CA2902118A1 - Concrete building structure and method for modular construction of same - Google Patents
Concrete building structure and method for modular construction of same Download PDFInfo
- Publication number
- CA2902118A1 CA2902118A1 CA2902118A CA2902118A CA2902118A1 CA 2902118 A1 CA2902118 A1 CA 2902118A1 CA 2902118 A CA2902118 A CA 2902118A CA 2902118 A CA2902118 A CA 2902118A CA 2902118 A1 CA2902118 A1 CA 2902118A1
- Authority
- CA
- Canada
- Prior art keywords
- concrete
- cross
- blocks
- rebar
- building structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
- E04B1/165—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with elongated load-supporting parts, cast in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A concrete building structure and method for constructing a building structure which includesa first cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally the length of a floor in the building structure; a second cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally perpendicularly to the first cross-brace section and spanning a width of the floor in the building structure, such that the first cross-brace section and the second cross-brace section form a grid understructure; a plurality of channels encapsulating adjacent blocks from the first cross-brace section and the second cross-brace section within each element in the grid understructure, whereby the grid understructure includes channels running along its entire length and width into which concrete may be poured at a building site; each of the plurality of blocks positioned within respective channels; a plurality of pre- cast concrete slabs resting atop the blocks in the grid understructure; the pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs; and poured concrete filling each of the channels and the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
Description
CONCRETE BUILDING STRUCTURE AND METHOD FOR
MODULAR CONSTRUCTION OF SAME
FIELD OF THE INVENTION
[0001] The invention relates to modularly constructed concrete buildings, and more particularly to a modularly constructed concrete building structure having one or more levels with floors formed from a plurality of precast concrete slabs attached to a grid support base.
BACKGROUND OF THE INVENTION
MODULAR CONSTRUCTION OF SAME
FIELD OF THE INVENTION
[0001] The invention relates to modularly constructed concrete buildings, and more particularly to a modularly constructed concrete building structure having one or more levels with floors formed from a plurality of precast concrete slabs attached to a grid support base.
BACKGROUND OF THE INVENTION
[0002] The construction of buildings formed of poured-in-place concrete and with exterior walls of concrete panels, has been in use for many years. Conventional techniques involve the use of, in general, first of all pouring concrete columns, internally reinforced with rebars, then erecting horizontal form work for pouring a floor slab, and then pouring an entire floor of concrete in situ on the form work at the building site. Usually the construction proceeds by pouring further columns and then pouring floors in situ, to reach the appropriate height of the building.
Exterior walls are often erected of precast concrete panels.
Exterior walls are often erected of precast concrete panels.
[0003] Such systems are labour intensive, and slow and expensive. The systems are also wasteful of materials such as form work, and wasteful of concrete and rebars. The form work is usually custom made on site and erected on a large number of internal portable posts. The form work must be laid out and supported accurately so that the pouring of the floor can proceed. The resulting floors are poured in one piece in the majority of cases. Rebars are incorporated throughout such a floor, and the floor is connected to the upper ends of the vertical frame s, usually by connecting rebars. The volumes of concrete used in such a system are very considerable. The thickness and weight of the rebars is also considerable. The total weight per floor of the building is therefore made up of relatively massive monolithic slabs of concrete, and large volumes and lengths of heavy rebars.
This is wasteful in terms of costs and materials. It also restricts the height of the building since the footings must be designed to carry a certain weight of construction materials when the building is erected and also the occupants of the building and all their equipment.
This is wasteful in terms of costs and materials. It also restricts the height of the building since the footings must be designed to carry a certain weight of construction materials when the building is erected and also the occupants of the building and all their equipment.
[0004] In addition to all this, the onsite labour costs are considerable.
Typically, onsite labour rates will be two or three times the hourly rate paid to employees in the factory. Clearly it is desirable to both reduce the volume of concrete material required and to reduce the weight of the rebars. It is further desirable to reduce the amount of form work which must be erected to support the floors while they are being poured, and cured. It is also desirable to reduce, as far as possible, the onsite labour costs.
Typically, onsite labour rates will be two or three times the hourly rate paid to employees in the factory. Clearly it is desirable to both reduce the volume of concrete material required and to reduce the weight of the rebars. It is further desirable to reduce the amount of form work which must be erected to support the floors while they are being poured, and cured. It is also desirable to reduce, as far as possible, the onsite labour costs.
[0005] It is therefore desirable to manufacture as far as possible, precast concrete floor components in a factory remote from the building site, and transport such precast floor components to the site and erect them in position. It is also desirable to precast other components including the wall panels , and also the vertical building support columns themselves, and transport them to the site.
This will greatly reduce the costs of onsite labour, and avoid time spent on erecting formwork, pouring concrete on site , and for curing time , and for removing formwork. It will reduce the time taken to pour concrete on site.
This will greatly reduce the costs of onsite labour, and avoid time spent on erecting formwork, pouring concrete on site , and for curing time , and for removing formwork. It will reduce the time taken to pour concrete on site.
