EP1501999A1 - Meeresboden/flächen-verbindungsinstallation für eine unterwasserrohrleitung, die durch mindestens ein durch eine basis gestütztes rohrkniestück mit einem steigrohr verbunden ist - Google Patents

Meeresboden/flächen-verbindungsinstallation für eine unterwasserrohrleitung, die durch mindestens ein durch eine basis gestütztes rohrkniestück mit einem steigrohr verbunden ist

Info

Publication number
EP1501999A1
EP1501999A1 EP03749918A EP03749918A EP1501999A1 EP 1501999 A1 EP1501999 A1 EP 1501999A1 EP 03749918 A EP03749918 A EP 03749918A EP 03749918 A EP03749918 A EP 03749918A EP 1501999 A1 EP1501999 A1 EP 1501999A1
Authority
EP
European Patent Office
Prior art keywords
pipe
platform
resting
riser
sea
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP03749918A
Other languages
English (en)
French (fr)
Other versions
EP1501999B1 (de
Inventor
Giovanni Chiesa
Floriano Casola
François-Régis PIONETTI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saipem SA
Original Assignee
Saipem SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saipem SA filed Critical Saipem SA
Publication of EP1501999A1 publication Critical patent/EP1501999A1/de
Application granted granted Critical
Publication of EP1501999B1 publication Critical patent/EP1501999B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/015Non-vertical risers, e.g. articulated or catenary-type
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/0107Connecting of flow lines to offshore structures

