EP1329558A1 - Device for adjusting the height of a manhole cover to the street level - Google Patents
Device for adjusting the height of a manhole cover to the street level Download PDFInfo
- Publication number
- EP1329558A1 EP1329558A1 EP02001526A EP02001526A EP1329558A1 EP 1329558 A1 EP1329558 A1 EP 1329558A1 EP 02001526 A EP02001526 A EP 02001526A EP 02001526 A EP02001526 A EP 02001526A EP 1329558 A1 EP1329558 A1 EP 1329558A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- shaft
- manhole cover
- cover
- spacer elements
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/14—Covers for manholes or the like; Frames for covers
- E02D29/1409—Covers for manholes or the like; Frames for covers adjustable in height or inclination
Definitions
- the invention relates to a device for lifting Manhole covers for inspection shafts at street level.
- the shafts usually consist of a cylindrical lower part and an adjacent shaft cone.
- the manhole cover rests on the manhole cone from an annular, on the annular end face of the shaft cone resting on the frame and one in the frame insertable manhole cover. Between the frame and the shaft cone can still spacers arranged his. If, for example, a manhole cover is no longer is completely flush with the road surface a bump when driving over if the vehicle is on the Manhole cover attaches, causing the shaft to sink and thus the shaft cover is reinforced.
- the object of the present invention is a device for precisely lifting a manhole cover to be specified at street level.
- the invention provides a device with which lifting the manhole cover is exactly adaptable to the street level.
- the Device spacers on the height adjustable can be, and preferably three of them the upper edge of the exposed shaft cone or spacer ring be applied. On these spacers the frame of the manhole cover is put on. Using of height-adjustable spacer elements, these are preferred adjusted in height so that the frame and the manhole cover later inserted into the frame exactly swearing with the road surface.
- the device according to the invention also includes a formwork device, for example in the form of an inflatable, on the inner wall the shaft cone and / or any spacer ring as well as the frame of the manhole cover, which is fully adjustable Pillow or cylindrical body or double-walled cylindrical Jacket, which have filling tubes, the one Outlet opening in the created by the spacers annular cavity protrudes, and an inlet opening exhibit. Suitable, curable is over the filling tubes Potting compound can be pressed into the annular cavity. As soon as the pressed casting compound the frame of the manhole cover, which is preferably weighed down to street level has raised or with the help of height adjustable Spacers already preset at street level The frame begins to raise, the filling process completed. In the one around the manhole cover Recess of the road surface is conventional Filled bitumen mixture or a bitumen ring according to of patent application DE 199 19 025.9.
- the drawing shows one arranged in a street 1 Revision shaft 2 in section, which is a lower part of the shaft 4 and a shaft cone 5, on which one Manhole cover 6, which consists of a lying on the cone 5 Frame 7 and one usable in the frame Manhole cover (not shown) exists. Between the The shaft cone and the frame can still have one or more Spacer rings (not shown) may be arranged.
- a device 10 Around a manhole cover 6 to level 8 of the street 1, a device 10 according to the invention is used, which spacer elements 12, the height adjustable can be formed, and a formwork device 14 has, which all around close to the inner wall 16 and 17th the shaft cone 5 and the frame 7 can be created.
- the Formwork device 14 consists of an inflatable cushion 18, which has a compressed air connection 19, and in the at least one, preferably a plurality of filling tubes 20, 21 are arranged are, whose two ends 22, 22 'and 24, 24' from the Cushions 18 are brought out. About the filling tubes 20, 21 is Potting compound can be supplied.
- the device 10 is used as follows: If the Manhole cover 6 can be adapted to street level 8 should first be the road surface around the manhole cover exposed in a ring. Then multiple spacers 12, preferably three spacer elements placed the upper edge of the shaft cone 17. Using Height-adjustable spacers can be used in the height can be set so that the spacer elements placed frame 7 of the shaft cover 6 flush closes with the road surface. Then the pillow 18 in the of the shaft cone and the frame of the shaft cover enclosed space so inflated and inflated, that the pillow all around close to the inner wall 16 and 17 cone and frame creates and the filling tubes 20, 21 in by the spacers 12 between the cone and frame formed annular cavity 26 protrude. Over the filling pipes then the cavity 26 is under pressure with potting compound filled. The filling side of the filling pipes 20, 21 is symbolic represented by funnels 28, 30.
