EP1599842A2 - Risk minimisation and maintenance optimisation by determining damage proportions from operational data - Google Patents

Risk minimisation and maintenance optimisation by determining damage proportions from operational data

Info

Publication number
EP1599842A2
EP1599842A2 EP04712485A EP04712485A EP1599842A2 EP 1599842 A2 EP1599842 A2 EP 1599842A2 EP 04712485 A EP04712485 A EP 04712485A EP 04712485 A EP04712485 A EP 04712485A EP 1599842 A2 EP1599842 A2 EP 1599842A2
Authority
EP
European Patent Office
Prior art keywords
maintenance
damage
load
maintenance unit
failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP04712485A
Other languages
German (de)
French (fr)
Inventor
Herbert Depping
Matthias Maisch
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Voith Turbo GmbH and Co KG
Original Assignee
Voith Turbo GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Voith Turbo GmbH and Co KG filed Critical Voith Turbo GmbH and Co KG
Publication of EP1599842A2 publication Critical patent/EP1599842A2/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0283Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C5/00Registering or indicating the working of vehicles
    • G07C5/006Indicating maintenance

Definitions

  • the invention relates to a method for setting maintenance intervals of motor vehicle assemblies or their subunits, which are to be replaced during the maintenance of the vehicle with a certain degree of wear or fatigue.
  • These subunits are referred to below as maintenance units, since they are typically replaced as a whole in maintenance tasks.
  • Maintenance intervals represent a considerable additional effort.
  • a decision to replace maintenance units is usually based only on one
  • BESTATIGUNGSKOPIE external appearance in connection with the subjective overall impression of the motor vehicle. It therefore depends on the inspector how accurately the risk of failure of a particular maintenance unit is assessed. Nonetheless, even in the case of extensive experience, precise information about the actual exposure history is missing in most cases
  • the invention has for its object a method for determining
  • the method can be implemented as simply as possible with existing electronic control components of motor vehicles.
  • the inventors have recognized that the intervals after which maintenance units have to be inspected or replaced can be determined in a suitable manner by a multi-stage method.
  • the relevant loads on a maintenance unit are analyzed, and the failure behavior associated with these loads is carried out by tests and calculations, in particular
  • Different criteria for the failure of a maintenance unit can be defined, such as for example inadmissible wear, breakage, deformation or an intolerable change in function.
  • the result of this first stage of the process is a map in which the failure behavior depending on the different load levels and Load frequency is shown. Depending on the selection of the relevant loads, the failure behavior is represented by a map with one or more parameters.
  • Loads on the maintenance unit determined. In the simplest case, this involves recording the frequency of the occurrence of a certain load. In many cases, however, a refined procedure is necessary in order to be able to record the occurring loads with sufficient accuracy, especially if there are several relevant load factors or if dynamic effects have to be taken into account.
  • the load can be divided into classes and the damage-related events counted for each of these classes.
  • This counting can be done in different ways, for example by determining the length of stay in the respective class, the frequency of exceeding the class limit or the reversal of the load in the respective class.
  • a load spectrum is created which is representative of the stress on the maintenance unit.
  • the load spectrum determined during driving operation is appropriately offset against the failure behavior of the maintenance unit known from the first stage.
  • the result is an abstract quantity called the sum of damage.
  • This sum of damage which increases during operation and can be stored in a simple manner, is the parameter in the method according to the invention which leads to an inspection of a maintenance unit, on the condition that the sum of damage exceeds a certain critical threshold.
  • the critical threshold can be determined by knowing the failure behavior from the first
  • a fourth stage of the method according to the invention according to which the failure behavior of the maintenance units can be determined in practice using a series of field data.
  • the damage amounts achieved in the field are determined and compared with the test results from the first stage of the process. Adjustments to the real failure behavior can either be made by changing the determination of the damage sum in the electronic control device or by moving the critical threshold of the damage sum.
  • each maintenance unit will be one with a low one
  • 1 shows a flow diagram of the method according to the invention for optimizing maintenance in a control device of a vehicle.
  • 2 schematically shows the subdivision of a motor vehicle assembly into
  • Fig. 3 shows schematically the relationship between the amount and frequency of loading on a maintenance unit and the
  • Fig. 4 shows an example of the division of a burden on a
  • Fig. 5 shows an example of the linkage of the load spectrum
  • Fig. 6 shows an example of the counting process for creating a
  • FIG. 7 shows an example of the probability of failure of two maintenance units as a function of the damage sum, as well as the
  • FIG. 2 shows the maintenance units (W1-W7) of an automatic transmission, which is used in the following as an example to illustrate the invention.
  • the division of the maintenance units shown in FIG. 2 is also only an example. In practice, it will result from the design of the motor vehicle assemblies, which also defines the procedure for maintenance work. For design reasons, only certain units as a whole can be inspected or replaced, with the installation position and interaction with other maintenance units playing an important role here. Another division into Maintenance units will result from the type of load during operation and the resulting signs of wear and tear or the fatigue of this component.
  • Maintenance intervals can also be used to classify motor vehicle assemblies into maintenance units so that the assignment of loads to damage amounts shown below can be carried out in a suitable manner. This means that the type of load on a maintenance unit should be classifiable as clearly as possible.
  • the operating data of the vehicle are the starting point for determining the load on a maintenance unit. This includes sensory data, for example on engine speeds, torques, temperatures of different vehicle components, but also vehicle dynamics data that characterize driving conditions. Furthermore, the operating data also include encoder signals which correspond to the driver's request, for example after acceleration. In today's vehicles, sensory data and encoder signals are available via communication networks, such as the CAN bus, and are used for vehicle control, such as optimizing the switching behavior in automatic transmissions.
  • the term operating data in the following book is understood to mean all information about the vehicle, its payload and the vehicle components, which is typically stored in control units and is accessible via the communication links mentioned. For example, these are characteristic curves of the motor, the gearbox, the axle and gear ratios, and moments of inertia, etc.
  • the loads on the respective maintenance units can be estimated.
  • the loads associated with the operating data or a part of these data must be stored in the control unit of the maintenance units or the motor vehicle modules.
  • the load effects result from the effect of Torque, speed, pressure, temperature on the maintenance unit and the resulting effects such as friction, tension or deformation.
  • Such an assignment between operating data and load is to be specified for each maintenance unit and is determined by the manufacturer of the maintenance unit as a load model.
  • These assigned load data can also be stored in a central control unit for all maintenance units.
  • the hatched area in FIG. 2 extends from a lower threshold, at which the probability that a given pair of stress level and stress frequency leads to a failure is approximately 1%, to an upper threshold, which is accordingly characterized in that the -The probability of failure is 99%.
  • critical failure threshold 1 In the following for illustration
  • the critical Failure threshold is not assigned to the same failure probability across the entire map. If, for example, it is known from load tests that the actual failure behavior fluctuates significantly in statistical terms, the critical failure threshold can be corrected in areas of great variation by an average failure probability so that the critical failure threshold is shifted to a safe side. Essentially, the result of the first stage of the method according to the invention will therefore be to determine relevant loads that lead to failure in the accumulation and to assign them a critical failure threshold in a characteristic diagram.
  • Non-destructive measurement methods can be used to characterize the signs of fatigue during load tests.
  • An example of this is the X-ray refraction method, which can be used to detect microstructural defects such as microcracks resulting from the stress. Simulations of repeated component loads, damage accumulation calculations and plausibility assumptions are also suitable for establishing a quantitative relationship between load factors and damage.
  • the method is to determine the loads relevant for a maintenance unit within a time interval from the operating data and to classify them into a load pattern graded according to the load level. Based on this classification, the damage-relevant events can now be counted. This is what a counting means in the broadest sense
  • this frequency recording of a load in a class can also be a determination of the The length of time over which a load corresponding to the class occurs.
  • Another way of recording the frequency of the occurrence of a load belonging to a class can be to determine the frequency of crossing the class boundary in a defined or any direction or to reverse the load in the respective class.
  • the load history is shown in the form of a load collective, as is shown in a schematically simplified manner in FIG. 4.
  • Four different classes I - IV are shown with increasing load levels as well as a corresponding count of the load events assigned to the respective classes.
  • the failure behavior determined in method step 1 is shown in FIG. 5 with the aid of two curves which, depending on the load level and the frequency of occurrence of such a load, approximately describe a failure probability of 1% and 99%.
  • the load spectrum of the second process stage is added to FIG. The frequency Z ⁇ with a load from the highest is shown in dashed lines
  • / ZAI determined. Accordingly, an increase in the total damage is calculated as an increase in the frequency of exposure ⁇ Z
  • by ⁇ S ⁇ Z
  • a gear part which is loaded by torque fluctuations and which can be replaced as a maintenance unit is considered. It is further assumed that the torque fluctuations can be determined from the operating data or that these can be estimated at least indirectly via a model of the transmission and the measurement of the drive and driven torques.
  • the load is divided into classes, for example in the present case several threshold values can be set for the torque and an event is added to a load class when the torque threshold is exceeded from the lower to the higher torque.
  • Step sizes in the classification are advantageous in areas in which the failure behavior shows large variations with small parameter changes. This is particularly the case in the vicinity of maximum loads.
  • the procedure for counting load events in this illustrative example is illustrated with reference to FIG. 6.
  • the time curve of the torque and four threshold values for the torque are shown. Vertical arrows indicate that one of these threshold values has been exceeded and the corresponding assignment to a load class.
  • Damage total is calculated for each class, so that the total damage total for this maintenance unit is made up of the subtotals that result for the different classes.
  • the damage sum of a maintenance unit can consist of different contributions and thus of weighted partial damage sums if there are different, non-interacting damage mechanisms that cannot be meaningfully combined in a uniform load pattern. This applies in particular if the load factors have significantly different time constants and thus the increase in the partial damage sums are recorded with different time intervals.
  • a combination of permanent loads and stress events is also possible through the summation of separately determined partial damage sums to a damage sum assigned to the maintenance unit.
  • the method according to the invention has a fourth stage, in which a critical threshold value S for the damage sum is set on the basis of real field data in order to correct inaccuracies in the preceding method steps.
  • a critical threshold value S for the damage sum is set on the basis of real field data in order to correct inaccuracies in the preceding method steps.
  • the abstract size of the damage sum should best represent the actual load on a maintenance unit and thus its failure behavior. Accordingly, when recording the sum of damage during operation, this should be in a typical relationship with the probability of failure, which is shown schematically in FIG. 7. Two interpolated failure probabilities for component A and component B in
  • Figure 1 summarizes the inventive method. It shows the four process stages for determining maintenance intervals in the sequence in which they can be implemented in a control unit of a vehicle.
  • the control unit is connected to the sensor system of the vehicle and the control and regulation data of the maintenance units and also receives encoder signals. Additional vehicle data and load models for the maintenance units to be monitored are stored in the control unit. As shown in the flowchart, external and internal information is added
  • Load history for each assigned load collective are then linked to the failure behavior of the maintenance units known from the first method step, only the corresponding information about the failure behavior being stored in the control device and the corresponding tests and correlation calculations being carried out independently of the control device.
  • the combination of load collective and failure behavior in the control unit becomes the abstract, if possible the Determination of the amount of damage corresponding to the load history. This corresponds to the third stage of the process.
  • the subsequent fourth process stage is used to compare the damage sum with a critical threshold value S k . If this value is exceeded, a maintenance interval is completed and customer service with maintenance and possible replacement of the corresponding one
  • Maintenance unit is the result. If this is not immediately possible, at least one of the reaction options is to operate the maintenance unit carefully.
  • the procedural steps that are carried out in the motor vehicle itself are very simple and can usually be carried out using control devices that are already available. This is achieved by the complex procedural steps of creating a load model to estimate loads from the operating data, the procedure for classifying loads into load patterns as well as creating load collectives and assigning the loads to one
  • Threshold is carried out regardless of the vehicle.
  • the process can be verified by constant comparison with field data from customer service. It is thus possible to adapt the critical threshold values to the experiences that result from the care of a correspondingly large one with each service inspection
  • the driver or the control unit can inform the service center about the expiry of a maintenance interval via a wireless connection when the critical threshold value is reached.
  • operation of the component is only carried out in a gentle mode or a corresponding recommendation is signaled to the driver.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Control Of Electric Motors In General (AREA)