[0006] One modular system is disclosed in Russian patent No. 2376424 to Nikolay P.
Tikhovskiy. The system disclosed in this patent involves a floor made with the use of pre-cast flat solid concrete slabs, with rebar components extending out from the slabs. The slabs are then supported at floor level, leaving channel spaces between them. In this system the on-site pouring time and volume of on-site concrete required, and the form-work required is greatly reduced, compared with pouring an entire floor. However, the floor slabs with rebars were still relatively massive.
Tikhovskiy. The system disclosed in this patent involves a floor made with the use of pre-cast flat solid concrete slabs, with rebar components extending out from the slabs. The slabs are then supported at floor level, leaving channel spaces between them. In this system the on-site pouring time and volume of on-site concrete required, and the form-work required is greatly reduced, compared with pouring an entire floor. However, the floor slabs with rebars were still relatively massive.
[0007] In another method and system, disclosed in United States Patent No.
8,336,276 issued December 25, 2012 to Nikolay P. Tikhovskiy, the plain flat slabs are replaced with modular precast concrete caissons. The caissons are formed with massive, deep side walls, and a central slab portion of reduced thickness, supported by the side walls. These caissons may be formed in various shapes, typically square or rectangular but may be hexagonal, or even circular or other shapes, to suit the design of the building. The pre cast caissons are then supported in place at the building site, with their side walls spaced apart being supported by removable posts such as are well known in the art. Between the caisson side walls, channel spaces are defined, which are closed off by form work. Rebars are laid in the channel spaces between the caissons. Concrete beams are then poured on site in the channel spaces between the caissons. The concrete bonds with the side walls of the caissons thereby forming concrete beams, interconnecting and supporting the caissons. The caissons and the beams thus form a homogenous floor. Such caissons have features capable of interlocking directly with the poured concrete of the beams without the need for interlocking rebars.
[0008] The casting of such caissons with relatively complex sidewall features which permit the interlocking is costly, and leads to less flexibility in the design and shape of the perimeter of building floors. Furthermore, the underlying structure and form work required to support the caissons during installation can be cumbersome to create. It would be beneficial to use pre-cast flat concrete slabs as in the Russian patent mentioned above, but to alleviate one or more of the disadvantages described.
For example, the ability to use smaller pre-cast flat concrete slabs would be preferred. It would furthermore be beneficial to provide greater support and a strengthened floor surface when compared to the system of the '276 Patent.
SUMMARY OF THE INVENTION
[0008] The casting of such caissons with relatively complex sidewall features which permit the interlocking is costly, and leads to less flexibility in the design and shape of the perimeter of building floors. Furthermore, the underlying structure and form work required to support the caissons during installation can be cumbersome to create. It would be beneficial to use pre-cast flat concrete slabs as in the Russian patent mentioned above, but to alleviate one or more of the disadvantages described.
For example, the ability to use smaller pre-cast flat concrete slabs would be preferred. It would furthermore be beneficial to provide greater support and a strengthened floor surface when compared to the system of the '276 Patent.
SUMMARY OF THE INVENTION
[0009] In one embodiment of the invention, there is disclosed a concrete building structure including a first cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally the length of a floor in the building structure; a second cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally perpendicularly to the first cross-brace section and spanning a width of the floor in the building structure, such that the first cross-brace section and the second cross-brace section form a grid understructure; a plurality of channels encapsulating adjacent blocks from the first cross-brace section and the second cross-brace section within each element in the grid understructure, whereby the grid understructure includes channels running along its entire length and width into which concrete may be poured at a building site; each of the plurality of blocks positioned within respective channels; a plurality of pre-cast concrete slabs resting atop the blocks in the grid understructure; the pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs; and, poured concrete filling each of the channels and the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
[0010] In one aspect of this embodiment, one or both of the first and the second cross-brace sections further includes a top rebar extending along the length of a top surface thereof.
[0011] In another aspect of this embodiment, the top rebar is attached to a top surface of each of the blocks within the first and/or second cross-brace section.
[0012] In another aspect of this embodiment, each of the pre-cast concrete slabs include at least one main body rebar extending through the concrete slab and extending outwardly from opposite sides of the concrete slab in a direction parallel to a top surface of the slab.
[0013] In another aspect of this embodiment, each of the pre-cast concrete slabs further includes at least one corner rebar extending outwardly from a side of the concrete slab, proximate a corner of the slab; wherein the at least one corner rebar extends outwardly in a direction parallel to the top surface of the slab and then downwardly in a direction perpendicular to the top surface of the slab.
[0014] In another aspect of this embodiment,he at least one corner rebar hooks around the top rebar.
[0015] In another aspect of this embodiment, the channels comprise panels attached to sides of adjacent blocks from each of the first and second cross-brace sections; and a bottom panel attached to the bottom of each of the blocks.
[0016] In another aspect of this embodiment, the blocks further comprise one or more rivets extending upwardly away from a top surface of the blocks; and wherein the pre-cast concrete slabs comprise locating holes corresponding with the one or more rivets.
