EP1070806B1 - Platform system - Google Patents

Platform system Download PDF

Info

Publication number
EP1070806B1
EP1070806B1 EP00113056A EP00113056A EP1070806B1 EP 1070806 B1 EP1070806 B1 EP 1070806B1 EP 00113056 A EP00113056 A EP 00113056A EP 00113056 A EP00113056 A EP 00113056A EP 1070806 B1 EP1070806 B1 EP 1070806B1
Authority
EP
European Patent Office
Prior art keywords
stage
building
elements
stage system
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP00113056A
Other languages
German (de)
French (fr)
Other versions
EP1070806A1 (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Doka Industrie GmbH
Original Assignee
Doka Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Doka Industrie GmbH filed Critical Doka Industrie GmbH
Publication of EP1070806A1 publication Critical patent/EP1070806A1/en
Application granted granted Critical
Publication of EP1070806B1 publication Critical patent/EP1070806B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/34Scaffold constructions able to be folded in prismatic or flat parts or able to be turned down
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/002Workplatforms, railings; Arrangements for pouring concrete, attached to the form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls

Definitions

  • the invention relates to a stage system that is in the field of construction is usable.
  • scaffolding When erecting structures, scaffolding is made of numerous stage elements can be constructed for various work required. For example, must from scaffoldings the reinforcements are attached. Further are usually required for concreting Shuttering elements furnished by scaffolding. Even while of concreting workers are on scaffolding, to those containers or bodies that make up the Concrete flows between the formwork to handle. Also Works on the facade are carried out from scaffolding. Finally, in climbing formwork systems are usually Mounted on climbing consoles scaffolds by these scaffolding from all the above activities in the Regarding the each above the climbing console new to To carry out concreting building section.
  • WO 90/14479 a framework is disclosed which also to arranged on all four corners of rectangular work platforms Carrier, wherein the working platforms either hinged or foldable on the straps that are in the be located on the back of the building.
  • Such scaffolding is for certain work on the building quite usable.
  • for reinforcement can of such scaffolds are made, and those Beams, which are arranged to the building, disturb can.
  • the formwork elements it is necessary that in the previously described Way to dismantle scaffolding. Setting up the Formwork elements is not possible, if the scaffolding stay put, because the formwork elements exactly in the Must be handled by scaffolding, and here in particular from the arranged to the building Carriers is taken.
  • GB 2 180 583 A describes the preamble of claim 1 and in particular a single scaffolding with a stage suitable for Gardening and housework is adjusted and next to one Carrying structure a single, foldable stage cover pointing towards a hedge or a building projects.
  • the single scaffold can be supported on a building, to carry out work. Because of this support and because of the property as a single device is a such scaffolding for use as scaffolding, especially for the execution of formwork work not suitable.
  • the invention is based on the object, a stage system with multiple stage elements to create that flexible can be used and that is suitable for the implementation of numerous different activities within the framework of the Creation of a building is suitable.
  • a stage system which consists of several similar stage elements, the in a first embodiment, at least one carrier exhibit.
  • the carrier (s) essentially serve the stage covering and optionally attachable, further Facilities such as e.g. Rear guards, too wear.
  • Stage element designed such that there is no carrier has, but a support member, by means of which the Stage element can be fastened to a carrier.
  • the measure according to which the stage covering on the carrier or the Carrying element in the attached state cantilevered is formed offers the substantial advantage that at the directed to the building side no disturbing vertical beams available. Rather, it is directed to the building Area in the horizontal direction continuously clear, leaving from the stage covering without hindrance the reinforcement work and the handling of concreting facilities can take place.
  • the stage element according to the invention is characterized characterized in that the stage cover is designed to be foldable, what about the stage cover overall and / or one Part of the stage cover can be provided. This will the stage element also for other activities, as the above already mentioned, can be used.
  • the foldable training allows the Stage coverings too, that with a scaffolding that through several Stage elements according to the invention is constructed, material not only on the top surface, but after that Fold back the topping also on the underlying stage coverings can be stored.
  • a scaffold that through several Stage elements according to the invention is constructed, all in Framework of the construction of the works, like rebar, shells, concreting, moving Prefabricated parts and subsequent façade work possible, without the scaffold replaced by another scaffold or must be added, or the framework must be moved.
  • stage covering is overall hinged is attached to the support or the support element.
  • These Measure is particularly for example in the case advantageous that on a below the top Stage covers arranged stage covering material filed shall be. To hamper this process as little as possible, the stage covering in this embodiment may be total be folded back.
  • the Stage covering not only in the area of its attachment to the Carrier or the support element, but at one point along its extension in the direction of the building foldable too shape. This makes it possible, only the foremost Area of the stage covering either slightly or too fold back completely, so that unfolded on the remaining area of the stage covering standing possible is, and workers from there, for example, the Setting up the formwork can perform. Especially after folding back the foremost area of the Stage covers a collision and interference between this Area and the formwork elements to be established prevented. Overall, as mentioned, the preferred Stage covering foldable to form all the to realize the aforementioned advantages.
  • Stage element not to the dimensions of a building should be adapted, but rather uniformly is to be designed, is in a special Embodiment provided a stage element, whose Stage covering and / or optionally protective device has at least one telescoping compensation element, so that a gap to adjacent stage coverings and Protective devices can be closed, and that emerging stage system has a flexible width.
  • stage elements are used instead a carrier at least have a support member consists the stage system next to the several stage elements at least one carrier.
  • the carrier it is preferable for the carrier to have more than one Stage elements, preferably one above the other, are attachable, so that results in a multi-storey scaffolding.
  • stage system with at least a carrier or that embodiment of the Stage element according to the invention, comprising a support
  • this at its lower End is designed such that the stage system or the Stage element can be set up on a level floor.
  • the carrier at its lower End is additionally designed to be on a console to be mounted.
  • This will increase the compatibility of the inventive stage system or stage element with Climbing brackets guaranteed, on which, preferably also multi-storey, the stage system according to the invention attachable is.
  • all required activities such as Reinforcing, setting up the Formwork, concreting and subsequent work of one and the same framework, its location is not must be changed.
  • the Stage system or the stage element on a building can be anchored.
  • stage system according to the invention or stage element such is designed that a formwork element anchored thereto is.
  • Fig. 1 is in an unfolded state and a the Attachment state corresponding orientation from the side Stage element 14 according to the invention in a first Embodiment shown.
  • the stage element 14 at both (from the front or Rear side of the considered) side edge areas shown support member 18 (see Fig .. 3).
  • Stage cover 22 hinged formed which in the shown Embodiment is realized in two forms. To the one is located at the transition between stage covering 22nd and support member 18 a first hinged hinge 38, by means of of which the stage covering 22 is shown in FIG. 2, folded position can be brought. As below is explained in more detail, this function in the Use of the stage element 14 together with other, arranged above the stage elements are used to Stage covering 22 of the top stage element 14 completely Fold back to the material from above lay down underlying stage coverings or the reinforcement contribute.
  • the stage covering points 22 of the embodiment shown in Fig. 1 another Folding hinge 40 between the foremost region 42 and a rear portion 44 of the stage cover 22. through of the hinge 40, the front portion 42 may be all or partially folded back towards the rear area 44 so that in the area where the foremost Area 42 is in the unfolded state, without mutual interference a shuttering element can be arranged can.