Abstract

The invention relates to a method for determining maintenance intervals for motor vehicle modules which comprise at least one maintenance unit. Each maintenance unit is associated with an amount of damage, whose the value increases during the operation of the motor vehicle. The load acting upon a maintenance unit is determined or estimated from operational data of the vehicle or from one part of said data in a selected time interval and divided into different categories of a load pattern. The increase in total damage for said time interval is calculated by subsequently comparing the load pattern of a time interval with stored data of the breakdown behaviour of the maintenance unit. The end of the maintenance interval for a maintenance unit is then achieved when the associated total damage exceeds a specific critical threshold value.

Description

Risikominimierung und Wartungsoptimierung durch Ermittlung von Schädigungsanteilen aus Betriebsdaten Risk minimization and maintenance optimization by determining damage components from operating data
Die Erfindung betrifft ein Verfahren zur Festsetzung von Wartungsintervallen von Kraftfahrzeugbaugruppen oder ihrer Untereinheiten, die bei der Wartung des Fahrzeugs bei einem bestimmten Abnutzungs- bzw. Ermüdungsgrad zu ersetzen sind. Diese Untereinheiten werden im Folgenden als Wartungseinheiten bezeichnet, da sie typischerweise bei Wartungsaufgaben als Ganzes ersetzt werden.The invention relates to a method for setting maintenance intervals of motor vehicle assemblies or their subunits, which are to be replaced during the maintenance of the vehicle with a certain degree of wear or fatigue. These subunits are referred to below as maintenance units, since they are typically replaced as a whole in maintenance tasks.
Zur Wartung von Kraftfahrzeugbaugruppen werden üblicherweise einzelne Wartungseinheiten nach einer bestimmten festgesetzten Lebensdauer oder alternativ nach einer bestimmten Laufleistung ersetzt. Eine solche starre Festsetzung von Wartungsintervallen hat jedoch den Nachteil, dass Wartungseinheiten bei ganz unterschiedlichen Abnutzungs- bzw.For the maintenance of motor vehicle assemblies, individual maintenance units are usually replaced after a certain fixed service life or alternatively after a certain mileage. However, such a rigid determination of maintenance intervals has the disadvantage that maintenance units with very different wear and tear or
Ermüdungsgraden gewartet oder ganz ausgewechselt werden. Dabei bleibt unberücksichtigt, in welcher Form diese Wartungseinheiten im vorausgegangenen Betrieb belastet wurden. Hier können deutliche Unterschiede ausgemacht werden bezüglich der Abnutzung und Ermüdung, die durch eine unterschiedliche Einsatzdauer, die Art der Zuladung, die Charakteristika der zurückgelegtenDegrees of fatigue are serviced or replaced entirely. It does not take into account the form in which these maintenance units were charged in the previous operation. Clear differences can be identified here with regard to wear and fatigue, due to a different period of use, the type of payload, the characteristics of the distance traveled
Strecken, unterschiedliche klimatische Voraussetzungen und durch Unterschiede im individuellen Fahrverhalten bewirkt werden. Eine pauschale Annahme von Wartungsintervallen geht von einer gewissen Mittelung dieser Belastungen aus. Dabei werden jedoch häufig Wartungseinheiten zu früh ausgetauscht oder es kommt zu Fahrzeugausfällen, weil ungewöhnlich stark belastete Bauteile innerhalb des üblichen Wartungsintervalls ausfallen.Routes, different climatic conditions and differences in individual driving behavior. A general assumption of maintenance intervals is based on a certain averaging of these loads. However, maintenance units are often replaced too early or vehicle failures occur because unusually heavily loaded components fail within the usual maintenance interval.
Eine Einzelfallentscheidung über das Ersetzen von Wartungseinheiten setzt eine regelmäßige Inspektion und meist eine Freilegung oder den Ausbau der jeweiligen Wartungseinheit voraus. Dies stellt gegenüber der Festsetzung von starrenAn individual decision about the replacement of maintenance units requires regular inspection and usually an exposure or expansion of the respective maintenance unit. This contrasts with fixing rigid
Wartungsintervallen einen erheblichen Mehraufwand dar. Zusätzlich stützt sich eine Entscheidung über den Austausch von Wartungseinheiten meist nur auf einMaintenance intervals represent a considerable additional effort. In addition, a decision to replace maintenance units is usually based only on one
BESTATIGUNGSKOPIE äußeres Erscheinungsbild in Verbindung mit dem subjektiven Gesamteindruck des Kraftfahrzeugs. Es hängt somit vom Inspizierenden ab, wie treffend das Ausfallrisiko einer bestimmten Wartungseinheit eingeschätzt wird. Gleichwohl fehlen auch bei großer Erfahrung für eine präzise Beurteilung in den meisten Fällen Informationen über die tatsächliche Belastungsgeschichte derBESTATIGUNGSKOPIE external appearance in connection with the subjective overall impression of the motor vehicle. It therefore depends on the inspector how accurately the risk of failure of a particular maintenance unit is assessed. Nonetheless, even in the case of extensive experience, precise information about the actual exposure history is missing in most cases
Wartungseinheit. Bei komplexen Baugruppen, wie z.B. Fahrzeuggetrieben, sind zusätzlich die Bauteile in der Regel nicht zugänglich, wodurch keine Möglichkeit für eine visuelle Beurteilung besteht.Maintenance unit. For complex assemblies, such as Vehicle-driven, the components are usually not accessible, which means that there is no possibility for a visual assessment.
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zur Bestimmung vonThe invention has for its object a method for determining
Wartungsintervallen für Kraftfahrzeugbaugruppen anzugeben, das die oben beschriebenen Nachteile pauschaler Wartungsintervalle oder subjektiver Einzelfallentscheidungen überwindet. Das Verfahren soll es ermöglichen, eine Wartung möglichst gut dem tatsächlichen Verschleißgrad und der daraus resultierenden Ausfallswahrscheinlichkeit anzupassen. Gleichzeitig soll dasTo specify maintenance intervals for motor vehicle assemblies, which overcomes the disadvantages described above of general maintenance intervals or subjective individual decisions. The method should enable maintenance to be adapted as well as possible to the actual degree of wear and the resulting failure probability. At the same time
Verfahren möglichst einfach mit bereits bestehenden elektronischen Steuerungskomponenten von Kraftfahrzeugen zu realisieren sein.The method can be implemented as simply as possible with existing electronic control components of motor vehicles.
Die Erfinder haben erkannt, dass die Intervalle, nach denen Wartungseinheiten inspiziert oder ausgetauscht werden müssen, durch ein mehrstufiges Verfahren in geeigneter Art und Weise zu ermitteln sind.The inventors have recognized that the intervals after which maintenance units have to be inspected or replaced can be determined in a suitable manner by a multi-stage method.
In einer ersten Stufe des Verfahrens werden die relevanten Belastungen auf eine Wartungseinheit analysiert und das Ausfallverhalten, welches mit diesen Belastungen verbundenen ist, durch Versuche und Berechnungen, insbesondereIn a first stage of the method, the relevant loads on a maintenance unit are analyzed, and the failure behavior associated with these loads is carried out by tests and calculations, in particular
Korrelationsrechnungen, ermittelt. Hierbei können unterschiedliche Kriterien für den Ausfall einer Wartungseinheit festgelegt werden, wie beispielsweise nicht zulässiger Verschleiß, Bruch, Verformung oder auch eine nicht tolerierbare Funktionsänderung.Correlation calculations. Different criteria for the failure of a maintenance unit can be defined, such as for example inadmissible wear, breakage, deformation or an intolerable change in function.
Das Ergebnis dieser ersten Stufe des Verfahrens ist ein Kennfeld, in dem das Ausfallverhalten in Abhängigkeit der unterschiedlichen Belastungshöhe und Belastungshäufigkeit dargestellt wird. Je nach Auswahl der relevanten Belastungen wird das Ausfallverhalten durch ein Kennfeld mit einem oder mehreren Parametern repräsentiert.The result of this first stage of the process is a map in which the failure behavior depending on the different load levels and Load frequency is shown. Depending on the selection of the relevant loads, the failure behavior is represented by a map with one or more parameters.
In der zweiten Stufe des Verfahrens werden die im Fahrbetrieb auftretendenIn the second stage of the process, those that occur while driving are
Belastungen auf die Wartungseinheit ermittelt. Im einfachsten Fall handelt es sich hierbei um die Erfassung der Häufigkeit des Auftretens einer bestimmten Belastung. Vielfach wird jedoch ein verfeinertes Verfahren notwendig, um die auftretenden Belastungen hinreichend genau erfassen zu können, insbesondere wenn es sich um mehrere relevante Belastungsfaktoren handelt oder wenn dynamische Effekte zu berücksichtigen sind.Loads on the maintenance unit determined. In the simplest case, this involves recording the frequency of the occurrence of a certain load. In many cases, however, a refined procedure is necessary in order to be able to record the occurring loads with sufficient accuracy, especially if there are several relevant load factors or if dynamic effects have to be taken into account.
Hierfür kann eine Einteilung der Belastung in Klassen und eine davon ausgehende Zählung der schädigungsrelevanten Ereignisse für jede diese Klassen durchgeführt werden. Diese Zählung kann auf unterschiedliche Art und Weise bewirkt werden, etwa durch die Bestimmung der Verweildauer in der jeweiligen Klasse, die Überschreitungshäufigkeit der Klassengrenze oder die Umkehr der Belastung in der jeweiligen Klasse. Als Ergebnis der zweiten Verfahrensstufe entsteht ein Belastungskollektiv, welches repräsentativ für die Beanspruchung der Wartungseinheit ist.For this purpose, the load can be divided into classes and the damage-related events counted for each of these classes. This counting can be done in different ways, for example by determining the length of stay in the respective class, the frequency of exceeding the class limit or the reversal of the load in the respective class. As a result of the second stage of the process, a load spectrum is created which is representative of the stress on the maintenance unit.
