EP1490558A1 - Verbinderanordnung - Google Patents

Verbinderanordnung

Info

Publication number
EP1490558A1
EP1490558A1 EP03706140A EP03706140A EP1490558A1 EP 1490558 A1 EP1490558 A1 EP 1490558A1 EP 03706140 A EP03706140 A EP 03706140A EP 03706140 A EP03706140 A EP 03706140A EP 1490558 A1 EP1490558 A1 EP 1490558A1
Authority
EP
European Patent Office
Prior art keywords
connector
legs
clip
concrete
connector element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP03706140A
Other languages
English (en)
French (fr)
Other versions
EP1490558A4 (de
Inventor
Mark Patrick
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Western Sydney
Original Assignee
University of Western Sydney
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AUPS1059A external-priority patent/AUPS105902A0/en
Priority claimed from AUPS3098A external-priority patent/AUPS309802A0/en
Priority claimed from AU2002951162A external-priority patent/AU2002951162A0/en
Application filed by University of Western Sydney filed Critical University of Western Sydney
Publication of EP1490558A1 publication Critical patent/EP1490558A1/de
Publication of EP1490558A4 publication Critical patent/EP1490558A4/de
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/14Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/29Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated the prefabricated parts of the beams consisting wholly of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • E04B5/40Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0645Shear reinforcements, e.g. shearheads for floor slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B2005/232Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with special provisions for connecting wooden stiffening ribs or other wooden beam-like formations to the concrete slab
    • E04B2005/237Separate connecting elements