- the pouring compound filling process is ended when the frame 7 of the manhole cover 6 up to street level is raised or if it is already preset at street level Frame begins to rise.
- the frame is loaded with a weight, which ensures is that the cavity 26 is even with potting compound is filled and the manhole cover is not already already raised when the cavity is not completely filled becomes.
- the casting compound After the casting compound has hardened, it is placed around the shaft excavated area of the pavement with bitumen mixture filled.
- Materials such as repair concrete, Grouting mortar, silicate resins or similar are suitable.
- the shaft cone 5 and the frame 7 of the Manhole cover 6 can be arranged one or more spacer rings his; then the spacers 12 are preferred between the top spacer and the frame 7 arranged.
- the device 10 according to the invention is also at Shafts without shaft cone can be used equally.
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
Die Erfindung betrifft eine Vorrichtung zum Anheben von Schachtabdeckungen von Revisionsschächten auf Straßenniveau.The invention relates to a device for lifting Manhole covers for inspection shafts at street level.
Revisionsschächte, insbesondere in Straßen mit bituminösen Straßendecken zeigen praktisch regelmäßig nach unterschiedlich langer Zeit und unterschiedlich langem Überfahren durch Kraftfahrzeuge Setzungserscheinungen. Die Schächte bestehen in der Regel aus einem zylindrischen Unterteil und einem sich daran nach oben anschließenden Schachtkonus. Auf dem Schachtkonus liegt die Schachtabdeckung auf, die aus einem ringförmigen, auf der ringförmigen Stirnfläche des Schachtkonus aufliegenden Rahmen und einem in den Rahmen einsetzbaren Schachtdeckel besteht. Zwischen dem Rahmen und dem Schachtkonus können noch Distanzringe angeordnet sein. Wenn beispielsweise eine Schachtabdeckung nicht mehr vollständig bündig mit der Straßenoberfläche ist, entsteht beim Überfahren ein Prellschlag, wenn das Fahrzeug auf der Schachtabdeckung aufsetzt, wodurch das Absinken des Schachtes und damit der Schachtabdeckung noch verstärkt wird. Bei Straßenemeuerungen wird häufig auf die vorhandene Straßendecke eine neue Bitumenschicht aufgebracht, wodurch eine Schachtabdeckung unter Fahrbahnniveau gerät. Solche Defekte in der Straßendecke müssen umgehend beseitigt werden, da sie sonst eine Beschädigung oder Ausweitung der Zerstörung der Bitumendecke zur Folge haben. Ferner entsteht durch die Prellschläge eine erhebliche Lärmbelästigung der Straßenanwohner. Die Behebung dieser Fehler wird üblicherweise in der Form durchgeführt, daß um die Schachtabdeckung herum die Straßendecke entfernt wird. Ist der Schacht um die Schachtabdeckung herum freigelegt, wird die Schachtabdekkung üblicherweise durch Unterlegen von vorgefertigten Distanzringen zwischen Schachtkonus und Schachtabdeckung möglichst bis auf das Niveau der Straßendecke angehoben. Der Freiraum um den Schacht wird wieder aufgefüllt und mittels Heißbifcumenmischung wird die Straßendecke wieder verschlossen. Da Distanzringe bestimmte Höhen aufweisen, ist ein exaktes Ausrichten der Schachtabdeckung mit dem Niveau der Straßendecke in der Regel nicht möglich.Inspection shafts, especially in streets with bituminous Road surfaces practically regularly show different a long time and overrun of different lengths by motor vehicle signs of settlement. The shafts usually consist of a cylindrical lower part and an adjacent shaft cone. The manhole cover rests on the manhole cone from an annular, on the annular end face of the shaft cone resting on the frame and one in the frame insertable manhole cover. Between the frame and the shaft cone can still spacers arranged his. If, for example, a manhole cover is no longer is completely flush with the road surface a bump when driving over if the vehicle is on the Manhole cover attaches, causing the shaft to sink and thus the shaft cover is reinforced. at Street renewals are often on the existing road surface applied a new layer of bitumen, resulting in a Manhole cover below road level. Such defects in the road surface must be removed immediately since they otherwise damage or expand the destruction of the bituminous roof. Furthermore arises from the Bouncing strikes cause considerable noise pollution for street residents. Correcting these errors is usually done in the shape that is carried out around the manhole cover the road surface is removed. Is the shaft around The shaft cover is exposed around the shaft cover usually by placing prefabricated spacer rings between the shaft cone and the shaft cover if possible raised to the level of the road surface. The Free space around the shaft is refilled and by means of The hot road bifcumen mixture is closed again. Since spacer rings have certain heights, it is an exact one Align the manhole cover with the level of the Road surfaces are generally not possible.
