EP1500715A4 - Verfahren zum schmieden von titanlegierung und geschmiedetes titanlegierungsmaterial - Google Patents
Verfahren zum schmieden von titanlegierung und geschmiedetes titanlegierungsmaterialInfo
- Publication number
- EP1500715A4 EP1500715A4 EP02722818A EP02722818A EP1500715A4 EP 1500715 A4 EP1500715 A4 EP 1500715A4 EP 02722818 A EP02722818 A EP 02722818A EP 02722818 A EP02722818 A EP 02722818A EP 1500715 A4 EP1500715 A4 EP 1500715A4
- Authority
- EP
- European Patent Office
- Prior art keywords
- titanium alloy
- forging
- forged
- alloy material
- forged titanium
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 229910001069 Ti alloy Inorganic materials 0.000 title 2
- 239000000956 alloy Substances 0.000 title 1
- 238000005242 forging Methods 0.000 title 1
- 238000000034 method Methods 0.000 title 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
- C22F1/16—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of other metals or alloys based thereon
- C22F1/18—High-melting or refractory metals or alloys based thereon
- C22F1/183—High-melting or refractory metals or alloys based thereon of titanium or alloys based thereon
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J1/00—Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
- B21J1/04—Shaping in the rough solely by forging or pressing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J1/00—Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
- B21J1/06—Heating or cooling methods or arrangements specially adapted for performing forging or pressing operations
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C14/00—Alloys based on titanium
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Forging (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2002/004208 WO2003091468A1 (fr) | 2000-11-09 | 2002-04-26 | Procede de forgeage d'alliage de titane et materiau d'alliage de titane forge |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP1500715A1 EP1500715A1 (de) | 2005-01-26 |
| EP1500715A4 true EP1500715A4 (de) | 2005-06-29 |
Family
ID=33485763
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP02722818A Ceased EP1500715A4 (de) | 2002-04-26 | 2002-04-26 | Verfahren zum schmieden von titanlegierung und geschmiedetes titanlegierungsmaterial |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20040244887A1 (de) |
| EP (1) | EP1500715A4 (de) |
| JP (1) | JPWO2003091468A1 (de) |
| WO (1) | WO2003091468A1 (de) |
Families Citing this family (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4939741B2 (ja) | 2004-10-15 | 2012-05-30 | 住友金属工業株式会社 | nearβ型チタン合金 |
| JP5589669B2 (ja) * | 2010-08-19 | 2014-09-17 | 新日鐵住金株式会社 | チタン合金鍛造材の製造方法 |
| US20120096915A1 (en) * | 2010-10-25 | 2012-04-26 | General Electric Company | System and method for near net shape forging |
| JP6084553B2 (ja) * | 2013-02-06 | 2017-02-22 | 株式会社神戸製鋼所 | チタン合金鍛造材およびその製造方法 |
| CA2915299A1 (en) * | 2013-07-10 | 2015-01-15 | Howmet Aerospace Inc. | Methods for producing forged products and other worked products |
| CN108472712A (zh) * | 2016-01-14 | 2018-08-31 | 奥科宁克公司 | 用于生产锻造产品和其它加工产品的方法 |
| CN106903249B (zh) * | 2017-03-06 | 2018-10-02 | 湖南金天钛业科技有限公司 | 一种高组织均匀钛合金饼材的锻造方法 |
| CN112642976B (zh) * | 2020-12-01 | 2022-10-04 | 太原理工大学 | 一种控制钛合金β锻造织构的两段非等温锻造方法 |
| CN113399608B (zh) * | 2021-05-28 | 2022-09-20 | 中国航发北京航空材料研究院 | 一种tb6钛合金异型连接件锻造成形方法 |
| CN114951522B (zh) * | 2022-06-28 | 2023-08-11 | 中南大学 | 一种单晶TiAl的等温锻造方法 |
| CN115287427B (zh) * | 2022-07-19 | 2023-11-10 | 西安聚能高温合金材料科技有限公司 | 一种Fe-Ni-Co基高温合金GH907合金棒材制备方法 |
| CN117655252A (zh) * | 2022-08-31 | 2024-03-08 | 宝武特冶钛金科技有限公司 | 一种TC25钛合金锻件β锻的热加工工艺 |
| CN115740321B (zh) * | 2022-11-24 | 2025-06-24 | 西北工业大学 | 确定具有破碎晶界的网篮组织的钛合金模锻参数的方法 |
| CN118222955B (zh) * | 2023-12-28 | 2024-12-31 | 中国第二重型机械集团德阳万航模锻有限责任公司 | 高强韧tc21钛合金超大型缘条模锻件的显微组织控制方法 |
| CN117926158A (zh) * | 2024-02-01 | 2024-04-26 | 陕西长羽航空装备股份有限公司 | 一种航空钛合金低温等温锻制备方法 |
| CN118305544A (zh) * | 2024-04-25 | 2024-07-09 | 盈利时表业(东莞)有限公司 | 一种tc4钛合金锻压成型工艺 |
| CN118835110B (zh) * | 2024-07-02 | 2025-10-14 | 宝武特冶钛金科技有限公司 | 一种消除β斑的TB6自由锻件的制造方法 |
| CN119426503A (zh) * | 2024-11-08 | 2025-02-14 | 陕西天成航空材料股份有限公司 | 超长规格两相钛合金锻板的锻造方法 |
| CN119500942B (zh) * | 2024-11-26 | 2025-10-17 | 中国航发北京航空材料研究院 | 一种tc32钛合金大规格锻板及其制备方法 |
| CN119588862A (zh) * | 2024-12-09 | 2025-03-11 | 天津大学 | 一种合金材料低温多向锻造工艺及装置 |
| CN121402544A (zh) * | 2025-11-03 | 2026-01-27 | 张家港Aaa精密制造股份有限公司 | 基于智能制造的轴承优化加工方法及系统 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5215600A (en) * | 1991-07-22 | 1993-06-01 | Rohr, Inc. | Thermomechanical treatment of Ti 6-2-2-2-2 |
| EP0834586A1 (de) * | 1996-03-29 | 1998-04-08 | Kabushiki Kaisha Kobe Seiko Sho | Hochfeste titanlegierung, verfahren zur herstellung eines produktes daraus und produkt |
