EP1162313A1 - Artificial stone for reinforcing outdoor traffic areas - Google Patents

Artificial stone for reinforcing outdoor traffic areas Download PDF

Info

Publication number
EP1162313A1
EP1162313A1 EP00112212A EP00112212A EP1162313A1 EP 1162313 A1 EP1162313 A1 EP 1162313A1 EP 00112212 A EP00112212 A EP 00112212A EP 00112212 A EP00112212 A EP 00112212A EP 1162313 A1 EP1162313 A1 EP 1162313A1
Authority
EP
European Patent Office
Prior art keywords
tooth
stone
artificial stone
stones
gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP00112212A
Other languages
German (de)
French (fr)
Other versions
EP1162313B1 (en
Inventor
Michael Schmitz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UNI-INTERNATIONAL BAUSYSTEME GMBH & CO. KG
Original Assignee
KANN Baustoffwerke GmbH
KANN GmbH Baustoffwerke
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to AT00112212T priority Critical patent/ATE248253T1/en
Application filed by KANN Baustoffwerke GmbH, KANN GmbH Baustoffwerke filed Critical KANN Baustoffwerke GmbH
Priority to PT00112212T priority patent/PT1162313E/en
Priority to EP00112212A priority patent/EP1162313B1/en
Priority to ES00112212T priority patent/ES2204401T3/en
Priority to DK00112212T priority patent/DK1162313T3/en
Priority to PCT/EP2001/005049 priority patent/WO2001094703A1/en
Priority to AU7399001A priority patent/AU7399001A/en
Priority to JP2002502236A priority patent/JP2004506822A/en
Priority to IL15320201A priority patent/IL153202A0/en
Priority to AU2001273990A priority patent/AU2001273990B2/en
Priority to CZ20024034A priority patent/CZ293750B6/en
Priority to CA002411032A priority patent/CA2411032C/en
Priority to HU0301428A priority patent/HU226502B1/en
Publication of EP1162313A1 publication Critical patent/EP1162313A1/en
Priority to US10/310,916 priority patent/US6857244B2/en
Application granted granted Critical
Publication of EP1162313B1 publication Critical patent/EP1162313B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/02Paving elements having fixed spacing features

Definitions

  • the invention relates to an artificial stone, in particular made of concrete for fastening of outdoor traffic areas, the stone being perpendicular to the laying plane directed and essentially parallel side faces each at least a pairing of one tooth and one of the tooth shapes lying next to it essentially corresponding tooth gap for the tooth of the adjacent Stone and the sequence in a direction of rotation of the stone of tooth and tooth space is the same for all side surfaces.
  • Such artificial stones with which slabs in particular made of concrete are included should be, if necessary, with a structured surface over the entire surface be trained.
  • the sequence of all stones in the direction of rotation of tooth and tooth gap is the same, is required for the laying work no special attention. Rather, the stones can be as they are Operator in hand come to be placed on stones already laid.
  • the mutual interlocking given by the means described Stones also lead to a bond that is parallel to the assigned side surfaces is effective in both directions, resulting in a covering that its strength parallel to the installation level of all commonly occurring Withstands loads.
  • the object of the invention is therefore, for artificial stones of the type described a way of specifying how the prescribed joint spacing changes ensures the smallest possible number of elements forming this distance, taking measures that are particularly important in this regard to that of shaping the stone-serving tool should be avoided.
  • This task is based on an artificial stone of the type mentioned solved according to the invention by facing away from the assigned side surface and integrally formed on the tip of the tooth or the bottom of the tooth gap has a material order.
  • the arrangement of the regulations Joint spacing ensures protrusions to the lowest possible Limited number, namely the mutual interlocking neighboring Stones that determine their mutual distance anyway. This will make the Side surfaces of the stones, moreover, completely free from any penetration of the filler in the joints disruptive parts, so that a relative easy and safe filling of the joints is guaranteed.
  • the means of the invention are also used to manufacture the stones are used to drive form no special expenses, because of the design of the respective tooth or the respective tooth gap is to be carried out anyway or to prepare, in which case there is practically no effort, in the area of the tooth tip or in the area of the gap base for to create the material application by which there is an extension at the tooth tip or at the bottom of the tooth gap there is a flattening that is strip-shaped extends over the entire height of the.
  • the joint between neighboring stones depending on the country should have a certain minimum width, it is appropriate and sufficient the material application perpendicular to the assigned side surface of the stone to give a depth in the range of 0.5 to 4 millimeters, the shallower depth is sufficient if the stones are installed mechanically in the manner described because, as I said, there is an additional spacing of 1 to 1.5 millimeters by itself.
  • the stone to form wide joints between adjacent stones at least one side surface with at least one integrally molded spacer cam is provided and that the free end of the spacer cam from Tooth and tooth gap formed pairing bears.
  • the distance cams formed wide joint the problem of thermal expansion, the manufacturing tolerance and the introduction of the filling material between the stones given, the problem does exist for the longitudinal course of the Free ends of the spacing cams are used for the toothing Mutual bond of the stones to withstand all occurring loads is required, on the other hand, in its given by the width of the cams Course has such a length that its filling with the filling material is required. Otherwise there could be cavities between the cams remain, the filling of which is not guaranteed from the sides of the cams.
  • the pourability of the filling material can be very different, can also apply accordingly to the material order the tooth tip or the tooth space base a larger dimension, for example be made in the range of 5 millimeters.
  • a stone it is also expedient for a stone to be parallel to the laying plane effective length of the individual side faces the simple or integer multiple is the smallest effective length and that everyone is the smallest effective Long side surface section with a pair of tooth and Tooth gap or a spacing cam carrying this is provided.
  • the size of the stone is usually one or more of the smallest Basic size results.
  • This smallest basic size is then the effective side length the side length of the stone itself plus twice half of the itself the side in its longitudinal direction to calculate joints, their size or, in turn, spread out from that which becomes effective in relation to the neighboring stone Size of the material application of the teeth or the reason for the tooth gaps, if applicable plus the size of the distance cams provided.
  • a stone in a longitudinal direction for example, three times the basic size seen in this longitudinal direction corresponds to the central longitudinal section
  • the stone itself is the effective length of the basic size while it is attached to it length sections of the side adjoining both sides of a length section of the Stone itself plus half the width of the adjoining in this longitudinal direction Correspond to the joint.
  • flanks of the tooth on the one hand and the Tooth gap on the other hand include an angle of at least 90 °, and that the bisector of this angle perpendicular to the assigned side surface of the stone is arranged. This ensures that on the one hand the stones are mutual have a good bond, but on the other hand it is definitely possible the stones into a corner by an essentially horizontal movement already installed adjacent stones of the formed angle.
  • Figure 1 shows two square stones 1, which correspond to those on a stone shown center lines from four times a square basic size 2 put together.
  • the side surfaces 3, 4 of each basic size 2 carry a spacer cam 5, 6.
  • the presence of these distance cams results in the effective length of each basic size 2 in the present case from the side length 3 or 4 plus half the width of the joint 7 between the two shown Stones, i.e. to the size marked with the number 8.
  • the end faces of the cams 5, 6 each have a tooth 9 and a tooth gap 10, the viewed in a direction of rotation of the stone 1 Teeth 9 and the tooth gaps 10 of all spacing cams 5, 6 in the same order lie side by side. As a result, those facing each other fit End faces of the spacing cams of adjacent stones form-fit one into the other.
  • the positioning of the spacing cams 5, 6 is also more effective with regard to all Lengths 8 alike and made so that the center axes 11 of all Spacer cams are positioned on the center of the effective length 8.
  • flanks of both the teeth 9 and the tooth gaps 10 close one another suitable angle, the size of at least 90 °, but preferably 90 ° and its bisector perpendicular to the assigned side surface section 3, 4 stands.
  • the teeth 9 point from of their profiling that exactly matches the tooth gaps 10 additionally in one piece molded on the tip of a material covering the entire stone height 12 on, by bumping against the bottom 13 of the assigned Tooth gap 10 ensures that the course of the flanks of interlocking pairings there is a mutual distance between the tooth and the gap between the teeth, which keeps the unimpeded and flawless assembly of the joint formed by this distance 14 with filling material allowed so that there are no voids between the cams train or remain there.
  • the horizontal cross section of the material application 12 is designed so that it is spaced, ie flowing into the flanks of the tooth.
  • the cams 5, 6 are provided for wide joints 7 and thus to form a covering, which among other things the completion of Surface water over the joints 7 allows.
  • the teeth 9 protrude the front edge of the cams 5, 6 before, while the tooth gaps 10 backwards sit in the material of the cams.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Signs Or Road Markings (AREA)
  • Prostheses (AREA)
  • Glass Compositions (AREA)

