EP1258566A1 EP01201765A EP01201765A EP1258566A1 EP 1258566 A1 EP1258566 A1 EP 1258566A1 EP 01201765 A EP01201765 A EP 01201765A EP 01201765 A EP01201765 A EP 01201765A EP 1258566 A1 EP1258566 A1 EP 1258566A1
Authority
EP
European Patent Office
Prior art keywords
reinforcement
concrete
layer
foundation
holders
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP01201765A
Other languages
German (de)
French (fr)
Inventor
Renaat Verbrugge
Christiane Verbrugge
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to EP01201765A priority Critical patent/EP1258566A1/en
Publication of EP1258566A1 publication Critical patent/EP1258566A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations

Definitions

  • the invention relates to a foundation method and a foundation slab.
  • the generally applied foundation methods comprises following steps:
  • Another disadvantage of this method is teh stability of the trenches themselves, especially in case of high (ground-)water level.
  • the trenches collapse even before the concrete can be poured in, which results in unverifiable dimensions of the foundation trenches.
  • the foundation comprises a foundation base made of concrete, which is installed on the ground, and a foundation beam made of steel, secured to the foundation base.
  • the foundation beam is tightened to the foundation by anchor bolts previously driven into the foundation base, or is tightened by chemical anchors constructed on-site.
  • a connecting piece is welded to the foundation beam in advance.
  • the foundation beams of the adjacent foundations are thereby connected together by a tie member comprising reinforcing braces.
  • a first disadvantage of this foundation method is that it is still necessary to dig out to an important depth for the construction of the concrete base, whereby also the risk of collapsing of the ground stays.
  • a second disadvantage is that the connection of the concrete base with steel foundation beams and tie members results in a rather high foundation construction, which rises more than 800 mm above the ground level.
  • the purpose of the invention is to provide a foundation method that resolves the abovementioned disadvantages.
  • a foundation method that comprises the steps:
  • one or more devices selected from air cushions, recycled PVC-blocks, carton or plastic blocks, etc. are used for said lost shuttering.
  • zig-zag meshes are used for said distant holders.
  • bended meshes and/or reinforcement baskets are used for said distant holders.
  • part of said lost shuttering is replaced by technical supplies such as tanks for rain water, septic tanks, and/or heat exchangers for subfloor heating or cooling.
  • the method according to the invention comprises preferably the steps:
  • the invention relates to a foundation slab which is made by the method as described above.
  • the foundation slab has following sizes:
  • a foundation slab (1) according to the invention as shown in figure 1, comprises three major parts:
  • Such a concrete slab (1) can be realised in two days:
  • parts of these two concrete layers can also be repalced by precasted concrete plates, this in order to accelerate the proces.
  • a foundation slab made by a method according to the invention has the advantage that a light-weight foundation is provided, which is applicable on ground with low supporting capacity, where otherwise other expensive foundation techniques need to be applied.
  • Another advantage is that an excellent stiffness and flexural strength is obtained, as a result of which setting cracks will be reduced to a minimum.
  • This foundation slab ends 20 to 30 cm higher than the original ground level, which is often desired.
  • This foundation method has a very fast execution, there is little or no removal of ground.
  • a combination with a prefabricated cellar, and eventually with a pile or pit foundation can easily be realised. Reinforced underground beams are not necessary. The required stiffness can be obtained by adding extra reinforcement bars in the slabs at the bottom and the top and in the space within the distant holders.

Abstract

The invention relates to a foundation method in which the method comprises providing a first concrete layer (2), provided with distant holders (6), and optionally provided with a first reinforcement (5), on the ground; whereafter lost shuttering (7) which can bear the load of concrete is placed between said distant holders (6); and whereafter a second concrete layer (8), optionally provided with second reinforcement (9), is provided on top of said lost shuttering (7) and in the space created by the distant holders (6). For said lost shuttering (7), preferably polystyrene blocks are used, and for said distant holders (6) zig-zag-meshes are used. The invention further relates to a foundation slab made by such a method.