Definitions

  • the present invention relates to a bottom-surface connection installation of at least one submarine pipe installed at great depth of the tour-hybrid type.
  • a floating support generally comprises anchoring means to remain in position despite the effects of currents, winds and swell. It also generally comprises means for storing and processing petroleum as well as means for unloading towards tanker-lifters, the latter being present at regular intervals to carry out the removal of production.
  • the designation of 0 these floating supports is the Anglo-Saxon term "Floating Production Storage Offloading" (meaning “floating means of storage, production and unloading") whose abbreviated term "FPSO" will be used throughout following description.
  • Hybrid Tower The assembly is commonly called “Hybrid Tower”, because it involves two technologies, on the one hand a vertical part, the tower, in which the riser is made up of rigid pipes, on the other hand the upper part of the riser made up of flexible in chain which ensure the connection to the floating support.
  • the assembly is commonly called “Hybrid Tower” because it involves two technologies, on the one hand a vertical part, the tower, in which the riser is made up of rigid pipes, on the other hand the upper part of the riser made up of flexible in chain which ensure the connection to the floating support.
  • French patent FR 2 507 672 published on December 17, 1982 and entitled “riser for great water depths”, which describes such a hybrid tower.
  • the present invention relates more particularly to the known field of type connections comprising a vertical hybrid tower anchored to the bottom and composed of a float located at the top of a vertical riser, the latter being connected by a pipe, in particular a flexible pipe. taking its own weight in the form of a chain from the top of the riser, to a floating support installed on the surface.
  • the advantage of such a hybrid tower lies in the possibility for the floating support to be able to deviate from its normal position by inducing a minimum of stresses in the tower as well as in the portions of conduits in the form of suspended chains, both basically only on the surface.
  • WO 00/49267 describes a tower whose float is at a depth greater than half a water height and whose catenary connection to the surface ship is made at 1 using thick rigid pipes.
  • the tower thus described requires, at its base, flexible connection cuffs making it possible to connect the lower end of the vertical risers of said tower to the underwater pipe resting on the bottom, so as to absorb the movements resulting from the expansions due to the temperature of the fluid transported.
  • the anchoring system comprises a vertical tendon constituted either by a cable, or by a metal bar, or else by a pipe stretched at its upper end by a float.
  • the lower end of the tendon is attached to a base resting on the bottom.
  • Said tendon comprises guide means distributed over its entire length through which said vertical risers pass.
  • Said base can be simply placed on the bottom of the sea and remain in place by its own weight, or remain anchored by means of batteries or any other device capable of holding it in place.
  • the lower end of the vertical riser is capable of being connected to the end of a bent, movable cuff, between a high position and a low position, relative to said base, to which this cuff is suspended and associated with a return means bringing it back to the high position in the absence of the riser.
  • This mobility of the bent cuff makes it possible to absorb variations in the length of the riser under the effects of temperature and pressure.
  • a stop device integral with it, comes to rest on the installed support guide at the head of the float and thus keeps the entire riser in suspension.
  • connection with the underwater pipe resting on the seabed is generally carried out by a section of pipe in the shape of a pigtail or in the shape of an S, said S then being produced in a plane either vertical or horizontal, the connection with said underwater pipe being generally carried out by means of an automatic connector.
  • pipe-in-pipe comprising a pipe conveying the hot fluid installed in an external protective pipe, the space between the two pipes being either simply filled with heat insulation, confined or not vacuum, or simply vacuum.
  • Many other materials have been developed to provide high performance insulation, some of them being resistant to pressure, simply surround the hot pipe and are generally confined within a flexible or rigid outer jacket, in pressure and whose main function is to maintain a substantially constant geometry over time.
  • All these devices conveying a hot fluid within an insulated pipe exhibit, to varying degrees, phenomena of differential expansion.
  • the internal pipe generally made of steel
  • the external envelope very often also made of steel
  • the forces generated on the connecting elements between the internal pipe and the external envelope are considerable and can reach several tens, even several hundred tonnes and the resulting overall elongation is of the order of 1 to 2 m in the case of isolated pipes of 1000 to 1200m in length.
  • the problem posed according to the present invention is to be able to produce and install such bottom-surface connections for underwater pipes at great depths, such as beyond 1000 meters for example, and of the type comprising a vertical tower and the transported fluid must be maintained above a minimum temperature until it reaches the surface, minimizing the components subject to heat loss, avoiding the drawbacks created by the proper thermal or differential expansion of the various components of said tower, so as to withstand the extreme stresses and phenomena of cumulative fatigue over the life of the structure, which commonly exceeds 20 years.
  • Another problem of the present invention is to provide a bottom-surface connection installation of the tower-hybrid type, the anchoring system of which is of great resistance and of low cost, and the method of setting up the different components is simplified and also of low cost.
  • Another problem at the basis of the invention is to provide an installation which makes it possible to intervene inside the underwater pipe resting at the bottom of the sea, by a "coil-tubing" type process from the surface. and from the upper end of the vertical riser.
  • a solution to the problems posed is therefore a bottom-surface connection installation for an underwater pipe resting on the seabed, in particular at great depth, comprising: a) at least one vertical riser connected at its lower end to at least one pipe underwater resting at the bottom of the sea, and at its upper end at least one float, and b) at least one connecting pipe, preferably a flexible pipe, ensuring the connection between a floating support and the upper end of said vertical riser, and c) the connection between the lower end of said vertical riser and a said submarine pipe resting at the bottom of the sea is done by means of an anchoring system comprising a base placed on the bottom.
  • the installation is characterized in that:
  • said base maintains and guides the junction elements between the lower end of said vertical riser and the end of the terminal rectilinear horizontal part of said pipe lying at the bottom of the sea, and
  • junction elements include • a rigid pipe element having an elbow-shaped curvature and A pipe connection element, preferably a single connection element, more preferably a single automatic connector,
  • junction elements - Maintaining and guiding said junction elements being such that said junction elements can only move in a translational movement in a single longitudinal direction YY 'corresponding substantially to the axial direction of said horizontal rectilinear terminal part of said pipe under -marine resting at the bottom of the sea.
  • junction elements which can only move according to a single degree of freedom in linear translation, can thus absorb any movements of expansion and retraction of the pipe resting at the bottom of the sea in said direction, as will be explained more far.
