EP1717509A2 - Flüssiggas Tank - Google Patents
Flüssiggas Tank Download PDFInfo
- Publication number
- EP1717509A2 EP1717509A2 EP05290940A EP05290940A EP1717509A2 EP 1717509 A2 EP1717509 A2 EP 1717509A2 EP 05290940 A EP05290940 A EP 05290940A EP 05290940 A EP05290940 A EP 05290940A EP 1717509 A2 EP1717509 A2 EP 1717509A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- wall
- sealing
- anchor
- barrier
- structural
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C3/00—Vessels not under pressure
- F17C3/02—Vessels not under pressure with provision for thermal insulation
- F17C3/025—Bulk storage in barges or on ships
- F17C3/027—Wallpanels for so-called membrane tanks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
- B63B25/08—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/14—Hull parts
- B63B3/68—Panellings; Linings, e.g. for insulating purposes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2201/00—Vessel construction, in particular geometry, arrangement or size
- F17C2201/01—Shape
- F17C2201/0147—Shape complex
- F17C2201/0166—Shape complex divided in several chambers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2201/00—Vessel construction, in particular geometry, arrangement or size
- F17C2201/05—Size
- F17C2201/052—Size large (>1000 m3)
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2203/00—Vessel construction, in particular walls or details thereof
- F17C2203/03—Thermal insulations
- F17C2203/0304—Thermal insulations by solid means
- F17C2203/0329—Foam
- F17C2203/0333—Polyurethane
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2203/00—Vessel construction, in particular walls or details thereof
- F17C2203/03—Thermal insulations
- F17C2203/0304—Thermal insulations by solid means
- F17C2203/0358—Thermal insulations by solid means in form of panels
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2203/00—Vessel construction, in particular walls or details thereof
- F17C2203/06—Materials for walls or layers thereof; Properties or structures of walls or their materials
- F17C2203/0602—Wall structures; Special features thereof
- F17C2203/0612—Wall structures
- F17C2203/0626—Multiple walls
- F17C2203/0631—Three or more walls
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2209/00—Vessel construction, in particular methods of manufacturing
- F17C2209/22—Assembling processes
- F17C2209/221—Welding
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2209/00—Vessel construction, in particular methods of manufacturing
- F17C2209/22—Assembling processes
- F17C2209/228—Assembling processes by screws, bolts or rivets
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2209/00—Vessel construction, in particular methods of manufacturing
- F17C2209/23—Manufacturing of particular parts or at special locations
- F17C2209/232—Manufacturing of particular parts or at special locations of walls
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/03—Mixtures
- F17C2221/032—Hydrocarbons
- F17C2221/033—Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/01—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
- F17C2223/0146—Two-phase
- F17C2223/0153—Liquefied gas, e.g. LPG, GPL
- F17C2223/0161—Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/03—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
- F17C2223/033—Small pressure, e.g. for liquefied gas
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2260/00—Purposes of gas storage and gas handling
- F17C2260/01—Improving mechanical properties or manufacturing
- F17C2260/016—Preventing slosh
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2260/00—Purposes of gas storage and gas handling
- F17C2260/03—Dealing with losses
- F17C2260/031—Dealing with losses due to heat transfer
- F17C2260/033—Dealing with losses due to heat transfer by enhancing insulation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0102—Applications for fluid transport or storage on or in the water
- F17C2270/0105—Ships
- F17C2270/0107—Wall panels
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0165—Applications for fluid transport or storage on the road
- F17C2270/0168—Applications for fluid transport or storage on the road by vehicles
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0165—Applications for fluid transport or storage on the road
- F17C2270/0168—Applications for fluid transport or storage on the road by vehicles
- F17C2270/0171—Trucks
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0165—Applications for fluid transport or storage on the road
- F17C2270/0168—Applications for fluid transport or storage on the road by vehicles
- F17C2270/0173—Railways
Definitions
- the invention relates to a liquid container and method of making the liquid container.
- liquefied natural gas is obtained by causing natural gas, a fossil fuel, to be liquefied.
- An LNG storage tank is classified into a ground storage tank, which is installed on the ground or buried in the ground according to installation positions, and a mobile storage tank, which is mounted on transportation means such as automobiles and ships.
- the aforementioned LNG is stored in a cryogenic state and is explosive when it is exposed to shock.
- the LNG storage tank should be constructed such that shock resistance and liquid-tight characteristics thereof can be firmly maintained.
- the LNG storage tank installed on a mobile automobile or ship is slightly different from the ground storage tank with little motion in view of their configurations in that it should provide a means for overcoming mechanical stress due to the motion thereof.
- the LNG storage tank, which is installed on a ship and provided with a means for overcoming the mechanical stress can also be used as a ground storage tank. Therefore, the structure of an LNG storage tank installed on a ship will be described herein by way of example.
- an LNG storage tank installed within an LNG carrier may be classified into an independent tank type and a membrane type. This corresponds to classification according to whether cargo load is applied directly to an insulating material, and detailed description thereof will be discussed as follows.
- GT type made by Gaz Transport and TGZ type made by Technigaz are renamed and used as GTT NO 96-2 and GTT Mark III, respectively, as Gaz Transport (GT) and Technigaz (TGZ) are merged into and renamed as Gaztransport & Technigaz (GTT) in 1995.
- the membrane type LNG carrier of GTT is configured in such a manner that cargo load is directly applied to an insulating material or ship's hull and a cofferdam is installed between adjacent cargo tanks to avoid danger due to mechanical/thermal characteristics. Further, the air temperature in the cofferdam should be kept at a temperature of +5 °C or more in order to prevent low-temperature brittleness in an inner plate at a side of the cofferdam.
- a heating means such as a heating coil is generally installed to utilize a heat source such as steam or hot water.
- a scaffold is first installed at a ship's hull, and scaffold materials, insulation boxes and membranes manufactured on land, and other materials are then carried and installed. A working time before launch is longer in case of an old tank, whereas a working time after launch is longer in a membrane type.
- a GTT NO 96-2 type carrier among the GTT membrane type carriers is made of Invar steel (36% Ni) with a thickness of 0.5 ⁇ 0.7 mm, and first and second sealing barriers 10 and 15 have almost the same liquid-tight characteristics and strength as each other. Therefore, cargo can be safely carried using only the second sealing barrier 15 in a substantial period of time even when the first sealing barrier 10 leaks. Further, since a membrane of the sealing barriers 10 and 15 of the GTT NO 96-2 is straight, it can be more conveniently welded than a Mark III type corrugated membrane. Accordingly, the automation ratio of GTT NO 96-2 type is higher than that of GTT Mark III type, whereas the overall length of GTT NO 96-2 type to be welded is longer than that of GTT Mark III type.
- the currently employed GTT NO 96-2 type is most different from the conventional GT type in that instead of U-shaped bars, a plurality of double couples 17 are used to support the insulation box 11 and 16 (insulation barrier).
- the functions of main parts of heat-insulating sections of the GTT NO 96-2 type storage tank of the LNG carrier are as shown in Table 2.
- Table 2 Main Darts of heat-insulating sections of GTT NO 96-2 type storage tank Item Function Tongue It is installed at an insulation box and welded in three-ply way between membrane sheets to connect them, and it allows the membrane and insulation box to be connected to each other. Joist It is installed between the insulation boxes to reduce horizontal displacement and prevent high stress from being created. First and second insulation barriers (Perlite) It prevents heat from being transferred into the storage tank.
- First sealing barrier It provides a primary countermeasure and is a portion that comes into direct contact with the cargo having a temperature of -163 °C and primarily defines the storage tank.
- Second sealing barrier It provides a secondary countermeasure and performs a function of preventing cargo from leaking out during a predetermined period of time when the first sealing barrier is broken down.
- a GTT Mark III type is made of a stainless steel membrane with waveforms having a thickness of 1.2 mm, as a first sealing barrier 20, attached thereto.
- insulation barriers 21 and 26 are made of polyurethane foam, glass wool, Triplex or the like.
- the Mark III type is constructed in such a manner that the first and second insulation barriers 21 and 26 are manufactured on land and then integrated thereto. Therefore, the construction of the Mark III type is relatively easy as compared with the GTT NO 96-2 type in which the first and second insulation boxes 21 and 26 are respectively installed.
- the functions of main parts of heat-insulating sections of the GTT Mark III type storage tank of the LNG carrier are as shown in Table 3.
- Table 3 Main parts of heat-insulating sections of GTT Mark III type storage tank Item Function Mastic It transfers cargo load to the ship's hull. Plywood It is installed between the first and second sealing barriers and the first and second insulation barriers, allows constant load to be applied to the sealing barriers due to the uniform arrangement of the insulation barriers, and reduces the displacement created due to vertical load. Glass wool It is installed between the insulation boxes, reduces the horizontal displacement and prevents the occurrence of high stress. First and second insulation barriers (Polyurethane foam) It prevents heat from being transferred into the storage tank.
- Second sealing barrier It has a function of preventing the cargo from leaking out during a predetermined period of time when the first membrane, i.e. the first sealing barrier, and is configured such that the glass cloth is bonded to both surfaces of Al foils.
- First sealing barrier SUS 304L It is a first membrane with which cargo with a temperature of about -163°C is brought into contact, primarily defines a cargo tank, and is constructed to have such a corrugated structure that it can withstand thermal stress.
- GTT NO 96-2 type and GTT Mark III type storage tanks so configured An important part of the GTT NO 96-2 type and GTT Mark III type storage tanks so configured is a corner part.
- the corner part (edge part) of the LNG storage tank is a region to which load created due to thermal stress of the respective sealing barriers (membranes) of the storage tank is asymmetrically applied.
- This corner part should be constructed such that the stress created from the storage tank can be eliminated by distributing the asymmetrical load.
- a recent technology for the corner part (edge part) of the LNG storage tank includes "a water-tight and thermally insulating tank with an improved corner structure, built into the bearing structure of a ship" described in Korean Patent Laid-Open Publication No. 2000-0011347 .
- the corner structure disclosed in the above Korean publication No. 2000-0011347 causes a prefabricated composite girder 30 to be fixed at a right angled region where a cross bulkhead 2 and an inner face 1 of the ship's hull join together.
- the composite bulkhead 30 comprises a heat-insulating material 40 including reinforced webs 39 (shown in a dotted line) that are formed at a regular interval on a hard W-shaped metal body 31.
- This type of prefabricated composite girder 30 is configured in such a manner that portions brought into surface contact with the cross bulkhead 2 and inner face 1 of the ship's hull are fixed thereto via polymeric resin 34 and opposite branched surfaces are mechanically fastened to the bearing structure of the ship's hull by means of fixing means 32 and 33 that are supported on the cross bulkhead 2 and inner face 1 of the hull, respectively.
- a bottom surface of the prefabricated composite girder 30 has an inclined surface 42 such that a drainage space 41 is formed at the right-angled portion where the inner face 1 and cross bulkhead 2 join together.
- the technology for fabricating the corner part of the LNG storage tank using the aforementioned prefabricated composite girder 30 has advantages in that the installation costs become inexpensive thanks to its simple structure and resistance of the sealing barriers against the mechanical impact can be improved without impairing the painted portion of the double bulkhead.
- the fabricating process for the corner part is not easy because the prefabricated composite girder 30, i.e. a basic unit of the corner part of the storage tank, includes the hard metal body 31 which in turn is manually fixed to the cross bulkhead 2 and inner face 1 of the hull by means of mechanical fixing means 32 and 33 (e.g., bolts and nuts) fixedly formed on the bulkhead and inner face.
- the corner structure of the aforementioned membrane type LNG storage tank is a structure where the prefabricated composite girder 30, i.e. the basic unit of the corner part of the aforementioned storage tank, is firmly fixed to the cross bulkhead 2 and inner face 1 of the ship's hull. Therefore, any stress may be partially produced due to a wave or when the hull is moved, and thus, may be concentrated on the corner part. Accordingly, some efforts to reduce the stress concentration have been made for several decades and continuous efforts to reduce the stress concentration are further needed.
- the liquid container comprises: a sealing wall configured to directly contact liquid contained in the container; a structural wall comprising an exterior wall of the liquid container or an inner structure integrated with the exterior wall; a plurality of connectors mechanically connecting the sealing wall and the structural wall; and an intermediate wall structure positioned between the structural wall and the sealing wall, wherein the intermediate wall structure may be configured to move relative to at least one of the sealing wall and the structural wall.
- the intermediate wall structure may comprise a first surface facing the sealing wall, wherein the sealing wall may comprise a first surface facing the intermediate wall structure, and wherein the first surface of the intermediate wall structure may contact the first surface of the sealing wall.
- the first surface of the intermediate wall structure may be substantially parallel to the first surface of the sealing wall, and wherein the first surface of the intermediate wall structure may be slidable with reference to the first surface of the sealing wall.
- the intermediate wall structure may comprise a second surface facing the structural wall, wherein the structural wall may comprise a second surface facing the intermediate wall structure, and wherein the second surface of the intermediate wall structure may contact the second surface of the structural wall.
- the second surface of the intermediate wall structure may be substantially parallel to the second surface of the structural wall, and wherein the second surface of the intermediate wall structure may be slidable with reference to the second surface of the structural wall.
- the intermediate wall structure may be configured to slide with reference to the sealing wall and the structural wall.
- the plurality of connectors may be arranged to be elongated in a direction substantially perpendicular to at least one of the sealing wall and the structural wall.
- the intermediate wall structure may be mechanically connected to the plurality of connectors, and wherein the mechanical connection between the intermediate wall structure and the plurality of connectors may allow the intermediate wall structure to move relative to the plurality of connectors.
- the intermediate wall structure may have a plurality of through holes, and wherein each connector passes through each through hole.
- the intermediate wall structure may be configured to slide relative to at least one of the sealing wall and the structural wall in a direction substantially parallel to at least one of the sealing wall and the structural wall.
- the intermediate wall structure may comprise: a first layer facing the sealing wall; a second layer facing the structural wall; and a sealing layer positioned between the first and second layers.
- the intermediate wall structure may have a plurality of through holes, wherein each through hole may be configured to permit each connector to pass therethrough.
