hitherto not being built in such rock strata.
  • Genesis of the Invention
  • The genesis of the present invention is a desire to provide both a method whereby such tunnelling can be carried out, a two-stage rock bolt for use in carrying out the method, and a method of tensioning the two-stage rock bolt.
  • Summary of the Invention
  • In accordance with a first aspect of the present invention there is disclosed a method of preparing for concrete lining a tunnel through rock subject to squeezing, said method comprising the steps of:
    1. (i) if necessary, forming said tunnel,
    2. (ii) placing a plurality of spaced apart plates over the interior of said tunnel, each of said plates being secured by a two-stage rock bolt,
    3. (iii) allowing said squeezing rock to initially deform said rock bolts and drive said plates into edge abutment,
    4. (iv) placing said rock bolts into a final tensioned condition, and
    5. (v) using said edge abutting plates to comprise, or support, formwork for said concrete lining.
  • In accordance with a second aspect of the present invention there is disclosed a two-stage rock bolt for use in rock subject to squeezing, said rock bolt comprising a tendon, a first anchor means adapted to be anchored in a hole in said rock, and having associated therewith a pinch means through which said tendon can pass by deforming, a second anchor means including a trigger means and carried by said tendon adjacent said first anchor means, and an elongate release extending alongside said tendon from said trigger means beyond said rock, said release being operable to activate said trigger means to thereby actuate said second anchor means.
  • In accordance with a third aspect of the present invention there is disclosed a method of tensioning a two-stage rock bolt, said method comprising the steps of:
    1. (i) installing said rock bolt in a blind hole drilled in rock subject to squeezing,
    2. (ii) activating a first anchor carried adjacent the tip of said rock bolt,
    3. (iii) allowing tension to a first extent to be created in said rock bolt,
    4. (iv) activating a second anchor carried adjacent said first anchor, and
    5. (v) allowing tension in excess of said first extent to be created in said rock bolt.
  • In accordance with a fourth aspect of the present invention there is disclosed a method of grouting a rock bolt in a blind hole where a hollow breather tube is located alongside the rock bolt and extends between opposite ends of the hole to allow escape of air from the closed end of hole as grout is inserted into the open end of the hole, said method being characterised by the step of:
    1. (i) inserting an electric circuit into said breather tube and extending beyond the end thereof,
    2. (ii) said electric circuit including an indicator means at said open end of said hole and a sensor means at said closed end of said hole, said sensor means being activated by said grout reaching same to thereby indicate that said grout insertion should close.
    Brief Description of the Drawings
  • Three embodiments of the present invention will now be described with reference to the accompanying drawings in which:
    • Fig. 1 is a transverse cross-sectional view through a tunnel showing the position of steel plates prior to squeezing having taken effect,
    • Fig. 2 is a view similar to Fig. 1 but showing the position of the steel plates after squeezing has taken effect,
    • Fig. 3 is a longitudinal cross-sectional view through the tip of a two-stage cable tendon rock bolt of a first embodiment,
    • Fig. 4 is a longitudinal cross sectional view of the trailing end of the rock bolt of Fig. 3,
    • Fig. 5 is a view similar to Fig. 3 but of a rock bolt of a second embodiment, and
    • Fig. 6 is a truncated longitudinal cross-section through a third embodiment having the preferred grout breather tube.
    Detailed Description
  • As seen in Fig. 1, a tunnel 1 is excavated from rock 2 which is the subject of squeezing forces indicated by arrows A. In order to prevent the tunnel 1 collapsing, in accordance with the preferred embodiment of the present invention steel plates 4 are located over the interior surface of the tunnel, each of the plates 4 being held in position by means of a two-stage rock bolt 5. Each rock bolt 5 is positioned in a blind hole 6 which is drilled radially into the rock 2.
  • In the situation illustrated in Fig. 1, prior to squeezing having taken place, there is a small gap 8 between each of the steel plates 4. However, in the situation illustrated in Fig. 2 where squeezing has both commenced and progressed to a certain degree, the movement of the rock 2 effectively eliminates the gaps 8 so that the steel plates 4 edge abut. The rock bolts 5 are two-stage rock bolts in that the first stage which arises immediately after installation of the rock bolts 5 permits the intended small movement of the rock 2 so as to carry out the squeezing to the requisite extent. Thereafter, once the gaps 8 have been eliminated, the rock bolt is tensioned to its final tension which is intended to ensure that no further squeezing of the rock 2 takes place. In the condition illustrated in Fig. 2, the steel plates 4 are edge abutted one against the other and thus form a suitable boundary which can be used for formwork for a concrete lining 9 indicated by broken lines in Fig. 2 and which is intended to provide the final support for the walls of the tunnel 1. Alternatively, the steel plates 4 can support formwork which is used in the construction of the concrete lining 9.