[0017] The concrete building structure may include two or more floors, each floor having the grid understructure, the channels and the plurality of pre-cast concrete slabs as herein described.
[0018] In another embodiment of the invention, there is provided a method for constructing a concrete building structure including arranging a plurality of supports in a grid-like arrangement; the supports generally defining the ceiling height in a floor of the building structure; placing a plurality of first cross-brace sections on the supports; the first cross-brace sections including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar; wherein one support is provided for each concrete block such that each concrete block rests on its respective support; placing a plurality of second cross-brace sections perpendicular to the first cross-brace sections such that the first and second cross-brace sections form a gird understructure spanning a floor of the concrete structure; the second cross-brace sections including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar; forming a plurality of channels encapsulating adjacent blocks from the first cross-brace section and the second cross-brace section within each element in the grid understructure such that the grid understructure includes channels running along its entire length and width; positioning a plurality of pre-cast concrete slabs atop the blocks in the grid understructure; the pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs; pouring concrete into each of the channels and into the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
[0019] In one aspect of this embodiment, one or both of the first and the second cross-brace sections further includes a top rebar extending along the length of a top surface thereof.
[0020] In another aspect of this embodiment, the top rebar is attached to a top surface of each of the blocks within the first and/or second cross-brace section.
[0021] In another aspect of this embodiment, each of the pre-cast concrete slabs include at least one main body rebar extending through the concrete slab and extending outwardly from opposite sides of the concrete slab in a direction parallel to a top surface of the slab.
[0022] In another aspect of this embodiment, each of the pre-cast concrete slabs further includes at least one corner rebar extending outwardly from a side of the concrete slab, proximate a corner of the slab; wherein the at least one corner rebar extends outwardly in a direction parallel to the top surface of the slab and then downwardly in a direction perpendicular to the top surface of the slab.
[0023] In another aspect of this embodiment, the at least one corner rebar hooks around the top rebar.
[0024] In another aspect of this embodiment, the channels comprise panels attached to sides of adjacent blocks from each of the first and second cross-brace sections; and a bottom panel attached to the bottom of each of the blocks.
[0025] In another aspect of this embodiment, the blocks further comprise one or more rivets extending upwardly away from a top surface of the blocks; and wherein the pre-cast concrete slabs comprise locating holes corresponding with the one or more rivets.
[0026]
BRIEF DESCRIPTION OF THE DRAWINGS
BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Embodiments will now be described, by way of example only, with reference to the attached Figures, wherein:
[0028] Fig. 1 shows an arrangement of temporary supports upon which a building structure is constructed.
[0029] Fig. 2 shows a pair of cross-brace sections laid upon the supports of Fig. 1 according to an embodiment of the invention.
[0030] Fig. 3 shows a second pair of cross-brace sections laid perpendicularly to the cross-brace sections of Fig. 2.
[0031] Fig. 4 shows a top rebar upon the cross-brace sections of Fig. 2 and Fig. 3.
[0032] Fig. 5 shows the forming of channels around the cross-brace sections of Figs. 2 and 3.
[0033] Fig. 6 shows a pre-cast concrete slab being placed atop the cross-brace sections of Figs. 2 and 3.
[0034] Fig. 7 shows the pre-cast concrete slab of Fig. 6 once installed atop the cross-brace sections of Figs. 2 and 3.
[0035] Fig. 8 shows poured concrete filling the channels of Fig. 5 and the spaces between the concrete slabs of Fig. 7.
[0036] Fig. 9 shows a complete floor of the building structure, prior to the pouring of concrete.
DETAILED DESCRIPTION OF THE EMBODIMENTS
DETAILED DESCRIPTION OF THE EMBODIMENTS
[0037] Generally, the structure and method as herein described permits for a substantial portion of the building structure to be pre-cast or otherwise manufactured offsite and prior to beginning construction on a particular building. In addition, the nature of the pre-cast or otherwise pre-constructed elements allows for a variety of building shapes and designs to be produced using standardized and optionally off-the-shelf elements.
[0038] The figures that follow will illustrate a sequence of steps in the method for assembling the building, and the various required and/or optional elements will be described in additional detail as they are introduced into the description of the assembly.
[0039] Referring now to Fig. 1, there is shown a site 10 at which a building structure is to be built.
Prior to beginning construction, a plurality of supports 15 are laid out, preferably in a grid-like pattern spanning the intended floor area above which a building floor will be created.
In practice, a floor such as a foundation or a basement floor will already have been laid, upon which the supports 15 initially rest. It is also possible that a ground floor has already been laid and the supports 15 rest on the ground floor. At various positions around the perimeter or interior to the grid-like arrange of supports 15, a plurality of pre-cast concrete wall sections 20 may be position. These sections 20 will function as load-bearing columns which support the floor being built. In addition, these sections 20 may also later facilitate the connection of the exterior or interior walls of the building structure.
Prior to beginning construction, a plurality of supports 15 are laid out, preferably in a grid-like pattern spanning the intended floor area above which a building floor will be created.