In der dritten Stufe des Verfahrens wird das im Fahrbetrieb ermittelte Belastungskollektiv in geeigneter Weise mit dem aus der ersten Stufe bekannten Ausfallverhalten der Wartungseinheit verrechnet. Das Ergebnis ist eine abstrakte Größe, die als Schadenssumme bezeichnet wird. Diese Schadenssumme, die im laufenden Betrieb zunimmt und auf einfache Art und Weise abgespeichert werden kann, ist im erfindungsgemäßen Verfahren die Kenngröße, die zu einer Inspektion einer Wartungseinheit führt, unter der Bedingung, dass die Schadenssumme eine bestimmte kritische Schwelle überschreitet. Die kritische Schwelle kann durch Kenntnis des Ausfallverhaltens aus der erstenIn the third stage of the method, the load spectrum determined during driving operation is appropriately offset against the failure behavior of the maintenance unit known from the first stage. The result is an abstract quantity called the sum of damage. This sum of damage, which increases during operation and can be stored in a simple manner, is the parameter in the method according to the invention which leads to an inspection of a maintenance unit, on the condition that the sum of damage exceeds a certain critical threshold. The critical threshold can be determined by knowing the failure behavior from the first
Stufe des Verfahrens festgelegt werden. Nachteilig wirken sich hierbei aber die Unsicherheiten aus, die sowohl aus den Korrelationsberechungen und der Kennfeldfestlegung als auch aus den vereinfachten Versuchsdurchführungen zur Ermittelung des Ausfallverhaltens resultieren. Die Ermittelung eines zur Praxis repräsentativen Ausfallverhaltens erfordert einen hohen Versuchsaufwand und ist nicht immer zufriedenstellend durchführbar.Stage of the procedure. However, the uncertainties that result from both the correlation calculations and the Map definition as well as from the simplified tests to determine the failure behavior result. The determination of a failure behavior representative of practice requires a lot of experimentation and cannot always be carried out satisfactorily.
Es schließt sich daher eine vierte Stufe des erfindungsgemäßen Verfahrens an, wonach durch eine Reihe von Felddaten das Ausfallverhalten der Wartungseinheiten in der Praxis ermittelt werden kann. Dazu werden die im Feld erreichten Schadenssummen ermittelt und mit den Versuchsergebnissen aus der ersten Verfahrensstufe verglichen. Anpassungen an das reale Ausfallverhalten können entweder durch Änderungen der Ermittlung der Schadenssumme im elektronischen Steuerungsgerät oder durch Verlegung der kritischen Schwelle der Schadenssumme vorgenommen werden.This is followed by a fourth stage of the method according to the invention, according to which the failure behavior of the maintenance units can be determined in practice using a series of field data. For this purpose, the damage amounts achieved in the field are determined and compared with the test results from the first stage of the process. Adjustments to the real failure behavior can either be made by changing the determination of the damage sum in the electronic control device or by moving the critical threshold of the damage sum.
Mit Kenntnis der Schadenssumme wird jeder Wartungseinheit eine mit geringemWith knowledge of the damage amount, each maintenance unit will be one with a low one
Aufwand zu speichernde und zu verarbeitende Größe zugeordnet, die auf vereinfachte, aber dennoch hinreichend präzise Art und Weise, die tatsächliche Belastung auf das jeweilige Bauteil berücksichtigt und den Schädigungsgrad ermittelt. Diese Kenngröße der Schädigung erlaubt es, die Inspektion innerhalb eines deutlich besser angepassten Wartungsintervalls durchzuführen. Daraus ergibt sich eine deutlich verbesserte Festlegung von Wartungsintervallen mit einer "deutlich geringeren Bandbreite, innerhalb derer aus Kostengründen auf frühzeitige Inspektionen verzichtet und gleichzeitig die Ausfallwahrscheinlichkeit auf ein Minimum reduziert werden kann.Size allocated to effort to be stored and processed, which takes into account the actual load on the respective component and determines the degree of damage in a simplified, yet sufficiently precise manner. This characteristic of the damage allows the inspection to be carried out within a significantly better adjusted maintenance interval. This results in a significantly improved definition of maintenance intervals with a " significantly smaller bandwidth, within which, for cost reasons, early inspections can be dispensed with and at the same time the probability of failure can be reduced to a minimum.
Die Erfindung ist anhand der Zeichnungen näher erläutert. Darin ist im einzelnen folgendes dargestellt:The invention is explained in more detail with reference to the drawings. The following is shown in detail:
Fig. 1 zeigt ein Ablaufschema des erfindungsgemäßen Verfahrens zur Wartungsoptimierung in einem Steuerungsgerät eines Fahrzeugs. Fig. 2 zeigt schematisch die Unterteilung einer Kraftfahrzeugbaugruppe in1 shows a flow diagram of the method according to the invention for optimizing maintenance in a control device of a vehicle. 2 schematically shows the subdivision of a motor vehicle assembly into
Wartungseinheiten am Beispiel eines automatischen Getriebes.Maintenance units using the example of an automatic transmission.
Fig. 3 zeigt schematisch den Zusammenhang zwischen der Höhe und der Häufigkeit der Belastung auf eine Wartungseinheit und demFig. 3 shows schematically the relationship between the amount and frequency of loading on a maintenance unit and the
Ausfallverhalten.Failure behavior.
Fig. 4 zeigt beispielhaft die Einteilung einer Belastung auf eineFig. 4 shows an example of the division of a burden on a
Wartungseinheit in nach der Belastungshöhe gestaffelten Klassen in Verbindung mit der Häufigkeit des Auftretens einer entsprechenden Belastung. iMaintenance unit in classes graded according to the load level in connection with the frequency of the occurrence of a corresponding load. i
Fig. 5 zeigt beispielhaft die Verknüpfung von Lastkollektiv undFig. 5 shows an example of the linkage of the load spectrum and
Ausfallverhalten zur Bestimmung der Schadenssumme.Failure behavior to determine the amount of damage.
Fig. 6: zeigt beispielhaft den Zählvorgang zur Erstellung einesFig. 6: shows an example of the counting process for creating a
Belastungskolletivs.Belastungskolletivs.
Fig. 7 zeigt beispielhaft die Ausfallwahrscheinlichkeit zweier Wartungseinheiten in Abhängigkeit der Schadenssumme sowie dieFIG. 7 shows an example of the probability of failure of two maintenance units as a function of the damage sum, as well as the
Festlegung eines kritischen Schwellwerts für eine der Wartungseinheiten.Definition of a critical threshold for one of the maintenance units.
Figur 2 zeigt in schematisch stark vereinfachter Art und Weise die Wartungseinheiten (W1 - W7) eines automatischen Getriebes, das im Folgenden exemplarisch zur Veranschaulichung der Erfindung herangezogen wird. Die in Figur 2 dargestellte Aufteilung der Wartungseinheiten ist ebenfalls nur beispielhaft. Sie wird sich in der Praxis durch die Bauart der Kraftfahrzeugbaugruppen ergeben, wodurch auch die Vorgehensweise bei Wartungsarbeiten festgelegt ist. So lassen sich aus konstruktiven Gründen nur bestimmte Einheiten als Ganzes inspizieren oder ersetzen, wobei hier die Einbaulage und die Wechselwirkung mit anderen Wartungseinheiten eine wichtige Rolle spielt. Eine weitere Einteilung in Wartungseinheiten wird sich aus der Art der Belastung während des Betriebes ergeben und den daraus resultierenden Abnutzungserscheinungen bzw. der Ermüdung dieses Bauteils.FIG. 2 shows the maintenance units (W1-W7) of an automatic transmission, which is used in the following as an example to illustrate the invention. The division of the maintenance units shown in FIG. 2 is also only an example. In practice, it will result from the design of the motor vehicle assemblies, which also defines the procedure for maintenance work. For design reasons, only certain units as a whole can be inspected or replaced, with the installation position and interaction with other maintenance units playing an important role here. Another division into Maintenance units will result from the type of load during operation and the resulting signs of wear and tear or the fatigue of this component.
In Anwendung des erfindungsgemäßen Verfahrens zur Festlegung vonUsing the inventive method for determining
Wartungsintervallen kann die Einteilung von Kraftfahrzeugbaugruppen in Wartungseinheiten auch so vorgenommen werden, dass die im Folgenden dargestellte Zuordnung von Belastungen zu Schadenssummen in geeigneter Art und Weise durchgeführt werden kann. Das heißt, die Art der Belastung auf eine Wartungseinheit sollte möglichst eindeutig klassifizierbar sein.Maintenance intervals can also be used to classify motor vehicle assemblies into maintenance units so that the assignment of loads to damage amounts shown below can be carried out in a suitable manner. This means that the type of load on a maintenance unit should be classifiable as clearly as possible.