  • the substantially fixed point at altitude is located at the bottom of the tower at the flexible joint, which makes it possible to eliminate the bent connecting cuffs of the prior art, the vertical movements of the riser being absorbed by the float, free to move vertically at the top of said riser.
  • elbow-shaped curvature is understood to mean two short rectilinear sections arranged at 90 °, separated and interconnected by a curved section having a radius of curvature, preferably a large radius of curvature, in particular a radius of curvature greater than 5 m, more particularly on the order of 5 to 10 m, said elbow-shaped pipe portion having an axial plane, comprising the axes of the two said straight pipe sections arranged at 90 °.
  • the curvature is in the form of an arc of a circle.
  • a rigid pipe element in particular of length from 7 to 15 m.
  • Said elbow-shaped pipe portion providing the junction between said vertical riser and said pipe lying horizontally at the bottom of the sea, it is understood that said elbow-shaped pipe portion is arranged so that its said axial plane is in position vertical.
  • vertical riser is used here to account for the theoretical position of the riser when it is at rest, it being understood that the axis of the riser can have angular movements relative to the vertical and move in a cone d angle whose apex corresponds to the fixing point of the lower end of the riser on said base.
  • the term "vertical axial plane” means that this axial plane is in a position perpendicular to the plane of the seabed on which said base rests, which plane is theoretically a horizontal plane, and said axial plane comprises the axis of the rectilinear terminal part of the pipe lying at the bottom of the sea.
  • connection elements consist of a first male or female part which cooperate respectively with a second female or male part.
  • connection elements in particular of the automatic connector type, are known to those skilled in the art and include locking between a male part and a complementary female part, this locking being designed to be done very simply at the bottom of the sea at using a ROV, robot controlled from the surface, without requiring direct manual intervention by personnel.
  • Said connecting pipe between the floating support and the upper end of the vertical riser can be:.
  • said base comprises:
  • controlled movement is understood to mean a movement the amplitude of which is limited by mechanical stops integral with the platform.
  • the platform comprises a structure constituting guide elements such as a barrier or slide which prevent any other movement of the mobile support in a lateral direction XX 'or in height, that is to say in a vertical direction 121.
  • the installation according to the present invention is advantageous because it has a relatively static geometry of said junction elements relative to said base, and more particularly with respect to said mobile support, said junction elements being rigidly held on said mobile support.
  • the lower part of the tower is thus perfectly stabilized and no longer supports any effort, especially at the connection between the vertical riser and the pipe resting at the bottom of the sea, since the longitudinal translation movements of the mobile support creates flexibility the end of the pipe - submarine lying at the bottom of the sea, said flexibility-being capable of absorbing by deformation the elongation or the retraction of the underwater pipe under the effect of temperature and pressure , thus avoiding creating considerable thrust forces within the submarine pipe, these forces being able to reach 100, even 200 tonnes or more, and transmitting them to the foundation structure of the riser tower.
  • said vertical riser comprises in its lower end part a flexible joint, preferably reinforced, which allows angular movements ⁇ of the part of said vertical riser situated above said flexible joint, and said junction elements comprise said flexible joint or a portion of vertical riser located below said flexible joint.
  • a flexible joint allows a significant variation in the angle a between the riser axis and its theoretical vertical position at rest, without generating significant stress in the pipe portions located on either side of said flexible joint: these flexible joints are known to those skilled in the art and can be constituted by a spherical ball joint with seal, or a laminated ball joint made of sandwiches of elastomer sheets and adhered sheet, capable of absorbing significant angular movements by deformation of the elastomers, while retaining a perfect seal due to the absence of friction seal. Said angle ⁇ is generally between 10 and 15 degrees.
  • said flexible joint is hollow to allow the fluid to pass, and its internal diameter is preferably preferably of the same diameter as the adjacent conduits which are connected to it, in particular that of the vertical riser.
  • the term “reinforced flexible joint” is understood here to mean a joint capable of transferring to the mobile support the vertical forces created by the tension generated by the sub-surface float, and the horizontal forces created by the swell, and the current acting on the portion vertical riser, float and flexible connection to the floating support, as well as by the movements of said floating support.
  • the installation according to the invention makes it possible to eliminate all of these drawbacks of the prior art and to provide, at the best cost, a riser tower incorporating the most efficient insulation technologies.
  • the installation comprises:
  • said rigid pipe element having an elbow-shaped curvature is fixed directly under the face of said flexible joint and comprises at its other end a first part, preferably female, of a said connecting element, and
  • connection element preferably female
  • connection element preferably male
  • said pipe element having an elbow-shaped curvature perhaps :
  • said rigid elbow-shaped pipe element has at its free end a first part, male or female of a connection element, and the second complementary female or male part respectively of said connection element is located either the end of the rectilinear terminal pipe element of said pipe lying at the bottom of the sea, ie at the end of said vertical riser, more particularly, just below said flexible joint.
  • said movable support comprises a central cavity open on the top by an upper orifice capable of receiving said rigid pipe element having an elbow-shaped curvature when the latter is lowered from the surface within said support mobile.
  • said upper orifice cooperates with blocking elements, preferably a wedge system, making it possible to block said reinforced flexible joint which is thus rigidly and fixedly secured to said movable support, and the horizontal end part of said pipe resting at the bottom. sea is fixedly held on the bottom of said movable support, preferably using a collar system.
  • blocking elements preferably a wedge system
  • junction elements are fixedly fixed relative to said movable support and any expansion or retraction of the pipe which may occur in said axial longitudinal direction of the terminal part.
  • horizontal of said pipe resting at the bottom of the sea generates a displacement of said mobile support with said junction elements by translation in the same longitudinal direction.
  • said upper orifice has a peripheral internal wall in the form of a funnel with a large upper base and said corners allowing the blocking of said reinforced flexible joint consist of frustoconical corners,
  • said platform comprises elements for guiding and holding said mobile support so that said mobile support can only move on said platform by sliding in translation in a said longitudinal direction YY ′, preferably using sliding pads,
  • movable support is held laterally between two lateral guide barriers of said platform, and said lateral guide barriers cooperate with movable blocking elements which in retracted release position allow the descent of said movable support from the surface to a position between the two said lateral barriers over said platform, and in the advanced locking position cooperate with the external shape of said mobile support so that the vertical movement 121 in height thereof is controlled,