  • It will be appreciated that depending upon the nature of the rock 2, the steel plates 4 and rock bolts 5 may also be required on the floor of the tunnel, however, this is not illustrated in Figs. 1 and 2 in order not to overburden the diagrams.
  • Each of the rock bolts 5 in Figs. 1 and 2 has a leading end 11 and a trailing end 12. In Fig. 3 a longitudinal cross-section through the leading end 11 of the rock bolt 15 of a first embodiment is illustrated. The rock bolt 15 has a tendon 16 formed from a cable fabricated from steel wires. A portion of the tendon 16 intermediate two annular washers 17, 18 is provided with a tube 19, for example made from plastics material such as irrigation pipe extruded in high density polyethylene (HDPE). The tendon 16 is able to slide through the tube 19.
  • A grout tube 21 passes through the trailing washer 17. In addition, a secondary tube 22 also passes through both washers 17 and 18 and a pull cord 23 passes through the secondary tube 22.
  • The leading washer 18 is mounted on a pinch tube 25 (of the general type illustrated in Fig. 3 of US Patent No. 7,037, 046 ) which has a constricted interior passage 26 which is substantially S-shaped. The pinch tube 25 is longitudinally split so as to be formed from two portions which are clamped together about the tendon 16 and held in position by means of two keeper rings 27, 28.
  • Abutting the pinched tube 25 is a barrel 30 which has a tapered interior 31 which matches the taper on a frusto-conical wedge 40 which surrounds the tendon 16. The leading end of the barrel 30 is machined with an annular groove 33. A transversely split annular keeper 34 has a re-entrant annular flange 35 which is retained in the groove 33. The two parts of the annular keeper 34 overlap and are provided with two pairs of aligned orifices through each pair of which a corresponding pin 36A (Fig. 3 or 36B Fig. 5) is retained by means of a friction fit. Within the keeper 34 an O-ring 37 is retained in compression. In addition, the annular keeper 34 clamps on the wedge 40 and retains same in position with the internal diameter of the passage through the wedge 40 being sufficient to permit the tendon 16 to slide relative to the wedge 40. An important function of the intact keeper 34 is to maintain separation between the locking taper of the wedge 40 and the barrel 30.
  • The pull cord 23 is bifurcated (Fig.6) and one portion thereof 23A is connected to the pin 36A illustrated in Fig. 3. On the other side of the apparatus illustrated in Fig. 3, and therefore not visible in Fig. 3, is another pin 36B (illustrated in Fig. 5) which is connected to the other portion 23B of the bifurcated pull cord 23.
  • Turning now to Fig. 4, the trailing end 12 of the rock bolt 15 is illustrated. The trailing end of the tendon 16 passes through a central aperture 42 in the steel plate 4. Abutting against the steel plate 4 is a conventional locking mechanism in the form of an internally tapered barrel 130 and a frusto-conical wedge 140 which are capable of clamping the tendon 16 so as to place same in tension. The grout tube 21 passes through a corresponding opening in the plate 4 and a similar opening is provided for the pull cord 23.
  • After the blind hole 6 has been drilled, the leading end 11 of the first embodiment of the rock bolt 15 is passed into the hole 6 to the maximum extent permitted by the length of the tendon 16. The two annular washers 17 and 18 ensure that the tendon 16 is approximately centred in the blind hole 6 and also define an interior space into which grout is pumped in the direction of arrows B in Fig. 4 and C in Fig. 3. The grout fills the volume between the two washers 17 and 18 and thus provides a first anchor which retains the pinch tube 25 in position. Thereafter the tendon 16 can be lightly tensioned and locked by means of the barrel 130 and wedge 140, thereby completing the installation process.
  • As the rock 22 commences its squeezing action, the steel plate 4 is moved to the left as seen in Fig. 4 thereby increasing the tension within the tendon 16 and forcing the tendon 16 through the interior passage 26 of the pinch tube 25. This requires the tendon 16 to be deformed, and preferably elastically deformed, and typically increases the tension within the tendon 16 to approximately 50kN.
  • Once the plates 4 are edge abutting as illustrated in Fig. 2, then the pull cord 23 can be manually tugged so as to dislodge both pins 36A and 36B which retain the annular keeper 34. As a consequence, the annular keeper 34 which now consists of two separate parts radially expands under the urging of the resilient O-ring 37 thereby permitting the wedge 40 to enter into the barrel 30 under the influence of the tension within the tendon 16. That is to say, the wedge 40 and barrel 30 are permitted by the rupturing of the keeper 34 to come closer together to form a second anchor which securely grasps the tendon 16 and is capable of withstanding significant tension, for example up to 300kN. As a consequence, further squeezing movement of the rock 2 is prohibited and the steel plates 4 remain in their abutting configuration illustrated in Fig. 2 but do not move inwardly any further.