Ausgangspunkt für die Bestimmung der Belastung auf eine Wartungseinheit sind die Betriebsdaten des Fahrzeugs. Hierunter fallen sensorische Daten, beispielsweise über Drehzahlen, Drehmomente, Temperaturen unterschiedlicher Fahrzeugkomponenten, aber auch fahrdynamische Daten, die Fahrzustände charakterisieren. Ferner zählen auch Gebersignale zu den Betriebsdaten, die dem jeweiligen Fahrerwunsch, etwa nach Beschleunigung, entsprechen. Sensorische Daten und Gebersignale stehen in heutigen Fahrzeugen über Kommunikationsnetze, etwa den CAN-Bus, zur Verfügung und dienen der Fahrzeugsteuerung, wie beispielsweise dem Optimieren des Schaltverhaltens in automatischen Getrieben. Unter dem Begriff Betriebsdaten werden nachfolgend Buch alle Informationen über das Fahrzeug, seine Zuladung und die Fahrzeugkomponenten verstanden, die typischerweise in Steuergeräten abgelegt und über die genannten Kommunikationsverbindungen zugänglich sind. Beispielsweise handelt es sich hierbei um Kennlinien des Motors, des Getriebes, der Achs- und Getriebeübersetzungen sowie Massenträgheitsmomente etc.The operating data of the vehicle are the starting point for determining the load on a maintenance unit. This includes sensory data, for example on engine speeds, torques, temperatures of different vehicle components, but also vehicle dynamics data that characterize driving conditions. Furthermore, the operating data also include encoder signals which correspond to the driver's request, for example after acceleration. In today's vehicles, sensory data and encoder signals are available via communication networks, such as the CAN bus, and are used for vehicle control, such as optimizing the switching behavior in automatic transmissions. The term operating data in the following book is understood to mean all information about the vehicle, its payload and the vehicle components, which is typically stored in control units and is accessible via the communication links mentioned. For example, these are characteristic curves of the motor, the gearbox, the axle and gear ratios, and moments of inertia, etc.
Ausgehend von den Betriebsdaten können die auf die jeweiligen Wartungseinheiten einwirkenden Belastungen abgeschätzt werden. Hierfür müssen im Steuergerät der Wartungseinheiten oder der Kraftfahrzeugbaugruppen die zu den Betriebsdaten oder einem Teil dieser Daten zugeordneten Belastungen abgespeichert sein. Die Belastungswirkungen ergeben sich aus der Wirkung von Drehmoment, Drehzahl, Druck, Temperatur auf die Wartungseinheit und den daraus resultierenden Effekten, wie etwa Reibung, Spannung oder Verformung. Eine solche Zuordnung zwischen Betriebsdaten und Belastung ist für jede Wartungseinheit anzugeben und wird vom Hersteller der Wartungseinheit als Belastungsmodell festgesetzt. Diese zugeordneten Belastungsdaten können auch für alle Wartungseinheiten in einem zentralen Steuergerät abgelegt sein.Based on the operating data, the loads on the respective maintenance units can be estimated. For this purpose, the loads associated with the operating data or a part of these data must be stored in the control unit of the maintenance units or the motor vehicle modules. The load effects result from the effect of Torque, speed, pressure, temperature on the maintenance unit and the resulting effects such as friction, tension or deformation. Such an assignment between operating data and load is to be specified for each maintenance unit and is determined by the manufacturer of the maintenance unit as a load model. These assigned load data can also be stored in a central control unit for all maintenance units.
Für den ersten Schritt des erfindungsgemäßen Verfahrens ist es notwendig, mit Belastungstests einen quantitativen Zusammenhang zwischen Belastung und Ausfallswahrscheinlichkeit herzustellen. Dabei handelt es sich vielfach umFor the first step of the method according to the invention, it is necessary to establish a quantitative relationship between stress and the probability of failure using stress tests. In many cases it is
Belastungstests mit Wiederholungen auf einem bestimmten Belastungsniveau bis zum Ausfall in Kombination mit Korrelationsberechnungen. Im einfachsten Fall wird die Anzahl von Belastungsereignissen, dies kann beispielsweise bei einem Getriebe die Anzahl von Gangwechseln sein, mit dem Ausfallsverhalten verknüpft. Figur 3 zeigt in schematisch vereinfachter Art und Weise das Streuband desStress tests with repetitions at a certain stress level up to failure in combination with correlation calculations. In the simplest case, the number of load events, for example the number of gear changes in a transmission, is linked to the failure behavior. Figure 3 shows in a schematically simplified manner the scatter band of the
Ausfallverhaltens bei einer ausgewählten Belastung im Verhältnis zur Belastungshöhe und zur Häufigkeit, mit der diese auftritt. Der schraffierte Bereich in Figur 2 erstreckt sich von einer unteren Schwelle, bei der die Wahrscheinlichkeit, dass ein gegebenes Paar aus Belastungshöhe und Belastungshäufigkeit zu einem Ausfall führt, bei ungefähr 1 % liegt, zu einer oberen Schwelle, welche entsprechend dadurch gekennzeichnet ist, dass die -Wahrscheinlichkeit des Ausfalls bei 99 % liegt. Diese Kurven können natürlich nur näherungsweise angegeben werden und weisen je nach Art der Bestimmung und der Anzahl und Genauigkeit der hierfür durchgeführten Tests eine gewisse Streubreite auf. Somit ist die Festlegung einer Schwelle, die repräsentativ für dasFailure behavior for a selected load in relation to the load level and the frequency with which it occurs. The hatched area in FIG. 2 extends from a lower threshold, at which the probability that a given pair of stress level and stress frequency leads to a failure is approximately 1%, to an upper threshold, which is accordingly characterized in that the -The probability of failure is 99%. These curves can of course only be given approximately and, depending on the type of determination and the number and accuracy of the tests carried out for this purpose, have a certain spread. Thus, setting a threshold that is representative of the
Ausfallverhalten steht, im Ermessen des Fachmanns und wird je nach Art oder Bedeutung der zugeordneten Fahrzeugbaugruppe auf die sichere Seite zu geringeren Ausfallwahrscheinlichkeiten, oder, falls dies tolerierbar ist, in Richtung höherer Ausfallwahrscheinlichkeit verschoben werden. In Figur 3 wird zur Illustration diese, im Folgenden als kritische Ausfallschwelle 1 bezeichneteFailure behavior is at the discretion of the person skilled in the art and, depending on the type or meaning of the assigned vehicle assembly, is on the safe side towards lower failure probabilities or, if this is tolerable, shifted towards a higher failure probability. In FIG. 3, this is referred to as critical failure threshold 1 in the following for illustration
Festlegung, bei einer Ausfallwahrscheinlichkeit von 50 % eingezeichnet und ist als gestrichelte Linie dargestellt. Ferner kann es vorteilhaft sein, dass diese kritische Ausfallschwelle nicht über das gesamte Kennfeld der gleichen Ausfallswahrscheinlichkeit zugeordnet wird. Ist beispielsweise aus Belastungsversuchen bekannt, dass das tatsächliche Ausfallverhalten statistisch stark schwankt, so kann die kritische Ausfallsschwelle in Bereichen großer Variationen um eine mittlere Ausfallswahrscheinlichkeit so korrigiert werden, dass die kritische Ausfallschwelle zu einer sicheren Seite verschoben wird. Im Wesentlichen wird das Ergebnis der ersten Stufe des erfindungsgemäßen Verfahrens somit darin bestehen, relevante Belastungen, die in der Akkumulation zum Ausfall führen, zu bestimmen und ihnen in einem Kennfeld eine kritische Ausfallschwelle zuzuordnen.Definition, drawn in with a probability of default of 50% and is shown as a dashed line. Furthermore, it can be advantageous that this is critical Failure threshold is not assigned to the same failure probability across the entire map. If, for example, it is known from load tests that the actual failure behavior fluctuates significantly in statistical terms, the critical failure threshold can be corrected in areas of great variation by an average failure probability so that the critical failure threshold is shifted to a safe side. Essentially, the result of the first stage of the method according to the invention will therefore be to determine relevant loads that lead to failure in the accumulation and to assign them a critical failure threshold in a characteristic diagram.
Zur Charakterisierung von Ermüdungserscheinungen bei Belastungsversuchen können zerstörungsfreie Messverfahren eingesetzt werden. Ein Beispiel hierfür ist das Röntgen-Refraktionsverfahren, mit dem sich aus der Belastung resultierende, mikrostrukturelle Defekte wie Mikrorisse nachweisen lassen. Auch Simulationen wiederholter Bauteilbelastungen, Schadensakkumulationsrechnungen und Plausibilitätsannahmen sind geeignet, um einen quantitativen Zusammenhang von Belastungsfaktoren und Schädigung herzustellen.Non-destructive measurement methods can be used to characterize the signs of fatigue during load tests. An example of this is the X-ray refraction method, which can be used to detect microstructural defects such as microcracks resulting from the stress. Simulations of repeated component loads, damage accumulation calculations and plausibility assumptions are also suitable for establishing a quantitative relationship between load factors and damage.
Entscheidend für den nachfolgenden zweiten Schritt des erfindungsgemäßenCrucial for the subsequent second step of the invention
Verfahrens ist es, die für eine Wartungseinheit relevanten Belastungen innerhalb -eines Zeitintervalls aus den Betriebsdaten zu bestimmen und in ein nach der Belastungshöhe gestaffeltes Belastungsmuster zu klassieren. Basierend auf dieser Einteilung kann nun eine Zählung der schädigungsrelevanten Ereignisse durchgeführt werden. Hierbei wird unter einer Zählung im weitesten Sinne dasThe method is to determine the loads relevant for a maintenance unit within a time interval from the operating data and to classify them into a load pattern graded according to the load level. Based on this classification, the damage-relevant events can now be counted. This is what a counting means in the broadest sense
Erfassen der Häufigkeit mit der eine Klasse entsprechende Belastung auftritt verstanden. Ein Beispiel hierfür ist eine Einteilung einer thermischen Belastung in mehrere Temperaturüberschreitungsstufen, so dass als Beispiel für eine ereignisgesteuerte Zählweise in einer einzelnen Klasse eine Temperaturüberschreitung von 90° erfasst wird, und die Häufigkeit, mit der dieseUnderstand the frequency with which a class corresponding load occurs. An example of this is a division of a thermal load into several temperature overshoot levels, so that an example of an event-controlled counting in a single class is a temperature overshoot of 90 ° and the frequency with which this is recorded