- the sealing layer of the intermediate wall structure may be configured to form a substantially liquid-tight connection with at least part of the plurality of connectors.
- the sealing layer of the intermediate wall structure may comprise a portion extending into each through hole, and wherein the portion may be configured to substantially liquid-tightly connect with the connector passing through each through hole.
- the portion may be further configured to stretch and shrink in a direction of the movement of the intermediate wall structure relative to the at least one of the sealing wall and the structural wall.
- the connector may comprise a sealing layer configured to form a substantially liquid-tight connection with the sealing layer of the intermediate wall structure.
- the sealing layer of the connector may comprise a portion extending into each through hole, and wherein the portion may be configured to substantially liquid-tightly engage with the sealing layer of the intermediate wall structure.
- the portion may be further configured to stretch and shrink in a direction of the relative movement of the intermediate wall structure. There may be a gap between each connector passing through each through hole, and wherein the gap may be substantially filled with an insulating material.
- the first layer may comprise an insulating layer.
- the intermediate wall structure may further comprise an insulating layer located between the first layer and the sealing layer.
- the first layer may comprise an outer shell of the insulating material.
- the intermediate wall structure may comprise a plurality of modules connected to one another to form the intermediate wall structure, each module comprising: a first layer configured to face the sealing wall; a second layer configured to face the structural wall; and a sealing layer positioned between the first and second layers.
- the plurality of modules may be arranged such that the sealing layer of each module may be positioned at substantially the same distance from the structural wall and may be aligned with the sealing layer of a neighboring module, and the sealing layers of the neighboring modules may be liquid-tightly connected together.
- the liquid container may comprise a vehicle for transporting liquid.
- the vehicle may comprise a ship, train or truck.
- the vehicle may comprise a ship, and wherein the structural wall may comprise an exterior wall of the ship or an inner structure of the ship integrated with the exterior wall of the ship.
- the intermediate wall structure may comprise planar structures located between planar portions of the first sealing wall and the structural wall; and corner structures located between a corner portion of the first sealing wall and a corner portion made by the inner wall and one of the partitioning walls.
- the corner structures are bonded to the corner portion made by the inner wall and one of the partitioning walls, whereby the corner structures are slidable with reference to only the sealing wall and planar structures are slidable with reference to both the sealing wall and the structural wall.
- the liquid container comprises: an sealing wall comprising an interior surface configured to directly contact liquid containned in the container; a structural wall comprising an exterior wall of the liquid container or an inner structure integrated with the exterior wall; an intermediate wall structure positioned between the structural wall and the sealing wall, the intermediate wall structure comprising a first surface facing the sealing wall and a second surface facing the structural wall; and wherein the sealing wall contacts the first surface of the intermediate wall structure while the sealing wall and the first surface may be configured to slide relative to each other.
- the sealing wall and the first surface may make no direct connection or bonding therebetween that inhibits sliding thereof relative to each other.
- the liquid container may further comprise a reinforcing layer located between the sealing wall and the intermediate wall structure, wherein the first surface of the intermediate wall structure may contact the reinforcing layer without direct connection with the reinforcing layer.
- the reinforcing layer may be integrated with the sealing wall.
- the second surface contacts the structural wall while the second surface and the structural wall make no direct connection or bonding therebetween that inhibits sliding thereof relative to each other.
- the sealing wall may comprise a first sealing wall portion and a second sealing wall portion, wherein the first sealing wall portion and the second sealing wall portion may be connected to each other via an angular relationship
- the structural wall may comprise a first structural wall portion and a second structural portion, wherein the first structural wall portion may be substantially parallel to the first sealing wall portion, wherein the second structural wall portion may be substantially parallel to the second sealing wall portion
- the intermediate wall structure may comprise a first intermediate wall structure portion and a second intermediate wall structure portion, and wherein the first intermediate wall structure portion may contact the first sealing wall portion while not directly connected or bound to the first sealing wall portion.
- the first sealing wall portion and the second sealing wall portion may be substantially perpendicular to each other.
- the liquid container may further comprise a first reinforcing layer between the first sealing wall portion and the first intermediate wall structure portion, wherein the first reinforcing layer may be configured to slide with reference to the first intermediate wall structure portion.
- the first sealing wall portion and the second sealing wall portion may be connected liquid-tightly therebetween.
- the intermediate wall structure may comprise a first insulating layer, a second insulating layer and a sealing layer.
- a ship comprising a tank for containing liquid.
- the tank comprises: a sealing wall; a structural wall of the ship; a plurality of anchors positioned between the sealing wall and the structural wall, each anchor comprising a first end connected to the sealing wall and a second end connected to the structural wall; and an intermediate wall positioned between the structural wall and the sealing wall, wherein intermediate wall is configured to slide relative to at least one of the sealing wall and the structural wall.
- the structural wall may comprise a partitioning wall within the ship.
- the plurality of anchors may be elongated in a direction substantially perpendicular to at least one of the sealing wall and the structural wall.
- the intermediate wall may comprise a first surface in contact with the sealing wall, and wherein the first surface of the intermediate wall may be not bonded or attached directly to the sealing wall.
- the intermediate wall may comprise a second surface in contact with the structural wall, and wherein the second surface of the intermediate wall may be not bonded or attached directly to the sealing wall.
- the intermediate wall may comprise a plurality of through holes in a direction substantially perpendicular to at least one of the sealing wall and the structural wall.
- Each anchor may be placed in one of the plurality of through holes while the first and second ends may be connected to the sealing wall and the structural wall, respectively.
- the intermediate wall may comprise a first insulating layer, a second insulating layer and a sealing layer located between the first and second insulating layers, and wherein each anchor may comprise a sealing plate configured to be liquid-tightly connected with the sealing layer.
- the sealing plate may be arranged substantially parallel to the sealing layer of the intermediate wall.
- the sealing plate may comprise at least one corrugated area configured to allow stretching and shrinkage when a force is applied thereto in a direction on a plane where the sealing plate may be placed.
- the intermediate wall may comprise a first insulating layer and a sealing layer, which may be substantially parallel to the sealing wall, and wherein the first insulating layer may be located between the sealing wall and the sealing layer.
- the intermediate wall structure may comprise planar structures located between planar portions of the first sealing wall and the structural wall; and corner structures located between a corner portion of the first sealing wall and a corner portion made by the inner wall and one of the partitioning walls.
- the corner structures may be bonded to the corner portion made by the inner wall and one of the partitioning walls, whereby the corner structures are slidable with reference to only the sealing wall and planar structures are slidable with reference to both the sealing wall and the structural wall.
- Still another aspect of the invention provides a ship with a liquid tank.
- the liquid tank comprises: a sealing wall configured to directly contact liquid contained in the tank; a structural wall; an intermediate wall positioned between the structural wall and the sealing wall; and wherein the sealing wall is configured to move relative to at least one of the intermediate wall and the structural wall.
- the intermediate wall may have a first surface facing and contacting the sealing wall, and wherein the first surface may be not directly attached to the sealing wall.
- the ship may further comprise a reinforcing layer positioned between the sealing wall and the intermediate wall, wherein the reinforcing layer may be integrated with the sealing wall, and wherein the reinforcing layer contacts the intermediate wall.
- the intermediate wall may comprise a first insulating layer, a second insulating layer and a sealing layer located between the first and second insulating layers.
- the intermediate wall may have a second surface facing and contacting the structural wall, and wherein the second surface may be configured to move relative to the structural wall.
- the intermediate wall may have a second surface facing and contacting the structural wall, and wherein the second surface may be not directly attached to the structural wall.
- the structural wall may comprise an exterior wall of the ship or inner wall integrated with the exterior wall.
- the sealing wall may comprise a first sealing wall portion and a second sealing wall portion, wherein the first and second sealing wall portions may be connected to each other via an angular relationship wherein the intermediate wall may comprise a first intermediate wall portion and a second intermediate wall portion, wherein the first and second intermediate wall portions may be connected to each other by substantially the same angle as the first and second sealing wall portions, and wherein the first intermediate wall portion may contact the first sealing wall portion and does not directly attach to the first sealing wall portion.
- Still another aspect of the invention provides a ship comprising a liquid tank.
- the ship comprising: a first sealing wall; a second sealing wall surrounding the first sealing wall; a first insulating layer between the first sealing wall and the second sealing wall; a structural wall comprising an exterior wall of the ship or an interior wall integrated with the exterior wall of the ship; a second insulating layer located between the second sealing wall and the structural wall; a plurality of anchors connecting the first sealing wall and the structural wall, each anchor having a first end and a second end, the first end being attached to the first sealing wall, and the second end being attached to the structural wall; and wherein the second sealing wall is configured to move relative to at least one of the first sealing wall and the structural wall.
- Each anchor may be elongated in a direction substantially perpendicular to at least one of the first and second sealing walls.
- the second sealing wall may be integrated with at least one of the first insulating layer and the second insulating layer, and wherein the at least one of the first insulating layer and the second insulating layer may be configured to move relative to at least one of the first sealing wall and the structural wall.
- Each anchor passes through a hole formed in the second sealing wall.
- Each anchor may comprise a sealing plate configured to liquid-tightly connect with an edge of the hole of the second sealing wall.
- the sealing plate may be liquid-tightly integrated with a body of each anchor.
- At least one of the sealing plate and the second sealing wall may comprise a corrugated portion configured to shrink and expand upon application of force thereto, and wherein the second sealing wall may be configured to move relative to at least one of the plurality of anchors.
- the intermediate wall structure may comprise planar structures located between planar portions of the first sealing wall and the structural wall; and corner structures located between a corner portion of the first sealing wall and a corner portion made by the inner wall and one of the partitioning walls.
- the corner structures may be bonded to the corner portion made by the inner wall and one of the partitioning walls, whereby the corner structures are slidable with reference to only the sealing wall and planar structures are slidable with reference to both the sealing wall and the structural wall.
- a further aspect of the invention provides a wall module configured to be connected with another wall module for use in manufacturing a liquid container.
- the wall module comprising: a first outer layer; a first insulating layer formed over the first outer layer, the first insulating layer comprising a first edge and a first side surface extending from the first edge; a sealing layer formed over the first insulating layer; a second insulating layer formed over the sealing layer; and a flange extending from the first outer layer outwardly beyond the first side surface in a direction substantially perpendicular to the first side surface.
- the wall module may further comprise a second outer layer formed over the second insulating layer. The flange extending from the first outer layer may be configured to align with a corresponding flange of another wall module.
- the sealing layer may extend outwardly beyond the first side surface in a direction substantially perpendicular to the first side surface.
- the sealing layer may be configured to liquid-tightly connect with a corresponding sealing layer of another wall module.
- the second insulating layer may comprise a second edge and a second side surface extending from the second edge, wherein the second side surface may be substantially parallel to the first side surface, and wherein the second side surface may be located at an inward position relative to the first side surface.
- the sealing layer may extend beyond the second side surface.
- a further aspect of the invention provides a wall module configured to be connected with another wall module for use in manufacturing a liquid container.
- the wall module comprising: a first insulating layer comprising a first edge and a first side surface extending from the first edge; a second insulating layer comprising a second edge and a second side surface extending from the second edge thereof, the second edge being substantially parallel to the first edge; and a sealing layer located between the first and second insulating layers, the sealing layer comprising an extended portion extending outwardly beyond both the first and second side surfaces.
- the extended portion of the sealing layer may be configured to liquid-tightly connect with a corresponding portion of another wall module.
- the extended portion of the sealing layer may comprise a connecting area, and wherein a cross-section of the connecting area in a plane substantially perpendicular to the first edge may comprise at least one turn along the extended portion extending away from the first side surface.
- the wall module may further comprise an outer layer formed on the first insulating layer, the outer layer comprising a flange extending outwardly beyond the first side surface in a direction substantially perpendicular to the first side surface, wherein the flange may be configured to align a corresponding flange of another wall module.
- the first side surface may be configured to face a corresponding side surface of another wall module, and wherein the second side surface may be configured to face a corresponding side surface of another wall module.
- a further aspect of the invention provides a wall module assembly, which comprises: a first wall module comprising a top surface, a bottom surface and a first side, the first wall module may further comprise two insulating layers and a sealing layer located between the two insulating layers, the first side comprising a upper side surface and a lower side surface, the first side may further comprise an extension of the sealing layer extending outwardly beyond both the upper and lower side surfaces, the extension of the sealing layer further extending substantially laterally so as to divide the first side into the upper and lower side surfaces; a second wall module comprising a top surface, a bottom surface and a second side, the second wall module may further comprise two insulating layers and a sealing layer located between the two insulating layers, the second side comprising an upper side surface and a lower side surface, the second side may further comprise an extension of the sealing layer extending outwardly beyond at least one of the upper and lower side surfaces, the extension of the sealing layer further extending substantially laterally so as to divide the second side into the upper and lower side surfaces;
- a further aspect of the invention provides a wall module configured to be connected with another wall module for use in manufacturing a cryogenic liquid container, the wall module comprising: a first insulating barrier; a second sealing barrier formed under the first insulating barrier; a second insulating barrier formed under the second sealing barrier; and a flange extending from the second insulating barrier outwardly beyond side surfaces of the second insulating barrier.
- the flange is configured to align with a corresponding flange of another wall module.
- the sealing barrier extends outwardly beyond the first side surface in a direction substantially perpendicular to the first side surface.
- the second sealing barrier is configured to liquid-tightly connect with a corresponding sealing barrier of another wall module.
- At least one corner of the module is configured to take the shape of a partially cut-away step.
- a first plywood layer is formed over the first insulating barrier, a second plywood layer is formed under the second insulating barrier, and an edge of the second plywood layer form the flange.
- the foregoing wall module assembly may further comprise an insulating material between the lower side surfaces of the first and second wall modules and under where the extensions of the first and second wall modules may be connected.
- the wall module assembly may further comprise an insulating material between the upper side surfaces of the first and second wall modules and over where the extension of the first and second wall modules may be connected.