  • said base comprises a platform resting at the bottom of the sea, which cooperates with stabilizing elements comprising dead bodies placed over said platform or suction anchors passing through said platform to be sunk into the ground and / or spade-like projecting elements arranged on the underside of said platform and sunk into the sea bottom to prevent any sliding of said platform at the bottom of the sea.
  • the surface support being subjected not only to swell and current, but also to the effects of the wind, the overall movements create at the singular point that constitutes the junction between riser and flexible pipe, considerable efforts in the various mechanical components.
  • the float exerts a vertical traction upwards which can vary from a few tens of tonnes to several hundred tonnes or even beyond 1000 tonnes, depending on the water depth which can reach 1500m, even 3000m, and depending on the diameter internal of the pipe which can vary from 6 "to 14", even 16 ".
  • an installation according to the present invention advantageously comprises at least one float.
  • Another problem according to the present invention is to allow easy intervention inside said riser from the surface, in particular to allow inspection or cleaning of said vertical riser, by introduction of a rigid tube from the upper end of the float. , passing through said connecting device between float and vertical riser.
  • these bottom-surface connections convey a multiphase fluid, that is to say a fluid composed of crude oil, water and gas.
  • a multiphase fluid that is to say a fluid composed of crude oil, water and gas.
  • the local pressure decreases and the gas bubbles then increase in volume, creating phenomena of instability of the fluid stream which can lead to significant jolts.
  • the gas is found in the upper part and the oil-water mixture is trapped in the low points, that is to say in the lower part of the zone of the flexible chain, as well as in the lower part of the substantially vertical section of the riser or even beyond the bend located at the foot of the vertical riser, in the horizontal part of the underwater pipe resting on the bottom of the sea.
  • the multiphase mixture consisting of crude oil, water and gas, tends, when the temperature drops below a value between 30 and 40 ° C, to create two types of plugs which may block production.
  • a first type of plug is due to the formation of hydrates from the gas phase in the presence of water, another type is due to the freezing of paraffin contained in variable proportion in the crude oil of certain petroleum fields, particularly in West Africa.
  • coiled-tubing consisting in pushing a rigid tube of small diameter, generally 20 to 50mm, through the pipe.
  • Said rigid tube is stored wound by simple bending on a drum, then untwisted when it is unwound.
  • Said tube can measure several thousand meters in a single length.
  • the end of the tube located at the barrel of the storage drum is connected via a rotating joint to a pumping device capable of injecting a high pressure liquid and at high temperature.
  • a pumping device capable of injecting a high pressure liquid and at high temperature.
  • connection device between said float and the upper end of said riser comprising:
  • connection of said second flexible pipe to the upper end of said riser is done by means of a swan neck device, which swan neck device also ensures the connection between said riser and a said connecting pipe with the floating support, preferably a so-called flexible pipe,
  • said second flexible pipe is preferably extended through said float by a rigid tubular pipe passing right through the float, so that one can intervene inside said vertical riser from the top of the float through said rigid tubular pipe, then said connecting device made up of said second flexible pipe and through said swan-neck device, so as to access the interior of said riser and clean it by injection of liquid and / or by scraping the internal wall of said riser, then of said underwater pipe resting on the bottom of the sea.
  • Said vertical riser comprises in its upper part above said flexible joint a system of insulated pipes consisting of a set of two coaxial pipes comprising an internal pipe and an external pipe, a fluid or insulating material, preferably a change material live from paraffin type, a gelled insulating compound, or a combination of the two, being preferably placed between the two said pipes, or by maintaining a high vacuum between two pipes.
  • Another advantage of the installation according to the invention is that all the elements can be prefabricated on the ground before being installed. They can thus be mounted "blank" to verify that all the elements cooperate correctly, including the locking means; thus, installation assembly is greatly simplified and the operational time of installation vessels minimized.
  • the submarine conduits were laid and then, after installation of the risers, elbow connection cuffs were manufactured on the basis of a metrology of high precision carried out thanks to ROVs.
  • the cuff, prefabricated on land or on site can measure several tens of meters and must then be installed by the same ROV, which represents a considerable operational time, therefore a very high cost due to the sophistication of specialized installation vessels.
  • the gain achieved by the device and the method according to the invention is calculated in several days of installation vessel as well as in the elimination of the automatic connectors essential at each end of the prefabricated cuff, which represents a reduction in cost. considerable.
  • the objectives of the present invention are therefore also obtained by a method of setting up an installation which comprises the steps in which:
  • a so-called base is installed at the bottom of the sea
  • said platform is placed at the bottom of the sea, and said mobile support on said platform, and said latches are actuated to control and prevent the displacement in height of said mobile support relative to said platform forms while leaving free the movement of controlled translation of said movable support in said longitudinal direction YY ', and
  • the mobile support is assembled on the surface within the platform, then the assembly is then lowered and put in place on the seabed.
  • said junction elements are such that: a) said underwater pipe resting on the seabed is equipped at its end with a said rigid pipe element having an elbow-shaped curvature, said elbow-shaped pipe element having at its upper end a said first part of a connection element, and b) said vertical riser is equipped at its lower end with a said flexible joint and of a said second part of connection element on the underside of said flexible joint.
  • Figure 1 is a side view of the top of a hybrid tower connected to a floating support of the FPSO type, with a ship 2 carrying out an intervention operation vertical to said tower.
  • FIG. 2 shows a sectional view of the lower part of the installation according to the invention, after connection of the vertical riser with said underwater pipe resting on the bottom of the sea.
  • FIG. 3 represents a top view at the level of the upper orifice of the mobile support 14 of FIG. 2 with a frustoconical wedge system 17.
  • Figure 4 is a sectional side view of the lower part of the installation, after connection.
  • Figure 5 is a sectional view of the base before installation of said movable support and said pipes to be connected.
  • Figure 6 is a side view of the base comprising the platform and the movable support put in place before the establishment of the pipes to be connected.
  • Figure 7 is a sectional view of the installation in its lower part showing the establishment of the pipe element having a curvature in the form of an elbow descending inside said movable support.
  • Figure 8 is a sectional view of the lower part of the installation in the installation step subsequent to the step of Figure 7 in which, after installation of the elbow-shaped pipe element , it descends, inside said movable support, the lower end of said riser equipped with a flexible seal and a female part of a connection element.
  • FIG. 9 represents a sectional view of the lower part of the installation after connection of the pipes on the underside of the flexible joint.