Belastung auftritt, gezählt wird. In einem verallgemeinerten Fall kann diese Häufigkeitserfassung einer Belastung in einer Klasse auch eine Bestimmung der Zeitdauer sein, über die eine der Klasse entsprechende Belastung auftritt. Eine weitere Möglichkeit, die Häufigkeit des Auftretens einer zu einer Klasse gehörenden Belastung festzuhalten, kann die Bestimmung der Überschreitungshäufigkeit der Klassengrenze in eine festgelegte oder eine beliebige Richtung oder die Umkehr der Belastung in der jeweiligen Klasse sein.Load occurs, is counted. In a generalized case, this frequency recording of a load in a class can also be a determination of the The length of time over which a load corresponding to the class occurs. Another way of recording the frequency of the occurrence of a load belonging to a class can be to determine the frequency of crossing the class boundary in a defined or any direction or to reverse the load in the respective class.
Als Resultat dieses zweiten Schritts entsteht somit eine Darstellung der Belastungshistorie in der Form eines Belastungskollektivs, wie es in schematisch vereinfachter Art und Weise in Figur 4 dargestellt ist. Gezeigt sind vier unterschiedliche Klassen I - IV mit ansteigender Belastungshöhe sowie eine entsprechende Zählung der den jeweiligen Klassen zugeordneten Belastungsereignisse.As a result of this second step, the load history is shown in the form of a load collective, as is shown in a schematically simplified manner in FIG. 4. Four different classes I - IV are shown with increasing load levels as well as a corresponding count of the load events assigned to the respective classes.
Aus dem anschließenden Vergleich dieses Belastungskollektivs mit dem Ausfallverhalten bei derartiger Belastung in der dritten Stufe des erfindungsgemäßen Verfahrens ergibt sich die Festsetzung einer Zunahme der Schadenssumme zum entsprechenden Zeitintervall. An einem schematisch vereinfachten Beispiel, dargestellt in Figur 5, soll dies erläutert werden:From the subsequent comparison of this load collective with the failure behavior with such a load in the third stage of the method according to the invention, an increase in the damage sum at the corresponding time interval is determined. This will be explained using a schematically simplified example, shown in FIG. 5:
Das im Verfahrensschritt 1 bestimmte Ausfallverhalten ist in Figur 5 anhand von zwei Kurven dargestellt, die, in Abhängigkeit der Belastungshöhe und der Ηäufigkeit des Auftretens einer solchen Belastung, eine Ausfallwahrscheinlichkeit von 1 % und von 99 % angenähert beschreiben. Zusätzlich ist der Figur 5 das Belastungskollektiv der zweiten Verfahrensstufe hinzugefügt. Gestrichelt dargestellt ist die Häufigkeit Z\, mit der eine Belastung aus der höchstenThe failure behavior determined in method step 1 is shown in FIG. 5 with the aid of two curves which, depending on the load level and the frequency of occurrence of such a load, approximately describe a failure probability of 1% and 99%. In addition, the load spectrum of the second process stage is added to FIG. The frequency Z \ with a load from the highest is shown in dashed lines
Belastungsklasse IV aufgetreten ist. Für diese Klasse wurde eine Wiederholzahl ZAI für diese Belastung bestimmt bis die kritische Ausfallsschwelle erreicht ist; hier wird exemplarisch eine Ausfallwahrscheinlichkeit von 1 % als kritische Ausfallschwelle angenommen. Demnach kann der bisherigen Wiederholungszahl in dieser Klasse eine Schadenssumme S zugerechnet werden, die sich aus demStress class IV has occurred. A repetition number ZAI for this load was determined for this class until the critical failure threshold was reached; Here, a default probability of 1% is assumed as the critical default threshold. Accordingly, the previous number of repetitions in this class can be assigned a damage sum S, which results from the
Quotienten Z|/ ZAI bestimmt. Entsprechend berechnet sich eine Zunahme der Schadenssumme als Zunahme der Belastungshäufigkeit ΔZ| um ΔS = ΔZ|/ZAI. Bei der in Figur 5 dargestellten progressiven Kurve für die Ausfallswahrscheinlichkeit resultiert, dass kleinere Belastungen zu einer geringeren Erhöhung der Schadenssumme führen, entsprechend stärker wird die Schadenssumme bei höheren Belastungen vergrößert. Zusätzlich ist es denkbar, dass Ausfallverhalten in Abhängigkeit von unterschiedlichen Belastungsparametern zu korrigieren. Dies kann beispielsweise bei erhöhter Temperatur, Druck usw. erfolgen. In diesen Fällen sind Lastkollektiv und Ausfallverhalten gesondert auszuwerten und die Ergebnisse der Schadensummenberechnung zusammenzuführen.Quotient Z | / ZAI determined. Accordingly, an increase in the total damage is calculated as an increase in the frequency of exposure ΔZ | by ΔS = ΔZ | / ZAI. at The progressive curve for the failure probability shown in FIG. 5 results in the fact that smaller loads lead to a smaller increase in the damage sum, and the damage sum is increased correspondingly more with higher loads. In addition, it is conceivable to correct the failure behavior depending on different load parameters. This can take place, for example, at elevated temperature, pressure, etc. In these cases, the load spectrum and failure behavior must be evaluated separately and the results of the damage sum calculation must be combined.
Als illustrierendes Ausführungsbeispiel wird ein durch Drehmomentschwankungen belastetes Getriebeteil betrachtet, das als Wartungseinheit ausgetauscht werden kann. Es wird ferner angenommen, dass aus den Betriebsdaten die Drehmomentesschwankungen bestimmt werden können oder diese zumindest indirekt über ein Modell des Getriebes und der Messung der antriebs- und abtriebsseitigen Drehmomente abgeschätzt werden können. Zunächst führt man eine Einteilung der Belastung in Klassen durch, wobei beispielsweise im vorliegenden Fall mehrere Schwellwerte für das Drehmoment gesetzt werden können und ein Ereignis einer Belastungsklasse dann hinzugefügt wird, wenn eine Überschreitung der Drehmomentschwelle vom niedrigeren zum höheren Drehmoment auftritt. Mögliche feinere Abstufungen und nicht-äquidistanteAs an illustrative exemplary embodiment, a gear part which is loaded by torque fluctuations and which can be replaced as a maintenance unit is considered. It is further assumed that the torque fluctuations can be determined from the operating data or that these can be estimated at least indirectly via a model of the transmission and the measurement of the drive and driven torques. First, the load is divided into classes, for example in the present case several threshold values can be set for the torque and an event is added to a load class when the torque threshold is exceeded from the lower to the higher torque. Possible finer gradations and non-equidistant
Schrittweiten in der Klassierung sind in Bereichen von Vorteil, in denen das Äusfallverhalten große Variationen bei kleinen Parameterveränderungen aufweist. Dies ist insbesondere in der Nähe von Maximalbelastungen der Fall.Step sizes in the classification are advantageous in areas in which the failure behavior shows large variations with small parameter changes. This is particularly the case in the vicinity of maximum loads.
Die Vorgehensweise zur Zählung von Belastungsereignissen in diesem illustrierenden Beispiel ist anhand von Figur 6 dargestellt. Gezeigt ist der zeitliche Verlauf des Drehmoments sowie vier Schwellwerte für das Drehmoment. Mit vertikalen Pfeilen ist jeweils eine Überschreitung einer dieser Schwellwerte und die entsprechende Zuordnung zu einer Belastungsklasse markiert.The procedure for counting load events in this illustrative example is illustrated with reference to FIG. 6. The time curve of the torque and four threshold values for the torque are shown. Vertical arrows indicate that one of these threshold values has been exceeded and the corresponding assignment to a load class.
Auf diese Art und Weise entsteht während des Betriebs ein Belastungskollektiv, welches mit dem aus der ersten Stufe des erfindungsgemäßen Verfahrens ermittelten Ausfallverhalten verrechnet wird. Die Erhöhung der Belastungsanzahl in einer Klasse führt zu einer Erhöhung der Schadenssumme, die sich wie oben dargestellt über den Quotient der tatsächlichen Belastung bzw. der tatsächlichen Belastungszunahme und der in dieser Klasse zugeordneten mittleren Belastungsanzahl bis zur kritischen Ausfallsschwelle bestimmt. Dieser Anteil derIn this way, a load collective arises during operation, which corresponds to that from the first stage of the method according to the invention determined failure behavior is offset. The increase in the number of loads in a class leads to an increase in the total damage, which, as shown above, is determined by the quotient of the actual load or the actual increase in load and the average number of loads assigned to this class up to the critical failure threshold. This share of
Schadenssumme wird für jede Klasse berechnet, so dass sich die gesamte Schadenssumme für diese Wartungseinheit aus den Teilsummen zusammensetzt, die sich für die unterschiedlichen Klassen ergeben.Damage total is calculated for each class, so that the total damage total for this maintenance unit is made up of the subtotals that result for the different classes.
Die Schadenssumme einer Wartungseinheit kann aus unterschiedlichen Beiträgen und somit aus gewichteten Teilschadenssummen bestehen, wenn unterschiedliche, nicht zusammenwirkende Schädigungsmechanismen existieren, die nicht sinnvoll in einem einheitlichen Belastungsmuster kombinierbar sind. Dies gilt insbesondere, wenn die Belastungsfaktoren deutlich unterschiedliche Zeitkonstanten besitzen und damit die Zunahme der Teilschadenssummen mit verschiedenen Zeitintervallen erfasst werden. Auch eine Kombination von Dauerbelastungen und Belastungsereignissen ist durch die Summation von getrennt ermittelten Teilschadenssummen zu einer der Wartungseinheit zugeordneten Schadenssumme möglich.The damage sum of a maintenance unit can consist of different contributions and thus of weighted partial damage sums if there are different, non-interacting damage mechanisms that cannot be meaningfully combined in a uniform load pattern. This applies in particular if the load factors have significantly different time constants and thus the increase in the partial damage sums are recorded with different time intervals. A combination of permanent loads and stress events is also possible through the summation of separately determined partial damage sums to a damage sum assigned to the maintenance unit.