Definitions

  • the present invention relates to connector assemblies for attaching concrete bodies to structures, for example in composite slabs, columns, beams or any structure attached to concrete slabs, blocks, etc.
  • the present invention also relates to connector elements that can be used as part of the connector assemblies .
  • the present invention also relates to clips that can be used as part of the connector assemblies.
  • the present invention relates to connector assemblies that include connectors in the form of shear connector studs that form the main connection between a frame structure and a concrete slab.
  • the present invention relates to connector elements that can be used with the shear connector studs .
  • the present invention relates to clips that can be used with the shear connector studs and the connector elements.
  • Forming concrete composite structures in building construction involves assembling a structural framework with cross-connecting primary beams and secondary beams, and laying a ribbed decking across the supporting primary and secondary beams . Reinforcing bars or mesh are then layed on top of the decking. Concrete is poured on top of the decking to complete the composite structure.
  • the structural framework is usually made of steel.
  • Figure 1 illustrates an example of a steel/concrete composite floor. When the concrete hardens and reaches sufficient compressive strength, the decking provides the main reinforcement for the concrete slab and the slab becomes the top flange of the composite beam.
  • Connectors in the form of shear connector studs are often used to strengthen the connection between the steel framework and concrete slab.
  • the studs are fixed, generally welded, upright through the steel decking or through a pre-punched hole in the decking before the concrete is poured and are placed above the primary or secondary beams. Once the studs are cast in concrete, they become an important part of the connection formed between the steel framework and concrete slab.
  • the strength, ductility and efficiency of the shear connection formed between the concrete slab and framework can under ultimate load conditions lead to the common problem of rib punch-through failure.
  • rib punch-through failure occurs when the studs are subjected to longitudinal shear forces between the concrete and steel framework.
  • the weight of the structure and the load it supports have the effect of thrusting the concrete against one side of each stud creating concentrated stresses at the base of the stud and forming a break-away wedge in the concrete which, under the longitudinal shear force, is pushed into the ribs of the steel decking and away from the studs .
  • Arrow A indicates the direction of shear force in the concrete C against the stud S fixed through decking D to steel beam SB.
  • the break-away concrete wedge is denoted by W.
  • Ductility is a desirable feature of shear connector studs and in some countries it is mandatory in their national design Standards that the shear connector studs in composite structures be ductile. Ductility can be assessed according to the relationship between the shear force and slip, where the slip occurs longitudinally between the concrete slab and steel beam. The slip is indicated in Figure 2A by Dimension B.
  • the definition of a ductile shear connector stud in some national design standards is one having a characteristic slip capacity exceeding 6 mm. Noting that slip capacity in a solid slab increases with shank diameter, studs with certain dimensions are considered ductile.
  • some national design Standards accept a headed stud as being ductile if the stud has an overall length after welding of at least 4 times the shank diameter, and with a diameter of not less than 16 mm and not exceeding 22 mm.
  • voids include profiled ribbing on steel decking creating notch-like voids in the concrete body, while hollow cores in pre-cast concrete also create voids.
  • open or closed type variety of steel decking ribs the more significant problems are associated with the open type ribs which are more responsible for creating notch- like voids in the concrete body.
  • Rib punch-through failure occurs predominantly in secondary beams, that is beams spanning effectively perpendicular to the decking ribs, because with secondary beams the thrust forces are directed across the ribbed decking and are thus more likely to carry the effects of voids in the ribs to the stud shanks between the ribs.
  • the concrete layer in composite slabs is generally in compression whilst the steel beams underneath are in tension. Accordingly, the compressive force in the concrete reduces from the middle of a beam, where the moments are greatest, to the ends of typeially simply supported composite beams where the moments reduce to zero. This describes a composite beam in positive bending, but longitudinal shear forces also develop in the negative moment regions in continuous composite beams which can also lead to rib punch-through failure.
  • rib punch-through failure In primary beams the phenomenon of rib punch-through failure is less likely because the shear forces run parallel to the decking ribs and therefore the rib voids are less likely to affect the studs between the ribs. This is not to say that rib punch-through failure does not occur in primary beams because even though the shear force runs parallel to the decking ribs, concrete surrounding each stud is still known to be thrust laterally to the decking sheets through the sides of the open ribs. Haunch width of the concrete can be a critical factor in this regard, as can the presence of reinforcing steel.
  • FIG. 2B illustrates such a situation where two bolts B cast in a concrete slab C connect a structural component SC to the concrete slab through a plate P to which the bolts are connected with nuts N. With the upper shear force travelling in the direction of Arrow A, a cracked wedge W is likely to form at the free edge FE of the concrete slab.
  • the free edge has a similar effect on the casting-bolts as the voids in the composite beam examples given above, that is, the free edge is a point of weakness in the concrete where a crack may form. If a connecting bolt is located close to the free edge illustrated in Figure 2B, a wedge of concrete breaking off at the free edge could weaken or dislodge concrete around the embedded bolt and weaken the bolt's hold in the concrete. The resulting problem is equivalent to rib punch-through failure in composite beams.
  • a connector assembly for connecting together a structural component and a concrete body wherein the connector assembly is capable of resisting shear forces between the structural component and the concrete body and includes :
  • the connector assembly includes a means for holding the connector element around the connector.
  • the holding means is a clip extending between the connector and the connector element.
  • the connector has a shank with one end adapted to be embedded in concrete and the other end adapted to be attached to the structural component .
  • the clip includes :
  • a plurality of legs formed from resilient material that extend inwardly and have inner ends that describe an opening that can receive the shank of the connector, and which opening has a diameter that is less than that of the shank, whereby in use the legs deflect when the clip is pushed over the shank so that the shank extends through the opening and the inner ends of the legs contact the shank and thereby couple the clip to the shank .
  • the holding means is adapted to hold the connector element from the connector so that there is a spacing of at least 20 mm between the components.
  • the holding means is adapted to hold the connector element from the connector a spacing of at least 25 mm.
  • the holding means is adapted to hold the connector element from the connector so that there is a spacing of at least 30 mm.