Die Aufgabe der vorliegenden Erfindung besteht darin, eine Vorrichtung zum genauen Anheben einer Schachtabdeckung auf Straßenniveau anzugeben.The object of the present invention is a device for precisely lifting a manhole cover to be specified at street level.
Diese Aufgabe wird durch die Erfindung gemäß Anspruch 1 gelöst.This object is achieved by the invention according to claim 1 solved.
Vorteilhafte und zweckmäßige Weiterbildungen der Aufgabenlösung sind in den Unteransprüchen angegeben.Advantageous and expedient further training of the task solution are specified in the subclaims.
Die Erfindung schafft eine Vorrichtung, mit der nach dem Herausheben der Schachtabdeckung die Schachtabdeckung exakt an das Straßenniveau anpaßbar ist. Hierzu weist die Vorrichtung Abstandselemente auf, die höhenverstellbar ausgebildet sein können und von denen vorzugsweise drei auf den oberen Rand des freigelegten Schachtkonus oder Distanzringes aufgebracht werden. Auf diese Abstandselemente wird der Rahmen der Schachtabdeckung aufgelegt. Bei Verwendung von höhenverstellbaren Abstandselementen werden diese vorzugsweise in der Höhe so eingestellt, daß der Rahmen und der später in den Rahmen eingesetzte Schachtdeckel exakt mit der Straßendecke fluchten. Die erfindungsgemäße Vorrichtung umfaßt ferner eine Schalungseinrichtung, beispielsweise in Form eines aufblasbaren, an die Innenwand des Schachtkonus und/oder evtl. vorhandenen Distanzringes sowie des Rahmens der Schachtabdeckung rundum anpaßbaren Kissens oder zylindrischen Körpers oder doppelwandigen zylindrischen Mantels, welche Füllrohre aufweisen, die eine Auslaßöffnung, die in den durch die Abstandselemente geschaffenen ringförmigen Hohlraum ragt, und eine Einlaßöffnung aufweisen. Über die Füllrohre ist geeignete, aushärtbare Vergußmasse in den ringförmigen Hohlraum preßbar. Sobald die eingepreßte Vergußmasse den Rahmen der Schachtabdeckung, welcher vorzugsweise beschwert wird, bis auf Straßenniveau angehoben hat oder bei mit Hilfe höhenverstellbarer Abstandselemente bereits auf Straßenniveau voreingestelltem Rahmen diesen anzuheben beginnt, wird der Einfüllvorgang beendet. In die um die Schachtabdeckung herum befindliche Ausnehmung der Straßendecke wird auf herkömmliche Weise Bitumenmischung eingefüllt oder ein Bitumenring gemäß der Patentanmeldung DE 199 19 025.9 eingebracht.The invention provides a device with which lifting the manhole cover is exactly adaptable to the street level. The Device spacers on the height adjustable can be, and preferably three of them the upper edge of the exposed shaft cone or spacer ring be applied. On these spacers the frame of the manhole cover is put on. Using of height-adjustable spacer elements, these are preferred adjusted in height so that the frame and the manhole cover later inserted into the frame exactly swearing with the road surface. The device according to the invention also includes a formwork device, for example in the form of an inflatable, on the inner wall the shaft cone and / or any spacer ring as well as the frame of the manhole cover, which is fully adjustable Pillow or cylindrical body or double-walled cylindrical Jacket, which have filling tubes, the one Outlet opening in the created by the spacers annular cavity protrudes, and an inlet opening exhibit. Suitable, curable is over the filling tubes Potting compound can be pressed into the annular cavity. As soon as the pressed casting compound the frame of the manhole cover, which is preferably weighed down to street level has raised or with the help of height adjustable Spacers already preset at street level The frame begins to raise, the filling process completed. In the one around the manhole cover Recess of the road surface is conventional Filled bitumen mixture or a bitumen ring according to of patent application DE 199 19 025.9.