  • FIG. 10 represents a side view in section of FIG. 9.
  • FIG. 11 represents a top view of a base according to the invention comprising a movable support which can slide in translation on a platform 15 supporting guide barriers 16 ⁇ , said translation being controlled by a termination stop 16 3 .
  • FIG. 12 shows a side view in section of an alternative embodiment of the connection of pipes of the installation according to the invention.
  • the FPSO 1 is anchored on an oil field by 1500m of water height, by an anchoring system not shown and has at its plating a support system 2 ⁇ flexible pipes 3 of effluents tankers in chain configuration going up towards a device in the form of a swan neck 4- ⁇ , itself secured to the upper end of a vertical riser 5.
  • the whole is kept in tension by said float 6 installed at the head of the riser vertical 5 by means of a flexible pipe 7.
  • Said float 6 is crossed by a pipe 8 in continuity with said flexible 7 to lead to an orifice closed by a valve 9.
  • An intervention vessel 2 situated vertically above said float can perform a maintenance operation by coil-tubing through the float 6, so as to push in the vertical part of the pipe, a rigid pipe, not shown, of small diameter, generally 50mm, intended to clean the interior of the pipeline as it progresses.
  • Coil-tubing devices being known to those skilled in the art in the field of interventions on oil wells will not be developed in more detail here.
  • FIGs 2 to 4, and 6 to 12 there is shown the lower part of an installation according to the invention in which the connection between the lower end of said vertical riser 5 and said underwater pipe 10 resting at the bottom of the sea is done through an anchoring system comprising a base 4 placed on the bottom.
  • Said base 4 includes:
  • movable support 14 being able to move in a controlled manner on said platform in a said translation in a said longitudinal direction
  • the platform 15 comprises a structure constituting guide elements 16 ⁇ such as barrier or slide which prevent any other movement of the mobile support in a lateral direction XX 'or in height, that is to say in a vertical direction 121.
  • Said base 4 rigidly maintains and guides the junction elements 11-13 between the lower end of said vertical riser 5 and the end of the rectilinear terminal horizontal part of said pipe lying at the bottom of the sea 10, and said elements junction 11-13 comprise a pipe element having an elbow-shaped curvature 11 and a pipe connection element 12, preferably a single connection element, more preferably, a single automatic connector, maintaining and guiding the said elements junction elements 11-13 being such that said junction elements 11-13 can only move in a translational movement in a single longitudinal direction YY 'corresponding to the axial direction of said part horizontal rectilinear terminal of said underwater pipe lying at the bottom of the sea 10.
  • FIGS 2 and 9 show sections in front view of an installation according to the invention after installation of all the junction elements and pipes to be connected.
  • Figures 4 and 10 show side views of an installation according to the invention, after installation of the junction elements and the pipes to be connected.
  • FIGS. 5 to 8, as well as 11 and 12 represent views of different constituent elements of the installation according to the invention during the different phases of the installation procedure.
  • FIG 5 there is shown the platform 15 surmounted by the lateral guide barriers 16 ⁇ which guide in the sliding in longitudinal translation in the direction YY 'of the movable support element whose lower part is maintained between said guide barriers 16 ⁇ .
  • a stop element I6 3 has been shown which makes it possible to control the sliding in translation and prevents excessive sliding of the movable support 14 inside the guide barriers I6 1 over the platform 15
  • This sliding in translation in the direction..YY ' is made possible by means of sliding pads 14- ⁇ , arranged below said movable support 14, on its sides and on top. It is also possible to use rollers or any other device aimed at reducing friction during longitudinal displacements in the direction YY '.
  • FIG 6 there is shown the movable support 14 lowered from the surface using cables not shown, inserted between the elevated structures constituting the guide barriers I6 1 disposed above the guide platform 15.
  • This movable support 14 can move along a longitudinal axis YY 'thanks to the sliding pads 14 ⁇ but can neither move laterally along the axis XX', nor upward along the axis 12.
  • the upper part of the barriers guide 16 1 cooperates with movable blocking elements consisting of a wedge system 16, which can be engaged so that the external shape of the lower part of the movable support at a shoulder 14 4 on which rests sliding pads 14- ⁇ , abut against said engaged corners 16 2 preventing the elevation of the movable support 14.
  • the guide barriers I6 1 arranged pa r above the platform 15 are spaced so as to provide a sufficient clearance, for example 1 cm, on either side of the movable support when the latter is placed on the platform between said guide barriers 16 ⁇ to avoid possible jamming during movements along the axis YY 'of the movable support 14 over the platform 15.
  • the platform 15 is held in position on the seabed 20 either by its own weight, or by adding dead bodies 15 2 , or via dark suction anchors 15 3 across the platform, or again by a combination of these methods. Spades 15 ⁇ are advantageously provided on the underside of the platform 15 to avoid any sliding or horizontal displacement of the platform whatever the direction.
  • FIGs 2, 6 7, 8 and 12 there is shown the mobile support which rests on its lower pads 14 ⁇ on the platform 15. More specifically, the lower pads 14- ⁇ rest on a notch at the base of the barriers guide 16 ⁇ . This type of position occurs when the upper float 6 of FIG. 1 is not completely deballasted and keeps the riser 5 in tension, and the self-weight of the mobile support 14 is such that said mobile support nevertheless rests on its pads lower 14- ⁇ .
  • the platform 15 can have a length of 10 to 12 m and a width of 6 m, capable of receiving dead bodies 15 2 from 25 to 50 tonnes.
  • the mobile support 14 can have a mass of 40 tonnes corresponding to the tension minimum required at the riser base, that is to say at the flexible joint 13.
  • Said movable support 14 can measure approximately 1.5 m wide and 4 m long.
  • the mobile support 14 is positioned substantially in the middle of the platform, which allows a relative displacement ⁇ of plus or minus 3 m, along the axis XX ', displacement generated by the expansion or the thermal shrinkage, as well as underwater pipe 10, as well as by the internal pressure of the underwater pipe 10 resting on the bottom.
  • a mobile support 14 has been shown having a central cavity 18, the upper part of which comprises a peripheral internal wall which is flared in the form of a funnel, said cavity 18 being open in its upper part by a orifice 18 ⁇ corresponding to said large base of the upper part in the form of a funnel of the cavity 18.
  • a cradle-shaped base 14 3 makes it possible to receive and support the rigid pipe element having a elbow-shaped curvature 11 which is arranged inside said movable support 14 as shown in FIGS. 2 and 9.
  • the mobile support has an internal cavity also open at its base, so that one can set up the underwater pipe by temporarily installing it on the platform 15, then lower the support mobile over the underwater pipe insofar as the central cavity of the mobile support authorizes the passage of the elbow element 11 and the automatic connector 12, and finally, the underwater pipe is secured to the mobile support, the base 14 3 and said locking means 19-19 ⁇ are located on the wall of the internal cavity of the movable support located above said pipe initially installed on the platform 15.
  • the pipe underwater 10 resting at the bottom of the sea ends in a rigid pipe element having an elbow-shaped curvature 11, ending at its upper part turned upwards by a first part 12- ⁇ of an element connection 12, namely here, a male part.