  • the holding means is adapted to hold the connector element from the connector so that there is a spacing of at least the maximum size of aggregate in concrete in the concrete body between the components.
  • the holding means is adapted to hold the connector element from the connector so that there is a spacing of least 1.25 times the maximum size of aggregate in concrete in the concrete body.
  • the holding means is adapted to hold the connector element from the connector so that there is a spacing of at least 1.5 times the maximum size of aggregate in concrete in the concrete body.
  • the connector element may be, by way of example, a ring of solid material, specifically galvanised steel, a ring of mesh or a coil with small pitch windings.
  • the connector element is a coil with small pitch windings
  • the ends of the coils are closed to facilitate the development of hoop stresses in the coil.
  • the connector element is a continuous ring of solid material, such as steel.
  • the rings are cut from a length of galvanised steel tube.
  • the rings preferably have an outer diameter of 76 mm and a wall 2 mm thick.
  • High tensile steel of 350 MPa proof stress is preferred over lower grade steel.
  • the connector element is preferably kept centrally in position before the concrete is poured with a restraining clip that defines the means for holding the connector element around the connector.
  • the connector element is annular and preferably has a height approximately 60% - 80% the height of the rib or ribs on the decking and ideally 70% the height of the rib or ribs.
  • the connector element is preferably provided with lateral cross plates on opposite sides of the element wherein the cross plates are adapted to support reinforcing rods extending parallel to the decking ribs to assist in confining the concrete around the connector.
  • a composite concrete structure including a concrete body and a structural component connected together by way of a connector assembly, the connector assembly including:
  • the connector assembly includes a means holding the connector element around the connector.
  • the holding means is a clip extending between the connector and the connector element.
  • the spacing of the connector element from the connector is at least 20 mm.
  • the spacing of the connector element from the connector is at least 25 mm.
  • the spacing of the connector element from the connector is at least 30 mm.
  • the spacing of the connector element from the connector is at least the maximum size of aggregate in concrete in the concrete body.
  • the spacing of the connector element from the connector is at least 1.25 times the maximum size of aggregate in concrete in the concrete body.
  • the spacing of the connector element from the connector is at least 1.5 times the maximum size of aggregate in concrete in the concrete body.
  • the connector element may surround more than one connector.
  • a shear connector assembly for use in construction of concrete composite structures having a concrete body supported by a decking on a structural framework, the shear connector assembly including:
  • the shear connector assembly includes a means for holding the connector element around the connector stud and concentric of the stud.
  • the holding means is a clip extending between the connector and the connector element.
  • a method of forming a composite concrete strueture including:
  • the method includes cutting more than one connector element from a length of steel tube.
  • the method further includes distancing the stud and surrounding connector element from the decking rib at which concrete failure is most likely to occur.
  • the purpose of the clip is to facilitate locating the connector element in relation to the connector. This is a particularly important issue in the difficult working environment in which the connector assembly is generally used.
  • the clip includes:
  • a plurality of legs formed from resilient material that extend inwardly and have inner ends that describe an opening that can receive a section of the connector, and which opening has a diameter that is less than that of the connector section, whereby in use the legs deflect when the clip is pushed over the connector so that the connector section extends through the opening and the inner ends of the legs contact the connector section and thereby couple the clip to the connector.
  • the above described clip makes it possible to effectively lock the clip and thereby the connector element to the connector.
  • the legs are formed to enable the legs to flex in at least one direction, when in use the clip is pushed over the connector to locate the clip on the connector.
  • the legs are formed to enable the legs to flex in two mutually perpendicular directions, when in use the clip is pushed over the connector to locate the clip on the connector.
  • At least one of the legs includes an upward crank.
  • the cranked end facilitates guiding the clip onto the connector.
  • the cranked end facilitates initially locating the clip in the correct orientation in relation to the connector section. Specifically, the cranked end provides an obvious visual indication of the correct orientation of the clip in relation to the connector section.
  • the cranked end increases resistance to sliding movement of the clip after it has been located on the connector section. Specifically, sliding movement tends to cause the upwardly cranked end or ends to dig into the connector section and thereby increase resistance to further sliding movement.
  • the leg or legs that include the cranked end further include a leg section that is formed to increase the flexibility of the leg.
  • the leg section reduces the force required to push the clip over the connector to locate the clip on the connector section and makes it possible to control the bending stresses in the legs, thereby preventing yielding of the legs. Yielding of the legs is unsatisfactory because it prevents good engagement of the clip onto the connector.
  • the leg section is in the form of a curved bend in the leg outwardly of the cranked end.
  • the inner ends of the legs are relatively wide to enable the legs to grip the connector section securely.
  • the inner ends of the legs include projections that enable the legs to grip the connector section securely.
  • the legs are formed from spring steel.
  • the legs are formed so as to minimise interference to concrete flowing into the volume defined by the connector element that enclose the connector.
  • the means for coupling the clip to the section of the connector element includes a plurality of clasps that can clip onto the upper section of the connector element.
  • the present invention also provides a connector element assembly for use in a connector assembly for connecting together a concrete body and a structural component wherein the connector assembly is capable of resisting shear forces between the structural component and the concrete body.
  • the connector assembly includes the connector element assembly and a connector adapted to be embedded in concrete.
  • the connector element assembly of the present invention includes :
  • the clip section includes a plurality of legs formed from resilient material that extend inwardly from an upper section of the barrier section and have inner ends that describe an opening that can receive a section of the connector and have a diameter that is less than that of the connector section, whereby in use the legs deflect when the connector element is pushed over the shank so that the shank extends through the opening and the inner ends of the legs contact the connector section and thereby couple the connector element to the connector with the barrier section positioned to surround the connector.
  • the above-described connector element assembly can be effectively locked to the connector.