  • If desired, the significant tension in the tendon 16 can be created using a substantially conventional cable jack.
  • A second embodiment of the rock bolt 5 is illustrated in Fig. 5 and takes the form of a rock bolt 115, only the leading end 111 being illustrated. The tendon 16, pull cord 23, pinch tube 25, barrel 30, annular keeper 34 and wedge 40 are as before.
  • Instead of the first anchor being formed from grout as in Fig. 3, in the arrangement of Fig. 5 a mechanical or point anchor 50 is provided. The anchor 50 consists of an outer shell 51 which is preferably longitudinally split into three portions and which has a serrated exterior surface 52. Located within the shell 51 is a tapered collet 53 which is urged to the left as seen in Fig. 5 by means of a spring 54 retained between a washer 55 and a nut 56. The collet 53 is shaped to mate with the pinch tube 25. The initial tension created within the tendon 16 following installation of the rock bolt 115 expands the shell 51 thereby anchoring the anchor 50 relative to the blind hole 6. As a consequence, the pinch tube 25 is fixed relative to the hole 6 in the same way that the grout of Fig. 3 fixes the pinch tube 25 relative to the hole 6 in the embodiment of Fig. 3.
  • At the trailing end of the rock bolt 115 the arrangement is the same as illustrated in Fig. 4 save that the grout tube 21 is absent. In all other respects the operation of the rock bolt 115 is the same as operation of the rock bolt 15.
  • In the third embodiment of a rock bolt 215 as illustrated in Fig. 6 the tendon 16, plate 4, barrel 130 and wedge 140 are as in Fig.4. Similarly, the washers 17 and 18 and pinch tube 25 are also as in Fig. 3. The grout tube 21 and the secondary tube 22 with its pull cord 23 are also as in Fig. 3.
  • In Fig. 6 a breather tube 91 is provided which extends through the plate 4 and through the washer 18. That is, the leading end of the breather tube 91 terminates in the space between the two washers 17, 18 which is to be filled with grout (not illustrated). In addition, the breather tube 91 has a pair of insulated wires 92 which run the length of the breather tube 91 and terminate at its leading end in a pair of electrical contacts 93. At the trailing end of the rock bolt 215 the wires 92 terminate in a battery 98 and a light 99 preferably in the form of a light emitting diode (LED).
  • In operation the apparatus of Fig. 6 functions as follows: Grout is pumped into the grout tube 21 as indicated by arrow B and exits from the grout tube 21 between the washers 17, 18 as indicated by arrow C. As a consequence air is expelled from between the washers 17, 18 entering the breather tube 91 as indicated by arrow D and exiting the breather tube to the rear of the plate 4 as indicated by arrow E.
  • If the overall length of the bolt 215 was short, say 1-5 metres, when the space between the washers 17,18 was full of grout, the grout would exit from the breather tube 92 (as indicated by arrow E) thereby signalling that no more grout should be pumped into the grout tube 21. However, where the overall length of the rock bolt 215 is larger (typically 30 metres or so) the resistance of the breather tube 92 to grout passing through it prevents this simple system from working satisfactorily. Instead, grout makes its way past one or both of the washers 17, 18 into places where it is not wanted and grout continues to be pumped into the grout tube 21 for want of a stop signal.
  • Such a stop signal is provided by the wires 92. When the grout reaches the spaced apart contacts 93, the grout (which is preferably water based) conducts sufficient electric current to activate the LED 99. This signals that the pumping of the grout should stop because the space between the washers 17, 18 is now full of grout. It is to be understood in this connection that the grout tube 21, pull cord 23 and breather tube 91 are preferably not located in the one vertical plate as indicated in Fig. 6 but are preferably radially spaced with approximately 120° spacing relative to the longitudinal axis of the tendon 16.
  • In addition, the contacts 93 preferably are placed in the upper most portion of the space between the washers 17, 18 to ensure that the grout which enters into this portion of the space reaches the contacts 93 last.
  • The foregoing describes only some embodiments of the present invention and modifications, obvious to those skilled in the art, can be made thereto without departing from the scope of the present invention. For example, although the tendon 16 is provided by means of a cable, the tendon 16 could equally be a solid rod or a tube.
  • The term "comprising" (and its grammatical variations) as used herein is used in the inclusive sense of "including" or "having" and not in the exclusive sense of "consisting only of".