- the wall module assembly may further comprise a first connecting piece with a first engaging surface and a second connecting piece with a second engaging surface, wherein at least a portion of the extension may be located between the first engaging surface and the second engaging surface, and wherein the portion of the extension may be in contact with both the first engaging surface and the second engaging surface.
- the portion of the extension located between the first engaging surface and the second engaging surface may be squeezed by the first connecting piece and the second connecting piece.
- the first connecting piece may comprise at least one protrusion on the first engaging surface, and wherein the at least one protrusion may be configured to contact the portion of the extension.
- the second connecting piece may comprise at least one protrusion on the second engaging surface, and wherein the at least one protrusion of the second connecting piece may correspond to the at least one protrusion of the first connecting piece.
- the extension of the first wall module may comprise a connecting portion having a cross-section in a plane substantially perpendicular to a boundary between the lower surface and the extension, and wherein the cross-section changes directions at least one time as the extension extends away from the first side of the first wall module.
- the connecting portion may comprise at least one hill and at least one valley.
- the wall module assembly may further comprise a connector configured to liquid-tightly engage with the connecting portion of the extension.
- a still further aspect of the invention provides a method of building a liquid container.
- the method comprises: providing a structural wall, an intermediate wall structure and a plurality of elongated anchors, each elongated anchor having a first end portion, a middle portion and a second end portion along a longitudinal direction thereof, the middle portion located between the first and second end portion; placing the intermediate wall structure on the structural wall; connecting the first end portion of the anchor with the structural wall; placing the sealing wall such that the intermediate wall structure and the anchor may be interposed between the structural wall and the sealing wall; connecting the second end portion of the anchor with the sealing wall; and wherein the intermediate wall structure and the sealing wall makes no direct connection that inhibits relative movement thereof with each other.
- the liquid container may comprise a ship, and wherein the structural wall may comprise an exterior wall or an interior wall of the ship.
- the intermediate wall structure may be not attached onto the sealing wall.
- the intermediate wall structure may be movable relative to at least one of the sealing wall and the structural wall.
- connecting the first end portion may comprise attaching the first end portion to the structural wall such that the anchor is substantially non-movable relative to the structural wall.
- Connecting the second end portion may comprise attaching the second end portion to the sealing wall such that the anchor is substantially non-movable relative to the sealing wall.
- Placing the intermediate wall structure may comprise: placing a first wall module on the structural wall; placing a second wall module on the structural wall and next to the first wall module; and connecting the first and second wall modules to form the intermediate wall structure.
- Connecting the first end portion of the anchor may comprise: placing the anchor next to the intermediate wall structure such that the first end portion thereof faces the structural wall; and attaching the first end portion of the anchor to the structural wall such that the longitudinal direction thereof may be substantially perpendicular to the structural wall.
- the foregoing method may further comprise liquid-tightly connecting the anchor with the intermediate wall structure.
- the method may further comprise connecting the anchor to the intermediate wall structure such that the intermediate wall structure may be allowed to move relative to the anchor.
- the intermediate wall structure may comprise a first insulating layer, a second insulating layer and a sealing layer located between the first and second insulating layers.
- the method may further comprise liquid-tightly connecting the sealing layer of the intermediate wall structure with the anchor.
- the method may further comprise liquid-tightly connecting a sealing plate with the middle portion of the anchor, wherein the sealing plate extends from the middle portion generally in a plane substantially perpendicular to the longitudinal direction, and wherein the sealing plate may be liquid tightly connected with the sealing layer of the intermediate wall structure.
- the sealing plate may comprise at least one corrugation configured to allow extension and shrinkage thereof in a direction generally in the plane substantially perpendicular to the longitudinal direction of the anchor.
- a still further aspect of the invention provides a liquid container produced by the foregoing method, wherein the anchor is located in a through hole formed in the intermediate wall structure.
- the liquid container may comprise a ship, wherein the structural wall may comprise an exterior wall or an interior wall of the ship.
- a still further aspect of the invention provides a method of building a liquid container.
- the method comprise: providing a structural wall, a sealing wall, a plurality of modules configured to form an intermediate wall structure, and a plurality of elongated anchors, each elongated anchor having a first end portion a second end portion; arranging the plurality of modules to form the intermediate wall structure and to define a plurality of through holes in the intermediate wall structure, each through hole being defined by two or more neighboring modules; arranging the plurality of anchors such that each anchor passes through one of the through holes; mechanically connecting the first end portion of the anchor to the structural wall; mechanically connecting the second portion of the anchor to the sealing wall; wherein the intermediate wall structure may be located between the structural wall and the sealing wall.
- the intermediate wall structure may have no direct connection with the sealing wall that inhibits relative movement thereof relative to the sealing wall.
- the intermediate wall structure may have no direct connection with the structural wall that inhibits relative movement thereof relative to the structural wall.
- the liquid container may comprise a ship, and wherein the structural wall may comprise an exterior wall of the ship or an interior wall connected to the exterior wall.
- the aforementioned membrane type LNG storage tank has been improved over several decades in view of the reduction of boiled off gas (BOG), i.e. loss due to vaporization of cryogenic liquefied natural gas (LNG), the simplification of structure of complicated insulation barriers and sealing barriers, the reduction of tank construction period due to a simple manufacturing process, the reduction of stress in the corner parts and sealing barriers of the tank, and the like.
- BOG boiled off gas
- LNG cryogenic liquefied natural gas
- a heat-insulating system installed on a floor surface of the storage tank includes a plurality of planar structures, each of which is fixed by means of an anchor structure. Further, the insulation barriers of the ship's hull are deformed due to waves or cargo sloshing when the ship is moved, and mechanical stress is produced accordingly. Consequently, continuous technical developments have been made to eliminate the mechanical stress.
- An aspect of the present invention is to provide a novel LNG storage tank and construction method thereof, wherein thermal/mechanical stress created by the storage and/or discharge of liquefied natural gas into and/or from the storage tank can be efficiently eliminated and a tank construction period can also be reduced due to the simplification of fabricating structure and manufacturing process, by proposing a novel membrane type LNG storage tank that is different from the conventional membrane type LNG storage tank in view of their structures.
- a liquefied natural gas storage tank including two successive sealing barriers and two insulation barriers, among which a first sealing barrier of the sealing barriers is brought into contact with liquefied natural gas stored in the storage tank, and a first insulation barrier, a second sealing barrier and a second insulation barrier are sequentially disposed on a lower surface of the first sealing barrier, wherein the first sealing barrier is supported by an anchor structure mechanically fastened to a bottom floor of the tank, and the insulation barriers are slidably installed between the first sealing barrier and the bottom floor of the tank.
- the insulation barriers can be slightly slid with respect to the first sealing barrier because the first sealing barrier is only welded to and supported by the anchor structure.
- the "bottom floor of the tank” or “inner surface” is meant to include inner barriers on lateral sides and floor of the hull, an upper barrier(ceiling) of the hull, and a cross bulkhead.
- an insulation system of the tank including the first and second insulation barriers is brought into contact with the inner barriers of the hull.
- the sliding means that the insulation barrier units such as "a planar structure" described below can be slightly moved in a lateral direction while not destroying the insulation system in spite of the bending stress.
- the first and second insulation barriers are bonded with adhesive to upper and lower surfaces of the second sealing barrier, respectively.
- the insulation barriers and sealing barrier are manufactured into a prefabricated assembly to be an assembly unit when fabricating the tank.
- a corner structure installed at the corner of the tank and a planar structure installed on a planar floor of the tank may be manufactured in the form of a prefabricated assembly.
- the second insulation barrier may comprise insulation made of polyurethane foam and a plate made of plywood and bonded to a lower surface of the insulation.
- the first insulation barrier may comprise insulation made of polyurethane foam and plates made of plywood and bonded to upper and/or lower surfaces of the insulation.
- the second sealing barrier may be made of an aluminum sheet or flexible sheet (triplex, more preferably, rigid triplex).
- the second sealing barrier is formed to protrude from a side of the first and second insulation barriers such that it is connected together with a second sealing barrier of the adjacent prefabricated assembly (planar structure) or a second sealing barrier of an adjacent anchor structure when the units of the prefabricated assemblies are fabricated.
- the shape or material of the first insulation barrier is not specifically limited.
- the first sealing barrier may be made of stainless steel or include a corrugated portion.
- a side space defined between the second insulation barriers may be filled with insulation made of polyurethane foam.
- a side space defined between the first insulation barriers may be filled with insulation made of glass wool.
- the second sealing barrier extends into the space defined by the insulation barriers (i.e., between the sides of the insulation barriers), an end of the second sealing barrier is connected within the space by means of upper and lower fixing plates, and coupling surfaces of the upper and lower fixing plates include a recessed portion in which the end of second sealing barrier can be inserted.
- the recessed portion may be curved, and the assembled lower and upper fixing plates may be curved slightly in a longitudinal direction to have an excess length, whereby stress created when the sealing barrier is contacted due to the cooling can be absorbed.
- the second sealing barrier is preferably coated with a resin material on top and bottom surfaces thereof and extends into a side space defined by the neighboring insulation barriers.
- upper and lower connection members brought into contact with the end of the second sealing barrier are included in the space, coupling surfaces of the upper and lower connection members are formed with convex and concave portions such that the resin material coated on the top and bottom surfaces of the second sealing barrier is compressed.
- Such a coupling method can further improve the sealing characteristics of the second sealing barrier.
- corner structures fastened to edge portions in the tank are included.
- planar structures slidably positioned on flat surfaces in the tank are included.
- anchor structures fastened to the tank to attach the planar structures onto inner surfaces of the tank are included.
- planar structure is preferably fabricated in such a manner that a side thereof is fixed by corner boundary projections to which the corner structure is fixed and includes a second insulation barrier installed at the same height as the second insulation barrier of the corner structure, a second sealing barrier formed on an upper surface of the second insulation barrier and a first insulation barrier formed on an upper surface of the second insulation barrier.
- the anchor structure may include an anchor support rod fixed onto an anchor lower plate mechanically fastened to a portion where the planar structures join together; a second insulation barrier penetrated by the anchor support rod at a central portion thereof and installed at the same height as a second insulation barrier of the planar structure; a second sealing barrier penetrated by the anchor support rod at a central portion thereof and fixed onto an upper surface of the second insulation barrier and fastened to an adjacent second sealing barrier of the planar structure; a first insulation barrier penetrated by the anchor support rod at a central portion thereof and fixed onto an upper surface of the second sealing barrier; and an upper cap fixed to an upper end of the anchor support rod.
- the anchor lower plate causes a lower plate of the second insulation barrier of a unit structure of the adjacent prefabricated assembly to be fixed to the inner surface of a ship's hull.
- the second sealing barrier of the anchor structure may include a corrugated portion formed at an outer peripheral portion thereof.
- the second sealing barrier of the anchor structure protrudes from a side of the first insulation barrier of the anchor structure to be connected to the second sealing barrier of the adjacent prefabricated assembly.
- the first and second insulation barriers of the anchor structure are bonded with adhesive to upper and lower surfaces of the second sealing barrier of the anchor structure, respectively.
- the second insulation barrier of the anchor structure may include insulation made of polyurethane foam and a plate made of plywood and bonded to an upper surface of the insulation.
- the first insulation barrier of the anchor structure may also include insulation made of polyurethane foam and plates made of plywood and bonded to upper and lower surfaces of the insulation.
- the plywood plate bonded to a lower end of the second insulation barrier of the prefabricated assembly protrudes from the side of the second insulation barrier and is thus fixed onto the bottom floor by means of the anchor lower plate of the anchor structure. Accordingly, the insulation barriers cannot be moved upward but can be slightly moved in a horizontal direction even though they are fixed in the same direction.
- the corner structure is manufactured into a prefabricated assembly including an L-shaped second insulation barrier brought into contact with a corner where the inner surfaces of the tank join together, a second sealing barrier formed on an upper surface of the second insulation barrier, a first insulation barrier formed on an upper surface of the second sealing barrier, and an L-shaped corner support plate formed on an upper surface of the first insulation barrier for bearing load of cargo, whereby the prefabricated assembly is fixed by means of corner boundary projections formed on the inner surfaces of the tank.
- the corner support plate may be slidably installed to the first insulation barrier of the corner structure such that the support plate can be contracted and expanded. Further, the first and second insulation barriers of the corner structure are bonded with adhesive to upper and lower surfaces of the second sealing barrier of the corner structure. Moreover, the first insulation barrier, the second sealing barrier, the second insulation barrier and the corner support plate are manufactured into a prefabricated assembly.
- the prefabricated assembly (the corner structure) is fixed by means of the corner boundary projections formed on the inner surfaces of the tank.
- the second sealing barrier is formed to protrude from a side of the first and second insulation barriers.
- plates are formed on lower surfaces of the first and second insulation barriers such that side ends thereof protrude further from sides of the insulation barriers, and thus, the plates are fixed onto the bottom floor of the hull by means of the fixing stand.
- the lower surface of the second insulation barrier is preferably bonded with adhesive onto the bottom floor of the hull.
- first and second insulation barriers may be mechanically coupled to each other by means of a connection reinforcement bar for connecting and fixing an upper end of a lower support rod, which penetrates and protrudes from the second insulation barrier, and a lower end of an upper support rod which penetrates the first insulation barrier.
- the lower support rod may be fitted and fastened to a rod support cap fixed onto a lower surface of the second insulation barrier, penetrate the second insulation barrier and be then fixed to the connection reinforcement bar.
- the upper support rod may be fitted and fastened to a rod support cap, which is fixed to a lower surface of the first insulation barrier and the connection reinforcement bar, penetrate the first insulation barrier and support the corner support plate.
- the upper support rod is preferably welded to the corner support plate.
- the first sealing barrier is placed onto the upper surface of the corner support plate, and they are welded to each other.
- the first sealing barrier of the corner structure is stably supported by the lower support rod coupled to the bottom floor of the hull, the upper support rod coupled to the lower support rod and the corner support plate coupled to the upper support rod.
- the corner support plate is made of a slightly thick plate, the first sealing barrier of the corner structure from which asymmetrical stress is created can be more stably supported.