  • This is the result of a stage system that through a plurality of the illustrated stage elements 14 is formed, both the reinforcement, for which the fully unfolded Stage covering 22 is used, as well as the subsequent Setting up the formwork elements possible, for which the foremost region 42 at least slightly upwards or is completely folded back on the rear portion 44.
  • a protective device 24 usually in the form of a grid, extending to the Secure the building rear-facing area.
  • the inventive Stage element 14 advantageously in a small space fold.
  • the stage cover 22 is a total order the hinge 38 upwards, in the direction of the guardrail 24 folded, the strut 36 released from the support member and will work in the same orientation.
  • folded state can be several stage elements on each other with a small footprint store by putting in front of the presentation Of Fig. 2 rotated by 90 °, brought flat alignment become.
  • Fig. 3 is shown how three of the in Figs. 1 and 2 shown stage elements 14 to a stage system 10th be combined.
  • the three stage elements 14 one above the other by means of their respective support elements 18 two columnar supports 20 attached and by bolts or fixed by quick connection.
  • the carriers 20 have a grid of openings or, for example, projections on, so that the stage elements each at a suitable height can be mounted.
  • the collar Stage elements 22 each forward, so according to the Representation of Fig. 3 out of the plane, out, so that in the area facing the building no other support elements or supports are located, and in this Area can be worked freely.
  • stage system readily with additional, laterally or above arranged sections of the stage system can be combined to a total of one multi-storey, large facade scaffolding or scaffolding form a climbing system.
  • the shown carrier 20 with further, arranged above Carriers for example via a flange or Plug connection are coupled.
  • stage element 12 This corresponds with respect to the case foldable in the case shown twice Training the stage cover 22 and its support by a strut 36 of the shown in Figs. 1 and 2 Embodiment.
  • the stage cover 22 instead of the support member 18 of the first Embodiment, the stage cover 22 but with a Carrier 16 connected.
  • the carrier 16 of which as in the Stage system according to FIG. 3 at both lateral edges one each is provided (see Fig. 6), it is essentially vertically aligned in the mounting state Struts, by suitable fasteners 46 at the similarly designed carriers 16 more Stage elements are attachable, so that a multi-storey scaffolding, each with cantilevered Stage coverings 22 results.
  • a guard 24 is also in the illustrated Embodiment of the second embodiment.
  • the second is also Embodiment of the stage element 12 according to the invention by means of the hinge 38, via which the stage covering 22 a total of hinged on the support 16 is mounted in a flat shape collapsible.
  • This can also be done a plurality of stage elements 12 of the second embodiment be stored flat stacked on a small space. This results from the first described above Embodiment of the further advantage that no additional Carrier must be stored, as these in the form of the carrier 16th are provided as part of the stage element 12.
  • Fig. 6 is corresponding to the illustration of Fig. 3 a Example of a stage system 10 shown that consists of three stacked stage elements 12 of the second Embodiment exists.
  • the Carrier 16 each provided on both side edges.
  • the beams 16 of the second embodiment in FIG their lower area can be designed to be not only with the carriers 16 other stage elements connectable, but also on level ground installable and on the console of a climbing formwork system are attachable, as will be explained in more detail below.
  • the first embodiment provided carrier 20, where preferably several stage elements 14 are attachable.
  • a height of 2 m is preferred, so that thereby a corresponding Stage system can be set up, its stage cover 22nd each spaced apart by 2 m in height.
  • Fig. 7 is a side view of the use of Stage system 10 according to the invention shown in the reinforcement.
  • the inner formwork 48 is already placed and supported against the ground 30.
  • the Stage system 10 can be seen that it is also on the level bottom 30 is set up.
  • a stage system consisting of several Stage elements of the second embodiment is shown, and that of course also a stage system consisting of Stage elements of the first embodiment is usable.
  • the cantilevered Training the stage covers 22 provides in this context the advantage that the concreting work is not by carriers or supports are disturbed. This advantage is particular realized compared to the conventional facade scaffolding, the can replace the stage system of the invention.
  • the concreting of Ceilings are possible by placing inside the building instead the inner formwork 48 shown in Fig. 7 and 8 a Slab formwork system is placed on the following also from the top stage covering in FIG. 8 is concreted. Furthermore, this is when concreting on the Ceiling personnel through the top stage cover protected from falling.
  • Fig. 9 is finally shown how the inventive stage system 10 in an advantageous manner a climbing formwork system can be combined, the one Console 32, to which the stage formwork system 10th with its lowest support 16 is mountable.
  • the stage system 10 usually largely assembled state on the means of Climbing equipment attached to the exterior of the building Consoles 32 lifted.
  • the stage system 10 is as Part of the climbing formwork system again for all of can be used for required work.
  • Fig. 7 corresponding situation of the complete unfolded stage coverings 22 performed from the reinforcement become.
  • the Formwork elements 34 of the outer formwork introduced and to the Supports 16 of the stage system 10 are fixed.
  • the stage coverings 22 After all can in particular from the top stage covering 10 of the Concreting be performed. If the outside formwork too it must be removed at any time in turn, the stage coverings 22 at least partially fold back, leaving enough room for handling the Shuttering elements 34 is available. It is still mentions that the complete scaffolding created by the Stage system 10 according to the invention is formed, together with the attached formwork elements 34, the console 32nd and below suspended suspended platform 54 by means of a Cranes can be implemented if this instead of a Klettersystems is used.
  • stage cover 22 each have an integrated Have got through, so in a scaffold that through numerous side and superimposed stage elements 12 or 14 is formed by combination with corresponding ladder elements a complete passage ensure.
  • Fig. 10 is an alternative in a side view Embodiment of the stage system 10 according to the invention shown.
  • This embodiment is consistent with the embodiment Figs. 4 to 6 insofar as the single Stage element 12 has a carrier 16, on which a free cantilevered stage cover 22 is attached hinged.
  • the Embodiment of FIG. 10 differs from that of FIG. 4 to 6 in that the stage covering 22 in the region of the upper end of the individual carrier 16 of the Stage element 12 is attached.
  • the solid support 16 of the uppermost Stage element see Fig. 6
  • static Reasons are no longer necessary to be saved can.
  • the uppermost ends Stage element 12 in the region of the attachment point of the uppermost Decking 22, and above the level extends in Contrary to the embodiment of FIG. 6, no carrier 16 more.
  • no carrier 16 more is in the upper end of the two arranged parallel to each other top carrier 16 only a comparatively light Plug rail 24 inserted as a protective device.
  • Stage system 10 As is apparent from the lower portion of Fig. 10 extends in this embodiment of the invention Stage system 10, the respective protection device 24, so the Railing, the single stage element 14 from the lower End of the carrier 16 up to the required height.
  • Stage covering for the lowest level (apart from the underneath suspended platforms 54) is replaced by the Stage covering the console 32 formed in which the with Dashed lines indicated traverse is formed.
  • the attachment of the carrier 16 is still noted that these, as can be seen from the figure is, in the case shown on the console 32 and at other applications on a suitable floor support supplementally supported by support struts 56. hereby the individual carriers 16 can be dimensioned somewhat lighter which increases their profitability.
  • stage covering 22 total down can be folded down.
  • the stage cover 22 at the Embodiment of FIG. 10 in the region of the upper Carrier end of the individual carrier 16 is a Fold down advantageous because this way the Dimensions of the individual prefabricated and folded stage element 12 within reasonable limits can be kept.
  • the foremost portion 42 of FIG single stage covering 22 also in the embodiment of Fig. 10 can be folded upwards.
  • the Area at the back of the building between the support struts 56 can be used advantageously to material to take off and to the stage covering from the back of the building ago supply.
  • the console 32 for example, to the am farthest edge of the console 32 away from the building as well as to the building in the area of the respective Support struts 56 may be provided extending a railing, and the railing 24 shown in Fig. 10 at the lowest Stage element 12 omitted.
  • the railing 24 shown in Fig. 10 at the lowest Stage element 12 omitted.