Claims (29)

  1. A method of preparing for concrete lining a tunnel through rock subject to squeezing, said method being characterised by steps of:
    (i) if necessary, forming said tunnel (1),
    (ii) placing a plurality of spaced apart plates (4) over the interior of said tunnel, each of said plates being secured by a two-stage rock bolt (15, 115, 215),
    (iii) allowing said squeezing rock to initially deform said rock bolts and drive said plates (4) into edge abutment,
    (iv) placing said rock bolts into a final tensioned condition, and
    (v) using said edge abutting plates to comprise, or support, formwork for said concrete lining (9).
  2. The method as claimed in claim 1 characterised by the further step of
    (vi) allowing said final tensioned condition to arise through further squeezing of said rock.
  3. The method as claimed in claim 1 characterised by the further step of:
    (vii) creating said final tensioned condition by tensioning said rock bolt.
  4. The method as claimed in any one of claims 1-3 characterised by the further step of:
    (viii) forcing concrete into said formwork to create said concrete lining.
  5. A two-stage rock bolt for use in rock subject to squeezing, said rock bolt (15, 115, 215) being characterised in that a tendon (16), a first anchor means (50) is adapted to be anchored in a hole (6) in said rock, and has associated therewith a pinch means (25) through which said tendon (16) can pass by deforming, a second anchor means (30, 40) includes a trigger means (36) and is carried by said tendon adjacent said first anchor means (50), and an elongate release (23) extends alongside said tendon from said trigger means beyond said rock, said release (23) being operable to activate said trigger means (36) to thereby actuate said second anchor means.
  6. The rock bolt as claimed in claim 5 characterised in that said first anchor includes grout located between said hole and said tendon.
  7. The rock bolt as claimed in claim 5 characterised in that said first anchor comprises a mechanical or point anchor (50).
  8. The rock bolt as claimed in any one of claims 5-7 characterised in that said pinch means comprises a longitudinally split tube having a constricted interior (26).
  9. The rock bolt as claimed in claim 8 characterised in that said constricted interior has a generally S-shaped configuration.
  10. The rock bolt as claimed in any one of claims 5-9 characterised in that said pinch means is located between the tip of said rock bolt and said first anchor.
  11. The rock bolt as claimed in claim 10 characterised in that said pinch means is located immediately adjacent, and abutting, said first anchor.
  12. The rock bolt as claimed in any one of claims 5-11 characterised in that said elongate release comprises a pull chord.
  13. The rock bolt as claimed in any one of claims 5-12 characterised in that said trigger means comprises a transversely split ring, two portions (27, 28) of said ring overlapping and including two pairs of aligned orifices, and a pin (36) retained in each said pair of aligned orifices by a friction fit whereby removal of said pin activates said trigger means.
  14. The rock bolt as claimed in claim 13 characterised in that a resilient means (37) urges said split ring portions apart.
  15. The rock bolt as claimed in claim 14 characterised in that said resilient means comprises an O-ring in compression.