- the corner support plate is weakly connected directly to the first insulation barrier of the corner structure, it can be slightly slid with respect to the first insulation barrier. Accordingly, the mechanical stress created due to the difference in contraction owing to temperature change between the first insulation barrier and the corner support plate or first sealing barrier can also be reduced or eliminated.
- the anchor lower plate serves to fix a lower plate of the second insulation barrier of an adjacent unit structure to the inner surface of a ship's hull.
- the second sealing barrier of the anchor structure preferably includes a corrugated portion formed at an outer peripheral portion thereof.
- the first and second insulation barriers of the anchor structure are bonded with adhesive to upper and lower surfaces of the second sealing barrier of the anchor structure, respectively.
- the anchor structure includes an anchor lower plate for fixing an anchor base plate with a rod support cap built therein, said anchor base plate being installed at a regular interval(spacing) on the internal surfaces of the tank and being formed with a fastening hole; an anchor support rod fixed vertically to the rod support cap; a second insulation barrier penetrated by the anchor support rod at a central portion thereof; a second sealing barrier penetrated by the anchor support rod at a central portion thereof and fixed onto an upper surface of the second insulation barrier of the anchor structure; a first insulation barrier penetrated by the anchor support rod at a central portion thereof and fixed onto an upper surface of the second sealing barrier of the anchor structure; an upper cap fixed to an upper end of the anchor support rod for fixing the first insulation barrier of the anchor structure; and a connection insulation barrier placed adjacent to a side of the first insulation barriers and to an upper surface of the second sealing barriers, spaced apart by a predetermined distance from the first insulation barrier of the anchor structure, and fixed to upper surfaces of the second sealing barriers of the adjacent plan
- connection insulation barrier is placed adjacent to side surfaces of the respective first insulation barriers of the adjacent planar structures and to an upper surface of the second sealing barriers of the planar structure fixed onto the second insulation barriers of the planar structures, and the connection insulation barrier is also bonded with to the second sealing barriers of the planar and anchor structures.
- the insulation is filled into a gap between the connection insulation barrier and the first insulation barrier of the anchor structure.
- a method of manufacturing a liquefied natural gas storage tank including two successive sealing barriers and two insulation barriers, among which a first sealing barrier of the sealing barriers is brought into contact with liquefied natural gas stored in the storage tank, and a first insulation barrier, a second sealing barrier and a second insulation barrier are sequentially disposed on a lower surface of the first sealing barrier, comprising the steps of forming boundary projections near inner corners of the tank and fixedly installing anchor base plates onto inner surfaces of the tank at a regular interval; fixedly attaching prefabricated corner structures, each of which includes a second insulation barrier, a second sealing barrier, a first insulation barrier and a corner support plate, between the formed boundary projections; fixing the fixed corner structures to the boundary projections with fixing stands and simultaneously fixing anchor lower plates onto upper surfaces of the anchor base plates and then vertically fixing anchor support rods onto center portions of the anchor lower plates; fitting and fixing sides of prefabricated planar structures, each of which includes a second insulation barrier, a second sealing barrier and a first insulation barrier
- the step of fixing the anchor lower plates onto the upper surfaces of the anchor base plates and then vertically fixing the anchor support rods onto the center portions of the anchor lower plates may comprise the steps of bolting the anchor lower plates to the anchor base plates, fixing rod support caps to the centers of the anchor lower plates and bolting the anchor support rods to the rod support caps.
- the step of filling the insulation into the spaces defined between the second insulation barriers of the corner structures and planar structures may comprise the step of filling the spaces with insulations made of polyurethane foam.
- the step of fastening the second sealing barriers of the corner structures and the second sealing barriers of the adjacent planar structures to each other, fastening the second sealing barriers of the planar structures to each other, and also fastening the second sealing barriers of the planar structures and the second sealing barriers of the anchor structures to each other may comprise the step of bolting lower fixing plates placed below the second sealing barriers and upper fixing plates placed above the second sealing barriers to face the lower fixing plates.
- the step of fastening the second sealing barriers of the corner structures and the second sealing barriers of the adjacent planar structures to each other, fastening the second sealing barriers of the planar structures to each other, and also fastening the second sealing barriers of the planar structures and the second sealing barriers of the anchor structures to each other may comprise the step of fixing the lower fixing plate bolted to the second sealing barrier and the upper fixing plate placed to face the top surface of the lower fixing plate in a curved shape by means of their curved portions formed thereon.
- the LNG storage tank of the present invention described above can be installed to all kinds of ships, ground tanks and vehicles irrespective of whether there is any cargo motion therein.
- a fabricating process can be shortened by simplifying the configuration of the corner structure for connecting the planar structures of the storage tank that are installed within a ship for transporting liquefied nature gas corresponding to cryogenic liquid and the liquid-tight characteristics of the anchor structure can be firmly maintained by tightly connecting the neighboring planar structures.
- the first sealing barrier of the insulation system of the present invention is fastened directly to the anchor structure and weakly connected to the insulation barriers (planar structures)
- the insulation barriers can be slightly slid with respect to the first sealing barrier and thus they conform to the distortion of the hull. Therefore, the insulation system can be hardly destroyed.
- the corner structure installed within the hull of a ship for storing liquefied nature gas corresponding to cryogenic liquid to shorten the assembling process and simultaneously installing thick plates capable of supporting the corner structure while firmly maintaining the liquid-tight characteristics of the corner structure, the stress created by mechanical/thermal contraction and expansion of the storage tank can be easily reduced or eliminated. Therefore, more reliable ship can be provided.
- connection insulation barrier is bonded with adhesive to the underlying second sealing barriers which in turn are coupled to each other by means of the upper and lower connection members, the fixing characteristics of the second sealing barriers near the anchor structure are further improved, whereby liquid-tight characteristics and safety are further increased.
- Figs. 1 and 2 are sectional and perspective views showing a GTT NO 96-2 type LNG storage tank, i.e. a conventional membrane type LNG storage tank.
- Figs. 3 and 4 are sectional and perspective views showing a GTT Mark III type LNG storage tank, i.e. a conventional membrane type LNG storage tank.
- Fig. 5 is a sectional view showing the structure of a corner part of the conventional LNG storage tank.
- Fig. 6 (a) and (b) show the inner configuration of the corner structure of the LNG storage tank according to an embodiment of the present invention.
- Fig. 7 is a whole perspective view illustrating the connection relationship between the corner structures of the LNG storage tank installed within a ship according to the present invention.
- Fig. 8 is a partially enlarged sectional perspective view showing the corner structure of the LNG storage tank installed within the ship according to an embodiment of the present invention.
- Figs. 9 to 23 are perspective views sequentially illustrating processes of fabricating the LNG storage tank into an inner space of a ship's hull according to an embodiment of the present invention.
- Fig. 24 is an enlarged sectional view showing a means for interlocking second sealing barriers of the LNG storage tank according to an embodiment of the present invention.
- Fig. 25 is an enlarged perspective view showing a means for interlocking second sealing barriers of the LNG storage tank according to an embodiment of the present invention.
- Fig. 26 (a) and (b) are partially enlarged sectional views illustrating the connection relationship between anchor structures of the LNG storage tank according to an embodiment of the present invention.
- Fig. 27 is a partially cut-away perspective view of an LNG storage tank according to another embodiment of the present invention.
- Figs. 28 to 36 are perspective views sequentially illustrating processes of fabricating the LNG storage tank into an inner space of a ship's hull according to another embodiment of the present invention.
- Figs. 37 and 38 are enlarged sectional views showing a state where second sealing barriers are interlocked in the LNG storage tank according to another embodiment of the present invention.
- Figure 39 is a cross-sectional view of a ship comprising liquid containers.
- Figure 40 is an enlarged cross-sectional view of walls of a liquid container of Figure 39.
- Figure 41 is a schematic view illustrating connections of a sealing plate with an anchor rod and a second sealing layer or barrier of Figure 40.
- Corner support plate 51 First insulation barrier of corner part 52: Second sealing barrier of corner part 53: Second insulation barrier of corner part 54, 56: Plates 57, 58: Insulations 60: Lower support rod 61: Rod support cap 70: Upper support rod 80, 81: Boundary projection of corner part 90: Connection support 100: Corner structure 101: Fixing stand 109: Stud pin 110: Anchor base plate 111: Anchor lower plate 113: Second insulation barrier of anchor structure 114: Second sealing barrier of anchor structure 115: Corrugated portion 119: Upper cap of anchor structure 150: Anchor structure 200: Planar structure 201: Lower plate material 202: Second insulation barrier of planar structure 203: Second sealing barrier of planar structure 204: First insulation barrier of planar structure 205: Upper plate 211: Insulation 212: Upper fixing plate 213: Lower fixing plate 214: Fixing bolt 250: First sealing barrier 251: Corrugated portion
- the present invention is directed to a liquefied natural gas storage tank in which liquefied natural gas (LNG) is stored in a high pressure and extremely low temperature state.
- LNG liquefied natural gas
- the LNG storage tank is constructed such that impact resistance and liquid-tight characteristics are firmly maintained.
- the LNG storage tank mounted to an automobile or ship, in which cargo is moved, is different from the ground storage tank with little motion in that suitable countermeasures should be prepared against mechanical stress due to the cargo motion in the storage tank.
- the LNG storage tank mounted to a ship to which the countermeasures against the mechanical stress are provided can also be applied to the ground storage tank.
- the configuration of an LNG storage tank mounted to a ship will be explained herein by way of example.
- Figure 39 illustrates a cross-sectional view of an exemplary ship 3900 according to one embodiment.
- the ship 3900 is comprised of an exterior wall 3901 that forms the shape of the ship and an inner wall 3903.
- the inner wall 3903 is integrated with the exterior wall 3901 via connecting walls or structures 3905, and reinforces the exterior wall 3901. Also, the inner wall 3903 may inhibit water from flowing into the interior of the ship 3900 in case the exterior wall 3901 is damaged.
- a ship 3900 may not have an inner wall 3903.
- the inner wall 3903 may be replaced with structures (not shown) interconnected with the exterior wall.
- the interior of the inner wall 3903 is partitioned with partitioning walls 3907 into four interior spaces 3911.
- the interior of the inner wall 3903 may be partitioned in various ways or may not be partitioned at all.
- the partitioning walls 3907 are integrated with the inner wall 3903 and the exterior wall 3901.
- the partitioning walls 3907 may be replaced with certain structures (not shown) that are interconnecting portions of the inner wall 3903 across the interior of the inner wall 3903.
- Each of the interior spaces 3911 can comprise a liquid tank for containing cold liquid such as liquefied natural gas.
- An inner most wall 250 contacts the liquid 3913 that is contained in the tank and referred to as a first sealing barrier or first sealing wall.
- a plurality of anchors or connectors 3915 are directly attached to both the first sealing wall 250 and the inner wall 3903 (or the partitioning wall 3907).
- the first sealing wall 250 is integrated with the inner wall 3903 (and the partitioning wall 3907) and generally is not intended to move relative to the inner wall 3903 (and the partitioning wall 3907).
- the first sealing wall 250 is integrated with the exterior wall 3901.
- the structural wall comprises the inner wall 3903 and partitioning walls 3907.
- intermediate wall structures 3917 are interposed between the first sealing wall 250 and the structural wall.
- Some intermediate wall structures 3917 (200a, 200b) are located between planar portions of the first sealing wall 250 and the structural wall 3903, 3907, and are referred to as planar structures 200.
- Other intermediate wall structures 3917 (100) are located between a corner portion of the first sealing wall 250 and a corner portion made by the inner wall 3903 and one of the partitioning walls 3907.
- the corner intermediate wall structures 3917 (100) are referred to as corner structures 100.
- the intermediate wall structures 3917 are configured to float in the space between the first sealing wall 250 and the structural wall.
- Each intermediate wall structure 3917 has a first surface (not shown) that faces the first sealing wall 250 and a second surface (not shown) that faces the structural wall.
- the first surface of the intermediate wall structure 3917 is not directly attached to the first sealing wall 250 while contacting the first sealing wall 250 or any members integrated with the first sealing wall.
- the second surface of the intermediate wall structure 3917 may not be directly attached to the structural wall while contacting the structural wall.
- the intermediate wall structures 3917 are interconnected with each other and form a single integrated body.
- Each of the intermediate wall structures 3917 may comprise a plurality of modules interconnected one another. Alternatively, each intermediate wall structure 3917 may be a single module.
- the liquid tanks may be formed in various shapes other than spherical, such as generally globular, cubical, rectangular, oval, cylindrical etc. In other embodiments, the liquid tanks may be formed on trucks, trains or other vehicles. Also, in other embodiments, the liquid tanks 3919 may be formed on the ground or under the ground.
- Figure 40 illustrates an enlarged view of the circled portion 3923 of Figure 39.
- the intermediate wall structures (planar structure 200a, 200b and the corner structure 100) include a first insulation barrier or layer 204, 51, a second insulation barrier or layer 202, 53 and a second sealing barrier or layer 52, 203.
- Each intermediate wall structure may further include one or more additional functional layers.
- each anchor comprises anchor rod 112a, 112b and a sealing plate (not shown).
- One end of the anchor rod 112a, 112b is attached to the first sealing wall 250, while the other end of the anchor rod 112a, 112b is attached to the structural wall 3903, 3907.
- the attachment of the anchor rod 112a, 112b to the first wall 250 and the structural wall 3903, 3907 will be described in more detail with reference additional embodiments.
- the anchors 3915 connecting the first sealing wall 250 and the structural wall 3903, 3907 are arranged in a space formed and defined by two or more neighboring structures 100, 200a, 200b. In other embodiments, the anchors 3915 may be arranged in a through hole formed in a single intermediate wall structure 100, 200a, 200b.
- a fitting 113a, 113b is placed in the space surrounding the anchor rod 112 and between or among the neighboring intermediate wall structures 100, 200a, 200b that define the space.
- the fitting 113a is placed in the space between the second insulation layers 202 and 53.
- the fitting 113b is placed in the space between the second insulation layers 202 and 53.