In practice, a floor such as a foundation or a basement floor will already have been laid, upon which the supports 15 initially rest. It is also possible that a ground floor has already been laid and the supports 15 rest on the ground floor. At various positions around the perimeter or interior to the grid-like arrange of supports 15, a plurality of pre-cast concrete wall sections 20 may be position. These sections 20 will function as load-bearing columns which support the floor being built. In addition, these sections 20 may also later facilitate the connection of the exterior or interior walls of the building structure.
[0040] The supports 15 preferably consist of a pair of tubular pipes 17, 19, one of which has an outer diameter smaller than the internal diameter of the other tubular pipe. A
clamping or locking mechanism 21 is provided proximate a midsection of the pipe structure. This arrangement allows the supports 15 to be height-adjustable to a desired ceiling height for a particular floor in the building structure. Alternate supports may be provided by other arrangements. In particular, prior art scaffolding arrangements or other temporary structures upon which a floor could be built are contemplated. Once the floor above has been built, the supports 15 are removed. The number of supports 15, their general design, layout and strength would readily be determined by a person skilled in the art.
clamping or locking mechanism 21 is provided proximate a midsection of the pipe structure. This arrangement allows the supports 15 to be height-adjustable to a desired ceiling height for a particular floor in the building structure. Alternate supports may be provided by other arrangements. In particular, prior art scaffolding arrangements or other temporary structures upon which a floor could be built are contemplated. Once the floor above has been built, the supports 15 are removed. The number of supports 15, their general design, layout and strength would readily be determined by a person skilled in the art.
[0041] Turning now to Figs. 2 and 3, there is shown a plurality of pre-formed cross-brace segments 25A and 25B. The segments 25A are laid out to be supported on respect supports 15 in a first direction, for example running the length of a building floor. The segments 25B are laid out in a direction perpendicular to the direction of the segments 25A, such that the combination of cross-brace segments 25A and 25B form a grid for receiving pre-cast, flat concrete slabs, as will be discussed in further detail below. The cross-brace segments 25A and 25B preferably include a plurality of support blocks 30A and 30B, connected to each other by one or more rebars 35, which run approximately the entire length of the cross-brace segment. The blocks 30A and 30B can be stock, pre-cast concrete elements, and when assembled into the cross-brace are spaced apart to accommodate the pre-cast concrete slab that will be supported by the cross-brace segments. The particular size, dimensions and spacing of the blocks 30A and 30B will be selected by a person skilled in the art. One optional design selection is to size the blocks 30A and 30B to be of a minimum volume capable of supporting the flat concrete slabs that will be placed thereon. Other designs are also contemplated. Creating the cross-brace from such blocks and rebars permits for a highly flexible and customizable length of cross-brace created entirely from elements that can be pre-constructed. This adds to the modularity of the system and method as herein described in that the cross-braces themselves are modular elements, which are entirely scalable. Rebars 35 are typically metal rods cut to the intended length of the cross-brace 25A, 25B, and would be positioned and fixed within the blocks 30A and 30B in a manner known to one skilled in the art.
[0042] The cross-brace segments 25A and 25B, once assembled form a grid understructure upon which flat, pre-cast concrete elements can be placed. The rebars 35, while serving to hold and connect the distinct blocks 30 will also assist in maintaining poured concrete (as discussed below) in tension.
[0043] The resulting structure following this step is one where a plurality of blocks 30A are connected in series by one, and preferably two, rebars 35, to form a first cross-brace segment 25A, and supported on respective supports 15. A plurality of these cross-brace segments 25A are laid out across the intended floor. Positioned perpendicular to the cross-brace segments 25A are cross-brace segments 25B, consisting of blocks 30B connected in series by one, and preferably two rebars 37.
Where two rebars are used, they are preferably positioned parallel to each other, and at the same vertical height above the ground. The cross-brace segments 25B may be supported by their own respective supports 15, which can be height adjusted as described earlier to accommodate the small differential in height above the ground between the cross-brace segments 25A
and the cross-brace segments 25B. In addition, or alternatively, the rebars 37 can be supported entirely or in part by the rebars 35. Optionally, one or more rivets 40 may be provided on the blocks 30A
and 30B, to aid in the locating of the pre-cast cement slabs.
[00441 Next, as shown in Fig. 4 a top rebar 45 is positioned along the top surface of one, or both, of the cross-brace segments 25A or 25B. The purpose and use of top rebar 45 will be described further below. Typically, top rebar 45 is attached to only one of cross-brace segment 25A or 25B, even though having another top rebar on the other of these cross-segments is certainly contemplated.
Optionally, top rebar 45 may be pre-installed and positioned on the cross-brace segment(s) prior to assembly at the building site.
[00451 Turning now to Fig. 5, the grid understructure is completed by forming channels 50 around each of the blocks 30A and 30B. The channels 50 are preferably formed by attaching inner 52 and outer 54 channel wall portions to each block 30A, 30B (excluding those blocks on the periphery of the grid understructure), on opposite sides thereof, and a bottom wall portion 56 to an underside thereof. In essence, the blocks 30A and 30B form solid portions of the channels 50. The channels 50 may be formed in other ways, and from a variety of materials. In this preferred embodiment, wood panels are secured to the blocks 50 as edge connectors between two adjacent, and perpendicular blocks, with another wood panel placed underneath to form the bottom wall portion.