  16. The rock bolt as claimed in any one of claims 5-15 characterised in that said trigger means is located between first and second co-operating portions of said second anchor.
  17. The rock bolt as claimed in claim 16 characterised in that said trigger means when triggered permits said first and second co-operating portions to commence their co-operation.
  18. The rock bolt as claimed in claim 16 or 17 characterised in that said first portion is a barrel (30) having a tapered interior and said second portion is a frusto-conical wedge (40) which mates with said tapered interior.
  19. The rock bolt as claimed in any one of claims 5-18 characterised in that said first anchor permits a loading of said tendon (16) of approximately 50kN and said second anchor permits a loading of said tendon of approximately 300kN.
  20. The rock bolt as claimed in any one of claims 5-19 characterised in that said tendon is a cable.
  21. The rock bolt as claimed in any one of claims 5-19 characterised in that said tendon is solid.
  22. A method of tensioning a two-stage rock bolt, said method being characterised by the steps of:
    (i) installing said rock bolt (15, 115, 215) in a blind hole drilled in rock subject to squeezing,
    (ii) activating a first anchor (50) carried adjacent the tip of said rock bolt,
    (iii) allowing tension to a first extent to be created in said rock bolt,
    (iv) activating a second anchor(30,40) carried adjacent said first anchor, and
    (v) allowing tension in excess of said first extent to be created in said rock bolt.
  23. The method as claimed in claim 22 characterised in that said tension to said first extent is created by rock squeezing and deformation of the tendon of said rock bolt.
  24. The method as claimed in claim 22 or 23 characterised in that said tension beyond said first extent is created by rock squeezing.
  25. The method as claimed in claim 22 or 23 characterised in that said tension beyond said first extent is created by applying a mechanical force to the tendon of said rock bolt.
  26. A method of grouting a rock bolt in a blind hole where a hollow breather tube is located alongside the rock bolt and extends between opposite ends of the hole to allow escape of air from the closed end of hole as grout is inserted into the open end of the hole, said method being characterised by the step of
    (i) inserting an electric circuit into said breather tube and extending beyond the ends thereof,
    (ii) said electric circuit including an indicator means at said open end of said hole and a sensor means at said closed end of said hole, said sensor means being activated by said grout reaching same to thereby indicate that said grout insertion should close.
  27. The method as claimed in claim 26 characterised in that said sensor means comprises a pair of electrical contacts and said grout is electrically conductive.
  28. The method as claimed in claims 26 or 27 characterised in that said indicator means comprises a light.
  29. The method as claimed in claim 28 characterised in that said light incorporates at least one light emitting diode (LED).
EP07011898A 2006-06-21 2007-06-18 Method for lining a tunnel with concrete Not-in-force EP1870559B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP09010175A EP2110511A1 (en) 2006-06-21 2007-06-18 A two-stage rock bolt & method of use
PL07011898T PL1870559T3 (en) 2006-06-21 2007-06-18 Method for lining a tunnel with concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AU2006903352A AU2006903352A0 (en) 2006-06-21 A Two-stage Rock Bolt & Method of Use