Abstract

The platform (14) has at least one support (18) which can be set up spaced from a building or at least one support element (18) with which the platform element can be fixed on a support (20) set up spaced from the building. A foldaway platform covering (22) freely projects out in the direction of the building in the assembled state. The platform covering can be designed to fold up in several sections. A removable protection device (24) such as a grid can extend up from the support element to secure the area towards the back of the building.

Description

Technisches GebietTechnical area

Die Erfindung betrifft ein Bühnensystem, das auf dem Gebiet des Bauwesens verwendbar ist.The invention relates to a stage system that is in the field of construction is usable.

Beim Errichten von Bauwerken sind Gerüste, die aus zahlreichen Bühnenelementen aufgebaut sein können, für verschiedenste Arbeiten erforderlich. Beispielsweise müssen von Gerüsten aus die Bewehrungen angebracht werden. Ferner werden üblicherweise die für das Betonieren erforderlichen Schalungselemente von Gerüsten aus eingerichtet. Auch während des Betonierens halten sich Arbeitskräfte auf Gerüsten auf, um diejenigen Behälter oder Einrichtungen, aus denen der Beton zwischen die Schalungen fließt, zu handhaben. Auch Arbeiten an der Fassade werden von Gerüsten aus durchgeführt. Schließlich werden bei Kletterschalungssystemen üblicherweise auf Kletterkonsolen Gerüste montiert, um von diesen Gerüsten aus sämtliche der vorangehend genannten Tätigkeiten im Hinblick auf den jeweils oberhalb der Kletterkonsole neu zu betonierenden Gebäudeabschnitt durchführen zu können. When erecting structures, scaffolding is made of numerous stage elements can be constructed for various work required. For example, must from scaffoldings the reinforcements are attached. Further are usually required for concreting Shuttering elements furnished by scaffolding. Even while of concreting workers are on scaffolding, to those containers or bodies that make up the Concrete flows between the formwork to handle. Also Works on the facade are carried out from scaffolding. Finally, in climbing formwork systems are usually Mounted on climbing consoles scaffolds by these scaffolding from all the above activities in the Regarding the each above the climbing console new to To carry out concreting building section.

Stand der TechnikState of the art

Im Stand der Technik sind verschiedenste Gerüste bekannt, die jeweils an einzelne der obengenannten Tätigkeiten angepasst sind. Beispielsweise gibt es Fassadengerüste, bei denen vertikale Träger in einem bestimmten Raster derart aufgestellt werden, dass jeweils zwischen vier, in der Draufsicht ein Rechteck bildende Träger ein Bühnenbelag aufgelegt werden kann. Aus der EP 0 195 806 B1 ist es hierbei insbesondere bekannt, ein ganzes Gerüstmodul vorzusehen, bei dem die Bühnenbeläge an den Trägern klappbar angebracht sind, so dass die an der einen Seite der Arbeitsbeläge angeordneten Träger auf die auf der anderen Seite angeordneten Träger geklappt werden können, so dass das Gerüstmodul insgesamt vergleichsweise klein zusammenlegbar ist.In the prior art a variety of scaffolds are known, the adapted to each of the above-mentioned activities are. For example, there are facade scaffolding in which vertical carriers in a particular grid such be erected that between each four, in the Top view of a rectangle forming vehicle a stage covering can be hung up. From EP 0 195 806 B1 it is here especially known to provide an entire scaffolding module, at the stage coverings are attached to the carriers foldable, so that the arranged on one side of the work coverings Carrier on the arranged on the other side carrier can be worked out so that the scaffolding module in total is relatively small collapsible.

In der WO 90/14479 ist ein Gerüst offenbart, das ebenfalls an allen vier Ecken von rechteckigen Arbeitsbühnen angeordnete Träger aufweist, wobei die Arbeitsbühnen entweder klappbar oder faltbar an den Trägern angebracht sind, die sich im aufgestellten Zustand an der Gebäuderückseite befinden.In WO 90/14479 a framework is disclosed which also to arranged on all four corners of rectangular work platforms Carrier, wherein the working platforms either hinged or foldable on the straps that are in the be located on the back of the building.

Derartige Gerüste sind für bestimmte Arbeiten an dem Bauwerk durchaus brauchbar. Insbesondere zum Bewehren kann von derartigen Gerüsten aus gearbeitet werden, wobei diejenigen Träger, die zu dem Gebäude hin angeordnet sind, stören können. Bevor jedoch die Schalungselemente eingesetzt werden, ist es erforderlich, die in der vorangehend beschriebenen Weise gestalteten Gerüste abzubauen. Das Einrichten der Schalungselemente ist nämlich nicht möglich, wenn die Gerüste aufgestellt bleiben, weil die Schalungselemente genau in dem Bereich gehandhabt werden müssen, der von den Gerüsten, und hier insbesondere von den zu dem Gebäude hin angeordneten Trägern eingenommen wird. Such scaffolding is for certain work on the building quite usable. In particular, for reinforcement can of such scaffolds are made, and those Beams, which are arranged to the building, disturb can. However, before the formwork elements are used, it is necessary that in the previously described Way to dismantle scaffolding. Setting up the Formwork elements is not possible, if the scaffolding stay put, because the formwork elements exactly in the Must be handled by scaffolding, and here in particular from the arranged to the building Carriers is taken.