Description

  • The invention relates to a foundation method and a foundation slab.
  • Until now, the generally applied foundation methods comprises following steps:
    • removing the soil layer and/or the stirred toplayers of the ground;
    • digging trenches with a depth of 800 mm and a width of 600 - 800 mm;
    • filling with concrete up to a height of 400 mm;
    • laying a layer of full concrete blocks with a width of 300 mm on top of said concrete filled trenches;
    • installing sewers;
    • filling the space between said full concrete blocks with sand and stabilizer;
    • providing on top of said full concrete blocks and the filled space between them a layer of reinforced concrete.
  • The disadvantage of this foundation method is that only the trenches bear the full load of the building that is built on top of the foundation. The rest of the concrete serves nothing.
  • Another disadvantage of this method is teh stability of the trenches themselves, especially in case of high (ground-)water level. The trenches collapse even before the concrete can be poured in, which results in unverifiable dimensions of the foundation trenches.
  • Still another problem that arises with this method is the heavy weight of concrete. Concrete has a weight of 2500 kg/m3. When such a classic foundation method is exerted on ground with a low supporting capacity, the load that such ground can bear is for a great part already taken up by the load of the foundation slab. This means that the load of the building that has to be build on this foundation slab has to be seriously reduced. When the load of the building is too important, subsidence can occur.
  • Till now, this problem is solved by exerting expensive foundation techniques such as piles, or by digging deaper into the ground.
  • In JP 07211667, a foundation of building and a method for constructing the same is described for reducing the weight of a foundation and for eliminating the need for ground improvement works, etc.. Therefore, the foundation comprises a foundation base made of concrete, which is installed on the ground, and a foundation beam made of steel, secured to the foundation base. The foundation beam is tightened to the foundation by anchor bolts previously driven into the foundation base, or is tightened by chemical anchors constructed on-site. A connecting piece is welded to the foundation beam in advance. The foundation beams of the adjacent foundations are thereby connected together by a tie member comprising reinforcing braces.
  • A first disadvantage of this foundation method is that it is still necessary to dig out to an important depth for the construction of the concrete base, whereby also the risk of collapsing of the ground stays.
  • A second disadvantage is that the connection of the concrete base with steel foundation beams and tie members results in a rather high foundation construction, which rises more than 800 mm above the ground level.
  • Furthermore, the complexity of execution of this foundation method results in a very expensive method.
  • In one respect, the purpose of the invention is to provide a foundation method that resolves the abovementioned disadvantages.
  • To achieve this purpose, a foundation method is provided that comprises the steps:
    • providing a first concrete layer, provided with distant holders, and optionally provided with a first reinforcement, on the ground;
    • placing lost shuttering which can bear the load of concrete between said distant holders;
    • providing a second concrete layer, optionally provided with a second reinforcement, on top of said lost shuttering and in the space created by the distant holders. In a preferred foundation method according to the invention, polystyrene blocks are used for said lost shuttering.
  • This has the advantage that there is a high insulation value. As a result, a warm feeling flour is obtained.
  • In another preferred foundation method according to the invention, one or more devices selected from air cushions, recycled PVC-blocks, carton or plastic blocks, etc. are used for said lost shuttering.
  • In a specific foundation method according to the invention, zig-zag meshes are used for said distant holders.
  • In another specific foundation method according to the invention, bended meshes and/or reinforcement baskets are used for said distant holders.
  • In a more specific foundation method of the invention, part of said lost shuttering is replaced by technical supplies such as tanks for rain water, septic tanks, and/or heat exchangers for subfloor heating or cooling.
  • The method according to the invention comprises preferably the steps:
    • measuring out the external contours of the building;
    • removing the soil layer and/or the stirred toplayers of the ground;
    • installing sewers in a layer of stabilisator;
    • placing of external shuttering according to the external contours of the building;
    • optionally, placing a PE-foil on top of said layer of stabilisator;
    • laying a first mesh-reinforcement on the ground;
    • fixing zig-zag-meshes to said mesh-reinforcement;
    • pouring a first layer concrete on said mesh-reinforcement;
    • after curing of said first layer concrete until it is passable, placing polystyrene blocks between said zig-zag-meshes;
    • optionally, placing extra reinforcement bars;
    • laying a second mesh-reinforcement on top of said polystyrene blocks;
    • pouring a second layer concrete on said second mesh-reinforcement and in the space between the polystyrene blocks created by the zig-zag-meshes.
  • In another respect, the invention relates to a foundation slab which is made by the method as described above.
  • In a preferred embodiment of the foundation slab according to the invention, the foundation slab has following sizes:
    • a thickness of 50 to 150 mm for said first concrete layer;
    • a thickness varying between 200 and 1200 mm, a width of circa 1000 mm and a length of a couple of meters for said polystyrene blocks;
    • a height of 200 to 1200 mm for said distant holders.
    • a thickness of 50 to 150 mm for said second concrete layer.