  • the horizontal rectilinear terminal part of the underwater pipe resting on the seabed 10 located before said elbow-shaped pipe element 11, is supported by the cradle 14 3 on the bottom of said mobile support 14, and it is locked by a device 19 ensures the locking of a ferrule 19 ⁇ welded to the outside of the underwater pipe 10.
  • the mobile support 14 created by the expansion of the underwater pipe 10 resting on the ground under the effect of the temperature and the internal pressure, the said mobile support 14 will slide within the anchored platform 15-16- ⁇ -16 2 between the barriers of lateral guide 16 ⁇ .
  • the forces transmitted to said anchored base are radically reduced, as well as the compression forces within the underwater pipe resting on the bottom, and the risks of buckling and degradation of said underwater pipe are thus eliminated.
  • the vertical riser comprises at its lower end a flexible joint 13, itself- integral with the underside of the second part 12 2 of the automatic connector 12, intended to cooperate with the first part 12 1 to make the connection of the connection element 12 consisting of an automatic connector.
  • the internal passage of the flexible seal 13, as well as of the automatic connector 12 has an internal diameter preferably identical to that of the riser 5.
  • the flexible seal 13 is reinforced by an external reinforcement structure which makes it possible to ensure its embedding in the orifice upper 18 ⁇ of the cavity 18 of the mobile support 14 to ensure the rigidity of the assembly when a system of frustoconical corners 17 comes to lock it in the final position in the cavity 18 at the upper orifice 18 ⁇ of the mobile support 14, as illustrated in the figures.
  • the waterproof flexible joint can be of the mechanical ball joint type or of the elastomer flexible joint type, or even correspond to a limited length of flexible pipe capable of providing the same angular displacement relative to the vertical of the riser 5, in particular in a corner cone. ⁇ up to 15 degrees.
  • the pipe element having an elbow-shaped curvature 11 has a curvature comprising an arc of a circle with a large radius of curvature, in particular a radius of curvature greater than 5 m, more particularly of the order of 5 to 10 m produced by a curved pipe element measuring from 7 to 15 m.
  • the platform 15 is anchored using different anchoring means such as dead bodies 15 2 which are lowered using cables or suction anchors 15 3 , and 3. a said mobile support 14 that Your inserts between the guide barriers 16 ⁇ over the platform 15 and Your activates the locking latches 16 2 which prevent the upward movement in the direction 121 of the mobile support 14 while leaving free the sliding in translation in the longitudinal direction YY 'of the mobile support 14, said sliding in translation in the direction YY' being controlled by the elements abutment I6 3 -I6 4 resting on the platform 15, and
  • said elbowed rigid pipe element 11 is deposited at the bottom of the cavity 18 so that the horizontal rectilinear terminal part of the underwater pipe resting on the seabed rests on the cradle base 14 3 , and said part is secured horizontal terminal of the underwater pipe resting at the bottom of the sea 10 with a locking system 19, 19 ⁇ of the collar type, and
  • a vertical riser 5 is lowered equipped at its lower end with a flexible flexible joint 13 and with the second female complementary part 12 2 of said automatic connector 12 on the underside of said reinforced flexible joint 13, then
  • said reinforced flexible joint or a portion of terminal pipe at the lower end of said riser is blocked below said reinforced flexible joint 13, inside the upper orifice I81 comprising a peripheral wall of flared shape, using a wedge system which locks between said funnel-shaped peripheral wall of said upper opening I8 1 and said reinforced flexible joint 13 or said portion of end pipe below said joint flexible 13.
  • Corners 17 shown in Figures 6 to 8 in the released position relative to said wall of the upper orifice I8 1 are actuated by a ROV by means of hydraulic cylinders not shown to then come to engage inside the 'upper orifice I8 1 against its flared peripheral wall as shown in Figures 4, 9, 10 and 12.
  • the frustoconical corners 17 abut in abutment on the reinforcing structure of said reinforced flexible joint 13 and keep it in fixed position relative to mobile support 14.
  • Complementary locks 14 2 are then actuated by a device not shown, thus making it possible to transfer to the movable support 14 all of the vertical load created by the riser 5 kept in tension by the upper float 6 of FIG. 1.
  • Figure 3 is a sectional view from above relating to the upper orifice 18 ⁇ showing three frustoconical corners 17, one of which is shown in the retracted upward position, and the other two in the jamming position engaged downwardly. inside the hole 18- ⁇ .
  • the installation according to the invention has been described in FIGS. 2 to 11 with a reinforced flexible joint 13 situated above a part 12 2 of automatic connector 12.
  • said rigid pipe element having an elbow-shaped curvature 11 is pre-installed on the underside of said reinforced flexible joint 13, said elbow-shaped pipe element 11 having its free lower end, a first part 12 2 of connection element of the automatic connector type 12.
  • said first part 12 2 of connection element has its axis disposed horizontally slightly above the bottom of the cavity 18 of the movable support 14, once the flexible seal 13 is locked in place in the upper opening 18 ⁇ of the movable support 14 using the corners 17.
  • the connection is then made with the underwater pipe resting at the bottom of the sea 10, the horizontal rectilinear end part of which rests on a carriage 21 sliding on the platform 15 at the using sliding shoes 22, said rectilinear horizontal end portion of the underwater pipe resting at the bottom of the sea 10 being held by cradles 14 3 on the bottom of said movable carriage 21 and integral with said carriage 21 by a collar of lock 19-19 ⁇ .
  • the connection is made by displacement, in said longitudinal direction YY ', of said movable carriage 21 between said sliding barriers 16 ⁇ on the platform 15. Finally, the carriage 21 is secured to the movable support 14 by means not shown.
  • the installation comprises a connecting device 4- ⁇ , 7 between said float 6 and the upper end of said riser 5, comprising: a second flexible pipe 7, the ends of which are embedded at the level respectively of the underside of said float 6 and of the upper end of the riser 5,
  • connection of said second flexible pipe 7 to the upper end of said riser 5 is made by means of a device in the form of a swan neck
  • Said second flexible pipe 7 has at its ends elements of progressive variation of inertia of section 7 ⁇ , 7 2 at the level respectively of the underside of the float 6 and of the upper end of the swan neck.
  • the swan-neck device comprises an upper straight part which provides the junction between said vertical riser and said second flexible pipe connected to said float.
  • a curved elbow-shaped branch allows the junction between the end of said vertical riser and the end of said flexible pipe itself connected to said floating support.
  • the ends of said curve being substantially tangent to the curve of the chain formed by said flexible pipe which provides the connection to the floating support, and substantially tangent with said straight part of the device in the form of a swan neck.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Supports For Pipes And Cables (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
EP03749918A 2002-05-07 2003-05-05 Meeresboden/flächen-verbindungsinstallation für eine unterwasserrohrleitung, die durch mindestens ein durch eine basis gestütztes rohrkniestück mit einem steigrohr verbunden ist Expired - Lifetime EP1501999B1 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FR0205968 2002-05-07
FR0205968A FR2839542B1 (fr) 2002-05-07 2002-05-07 Installation de liaison fond-surface d'une conduite sous- marine comprenant un element de conduite coude maintenu par une embase
PCT/FR2003/001384 WO2003095788A1 (fr) 2002-05-07 2003-05-05 Installation de liaison fond-surface d'une conduite sous-marine reliee a un riser par un element de conduite soude maintenu par une embase