Other materials other than wood may also readily be used, including sheet metal. The rebars connecting each of the blocks 30A, 30B are intended to be encapsulated within the channels 50 such that when concrete is later poured into the channels 50, the rebars perform their intended function of maintaining tension within the concrete channels.
[0046] The channels 50 should be sufficiently sealed such that concrete can be poured into the channels, and sufficiently harden without significant leakage. There is no requirement, however, that the channels be water tight. Channels 50 could also be built entirely around, and underneath the blocks 30A, 30B, although this would require longer wall sections, which may be undesirable.
Various hardware elements, or additional wood (or other material) supports may be employed to strengthen the channels, connect the channels to the blocks, or otherwise provide the intended function.
[0047] On the periphery of the floor channels are analogously formed so as to complete the understructure forming a grid-pattern of channel, either encompassing the blocks 30A, 30B, or using the sides of the blocks 30A, as sides of the channel.
[0048] Next, and as shown in Figs. 6 and 7, precast, flat concrete slabs 55 are positioned atop the grid understructure, by resting on each of the blocks 30A, 30B. In embodiments where rivets extend upwardly from the blocks, corresponding locating holes are provided on the concrete slabs to define the position of the concrete slabs. Concrete slabs 55 are typically entirely precast and provide for a great deal of flexibility in the modular nature of the building structure and method as herein described.
[0049] As shown in Fig. 6, each of the concrete slabs 55 preferably include a plurality of rebars extending outwardly from the sides of the slab 55. In the preferred embodiment, a pair of corner rebars 60 are provided on adjacent sides of each corner 66 of the slab 55, and one or more main body rebars 70 between the corner rebars 60 of adjacent corners. The main body rebars 70 generally extend outwardly from the mid-portion of the sides of the slab 55. The corner rebars 60 extend outwardly from the sides of the slab 55 and curve downwardly towards the ground surface on which the building is built, forming a hook-type arrangement.
[0050] Once the slabs 55 are positioned on the blocks 30, as per Fig. 7, the corner rebars 60 hook around the top rebar 45 positioned atop the blocks 30A, 30B. The main body rebars 70 extend over the top rebar 45.
[0051] Next, as shown in Fig. 8, concrete 70 is poured into each of the channels 50 to form a generally flat top surface, which forms the floor being constructed in the building. The poured concrete fills the channels 50, encapsulating the top rebar 45, the main body rebars 70 and the corner rebars 60. The top rebars 45 and the main body rebars 70 serve the function of maintaining tension within the concrete structure, as rebars are known to do. The corner rebars 60, being curved to hook around the top rebar 45 also aids in maintaining tension, but in addition serves the unique purpose of fixing the slab 55 in place. Without the curved corner rebars 60, under certain loading conditions, there is a risk that the slab 55 could be placed under certain forces, which in extreme conditions would lead to the slab 55 becoming dislodged by popping upwards from the concrete surrounding it. The curved rebars 60 have been found to prevent this from happening and provide an additional strengthening factor within the concrete structure. Of course, the degree to which the slab 55 could dislodge is relatively small and in practice typically results in an uneven floor, rather than catastrophic events, but the provision of the curved rebars 60 and their interaction with the top rebar 45 appears to avoid this condition.
[0052] Fig. 9 shows a generally completed floor structure prior to the pouring of concrete within the channels. Once the cement structure has been completed, the building itself can be completed by adding exterior and interior walls, as is typically done in other modular home constructions. One manner in which exterior walls can be provided is as described in United States Patent No. 8,291,675 to Tikhovskiy, the contents of which are herein expressly incorporated by reference.
[0053] Various modifications and alternatives may be made to the invention.
For example, at least one of the cross-brace sections could be provided as an elongated, pre-cast concrete section with rebars running therethrough. In this variation, rather than providing the separated blocks in forming the cross-brace sections, only a single effective block is present which runs the length or width of the building floor. The perpendicular cross brace can then be provided with separated blocks as described above, thereby reducing some of the on-site work needed in completing the channels in the understructure. However, this variation results in less modularity. Otherwise, different types of materials may be used in forming the channels of the understructure, and indeed these channels may be pre-formed such that they are merely connected to the concrete blocks on-site. For example, sheet metal corner elements could be produced in advance and simply connected on-site to complete the channels around the blocks.
[0054] This concludes the description of the presently preferred embodiments of the invention.
The foregoing description has been presented for the purpose of illustration and is not intended to be exhaustive or to limit the invention to the precise form disclosed. It is intended the scope of the invention be limited not by this description but by the claims that follow.