Abstract

A cast stone (1) for fixing exterior traffic surfaces is disclosed, whereby the stone (1) has at least one pairing of a tooth (9) and an adjacent tooth space (10) essentially corresponding to the tooth shape for the tooth of the adjacently laid stone (1) on each side surface (3, 4). Furthermore, extending in a single piece from the corresponding side surfaces (3, 4) the peak of the tooth (9) and the recess of the tooth hole (10) comprise a material application (12).

Description

Die Erfindung betrifft einen Kunststein insbesondere aus Beton zur Befestigung von Verkehrsflächen im Freien, wobei der Stein an seinen senkrecht zur Verlegeebene gerichteten und im wesentlichen zueinander parallelen Seitenflächen je wenigstens eine Paarung aus einem Zahn und daneben liegend einer der Zahnform im wesentlichen entsprechenden Zahnlücke für den Zahn des benachbart verlegten Steines aufweist sowie in einer Umlaufrichtung des Steines die Aufeinanderfolge von Zahn und Zahnlücke für alle Seitenflächen gleich geartet ist.The invention relates to an artificial stone, in particular made of concrete for fastening of outdoor traffic areas, the stone being perpendicular to the laying plane directed and essentially parallel side faces each at least a pairing of one tooth and one of the tooth shapes lying next to it essentially corresponding tooth gap for the tooth of the adjacent Stone and the sequence in a direction of rotation of the stone of tooth and tooth space is the same for all side surfaces.

Solche Kunststeine, mit denen hier auch Platten insbesondere aus Beton eingeschlossen sein sollen, können vollflächig gegebenenfalls mit strukturierter Oberfläche ausgebildet sein. Indem bei allen Steinen in Umlaufrichtung die Aufeinanderfolge von Zahn und Zahnlücke gleich geartet ist, bedarf es bei der Verlegearbeit keiner besonderen Aufmerksamkeit. Vielmehr können die Steine so, wie sie der Bedienungsperson in die Hand kommen, an bereits verlegte Steine angesetzt werden. Die mit den beschriebenen Mitteln gegebene, gegenseitige Verzahnung der Steine führt im übrigen zu einem Verbund, der parallel zu den zugeordneten Seitenflächen in beiden Richtungen wirksam ist, womit sich ein Belag ergibt, der hinsichtlich seiner Festigkeit parallel zur Verlegeebene allen üblicherweise auftretenden Belastungen Stand hält.Such artificial stones, with which slabs in particular made of concrete are included should be, if necessary, with a structured surface over the entire surface be trained. By the sequence of all stones in the direction of rotation of tooth and tooth gap is the same, is required for the laying work no special attention. Rather, the stones can be as they are Operator in hand come to be placed on stones already laid. The mutual interlocking given by the means described Stones also lead to a bond that is parallel to the assigned side surfaces is effective in both directions, resulting in a covering that its strength parallel to the installation level of all commonly occurring Withstands loads.

Bezüglich der Fuge aneinandergelegter Steine besteht nun aber die Vorschrift, dass eine solche Fuge eine der jeweiligen nationalen Festlegung entsprechende Mindestbreite von etwa 2 bis 5 Millimetern aufweist, um Wärmedehnungen sowie Fertigungstoleranzen des aus den Steinen gebildeten Belages aufzunehmen und damit das nach dem Verlegen der Steine in der Regel durch Einschwemmen eingebrachte Füllmaterial für die Fugen, üblicherweise Sand, die Fugen auch ohne das Verbleiben von Hohlräumen ausfüllen kann. Beim Handverlegen der Steine lässt sich eine solche Fugenausbildung dadurch gewährleisten, dass die Bedienungsperson beispielsweise durch Spannen von Schnüren, entlang der die Steine beim Verlegen ausgerichtet werden, für den entsprechenden Abstand benachbarter Steine bzw. das Entstehen der vorschriftsmäßigen Fuge sorgt.With regard to the joint of stones placed against each other, there is now the requirement that such a joint corresponds to the respective national definition Has minimum width of about 2 to 5 millimeters to thermal expansion as well To record manufacturing tolerances of the covering formed from the stones and so that after the stones have been laid, they are usually washed in Filling material for the joints, usually sand, the joints also without the remaining voids can fill. When laying the stones by hand Such a joint formation can be ensured by the operator for example by stretching cords along which the stones be aligned when laying, for the corresponding distance from neighboring Stones or the creation of the proper joint ensures.

Die hiermit verbundene Arbeit ist jedoch aufwendig und benötigt den Einsatz geschulten Personals. Sollen die Steine aber maschinell unter Verwendung geeigneter mechanischer Mittel verlegt werden, wozu sie bekanntermaßen zu eine größere Zahl von Steinen in gegenseitigem Verbund enthaltenden Verlegeeinheiten zusammengefasst sind, ist die Entstehung der vorschriftsmäßigen Fugen nicht möglich. Denn beim Absetzen solcher Verlegeeinheiten rücken die Steine zwar im Durchschnitt um etwa einen Millimeter auseinander. Die so gebildete Fuge entspricht jedoch nicht der nach Norm vorgesehenen Sollbreite von 3 bis 5 Millimetern.The work associated with this, however, is complex and requires the use of trained personnel Personnel. However, the stones should be machined using suitable ones mechanical means, for which they are known to be larger Number of laying units containing stones in a mutual connection are summarized, the creation of the proper joints is not possible. Because when placing such laying units, the stones move in An average of about a millimeter apart. The joint formed in this way corresponds however not the target width of 3 to 5 millimeters provided by the standard.