  • the connector element assembly can be located on a connector after the connector has been secured, for example by welding, to a structural component.
  • the connector element assembly can be located on a connector before the connector is secured, for example by welding, to a structural component.
  • the connector may be any suitable form of fastener having a shank with one end adapted to be embedded in concrete.
  • the connector may be a headed stud or a structural bolt.
  • the headed stud may be a two component construction, with a headed member and a shank member that have complementary screw-threaded sections that facilitate connecting the members together.
  • This arrangement facilitates locating the connector element assembly on the connector.
  • the connector element assembly can be conveniently located on the shank member when the shank member is disconnected from the headed member by sliding the assembly along the length of the shank member and thereafter connecting the headed member to the shank member.
  • the legs are formed so that the legs can flex in one direction, when in use the connector element is pushed over the connector to locate the connector element on the connector.
  • the legs are formed so that the legs can flex in two mutually perpendicular directions, when in use the connector element is pushed downwardly over the shank to locate the connector element on the connector.
  • At least one of the legs includes an upward crank.
  • the cranked end facilitates guiding the connector element onto the connector.
  • the cranked end facilitates initially locating the connector element in the correct orientation in relation to the connector section.
  • the cranked end provides an obvious visual indication of the correct orientation of the connector element, and more particularly the clip section of the connector element, in relation to the connector section.
  • the cranked end increases resistance to sliding movement of the connector element after it has been located on the connector section. Specifically, sliding movement tends to cause the upwardly cranked end or ends to dig into the connector section and thereby increase resistance to further sliding movement.
  • leg or legs that include the cranked end further include a first leg section that is formed to increase the flexibility of the leg.
  • the first leg section reduces the downward force required to push the connector element over the connector to locate the connector element on the connector section and makes it possible to control the bending stresses in the legs, thereby preventing yielding of the legs. Yielding of the legs is unsatisfactory because it prevents good engagement of the connector element, and more particularly the clip section of the connector element, onto the connector.
  • the leg section is in the form of a curved bend in the leg outwardly of the cranked end.
  • the inner ends of the legs are relatively wide to enable the legs to grip the connector section securely.
  • the inner ends of the legs include projections that enable the legs to grip the shank securely.
  • the legs are formed from spring steel.
  • the legs are formed so as to minimise interference to concrete flowing into the volume defined by the connector element that enclose the connector.
  • the opening is a circular opening.
  • a method of manufacturing the above-described connector element assembly that includes stamping a flat blank from a steel sheet, the blank having (a) a rectangular section that corresponds to the barrier section and (b) 4 elongate members extending from one side of the rectangle that correspond to the legs of the clip section, folding the rectangular section of the blank to form the barrier section, and shaping the elongate members to form the legs of the clip section.
  • the present invention there is also provided a method of manufacturing the above-described connector element assembly that includes pressing a cup- shaped member from a steel sheet, the cup-shaped member having a cylindrical wall that forms the barrier section, and stamping the base to form the legs of the clip section.
  • Figure 1 illustrates a conventional composite structure in a building construction
  • Figure 2A is an illustration showing the problems associated with the prior art composite beams
  • Figure 2B illustrates problems associated with another prior art composite structure
  • Figure 3 is a perspective view of a connector assembly according to an embodiment of the present invention.
  • Figure 4 is a side sectional view of the connector assembly shown in Figure 3 ;
  • Figure 5 is another side sectional view of the connector assembly shown in Figure 3 ;
  • Figure 6 is a side view of an embodiment of a connector assembly in accordance with the invention incorporating a restraining clip
  • Figure 7 is a sectional plan view of Figure 6 taken along line 7-7;
  • Figure 8 is a perspective view of the connector assembly shown in Figure 3 with reinforcing rods;
  • Figure 9 is a graph showing results of a first test involving prior art;
  • Figure 10 is a graph showing results of the same test as Figure 9 but incorporating the present invention.
  • Figure 11 is a graph showing results from a second test involving the present invention.
  • Figure 12 is a vertical cross-section through an embodiment of a clip in accordance with the present invention coupled to a connector element
  • Figure 13 is a top plan view of the clip and the connector element shown in Figure 12;
  • Figure 14 is a vertical cross-section through an embodiment of a connector element assembly in accordance with the present invention, the Figure also showing in outline a connector and illustrating the position of the connector element assembly in relation to the connector in use of these components as a connector assembly;
  • Figure 15 is a top plan view of the connector element shown in Figure 14.
  • a connector assembly illustrated in the Figures includes shear connector element 10 and a connector in the form of a fastener that connects the components of a concrete composite structure.
  • the connector element increases the ductility and shear strength, and therefore the shear resistance, of a fastener in a concrete composite structure by surrounding the fastener in the form of a barrier thereby confining the concrete around the fastener.
  • the connector element surrounds a connector in the form of a stud that is mounted upright on decking in a composite concrete beam.
  • the present connector assembly could apply to any composite structure involving the connection of a component to concrete using connectors embedded in the concrete.
  • Figure 3 illustrates a standard shear connector stud 11 welded through ribbed decking 12, either directly or through a pre-punched hole, to a secondary steel beam 13.
  • a shear connector element 10 surrounds stud 11.
  • Figure 4 is a side sectional view of Figure 3 but with the stud 11 and element 10 embedded in a bed of concrete 14.
  • the shear connector element 10 sits on the pan 22 of the decking and forms a barrier surrounding the stud. More specifically, the barrier surrounds the base of the stud shank.
  • the decking is a steel ribbed decking, either directly or through a pre-punched hole, and the stud is welded through the decking to the steel beam underneath.
  • the connector element 10 is an annular steel ring spaced approximately 38 mm from the axial centre of the stud.
  • the element 10 need not be a solid annular barrier but can be an element forming a barrier with other characteristics and shapes.
  • the element may be an annular mesh or grid element surrounding the stud which, while still effective in confining the concrete around the base of the stud, also provides the wet concrete access to the pocket 15 to more quickly and thoroughly fill the pocket by allowing the wet concrete to flow through the holes in the mesh barrier.