Where two rebars are used, they are preferably positioned parallel to each other, and at the same vertical height above the ground. The cross-brace segments 25B may be supported by their own respective supports 15, which can be height adjusted as described earlier to accommodate the small differential in height above the ground between the cross-brace segments 25A
and the cross-brace segments 25B. In addition, or alternatively, the rebars 37 can be supported entirely or in part by the rebars 35. Optionally, one or more rivets 40 may be provided on the blocks 30A
and 30B, to aid in the locating of the pre-cast cement slabs.
[00441 Next, as shown in Fig. 4 a top rebar 45 is positioned along the top surface of one, or both, of the cross-brace segments 25A or 25B. The purpose and use of top rebar 45 will be described further below. Typically, top rebar 45 is attached to only one of cross-brace segment 25A or 25B, even though having another top rebar on the other of these cross-segments is certainly contemplated.
Optionally, top rebar 45 may be pre-installed and positioned on the cross-brace segment(s) prior to assembly at the building site.
[00451 Turning now to Fig. 5, the grid understructure is completed by forming channels 50 around each of the blocks 30A and 30B. The channels 50 are preferably formed by attaching inner 52 and outer 54 channel wall portions to each block 30A, 30B (excluding those blocks on the periphery of the grid understructure), on opposite sides thereof, and a bottom wall portion 56 to an underside thereof. In essence, the blocks 30A and 30B form solid portions of the channels 50. The channels 50 may be formed in other ways, and from a variety of materials. In this preferred embodiment, wood panels are secured to the blocks 50 as edge connectors between two adjacent, and perpendicular blocks, with another wood panel placed underneath to form the bottom wall portion.
Other materials other than wood may also readily be used, including sheet metal. The rebars connecting each of the blocks 30A, 30B are intended to be encapsulated within the channels 50 such that when concrete is later poured into the channels 50, the rebars perform their intended function of maintaining tension within the concrete channels.
[0046] The channels 50 should be sufficiently sealed such that concrete can be poured into the channels, and sufficiently harden without significant leakage. There is no requirement, however, that the channels be water tight. Channels 50 could also be built entirely around, and underneath the blocks 30A, 30B, although this would require longer wall sections, which may be undesirable.
Various hardware elements, or additional wood (or other material) supports may be employed to strengthen the channels, connect the channels to the blocks, or otherwise provide the intended function.
[0047] On the periphery of the floor channels are analogously formed so as to complete the understructure forming a grid-pattern of channel, either encompassing the blocks 30A, 30B, or using the sides of the blocks 30A, as sides of the channel.
[0048] Next, and as shown in Figs. 6 and 7, precast, flat concrete slabs 55 are positioned atop the grid understructure, by resting on each of the blocks 30A, 30B. In embodiments where rivets extend upwardly from the blocks, corresponding locating holes are provided on the concrete slabs to define the position of the concrete slabs. Concrete slabs 55 are typically entirely precast and provide for a great deal of flexibility in the modular nature of the building structure and method as herein described.
[0049] As shown in Fig. 6, each of the concrete slabs 55 preferably include a plurality of rebars extending outwardly from the sides of the slab 55. In the preferred embodiment, a pair of corner rebars 60 are provided on adjacent sides of each corner 66 of the slab 55, and one or more main body rebars 70 between the corner rebars 60 of adjacent corners. The main body rebars 70 generally extend outwardly from the mid-portion of the sides of the slab 55. The corner rebars 60 extend outwardly from the sides of the slab 55 and curve downwardly towards the ground surface on which the building is built, forming a hook-type arrangement.
[0050] Once the slabs 55 are positioned on the blocks 30, as per Fig. 7, the corner rebars 60 hook around the top rebar 45 positioned atop the blocks 30A, 30B. The main body rebars 70 extend over the top rebar 45.
[0051] Next, as shown in Fig. 8, concrete 70 is poured into each of the channels 50 to form a generally flat top surface, which forms the floor being constructed in the building. The poured concrete fills the channels 50, encapsulating the top rebar 45, the main body rebars 70 and the corner rebars 60. The top rebars 45 and the main body rebars 70 serve the function of maintaining tension within the concrete structure, as rebars are known to do. The corner rebars 60, being curved to hook around the top rebar 45 also aids in maintaining tension, but in addition serves the unique purpose of fixing the slab 55 in place. Without the curved corner rebars 60, under certain loading conditions, there is a risk that the slab 55 could be placed under certain forces, which in extreme conditions would lead to the slab 55 becoming dislodged by popping upwards from the concrete surrounding it. The curved rebars 60 have been found to prevent this from happening and provide an additional strengthening factor within the concrete structure. Of course, the degree to which the slab 55 could dislodge is relatively small and in practice typically results in an uneven floor, rather than catastrophic events, but the provision of the curved rebars 60 and their interaction with the top rebar 45 appears to avoid this condition.
[0052] Fig. 9 shows a generally completed floor structure prior to the pouring of concrete within the channels. Once the cement structure has been completed, the building itself can be completed by adding exterior and interior walls, as is typically done in other modular home constructions. One manner in which exterior walls can be provided is as described in United States Patent No. 8,291,675 to Tikhovskiy, the contents of which are herein expressly incorporated by reference.
[0053] Various modifications and alternatives may be made to the invention.