Aus diesem Grund bietet es auch keine Alternative, Fassadengerüste auf Arbeitsbühnen aufzubauen, die an dem bereits erstellten Teil des Gebäudes verankert sind. Neben den vorangehend angegebenen Nachteilen besteht das Problem, dass die Fassadengerüste auf der Arbeitsbühne zugfest verankert werden müssten, wofür bei den bekannten Bühnen keine Anschlüsse vorhanden sind. Schließlich sind die Fassadengerüste für diesen Zweck auch deshalb nicht geeignet, weil zur Durchführung nachfolgender Arbeiten häufig Material auf den Bühnen abgelegt werden muss, was bei den Fassadengerüsten nur auf der obersten Bühne möglich ist.For that reason, it also offers no alternative To build facade scaffolding on working platforms, which are attached to the already established part of the building are anchored. Next The disadvantages indicated above are the problem that the facade scaffolding on the work platform tensile strength would have to be anchored, what for the known stages no connections are available. Finally, the Facade scaffolding for this purpose also not suitable, because to carry out subsequent work often material must be stored on the stages, what with the Facade scaffolding only on the top stage is possible.

Diese Nachteile werden auch bei dem Gegenstand der DE 197 18 650 A1 nicht behoben, bei dem durch Zusatzteile eine Möglichkeit geschaffen wird, gängige Fassadengerüst-Stellrahmen zu einem an einer Bauwerkswand befestigbaren Konsolgerüst auszubauen. Hierdurch wird lediglich ein Ersatz für gesonderte Konsolgerüste geschaffen.These disadvantages are also at the subject of DE 197 18 650 A1 not resolved, in which by additional parts a possibility is created, common facade scaffolding frames to a fastened to a building wall Remove scaffold frame. This will only be a substitute created for separate console scaffolding.

Auf dem Gebiet der Kletterschalungen ist es bekannt, Arbeitsbühnen an Schalungselementen anzubringen, wodurch eine Möglichkeit geschaffen wird, beispielsweise während des Betonierens auf diesen Arbeitsbühnen tätig zu sein. Da die Arbeitsbühnen fest oberhalb der Schalungselemente angebracht sind, sind sie jedoch für das Bewehren unbrauchbar, so dass hierfür eigene Hilfsgerüste erforderlich sind. Folglich trifft es auch auf diese Lösungen zu, dass sie nur für bestimmte Tätigkeiten geeignet sind, und weitere Gerüste für die übrigen Tätigkeiten erforderlich sind.In the field of climbing formwork, it is known Attach work platforms to formwork elements, creating a Possibility is created, for example during the Concrete to work on these work platforms. Because the Work platforms fixed above the formwork elements However, they are useless for the reinforcement, so that this own auxiliary scaffolding are required. consequently It also applies to these solutions that they only for certain activities are suitable, and further scaffolding for the other activities are required.

Die GB 2 180 583 A beschreibt den Oberbegriff des Anspruchs 1 und insbesondere ein Einzelgerüst mit einer Bühne, das für Garten- und Hausarbeit angepasst ist und neben einer Tragestruktur einen einzigen, klappbaren Bühnenbelag aufweist, der in Richtung einer Hecke oder einem Gebäude vorspringt. Das Einzelgerüst ist an einem Gebäude abstützbar, um daran Arbeiten durchzuführen. Aufgrund dieser Abstützung und aufgrund der Eigenschaft als Einzelgerät ist ein derartiges Gerüst für die Verwendung als Baugerüst, insbesondere für die Durchführung von Schalungsarbeiten nicht geeignet.GB 2 180 583 A describes the preamble of claim 1 and in particular a single scaffolding with a stage suitable for Gardening and housework is adjusted and next to one Carrying structure a single, foldable stage cover pointing towards a hedge or a building projects. The single scaffold can be supported on a building, to carry out work. Because of this support and because of the property as a single device is a such scaffolding for use as scaffolding, especially for the execution of formwork work not suitable.

Dies gilt in gleicher Weise für den Gegenstand der US 2,398,604, der dem Oberbegriff des Anspruchs 2 entspricht, und bei dem mehrere Ständerelemente vorgesehen sind, die sich an einer bereits erstellten Gebäudemauer abstützen, wobei auf die Abstützungen Bretter zur Ausbildung einer Bühne auflegbar sind. Auch ein derartiges System ist im Baubetrieb, bei dem Schalungselemente zur Erstellung von neuen Wänden eingerichtet werden müssen, nicht verwendbar.This applies equally to the subject matter of the US 2,398,604 corresponding to the preamble of claim 2, and in which a plurality of stator elements are provided which are supported on an already created building wall, wherein on the supports boards can be placed to form a stage are. Also, such a system is in construction, in which Shuttering elements for creating new walls need to be set up, not usable.

Schließlich ist aus der DE 89 09 026 U1 eine Faltbühne bekannt, die einen Rahmen und einen klappbar daran angebrachten Bühnenbelag aufweist. Mittels des Rahmens ist die Faltbühne an Gebäudeankern einhängbar. Mit dieser Bühne kann folglich keinesfalls ein Gebäudeabschnitt, der sich auf dem gleichen Niveau wie die Bühne befindet, betoniert werden. Ferner werden jegliche an dem Gebäude erforderlichen Arbeiten durch den unmittelbar an dem Gebäude angebrachten Rahmen behindert.Finally, from DE 89 09 026 U1 a folding platform Known to have a frame and a hinged to it has attached stage covering. By means of the frame is the folding platform can be hung on building anchors. With this stage Consequently, no part of the building can be built up the same level as the stage is to be concreted. Furthermore, any work required on the building will be required through the frame attached directly to the building with special needs.

Darstellung der ErfindungPresentation of the invention

Der Erfindung liegt die Aufgabe zugrunde, ein Bühnensystem mit mehreren Bühnenelementen zu schaffen, das flexibel einsetzbar ist und das sich für die Durchführung von zahlreichen unterschiedlichen Tätigkeiten im Rahmen der Erstellung eines Bauwerks eignet.The invention is based on the object, a stage system with multiple stage elements to create that flexible can be used and that is suitable for the implementation of numerous different activities within the framework of the Creation of a building is suitable.