Um den geschilderten Problemen zu begegnen, ist es daher bei Kunststeinen mit planen Seitenflächen bekannt, an diese Seitenflächen eine größere Zahl von noppenförmigen Vorsprüngen anzuformen, wobei diese Vorsprünge senkrecht zur zugeordneten Seitenfläche eine solche Höhe haben, dass bei losem Ablegen die geforderte Fugenbreite erreicht wird und zwar auch dann, wenn die Steine in der geschilderten Art in Form sogenannter Verlegeeinheiten maschinell abgesetzt werden. Diese in der Regel in größerer Zahl erforderlichen Vorsprünge machen jedoch eine entsprechend aufwendigere Gestaltung der Formen zur Herstellung der Steine erforderlich und sie bilden in entsprechender Zahl immer noch Stellen, an denen das Füllmaterial für die Fügen beim Eindringen in die Fugen behindert wird, so dass Hohlräume, in die das Füllmaterial später nachsackt, nicht vermieden werden können.To counter the problems described, it is therefore with artificial stones plan known side surfaces, on these side surfaces a larger number of knob-shaped To form projections, these projections perpendicular to the associated Side surface are of such a height that when they are laid down loosely, the required Joint width is reached, even if the stones in the described Type in the form of so-called laying units are set down mechanically. However, these projections, which are usually required in large numbers, make a correspondingly more complex design of the molds for the production of the stones required and they still form the appropriate number of places where the filling material for the joints is hindered when entering the joints, so that cavities into which the filling material later sags are not avoided can.

Aufgabe der Erfindung ist es daher, für Kunststeine der eingangs geschilderten Art eine Möglichkeit anzugeben, wie sich der vorgeschriebene Fugenabstand durch eine geringstmögliche Zahl diesen Abstand bildender Elemente sicherstellen lässt, wobei hierfür besonders ins Gewicht fallende Maßnahmen an dem der Formung der Steine dienenden Werkzeug vermieden sein sollen. The object of the invention is therefore, for artificial stones of the type described a way of specifying how the prescribed joint spacing changes ensures the smallest possible number of elements forming this distance, taking measures that are particularly important in this regard to that of shaping the stone-serving tool should be avoided.

Diese Aufgabe ist ausgehend von einem Kunststein der eingangs genannten Art erfindungsgemäß dadurch gelöst, dass von der zugeordneten Seitenfläche fortgerichtet und einstückig angeformt die Spitze des Zahnes bzw. der Grund der Zahnlücke einen Materialauftrag aufweist.This task is based on an artificial stone of the type mentioned solved according to the invention by facing away from the assigned side surface and integrally formed on the tip of the tooth or the bottom of the tooth gap has a material order.

Durch diese erfindungsgemäße Maßnahme ist die Anordnung von den vorschriftsmäßigen Fugenabstand gewährleistenden Vorsprüngen auf die geringstmögliche Zahl begrenzt, nämlich den gegenseitigen Verzahnungsverbund benachbarter Steine, der deren gegenseitigen Abstand ohnehin bestimmt. Dadurch werden die Seitenflächen der Steine im übrigen vollkommen frei von jeglichen das Eindringen des Füllmaterials in die Fugen störenden Teilen, so dass ein verhältnismäßig leichtes und sicheres Verfüllen der Fugen gewährleistet ist.Through this measure according to the invention, the arrangement of the regulations Joint spacing ensures protrusions to the lowest possible Limited number, namely the mutual interlocking neighboring Stones that determine their mutual distance anyway. This will make the Side surfaces of the stones, moreover, completely free from any penetration of the filler in the joints disruptive parts, so that a relative easy and safe filling of the joints is guaranteed.

Andererseits sind jedoch auch mit den Mitteln der Erfindung an der zur Herstellung der Steine dienen Form keine besonderen Aufwendungen zu treiben, denn die Gestaltung des jeweiligen Zahnes bzw. der jeweiligen Zahnlücke ist ohnehin vorzunehmen bzw. vorzubereiten, wobei es dann praktisch keines Aufwandes mehr bedarf, im Bereich der Zahnspitze bzw. im Bereich des Lückengrundes den Platz für den Materialauftrag zu schaffen, durch den sich an der Zahnspitze eine Erweiterung bzw. beim Grund der Zahnlücke eine Abflachung ergibt, die sich leistenförmig über die gesamte Höhe des erstreckt.On the other hand, however, the means of the invention are also used to manufacture the stones are used to drive form no special expenses, because of the design of the respective tooth or the respective tooth gap is to be carried out anyway or to prepare, in which case there is practically no effort, in the area of the tooth tip or in the area of the gap base for to create the material application by which there is an extension at the tooth tip or at the bottom of the tooth gap there is a flattening that is strip-shaped extends over the entire height of the.

Im Hinblick darauf, dass die Fuge zwischen benachbarten Steinen je nach Ländervorschrift eine bestimmte Mindestbreite haben soll, ist es zweckmäßig und ausreichend, dem Materialauftrag senkrecht zur zugeordneten Seitenfläche des Steines eine Tiefe im Bereich von 0,5 bis 4 Millimetern zu geben, wobei die geringere Tiefe dann schon ausreicht, wenn die Steine in der geschilderten Weise maschinell verlegt werden, weil sich dabei, wie gesagt, eine zusätzliche Beabstandung von 1 bis 1,5 Millimetern von selbst ergibt. In view of the fact that the joint between neighboring stones depending on the country should have a certain minimum width, it is appropriate and sufficient the material application perpendicular to the assigned side surface of the stone to give a depth in the range of 0.5 to 4 millimeters, the shallower depth is sufficient if the stones are installed mechanically in the manner described because, as I said, there is an additional spacing of 1 to 1.5 millimeters by itself.

Bisher sind im wesentlichen solche Kunststeine angesprochen, die bis auf die Belassung der genannten Fuge dicht aneinander liegen, wobei die Gestaltung so vorgenommen ist, dass die Zähne an den Seitenflächen der Steine vorstehen, während die Zahnlücken hinter der Ebene der Seitenflächen im Vollmaterial des Steines liegen und sich selbstverständlich sowohl die Zähne als auch die Zahnlücken über die gesamte Höhe der Seitenflächen der Steine erstrecken.So far, essentially such artificial stones have been addressed, except for the leaving of the joint mentioned lie close together, the design being made in this way is that the teeth protrude on the side faces of the stones while the tooth gaps behind the level of the side surfaces in the solid material of the stone and of course both the teeth and the tooth gaps extend over the entire height of the side surfaces of the stones.

Nun gibt es jedoch auch Bedarfsfälle, für die die Steine unter Bildung breiter Fugen einen nennenswert größeren gegenseitigen Abstand haben sollen als die genannten etwa 2 bis 5 Millimeter, damit über solche breiten Fugen Oberflächenwasser absickern und/oder eine Gestaltungsmöglichkeit für die mit den Steinen belegte Fläche beispielsweise durch Einsaat von Rasen gegeben werden kann. Hierunter fallen auch sogenannte Rasengittersteine bzw. -platten mit zusätzlichen Durchbrechungen der Stein- bzw. Plattenfläche, bei denen auch die Durchbrechungen mit Erde gefüllt und einer Graseinsaat versehen werden können.Now, however, there are also cases in which the stones form wide joints should have a noticeably greater mutual distance than the ones mentioned about 2 to 5 millimeters, so surface water over such wide joints percolate and / or a design option for those covered with the stones Area can be given, for example, by sowing lawn. Below So-called grass pavers or slabs also fall with additional ones Breakthroughs in the stone or slab surface, including the perforations can be filled with soil and planted with grass.