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP09010175A Division EP2110511A1 (en) 2006-06-21 2007-06-18 A two-stage rock bolt & method of use

Publications (3)

Publication Number Publication Date
EP1870559A2 true EP1870559A2 (en) 2007-12-26
EP1870559A3 EP1870559A3 (en) 2008-01-02
EP1870559B1 EP1870559B1 (en) 2009-11-18

Family

ID=38438710

Family Applications (2)

Application Number Title Priority Date Filing Date
EP09010175A Withdrawn EP2110511A1 (en) 2006-06-21 2007-06-18 A two-stage rock bolt & method of use
EP07011898A Not-in-force EP1870559B1 (en) 2006-06-21 2007-06-18 Method for lining a tunnel with concrete

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP09010175A Withdrawn EP2110511A1 (en) 2006-06-21 2007-06-18 A two-stage rock bolt & method of use

Country Status (6)

Country Link
EP (2) EP2110511A1 (en)
AT (1) ATE449236T1 (en)
DE (1) DE602007003263D1 (en)
ES (1) ES2339390T3 (en)
PL (1) PL1870559T3 (en)
PT (1) PT1870559E (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
WO2015176081A3 (en) * 2014-05-15 2016-01-14 Ncm Innovations (Pty) Ltd Breather tube indicator
CN109281694A (en) * 2018-10-22 2019-01-29 山东建筑大学 Can the self-locking of real-time display anchor pole or anchor cable axle power allow pressure pallet and operating method
CN109667598A (en) * 2018-12-07 2019-04-23 中铁第四勘察设计院集团有限公司 A kind of composite lining of tunnel design method based on total safety coefficient method
CN111577320A (en) * 2020-05-22 2020-08-25 河南城建学院 High security civil engineering tunnel support
CN117988908A (en) * 2024-04-03 2024-05-07 武汉大学 Graded early warning anchor rod based on liquid metal and early warning method

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101372873B (en) * 2008-10-20 2010-12-08 中冶实久建设有限公司 Method for processing hot rolling swirl pool construction joint by top-down method
CN102536282B (en) * 2012-02-27 2013-10-16 西安科技大学 Method for preventing and controlling bottom heaving disaster of mine stoping tunnel
RU2498073C1 (en) * 2012-06-07 2013-11-10 Общество с ограниченной ответственностью "Проектно-производственный центр КузНИИшахтострой" (ООО "ППЦ КузНИИшахтострой") Method to create rock support of mine
CN104141496B (en) * 2014-06-21 2016-06-01 西安科技大学 A kind of rectangular shaped roadways failure and deformation of surrounding rocks control method
CN104018847B (en) * 2014-06-21 2016-02-03 西安科技大学 Based on distension prevention and controls at the bottom of the rectangular shaped roadways squeezing flow of beam on elastic foundation
CN106437796B (en) * 2016-10-28 2018-08-24 海南大学 A kind of lithostratigraphy shield tunnel end ruggedized construction and reinforcement means

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7037046B2 (en) 2002-06-21 2006-05-02 Jeffrey Robert Fergusson Yielding strata bolt

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2644329A1 (en) * 1976-10-01 1978-04-06 Ruhrkohle Ag Yielding mine roadway frame support - has overlapped segments in sections with shaped pieces at overlaps to entrain inner sections
DE3008727C2 (en) * 1980-03-07 1982-10-14 Bergwerksverband Gmbh, 4300 Essen Flexible freezer shaft exterior construction
DE3236569C2 (en) * 1982-10-02 1986-04-30 Ruhrkohle Ag, 4300 Essen Formwork and reinforcement element for in-situ concrete support in mining and tunnel construction
US4611954A (en) * 1984-09-25 1986-09-16 Republic Corporation Apparatus and method for mine installations
DE3820700A1 (en) * 1988-06-18 1989-12-21 Ruhrkohle Ag Compound anchor support system
US6270290B1 (en) * 1997-02-14 2001-08-07 Jennmar Corporation Tensionable cable bolt

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7037046B2 (en) 2002-06-21 2006-05-02 Jeffrey Robert Fergusson Yielding strata bolt

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015176081A3 (en) * 2014-05-15 2016-01-14 Ncm Innovations (Pty) Ltd Breather tube indicator
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN109281694A (en) * 2018-10-22 2019-01-29 山东建筑大学 Can the self-locking of real-time display anchor pole or anchor cable axle power allow pressure pallet and operating method
CN109667598A (en) * 2018-12-07 2019-04-23 中铁第四勘察设计院集团有限公司 A kind of composite lining of tunnel design method based on total safety coefficient method
CN109667598B (en) * 2018-12-07 2020-06-09 中铁第四勘察设计院集团有限公司 Tunnel composite lining design method based on total safety factor method
CN111577320A (en) * 2020-05-22 2020-08-25 河南城建学院 High security civil engineering tunnel support
CN111577320B (en) * 2020-05-22 2022-03-22 河南城建学院 High security civil engineering tunnel support
CN117988908A (en) * 2024-04-03 2024-05-07 武汉大学 Graded early warning anchor rod based on liquid metal and early warning method
CN117988908B (en) * 2024-04-03 2024-06-11 武汉大学 Graded early warning anchor rod based on liquid metal and early warning method