Zusätzlich weist das erfindungsgemäße Verfahren eine vierte Stufe auf, in der zur Korrektur von Ungenauigkeiten in den vorangehenden Verfahrensschritten ein kritischer Schwellwert S für die Schadenssumme anhand von realen Felddaten gesetzt wird. Nach der Vorgehensweise entsprechend der Schritte 1 bis 3 des Verfahren, sollte die abstrakte Größe der Schadenssumme möglichst gut die tatsächliche Belastung auf eine Wartungseinheit und damit ihr Ausfallverhalten nachbilden. Demnach sollte bei der Aufzeichnung der Schadenssumme im Betrieb diese mit der Ausfallwahrscheinlichkeit in einem typischen Zusammenhang stehen, welcher schematisch in Figur 7 gezeigt ist. Hierbei werden zwei interpolierte Ausfallwahrscheinlichkeiten für das Bauteil A und das Bauteil B inIn addition, the method according to the invention has a fourth stage, in which a critical threshold value S for the damage sum is set on the basis of real field data in order to correct inaccuracies in the preceding method steps. According to the procedure according to steps 1 to 3 of the procedure, the abstract size of the damage sum should best represent the actual load on a maintenance unit and thus its failure behavior. Accordingly, when recording the sum of damage during operation, this should be in a typical relationship with the probability of failure, which is shown schematically in FIG. 7. Two interpolated failure probabilities for component A and component B in
Abhängigkeit der Schadenssumme dargestellt. Kennzeichnend in beiden Fällen ist ein weitestgehend ausfallfreier Bereich für Schadenssummen unterhalb eines bestimmten Grenzwertes. Der kritische Schwellwert Sk für die Schadenssumme ist nun so zu wählen, dass er noch mit hoher Sicherheit in diesem ausfallfreien Bereich oder, sollte ein gewisses Ausfallrisiko bei einer Baueinheit tolerabel sein, zumindest gerade zu Beginn des Anstiegs der Ausfallwahrscheinlichkeit zu liegen kommt. Durch diese Festlegung des kritischen Schwellwertes Sk für dieDependence of the damage sum shown. Characteristic in both cases is a largely failure-free area for damage amounts below one certain limit. The critical threshold value S k for the damage sum is now to be selected such that it still comes to a high degree of certainty in this failure-free area or, should a certain failure risk be tolerable for a structural unit, at least just at the beginning of the increase in the failure probability. By determining the critical threshold value S k for the
Schadenssumme ist eine gewisse Fehlerkorrektur der vorangehenden Verfahrensschritte durchzuführen. Ferner kann bei deutlich abweichenden Ergebnissen bei Betrieb einer Vielzahl von gleichen Wartungseinheiten eine sehr einfache Korrektur von Wartungsintervallen und damit des Ausfallrisikos vorgenommen werden, in dem der kritische Schwellwert Sk für dieA certain amount of error correction in the previous procedural steps must be carried out. In addition, if the results from operating a large number of identical maintenance units differ significantly, a very simple correction of maintenance intervals and thus the risk of failure can be carried out by setting the critical threshold value S k for the
Schadenssumme angepasst wird.Damage amount is adjusted.
Figur 1 fasst das erfindungsgemäße Verfahren zusammen. Es zeigt die vier Verfahrensstufen zur Bestimmung von Wartungsintervallen in der Ablaufreihenfolge, wie sie in einem Steuergerät eines Fahrzeugs realisiert werden können. Das Steuergerät steht in Verbindung mit der Sensorik des Fahrzeugs und den Steuerungs- und Regelungsdaten der Wartungseinheiten und empfängt femer Gebersignale. Im Steuergerät sind zusätzliche Fahrzeugdaten sowie Belastungsmodelle für die zu überwachenden Wartungseinheiten abgelegt. Wie im Ablaufschema dargestellt, werden externe und interne Informationen zuFigure 1 summarizes the inventive method. It shows the four process stages for determining maintenance intervals in the sequence in which they can be implemented in a control unit of a vehicle. The control unit is connected to the sensor system of the vehicle and the control and regulation data of the maintenance units and also receives encoder signals. Additional vehicle data and load models for the maintenance units to be monitored are stored in the control unit. As shown in the flowchart, external and internal information is added
Betriebsdaten verbunden. Im nachfolgenden Schritt, welcher der zweiten Stufe "des erfindungsgemäßen Verfahrens entspricht, werden diese Betriebsdaten klassiert. Hierbei ist es möglich, sowohl die aktuellen Betriebsdaten, wie auch solche aus einem bestimmten Zeitintervall, zur Klassierung zu verwenden. Das Resultat ist die Verarbeitung der zu den Wartungseinheiten gehörendenOperating data connected. In the subsequent step, which corresponds to the second stage "of the method according to the invention, these operating data are classified. It is possible to use both the current operating data and also those from a specific time interval for the classification. The result is the processing of the data Maintenance units belonging
Belastungshistorie zu jeweils zugeordneten Belastungskollektiven. Diese werden dann mit dem aus der ersten Verfahrensstufe bekannten Ausfallverhalten der Wartungseinheiten verknüpft, wobei im Steuergerät nur die entsprechenden Informationen über das Ausfallverhalten abgelegt sind und die entsprechenden Versuche und Korrelationsberechnungen unabhängig vom Steuergerät durchgeführt werden. Aus der Verbindung von Belastungskollektiv und Ausfallsverhalten wird im Steuergerät die abstrakte, möglichst der Belastungshistorie entsprechende Größe der Schadenssumme bestimmt. Dies entspricht der dritten Verfahrensstufe. Die anschließende vierte Verfahrensstufe dient dem Vergleich der Schadenssumme mit einem kritischen Schwellwert Sk. Bei einer Überschreitung dieses Werts ist ein Wartungsintervall vollendet und ein Kundendienst mit Wartung und eventuellem Austausch der entsprechendenLoad history for each assigned load collective. These are then linked to the failure behavior of the maintenance units known from the first method step, only the corresponding information about the failure behavior being stored in the control device and the corresponding tests and correlation calculations being carried out independently of the control device. The combination of load collective and failure behavior in the control unit becomes the abstract, if possible the Determination of the amount of damage corresponding to the load history. This corresponds to the third stage of the process. The subsequent fourth process stage is used to compare the damage sum with a critical threshold value S k . If this value is exceeded, a maintenance interval is completed and customer service with maintenance and possible replacement of the corresponding one
Wartungseinheit ist die Folge. Ist dies nicht sofort möglich, besteht zumindest eine der Reaktionsmöglichkeiten in einem Schonbetrieb der Wartungseinheit.Maintenance unit is the result. If this is not immediately possible, at least one of the reaction options is to operate the maintenance unit carefully.
Die Verfahrensschritte, die im Kraftfahrzeug selbst durchgeführt werden, sind sehr einfach und können meist mit bereits zur Verfügung stehenden Steuergeräten vollzogen werden. Dies wird dadurch erreicht, indem die aufwendigen Verfahrensschritte der Erstellung eines Belastungsmodells, um aus den Betriebsdaten Belastungen abzuschätzen, der Vorgehensweise zur Klassierung von Belastungen in Belastungsmuster sowie zur Erstellung von Belastungskollektiven und zur Zuordnung der Belastungen zu einerThe procedural steps that are carried out in the motor vehicle itself are very simple and can usually be carried out using control devices that are already available. This is achieved by the complex procedural steps of creating a load model to estimate loads from the operating data, the procedure for classifying loads into load patterns as well as creating load collectives and assigning the loads to one
Schadenssummenzunahme auf Voruntersuchungen beruhen, deren Resultate fest in den Steuerungsrealisierungen programmiert werden können. Die Einfachheit der Abarbeitung des Verfahrens im Kraftfahrzeug selbst wird somit durch die Vorarbeit vor Inbetriebnahme erreicht. Dasselbe gilt auch für die vierte Verfahrensstufe, in der die aufwendige Bestimmung eines kritischenDamage total increase based on preliminary examinations, the results of which can be programmed in the control implementations. The simplicity of the processing of the method in the motor vehicle itself is thus achieved through the preparatory work before starting up. The same applies to the fourth process stage, in which the elaborate determination of a critical
Schwellwertes unabhängig vom Fahrzeug durchgeführt wird. Hierbei kann -vorteilhafter Weise das Verfahren durch den ständigen Vergleich mit Felddaten aus dem Kundendienst nachgeeicht werden. So ist es möglich bei jeder Serviceuntersuchung auch die kritischen Schwellwerte an die Erfahrungen anzupassen, die sich aus der Betreuung einer entsprechend großenThreshold is carried out regardless of the vehicle. Advantageously, the process can be verified by constant comparison with field data from customer service. It is thus possible to adapt the critical threshold values to the experiences that result from the care of a correspondingly large one with each service inspection
Fahrzeugflotte ergibt.Vehicle fleet results.
Nach einem Überschreiten des kritischen Schwellwerts der Schadenssumme sind in Figur 1 verschiedene Optionen angegeben. Darüber hinaus kann der Fahrer oder das Steuergerät beim Erreichen des kritischen Schwellwertes über eine drahtlose Verbindung das Servicecenter über den Ablauf eines Wartungsintervalls informieren. In einer vorteilhaften Ausgestaltung der Erfindung wird beim Erreichen der kritischen Schadenssumme der Betrieb des Bauteils nur noch in einem Schonmodus durchgeführt bzw. eine entsprechende Empfehlung wird dem Fahrer signalisiert. After the critical threshold value of the damage sum has been exceeded, various options are indicated in FIG. 1. In addition, the driver or the control unit can inform the service center about the expiry of a maintenance interval via a wireless connection when the critical threshold value is reached. In an advantageous embodiment of the invention, the If the critical damage sum has been reached, operation of the component is only carried out in a gentle mode or a corresponding recommendation is signaled to the driver.