Die Erfindung soll nachfolgend anhand der beigefügten Zeichnung, in der ein Ausführungsbeispiel dargestellt ist, näher erläutert werden.The invention will now be described with reference to the accompanying Drawing, in which an embodiment is shown, are explained in more detail.
Die Zeichnung zeigt einen in einer Straße 1 angeordneten
Revisionsschacht 2 im Schnitt, welcher einen Schachtunterteil
4 und einen Schachtkonus 5 aufweist, auf dem eine
Schachtabdeckung 6, die aus einem auf dem Konus 5 aufliegenden
Rahmen 7 und einem in den Rahmen einsetzbaren
Schachtdeckel (nicht dargestellt) besteht. Zwischen dem
Schachtkonus und dem Rahmen können noch ein oder mehrere
Distanzringe (nicht dargestellt) angeordnet sein.The drawing shows one arranged in a street 1
Um eine Schachtabdeckung 6 auf das Niveau 8 der Straße
1 anzuheben, wird eine erfindungsgemäße Vorrichtung 10 verwendet,
welche Abstandselemente 12, die höhenverstellbar
ausgebildet sein können, und eine Schalungseinrichtung 14
aufweist, welche rundum dicht an die Innenwandung 16 und 17
des Schachtkonus 5 und des Rahmens 7 anlegbar ist. Die
Schalungseinrichtung 14 besteht aus einem aufblasbaren Kissen
18, das einen Druckluftanschluß 19 aufweist, und in dem
wenigstens ein, vorzugsweise mehrere Füllrohre 20, 21 angeordnet
sind, deren beide Enden 22, 22' und 24, 24' aus dem
Kissen 18 herausgeführt sind. Über die Füllrohre 20, 21 ist
Vergußmasse zuführbar.Around a
Die Vorrichtung 10 wird wie folgt eingesetzt: Wenn die
Schachtabdeckung 6 an das Straßenniveau 8 angepaßt werden
soll, wird zunächst die Straßendecke um die Schachtabdekkung
herum ringförmig freigelegt. Dann werden mehrere Abstandselemente
12, vorzugsweise drei Abstandselemente, auf
den oberen Rand des Schachtkonus 17 aufgelegt. Bei Verwendung
höhenverstellbarer Abstandselemente können diese in
der Höhe so eingestellt werden, daß der auf die Abstandselemente
aufgelegte Rahmen 7 der Schachtabdeckung 6 bündig
mit der Straßendecke abschließt. Danach wird das Kissen 18
in den vom Schachtkonus und dem Rahmen der Schachtabdeckung
eingeschlossenen Raum derart eingebracht und aufgeblasen,
daß sich das Kissen rundum dicht an die Innenwandung 16 und
17 von Konus und Rahmen anlegt und die Füllrohre 20, 21 in
den durch die Abstandselemente 12 zwischen Konus und Rahmen
gebildeten ringförmigen Hohlraum 26 ragen. Über die Füllrohre
wird dann der Hohlraum 26 unter Druck mit Vergußmasse
ausgefüllt. Die Einfüllseite der Füllrohre 20, 21 ist symbolisch
durch Trichter 28, 30 dargestellt.The
Der Vergußmassen-Einfüllvorgang wird dann beendet, wenn
der Rahmen 7 der Schachtabdeckung 6 bis auf Straßenniveau
angehoben ist oder bei bereits auf Straßenniveau voreingestelltem
Rahmen sich dieser anzuheben beginnt. Vorzugsweise
wird der Rahmen mit einem Gewicht beaufschlagt, wodurch sichergestellt
ist, daß der Hohlraum 26 gleichmäßig mit Vergußmasse
gefüllt wird und die Schachtabdeckung nicht bereits
schon bei unvollständig gefülltem Hohlraum angehoben
wird.The pouring compound filling process is ended when
the
Nach Aushärten der Vergußmasse wird der um den Schacht herum ausgehobene Bereich des Straßenbelages mit Bitumenmischung ausgefüllt.After the casting compound has hardened, it is placed around the shaft excavated area of the pavement with bitumen mixture filled.