Also Published As

Publication number Publication date
EP1870559A3 (en) 2008-01-02
ATE449236T1 (en) 2009-12-15
EP2110511A1 (en) 2009-10-21
ES2339390T3 (en) 2010-05-19
EP1870559B1 (en) 2009-11-18
DE602007003263D1 (en) 2009-12-31
PT1870559E (en) 2010-02-23
PL1870559T3 (en) 2010-06-30

Similar Documents

Publication Publication Date Title
EP1870559B1 (en) Method for lining a tunnel with concrete
CA2265593C (en) A cable bolt
US10344593B2 (en) Grout delivery system
EP2318659B1 (en) Rock anchor cable
US7179020B2 (en) Mine roof bolt anchoring system and method
US20080181728A1 (en) Pipe bursting and replacement apparatus and method
KR100861938B1 (en) The earth anchor and construction method for use of that
US6986623B2 (en) Method and apparatus for anchoring a mine roof bolt
US9732614B2 (en) Device, method and system for loading fixatives for rock bolts
US7648311B2 (en) Cable bolt
AU2013204292B2 (en) Rock bolt assembly
AU626567B2 (en) Rock anchor
US20120219365A1 (en) Rock Bolt
US20030219316A1 (en) Rock bolt
KR100873738B1 (en) The earth anchor
KR102054994B1 (en) Cylindrical wedge anchor for reinforcing the ground and method for constructing this same
AU2008303063B2 (en) Method for fixing a cable or tendon
AU782049B2 (en) A strata bolting apparatus and method
AU723200B2 (en) A cable bolt
KR101212888B1 (en) Anchor structure and it's construction method
AU2013204193B2 (en) A cable bolt assembly
AU5935698A (en) Yielding adapter for rock bolts
GB2198205A (en) A dual stage dynamic rock stabilizing fixture and method of anchoring the fixture in rock formations
AU2014201722A1 (en) Method for fixing a cable or tendon
AU2014215939A1 (en) Tensioning system and assembly for a cable bolt

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

17P Request for examination filed

Effective date: 20080702

17Q First examination report despatched

Effective date: 20080731

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RTI1 Title (correction)

Free format text: METHOD FOR LINING A TUNNEL WITH CONCRETE

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 602007003263

Country of ref document: DE

Date of ref document: 20091231

Kind code of ref document: P

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20100217

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: MINOVA AUSTRALIA PTY LIMITED

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: HEPP WENGER RYFFEL AG

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20091118

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20091118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100318

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

REG Reference to a national code

Ref country code: CH

Ref legal event code: PUE

Owner name: INOVA AUSTRALIA PTY LIMITED

Free format text: INDUSTRIAL ROLL FORMERS PTY LIMITED#8 TARLINGTON PLACE#SMITHFIELD NSW 2164 (AU) -TRANSFER TO- MINOVA AUSTRALIA PTY LIMITED#LEVEL 10 35 SPRING STREET#MELBOURNE VIC 3000 (AU)

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2339390

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100218

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20100526

Year of fee payment: 4

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20100819

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100630

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20110228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100618

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100519

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100618

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110618

REG Reference to a national code

Ref country code: PL

Ref legal event code: LAPE

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 449236

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120618

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120618

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20130726

Year of fee payment: 7

Ref country code: DE

Payment date: 20130724

Year of fee payment: 7

Ref country code: PT

Payment date: 20130618

Year of fee payment: 7

Ref country code: CZ

Payment date: 20130808

Year of fee payment: 7

Ref country code: ES

Payment date: 20130729

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20130805

Year of fee payment: 7

Ref country code: GB

Payment date: 20130724

Year of fee payment: 7

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20141218

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602007003263

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140618

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141218

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20140618

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150101

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140630

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140630

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602007003263

Country of ref document: DE

Effective date: 20150101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140618

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20150724

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140619

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140618