  • The invention is now further explained on the basis of the following detailed specification of a preferred foundation slab according to this invention and of the foundation method for making such a foundation slab. The purpose of this specification is only to give a clarifying example and can therefore in no way be interpreted as a restriction on the field of application of the invention or on the patent rights claimed in the claims.
  • In this specification reference is made by means of reference numbers to the figures attached hereto, of which
    • figure 1 is a cross-section of a foundation slab according to the invention;
    • figure 2 is a perspective view of a foundation slab according to the invention;
    • figure 3 is a view from above of a foundation slab according to the invention.
  • A foundation slab (1) according to the invention, as shown in figure 1, comprises three major parts:
    • a first part (10), consisting of a first concrete layer (2) that is laid on a layer of stabilisator (3), on which optionally a PE-foil (4) is spread out, and in which the sewers are installed. This first concrete slab (2) has a relatively low thickness varying from 50 to 150 mm. In most cases, the first concrete slab (2) is reinforced by a first mesh-reinforcement (5). Therefore, this first mesh-reinforcement is placed on top of the layer of stabilisator; optionally more reinforcement may be required. Distant holders (6) with a height of 200 to 1200 mm are fixed appropriately to the first reinforcement (5). Preferably, zig-zag meshes are used. But, also bended meshes or reinforcement baskets can serve as distant holders (6). Hereafter, the concrete is being poured.
    • a second part (20), whereby after a minimum of curing of the concrete, i.e. until the concrete is being passable, lost shuttering (7) is placed between the distant holders (6). Preferably, expanded polystyrene blocks with a width of circa 1000 mm, a length of a couple of meters and a thickness varying between 200 and 1200 mm are used. However, carton, plastic blocks, or even air cushions can serve as well. The space between the lost shuttering (7), i.e. where the distant holders (6) are located, might require extra bars, e.g. of iron, as reinforcement.
    • a third part (30), whereby on top of the lost shuttering (7) a second reinforced concrete layer (8) is provided. Therefor, a second mesh-reinforcement (9) is provided on top of the second part (20), whereafter a layer concrete with a thickness from 50 to 150 mm is poured on top of the lost shuttering (7) and in the space created by the distant holders (6). This results in a kind of T-rib-floor, with important extra stiffness, which is obtained by the first reinforced concrete layer (2) on the bottom of the foundation slab.
  • On top of the third part (30) the facade (11) of the building and a layer of covering (in French "chappe") (12) is placed.
  • As a result, a stiff hybride foundation slab of 400 to 1500 mm thickness is obtained, using three different materials with following properties:
    • concrete, which has high pressure resistance and is easy to be shaped;
    • steel which has a high tensile strength, but which has to be placed as far away as possible from the neutral line to obtain a maximum use of the steel;
    • polystyrene, or another light-weight shuttering material, which is light-weight and sufficient pressure resistant to support the poured concrete during its curing time. These light-weight materials are located between the active zones of the slab on the bottom and on the top, i.e. around the neutral line.
  • Such a concrete slab (1) can be realised in two days:
    • day 1:
      • measuring out the external contours (13) of the building;
      • removing the soil layer and/or the stirred toplayers of the ground;
      • installing sewers in a layer of stabilisator (3);
      • placing of external shuttering (14) according to the external contours (13) of the building;
      • optionally, placing a PE-foil (2) on top of said layer of stabilisator (3);
      • laying a first mesh-reinforcement (5) on the ground;
      • fixing zig-zag-meshes (6) to said first mesh-reinforcement (5);
      • pouring a first layer concrete (2) on said first mesh-reinforcement (5);
    • day 2:
      • after curing of said first layer concrete (2) until it is passable, placing polystyrene blocks (7) between said zig-zag-meshes (6);
      • optionally, placing extra reinforcement bars;
      • laying a second mesh-reinforcement (9) on top of said polystyrene blocks (7);
      • pouring a second layer concrete (8) on said second mesh-reinforcement (9) and in the space between the polystyrene blocks (7) created by the zig-zag-meshes (6).
  • On day 3, the building of the facades (11) of the building and the laying of the layer of covering (12) can start.
  • Before pouring the first (2) and second concrete layer (8), parts of these two concrete layers can also be repalced by precasted concrete plates, this in order to accelerate the proces.
  • A foundation slab made by a method according to the invention has the advantage that a light-weight foundation is provided, which is applicable on ground with low supporting capacity, where otherwise other expensive foundation techniques need to be applied.
  • Another advantage is that an excellent stiffness and flexural strength is obtained, as a result of which setting cracks will be reduced to a minimum.
  • Also no trenches are necessary. As a result, they can not collapse, which happens often in case of ground with low supporting capacity or in case of high ground-water level.
  • Little or no ground supplements are required. This foundation slab ends 20 to 30 cm higher than the original ground level, which is often desired.
  • This foundation method has a very fast execution, there is little or no removal of ground.
  • A combination with a prefabricated cellar, and eventually with a pile or pit foundation can easily be realised. Reinforced underground beams are not necessary. The required stiffness can be obtained by adding extra reinforcement bars in the slabs at the bottom and the top and in the space within the distant holders.
  • In other words, a less expensive foundation in comparison with a classic foundation is obtained, which even has better supporting capacity than the foundations known at present.