Um auch solche Steine im Rahmen der Erfindung weiterzubilden, ist es zweckmäßig, dass der Stein zur Bildung breiter Fugen zwischen benachbarten Steinen an wenigstens einer Seitenfläche mit mindestens einer einstückig angeformten Abstandsnocke versehen ist und dass das freie Ende der Abstandsnocke die aus Zahn- und Zahnlücke gebildete Paarung trägt. Hier ist zwar für die durch die Abstandsnocken gebildete breite Fuge das Problem der Wärmedehnung, der Fertigungstoleranz und der Einbringung des Füllmaterials zwischen den Steinen nicht gegeben, sehr wohl besteht das Problem aber für den Längsverlauf der von den freien Enden der Abstandsnocken getragenen Verzahnung, die einerseits für einen allen auftretenden Belastungen Stand haltenden gegenseitigen Verbund der Steine erforderlich ist, andererseits in ihrem durch die Breite der Nocken gegebenen Verlauf eine solche Länge aufweist, dass auch deren Auffüllung mit dem Füllmaterial erforderlich ist. Denn anderenfalls könnten zwischen den Nocken Hohlräume verbleiben, deren Verfüllung von den Seiten der Nocken her nicht gewährleistet ist. In order to further develop such stones within the scope of the invention, it is expedient to that the stone to form wide joints between adjacent stones at least one side surface with at least one integrally molded spacer cam is provided and that the free end of the spacer cam from Tooth and tooth gap formed pairing bears. Here is for the distance cams formed wide joint the problem of thermal expansion, the manufacturing tolerance and the introduction of the filling material between the stones given, the problem does exist for the longitudinal course of the Free ends of the spacing cams are used for the toothing Mutual bond of the stones to withstand all occurring loads is required, on the other hand, in its given by the width of the cams Course has such a length that its filling with the filling material is required. Otherwise there could be cavities between the cams remain, the filling of which is not guaranteed from the sides of the cams.

Da in den vorstehend geschilderten Fällen die Schüttfähigkeit des Füllmaterials sehr unterschiedlich sein kann, kann entsprechend auch für den Materialauftrag der Zahnspitze bzw. des Zahnlückengrundes eine größere Dimensionerung beispielsweise im Bereich von 5 Millimetern vorgenommen werden.Since in the cases described above the pourability of the filling material can be very different, can also apply accordingly to the material order the tooth tip or the tooth space base a larger dimension, for example be made in the range of 5 millimeters.

Zweckmäßig ist es ferner, dass bei einem Stein die zur Verlegeebene parallele wirksame Länge der einzelnen Seitenflächen das einfache oder ganzzahlige Vielfache einer kleinsten wirksamen Länge ist und dass jeder die kleinste wirksame Länge aufweisende Seitenflächenabschnitt mit einer Paarung aus Zahn- und Zahnlücke bzw. einer diese tragenden Abstandsnocke versehen ist. Mit dieser Bemessung wird daran angeknüpft, dass bei Steinsätzen für ein Verlegemuster sich die Steingröße normalerweise aus dem ein- oder mehrfachen einer kleinsten Grundgröße ergibt. Bei dieser kleinsten Grundgröße ist dann als wirksame Seitenlänge die Seitenlänge des Steins an sich zuzüglich zweimal die Hälfte der sich an die Seite in ihrer Längsrichtung anschließenden Fugen zu rechnen, deren Größe bzw. Breite sich wiederum aus der gegenüber dem Nachbarstein wirksam werdenden Größe des Materialauftrags der Zähne bzw. des Grundes der Zahnlücken gegebenenfalls zuzüglich der Größe der vorgesehenen Abstandsnocken ergibt. Weist aber ein Stein in einer Längsrichtung beispielsweise das Dreifache der Grundgröße auf, so entspricht in dieser Längsrichtung gesehen der mittlere Längenabschnitt des Steines an sich der wirksamen Länge der Grundgröße, während die sich daran beidseits anschließenden Längenabschnitte der Seite einem Längenabschnitt des Steines an sich plus der halben Breite der sich in dieser Längsrichtung anschließenden Fuge entsprechen.It is also expedient for a stone to be parallel to the laying plane effective length of the individual side faces the simple or integer multiple is the smallest effective length and that everyone is the smallest effective Long side surface section with a pair of tooth and Tooth gap or a spacing cam carrying this is provided. With this dimensioning is linked to the fact that there are stone sets for a laying pattern the size of the stone is usually one or more of the smallest Basic size results. This smallest basic size is then the effective side length the side length of the stone itself plus twice half of the itself the side in its longitudinal direction to calculate joints, their size or, in turn, spread out from that which becomes effective in relation to the neighboring stone Size of the material application of the teeth or the reason for the tooth gaps, if applicable plus the size of the distance cams provided. Know but a stone in a longitudinal direction, for example, three times the basic size seen in this longitudinal direction corresponds to the central longitudinal section The stone itself is the effective length of the basic size while it is attached to it length sections of the side adjoining both sides of a length section of the Stone itself plus half the width of the adjoining in this longitudinal direction Correspond to the joint.

In diesem Zusammenhang ist es dann ferner vorteilhaft, dass die Mittenachse der Paarungen aus Zahn und Zahnlücke bzw. Abstandsnocken auf der Mitte des zugehörenden Seitenflächenabschnittes liegt. In this context, it is then also advantageous that the central axis of the Pairings of tooth and tooth gap or spacing cams on the middle of the associated Side surface section lies.

Weiterhin ist es zweckmäßig, dass die Flanken des Zahnes einerseits sowie der Zahnlücke andererseits einen Winkel von mindestens 90° einschließen, und dass die halbierende dieses Winkels senkrecht zur zugeordneten Seitenfläche des Steines angeordnet ist. Damit ist gewährleistet, dass einerseits die Steine gegenseitig einen guten Verbund haben, andererseits es aber auch auf jeden Fall möglich ist, die Steine durch eine im wesentlichen horizontale Bewegung auch in die Ecke eines bereits verlegten Nachbarsteinen gebildeten Winkels einzusetzen.It is also expedient that the flanks of the tooth on the one hand and the Tooth gap on the other hand include an angle of at least 90 °, and that the bisector of this angle perpendicular to the assigned side surface of the stone is arranged. This ensures that on the one hand the stones are mutual have a good bond, but on the other hand it is definitely possible the stones into a corner by an essentially horizontal movement already installed adjacent stones of the formed angle.

Schließlich kann vorteilhaft vorgesehen sein, dass die horizontale Querschnittskontur des Materialauftrags fließend in die Flanken des Zahnes bzw. der Zahnlükke übergeht.Finally, it can advantageously be provided that the horizontal cross-sectional contour of the material application flowing into the flanks of the tooth or the tooth gap transforms.

Weitere erfindungswesentliche Merkmale und Einzelheiten ergeben sich aus der nachfolgenden Beschreibung einer Ausführungsform, die auf der Zeichnung dargestellt ist, welche in Figur 1 zwei aneinandergesetzte Steine und in Figur 2 den Ausschnitt II aus Figur 1 in vergrößerter Darstellung zeigt.Further features and details essential to the invention result from the following description of an embodiment shown in the drawing is, which in Figure 1 two stones put together and in Figure 2 the Section II of Figure 1 shows an enlarged view.

Figur 1 zeigt zwei quadratische Steine 1, die sich entsprechend der an einem Stein dargestellten Mittellinien aus dem Vierfachen einer quadratischen Grundgröße 2 zusammensetzen. Die Seitenflächen 3, 4 jeder Grundgröße 2 tragen eine Abstandsnocke 5, 6. Durch das Vorhandensein dieser Abstandsnocken ergibt sich die wirksame Länge jeder Grundgröße 2 im vorliegenden Falle aus der Seitenlänge 3 bzw. 4 zuzüglich der halben Breite der Fuge 7 zwischen den beiden dargestellten Steinen, also auf die mit der Ziffer 8 bezeichnete Größe.Figure 1 shows two square stones 1, which correspond to those on a stone shown center lines from four times a square basic size 2 put together. The side surfaces 3, 4 of each basic size 2 carry a spacer cam 5, 6. The presence of these distance cams results in the effective length of each basic size 2 in the present case from the side length 3 or 4 plus half the width of the joint 7 between the two shown Stones, i.e. to the size marked with the number 8.