Die Lösung dieser Aufgabe erfolgt durch die Merkmale des Patentanspruchs 1 oder 2.The solution to this problem is provided by the features of Patent claim 1 or 2.

Demzufolge wird erfindungsgemäß ein Bühnensystem vorgesehen, das aus mehreren gleichartigen Bühnenelementen besteht, die in einer ersten Ausführungsform zumindest einen Träger aufweisen. Der oder die Träger dienen im wesentlichen dazu, den Bühnenbelag und wahlweise anbringbare, weitere Einrichtungen, wie z.B. rückwärtige Schutzeinrichtungen, zu tragen. In einer zweiten Ausführungsform ist das Bühnenelement derart gestaltet, dass es keinen Träger aufweist, sondern ein Trageelement, mittels dessen das Bühnenelement an einem Träger befestigbar ist. Beiden Ausführungsformen ist erfindungsgemäß gemeinsam, dass sich von dem Träger bzw. dem Trageelement im Anbringzustand frei auskragend ein Bühnenbelag erstreckt, der klappbar ausgebildet ist.Accordingly, a stage system is provided according to the invention, which consists of several similar stage elements, the in a first embodiment, at least one carrier exhibit. The carrier (s) essentially serve the stage covering and optionally attachable, further Facilities such as e.g. Rear guards, too wear. In a second embodiment that is Stage element designed such that there is no carrier has, but a support member, by means of which the Stage element can be fastened to a carrier. Both Embodiments according to the invention have in common that free from the carrier or the carrying element in the attached state projecting a stage covering that folds out is trained.

Die Maßnahme, wonach der Bühnenbelag an dem Träger bzw. dem Trageelement im angebrachten Zustand frei auskragend ausgebildet ist, bietet den wesentlichen Vorteil, dass an der zu dem Bauwerk gerichteten Seite keine störenden Vertikalträger vorhanden sind. Vielmehr ist der zu dem Bauwerk gerichtete Bereich in horizontaler Richtung durchgehend frei, so dass von dem Bühnenbelag aus ohne Behinderung die Bewehrungsarbeiten und die Handhabung der Betonier-Einrichtungen stattfinden können. The measure according to which the stage covering on the carrier or the Carrying element in the attached state cantilevered is formed, offers the substantial advantage that at the directed to the building side no disturbing vertical beams available. Rather, it is directed to the building Area in the horizontal direction continuously clear, leaving from the stage covering without hindrance the reinforcement work and the handling of concreting facilities can take place.

Ferner zeichnet sich das erfindungsgemäße Bühnenelement dadurch aus, dass der Bühnenbelag klappbar ausgebildet ist, was hinsichtlich des Bühnenbelags insgesamt und/oder eines Teils des Bühnenbelags vorgesehen sein kann. Hierdurch wird das Bühnenelement auch für andere Tätigkeiten, als die oben bereits erwähnten, einsetzbar. Im einzelnen ist es möglich, den Bühnenbelag zurückzuklappen, und in dem Bereich, in dem sich die nunmehr zurückgeklappten Bühnenbeläge befanden, die Schalungselemente zu handhaben und einzurichten. Das durch mehrere erfindungsgemäße Bühnenelemente gebildete Bühnensystem muss hierzu nicht versetzt werden. Durch das Zurückklappen der Bühnenbeläge wird Raum für die Handhabung und Einrichtung der Schalungselemente geschaffen.Furthermore, the stage element according to the invention is characterized characterized in that the stage cover is designed to be foldable, what about the stage cover overall and / or one Part of the stage cover can be provided. This will the stage element also for other activities, as the above already mentioned, can be used. In particular, it is possible to fold back the stage covering, and in the area in which the now folded back stage coverings were, the Handling and setting up shuttering elements. That through formed several stage elements according to the invention Stage system does not need to be offset for this purpose. By the Folding back the stage covers will give room for handling and device of the formwork elements created.

Schließlich ermöglicht die klappbare Ausbildung der Bühnenbeläge auch, dass bei einem Gerüst, das durch mehrere erfindungsgemäße Bühnenelemente aufgebaut wird, Material nicht nur auf dem obersten Belag, sondern nach dem Zurückklappen des obersten Belages auch auf den darunterliegenden Bühnenbelägen abgelegt werden kann. Insgesamt sind somit von einem Gerüst, das durch mehrere erfindungsgemäße Bühnenelemente aufgebaut wird, sämtliche im Rahmen der Erstellung des Bauwerks auftretenden Tätigkeiten, wie Bewehren, Schalen, Betonieren, das Versetzen von Fertigteilen und die nachfolgenden Fassadenarbeiten möglich, ohne dass das Gerüst durch ein anderes Gerüst ersetzt oder ergänzt werden muss, oder das Gerüst versetzt werden muss.Finally, the foldable training allows the Stage coverings too, that with a scaffolding that through several Stage elements according to the invention is constructed, material not only on the top surface, but after that Fold back the topping also on the underlying stage coverings can be stored. Overall, therefore, are of a scaffold that through several Stage elements according to the invention is constructed, all in Framework of the construction of the works, like rebar, shells, concreting, moving Prefabricated parts and subsequent façade work possible, without the scaffold replaced by another scaffold or must be added, or the framework must be moved.

Bevorzugte Weiterbildungen sind in den weiteren Ansprüchen beschrieben.Preferred developments are in the further claims described.

Für die klappbare Ausbildung des Bühnenelements bietet es bestimmte Vorteile, wenn der Bühnenbelag insgesamt klappbar an dem Träger oder dem Trageelement angebracht ist. Diese Maßnahme ist beispielsweise in dem Fall besonders vorteilhaft, dass auf einen unterhalb des obersten Bühnenbelags angeordneten Bühnenbelag Material abgelegt werden soll. Um diesen Vorgang möglichst wenig zu behindern, kann der Bühnenbelag bei dieser Ausführungsform insgesamt zurückgeklappt werden.It offers for the foldable training of the stage element certain advantages when the stage covering is overall hinged is attached to the support or the support element. These Measure is particularly for example in the case advantageous that on a below the top Stage covers arranged stage covering material filed shall be. To hamper this process as little as possible, the stage covering in this embodiment may be total be folded back.