- the spaces 3929, 3931 where a fitting is not shown may be filled with an insulating material. Alternatively, another fitting may be placed in the spaces 3929, 3931.
- the fitting 113a, 113b has a groove 3927 extending toward the front and back of the drawing sheet.
- the intermediate wall structure 100, 200a, 200b has a tongue or flange 3925.
- the groove 3927 formed in the fitting 113a, 113b receives the flange 3925 such that the planar structure 200a, may not substantially move in a longitudinal direction of the anchor rod 112a, and the planar structure 200b, may not substantially move in a longitudinal direction of the anchor rod 112b.
- the groove 3927 is deeper than the flange, which allows movement of the planar structure 200a in a direction toward and away from the anchor rod 112a, i.e. in a direction generally perpendicular to the longitudinal direction of the anchor rod 112a.
- the planar structure 200b may be movable in a direction toward and away from the anchor rod 112b.
- the corner structure 100 may not move at all since its movement in the longitudinal direction of the anchor rod 112a is prevented by the fitting 113a and its movement in the longitudinal direction of the anchor rod 112b is prevented by the fitting 113b. Although it is described such that the intermediate wall structure's movement in the longitudinal direction of the neighboring anchor wall.
- the second sealing layers 52, 203 of the intermediate wall structures 100, 200 are liquid-tightly connected with the sealing plate of the anchor, which will be discussed with reference to Figure 41.
- one or more corrugations 115 are formed in the second sealing layers 52, 203 and/or sealing plate of the anchor.
- Each corrugation is configured to allow shrinkage and expansion of the sealing plate or the second sealing layers 52, 203 in a direction, particularly toward and away from the anchor.
- the first surface of the intermediate wall structure 100, 200a, 200b faces the first sealing wall 250 and is neither bonded nor attached directly to the first sealing wall 250.
- the second surface of the intermediate wall structure 100, 200a, 200b faces the structural wall 3903, 3907 and is neither bonded nor attached directly to the structural wall 3903, 3907.
- the planar structure 200a may float in a direction perpendicular to the longitudinal direction of the anchor rod 112a while maintained between the first sealing wall 250 and the structural wall 3903.
- the planar structure 200b may float in a direction perpendicular to the longitudinal direction of the anchor rod 112b.
- the planar structure 200a and 200b may not substantially move in the longitudinal direction of the anchor 112a and 112b respectively as the flange 3925 is engaged with the groove 3927.
- the corner structure is bonded to the corner portion made by the inner wall and one of the partitioning walls, whereby the corner structures are slidable with reference to only the sealing wall and planar structures are slidable with reference to both the sealing wall and the structural wall.
- the anchor structure may be configured to permit the first sealing wall to move with reference to the corner structure or the structural wall.
- FIG 41 schematically illustrates configurations of the anchor rod 112a, a sealing plate 3933, corrugation 115, etc.
- the sealing plate 3933 is arranged in a plane substantially perpendicular to the longitudinal direction of the anchor rod 112a and liquid tightly connected with the anchor rod 112a. In the illustrated configuration, for example, the sealing plate 3933 is sandwiched between two nuts 3936, 3937 engaged with threads formed on the side of the anchor rod 112a.
- the sealing plates 3933 may be liquid tightly connected with the anchor rod 112a in a variety of different ways.
- the sealing plate 3933 has a rippled portion 3935 near its edge, which is liquid tightly connected with the second sealing layer 203 of the neighboring intermediate wall structure. The connection of the rippled portion 3935 will be further discussed with reference to Figure 24. As will be well appreciated by a skilled artisan, the rippled portion 3935 can be replaced any other configuration that can form liquid tight connection with the second sealing layer 203.
- the sealing plate 3933 has at least one corrugation or wrinkle 115 surrounding the anchor rod 112a.
- the corrugation or wrinkle 115 is to allow shrinkage and expansion of the sealing plate 3933 in the plane substantially perpendicular to the longitudinal direction of the anchor rod 112a.
- the corrugation or wrinkle 115 may also be formed in the second sealing layer 203 of the neighboring intermediate wall structure.
- the corrugation or wrinkle 115 may be formed in the second sealing layer 203 instead of in the sealing plate 3933.
- the LNG storage tank of the present invention comprises a second insulation barrier installed to be brought into surface contact with an inner surface of a hull of the ship, a second sealing barrier formed on an upper surface of the second insulation barrier, and a first insulation barrier formed on an upper surface of the second sealing barrier.
- a second insulation barrier installed to be brought into surface contact with an inner surface of a hull of the ship
- a second sealing barrier formed on an upper surface of the second insulation barrier
- a first insulation barrier formed on an upper surface of the second sealing barrier.
- the prefabricated corner structures are first fixed in the interior of a ship's hull and the planar structures are then fabricated to the corner structures.
- the planar structures are securely fastened to the hull by fabricating anchor structures on a tank fabrication site.
- Fig. 6 is a sectional view illustrating the inner configuration of the corner structure of the LNG storage tank according to an embodiment of the present invention
- Fig. 7 is a whole perspective view illustrating the connection relationship between the corner structures of the LNG storage tank installed within the ship according to an embodiment of the present invention
- Fig. 8 is a partially enlarged sectional perspective view showing the corner structure of the LNG storage tank installed within the ship according to an embodiment of the present invention.
- the corner structure 100 is prefabricated to have such a configuration that its second insulation barrier 53 is L-shaped to come into surface contact with a corner position where surfaces of the ship's hull join together, its second sealing barrier 52 is attached and fixed to an upper surface of the second insulation barrier in the same manner as above, and its first insulation barrier 51 is also formed on an upper surface of the second sealing barrier.
- the first and second insulation barriers 51 and 53 of the corner structure be firmly and securely bonded with adhesive to the upper and lower surfaces of the second sealing barrier 52.
- the interior of a ship for storing LNG is composed of a bottom floor 1 and a bulkhead 2 integrally formed therewith and includes an inner space in which the corner structure of the present invention can be installed. More specifically, the present invention is directed to a corner structure installed at a position where the aforementioned bottom floor 1 and cross or lateral bulkhead 2 join together at a predetermined angle. Therefore, the shape of the second insulation barrier may be different from the L shape because the angle that the tank surfaces join together varies according to the tank shapes or corner positions.
- the L-shaped second insulation barrier 53 that is brought into surface contact with the bottom floor 1 and bulkhead 2 is formed at a position where the bottom floor 1 and the bulkhead 2 join together at a predetermined angle.
- the terms 'first' and 'second' are used to distinguish whether the liquefied natural gas stored in the storage tank is primarily or secondarily sealed and insulated by means of a certain barrier.
- the second insulation barrier 53 is composed of a second insulation 58 that is made of polyurethane foam, and a second insulating plate 56 that is made of plywood and bonded to a lower surface of the second insulation.
- the second insulating plate 56 is brought into surface contact with the bottom floor I and bulkhead 2 that are defined as inner surfaces of the ship's hull.
- the manufacturing methods, shapes, materials, etc. of the insulation barrier are described in U.S. Patent Nos. 4,747,513 , 5,501,359 , 5,586,513 and 6,035,795 , International Publication No. WO 1989/09909 , Japanese Patent Laid-Open Publication Nos. 2000-038190 and 2001-122386 , and the like, all of which are incorporated herein by reference.
- the insulation barrier and timber bonded thereto, which are described in the above documents, may be used herein.
- the second sealing barrier 52 is placed onto the upper surface thereof.
- the second sealing barrier 52 serves to secondarily prevent the LNG stored in the storage tank from leaking out from the storage tank.
- An upper surface of the second insulation 58 of the second insulation barrier 53 is bonded to a lower surface of the second sealing barrier 52 by means of an adhesive.
- the second sealing barrier 52 be made of aluminum sheet or flexible sheet (alias, "Triplex").
- lower support rods 60 that will be fixed to the first insulation barrier 51 formed on the upper surface of the second sealing barrier 52 penetrate the second insulation barrier 53 and the second sealing barrier 52.
- a plurality of holes through which the lower support rods 60 can pass are formed in the second insulation barrier 53 at a regular interval.
- Each of the rod support caps 61 to which a lower end of the lower support rod 60 can be firmly fixed is inserted into and supported by a lower end of the hole formed in the second insulating plate 56.
- the lower support rod 60 is inserted into the rod support cap 61 to pass through the second sealing barrier 53, and the lower end of the lower support rod 60 is firmly fastened by means of a fixing nut 62 within the support cap 61.
- an upper end of the lower support rod 60 that has penetrated the second insulation barrier 53 also penetrates the second sealing barrier 52 that is fixed onto the upper surface of the second insulation barrier 53.
- the second sealing barrier 52 is fixed to the lower support rod 60 by means of a support nut 63 and sealing barrier fixing nut 64 fastened to the upper portion of the lower support rod 60.
- the upper end of the lower support rod 60 that penetrates the second insulation barrier 53 and second sealing barrier 52 to cause them to be fixed to the first insulation barrier 51 is penetrated through and fixed to a lower portion of the first insulation barrier 51.
- the first insulation barrier 51 is brought into surface contact with, and fixedly bonded to the second sealing barrier 52 fixed to the upper surface of the second insulation barrier 53.
- the first insulation barrier 51 is composed of a lower plate 55 that is brought into surface contact with and fixedly bonded to the second sealing barrier 52 by means of an adhesive, a first insulation 57 that is formed on an upper surface of the lower plate 55, and an upper plate 54 that is fixedly bonded to an upper surface of the first insulation 57.
- the upper and lower plates 54 and 55 of the first insulation barrier are made of plywood, whereas the first insulation 57 is made of polyurethane foam.
- connection reinforcement bar 90 is placed onto the lower plate 55 of the first insulation barrier 51, through which the lower support rod 60 has passed, so as to connect the lower support rod and an upper support rod to be described later. That is, the upper end of the lower support rod 60 that has passed through the second insulation barrier 53 and sealing barrier 52 penetrates the connection reinforcement bar 90 placed onto the lower plate 55 of the first insulation barrier 51 such that they can be fastened to each other in a bolt-nut fastening manner.
- a plurality (pair in the figures of the present invention) of lower ends of the upper rods 70 are fixed to the connection reinforcement bar 90 in such a manner that the upper support rod 70 is inserted into a rod support cap 71, which is fixed, e.g. welded, to a bottom surface of the connection reinforcement bar 90, and then fastened to the connection reinforcement bar 90 by means of the fixing nut 72.
- connection reinforcement bar 90 the upper end of the lower support rod 60, which penetrates the second insulation barrier 53 and sealing barrier 52, and the lower end of the upper support rod 70, which penetrates the first insulation barrier 51, are securely fixed to the connection reinforcement bar 90.
- the upper support rod 70 is fixed to and supported by the first insulation barrier 51 and the upper plate 54 of the insulation barrier 51, and the L-shaped corner support plate 50 is placed and supported on the upper surface of the upper plate 54 of the first insulation barrier 51 such that asymmetrical load created from the aforementioned storage tank may be applied thereto.
- the corner support plate 50 is not bonded with adhesive but mechanically coupled to the first insulation barrier 51 such that it can be slid onto the first insulation barrier 51 even though there is the contraction and expansion of the corner support plate occur due to heat.
- a first sealing barrier 250 to be explained later is placed onto and coupled to the corner support plate 50 in such a manner as the welding.
- Fig. 6 (b) shows another example for a method of coupling the upper support rod 70 to the corner support plate 50. That is, the upper rod 70 penetrates the first insulation barrier 51 and the upper plate 54 disposed thereon and is directly coupled to the corner support plate 50 so as to support the corner support plate 50. At this time, there is a small space between the upper support rod 70 and the first insulation barrier 51 of the corner part, and there is no direct coupling, via adhesive, between the corner support plate 50 and the first insulation barrier 51. Therefore, the corner support plate 50 can be slid slightly with respect to the first insulation barrier 51. This sliding of the corner support plate can overcome the contraction and expansion difference between the first insulation barrier 51 and the corner support plate 50, due to temperature change resulting from the material difference.
- the first sealing barrier of the corner part can be stably supported by the lower support rod 60 coupled to inner surfaces of the tank, the upper support rod 70 coupled to the lower support rod 60 and the corner support plate 50 coupled to the upper support rod 70. Furthermore, since the corner support plate 50 is manufactured of a slightly thick plate, it can stably and sufficiently support the first sealing barrier of the corner part from which asymmetrical stress is created.
- the second sealing barrier 52 of the corner structure 100 is made of aluminum sheet or flexible sheet (Triplex).
- the second sealing barrier 52 is formed to further protrude from the side of the first and second insulation barriers 51 and 53, and thus fastened to a second sealing barrier 203 of a prefabricated adjacent planar structure during the next process.
- Fig. 9 shows a planar structure constructing the LNG storage tank according to the present invention.
- the planar structure 200 of the present invention is introduced into the ship's hull after it has been prefabricated outside of the hull.
- the planar structure 200 has a configuration similar to the corner structure 100.
- an upper plate 205 made of plywood is installed to a top portion of a first insulation barrier 204 of the planar structure.
- the planar structure is configured in such a manner that a lower plate 201 brought into surface contact with the inner surface 1 of the ship's hull is provided on a second insulation barrier 202 of the planar structure which is made of polyurethane foam, the second sealing barrier 203 made of aluminum sheet or flexible sheet (triplex, preferably rigid triplex) is again bonded to an upper surface of the second insulation barrier, and the first insulation barrier 204 made of polyurethane foam and the upper plate 205 made of plywood are then bonded to an upper surface of the second sealing barrier 203.
- the lower plate 201 and second sealing barrier 203 of the second insulation barrier of the planar structure protrude slightly from the side of the first and second insulation barrier 204 and 202 such that they are interlocked with and fixed to adjacent planar structure 200 or corner structure 100 during the next process.
- the opposite edge side of the planar structure brought into contact with the corner structure 100 is configured to take the shape of a partially cut-away step such it can be fabricated and fixed by means of an anchor structure 150 of the present invention.
- the planar structure 200 of the present invention is configured to have the same height as that of the adjacent corner structure 100.