Claims

Patentansprüche claims
1. Verfahren zur Bestimmung von Wartungsintervallen für Kraftfahrzeugbaugruppen, die wenigstens eine Wartungseinheit umfassen; 1.1 jeder Wartungseinheit ist eine Schadenssumme zugeordnet, deren Wert bei1. Method for determining maintenance intervals for motor vehicle assemblies which comprise at least one maintenance unit; 1.1 each maintenance unit is assigned a sum of damage, the value of which is at
Betrieb des Kraftfahrzeugs zunimmt;Operation of the motor vehicle increases;
1.2 aus den Betriebsdaten des Fahrzeugs oder aus einem Teil dieser Daten wird in einem gewählten Zeitintervall die auf eine Wartungseinheit wirkende Belastung bestimmt oder abgeschätzt und in unterschiedliche Klassen eines Belastungsmusters eingeteilt;1.2 the load acting on a maintenance unit is determined or estimated in a selected time interval from the operating data of the vehicle or from part of this data and divided into different classes of a load pattern;
1.3 aus dem Vergleich des Belastungsmusters eines Zeitintervalls mit gespeicherten Daten des Ausfallverhaltens der Wartungseinheit wird die Zunahme der Schadenssumme für dieses Zeitintervall berechnet;1.3 from the comparison of the load pattern of a time interval with stored data of the failure behavior of the maintenance unit, the increase in the damage sum for this time interval is calculated;
1.4 das Ende des Wartungsintervalls für eine Wartungseinheit ist dann erreicht, wenn die zugeordnete Schadenssumme einen bestimmten kritischen1.4 The end of the maintenance interval for a maintenance unit is reached when the assigned amount of damage reaches a certain critical level
Schwellwert überschreitet.Threshold exceeded.
2. Verfahren nach Anspruch 1 , dadurch gekennzeichnet, dass die Zeitintervalle eine regelmäßige Dauer aufweisen, in denen die Klassierung der auf eine Wartungseinheit wirkenden Belastung in Belastungsmuster vorgenommen wird.2. The method according to claim 1, characterized in that the time intervals have a regular duration in which the classification of the load acting on a maintenance unit is carried out in load patterns.
3. Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass die Länge der Zeitintervalle an die jeweilige Wartungseinheit angepasst wird.3. The method according to claim 2, characterized in that the length of the time intervals is adapted to the respective maintenance unit.
4. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Zeitintervalle unterschiedlich sind, in denen die Einteilung der auf eine Wartungseinheit wirkenden Belastung in Belastungsmuster vorgenommen wird und ihr Beginn und ihre Dauer durch das Auftreten definierter Betriebszustände bestimmt wird. 4. The method according to claim 1, characterized in that the time intervals are different, in which the division of the load acting on a maintenance unit into load patterns is carried out and its start and duration is determined by the occurrence of defined operating states.
5. Verfahren nach Anspruch 1 , dadurch gekennzeichnet, dass als Daten zum Ausfallverhalten für jede Klasse des Belastungsmusters die Anzahl von Wiederholungen mit einer der Klasse entsprechenden Belastung bis zum Erreichen einer festgelegten Ausfallwahrscheinlichkeit abgespeichert wird.5. The method according to claim 1, characterized in that the number of repetitions with a load corresponding to the class is stored as data on the failure behavior for each class of the load pattern until a defined failure probability is reached.
6. Verfahren nach Anspruch 5, dadurch gekennzeichnet, dass sich beim Auftreten eines Belastungsereignisses, welches einer Klasse des Belastungsmusters zugeordnet werden kann, die Schadenssumme einer Wartungseinheit um den Kehrwert der Anzahl von Wiederholungen bis zum Erreichen einer festgelegten Ausfallwahrscheinlichkeit erhöht.6. The method according to claim 5, characterized in that when a load event occurs, which can be assigned to a class of the load pattern, the damage sum of a maintenance unit increases by the reciprocal of the number of repetitions until a defined failure probability is reached.
7. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die Schadenssumme einer Wartungseinheit aus Teilschadenssummen besteht, die den einzelnen Klassen des Belastungsmusters zugeordnet sind.7. The method according to any one of claims 1 to 6, characterized in that the damage sum of a maintenance unit consists of partial damage sums which are assigned to the individual classes of the load pattern.
8. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass der kritische Schwellwert aus der Ausfallwahrscheinlichkeit der Wartungseinheit in Abhängigkeit der zugeordneten Schadenssumme bestimmt wird.8. The method according to any one of claims 1 to 7, characterized in that the critical threshold value is determined from the failure probability of the maintenance unit as a function of the assigned damage sum.
"9. Verfahren nach Anspruch 8, dadurch gekennzeichnet, dass der kritische Schwellwert der Schadenssumme so gewählt wird, dass die Ausfallswahrscheinlichkeit unterhalb eines bestimmten Wertes bleibt. " 9. The method according to claim 8, characterized in that the critical threshold value of the damage sum is chosen so that the probability of failure remains below a certain value.
10. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass die Schadenssummen der Wartungseinheiten einer Kraftfahrzeugbaugruppe in einem Steuergerät gespeichert werden, die der Kraftfahrzeugbaugruppe zugeordnet ist.10. The method according to any one of claims 1 to 9, characterized in that the damage sums of the maintenance units of a motor vehicle assembly are stored in a control unit which is assigned to the motor vehicle assembly.
11. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass die Schadenssummen der Wartungseinheiten aller Kraftfahrzeugbaugruppen in einem zentralen Steuergerät gespeichert werden.11. The method according to any one of claims 1 to 9, characterized in that the damage sums of the maintenance units of all Motor vehicle assemblies are stored in a central control unit.
12. Verfahren nach einem der Ansprüche 1 bis 11 , dadurch gekennzeichnet, dass der Fahrzeugbetrieb in Abhängigkeit der Schadenssummen angepasst wird.12. The method according to any one of claims 1 to 11, characterized in that the vehicle operation is adjusted depending on the damage sums.
13. Verfahren nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass die Schadenssummen der Wartungseinheiten für Inspektionen ausgelesen werden kann.13. The method according to any one of claims 1 to 12, characterized in that the damage sums of the maintenance units can be read out for inspections.
14. Verfahren nach einem der Ansprüche 1 bis 13, dadurch gekennzeichnet, dass bei einer bestimmten Schadenssumme ein Warnhinweis ausgelöst wird.14. The method according to any one of claims 1 to 13, characterized in that a warning is triggered when a certain amount of damage.
15. Verfahren nach einem der Ansprüche 1 bis 14, dadurch gekennzeichnet, dass das Verfahren für Wartungseinheiten in einem automatischen Getriebe verwendet wird.15. The method according to any one of claims 1 to 14, characterized in that the method is used for maintenance units in an automatic transmission.
16. Verfahren nach einem der Ansprüche 1 bis 15, dadurch gekennzeichnet, dass das Verfahren für Wartungseinheiten in einem Antriebssystem verwendet wird.16. The method according to any one of claims 1 to 15, characterized in that the method is used for maintenance units in a drive system.
17. Verfahren nach einem der Ansprüche 1 bis 16, dadurch gekennzeichnet, dass das Verfahren für Wartungseinheiten in einem Bremssystem verwendet wird. 17. The method according to any one of claims 1 to 16, characterized in that the method is used for maintenance units in a brake system.
EP04712485A 2003-03-06 2004-02-19 Risk minimisation and maintenance optimisation by determining damage proportions from operational data Withdrawn EP1599842A2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE10310116 2003-03-06
DE2003110116 DE10310116A1 (en) 2003-03-06 2003-03-06 Risk minimization and maintenance optimization by determining damage components from operating data
PCT/EP2004/001575 WO2004078543A2 (en) 2003-03-06 2004-02-19 Risk minimisation and maintenance optimisation by determining damage proportions from operational data