Alternativ, oder, wie derzeit bevorzugt wird, in Ergänzung zu dem vorangehend beschriebenen Merkmal ist es vorteilhaft, den Bühnenbelag nicht nur im Bereich seiner Anbringung an dem Träger oder dem Trageelement, sondern an einer Stelle entlang seiner Erstreckung in Richtung des Bauwerks klappbar zu gestalten. Hierdurch ist es möglich, nur den vordersten Bereich des Bühnenbelags wahlweise geringfügig oder auch vollständig zurückzuklappen, so dass auf dem ausgeklappt verbleibenden Bereich des Bühnenbelags das Stehen möglich ist, und Arbeitskräfte von dort aus beispielsweise das Einrichten der Schalungen durchführen können. Insbesondere wird nach dem Zurückklappen des vordersten Bereichs des Bühnenbelags eine Kollision und Störung zwischen diesem Bereich und den einzurichtenden Schalungselementen verhindert. Insgesamt wird, wie erwähnt, bevorzugt, den Bühnenbelag mehrfach klappbar auszubilden, um sämtliche der vorangehend genannten Vorteile zu realisieren.Alternatively, or as currently preferred, in addition to The feature described above, it is advantageous to the Stage covering not only in the area of its attachment to the Carrier or the support element, but at one point along its extension in the direction of the building foldable too shape. This makes it possible, only the foremost Area of the stage covering either slightly or too fold back completely, so that unfolded on the remaining area of the stage covering standing possible is, and workers from there, for example, the Setting up the formwork can perform. Especially after folding back the foremost area of the Stage covers a collision and interference between this Area and the formwork elements to be established prevented. Overall, as mentioned, the preferred Stage covering foldable to form all the to realize the aforementioned advantages.

Aus Sicherheitsgesichtspunkten wird bevorzugt, dass an dem Bühnenelement als integraler Bestandteil eine im Anbringzustand an der Gebäuderückseite angeordnete Schutzeinrichtung vorgesehen ist. Für diese Schutzeinrichtung hat es sich als vorteilhaft erwiesen, sie abnehmbar auszubilden, so dass nach dem Abnehmen der Schutzeinrichtung auch eine Zuführung von Material nicht nur von oben her, sondern auch von der Gebäuderückseite her, auf eine beliebige Ebene, möglich ist.From a safety point of view, it is preferred that on the Stage element as an integral part of a Attachment arranged at the back of the building Guard is provided. For this protection device It has proven to be advantageous to remove them form so that after removing the guard also a supply of material not only from above, but also from the back of the building, to any one Level, is possible.

Da die seitlichen Abmessungen des erfindungsgemäßen Bühnenelements nicht an die Abmessungen eines Gebäudes angepasst werden sollen, sondern dieses vielmehr einheitlich gestaltet werden soll, ist in einer speziellen Ausführungsform ein Bühnenelement vorgesehen, dessen Bühnenbelag und/oder gegebenenfalls Schutzeinrichtung zumindest ein teleskopierbares Ausgleichselement aufweist, so dass eine Lücke zu benachbarten Bühnenbelägen und Schutzeinrichtungen geschlossen werden kann, und das entstehende Bühnensystem eine flexible Breite aufweist.Since the lateral dimensions of the invention Stage element not to the dimensions of a building should be adapted, but rather uniformly is to be designed, is in a special Embodiment provided a stage element, whose Stage covering and / or optionally protective device has at least one telescoping compensation element, so that a gap to adjacent stage coverings and Protective devices can be closed, and that emerging stage system has a flexible width.

Wenngleich die Verwendung eines einzelnen Bühnenelements denkbar ist, wird selbstverständlich bevorzugt, aus mehreren Bühnenelementen ein vollständiges Bühnensystem aufzubauen. In dem Fall, dass Bühnenelemente verwendet werden, die anstelle eines Trägers zumindest ein Trageelement aufweisen, besteht das Bühnensystem neben den mehreren Bühnenelementen aus zumindest einem Träger.Although the use of a single stage element is conceivable, is of course preferred from several Stage elements to build a complete stage system. In in the event that stage elements are used instead a carrier at least have a support member consists the stage system next to the several stage elements at least one carrier.

Hierbei wird für den Träger bevorzugt, dass daran mehrere Bühnenelemente, vorzugsweise übereinander, anbringbar sind, so dass sich ein mehrstöckiges Gerüst ergibt.In this case, it is preferable for the carrier to have more than one Stage elements, preferably one above the other, are attachable, so that results in a multi-storey scaffolding.

Für das vorangehend beschriebene Bühnensystem mit zumindest einem Träger bzw. diejenige Ausführungsform des erfindungsgemäßen Bühnenelements, die einen Träger aufweist, wird für den Träger bevorzugt, dass dieser an seinem unteren Ende derart gestaltet ist, dass das Bühnensystem bzw. das Bühnenelement auf einem ebenen Boden aufstellbar ist. Durch diese Maßnahme wird gewährleistet, dass das erfindungsgemäße Bühnensystem in der gleichen Weise verwendbar ist wie herkömmliche Fassadengerüste.For the above-described stage system with at least a carrier or that embodiment of the Stage element according to the invention, comprising a support, is preferred for the carrier, that this at its lower End is designed such that the stage system or the Stage element can be set up on a level floor. By This measure ensures that the inventive Stage system is usable in the same way as conventional facade scaffolding.

Ergänzend wird bevorzugt, dass der Träger an seinem unteren Ende zusätzlich dafür ausgebildet ist, auf einer Konsole montiert zu werden. Hierdurch wird die Kompatibilität des erfindungsgemäßen Bühnensystems bzw. Bühnenelements mit Kletterkonsolen gewährleistet, an denen, bevorzugt ebenfalls mehrstöckig, das erfindungsgemäße Bühnensystem anbringbar ist. Somit können auch bei Kletterschalungssystemen sämtliche erforderliche Tätigkeiten, wie z.B. Bewehren, Einrichten der Schalungen, Betonieren und nachfolgende Arbeiten von ein und demselben Gerüst aus durchgeführt werden, dessen Lage nicht verändert werden muss.In addition, it is preferred that the carrier at its lower End is additionally designed to be on a console to be mounted. This will increase the compatibility of the inventive stage system or stage element with Climbing brackets guaranteed, on which, preferably also multi-storey, the stage system according to the invention attachable is. Thus, even with climbing formwork systems all required activities, such as Reinforcing, setting up the Formwork, concreting and subsequent work of one and the same framework, its location is not must be changed.

Aus Stabilitätsgründen und um die Verwendbarkeit als Fassadengerüst zu realisieren, wird bevorzugt, dass das Bühnensystem bzw. das Bühnenelement an einem Bauwerk verankerbar ist.For stability reasons and for usability as Facade scaffolding to realize, it is preferred that the Stage system or the stage element on a building can be anchored.