Claims (9)

  1. Foundation method, characterised in that the method comprises the steps:
    providing a first concrete layer (2), provided with distant holders (6), and optionally provided with a first reinforcement (5), on the ground;
    placing lost shuttering (7) which can bear the load of concrete between said distant holders (6);
    providing a second concrete layer (8), optionally provided with second reinforcement (9), on top of said lost shuttering (7) and in the space created by the distant holders (6).
  2. Method according to claim 1, characterised in that polystyrene blocks are used for said lost shuttering (7).
  3. Method according to claim 1, characterised in that one or more devices selected from air cushions, recycled PVC-blocks, carton or plastic blocks, etc. are used for said lost shuttering (7).
  4. Method according to claim 1, characterised in that zig-zag meshes are used for said distant holders (6).
  5. Method according to claim 1, characterised in that bended meshes and/or reinforcement baskets are used for said distant holders (6).
  6. Method according to one of claims 1 up to and including 3, characterised in that part of said lost shuttering (7) is replaced by replaced by technical supplies such as tanks for rain water, septic tanks, and/or heat exchangers for subfloor heating or cooling.
  7. Method according to one of claims 1 up to and including 6, characterised in that the method comprises the steps:
    measuring out the external contours (13) of the building;
    removing the soil layer and/or the stirred toplayers of the ground;
    installing sewers in a layer of stabilisator (3);
    placing of external shuttering (14) according to the external contours (13) of the building;
    optionally, placing a PE-foil on top of said layer of stabilisator (3);
    laying a first mesh-reinforcement (5) on the ground;
    fixing zig-zag-meshes (6) to said mesh-reinforcement (5);
    pouring a first layer concrete (2) on said mesh-reinforcement (5);
    after curing of said first layer concrete (2) until it is passable, placing polystyrene blocks (7) between said zig-zag-meshes (6);
    optionally, placing extra reinforcement bars;
    laying a second mesh-reinforcement (9) on top of said polystyrene blocks (7);
    pouring a second layer concrete (8) on said second mesh-reinforcement (9) and in the space between the polystyrene blocks (7) created by the zig-zag-meshes (6).
  8. Foundation slab, characterised in that the slab is made by the method according to one of the preceeding claims.
  9. Foundation slab according to claim 8, characterised by following sizes:
    a thickness of 50 to 150 mm for said first concrete layer (2);
    a thickness varying between 200 and 1200 mm, a width of circa 1000 mm and a length of a couple of meters for said polystyrene blocks (7);
    a height of 200 to 1200 mm for said distant holders (6).
    a thickness of 50 to 150 mm for said second concrete layer (8).
EP01201765A 2001-05-14 2001-05-14 Foundation method and foundation slab made by such a method Withdrawn EP1258566A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP01201765A EP1258566A1 (en) 2001-05-14 2001-05-14 Foundation method and foundation slab made by such a method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP01201765A EP1258566A1 (en) 2001-05-14 2001-05-14 Foundation method and foundation slab made by such a method

Publications (1)

Publication Number Publication Date
EP1258566A1 true EP1258566A1 (en) 2002-11-20

Family

ID=8180295

Family Applications (1)

Application Number Title Priority Date Filing Date
EP01201765A Withdrawn EP1258566A1 (en) 2001-05-14 2001-05-14 Foundation method and foundation slab made by such a method

Country Status (1)

Country Link
EP (1) EP1258566A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007224536A (en) * 2006-02-22 2007-09-06 Eifs Japan株式会社 Artificial ground and its construction method
ES2283160A1 (en) * 2004-01-23 2007-10-16 Vicente Roca Amenedo Isolated mould system for foundation, has excavation carrying out on ground running rock and light material blocks, which are constituted by group of prismatic pieces with systems of drainage in their lower base
BE1022899B1 (en) * 2015-09-02 2016-10-10 SD Building & Engineering - Group bvba Method for manufacturing a foundation plate and foundation plate
JP6944224B1 (en) * 2021-02-07 2021-10-06 株式会社ピーエルジー Foundation structure for structures