Die Endflächen der Nocken 5, 6 weisen jeweils nebeneinander einen Zahn 9 und eine Zahnlücke 10 auf, wobei in einer Umlaufrichtung des Steines 1 gesehen die Zähne 9 und die Zahnlücken 10 aller Abstandsnocken 5, 6 in der gleichen Reihenfolge nebeneinander liegen. Dadurch passen die aufeinander zu gerichteten Endflächen der Abstandsnocken benachbarter Steine formschlüssig ineinander.The end faces of the cams 5, 6 each have a tooth 9 and a tooth gap 10, the viewed in a direction of rotation of the stone 1 Teeth 9 and the tooth gaps 10 of all spacing cams 5, 6 in the same order lie side by side. As a result, those facing each other fit End faces of the spacing cams of adjacent stones form-fit one into the other.

Auch die Positionierung der Abstandsnocken 5, 6 ist bezüglich aller wirksamer Längen 8 gleichermaßen und so vorgenommen, dass die Mittenachsen 11 aller Abstandsnocken auf der Mitte der wirksamen Länge 8 positioniert sind. The positioning of the spacing cams 5, 6 is also more effective with regard to all Lengths 8 alike and made so that the center axes 11 of all Spacer cams are positioned on the center of the effective length 8.

Die Flanken sowohl der Zähne 9 als auch der Zahnlücken 10 schließen einen zueinander passenden Winkel ein, dessen Größe mindestens 90°, vorzugsweise aber 90° beträgt und dessen Winkelhalbierende senkrecht auf dem zugeordneten Seitenflächenabschnitt 3, 4 steht.The flanks of both the teeth 9 and the tooth gaps 10 close one another suitable angle, the size of at least 90 °, but preferably 90 ° and its bisector perpendicular to the assigned side surface section 3, 4 stands.

Wie nun insbesondere aus Figur 2 ersichtlich, weisen die Zähne 9 ausgehend von ihrer zu den Zahnlücken 10 genau passenden Profilierung zusätzlich einstückig an ihrer Spitze angeformt einen über die gesamte Steinhöhe gehenden Materialauftrag 12 auf, der durch sein Anstoßen gegen den Grund 13 der zugeordneten Zahnlücke 10 dafür sorgt, dass der Verlauf der Flanken ineinandergreifender Paarungen von Zahn und Zahnlücke einen gegenseitigen Abstand hält, der das ungehinderte und einwandfreie Bestücken der durch diesen Abstand gebildeten Fuge 14 mit Füllmaterial erlaubt, so dass sich zwischen den Nocken keine Hohlräume ausbilden bzw. dort verbleiben können. Der horizontale Querschnitt des Materialauftrags 12 ist dabei so ausgelegt, dass er abstandslos, also fließend in die Flanken des Zahnes übergeht.As can now be seen in particular from FIG. 2, the teeth 9 point from of their profiling that exactly matches the tooth gaps 10 additionally in one piece molded on the tip of a material covering the entire stone height 12 on, by bumping against the bottom 13 of the assigned Tooth gap 10 ensures that the course of the flanks of interlocking pairings there is a mutual distance between the tooth and the gap between the teeth, which keeps the unimpeded and flawless assembly of the joint formed by this distance 14 with filling material allowed so that there are no voids between the cams train or remain there. The horizontal cross section of the material application 12 is designed so that it is spaced, ie flowing into the flanks of the tooth.

Bei den dargestellten Steinen 1 sind die Nocken 5, 6 vorgesehen, um breite Fugen 7 und damit einen Belag auszubilden, der unter anderem das Abschließen von Oberflächenwasser über die Fugen 7 ermöglicht. Dabei stehen die Zähne 9 über die Vorderkante der Nocken 5, 6 vor, während die Zahnlücken 10 nach rückwärts im Material der Nocken sitzen.In the blocks 1 shown, the cams 5, 6 are provided for wide joints 7 and thus to form a covering, which among other things the completion of Surface water over the joints 7 allows. The teeth 9 protrude the front edge of the cams 5, 6 before, while the tooth gaps 10 backwards sit in the material of the cams.

Will man die geschilderte Verzahnung nun bei unmittelbar also ohne die Zwischenschaltung von Nocken verlegten Steinen anwenden, so kann man sich deren Gestaltung anhand der Figur 1 leicht so vorstellen, dass dann die Zahnlücken 10 ausgehend von den Seitenflächen 3, 4 rückwärts im Vollmaterial der Steine 1 liegen, während allein die Zähne 9 ausgehend von den Seitenflächen 3, 4 nach außen vorstehen. Damit entsteht dann zwischen den Seitenflächen 3, 4 benachbarter Steine, also entlang des gesamten Umfanges der jeweiligen Steine 1 eine Fuge von der Größe der Fuge 14 allein durch Wirkung des Materialauftrags 12, ohne dass es dazu weiterer Abstand bildender Maßnahmen bedarf. If you want the described gearing now with immediate without the intermediary of stones laid by cams, so you can look at their design with the aid of FIG. 1, so that the tooth gaps 10 starting from the side surfaces 3, 4 lie backwards in the solid material of the stones 1, while only the teeth 9 starting from the side surfaces 3, 4 to the outside protrude. This then creates adjacent between the side surfaces 3, 4 Stones, i.e. a joint along the entire circumference of the respective stones 1 the size of the joint 14 solely by the action of the material application 12, without that further distance-forming measures are required.

Nur der Ordnung halber sei darauf hingewiesen, dass sich die Zähne 9 und die Zahnlücken 10 jeweils über die gesamte Höhe der Abstandsnocken 5, 6 bzw. bei den zuletzt geschilderten Steinen über die gesamte Höhe der Seitenflächen 3, 4 erstrecken, da anders die Fuge 14 durch das Füllmaterial nicht erreichbar ist. Was die von den Seitenflächen 3, 4 nach innen beabstandete Linie 15 betrifft, so stellt diese eine Fase dar, durch die an dieser Stelle die Kante der Steine 1 gebrochen ist.Just for the sake of order it should be noted that the teeth 9 and the Tooth gaps 10 each over the entire height of the spacing cams 5, 6 and at the last described stones over the entire height of the side surfaces 3, 4 extend, since otherwise the joint 14 is not accessible through the filling material. What the line 15 which is spaced inwards from the side surfaces 3, 4, represents this is a bevel through which the edge of the stones 1 is broken at this point is.

Anstelle der Bildung einer ausreichenden Fuge 14 durch den Materialauftrag 12 kann die gleiche Wirkung auch dadurch erzielt werden, dass unter Fortlassung des Materialauftrags 12 der Grund 13 der Zahnlücken 10 zusätzlich zu dem dargestellten abgeflachten Verlauf durch Materialauftrag eine weitergehende Abflachung aufweist, deren senkrecht zur zugeordneten Seitenfläche 3, 4 gemessene Größe der entsprechenden Größe des Materialauftrags 12 entspricht.Instead of the formation of a sufficient joint 14 by the material application 12 the same effect can also be achieved by omitting the Material order 12 the reason 13 of the tooth gaps 10 in addition to that shown flattened course by material application a further flattening has, the size measured perpendicular to the associated side surface 3, 4 corresponds to the corresponding size of the material order 12.