Um die erwähnte Verwendbarkeit für sämtliche erforderliche Tätigkeiten, hier insbesondere das Einrichten der Schalungselemente, zu erreichen, wird ferner bevorzugt, dass das erfindungsgemäße Bühnensystem bzw. Bühnenelement derart gestaltet ist, dass daran ein Schalungselement verankerbar ist.To the mentioned usability for all required Activities, in particular the setting up of the Shuttering elements to achieve, it is further preferred that the stage system according to the invention or stage element such is designed that a formwork element anchored thereto is.

Kurze Beschreibung der ZeichnungenBrief description of the drawings

Nachfolgend werden beispielhaft in den Zeichnungen dargestellte Ausführungsformen der Erfindung näher erläutert. Es zeigen:

Fig. 1
eine Seitenansicht eines erfindungsgemäßen Bühnenelements in einer ersten Ausführungsform im ausgeklappten Zustand;
Fig. 2
das in Fig. 1 gezeigte Bühnenelement im zusammengeklappten Zustand;
Fig. 3
in einer Vorderansicht ein erfindungsgemäßes Bühnensystem bestehend aus drei der in den Fig. 1 und 2 dargestellten Bühnenelemente und zwei Trägern;
Fig. 4
eine Seitenansicht eines erfindungsgemäßen Bühnenelements in einer zweiten Ausführungsform im ausgeklappten Zustand;
Fig. 5
eine Seitenansicht des in Fig. 4 gezeigten Bühnenelements in einem zusammengeklappten Zustand;
Fig. 6
eine Vorderansicht eines Bühnensystems bestehend aus drei der in den Fig. 1 und 2 dargestellten Bühnenelemente;
Fig. 7
in einer Seitenansicht die Verwendung des erfindungsgemäßen Bühnensystems beim Bewehren;
Fig. 8
in einer Seitenansicht die Verwendung des erfindungsgemäßen Bühnensystems beim Verankern einer Schalung und Betonieren;
Fig. 9
die in Fig. 8 dargestellte Situation, wobei das erfindungsgemäße Bühnensystem auf einer Konsole montiert ist; und
Fig. 10
eine alternative Ausführungsform des erfindungsgemäßen Bühnensystems bei dessen Verwendung.
Embodiments of the invention illustrated by way of example in the drawings will be explained in more detail below. Show it:
Fig. 1
a side view of a stage element according to the invention in a first embodiment in the unfolded state;
Fig. 2
the stage element shown in Figure 1 in the folded state.
Fig. 3
in a front view of an inventive stage system consisting of three of the illustrated in Figures 1 and 2 stage elements and two carriers.
Fig. 4
a side view of a stage element according to the invention in a second embodiment in the unfolded state;
Fig. 5
a side view of the stage element shown in Figure 4 in a folded state.
Fig. 6
a front view of a stage system consisting of three of the stage elements shown in Figures 1 and 2;
Fig. 7
in a side view, the use of the stage system according to the invention during the reinforcement;
Fig. 8
in a side view, the use of the stage system according to the invention in anchoring a formwork and concreting;
Fig. 9
the situation shown in Figure 8, wherein the stage system according to the invention is mounted on a console. and
Fig. 10
an alternative embodiment of the stage system according to the invention in its use.

Ausführliche Beschreibung bevorzugter Ausführungsformen der ErfindungDetailed description of preferred embodiments of invention

In Fig. 1 ist in einem ausgeklappten Zustand und einer dem Anbringzustand entsprechenden Ausrichtung von der Seite ein Bühnenelement 14 gemäß der Erfindung in einer ersten Ausführungsform gezeigt. Dieses weist als Bestandteil des Bühnenelements 14 keinen Träger auf, sondern vielmehr ein im Anbringzustand an der dem Gebäude abgewandten Seite angeordnetes Trageelement 18, mit dem das Bühnenelement an einem Träger anbringbar ist, wie nachfolgend unter Bezugnahme auf die Fig. 3 noch genauer erläutert wird. In dem gezeigten Fall weist das Bühnenelement 14 an beiden (von der Vorder-oder Rückseite aus betrachteten) seitlichen Randbereichen das gezeigte Trageelement 18 auf (vgl. Fig. 3).In Fig. 1 is in an unfolded state and a the Attachment state corresponding orientation from the side Stage element 14 according to the invention in a first Embodiment shown. This indicates as part of the Stage element 14 no carrier on, but rather an im Attachment on the side facing away from the building arranged support member 18, with which the stage element a carrier is attachable, as hereinafter with reference is explained in more detail on the Fig. 3. In the shown Case, the stage element 14 at both (from the front or Rear side of the considered) side edge areas shown support member 18 (see Fig .. 3).

Von dem Trageelement 18 erstreckt sich im angebrachten Zustand frei auskragend in Richtung des (nicht gezeigten) Gebäudes ein Bühnenbelag 22, der zu dem Trageelement hin durch eine Strebe 36 abgestützt ist. Erfindungsgemäß ist der Bühnenbelag 22 klappbar ausgebildet, was bei dem gezeigten Ausführungsbeispiel in zweifacher Form verwirklicht ist. Zum einen befindet sich an dem Übergang zwischen Bühnenbelag 22 und Trageelement 18 ein erstes Klappscharnier 38, mittels dessen der Bühnenbelag 22 in die in Fig. 2 dargestellte, zusammengeklappte Lage bringbar ist. Wie nachfolgend noch genauer erläutert wird, kann diese Funktion bei der Verwendung des Bühnenelements 14 zusammen mit weiteren, darüber angeordneten Bühnenelementen dazu genutzt werden, den Bühnenbelag 22 des obersten Bühnenelements 14 vollständig zurückzuklappen, um von oben Material auf die darunterliegenden Bühnenbeläge abzulegen oder die Bewehrung einzubringen.From the support member 18 extends in the attached State cantilevering in the direction of (not shown) Building a stage covering 22, which points to the support element is supported by a strut 36. According to the invention Stage cover 22 hinged formed, which in the shown Embodiment is realized in two forms. To the one is located at the transition between stage covering 22nd and support member 18 a first hinged hinge 38, by means of of which the stage covering 22 is shown in FIG. 2, folded position can be brought. As below is explained in more detail, this function in the Use of the stage element 14 together with other, arranged above the stage elements are used to Stage covering 22 of the top stage element 14 completely Fold back to the material from above lay down underlying stage coverings or the reinforcement contribute.