- Fig. 10 is a perspective view showing a state where boundary projections and stud pins 109 are installed at an inner surface of a ship's hull;
- Fig. 11 is a perspective view showing a state where a corner structure is fitted to the boundary projections of Fig. 10;
- Fig. 12 is a perspective view showing a state where the corner structure of Fig. 11 is fastened to the hull;
- Fig. 13 is a perspective view showing a state where a planar structure is placed adjacent to the corner structure of Fig. 12;
- Fig. 14 is a perspective view showing a state where the planar structure of Fig. 13 is fastened to the hull and anchor support rods are coupled thereto;
- Fig. 11 is a perspective view showing a state where a corner structure is fitted to the boundary projections of Fig. 10
- Fig. 12 is a perspective view showing a state where the corner structure of Fig. 11 is fastened to the hull
- Fig. 13 is a perspective view
- FIG. 15 is a perspective view showing a state where second sealing barriers and insulation barriers of the anchor structure are installed to the anchor support rods;
- Fig. 16 is a perspective view showing a state where a plurality of planar structures are fixed to the ship's hull;
- Fig. 17 is a perspective view showing a state where the second sealing barriers of the anchor structure are fastened to those of the planar structures of Fig. 16;
- Fig. 18 is a perspective view showing a state where the first insulation barriers of the anchor structure are inserted onto the second sealing barriers of Fig. 17;
- Fig. 19 is a perspective view showing a state where anchor upper plate is fixed on the first insulation barriers of Fig. 18 are fixed;
- Fig. 16 is a perspective view showing a state where a plurality of planar structures are fixed to the ship's hull;
- Fig. 17 is a perspective view showing a state where the second sealing barriers of the anchor structure are fastened to those of the planar structures of Fig. 16;
- Fig. 20 is a perspective view showing a state where an anchor insulation plate is installed onto the first insulation barriers of the anchor structure of Fig. 19;
- Fig. 21 is a perspective view showing a state where the anchor insulation plate of Fig. 20 is fixed;
- Fig. 22 is a perspective view showing a state where first insulations are filled; and
- Fig. 23 is a perspective view showing a state where a first sealing barrier is installed onto the fabricated structure of Fig. 22.
- the LNG storage tank of the present invention is installed onto a bottom floor 1 of the ship's hull and a cross or lateral bulkhead 2 extending from the bottom floor in a cross or lateral direction at a right or predetermined angle.
- the boundary projections 80 and 81 of the corner structure for use in fixing the corner structure 100 are fixed to the bottom floor 1 and the cross bulkhead 2. At this time, it is preferred that the boundary projections 80 and 81 be fixed by the welding and their spacing from the corner be determined such that the prefabricated corner structure can be inserted into the spacing. After the corner structure 100 has been inserted between the boundary projections 80 and 81, some gaps are formed between the corner structure and the boundary projections.
- a fixing stand 101 is fixed to the boundary projections 80 and 81.
- the fixing stand 101 is preferably bolted to the boundary projections 80 and 81.
- the fixing stand 101 is preferably formed with a protrusion corresponding to the gap defined between the corner structure 100 and the boundary projections 80 or 81 such that it is tightly fitted into the gap between the corner structure 100 and the boundary projections 80 or 81 to prevent the corner structure from moving between the boundary projections.
- the corner structure 100 is primarily bonded onto the bottom floor 1 or cross bulkhead 2 of the ship's hull at its bottom surface and secondarily attached to the inner boundary projections 80 and 81 by means of the fixing stand 101.
- an anchor base plate 110 of an anchor structure 150 for fixing the planar structure 200 installed in series from the corner structure 100 is also fixed onto surfaces of the bottom floor 1 and cross head 2 at a regular interval.
- a group of stud pins 109 are formed on the inner surface of the hull at the regular interval.
- a portion of the stud pin 109, which is brought into contact with the bottom floor 1 or cross bulkhead 2 is sharpened and pressed such that the stud pin 109 is welded onto the inner surface of the hull.
- the anchor base plate 110 is formed with through-holes corresponding to the stud pins 109 such that the stud pins 109 are fitted into the anchor base plate 110 by means of the holes.
- the anchor base plate 110 is coupled, i.e. welded or bonded, to the inner surface of the hull. Further, the thickness of anchor base plate 110 is the same as that of the lower plate 201 of the second insulation barrier of the planar structure.
- an anchor lower plate 111 is coupled to an upper surface of the anchor base plate 110 such that it can cover the lower plate 201 of the second insulation barrier of the planar structure.
- a plurality of through-holes are formed on the anchor lower plate 111 at positions corresponding to the stud pins 109.
- the anchor base plate 110 is completely fixed by fastening a nut to the stud pin 109 that has penetrated the anchor lower plate 111.
- planar structure 200 is limited in its upward motion because the lower plate 201 is fixed by means of the fixing stand 101 or anchor lower plate 111, but can be slightly slid in a horizontal direction.
- an anchor support rod 112 is vertically fixed at the center of the anchor lower plate 111.
- a predetermined recessed space is formed at the center of the anchor lower plate 111. Further, the anchor base plate 110 is positioned below the anchor lower plate 111. At this time, the anchor base plate 110 with a plurality of through-holes formed at positions corresponding to the stud pins 109 is installed in a state where the stud pins 109 pass through the holes. Next, the anchor base plate 110 is fixed by fastening a nut to the stud pin 109.
- a rod support cap 120 is installed in the recessed space of the anchor lower plate 111 through a central hole of the anchor base plate 110.
- the rod support cap 120 is configured in such a manner that a nut is included therein or integrally formed thereon.
- the rod support cap 120 is processed to have a nut-shaped portion at the center thereof and the aforementioned anchor support rod 112 is vertically coupled to the rod support cap 120.
- the rod support cap 120 and the nut are used in the same manner as the rod support cap 61 and the fixing nut 62 as shown in Fig. 8.
- heat may be transferred upward or downward through the anchor support rod 112, but it is preferred that the diameter and heat transfer rate of the anchor support rod 112 be taken into consideration, when it is designed, such that the heat transfer from the liquefied natural gas in the storage tank to the ship's hull can be minimized.
- This anchor support rod 112 serves to primarily support load created from the first sealing barrier, which will be attached during the next process.
- the prefabricated assembly of the insulation barriers is bonded with adhesive directly but weakly to the first sealing barrier. Therefore, the prefabricated assembly can be slightly slid with respect to the first sealing barrier unlike the conventional insulation barrier assembly, and thus, the stability of the tank structure against the hull deformation can also be improved.
- each of the planar structures 200 are positioned in place and fixed with respect to the anchor lower plate 111 and anchor support rod 112 of the present invention in the same fixing manner as described above. At this time, each of the planar structures 200 is positioned and fixed on a specific space on the inner surface 1 of the ship's hull defined by the anchor lower plate 111.
- the aforementioned planar structure 200 is introduced into the ship's hull in a state where it has been already fabricated at a site outside of the hull.
- An upper plate 205 is bonded to an upper surface of the first insulation barrier 204 of the planar structure 200.
- the planar structure 200 of the present invention is configured in such a manner that the lower plate 201 of the second insulation barrier, which is brought into surface contact with the inner surface 1 of the ship's hull, is provided; the second insulation barrier 202 made polyurethane foam is bonded to the upper surface of the lower plate; the second sealing barrier 203 made of aluminum sheet or flexible sheet (triplex) is again bonded to the upper surface of the second insulation barrier; the first insulation barrier 204 made of polyurethane foam is then bonded to the upper surface of the second sealing barrier; and the upper plate 205 made of plywood is again bonded to the upper surface of the first insulation barrier.
- the lower plate 201 and second sealing barrier 203 of the second insulation barrier of the planar structure protrude slightly from the side of the first and second insulation barrier 202 and 204 such that they are interlocked with and fixed to the second sealing barrier of the adjacent planar structure 200 or corner structure 100 during the next process.
- the opposite edge side of the planar structure brought into contact with the corner structure 100 is configured to take the shape of a partially cut-away step such it can be fabricated and fixed by means of an anchor structure 150 of the present invention.
- the planar structure 200 of the present invention is configured to have the same height as that of the adjacent corner structure 100.
- the prefabricated planar structure 200 of the present invention is fixed to the inner surface of the ship's hull is such a manner that one side of the lower plate 201 of the planar structure, which protrudes from the side of the second insulation barrier 202 of the planar structure facing the corner structure (not shown), is inserted into a gap between the inner surface of the hull and a side of the fixing stand used to fix the corner structure to the boundary projections, and the other side of the lower plate 201 of the planar structure, which protrudes from the other side of the second insulation barrier 202 of the planar structure, is simultaneously inserted into a gap that is formed by the anchor base plate 110 made of metal and fixed onto the inner surface 1 of the hull and the anchor lower plate 111 made of plywood and fixed onto the upper surface of the anchor base plate.
- a second insulation barrier 113 of the anchor structure is placed onto the anchor lower plate 111 as shown in Fig. 15. Further, a second sealing barrier 114 with a circular corrugated portion 115 formed thereon is placed onto an upper surface of the second insulation barrier 113 of the anchor structure. Furthermore, the second sealing barrier 114 is fitted into and supported by a catching step 121 formed on the anchor support rod 112 and is then firmly fixed by means of a fixing nut 123 bolted to the support rod 112.
- planar structure 200 If the planar structure 200 is placed and fixed, a space defined by the second insulation barriers 53 and 202 of the corner structure 100 and planar structure 200 is filled with an insulating material made of polyurethane foam and the second insulation barrier 113 and second sealing barrier 114 of the anchor structure are fitted around the anchor support rod 112, as shown in Figs. 15 to 22.
- the second insulation barrier 113 of the anchor structure is shaped as a hexahedron and is composed of insulations made of polyurethane foam and plates made of plywood.
- the second sealing barrier 114 of the anchor structure, which is attached and fixed to the upper surface of the second insulation barrier, is made of aluminum sheet or flexible sheet (triplex).
- the circular corrugated portion 115 is preferably formed at the second sealing barrier 114 as shown in Fig. 23. That is, since the corrugated portion 115 is stretched or contracted in its sliding direction when the planar structure 200 is slid on the inner surface of the hull, mechanical or thermal deformation is hardly applied to the insulation or sealing barrier.
- the gap between the respective planar structures 200 tends to increase due to the mechanical stress applied to layers of the insulation barriers. Since the planar structure 200 of the storage tank according to the present invention is caught in the anchor lower plate 111 of the anchor structure 150, however, it can be slightly slid on the inner surface of the hull without being taken off from the anchor lower plate.
- the insulation barriers themselves can absorb the deformation of the hull, because the corner structure 100 is fixed to the hull but the respective planar structures 200 can be partially slid in a lateral direction even though the stress is created at the hull.
- the gaps defined by their respective second insulation barriers are filled with insulations 211 made of polyurethane foam. Then, the respective adjacent second insulation barriers will be connected and fixed to one another by means of the fixing means.
- the second sealing barrier 52 of the corner structure 100 is fastened to the sealing barrier 203 of the adjacent planar structure 200, the second sealing barriers 203 of the two adjacent planar structures 200 are fastened to each other, and the second sealing barrier 203 of the planar structure 200 is fastened to the sealing barrier 114 of the anchor structure.
- gaps defined by the respective first insulation barriers are filled with insulations 210 made of polyurethane foam.
- the first sealing barrier 250 is coupled onto the assembled structures.
- the first sealing barrier is welded (preferably, fillet welded) to the anchor structure, preferably to an upper cap 119 of the anchor structure.
- the first sealing barrier will be explained later in detail.
- Fig. 24 is an enlarged sectional view showing a means for interlocking the second sealing barriers of the LNG storage tank according to the present invention
- Fig. 25 is an enlarged perspective view showing the means for interlocking the second sealing barriers of the LNG storage tank according to the present invention
- Fig. 26 is a partially enlarged sectional view illustrating the connection relationship between the anchor structures of the LNG storage tank according to the present invention.
- the second sealing barriers of the present invention are connected and fixed using the fixing means shown in Figs. 24 and 25. Such a fixing method can be applied to all the second sealing barriers of the present invention.
- lower and upper fixing plates 213 and 212 are placed near a position where the second sealing barriers 52 and 203, which protrude respectively into the space defined by the first and second insulation barriers 51 and 53 of the corner structure and the first and second insulation barriers 204 and 202 of the planar structure (i.e., space between the insulation barriers), are adjacent to each other, such that the second sealing barriers are interposed between the upper and lower plates, as shown Fig. 24.
- the second sealing barriers 52 and 203 are firmly fixed by fastening the lower and upper plates 213 and 212 to each other with a fixing bolt 214, although it is not specifically limited thereto.
- the lower and upper plates 213 and 212 are made of metal.
- the lower and upper plates 213 and 212 cause the second sealing barriers 52 and 203 to be connected and fixed to each other in such a state where the barriers are curved. This can be made by making mutually facing portions of the lower and upper plates 213 and 212 into curved concave portions corresponding to each other. Since a distal end of the second sealing barrier is curved as described above, the sealing characteristics of the second sealing barrier can be improved against any possible LNG leakage through the first sealing barrier.
- an assembly of the lower and upper plates 213 and 212 is preferably curved slightly in a longitudinal direction to have an excess length.
- the second sealing barriers are coupled to one another irrespective of the insulation barriers and the ship's hull, a certain degree of freedom can be provided to the insulation barriers, and thus, damage of the insulation barriers due to the deformation of inner surfaces of the hull can also be prevented.
- the lower spaces defined by the corner structure 100 and planar structure 200 is filled with insulations and the second sealing barriers are then fixed to each other using the aforementioned fixing means.
- a nut with a washer integrally formed on a lower end thereof is furred around and fastened to the anchor support rod 112.
- the nut washer is maintained at a state where it pushes down an upper surface of the insulations with a predetermined pressure.
- the LNG is stored in the storage tank of a ship, the volume, i.e. thickness, of the insulations may be decreased by means of the increasing pressure of the LNG cargo. Therefore, the nut should be designed in consideration of the foregoing thickness reduction of the insulations.