Als Vergußmassen sind Werkstoffe wie Reparaturbeton, Vergußmörtel, Silicatharze o. ä. geeignet.Materials such as repair concrete, Grouting mortar, silicate resins or similar are suitable.
Zwischen dem Schachtkonus 5 und dem Rahmen 7 der
Schachtabdeckung 6 können ein oder mehrere Distanzringe angeordnet
sein; dann werden die Abstandselemente 12 vorzugsweise
zwischen dem obersten Distanzring und dem Rahmen 7
angeordnet.Between the
Die erfindungsgemäße Vorrichtung 10 ist auch bei
Schächten ohne Schachtkonus gleichermaßen einsetzbar.The
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP02001526A EP1329558A1 (en) | 2002-01-18 | 2002-01-18 | Device for adjusting the height of a manhole cover to the street level |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP02001526A EP1329558A1 (en) | 2002-01-18 | 2002-01-18 | Device for adjusting the height of a manhole cover to the street level |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1329558A1 true EP1329558A1 (en) | 2003-07-23 |
Family
ID=8185328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP02001526A Withdrawn EP1329558A1 (en) | 2002-01-18 | 2002-01-18 | Device for adjusting the height of a manhole cover to the street level |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP1329558A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7153057B1 (en) | 2006-02-06 | 2006-12-26 | Anthony Lucas | Securable temporary manhole cover |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63251528A (en) * | 1987-04-07 | 1988-10-19 | Hinode Suido Kiki Kk | Setting of cover-receiving frame for underground structure |
JPH03228928A (en) * | 1990-02-02 | 1991-10-09 | Hakko Co Ltd | Adjustment device for manhole cover height |
JPH08218406A (en) * | 1995-02-13 | 1996-08-27 | Suzuki Chutetsu Kogyo Kk | Mounting method of manhole lid frame |
JPH09144041A (en) * | 1995-11-17 | 1997-06-03 | Nagashima Imono Kk | Method of cover-height adjusting construction of manhole |
DE19919025A1 (en) | 1999-04-27 | 2000-11-02 | Gudrun Mietz | Method and device for repairing or replacing parts of a bituminous road surface |
DE10102068A1 (en) * | 2001-01-17 | 2002-08-01 | Gudrun Mietz | Lifting device for inspection shaft covers in road surfaces uses spacers to define ring chamber between shaft and cover, shuttering to seal space, and casting compound filled into space to raise cover |
-
2002
- 2002-01-18 EP EP02001526A patent/EP1329558A1/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63251528A (en) * | 1987-04-07 | 1988-10-19 | Hinode Suido Kiki Kk | Setting of cover-receiving frame for underground structure |
JPH03228928A (en) * | 1990-02-02 | 1991-10-09 | Hakko Co Ltd | Adjustment device for manhole cover height |
JPH08218406A (en) * | 1995-02-13 | 1996-08-27 | Suzuki Chutetsu Kogyo Kk | Mounting method of manhole lid frame |
JPH09144041A (en) * | 1995-11-17 | 1997-06-03 | Nagashima Imono Kk | Method of cover-height adjusting construction of manhole |
DE19919025A1 (en) | 1999-04-27 | 2000-11-02 | Gudrun Mietz | Method and device for repairing or replacing parts of a bituminous road surface |
DE10102068A1 (en) * | 2001-01-17 | 2002-08-01 | Gudrun Mietz | Lifting device for inspection shaft covers in road surfaces uses spacers to define ring chamber between shaft and cover, shuttering to seal space, and casting compound filled into space to raise cover |