For example, at least one of the cross-brace sections could be provided as an elongated, pre-cast concrete section with rebars running therethrough. In this variation, rather than providing the separated blocks in forming the cross-brace sections, only a single effective block is present which runs the length or width of the building floor. The perpendicular cross brace can then be provided with separated blocks as described above, thereby reducing some of the on-site work needed in completing the channels in the understructure. However, this variation results in less modularity. Otherwise, different types of materials may be used in forming the channels of the understructure, and indeed these channels may be pre-formed such that they are merely connected to the concrete blocks on-site. For example, sheet metal corner elements could be produced in advance and simply connected on-site to complete the channels around the blocks.
[0054] This concludes the description of the presently preferred embodiments of the invention.
The foregoing description has been presented for the purpose of illustration and is not intended to be exhaustive or to limit the invention to the precise form disclosed. It is intended the scope of the invention be limited not by this description but by the claims that follow.
Claims (17)
1. A concrete building structure comprising:
a first cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally the length of a floor in the building structure;
a second cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally perpendicularly to said first cross-brace section and spanning a width of the floor in the building structure, such that said first cross-brace section and said second cross-brace section form a grid understructure;
a plurality of channels encapsulating adjacent blocks from said first cross-brace section and said second cross-brace section within each element in said grid understructure, whereby said grid understructure includes channels running along its entire length and width into which concrete may be poured at a building site; each of said plurality of blocks positioned within respective channels;
a plurality of pre-cast concrete slabs resting atop said blocks in said grid understructure; said pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs; and, poured concrete filling each of said channels and the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
a first cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally the length of a floor in the building structure;
a second cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally perpendicularly to said first cross-brace section and spanning a width of the floor in the building structure, such that said first cross-brace section and said second cross-brace section form a grid understructure;
a plurality of channels encapsulating adjacent blocks from said first cross-brace section and said second cross-brace section within each element in said grid understructure, whereby said grid understructure includes channels running along its entire length and width into which concrete may be poured at a building site; each of said plurality of blocks positioned within respective channels;
a plurality of pre-cast concrete slabs resting atop said blocks in said grid understructure; said pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs; and, poured concrete filling each of said channels and the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
2. The concrete building structure according to claim 1, wherein one or both of said first and said second cross-brace sections further includes a top rebar extending along the length of a top surface thereof.
3. The concrete building structure according to claim 2, wherein said top rebar is attached to a top surface of each of said blocks within said first and/or second cross-brace section.
4. The concrete building structure according to claim 3, wherein each said pre-cast concrete slabs include at least one main body rebar extending through the concrete slab and extending outwardly from opposite sides of said concrete slab in a direction parallel to a top surface of said slab.
5. The concrete building structure according to claim 4, wherein each said pre-cast concrete slabs further includes at least one corner rebar extending outwardly from a side of said concrete slab, proximate a corner of the slab; wherein said at least one corner rebar extends outwardly in a direction parallel to the top surface of the slab and then downwardly in a direction perpendicular to the top surface of the slab.
6. The concrete building structure according to claim 5, wherein said at least one corner rebar hooks around said top rebar.
7. The concrete building structure according to claim 1, wherein said channels comprise panels attached to sides of adjacent blocks from each of said first and second cross-brace sections;
and a bottom panel attached to the bottom of each of said blocks.
and a bottom panel attached to the bottom of each of said blocks.
8. The concrete building structure according to claim 1, wherein said blocks further comprise one or more rivets extending upwardly away from a top surface of said blocks;
and wherein said pre-cast concrete slabs comprise locating holes corresponding with said one or more rivets.
and wherein said pre-cast concrete slabs comprise locating holes corresponding with said one or more rivets.
9. The concrete building structure according to claim 1 comprising two or more floors, each floor having said grid understructure, said channels and said plurality of pre-cast concrete slabs.
10. A method for constructing a concrete building structure comprising:
arranging a plurality of supports in a grid-like arrangement; said supports generally defining the ceiling height in a floor of the building structure;
placing a plurality of first cross-brace sections on said supports; said first cross-brace sections including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar; wherein one support is provided for each concrete block such that each concrete block rests on its respective support;
placing a plurality of second cross-brace sections perpendicular to said first cross-brace sections such that said first and second cross-brace sections form a gird understructure spanning a floor of the concrete structure; said second cross-brace sections including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar;
forming a plurality of channels encapsulating adjacent blocks from said first cross-brace section and said second cross-brace section within each element in said grid understructure such that said grid understructure includes channels running along its entire length and width;
positioning a plurality of pre-cast concrete slabs atop said blocks in said grid understructure; said pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs;
pouring concrete into each of said channels and into the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
arranging a plurality of supports in a grid-like arrangement; said supports generally defining the ceiling height in a floor of the building structure;
placing a plurality of first cross-brace sections on said supports; said first cross-brace sections including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar; wherein one support is provided for each concrete block such that each concrete block rests on its respective support;
placing a plurality of second cross-brace sections perpendicular to said first cross-brace sections such that said first and second cross-brace sections form a gird understructure spanning a floor of the concrete structure; said second cross-brace sections including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar;
forming a plurality of channels encapsulating adjacent blocks from said first cross-brace section and said second cross-brace section within each element in said grid understructure such that said grid understructure includes channels running along its entire length and width;
positioning a plurality of pre-cast concrete slabs atop said blocks in said grid understructure; said pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs;
pouring concrete into each of said channels and into the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
11. The method according to claim 10, wherein one or both of said first and said second cross-brace sections further includes a top rebar extending along the length of a top surface thereof.