Publications (2)

Publication Number Publication Date
EP1501999A1 true EP1501999A1 (de) 2005-02-02
EP1501999B1 EP1501999B1 (de) 2006-03-08

Family

ID=29286510

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03749918A Expired - Lifetime EP1501999B1 (de) 2002-05-07 2003-05-05 Meeresboden/flächen-verbindungsinstallation für eine unterwasserrohrleitung, die durch mindestens ein durch eine basis gestütztes rohrkniestück mit einem steigrohr verbunden ist

Country Status (7)

Country Link
US (1) US7025535B2 (de)
EP (1) EP1501999B1 (de)
AT (1) ATE319909T1 (de)
AU (1) AU2003249394A1 (de)
DE (1) DE60303941D1 (de)
FR (1) FR2839542B1 (de)
WO (1) WO2003095788A1 (de)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2852917B1 (fr) 2003-03-26 2005-06-24 Saipem Sa Receptacle a compartiments etanches et procede de mise en place pour recuperer des effluents polluants d'une epave
FR2859495B1 (fr) * 2003-09-09 2005-10-07 Technip France Methode d'installation et de connexion d'une conduite sous-marine montante
US7360968B2 (en) * 2004-01-30 2008-04-22 Heerema Marine Contractors Nederland B.V. Method and device for anchoring a pipeline
FR2867804B1 (fr) * 2004-03-16 2006-05-05 Technip France Methode et installation pour la mise en service d'une conduite
WO2005112574A2 (en) * 2004-05-14 2005-12-01 Exxonmobil Upstream Research Company Flying lead connector and method for making subsea connections
FR2888305B1 (fr) * 2005-07-11 2008-12-12 Technip France Sa Methode et installation de raccordement d'une conduite sous-marine rigide et d'une conduite sous-marine flexible
US20070044972A1 (en) * 2005-09-01 2007-03-01 Roveri Francisco E Self-supported riser system and method of installing same
US7543613B2 (en) * 2005-09-12 2009-06-09 Chevron U.S.A. Inc. System using a catenary flexible conduit for transferring a cryogenic fluid
NO20072021L (no) * 2007-04-20 2008-10-21 Seabed Rig As Fremgangsmate og anordning for intervensjon i en undervanns produksjonsbronn
WO2008144328A1 (en) * 2007-05-17 2008-11-27 Chevron U.S.A. Inc. Stab and hinge-over pipeline end terminal assembly
ATE520181T1 (de) * 2007-06-11 2011-08-15 Vestas Wind Sys As Rohranordnung für eine offshore-anlage
US8011856B2 (en) * 2007-08-10 2011-09-06 Mendel Nock Constant thrust restraint of pipeline walking
US20090223673A1 (en) * 2008-03-04 2009-09-10 Bartlett William F Offshore Riser Retrofitting Method and Apparatus
FR2930587A1 (fr) * 2008-04-24 2009-10-30 Saipem S A Sa Installation de liaison fond-surface d'une conduite rigide avec une conduite flexible a flottabilite positive et une piece de transition d'inertie
FR2933124B1 (fr) * 2008-06-27 2010-08-13 Technip France Procede d'installation d'une tour hybride dans une etendue d'eau, tour hybride et installation d'exploitation de fluides associee
FR2939178B1 (fr) 2008-12-03 2013-05-03 Saipem Sa Conduite sous-marine de jonction comprenant une isolation thermique.
NO337059B1 (no) * 2009-05-25 2016-01-11 Aker Pusnes As Koblingsinnretning
FR2948144B1 (fr) * 2009-07-16 2011-06-24 Technip France Dispositif de suspension de conduite petroliere et methode d'installation
FR2954966B1 (fr) * 2010-01-05 2012-01-27 Technip France Ensemble de support d'au moins une conduite de transport de fluide a travers une etendue d'eau, installation et procede associes.
FR2957649B1 (fr) 2010-03-18 2012-05-11 Saipem Sa Procede de depose d'une ligne sous-marine au fond de la mer
US8425154B1 (en) * 2010-08-30 2013-04-23 Trendsetter Engineering, Inc. System and method for repairing and extended length of a subsea pipeline
US9858810B2 (en) * 2010-09-29 2018-01-02 Siemens Aktiengesellschaft Arrangement and method for controlling and/or monitoring a subsea device
EA201301092A1 (ru) * 2011-05-03 2014-03-31 Бп Корпорейшн Норт Америка Инк. Регулирующая и удерживающая система для подводной гибкой муфты и реализуемый ею способ
WO2015093978A1 (en) * 2013-12-18 2015-06-25 Aker Subsea As Hinged cable termination
CN103899844A (zh) * 2014-04-23 2014-07-02 中国海洋石油总公司 海底管道机械管卡的辅助安装机具
US9382780B1 (en) * 2015-07-21 2016-07-05 Chevron U.S.A. Inc. Vertical swivel connection assembly and systems and methods for use thereof
IT201700032863A1 (it) 2017-03-24 2018-09-24 Saipem Spa Sistema di accoppiamento tra un riser e una struttura di sostegno sottomarina
GB2586725B (en) * 2018-03-26 2022-06-08 Odebrecht Oleo E Gas S A Composite material riser and flowline connection system applicable to hybrid riser, and its construction method
GB2579869B (en) 2018-12-19 2021-06-02 Subsea 7 Do Brasil Servicos Ltda Methods and apparatus for installing subsea risers
CN111023953B (zh) * 2019-11-19 2024-06-14 大连理工大学 一种不同深度海床原位变形测试装置及系统