  • the element could consist of a spiral coil surrounding the stud and having windings of a sufficiently small pitch so as to provide a confining barrier but still allow concrete to flow in between the windings.
  • Elements made of steel are convenient, economical and relatively simple to use, however elements made of other materials capable of forming suitable barriers are also envisaged.
  • other materials that could be used are high-strength plastic or composite materials that do not chemically react with the concrete.
  • the elements are steel rings, that are cut from a length of steel tubing.
  • the base of the annular ring element is cut to accommodate interconnection lips or joints.
  • the element can be modified to accommodate other features of the decking such as low ribs .
  • a holding or restraining clip 30 illustrated in Figures 6 and 7 is located on the top rim 21 of the element 10.
  • the restraining clip is similar in principle to a circlip but instead has three arms 31 substantially equally separated from each other extending outwardly from a semi-circular centre 32. Centre 32 clips around the shank 16 of stud 11 and the three arms 31 extend towards the top rim 21 of the connector element 10 and clip onto the rim 21 by way of clasps 33 at the end of each arm 31.
  • the retaining clip is resilient such that the arms 31 are able to maintain the connector element 10 a spaced distance from the stud 11 but allow some amount of flexibility to enable the components to be assembled and to withstand the forces of the moving wet concrete during casting.
  • the restraining clip only has two opposed arms extending from a semi-circular centre.
  • the clip is likely to be made of a resilient plastic. As illustrated in Figure 6 the circular centre 32 of the clip 30 is placed higher on the stud shank 16 than the top of the element 10 with the arms extending downwardly onto the rim 21 to in effect hold the element 10 down so that it does not displace during pouring of concrete. It is understood that the retaining clip is not the only means of holding the element around the stud and that any mechanical equivalent could work equally as well to maintain the element in the correct position before and during casting. A further embodiment of the holding means is described in relation to Figures 12 and 13.
  • FIG 8 illustrates two reinforcing rods 35 held parallel to ribs 20 on decking 12 by cross plates 36 attached laterally to connector element 10 on opposing sides of the, element.
  • Figure 4 illustrates the rods in cross-section.
  • Cross plates 36 are welded to the connector element and contain apertures 37 through which the reinforcing rods 35 extend and are held in place.
  • the orientation of the reinforcing rods 35 is such that when embedded in concrete they traverse a bursted seam that may form and by extending into more solid concrete the rods anchor the concrete around the stud 11. Maximum effect is achieved by placing the rods deep into where the wedge will form and reasonably close to the web 23 of the rib.
  • the reinforcing rods are one way of assisting to increase the holding strength of the present connector assembly. Additionally, the head 17 of the stud 11 should be fully embedded in the concrete cover slab above the decking ribs.
  • the relative height of the stud 11 to the top of the decking ribs 20 also affects the strength of the connector assembly. It has been found that a stud having a height of at least 40 mm above the top of the ribs 20 has improved its performance. Furthermore, increasing the height of the element 10 to the height of the rib can improve the performance to that of a shear connector in a solid slab without voids. Stud performance was tested using studs having a height of 95 mm welded through steel ribbed decking with ribs having a height of 55 mm.
  • Figure 4 illustrates the set up of a first test with and without an element 10.
  • a connector element 10 having a height of 40 mm and clipped to the stud 11 was found to perform satisfactorily in confining the concrete around the base of the stud. Accordingly, an element height of at least 70% of the height of decking ribs 20 will sufficiently confine the concrete and prevent wedges or cracks entering the pocket 15 from above the top rim 21 of the element 10. As mentioned above, an even better performance is achieved where the height of the element equals or exceeds that of the ribs. Whilst an element height of 20 mm was found to offer some improvement, it did not perform as well as the 40 mm high element tested. Logically the higher the element forming the barrier up to a height reaching the height of the rib, the better the performance of the stud.
  • the steel ring of the tested element had an outer diameter of 76 mm and a wall thickness of 2 mm.
  • multiple studs are placed adjacent to each other on the decking pan 22 to provide increased connection strength.
  • separate elements 10 may be used to surround each stud or, alternatively, a single element having a rectangular, oval, or the like, shape is positioned to surround both studs.
  • Inner dividing walls of the element in these situations may be provided to compartmentalise the element giving each stud its own pocket of locally confined concrete. Hence, when the concrete is poured it flows into all pockets of the element surrounding the studs . The element prevents cracks and wedges from forming inside the walls of the element .
  • Figure 9 illustrates the results of the single mounted stud welded to the decking substantially equidistant from the webs 23 of the decking ribs 20, illustrated in Figure 4 but without the connector element 10 or bars 35.
  • the graph of Figure 9 shows that at the standard 6 mm slip the shear force on the stud was approximately 53 kN. Another important point is that there is a substantial drop off of load below the peak level at a slip of approximately 2mm and in accordance with some standards the behaviour is brittle and therefore unsatisfactory.
  • Figure 5 illustrates a stud located closer to the left-side rib 24 than the right-side rib 25.
  • a wedge is likely to form at the right-side rib 25.
  • moving the stud further away from this rib 25 increases the size of the wedge of concrete that has to be dislodged around the base of a stud.
  • Combining the increased distance between the stud and active rib with the use of the present connector element can significantly increase the shear strength and ductility of the stud.
  • the graph of Figure 11 shows the results of a shear force verses slip test of a stud located 100 mm away from the right-side rib 25 as illustrated in Figure 5.
  • the stud is surrounded by a connector element 40 mm in height.
  • the graph results show that at the 6 mm slip mark the stud sustained a force of approximately 115 kN and finally fractured just under 120 kN, which is an extremely favourable performance as if the stud had been in a solid concrete slab without voids.
  • Figures 12 and 13 illustrate an embodiment of a clip for holding a connector element 3 in relation to a connector.
  • the connector element 3 shown in Figure 12 forms part of a connector assembly of the type disclosed in Figures 3 and 4.
  • the connector element 3 is in the form of a steel ring that has an upper rim 5.
  • the connector assembly also includes a connector in the form of a fastener that has a shank and an enlarged head that connects a component such as a steel column to an underlying foundation prior to pouring concrete into the foundation.
  • the connector element 3 increases the ductility and shear strength, and therefore the shear resistance, of the fastener by forming a barrier around the connector and thereby confining concrete around the fastener.
  • the purpose of the clip, generally identified by the numeral 7, in Figures 12 and 13 is to facilitate locating the connector element 3 securely in place in relation to the connector before concrete is poured.