Publications (1)

Publication Number Publication Date
EP1599842A2 true EP1599842A2 (en) 2005-11-30

Family

ID=32891953

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04712485A Withdrawn EP1599842A2 (en) 2003-03-06 2004-02-19 Risk minimisation and maintenance optimisation by determining damage proportions from operational data

Country Status (3)

Country Link
EP (1) EP1599842A2 (en)
DE (1) DE10310116A1 (en)
WO (1) WO2004078543A2 (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004047241A1 (en) 2004-09-29 2006-04-06 Abb Patent Gmbh Method and device for diagnosing technical devices arranged within an industrial plant
BRPI0700362A (en) * 2007-01-15 2008-09-02 Tenneco Automotive Operating automotive suspension wear monitoring device (slm)
DE102007002801B4 (en) * 2007-01-18 2011-02-17 Audi Ag Method for determining a probability of failure of at least one component of a drive device
US7852201B2 (en) * 2007-03-15 2010-12-14 Gm Global Technology Operations, Inc. Apparatus and method for determining the remaining useful life of a transmission filter
DE102007017614A1 (en) 2007-04-12 2008-10-16 Wittenstein Ag Method for the optimal operation of transmissions
GB0807775D0 (en) * 2008-04-29 2008-06-04 Romax Technology Ltd Methods for model-based diagnosis of gearbox
DE102008030870A1 (en) * 2008-06-30 2009-12-31 Continental Automotive Gmbh Internal combustion engine i.e. common-rail-diesel-internal combustion engine, diagnosis method, involves producing signal, during exceeding of specific failure probability, where signal indicates increased risk of valve, reservoir and pump
SE533913C2 (en) * 2009-07-09 2011-03-01 Leine & Linde Ab Procedure for operation of an encoder system and an encoder system
DE102009058331A1 (en) 2009-12-15 2011-06-16 Robert Bosch Gmbh Controller e.g. valve controller, for controlling e.g. physical parameter of motor vehicle, has evaluating unit adapting maximum operating duration to detected operating loads or testing and verifying acceptance of operating duration
EP2767815B1 (en) * 2013-02-18 2018-06-20 IVECO S.p.A. System for monitoring the wear of the gears of a vehicle transmission
ES2666319T3 (en) * 2013-02-18 2018-05-04 Iveco S.P.A. Method and device and computer program and computer-readable media for monitoring clutch wear of an automated manual or manual transmission, particularly for heavy vehicles
AT514683B1 (en) * 2013-10-11 2015-03-15 Avl List Gmbh Method for estimating the damage of at least one technical component of an internal combustion engine
DE102015120203A1 (en) * 2015-11-23 2017-05-24 Dr. Ing. H.C. F. Porsche Aktiengesellschaft Method and system for determining a load on a vehicle
SE541415C2 (en) * 2016-09-26 2019-09-24 Scania Cv Ab Method and system for prediction of a drainage valve malfunction probability
DE102017200274A1 (en) * 2017-01-10 2018-07-12 Zf Friedrichshafen Ag Method for determining the life of components
MX2019011484A (en) 2017-03-30 2019-11-01 Tlv Co Ltd Risk assessment device, risk assessment method, and risk assessment program.
DE102017004424B4 (en) * 2017-05-08 2020-07-09 Mtu Friedrichshafen Gmbh Procedure for the maintenance of an injector as required
DE102017214821B4 (en) * 2017-08-24 2022-05-19 Volkswagen Aktiengesellschaft Diagnostic method for determining the status of at least one traction device, computer program product, storage device, engine control unit and vehicle
DE102017222545A1 (en) * 2017-12-13 2019-06-13 Zf Friedrichshafen Ag Method and control device for assessing the damage of a load-carrying component
DE102018102710B4 (en) 2018-02-07 2023-09-21 Knorr-Bremse Systeme für Nutzfahrzeuge GmbH Method for determining whether a brake needs to be repaired
DE102018104665B4 (en) * 2018-03-01 2022-12-01 Rolls-Royce Solutions GmbH Method for operating an internal combustion engine, control device and internal combustion engine
DE102018104667A1 (en) * 2018-03-01 2019-09-05 Mtu Friedrichshafen Gmbh Method for operating an internal combustion engine, control device and internal combustion engine
CN111855383B (en) * 2020-07-29 2023-09-05 石河子大学 Fatigue life prediction method for wind turbine blade under icing load
DE102022203250A1 (en) 2022-04-01 2023-10-05 Zf Friedrichshafen Ag Procedure for using operational data
EP4276559A1 (en) 2022-05-12 2023-11-15 BAUER Maschinen GmbH Method and system for determining a critical material fatigue condition in civil engineering machines

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3128971C2 (en) * 1981-07-22 1986-02-13 Vdo Adolf Schindling Ag, 6000 Frankfurt Device for indicating the need for maintenance work on an internal combustion engine
DE3234727A1 (en) * 1982-09-18 1984-03-22 Dr.Ing.H.C. F. Porsche Ag, 7000 Stuttgart METHOD FOR DETERMINING THE TIME FOR THE MAINTENANCE OF A MOTOR VEHICLE
US4847768A (en) * 1988-08-29 1989-07-11 General Motors Corporation Automatic engine oil change indicator system
DE4038972C1 (en) * 1990-12-06 1991-11-07 Man Nutzfahrzeuge Ag, 8000 Muenchen, De
DE4305172A1 (en) * 1993-02-19 1994-08-25 Autent Ingenieurgesellschaft F Device for monitoring a safety-relevant element of a motor vehicle
US5642284A (en) * 1994-08-12 1997-06-24 Caterpillar Inc. Maintenance monitor system
DE19709445B4 (en) * 1997-03-07 2004-01-15 Volkswagen Ag Device and method for calculating and displaying service intervals
DE10129457C1 (en) * 2001-06-19 2002-12-19 Daimler Chrysler Ag Automobile service timing and requirement determination method uses tolerance ranges for each service position

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2004078543A3 *

Also Published As

Publication number Publication date
WO2004078543A2 (en) 2004-09-16
DE10310116A1 (en) 2004-09-23
WO2004078543A3 (en) 2005-06-23

Similar Documents

Publication Publication Date Title
EP1599842A2 (en) Risk minimisation and maintenance optimisation by determining damage proportions from operational data
EP1607192B1 (en) Method and system for estimating the wear of robot arm joints
DE102008006370A1 (en) Method and device for monitoring a machine
DE2500086B2 (en)
WO2023061850A1 (en) Method for monitoring the state of a machine tool
DE10348608A1 (en) Production machine motor drive spindle has sensor ring detecting oscillation values and time-temperature profile
EP3390259B1 (en) Method for monitoring a safety circuit of a lift assembly and monitoring device for a safety circuit of a lift assembly
WO2020064712A1 (en) Method for improving the prioritization of messages, software component, operating and observation system, and automation system
EP1405147B1 (en) Monitoring of a measuring signal, in particular in automation technology
EP2956348B1 (en) Monitoring of coupling elements of a vehicle
DE112018002549T5 (en) Electronic control unit
EP1528447B1 (en) Diagnostic method and device for monitoring the functioning of a control loop
EP1262760B1 (en) Method for determining the viscosity of a working fluid of a combustion engine
EP3065015B1 (en) Diagnostic device and method for monitoring the operation of control loops
EP3056957A1 (en) Diagnostic device and method for monitoring the operation of a closed loop
DE60117650T2 (en) Method for detecting streaky defects in a moving paper web
WO2012062387A1 (en) Intelligent visualisation in the monitoring of process and/or system variables
EP1431927A1 (en) Method for estimating the remaining lifetime of an apparatus
DE102012211722A1 (en) Method for diagnosing system component of combustion engine in motor vehicle, involves calculating mean value and computing quick-pass threshold or quick-fail threshold that are determined as function of number of measurement results
DE102019107242A1 (en) Diagnostic method, diagnostic system and motor vehicle
EP3872721A1 (en) Methods and systems for optimizing maintenance of industrial machines
DE102019114488A1 (en) Method for operating a bottling plant and bottling plant
DE10014740B4 (en) Method and apparatus for monitoring resources in a multi-stage manufacturing process
DE102019001627A1 (en) Process for wear detection and predictive wear forecast of electromechanical actuators at the operating time of a machine with an internal combustion engine
WO2019115342A1 (en) Method and device for predicting the failure time of the pressure limiting valve of a high-pressure fuel pump of a motor vehicle

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20050808

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Effective date: 20060506

DAX Request for extension of the european patent (deleted)
RBV Designated contracting states (corrected)

Designated state(s): DE