- an anchor insulation plate 118 is also fixed onto the first anchor insulation barrier 116, and the circular anchor upper cap 119 is further inserted into and fixed to the end of the anchor.
- a predetermined recessed space is formed at the center of the upper surface of the first anchor insulation plate 118 and the anchor upper cap 119 is placed into the recessed space. Since the anchor upper cap 119 includes a nut or is integrally formed with a nut structure, it can be easily fastened to the upper end of the anchor support rod 112. Accordingly, the assembly of the anchor structure 150 is completed.
- Fig. 26 is a partially enlarged sectional view illustrating the coupling relationship between anchor structures of the LNG storage tank according to the present invention.
- the anchor structure 150 of the present invention fabricated through a series of processes has the same coupling structure as shown in Fig. 26.
- corner structures 100 and the planar structures 200 of the present invention are installed onto the inner surfaces of the ship's hull and the anchor structures 150 are also assembled, upper spaces between the first insulation barriers 204 of the corner structures 100, planar structures 200 and anchor structures 150 (i.e., spaces positioned above the spaces defined by the second insulation barriers) are filled with insulations.
- Glass wool is used as the insulations with which the upper spaces are filled, so as to more flexibly cope with the thermal contraction of the first insulation barrier and to more easily solve the problem resulting from the thermal stress.
- the first membrane-type sealing barrier 250 with a corrugated portion 251 is fixed onto the assembled structures.
- the first sealing barrier 250 is generally made of stainless steel with excellent corrosion resistance and thermal stability.
- the first insulation barrier 250 may be made of materials that have been known from the conventional Mark III type tank or proposed in the patents ( Korean Patent Application No. 2001-0010438 or 2001-0010152 ) referenced by the present inventor(s). The materials and shapes of the first insulation barriers may be modified. Further, the first insulation barrier described in U.S. Patent Nos. 3,299,598 , 3,302,359 and 3,510,278 may also be employed herein.
- the corrugated portion 251 is formed in a longitudinal direction along the spaces defined by the respective assembled structures 100, 150 and 200, and the other additional corrugated portions are also formed near the corrugated portion 251. Since the thermal contraction and expansion of the first sealing barrier 250 brought into direct contact with the LNG stored in the tank is produced most excessively at this corrugated portion 251, the corrugated portion should be formed in this way such that the thermal deformation can be flexibly coped with and easily reduced. Further, the reason that the corrugated portions 251 are formed in the longitudinal direction above the spaces defined between the respective first insulation barriers is that the thermal stress applied to the storage tank can be easily reduced by mutually coping with the thermal contraction and expansion of the second sealing barrier attached to the first insulation barrier.
- Fig. 27 is a partially cut-away perspective view of the LNG storage tank according to another embodiment of the present invention.
- the LNG storage tank is configured in such a manner that a second insulation barrier 292 is installed to a space defined in the construction such as a ship for storing liquefied natural gas therein, and a second sealing barrier 292 and a first insulation barrier 294 are sequentially installed onto an upper surface of the second insulation barrier.
- a predetermined space is formed between adjacent ends of the first insulation barriers 294 above ends of the second insulation barriers 292, and a connection insulation barrier 297 that is coupled to the first insulation barrier.
- a first insulation barrier 276 of an anchor structure is installed at the center of the connection insulation barrier 297, and insulations 325 made of glass wool is filled between the connection insulation barrier 297 and the first insulation barrier 276 of the anchor structure.
- Figs. 28 to 36 are perspective views sequentially illustrating the processes of fabricating the LNG storage tank into the inner space of a ship's hull according to another embodiment of the present invention.
- the second sealing barrier 114 with a circular corrugated portion 115 formed thereon is placed onto an upper surface of the second insulation barrier 113 of the anchor structure.
- the second sealing barrier 114 is fitted into and supported by a catching step 121 formed on the anchor support rod 112 and is then firmly fixed by means of the fixing nut 123 bolted to the support rod 112.
- connection insulation barrier 297 installed to be connected to side surfaces of the respective adjacent first insulation barriers 294 of the planar structure and to an upper surface of the second sealing barrier 293 bonded onto an upper surface of the second insulation barrier 292 of the planar structure.
- the connection insulation barrier 297 may be bonded, using an adhesive P, to an upper surface of the second sealing barrier 293 of the planar structure and the first sealing barrier 114 of the anchor structure.
- connection insulation barrier 297 is more firmly coupled to the second sealing barrier 114 and 293 by means of the adhesive.
- connection insulation barrier 297 may be spaced apart by a predetermined gap (1 ⁇ 4 mm) from the adjacent side surfaces of the first insulation barrier 294 of the planar structure.
- This gap corresponds to a space in which the planar structure 200 can be moved when a ship's hull is deformed, and it can also serve to absorb the deformation.
- connection insulation barrier 297 is placed onto the upper surface of the adjacent second sealing barrier 293 and causes ends of the second sealing barriers 114 and 293 to be sealed.
- connection insulation barrier 297 is strongly coupled to the second sealing barrier 114 or 293 by means of the adhesive P as described above, the LNG cannot reach up to the second sealing barrier 293 of the planar structure or the second sealing barrier 114 of the anchor structure. Therefore, the leakage of the LNG can be certainly prevented.
- the respective second sealing barriers 114 and 293 are fixed to each other by means of the fixing means. Then, in the order shown in Figs. 31 to 36, the first insulation barrier 116 of the anchor structure is fitted around the anchor support rod 112 and an anchor upper plate 337 is inserted into a circular recessed space formed on the upper surface of the first insulation barrier 116 such that it can be fixed to the upper end of the anchor support rod 112.
- an anchor insulation plate 338 is attached to and fixed onto the upper surface of the anchor upper plate 337, and an anchor upper cap 339 is again inserted into and fixed to the center of the anchor insulation plate.
- a predetermined recessed space is formed at the center of the upper surface of the first anchor insulation plate 338 and the anchor upper cap 339 is placed into the recessed space. Since the anchor upper cap 339 includes a nut or is integrally formed with a nut structure, it can be easily fastened to the upper end of the anchor support rod 112. Accordingly, the assembly of the anchor structure 150 is completed.
- a space between the first insulation barriers 276 and 297 of the anchor structure according to the present invention i.e., a space positioned above a space defined by the second insulation barriers
- glass wool 325 is used as the insulations with which the upper space is filled, so as to more flexibly cope with the thermal contraction of the first insulation barriers 276 and 297 and to more easily solve the problem resulting from the thermal stress.
- the first membrane-type sealing barrier 250 with a corrugated portion 251 is fixed onto the assembled structures.
- the first sealing barrier 250 is generally made of stainless steel with excellent corrosion resistance and thermal stability.
- the first insulation barrier 250 may be made of materials that have been known from the conventional Mark III type tank or proposed in the patents ( Korean Patent Application No. 2001-0010438 or 2001-0010152 ) referenced by the present inventor(s). The shapes of the first insulation barriers may be modified.
- Figs. 37 and 38 are enlarged sectional views showing a state where second sealing barriers are interlocked in the LNG storage tank according to the present invention.
- the second sealing barriers 293 of the present invention are connected and fixed using the fixing means shown in Figs. 37 and 38. Such a fixing method can be applied to all the second sealing barriers of the present invention.
- connection members 312 and 313 are installed near a position where the second sealing barriers 293, which protrude respectively into the space defined by the first and second insulation barriers 292 and 294 of the corner structure and the first and second insulation barriers 204 and 202 of the planar structure (i.e., space between the insulation barriers), are adjacent to each other, such that they are brought into contact with ends of the second sealing barriers 293, as shown Fig. 37.
- the second sealing barrier 293 is coated with resin materials 293a on the top and bottom surfaces and extends into the space defined by the adjacent insulation barriers.
- the second sealing barriers 293 are firmly fixed by fastening the upper and lower members 312 and 313 to each other with a self drilling screw 314, although it is not specifically limited thereto.
- a perforated portion 297a through which the self drilling screw 314 is inserted is formed on the connection insulation barrier 297.
- the fixing bolt or screw 314 is a structure for fixing the upper and lower connection members 312 and 313 to each other while directly penetrating the members. If this fixing bolt or screw is used, the fixing operation can be made without forming additional bolt-fastening holes on the members.
- the self drilling screw may be employed in the present invention.
- a plain washer 314a or spring washer 314b is included in the fixing screw 314 such that the washer is maintained at a state where it pushes down an upper surface of the insulations with a predetermined pressure.
- the fixing screw 314 be fastened in consideration of the reduction in volume, i.e. thickness, of the insulation due to the increasing pressure of the LNG cargo.
- a recessed portion in which the second sealing barriers 293 are accommodated is formed on coupling surfaces of the upper and lower members 312 and 313.
- convex portions 312a and 313a that face each other or alternate with each other are formed on both ends of the recessed portion.
- the aforementioned upper and lower members 312 and 313 allow the convex portions 312a and 313a to press the resin materials 293a coated onto the second sealing barriers 293 when the members are fixed by means of the fixing bolt 314.
- the resin materials 293a are accommodated in concave portions formed between the convex portions 312a and 313a and allows gaps between the upper or lower member 312 or 313 and the second sealing barrier 293 to be sealed up.
- the resin materials 293a are made of curable resins, and they are compression molded and then cured.
- the sealing characteristics of the second sealing barriers can be improved against any possible LNG leakage through the first sealing barrier 250.
- the present invention can be applied to an LNG storage tank installed on the ground as well as an LNG storage tank installed within a ship's hull.
- the LNG storage tank of the present invention has advantages in that a fabricating process can be shortened by simplifying an installation structure of a tank which is installed within a ship for transporting liquefied nature gas corresponding to cryogenic liquid and the stress created due to mechanical deformation upon the loading or unloading of the liquefied natural gas can also be easily reduced while the liquid-tight characteristics are firmly maintained.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040103255A KR100499710B1 (ko) | 2004-12-08 | 2004-12-08 | 선박 내부에 설치되는 액화천연가스 저장용 탱크 구조 및 탱크 제조방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1717509A2 true EP1717509A2 (de) | 2006-11-02 |