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4024724A (en) * 1972-05-25 1977-05-24 Deep Oil Technology, Inc. Means and method for making a flowline connection to a subsea connector means
FR2396154A1 (fr) * 1977-07-01 1979-01-26 Emh Perfectionnements apportes a une colonne articulee, pour l'exploitation du fond marin, comportant des tuyauteries raccordables entre la colonne et son embase
FR2507672A1 (fr) 1981-06-12 1982-12-17 Inst Francais Du Petrole Colonne montante pour les grandes profondeurs d'eau
US4615646A (en) * 1984-05-25 1986-10-07 Shell Oil Company Flowline connection means
FR2627542A1 (fr) * 1988-02-24 1989-08-25 Coflexip Dispositif de transfert de fluide entre le fond sous-marin et la surface
FR2790054B1 (fr) 1999-02-19 2001-05-25 Bouygues Offshore Procede et dispositif de liaison fond-surface par conduite sous marine installee a grande profondeur
FR2821143B1 (fr) * 2001-02-19 2003-05-02 Bouygues Offshore Installation de liaison fond-surface d'une conduite sous-marine installee a grande profondeur du type tour-hybride
FR2826051B1 (fr) * 2001-06-15 2003-09-19 Bouygues Offshore Installation de liaison fond-surface d'une conduite sous-marine reliee a un riser par au moins un element de conduite flexible maintenu par une embase

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO03095788A1 *

Also Published As

Publication number Publication date
FR2839542A1 (fr) 2003-11-14
US20050271476A1 (en) 2005-12-08
US7025535B2 (en) 2006-04-11
WO2003095788A8 (fr) 2004-12-16
WO2003095788A1 (fr) 2003-11-20
ATE319909T1 (de) 2006-03-15
DE60303941D1 (de) 2006-05-04
FR2839542B1 (fr) 2004-11-19
AU2003249394A1 (en) 2003-11-11
EP1501999B1 (de) 2006-03-08

Similar Documents

Publication Publication Date Title
EP1501999B1 (de) Meeresboden/flächen-verbindungsinstallation für eine unterwasserrohrleitung, die durch mindestens ein durch eine basis gestütztes rohrkniestück mit einem steigrohr verbunden ist
EP1362161B1 (de) Vorrichtung zur bildung einer verbindung zwischen meeresgrund und oberfläche, einer in grosser tiefe installierten unterwasserleitung
EP1395731B1 (de) Verbindungsanlage zwischen einer unterwasserleitung und einem unterwassersteigrohr
EP1917416B1 (de) Anlage mit mindestens zwei meeresbodenflächensteckern für mindestens zwei auf dem meeresboden liegende unterwasserpipelines
EP2286056B1 (de) Boden-oberfläche-verbindung aus einem starren steigrohr mit flexiblem kanal mit positiver flotation
EP2844820B1 (de) Installation mit meeresboden-zu-oberfläche-verbindungen vom typ eines multi-riser-hybridturms mit flexiblen rohren mit positivem auftrieb
FR2971322A1 (fr) Limiteur de courbure de ligne flexible sous-marine et installation de liaison fond-surface en comprenant
WO2010097528A1 (fr) Installation de liaison fond-surface de type tour hybride multi-riser comprenant des modules de flottabilite coulissants
EP2785952B1 (de) Vorrichtung für flexible und mannigfaltige verbindungen zwischen meeresgrund und oberfläche auf mindestens zwei ebenen
WO2016110617A1 (fr) Dispositifs de lestage et/ou de protection pour lignes subaquatiques
EP2997220B1 (de) Vorrichtung zur verankerung einer laufbahnhalterung in einer vom meeresgrund bis zur oberfläche reichenden anlage
WO2009138610A1 (fr) Element de conduite de transition d'inertie notamment pour encastrement d'une conduite rigide sous-marine
FR2809136A1 (fr) Installation de liaison fond-surface pour conduite sous- marine, dispositif de liaison entre un flotteur et un riser, et procede d'intervention dans ledit riser
EP3265642B1 (de) Anlage mit mindestens zwei unterflächigen verbindungen mit durch balken verbundenen vertikalen steigrohren
WO2015162384A2 (fr) Dispositif d'attache pour lignes subaquatiques
OA18412A (fr) Installation comprenant au moins deux liaisons fond-surface comprenant des risers verticaux reliés par des barres
OA17101A (en) Installation de liaisons fond-surface de type tour hybride multi-risers comprenant des conduites flexibles à flottabilité positive.
OA16986A (rf) Installation de liaisons fond-surface flexibles multiples sur au moins deux niveaux.

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20041027

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

DAX Request for extension of the european patent (deleted)
GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REF Corresponds to:

Ref document number: 60303941

Country of ref document: DE

Date of ref document: 20060504

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060531

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060531

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20060516

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060608

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060608

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060609

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060619

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060808

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20061211

BERE Be: lapsed

Owner name: SAIPEM SA

Effective date: 20060531

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060609

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060909

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060505

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060308

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 14

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 15

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20200417

Year of fee payment: 18

Ref country code: FR

Payment date: 20200522

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20200527

Year of fee payment: 18

Ref country code: IT

Payment date: 20200511

Year of fee payment: 18

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20210601

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210505

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210505

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210601

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200505