Non-Patent Citations (4)
Title |
---|
PATENT ABSTRACTS OF JAPAN vol. 013, no. 045 (M - 792) 2 February 1989 (1989-02-02) * |
PATENT ABSTRACTS OF JAPAN vol. 016, no. 002 (M - 1197) 7 January 1992 (1992-01-07) * |
PATENT ABSTRACTS OF JAPAN vol. 1996, no. 12 26 December 1996 (1996-12-26) * |
PATENT ABSTRACTS OF JAPAN vol. 1997, no. 10 31 October 1997 (1997-10-31) * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7153057B1 (en) | 2006-02-06 | 2006-12-26 | Anthony Lucas | Securable temporary manhole cover |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CH626132A5 (en) | Process and apparatus for erecting essentially cupola-shaped structures, and a structure erected therewith | |
DE60300698T2 (en) | Method for replacing a manhole frame | |
DE10102068A1 (en) | Lifting device for inspection shaft covers in road surfaces uses spacers to define ring chamber between shaft and cover, shuttering to seal space, and casting compound filled into space to raise cover | |
EP1329558A1 (en) | Device for adjusting the height of a manhole cover to the street level | |
DE69023923T2 (en) | Fume cupboard with plastic cover for filters. | |
DE19919025A1 (en) | Method and device for repairing or replacing parts of a bituminous road surface | |
DE3203107A1 (en) | Apparatus and process for producing angle elements from concrete | |
DE4122413C2 (en) | Method and device for producing a collecting space | |
DE3114744A1 (en) | Formwork for concrete foundations | |
DE10330055B4 (en) | Manhole cover and method of installation | |
EP1117613A1 (en) | Compact tank farm and a method for mounting same | |
DE4136610C2 (en) | Method for widening a route, in particular a waterway | |
DE3442913C2 (en) | ||
DE10042489C2 (en) | Device for pressing the transitions of house connection pipes | |
DE2952042A1 (en) | Adjustable road manhole cover frame - is L=sectioned with one arm acting as support and other providing holding space (AT 15.05.80) | |
WO2009021478A1 (en) | Method of renewing a railway line and associated railway line | |
DE627752C (en) | Method and tool for compacting the subsoil of road surfaces | |
DE964488C (en) | Device for achieving a uniform settlement of a sealing core located in a dam | |
CH696001A5 (en) | Fitting drain shaft cover in railway track bed, comprises placing shuttering ring on top of shaft cone and removing after bed support layer has been laid | |
DE19548834A1 (en) | Prefabricated manhole shaft in fibre reinforced cement or plastic | |
CH692207A5 (en) | Equipment for installation of shaft covers in road construction incorporates height adjustment device laid on upper edge of shaft pipe | |
DE3929530C2 (en) | Formwork to be arranged around a vertical shaft and method for manufacturing the formwork | |
EP1087069A2 (en) | Method for the construction of a ceiling of a building | |
AT360441B (en) | SHAFT COVER SUPPORT FRAME | |
DE2618771A1 (en) | Manhole cover frame with adjustable level - has telescoping parts and rests in seating groove filled with granular material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK RO SI |
|
AKX | Designation fees paid | ||
REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8566 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20040124 |