Claims (8)

Kunststein (1) insbesondere aus Beton zur Befestigung von Verkehrsflächen im Freien, wobei der Stein (1) an seinen senkrecht zur Verlegeebene gerichteten und im wesentlichen zueinander parallelen Seitenflächen (3, 4) je wenigstens eine Paarung aus einem Zahn (9) und danebenliegend einer der Zahnform im wesentlichen entsprechenden Zahnlücke (10) für den Zahn (9) des benachbart verlegten Steines (1) aufweist sowie in einer Umlaufrichtung des Steines (1) die aufeinanderfolge von Zahn (9) und Zahnlücke (10) für alle Seitenflächen (3, 4) gleichgeartet ist,
dadurch gekennzeichnet, dass von der zugeordneten Seitenfläche (3, 4) fortgerichtet und einstückig angeformt die Spitze des Zahnes (9) bzw. der Grund (13) der Zahnlücke (10) einen Materialauftrag aufweist.
Artificial stone (1), in particular made of concrete, for fastening traffic areas outdoors, the stone (1) on its side surfaces (3, 4) which are directed perpendicularly to the laying plane and are essentially parallel to one another, each have at least one pair of teeth (9) and one adjacent to them has the tooth shape (10) for the tooth (9) of the stone (1) laid next to it, which tooth shape corresponds essentially to the tooth shape, and the sequence of tooth (9) and tooth space (10) for all side surfaces (3, 4) is the same,
characterized in that the tip of the tooth (9) or the base (13) of the tooth gap (10) has a material application from the assigned side surface (3, 4) and is integrally formed thereon.
Kunststein nach Anspruch 1,
dadurch gekennzeichnet, dass der Materialauftrag 12 senkrecht zur zugeordneten Seitenfläche (3, 4) eine Tiefe im Bereich von 0, 5 bis 4 Millimetern aufweist.
Artificial stone according to claim 1,
characterized in that the material application 12 perpendicular to the associated side surface (3, 4) has a depth in the range of 0.5 to 4 millimeters.
Kunststein nach Anspruch 1 oder 2,
dadurch gekennzeichnet, dass der Stein (1) zur Bildung breiter Fugen (7) zwischen benachbarten Steinen (1) an wenigstens einer Seitenfläche (3, 4) mit mindestens einer einstückig angeformten Abstandsnocke (5, 6) versehen ist und dass das freie Ende der Abstandsnocke (5, 6) die aus Zahn (9) und Zahnlücke (10) gebildete Paarung trägt.
Artificial stone according to claim 1 or 2,
characterized in that the stone (1) for forming wide joints (7) between adjacent stones (1) is provided on at least one side surface (3, 4) with at least one integrally molded spacer cam (5, 6) and that the free end of the Spacer cam (5, 6) carries the pairing formed by tooth (9) and tooth gap (10).
Kunststein nach Anspruch 3,
dadurch gekennzeichnet, dass bei mehreren Abstandsnocken (5, 6) eines Steines (1) diese untereinander vollkommen gleich ausgebildet sind.
Artificial stone according to claim 3,
characterized in that in the case of a plurality of spacing cams (5, 6) of a stone (1), these are completely identical to one another.
Kunststein nach einem der Ansprüche 1 bis 4,
dadurch gekennzeichnet, dass bei einem Stein (1) die zur Verlegeebene parallele wirksame Länge der einzelnen Seitenflächen (3, 4) das einfache oder ganzzahlige Vielfache einer kleinsten wirksamen Länge (8) ist und dass jeder die kleinste wirksame Länge (8) aufweisende Seitenflächenabschnitt (3, 4) mit einer Paarung aus Zahn (9) und Zahnlücke (10) bzw. einer diese tragenden Abstandsnocke (5, 6) versehen ist.
Artificial stone according to one of claims 1 to 4,
characterized in that, in the case of a stone (1), the effective length of the individual side faces (3, 4) parallel to the laying plane is the simple or integral multiple of a smallest effective length (8) and that each side face section () having the smallest effective length (8) 3, 4) is provided with a pairing of tooth (9) and tooth gap (10) or a spacer cam (5, 6) carrying this.
Kunststein nach Anspruch 5,
dadurch gekennzeichnet, dass die Mittenachse (11) aller Paarungen aus Zahn (9) und Zahnlücke (10) bzw. Abstandsnocken (5, 6) auf der Mitte der wirksamen Länge (8) des zugehörenden Seitenflächenabschnittes (3, 4) liegt.
Artificial stone according to claim 5,
characterized in that the center axis (11) of all pairings of tooth (9) and tooth space (10) or spacing cams (5, 6) lies on the center of the effective length (8) of the associated side surface section (3, 4).
Kunststein nach einem oder mehreren der Ansprüche 1 bis 6,
dadurch gekennzeichnet, dass die Flanken des Zahnes (9) einerseits sowie der Zahnlücke (10) andererseits einen Winkel von mindestens 90° einschließen, und dass die halbierende dieses Winkels senkrecht zur zugeordneten Seitenfläche (3, 4) des Steines angeordnet ist.
Artificial stone according to one or more of claims 1 to 6,
characterized in that the flanks of the tooth (9) on the one hand and the tooth gap (10) on the other hand enclose an angle of at least 90 °, and that the bisecting of this angle is arranged perpendicular to the associated side surface (3, 4) of the stone.
Kunststein nach einem oder mehreren der Ansprüche 1 bis 7,
dadurch gekennzeichnet, dass die horizontale Querschnittskontur des Materialauftrags (12) fließend in die Flanken des Zahnes (9) bzw. der Zahnlücke (10) übergeht.
Artificial stone according to one or more of claims 1 to 7,
characterized in that the horizontal cross-sectional contour of the material application (12) merges smoothly into the flanks of the tooth (9) or the tooth gap (10).
EP00112212A 2000-06-07 2000-06-07 Artificial stone for reinforcing outdoor traffic areas Expired - Lifetime EP1162313B1 (en)

Priority Applications (14)

Application Number Priority Date Filing Date Title
PT00112212T PT1162313E (en) 2000-06-07 2000-06-07 ARTIFICIAL STONE FOR CONSOLIDATION OF NON-EXTERIOR TRANSIT SURFACES
EP00112212A EP1162313B1 (en) 2000-06-07 2000-06-07 Artificial stone for reinforcing outdoor traffic areas
ES00112212T ES2204401T3 (en) 2000-06-07 2000-06-07 ARTIFICIAL STONE FOR THE AFFIRMED OF SURFACES RESERVED FOR TRAFFIC IN OUTDOORS.
DK00112212T DK1162313T3 (en) 2000-06-07 2000-06-07 Tile for reinforcing traffic areas outdoors
AT00112212T ATE248253T1 (en) 2000-06-07 2000-06-07 ARTIFICIAL STONE FOR FASTENING OUTDOOR TRAFFIC SURFACES
AU2001273990A AU2001273990B2 (en) 2000-06-07 2001-05-04 Cast stone for fixing exterior traffic surfaces
JP2002502236A JP2004506822A (en) 2000-06-07 2001-05-04 Artificial stone for paving outdoor traffic surfaces
IL15320201A IL153202A0 (en) 2000-06-07 2001-05-04 Cast stone for fixing exterior traffic surfaces
PCT/EP2001/005049 WO2001094703A1 (en) 2000-06-07 2001-05-04 Cast stone for fixing exterior traffic surfaces
CZ20024034A CZ293750B6 (en) 2000-06-07 2001-05-04 Paving element, particularly of concrete for fixing exterior traffic surfaces
CA002411032A CA2411032C (en) 2000-06-07 2001-05-04 Cast stone for fixing exterior traffic surfaces
HU0301428A HU226502B1 (en) 2000-06-07 2001-05-04 Cast stone for fixing exterior traffic surfaces
AU7399001A AU7399001A (en) 2000-06-07 2001-05-04 Cast stone for fixing exterior traffic surfaces
US10/310,916 US6857244B2 (en) 2000-06-07 2002-12-06 Cast stone for fixing exterior traffic surfaces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP00112212A EP1162313B1 (en) 2000-06-07 2000-06-07 Artificial stone for reinforcing outdoor traffic areas