  • the clip 7 is located first on the connector element 3 and the assembly of the connector element 3 and the clip 7 are located on the shank by positioning the clip above the shank and then pushing the clip down onto the shank.
  • the clip 3 includes a circular outer frame 9.
  • the frame 9 includes an inner circular wall 11 that has a diameter that enables the wall to contact an inner surface of the connector element 3 when the clip 7 is coupled to the connector element 3.
  • the wall provides stability to the assembly of the connector element 3 and the clip 7.
  • the clip 3 shown in Figures 12 and 13 also includes 2 pairs of outer clasps 13 that can be located over the rim 5 of the connector element 3 and couple the clip 7 securely to the connector element 3.
  • the clip 7 also includes 4 equally spaced legs 15 extending inwardly from the frame 9.
  • the legs 15 are formed from spring steel .
  • the legs 15 terminate in inner ends 17 that describe a circular opening 19 for receiving the shank of the connector.
  • the diameter of the described opening 19 is selected to be less that that of the shank so that the legs 15 engage and thereby couple the clip to the connector when the clip is pushed down onto the shank.
  • the legs include upwardly inclined sections 21 that define a frusto-conical region around the shank. As is described above, these upwardly cranked sections provide a number of advantages, including facilitating guiding the clip onto the shank, facilitating initially locating the clip in the correct orientation in relation to the shank, and increasing resistance to upward movement of the clip after it has been located on the shank.
  • the connector element assembly shown in Figures 14 and 15 is intended for use as part of a connector assembly of the type shown in Figures 3 and 4 for connecting a component such as a steel column to an underlying foundation prior to pouring concrete into the foundation.
  • the connector assembly also includes a connector 4 (partly shown in outline in Figure 14) in the form of a fastener that has a shank (as shown in the Figure) and an enlarged head at the top (not shown) .
  • the purpose of the connector element assembly is to increase the ductility and shear strength, and therefore the shear resistance, of the connector 4 by forming a barrier around and thereby confining concrete around the connector 4.
  • 14 and 15 includes (a) a barrier section 5 and (b) a clip section generally identified by the numeral 7.
  • the purpose of the barrier section 5 is to confine concrete around the connector 4.
  • the purpose of the clip section 7 is to facilitate locating the connector element assembly securely in place in relation to the connector 4 before concrete is poured.
  • the barrier section 5 is in the form of a cylinder or ring.
  • the clip section 7 includes 4 equally spaced legs
  • the legs 15 terminate in inner ends 17 that describe a circular opening 19 for receiving the shank of the connector.
  • the diameter of the described opening 19 is selected to be less that that of the shank so that the legs 15 can engage and thereby couple the connector element assembly to the connector 4 when the connector element assembly is positioned onto the shank as shown in Figure 14.
  • the legs 15 include upwardly inclined sections 21 that define a frusto-conical region around the shank. As is described above, these upwardly cranked sections provide a number of advantages, including facilitating guiding the connector element assembly onto the shank, facilitating initially locating the connector element assembly in the correct orientation in relation to the shank, and increasing resistance to upward movement of the connector element assembly after it has been located on the shank.
  • the legs 15 also include a downwardly-curved bend 25 between the frusto-conical region and the junction of the legs 15 and the barrier section 5.
  • the bends 25 increase the effective length of the legs 15.
  • the connector element assembly is located on the shank of the connector 4 by positioning the clip section 7 above the shank with the legs 21 contacting the head (not shown) of the shank and then pushing the connector element assembly down onto the shank.
  • One option for manufacturing the connector element assembly is to form the connector element assembly from one piece of flat steel sheet.
  • the first step is to stamp a flat blank from the steel sheet, with the blank having (a) a rectangular section (that corresponds to the barrier section 5) , and (b) 4 elongate members extending from one side of the rectangle (that correspond to the legs 15 of the clip section 7) .
  • the next step is to roll the rectangular section into a cylinder and to join the ends of the rectangle together.
  • the ends could be joined together by means of hook elements 23 formed at one end that are either passed through openings (not shown) formed at the other end of the rectangle and are then folded back onto the cylinder or by double folding the ends onto each other which has the advantage of not reducing the steel section.
  • Another, although not the only other, option is to weld the ends together.
  • the final step is to shape the legs 15 into the required configuration, as shown in Figure 14.
  • Another option for manufacturing the connector element assembly is to press a cup having a base and a cylindrical wall from one piece of flat steel sheet, thereafter stamp the base to form an outline of the legs, and finally shape the legs to the form shown in Figure 14.
  • the formed connected elements are heat treated to form high- tensile spring steel.
  • the present invention is not so limited and extends to concrete structures generally.
  • the present invention extends to connector assemblies that can be used in relation to concrete footings and the like that are used to support steel columns with base plates and other structural components.
  • These arrangements typically include connectors in the form of bolts that are embedded in concrete footings and extend from the footings and provide connection points for base plates.
  • the connector assemblies would be fitted upside down underneath the steel base plate on bolts nearest the free edge.
  • the present invention is not so limited and extends to other arrangements, for example, arrangements in which the connectors extend horizontally in a concrete body.
  • One specific example of such arrangements includes connectors in the form of headed studs that are welded to an upstanding web of a T-section support structure at spaced intervals along the length of the web and extend horizontally into a concrete body. With this particular arrangement, the connector elements are positioned around the horiztonally extending studs.
  • the present invention is not so limited and extends to arrangements in which the connector elements are spaced above decking sheets and thereby allow wet concrete to flow in the gap between the decking sheets and the connector elements. Furthermore, whilst the discussion of the present invention focuses on applied loads in a particular direction, the present invention is equally applicable to arrangements that are subjected to varying loads in one or more directions.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Joining Of Building Structures In Genera (AREA)
EP03706140A 2002-03-12 2003-03-12 Verbinderanordnung Withdrawn EP1490558A4 (de)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
AUPS105902 2002-03-12
AUPS1059A AUPS105902A0 (en) 2002-03-12 2002-03-12 Connector assembly
AUPS3098A AUPS309802A0 (en) 2002-06-21 2002-06-21 Clip assembly
AUPS309802 2002-06-21
AU2002951162A AU2002951162A0 (en) 2002-09-02 2002-09-02 Connector element
AU2002951162 2002-09-02
PCT/AU2003/000288 WO2003076734A1 (en) 2002-03-12 2003-03-12 Connector assembly