| US5906692A (en) * | 1993-12-28 | 1999-05-25 | Alliedsignal Inc. | Process for producing forged α-2 based titanium aluminides having fine grained and orthorhombic transformed microstructure and articles made therefrom |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3863325A (en) * | 1973-05-25 | 1975-02-04 | Aluminum Co Of America | Glass cloth in metal forging |
| EP0408313B1 (de) * | 1989-07-10 | 1995-12-27 | Nkk Corporation | Legierung auf Titan-Basis und Verfahren zu deren Superplastischer Formgebung |
| JPH03115550A (ja) * | 1989-09-27 | 1991-05-16 | Seiko Instr Inc | β型チタン合金の加工方法 |
| US5125121A (en) * | 1991-09-10 | 1992-06-30 | Wroble Ida B | Cushion protection system for the incontinent |
| JP2002146499A (ja) * | 2000-11-09 | 2002-05-22 | Nkk Corp | チタン合金の鍛造方法並びに鍛造素材及び鍛造材 |
| JP2002177419A (ja) * | 2000-12-12 | 2002-06-25 | Maruman Golf Corp | ゴルフクラブヘッドの製造方法 |
-
2002
- 2002-04-26 JP JP2003587991A patent/JPWO2003091468A1/ja active Pending
- 2002-04-26 WO PCT/JP2002/004208 patent/WO2003091468A1/ja not_active Ceased
- 2002-04-26 EP EP02722818A patent/EP1500715A4/de not_active Ceased
- 2002-04-26 US US10/476,554 patent/US20040244887A1/en not_active Abandoned
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5215600A (en) * | 1991-07-22 | 1993-06-01 | Rohr, Inc. | Thermomechanical treatment of Ti 6-2-2-2-2 |
| US5906692A (en) * | 1993-12-28 | 1999-05-25 | Alliedsignal Inc. | Process for producing forged α-2 based titanium aluminides having fine grained and orthorhombic transformed microstructure and articles made therefrom |
| EP0834586A1 (de) * | 1996-03-29 | 1998-04-08 | Kabushiki Kaisha Kobe Seiko Sho | Hochfeste titanlegierung, verfahren zur herstellung eines produktes daraus und produkt |
Non-Patent Citations (1)
| Title |
|---|
| See also references of WO03091468A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2003091468A1 (fr) | 2003-11-06 |
| JPWO2003091468A1 (ja) | 2005-09-02 |
| EP1500715A1 (de) | 2005-01-26 |
| US20040244887A1 (en) | 2004-12-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP1382695A4 (de) | Stab aus titanlegierung und verfahren zu seiner herstellung | |
| AU2003268697A8 (en) | Aluminum alloy for casting-forging, aluminum cast/forged article, and method for manufacture thereof | |
| GB0502071D0 (en) | Al-cu-Mg-si alloy and method for producing the same | |
| AU2002335251A1 (en) | Method and apparatus for smelting titanium metal | |
| GB2415203B (en) | High strength Al-Zn alloy and method for producing such an alloy product | |
| GB2381536B (en) | Hardfacing alloy, methods, and products | |
| EP1688509A4 (de) | Hochfeste und hochzähe magnesiumlegierung und herstellungsverfahren dafür | |
| PL369514A1 (en) | Method for processing beta titanium alloys | |
| AU2003287036A1 (en) | Stock lifter for metal forming dies and method for making the same | |
| EP1510265A4 (de) | Magnesiumlegierungsplatte und verfahren zur herstellung derselben | |
| GB0503149D0 (en) | Copper alloy, copper alloy producing method, copper complex material, and copper complex material producing method | |
| AU2003294225A8 (en) | Method for making an alloy and alloy | |
| AU2003270305A1 (en) | System and method of producing metals and alloys | |
| GB2407101B (en) | Metal material and method for production thereof | |
| PL363906A1 (en) | Steel for mechanical structures, method of hot forming of steel element and forged steel element manufactured in this way | |
| AU2003263082A1 (en) | System and method of producing metals and alloys | |
| AU2003277681A1 (en) | Delayed fracture prevention method for steel structure and steel structure manufacturing method | |
| AU2002308805A1 (en) | Magnesium-based alloy and method for the production thereof | |
| AU2003275047A1 (en) | Semi-solid metal casting process and product thereof | |
| AU2003257810A1 (en) | Heat-resistant magnesium alloy and method for producing same | |
| GB0416764D0 (en) | A method of forging a titanium alloy | |
| AU2003280811A1 (en) | Nb-Al ALLOY POWDER AND METHOD FOR ELECTROLYTIC CAPACITOR AND METHOD FOR PREPARATION THEREOF, AND ELECTROLYTIC CAPACITOR | |
| AU2003211455A1 (en) | Hard metal alloy member and method for manufacture thereof | |
| EP1298226A4 (de) | Eisenbasislegierung und herstellunsverfahren dafür | |
| AU2002308806A1 (en) | Magnesium-based alloy and method for the production thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20031114 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20050519 |
|
| 17Q | First examination report despatched |
Effective date: 20050915 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED |
|
| 18R | Application refused |
Effective date: 20080228 |