Publications (2)

Publication Number Publication Date
EP1162313A1 true EP1162313A1 (en) 2001-12-12
EP1162313B1 EP1162313B1 (en) 2003-08-27

Family

ID=8168935

Family Applications (1)

Application Number Title Priority Date Filing Date
EP00112212A Expired - Lifetime EP1162313B1 (en) 2000-06-07 2000-06-07 Artificial stone for reinforcing outdoor traffic areas

Country Status (13)

Country Link
US (1) US6857244B2 (en)
EP (1) EP1162313B1 (en)
JP (1) JP2004506822A (en)
AT (1) ATE248253T1 (en)
AU (2) AU7399001A (en)
CA (1) CA2411032C (en)
CZ (1) CZ293750B6 (en)
DK (1) DK1162313T3 (en)
ES (1) ES2204401T3 (en)
HU (1) HU226502B1 (en)
IL (1) IL153202A0 (en)
PT (1) PT1162313E (en)
WO (1) WO2001094703A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6857244B2 (en) * 2000-06-07 2005-02-22 F. Von Langsdorff Licensing Limited Cast stone for fixing exterior traffic surfaces
US6942420B1 (en) 2001-02-05 2005-09-13 F. Von Langsdorff Licensing Limited Ground covering elements of artificial stone material
NO20180329A1 (en) * 2017-03-06 2018-09-07 Multiblokk As Concrete paving block
US20240301695A1 (en) * 2013-10-25 2024-09-12 Mbrico, Llc Stone or porcelain tile

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10149250A1 (en) * 2001-10-05 2003-04-17 Sf Koop Gmbh Beton Konzepte Concrete paving slab has spacers on all four edges, all of which are same distance from each other
EP1624108A1 (en) * 2004-08-02 2006-02-08 Harald Schröder Paving element
US20080240857A1 (en) * 2007-03-28 2008-10-02 Joseph Ciccarello Irregularly shaped hexagonal paving stone with integral mating spacers
US7971407B2 (en) * 2007-05-21 2011-07-05 Keystone Retaining Wall Systems, Inc. Wall block and wall block system for constructing walls
USD759843S1 (en) 2008-12-01 2016-06-21 F. Von Langsdorff Licensing Limited Paving stone
US20130302088A1 (en) * 2012-05-14 2013-11-14 Harvey Penshorn Paver with interlocking spacer
GB2503449B (en) * 2012-06-26 2019-01-09 Mousemesh Ltd A ventilation unit
USD791346S1 (en) 2015-10-21 2017-07-04 Pavestone, LLC Interlocking paver
US10583588B2 (en) 2013-06-21 2020-03-10 Pavestone, LLC Manufactured retaining wall block with improved false joint
US20140373479A1 (en) 2013-06-21 2014-12-25 Pavestone, LLC Adjustable locator retaining wall block and mold apparatus
CZ305072B6 (en) * 2013-07-16 2015-04-22 České vysoké učení technické v Praze, Kloknerův ústav Kloknerův ústav System for constructing concrete floor on soil consolidated surface in ground level buildings
USD762882S1 (en) 2013-12-05 2016-08-02 F. Von Langsdorff Licensing Limited Paving stone
USD737468S1 (en) 2014-05-07 2015-08-25 Pavestone, LLC Front face of a retaining wall block
USD789555S1 (en) 2015-07-22 2017-06-13 Keystone Retaining Wall Systems Llc Landscaping block
USD789556S1 (en) 2015-07-22 2017-06-13 Keystone Retaining Wall Systems Llc Landscaping block
US9951527B2 (en) 2015-07-22 2018-04-24 Keystone Retaining Wall Systems Llc Patio blocks and block systems with side surface positioning and retaining structures
USD791345S1 (en) 2015-07-22 2017-07-04 Keystone Retaining Wall Systems Llc Landscaping block
AU2016356749B2 (en) 2015-11-17 2021-12-16 F. Von Langsdorff Licensing Limited Paving element having drainage channels and pavement system incorporating same
USD844181S1 (en) 2017-04-26 2019-03-26 Keystone Retaining Wall Systems Llc Landscaping block
USD861918S1 (en) * 2018-03-01 2019-10-01 Holcim Coastal B.V. Cast stone
USD1037491S1 (en) 2021-12-14 2024-07-30 Pavestone, LLC Wall block
US20230313525A1 (en) * 2022-03-29 2023-10-05 Newstone Group Concrete Products Ltd. Wall Block

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29510837U1 (en) * 1995-07-04 1995-09-14 E. Schwenk Zementwerke KG, 89077 Ulm Composite panel
US5902069A (en) * 1996-02-20 1999-05-11 F. Von Langsdorff Licensing Limited Artificial paving stone with identical spacer elements having a tooth and a tooth recess
EP1024226A1 (en) * 1998-12-29 2000-08-02 FIEGE & BERTOLI GmbH & Co. KG. Artificial stone for pavings