EP1717509A3 EP1717509A3 (de) | 2015-02-11 |
Family
ID=36284358
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP05290940.5A Withdrawn EP1717509A3 (de) | 2004-12-08 | 2005-04-29 | Flüssiggas Tank |
EP05290979.3A Withdrawn EP1669662A3 (de) | 2004-12-08 | 2005-05-04 | Benutzung von modularen Wänden beim Bau von flüssigen Gastanks |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP05290979.3A Withdrawn EP1669662A3 (de) | 2004-12-08 | 2005-05-04 | Benutzung von modularen Wänden beim Bau von flüssigen Gastanks |
Country Status (3)
Country | Link |
---|---|
EP (2) | EP1717509A3 (de) |
KR (1) | KR100499710B1 (de) |
CN (2) | CN1786549B (de) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102633070A (zh) * | 2012-03-28 | 2012-08-15 | 东莞市永强汽车制造有限公司 | 一种轻质夹层结构的液罐车罐体 |
CN102633071A (zh) * | 2012-03-28 | 2012-08-15 | 东莞市永强汽车制造有限公司 | 一种热桥隔断板以及具有保温夹层的液罐车罐体 |
CN103899756A (zh) * | 2014-04-25 | 2014-07-02 | 中石化第十建设有限公司 | Lng全容罐拱顶气吹顶升过程密封设备及施工工艺 |
CN114811410A (zh) * | 2022-06-29 | 2022-07-29 | 中太海事技术(上海)有限公司 | 用于运输设备尤其是船舶等海洋装备的液化气体储存舱 |
CN114962984A (zh) * | 2022-06-29 | 2022-08-30 | 中太海事技术(上海)有限公司 | 用于储存液化气体的储存容器及其装配方法 |
Families Citing this family (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100644217B1 (ko) * | 2006-04-20 | 2006-11-10 | 한국가스공사 | 개선된 단열구조를 갖는 액화천연가스 저장탱크 및 그제조방법 |
DE102006043478B4 (de) * | 2006-09-15 | 2008-06-19 | Aker Mtw Werft Gmbh | Vorrichtung zur Befestigung von Verbundpaneelen an einer Tankstruktur |
US8028724B2 (en) | 2007-02-12 | 2011-10-04 | Daewoo Shipbuilding & Marine Engineering Co., Ltd. | LNG tank and unloading of LNG from the tank |
KR100805022B1 (ko) * | 2007-02-12 | 2008-02-20 | 대우조선해양 주식회사 | Lng 운반선용 lng 저장탱크 및 이를 이용한 증발가스처리 방법 |
CN101541646B (zh) * | 2007-04-09 | 2014-09-03 | 印度德里技术研究院 | 折叠和展开可折叠运输集装箱的装置和方法 |
KR100835090B1 (ko) | 2007-05-08 | 2008-06-03 | 대우조선해양 주식회사 | Lng 운반선의 연료가스 공급 시스템 및 방법 |
EP2003389A3 (de) | 2007-06-15 | 2017-04-19 | Daewoo Shipbuilding & Marine Engineering Co., Ltd | Verfahren und Vorrichtung zum Behandeln von Boil-off-Gas bei einem LNG-Tanker mit Rückverflüssigungsanlage und LNG-Tanker mit dieser Vorrichtung zur Behandlung von Boil-off-Gas |
US7644676B2 (en) | 2008-02-11 | 2010-01-12 | Daewoo Shipbuilding & Marine Engineering Co., Ltd. | Storage tank containing liquefied natural gas with butane |
KR100970146B1 (ko) | 2008-03-03 | 2010-07-14 | 삼성중공업 주식회사 | 액화천연가스 화물창의 금속 멤브레인 |
WO2009112059A1 (de) * | 2008-03-10 | 2009-09-17 | Aker Mtw Werft Gmbh | Vorrichtung zur reduzierung thermischer spannungen durch flexible kompensatoren |
WO2009112043A1 (de) | 2008-03-10 | 2009-09-17 | Aker Mtw Werft Gmbh | Vorrichtung zur befestigung von verbundpaneelen an einer tankstruktur |
CN101249874B (zh) * | 2008-04-02 | 2012-05-30 | 沪东中华造船(集团)有限公司 | Lng船绝缘箱的拼装方法及拼装模块 |
KR20090107805A (ko) | 2008-04-10 | 2009-10-14 | 대우조선해양 주식회사 | 천연가스 발열량 저감방법 및 장치 |
KR101215629B1 (ko) * | 2008-06-20 | 2012-12-26 | 삼성중공업 주식회사 | 액화천연가스 화물창의 코너 패널 |
KR101058522B1 (ko) | 2009-02-05 | 2011-08-23 | 한국과학기술원 | 단열 구조체 및 이를 갖는 극저온 액체저장탱크 |
NO332829B1 (no) * | 2009-10-29 | 2013-01-21 | Aker Engineering & Technology | Stotter for tanker |
KR20110051299A (ko) * | 2009-11-05 | 2011-05-18 | 한국가스공사 | 육상용 액화가스 저장탱크의 이중방벽 및 그 형성방법 |
FR2953582B1 (fr) * | 2009-12-09 | 2012-11-30 | Gaztransp Et Technigaz | Cuve pour fluide cryogenique |
KR101477839B1 (ko) * | 2010-11-15 | 2014-12-30 | 현대중공업 주식회사 | 국제해사기구 규정 Type A방식 독립형 LNG운반선의 화물창 |
FR2972242B1 (fr) * | 2011-03-01 | 2014-10-17 | Gaztransp Et Technigaz | Fixation de panneaux isolants sur une paroi porteuse selon un motif repete |
KR101259094B1 (ko) | 2011-05-06 | 2013-04-29 | 삼성중공업 주식회사 | 액화천연가스 저장탱크의 코너패널 설치방법 및 액화천연가스 저장탱크의 코너패널 |
KR101919165B1 (ko) * | 2013-04-05 | 2018-11-16 | 현대중공업 주식회사 | 극저온 물질 운반선의 화물창 |
CN103758387B (zh) * | 2014-02-19 | 2016-02-10 | 中国海洋石油总公司 | 液化天然气储罐壁板的安装方法 |
US20170144733A1 (en) * | 2014-07-04 | 2017-05-25 | Daewoo Shipbuilding & Marine Engineering Co., Ltd. | Liquefied natural gas storage tank and insulating wall securing device for liquefied natural gas storage tank |
KR101610255B1 (ko) | 2014-07-11 | 2016-04-07 | 한국가스공사 | 앵커 구조체, 앵커 구조체를 포함하는 액화천연가스 저장탱크 및 액화천연가스 저장탱크 제조 방법 |
KR101610257B1 (ko) | 2014-07-11 | 2016-04-20 | 한국가스공사 | 앵커 구조체 및 앵커 구조체를 포함하는 액화천연가스 저장탱크 |
KR101626848B1 (ko) | 2014-07-11 | 2016-06-02 | 한국가스공사 | 앵커 구조체 및 앵커 구조체를 포함하는 액화천연가스 저장탱크 |
KR101659418B1 (ko) * | 2015-01-26 | 2016-09-23 | 한국가스공사 | 액화천연가스 저장탱크의 코너 구조체 |
US10557592B2 (en) | 2014-08-06 | 2020-02-11 | Kc Lng Tech Co., Ltd. | Corner structure of LNG storage tank |
KR101678904B1 (ko) | 2014-12-02 | 2016-11-24 | 한국가스공사 | 저장탱크 |
KR101751840B1 (ko) * | 2015-08-21 | 2017-06-28 | 대우조선해양 주식회사 | 멤브레인형 저장탱크의 코너부 단열벽, 그것을 포함하는 멤브레인형 저장탱크 및 액화천연가스 저장탱크의 단열시스템 |
JP6920351B2 (ja) * | 2016-02-02 | 2021-08-18 | アイシー テクノロジー エーエス | 改良された液化天然ガス貯蔵タンク設計 |
GB2554862A (en) * | 2016-10-04 | 2018-04-18 | Torgy Lng Holding As | Secondary barrier system |
KR102525949B1 (ko) * | 2016-11-30 | 2023-04-26 | 대우조선해양 주식회사 | 멤브레인형 저장탱크의 단열시스템 및 이를 포함하는 멤브레인형 저장탱크 |
FR3072759B1 (fr) * | 2017-10-20 | 2021-04-30 | Gaztransport Et Technigaz | Cuve etanche et thermiquement isolante |
FR3073272B1 (fr) * | 2017-11-06 | 2019-11-01 | Gaztransport Et Technigaz | Cuve etanche et thermiquement isolante |
FR3073271B1 (fr) * | 2017-11-06 | 2019-11-01 | Gaztransport Et Technigaz | Cuve etanche et thermiquement isolante |
FR3077115B1 (fr) * | 2018-01-23 | 2021-02-12 | Gaztransport Et Technigaz | Cuve etanche et thermiquement isolante. |
FR3077116B1 (fr) * | 2018-01-23 | 2021-01-08 | Gaztransport Et Technigaz | Cuve etanche et thermiquement isolante |
CN108455109A (zh) * | 2018-04-26 | 2018-08-28 | 汤树林 | 一种模块化无限容积组合罐 |
FR3083517B1 (fr) * | 2018-07-09 | 2023-10-27 | Gaztransport Et Technigaz | Navire de transport sans ballast d'eau de mer |
CN110319339B (zh) * | 2019-06-17 | 2022-01-28 | 江苏新源能环科技有限公司 | 一种双膜沼气储气柜及其安装方法 |
KR102232225B1 (ko) * | 2019-08-14 | 2021-03-24 | 이상복 | 격납 시스템 및 이의 시공 방법 |
FR3102228B1 (fr) * | 2019-10-18 | 2021-09-10 | Gaztransport Et Technigaz | Cuve étanche et thermiquement isolante |
KR102248137B1 (ko) | 2019-12-10 | 2021-05-04 | 한국가스공사 | 액화가스 저장탱크의 코너 구조체 |
CN111219121B (zh) * | 2020-01-06 | 2021-03-02 | 湖南大学 | 一种具有内部支撑结构和耐高温的大型双层密封箱 |
FR3114138B1 (fr) * | 2020-09-11 | 2023-05-12 | Gaztransport Et Technigaz | Cuve étanche et thermiquement isolante |
KR102352003B1 (ko) * | 2020-12-18 | 2022-01-14 | 케이씨엘엔지테크 주식회사 | 코너 구조체를 포함하는 액화가스 화물창 및 이의 시공방법 |
KR102365770B1 (ko) * | 2021-03-22 | 2022-02-24 | 티아이지코리아 주식회사 | 격납 시스템 및 그 제조 방법 |
CN116902418B (zh) * | 2023-09-13 | 2023-11-17 | 中太(苏州)氢能源科技有限公司 | 一种低温储罐中利用安装件安装绝缘模块的安装工艺 |
CN117847404B (zh) * | 2024-03-07 | 2024-05-03 | 中太(苏州)氢能源科技有限公司 | 一种绝缘模块连接结构和具有该连接结构的储存容器 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3990382A (en) * | 1974-03-21 | 1976-11-09 | Gaz Transport | Fastening arrangement for sealing barrier in insulating wall of insulated compartment built into a ship's hull |
US4155482A (en) * | 1975-11-03 | 1979-05-22 | Owens-Corning Fiberglas Corporation | Insulated cryogenic liquid container |
FR2413260A1 (fr) * | 1977-12-29 | 1979-07-27 | Gaz Transport | Cuve etanche et thermiquement isolante integree a la structure porteuse d'un navire |
DE3316359A1 (de) * | 1982-06-01 | 1983-12-01 | Gaz-Transport, Paris | In die tragkonstruktion eines schiffes integrierter dichter und waermeisolierender tank und tankschiff |
WO1993023699A1 (fr) * | 1992-05-20 | 1993-11-25 | Societe Nouvelle Technigaz | Structure prefabriquee de formation de parois etanches et thermiquement isolantes pour enceinte de confinement d'un fluide a tres basse temperature |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1438330A (fr) * | 1965-03-05 | 1966-05-13 | Gaz Transp | Cuve intégrée perfectionnée pour le transport de gaz liquéfiés |
US3782581A (en) * | 1971-12-27 | 1974-01-01 | Phillips Petroleum Co | Fluid containment system |
US3870210A (en) * | 1973-10-05 | 1975-03-11 | Jr Earl M Trammell | Container unit for an automobile |
US4170952A (en) * | 1976-03-09 | 1979-10-16 | Mcdonnell Douglas Corporation | Cryogenic insulation system |
FR2781557B1 (fr) * | 1998-07-24 | 2000-09-15 | Gaz Transport & Technigaz | Perfectionnement pour une cuve etanche et thermiquement isolante a panneaux prefabriques |
FR2798358B1 (fr) * | 1999-09-14 | 2001-11-02 | Gaz Transport & Technigaz | Cuve etanche et thermiquement isolante integree dans une structure porteuse de navire, a structure d'angle simplifiee |
FR2813111B1 (fr) * | 2000-08-18 | 2002-11-29 | Gaz Transport & Technigaz | Cuve etanche et thermiquement isolante aretes longitudinales ameliorees |
-
2004
- 2004-12-08 KR KR1020040103255A patent/KR100499710B1/ko active IP Right Grant
-
2005
- 2005-04-29 CN CN2005100690417A patent/CN1786549B/zh not_active Expired - Fee Related
- 2005-04-29 EP EP05290940.5A patent/EP1717509A3/de not_active Withdrawn
- 2005-04-29 CN CNB2005100690436A patent/CN100453884C/zh not_active Expired - Fee Related
- 2005-05-04 EP EP05290979.3A patent/EP1669662A3/de not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3990382A (en) * | 1974-03-21 | 1976-11-09 | Gaz Transport | Fastening arrangement for sealing barrier in insulating wall of insulated compartment built into a ship's hull |
US4155482A (en) * | 1975-11-03 | 1979-05-22 | Owens-Corning Fiberglas Corporation | Insulated cryogenic liquid container |
FR2413260A1 (fr) * | 1977-12-29 | 1979-07-27 | Gaz Transport | Cuve etanche et thermiquement isolante integree a la structure porteuse d'un navire |
DE3316359A1 (de) * | 1982-06-01 | 1983-12-01 | Gaz-Transport, Paris | In die tragkonstruktion eines schiffes integrierter dichter und waermeisolierender tank und tankschiff |
WO1993023699A1 (fr) * | 1992-05-20 | 1993-11-25 | Societe Nouvelle Technigaz | Structure prefabriquee de formation de parois etanches et thermiquement isolantes pour enceinte de confinement d'un fluide a tres basse temperature |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102633070A (zh) * | 2012-03-28 | 2012-08-15 | 东莞市永强汽车制造有限公司 | 一种轻质夹层结构的液罐车罐体 |
CN102633071A (zh) * | 2012-03-28 | 2012-08-15 | 东莞市永强汽车制造有限公司 | 一种热桥隔断板以及具有保温夹层的液罐车罐体 |
CN102633071B (zh) * | 2012-03-28 | 2014-07-30 | 东莞市永强汽车制造有限公司 | 一种热桥隔断板以及具有保温夹层的液罐车罐体 |
CN103899756A (zh) * | 2014-04-25 | 2014-07-02 | 中石化第十建设有限公司 | Lng全容罐拱顶气吹顶升过程密封设备及施工工艺 |
CN103899756B (zh) * | 2014-04-25 | 2016-03-23 | 中石化第十建设有限公司 | Lng全容罐拱顶气吹顶升过程密封设备及施工工艺 |
CN114811410A (zh) * | 2022-06-29 | 2022-07-29 | 中太海事技术(上海)有限公司 | 用于运输设备尤其是船舶等海洋装备的液化气体储存舱 |
CN114962984A (zh) * | 2022-06-29 | 2022-08-30 | 中太海事技术(上海)有限公司 | 用于储存液化气体的储存容器及其装配方法 |
CN114962984B (zh) * | 2022-06-29 | 2024-02-02 | 中太能源科技(上海)有限公司 | 用于储存液化气体的储存容器及其装配方法 |
Also Published As
Publication number | Publication date |
---|---|
CN1786549B (zh) | 2012-04-25 |
CN1786550A (zh) | 2006-06-14 |
CN100453884C (zh) | 2009-01-21 |
EP1717509A3 (de) | 2015-02-11 |
EP1669662A3 (de) | 2015-02-11 |
CN1786549A (zh) | 2006-06-14 |
KR100499710B1 (ko) | 2005-07-05 |
EP1669662A2 (de) | 2006-06-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7171916B2 (en) | Ship with liquid tank | |
US7204195B2 (en) | Ship with liquid tank | |
EP1717509A2 (de) | Flüssiggas Tank | |
KR100667500B1 (ko) | 액화천연가스 저장탱크 및 그 제조용 모듈 | |
EP1847758B1 (de) | Flüssigerdgasspeichertank mit verbesserter Isolationsstruktur und Herstellungsverfahren dafür | |
EP1898143B1 (de) | Struktur für einen Flüssigerdgasspeichertank | |
KR100649316B1 (ko) | 액화천연가스 저장탱크의 앵커 구조체 | |
US10557592B2 (en) | Corner structure of LNG storage tank | |
KR100649317B1 (ko) | 액화천연가스 저장탱크의 코너 구조체 | |
KR100499713B1 (ko) | 액화천연가스 저장탱크의 앵커 | |
US20220390069A1 (en) | Corner structure of liquefied gas storage tank | |
US20240019081A1 (en) | Corner structure and liquefied gas storage tank having same | |
US20210301978A1 (en) | Self-bracing watertight tank wall | |
RU2791211C1 (ru) | Хранилище для сжиженного газа | |
RU2803083C2 (ru) | Хранилище для сжиженного газа |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20050510 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR LV MK YU |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR LV MK YU |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F17C 3/02 20060101AFI20150108BHEP |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
AXX | Extension fees paid |
Extension state: YU Extension state: AL Extension state: LV Extension state: HR Extension state: MK Extension state: BA |
|
17Q | First examination report despatched |
Effective date: 20161025 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20170505 |