Publications (2)

Publication Number Publication Date
EP1490558A1 true EP1490558A1 (de) 2004-12-29
EP1490558A4 EP1490558A4 (de) 2009-05-06

Family

ID=27808172

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03706140A Withdrawn EP1490558A4 (de) 2002-03-12 2003-03-12 Verbinderanordnung

Country Status (6)

Country Link
US (1) US20050246988A1 (de)
EP (1) EP1490558A4 (de)
CN (1) CN1650076A (de)
HK (1) HK1077858A1 (de)
NZ (1) NZ535296A (de)
WO (1) WO2003076734A1 (de)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2002951787A0 (en) * 2002-10-02 2002-10-17 University Of Western Sydney A composite beam
WO2007009160A1 (en) * 2005-07-15 2007-01-25 Fielders Australia Pty Ltd Shear connector for use in a concrete and steel structure
FR2910513B1 (fr) * 2006-12-26 2012-07-20 Gagne Structure multi-etage de parc de stationnement
US8516776B2 (en) * 2007-10-02 2013-08-27 Chan-Ping PAN Fire-prevention structure for buildings
US8505599B2 (en) * 2008-01-24 2013-08-13 Consolidated Systems, Inc. Panelization system and method
WO2014038875A1 (ko) * 2012-09-05 2014-03-13 한국건설기술연구원 펀칭 전단방지용 보강재 및 이를 이용한 기둥과 슬래브 및 확대 기초간의 접합부 시공 방법
US9976315B2 (en) * 2013-08-08 2018-05-22 University Of Utah Research Foundation Elongate member reinforcement
US10227786B2 (en) * 2013-08-08 2019-03-12 University Of Utah Research Foundation Elongate member reinforcement with a studded collar
CN105604193B (zh) * 2016-01-11 2017-11-03 北京城建设计发展集团股份有限公司 无弹性损失的弹性片材与硬质材料点式复合连接方法
JP6813002B2 (ja) * 2017-06-02 2021-01-13 Jfeスチール株式会社 床スラブ付鉄骨梁およびその設計方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3210900A (en) * 1961-10-23 1965-10-12 Crompton Parkinson Ltd Composite structure
SU907140A1 (ru) * 1980-06-16 1982-02-23 Хабаровский политехнический институт Устройство дл объединени железобетонной плиты со стальной балкой
DE19813565A1 (de) * 1998-03-27 1999-09-30 Schoeck Bauteile Gmbh Bauelement zur Schubbewehrung
US6223495B1 (en) * 1999-02-26 2001-05-01 Lee A. Shaw Vibrating screed with rollers
AU6999801A (en) * 2000-09-11 2002-03-14 Onesteel Reinforcing Pty Limited A composite beam