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2018875A (en) * 1978-04-07 1979-10-24 Caledonian Moroccan Constr Improvements in buildings
DE4015474A1 (en) * 1989-05-16 1990-11-22 Tanaka Homes Co Concrete floor for building - is supported by parallel tubular structural elements
JPH07166556A (en) * 1993-12-17 1995-06-27 Kurimoto Ltd Construction method for hollow foundation slab
JPH07211667A (en) 1994-01-26 1995-08-11 Nissan Motor Co Ltd Fabrication of semiconductor device
JPH085107A (en) * 1993-09-02 1996-01-12 Keiji Kosaka Cooling-heating equipment of house or the like utilizing heat storage function of box type foundation
JPH1018307A (en) * 1996-07-08 1998-01-20 Toshin Jiyuuken Kk Mat foundation and its construction method
JP2000120077A (en) * 1998-10-16 2000-04-25 Sadaaki Mochizuki Housing foundation, construction method thereof, and housing structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2018875A (en) * 1978-04-07 1979-10-24 Caledonian Moroccan Constr Improvements in buildings
DE4015474A1 (en) * 1989-05-16 1990-11-22 Tanaka Homes Co Concrete floor for building - is supported by parallel tubular structural elements
JPH085107A (en) * 1993-09-02 1996-01-12 Keiji Kosaka Cooling-heating equipment of house or the like utilizing heat storage function of box type foundation
JPH07166556A (en) * 1993-12-17 1995-06-27 Kurimoto Ltd Construction method for hollow foundation slab
JPH07211667A (en) 1994-01-26 1995-08-11 Nissan Motor Co Ltd Fabrication of semiconductor device
JPH1018307A (en) * 1996-07-08 1998-01-20 Toshin Jiyuuken Kk Mat foundation and its construction method
JP2000120077A (en) * 1998-10-16 2000-04-25 Sadaaki Mochizuki Housing foundation, construction method thereof, and housing structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 1996, no. 05 31 May 1996 (1996-05-31) *
PATENT ABSTRACTS OF JAPAN vol. 2000, no. 07 29 September 2000 (2000-09-29) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2283160A1 (en) * 2004-01-23 2007-10-16 Vicente Roca Amenedo Isolated mould system for foundation, has excavation carrying out on ground running rock and light material blocks, which are constituted by group of prismatic pieces with systems of drainage in their lower base
JP2007224536A (en) * 2006-02-22 2007-09-06 Eifs Japan株式会社 Artificial ground and its construction method
BE1022899B1 (en) * 2015-09-02 2016-10-10 SD Building & Engineering - Group bvba Method for manufacturing a foundation plate and foundation plate
JP6944224B1 (en) * 2021-02-07 2021-10-06 株式会社ピーエルジー Foundation structure for structures

Similar Documents

Publication Publication Date Title
US6434900B1 (en) Prefabricated concrete wall system
US9371648B1 (en) Concrete building structure and method for modular construction of same
KR101627279B1 (en) Biased soil pressure reinforcement rigid-frame bridge and construction method of the same
JP2015518931A (en) Modular foundation that can withstand ground movement
US8827235B1 (en) Concrete form for building foundation construction with form insert creating recessed sections
JP2008308945A (en) Concrete foundation combined with tension pile, and construction method thereof
WO2011009219A1 (en) Shoring free excavation and basement construction apparatus and method
EP1258566A1 (en) Foundation method and foundation slab made by such a method
JP7189001B2 (en) How to construct the foundation of a building
JPH05230845A (en) L-shaped block retaining wall structure and construction method thereof
KR101808833B1 (en) Floor structure of underground floor with reduced floor height using shear reinforcement and the construction method thereof
KR20100118482A (en) To use reclamation steel perimeter beam and slab diaphragm effect in order for one side of the basement outer wall continuous construct was possible ,which the basement infrastructure construction method
EP0151626B1 (en) Procedure for making foundations for a structure, and intermediate piece for use in the procedure
JP7016106B2 (en) Lightweight embankment structure and how to build a lightweight embankment
CA2902118A1 (en) Concrete building structure and method for modular construction of same
KR200245125Y1 (en) A pier structure for engineering works
JP6032568B2 (en) Hollow foundation foundation and its construction method
EP0910710B1 (en) Process for carrying out a sheet piling underneath an existing bearing wall or partition
KR102264595B1 (en) Self supporting type phc pile and construction method for the same
JPH07310329A (en) Foundation structure of building and construction method thereof
CN212656215U (en) Assembled pipe support of cross prefabricated steel concrete pile and steel-pipe column combination
JPH03228921A (en) Execution method for concrete foundation work
JP2615344B2 (en) Foundation using expanded polystyrene and its construction method
JP4902377B2 (en) Basic structure of concrete block fence and its construction method
JP3326465B2 (en) Open caisson method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

AKX Designation fees paid

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20030521