12. The method according to claim 11, wherein said top rebar is attached to a top surface of each of said blocks within said first and/or second cross-brace section.
13. The method according to claim 12, wherein each said pre-cast concrete slabs include at least one main body rebar extending through the concrete slab and extending outwardly from opposite sides of said concrete slab in a direction parallel to a top surface of said slab.
14. The method according to claim 13, wherein each said pre-cast concrete slabs further includes at least one corner rebar extending outwardly from a side of said concrete slab, proximate a corner of the slab; wherein said at least one corner rebar extends outwardly in a direction parallel to the top surface of the slab and then downwardly in a direction perpendicular to the top surface of the slab.
15. The method according to claim 14, wherein said at least one corner rebar hooks around said top rebar.
16. The method according to claim 10, wherein said channels comprise panels attached to sides of adjacent blocks from each of said first and second cross-brace sections;
and a bottom panel attached to the bottom of each of said blocks.
and a bottom panel attached to the bottom of each of said blocks.
17. The method according to claim 10, wherein said blocks further comprise one or more rivets extending upwardly away from a top surface of said blocks; and wherein said pre-cast concrete slabs comprise locating holes corresponding with said one or more rivets.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2902118A CA2902118C (en) | 2015-08-31 | 2015-08-31 | Concrete building structure and method for modular construction of same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2902118A CA2902118C (en) | 2015-08-31 | 2015-08-31 | Concrete building structure and method for modular construction of same |
Publications (2)
Publication Number | Publication Date |
---|---|
CA2902118A1 true CA2902118A1 (en) | 2017-02-28 |
CA2902118C CA2902118C (en) | 2018-01-16 |
Family
ID=58185868
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CA2902118A Active CA2902118C (en) | 2015-08-31 | 2015-08-31 | Concrete building structure and method for modular construction of same |
Country Status (1)
Country | Link |
---|---|
CA (1) | CA2902118C (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914802A (en) * | 2019-04-15 | 2019-06-21 | 徐伟红 | Build mold method in house |
WO2019222896A1 (en) * | 2018-05-21 | 2019-11-28 | 增城市碧桂园物业发展有限公司 | Floor panel and construction method thereof |
-
2015
- 2015-08-31 CA CA2902118A patent/CA2902118C/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019222896A1 (en) * | 2018-05-21 | 2019-11-28 | 增城市碧桂园物业发展有限公司 | Floor panel and construction method thereof |
CN109914802A (en) * | 2019-04-15 | 2019-06-21 | 徐伟红 | Build mold method in house |
Also Published As
Publication number | Publication date |
---|---|
CA2902118C (en) | 2018-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9371648B1 (en) | Concrete building structure and method for modular construction of same | |
US8291675B2 (en) | Modular construction system and components and method | |
US20210180310A1 (en) | Building construction system with split precast horizontal floor supports | |
US10094101B1 (en) | Precast concrete system with rapid assembly formwork | |
US8336276B2 (en) | Modular construction system and components and method | |
US3354593A (en) | Concrete beamless building construction | |
US20090151298A1 (en) | Method of Making Monolithic Concrete Structures | |
WO2015038805A1 (en) | Concrete deck for an integrated building system assembly platfrom | |
KR100694493B1 (en) | Downward construction method capable of using bracket support type temporary structure as working table | |
US10640970B2 (en) | Concrete building elements and assemblies thereof, and related methods | |
JP2006283333A (en) | Construction method of reinforced concrete column/steel beam building | |
CA2902118C (en) | Concrete building structure and method for modular construction of same | |
JP5925231B2 (en) | Building construction method and underground building of new building | |
JP5977412B2 (en) | Basement of new building using existing building | |
JP7189001B2 (en) | How to construct the foundation of a building | |
JP7126248B2 (en) | Culvert manufacturing method | |
US20070079570A1 (en) | Reinforced Concrete Forming System | |
JP4191235B1 (en) | Temporary support joint, temporary structure, and multi-story slab construction method | |
KR0171873B1 (en) | Constructive method of a high building | |
WO2020051002A1 (en) | Simplified precast concrete system with rapid assembly formwork | |
KR100837831B1 (en) | Underground downward construction system | |
JP7572413B2 (en) | How to build a structure | |
JP6032568B2 (en) | Hollow foundation foundation and its construction method | |
RU2453662C1 (en) | Collapsible-monolithic framing of building | |
WO2017122081A1 (en) | System and method for the construction of building made of reinforced concrete |