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1178210A (en) * 1914-09-15 1916-04-04 Ellcon Company Car-floor.
US1616977A (en) * 1926-09-20 1927-02-08 Alfred A Koivu Concrete building construction
US1901392A (en) * 1930-07-31 1933-03-14 John S Frederick Concrete form
US2458409A (en) * 1947-02-17 1949-01-04 Paige Electrical Products Corp Outlet box connector
US2589780A (en) * 1947-11-05 1952-03-18 Glenn L Martin Co Hose support for plastic tubes
US2896886A (en) * 1957-10-28 1959-07-28 Gen Electric Motor mount
US3024512A (en) * 1961-08-14 1962-03-13 Robert K Dyer Disposable concrete form for posts and columns
DE2809430B2 (de) * 1978-03-04 1980-05-22 Erich 7121 Gemmrigheim Hammerl Abstandhalter aus Kunststoff für Bewehrungsstäbe oder Bewehrungsmatten in Stahlbetonbauteilen
FR2431008A1 (fr) * 1978-07-11 1980-02-08 Lalaison Guy Chaise porteuse de boitier electrique dans les murs beton
US5293724A (en) * 1992-05-18 1994-03-15 Cornwall Kenneth R Coupling assembly for corrugated decks and method for connecting thereto
CH687262A5 (de) * 1993-10-14 1996-10-31 Anton H Erb In Beton eingiessbares Einzelteil einer Schubdornverbindungsanordnung.
US5492456A (en) * 1994-08-29 1996-02-20 Rheem Manufacturing Company Fan motor/impeller mounting system
US5810399A (en) * 1996-10-28 1998-09-22 Westco Scientific Instruments, Inc. Clamp for ground glass joint
DE19653077A1 (de) * 1996-12-19 1998-06-25 Deha Ankersysteme Dübelleiste für Schubbewehrungen
US5957644A (en) * 1997-03-11 1999-09-28 Vaughan; James A. Hanger for use in concrete structures
US5978997A (en) * 1997-07-22 1999-11-09 Grossman; Stanley J. Composite structural member with thin deck portion and method of fabricating the same
AU708967B3 (en) * 1997-12-09 1999-08-19 Cetram Pty Limited Cast-in fastenings for use in concrete components
JP2001173158A (ja) * 1999-12-16 2001-06-26 Sanko Co Ltd プラスチック製コンクリートスペーサ

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3210900A (en) * 1961-10-23 1965-10-12 Crompton Parkinson Ltd Composite structure
SU907140A1 (ru) * 1980-06-16 1982-02-23 Хабаровский политехнический институт Устройство дл объединени железобетонной плиты со стальной балкой
DE19813565A1 (de) * 1998-03-27 1999-09-30 Schoeck Bauteile Gmbh Bauelement zur Schubbewehrung
US6223495B1 (en) * 1999-02-26 2001-05-01 Lee A. Shaw Vibrating screed with rollers
AU6999801A (en) * 2000-09-11 2002-03-14 Onesteel Reinforcing Pty Limited A composite beam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO03076734A1 *

Also Published As

Publication number Publication date
CN1650076A (zh) 2005-08-03
WO2003076734A1 (en) 2003-09-18
EP1490558A4 (de) 2009-05-06
US20050246988A1 (en) 2005-11-10
NZ535296A (en) 2005-04-29
HK1077858A1 (zh) 2006-02-24

Similar Documents

Publication Publication Date Title
US8028493B2 (en) Floor construction method and system
KR100918974B1 (ko) 콘크리트 충전 강관 기둥 및 이의 제조방법
US8347571B2 (en) Structural column with footing stilt
US6920728B2 (en) Column and beam construction and method
CN109680810B (zh) 上层钢管柱与下层钢筋混凝土柱的转换节点及施工方法
US20050246988A1 (en) Connector assembly
KR101780370B1 (ko) 소켓슈와 앵커부재로 이루어진 전단연결재를 이용한 합성구조체
KR101116073B1 (ko) 층고절감형 합성보
JP3754698B1 (ja) 鉄塔の基礎構造
CN113235741A (zh) 一种钢管混凝土装配式隔震节点及施工方法
KR102268071B1 (ko) 말뚝의 두부 보강장치
US7448171B1 (en) Joist support structure adapted to be embedded into a foundation wall
KR101166549B1 (ko) 내부 구속 중공 철근 콘크리트 기둥의 접합 구조
CN110392758B (zh) 倒t形截面混合型预应力混凝土梁及利用其的面板施工方法
KR100947339B1 (ko) 기둥-슬래브 접합부의 수직걸림형 전단보강체
EP0487518A1 (de) Verankerungen in verbundstahl und betonbauteilen
KR100461914B1 (ko) 강관말뚝용 철근고정구 및 이를 이용한 강관말뚝 머리부와철근콘크리트 기초의 결합구조
KR20220083431A (ko) 단위 확장두부정착재를 이용한 말뚝의 두부보강 구조
KR200201561Y1 (ko) 강관파일 두부보강구조
WO2007009160A1 (en) Shear connector for use in a concrete and steel structure
KR100473454B1 (ko) 상하부고정 프리스트레스 강재보의 제작방법
AU2003208187B2 (en) Connector assembly
JP5152689B2 (ja) 橋脚とフーチングとの接合構造及び方法
KR200386881Y1 (ko) 강관파일의 두부 보강 구조
KR200455415Y1 (ko) 기초공사용 콘크리트 파일의 두부 보강조립체

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20041011

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

A4 Supplementary search report drawn up and despatched

Effective date: 20090406

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20090707