Family Cites Families (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US195286A (en) * 1877-09-18 Improvement in concrete-block pavements
US803380A (en) 1904-07-01 1905-10-31 John Wickre Building-block.
US1058674A (en) * 1911-09-16 1913-04-08 John Kertes Tile, quarry, or brick.
US1884216A (en) * 1929-03-07 1932-10-25 Goodyear Tire & Rubber Paving block
US2060746A (en) * 1934-07-27 1936-11-10 Globe Brick Company Brick
US2114244A (en) 1935-11-27 1938-04-12 Hans Knoll Building structure
GB1385207A (en) 1972-05-09 1975-02-26 Dytap Constr Holding Masonry block
JPS59107605A (en) * 1982-12-10 1984-06-21 Mitsubishi Electric Corp Array antenna device
JPS6126702A (en) * 1984-07-13 1986-02-06 Toyo Soda Mfg Co Ltd Production of magnetic metallic powder
US4773790A (en) 1986-06-04 1988-09-27 Gerhard Hagenah Groundcovering element, especially (concrete) slab
DE8901920U1 (en) * 1989-01-05 1989-06-08 Sf-Vollverbundstein-Kooperation Gmbh, 2820 Bremen Construction kit made of (concrete) moulded stone
DE8915417U1 (en) 1989-04-04 1990-06-28 Dr. Barth GmbH, 7582 Bühlertal Angle stone for surface stabilization
BE1005503A3 (en) 1990-11-16 1993-08-31 Brock Jean Jacques Pave the built for roads and other covering floors and highways and other coated floors paving of such.
HU214807B (en) * 1993-04-23 1998-05-28 René Scheiwiller Cap ston for shape of pavement
US5496129A (en) 1993-08-06 1996-03-05 Dube; Michael S. Frangible interlocking paving stone
US5409325A (en) * 1994-02-10 1995-04-25 Wu; Ming-Hsin Vinyl walkway paver
GB9407485D0 (en) 1994-04-15 1994-06-08 U P S Ltd Improvements in and relating to surfacing blocks
USD389926S (en) 1994-09-19 1998-01-27 Gunter Barth Paving element
US5466089A (en) * 1995-01-03 1995-11-14 Jurik; Dean Ground and floor covering block
ATE212686T1 (en) 1995-08-26 2002-02-15 Peter Geiger CONCRETE PAVING STONES
US5797698A (en) * 1996-04-10 1998-08-25 F. Von Langsdorff Licensing Ltd. Paving elements for the water-permeable reinforcement of surfaces
DE29619583U1 (en) * 1996-11-14 1998-07-02 Johann Pfennig GmbH, 68623 Lampertheim Concrete paving stone for seepable paving with high load-bearing capacity
DE29722519U1 (en) 1997-12-29 1998-02-19 Blenia Design S.A.G.L., Semione Paving stone element
EP0930399A3 (en) * 1998-01-17 2000-06-07 Rolf Scheiwiller Set of shaped bricks
AU2556099A (en) * 1998-09-07 2000-03-27 Ahmet Degirmenci Artificial paving stones with natural appearance, fabricated in moulds made of natural stones
USD426317S (en) 1999-07-07 2000-06-06 Crh Oldcastle, Inc. Paving stone
DE10005345A1 (en) * 2000-02-08 2001-08-09 Sf Koop Gmbh Beton Konzepte Paving stone or paving slab made of concrete
DE10013613B4 (en) * 2000-03-18 2013-05-02 Reiner Roth Concrete paving stone
EP1162313B1 (en) * 2000-06-07 2003-08-27 UNI-International Bausysteme GmbH & Co. KG Artificial stone for reinforcing outdoor traffic areas
US6508607B1 (en) 2000-12-21 2003-01-21 Lee A. Smith Erosion control block adapted for use with cellular concrete mattresses
DE10105055A1 (en) 2001-02-05 2002-12-05 Uni Int Bausysteme Gmbh & Co Flooring elements made of artificial stone material

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29510837U1 (en) * 1995-07-04 1995-09-14 E. Schwenk Zementwerke KG, 89077 Ulm Composite panel
US5902069A (en) * 1996-02-20 1999-05-11 F. Von Langsdorff Licensing Limited Artificial paving stone with identical spacer elements having a tooth and a tooth recess
EP1024226A1 (en) * 1998-12-29 2000-08-02 FIEGE & BERTOLI GmbH & Co. KG. Artificial stone for pavings

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6857244B2 (en) * 2000-06-07 2005-02-22 F. Von Langsdorff Licensing Limited Cast stone for fixing exterior traffic surfaces
AU2001273990B2 (en) * 2000-06-07 2006-01-19 Uni-International Bausysteme Gmbh + Co. Kg Cast stone for fixing exterior traffic surfaces
US6942420B1 (en) 2001-02-05 2005-09-13 F. Von Langsdorff Licensing Limited Ground covering elements of artificial stone material
US7220078B2 (en) 2001-02-05 2007-05-22 F.Von Langsdorff Licensing Limited Ground covering elements of artificial stone material
US20240301695A1 (en) * 2013-10-25 2024-09-12 Mbrico, Llc Stone or porcelain tile
NO20180329A1 (en) * 2017-03-06 2018-09-07 Multiblokk As Concrete paving block

Also Published As

Publication number Publication date
ES2204401T3 (en) 2004-05-01
CA2411032A1 (en) 2001-12-13
CZ293750B6 (en) 2004-07-14
US6857244B2 (en) 2005-02-22
DK1162313T3 (en) 2003-12-22
AU2001273990B2 (en) 2006-01-19
JP2004506822A (en) 2004-03-04
CA2411032C (en) 2009-11-24
PT1162313E (en) 2004-01-30
HU226502B1 (en) 2009-03-02
ATE248253T1 (en) 2003-09-15
AU7399001A (en) 2001-12-17
CZ20024034A3 (en) 2003-04-16
IL153202A0 (en) 2003-07-06
EP1162313B1 (en) 2003-08-27
HUP0301428A2 (en) 2003-09-29
US20030121229A1 (en) 2003-07-03
WO2001094703A1 (en) 2001-12-13

Similar Documents

Publication Publication Date Title
EP1162313A1 (en) Artificial stone for reinforcing outdoor traffic areas
EP0791689B1 (en) Artificial stone for reinforcing outdoor traffic areas
EP1027500B1 (en) Paving stone, set of paving stones and device for producing the same
EP0648291B1 (en) Block with lateral spacers
EP0377460B1 (en) Set of concrete paving blocks
EP1360375B1 (en) Artificial stone floor elements
DE2443329C3 (en) Concrete shaped stone for a retaining wall
EP0816564A2 (en) Reinforcement for traffic areas with paving elements or slabs
EP0065199A2 (en) Coupling system for establishing delimitating structures, and interconnectable blocks for said system
EP0016353B1 (en) Set of building parts for the construction of three-dimensional structures
DE102009005793B3 (en) Flooring made of a composite panel
DE4131423A1 (en) CONSTRUCTION KIT OF CONCRETE SHAPED STONES AND A HEAVYWEIGHT SUPPORT WALL MADE THEREOF
EP2354306B1 (en) Paving stone and group of paving stones
DE3804760A1 (en) Grass paving stone
DE4221900A1 (en) Artificial-stone road-surface component - has side protrusions forming gaps with adjacent components and groove in bottom connecting gaps together
DE3142745A1 (en) Construction element
DE19824556B4 (en) Concrete paving stone
DE3703368A1 (en) Prefabricated interlocking block
DE102006040692A1 (en) Kit for the limitation of beds, green areas, paths or other surfaces by means of boundary stones
DE1951581A1 (en) Composite stone for vertical and double horizontal composite
AT521506B1 (en) cast stone
EP0954639B1 (en) Moulded brick building set
EP0851065A1 (en) Building set for the construction of dry walls, retaining wall, and the like
DE19517662A1 (en) Group of pavement slabs with peripheral toothing
AT409147B (en) Concrete paving slab

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20001206

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

AKX Designation fees paid

Free format text: AT BE CH CY DK ES FI FR GB GR IE IT LI LU MC NL PT SE

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: UNI-INTERNATIONAL GMBH & CO. KG

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: UNI-INTERNATIONAL BAUSYSTEME GMBH & CO. KG

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): AT BE CH CY DK ES FI FR GB GR IE IT LI LU MC NL PT SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030827

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030827

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030827

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030827

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)
REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: GERMAN

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031127

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2204401

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040630

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040630

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040630

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040630

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20040528

EN Fr: translation not filed
BERE Be: lapsed

Owner name: *UNI-INTERNATIONAL BAUSYSTEME G.M.B.H. & CO. K.G.

Effective date: 20040630

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20050607

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061207

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20061207

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20070621

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20080625

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080607

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20090608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090608

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20110622

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20110627

Year of fee payment: 12

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120608

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120607

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20140618

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20140623

Year of fee payment: 15

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20150630

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 248253

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150630

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20170309 AND 20170315

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20190624

Year of fee payment: 20

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20200606

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20200606