Wie im Verlauf der Erstreckung des Bühnenbelags 22 in Richtung des Gebäudes zu erkennen ist, weist der Bühnenbelag 22 der in Fig. 1 dargestellten Ausführungsform ein weiteres Klappscharnier 40 zwischen dem vordersten Bereich 42 und einem hinteren Bereich 44 des Bühnenbelags 22 auf. Mittels des Scharniers 40 kann der vordere Bereich 42 ganz oder teilweise in Richtung des hinteren Bereichs 44 zurückgeklappt werden, so dass in dem Bereich, in dem sich der vorderste Bereich 42 im ausgeklappten Zustand befindet, ohne gegenseitige Störung ein Schalungselement angeordnet werden kann. Hierdurch ist von einem Bühnensystem aus, das durch mehrere der gezeigten Bühnenelemente 14 gebildet wird, sowohl das Bewehren, für das der vollständig ausgeklappte Bühnenbelag 22 verwendet wird, als auch das nachfolgende Einrichten der Schalungselemente möglich, wobei hierfür der vorderste Bereich 42 zumindest geringfügig nach oben oder vollständig auf den hinteren Bereich 44 zurückgeklappt wird. In Fig. 1 ist schließlich zu erkennen, dass sich von dem Trageelement 18 aus nach oben eine Schutzeinrichtung 24, üblicherweise in Form eines Gitters, erstreckt, um den zur Gebäuderückseite gerichteten Bereich abzusichern.As in the course of the extension of the stage covering 22 in Direction of the building is recognizable, the stage covering points 22 of the embodiment shown in Fig. 1 another Folding hinge 40 between the foremost region 42 and a rear portion 44 of the stage cover 22. through of the hinge 40, the front portion 42 may be all or partially folded back towards the rear area 44 so that in the area where the foremost Area 42 is in the unfolded state, without mutual interference a shuttering element can be arranged can. This is the result of a stage system that through a plurality of the illustrated stage elements 14 is formed, both the reinforcement, for which the fully unfolded Stage covering 22 is used, as well as the subsequent Setting up the formwork elements possible, for which the foremost region 42 at least slightly upwards or is completely folded back on the rear portion 44. In Fig. 1, it can finally be seen that of the Carrying element 18 from up a protective device 24, usually in the form of a grid, extending to the Secure the building rear-facing area.

Wie aus Fig. 2 hervorgeht, lässt sich das erfindungsgemäße Bühnenelement 14 in vorteilhafter Weise auf kleinem Raum zusammenlegen. Hierzu wird der Bühnenbelag 22 insgesamt um das Scharnier 38 nach oben, in Richtung des Schutzgeländers 24 geklappt, wobei die Strebe 36 von dem Trageelement gelöst wird und in dieselbe Ausrichtung geklappt wird. In dem in Fig. 2 dargestellten, zusammengeklappten Zustand lassen sich mehrere Bühnenelemente aufeinander mit geringem Platzbedarf lagern, indem sie vorher in eine gegenüber der Darstellung von Fig. 2 um 90° gedrehte, flache Ausrichtung gebracht werden.As is apparent from Fig. 2, the inventive Stage element 14 advantageously in a small space fold. For this purpose, the stage cover 22 is a total order the hinge 38 upwards, in the direction of the guardrail 24 folded, the strut 36 released from the support member and will work in the same orientation. In the in Fig. 2 illustrated, folded state can be several stage elements on each other with a small footprint store by putting in front of the presentation Of Fig. 2 rotated by 90 °, brought flat alignment become.

In Fig. 3 ist dargestellt, wie drei der in Fig. 1 und 2 gezeigten Bühnenelemente 14 zu einem Bühnensystem 10 kombiniert werden. Hierzu werden die drei Bühnenelemente 14 übereinander mittels ihrer jeweiligen Trageelemente 18 an zwei säulenförmigen Trägern 20 angebracht und durch Bolzen oder mittels Schnellanschluss befestigt. Die Träger 20 weisen ein Raster von Öffnungen oder beispielsweise auch Vorsprünge auf, so dass die Bühnenelemente jeweils in geeigneter Höhe montiert werden können. Wie sich aus Fig. 3 in Kombination mit der Darstellung von Fig. 1 ergibt, kragen die Bühnenelemente 22 jeweils nach vorne, also gemäß der Darstellung von Fig. 3 aus der Zeichenebene heraus, aus, so dass sich in dem zu dem Gebäude gewandten Bereich keine weiteren Trageelemente oder Stützen befinden, und in diesem Bereich frei gearbeitet werden kann. Selbstverständlich kann das in Fig. 3 dargestellte Bühnensystem 10 ohne weiteres mit zusätzlichen, seitlich oder darüber angeordneten Abschnitten des Bühnensystems kombiniert werden, um insgesamt ein mehrstöckiges, großflächiges Fassadengerüst oder ein Gerüst eines Klettersystems auszubilden. Insbesondere können die gezeigten Träger 20 mit weiteren, darüber angeordneten Trägern beispielsweise über eine Flansch- oder Steckverbindung gekuppelt werden.In Fig. 3 is shown how three of the in Figs. 1 and 2 shown stage elements 14 to a stage system 10th be combined. For this purpose, the three stage elements 14 one above the other by means of their respective support elements 18 two columnar supports 20 attached and by bolts or fixed by quick connection. The carriers 20 have a grid of openings or, for example, projections on, so that the stage elements each at a suitable height can be mounted. As is apparent from Fig. 3 in combination with the representation of Fig. 1 results, the collar Stage elements 22 each forward, so according to the Representation of Fig. 3 out of the plane, out, so that in the area facing the building no other support elements or supports are located, and in this Area can be worked freely. Of course you can the stage system 10 shown in Fig. 3 readily with additional, laterally or above arranged sections of the stage system can be combined to a total of one multi-storey, large facade scaffolding or scaffolding form a climbing system. In particular, the shown carrier 20 with further, arranged above Carriers for example via a flange or Plug connection are coupled.

Dies gilt in gleicher Weise für die in Fig. 4 in einer Seitenansicht dargestellte zweite Ausführungsform des erfindungsgemäßen Bühnenelements 12. Dieses entspricht hinsichtlich der in dem gezeigten Fall zweifach klappbaren Ausbildung des Bühnenbelags 22 und dessen Abstützung durch eine Strebe 36 der in den Fig. 1 und 2 gezeigten Ausführungsform. Anstelle des Trageelements 18 der ersten Ausführungsform ist der Bühnenbelag 22 jedoch mit einem Träger 16 verbunden. Bei dem Träger 16, von dem wie bei dem Bühnensystem gemäß Fig. 3 an beiden seitlichen Rändern jeweils einer vorgesehen ist (vgl. Fig. 6), handelt es sich im wesentlichen um im Anbringzustand vertikal ausgerichtete Streben, die durch geeignete Befestigungseinrichtungen 46 an den in gleicher Weise gestalteten Trägern 16 weiterer Bühnenelemente anbringbar sind, so dass sich ein mehrstöckiges Gerüst mit jeweils frei auskragenden Bühnenbelägen 22 ergibt. Auch bei dem dargestellten Ausführungsbeispiel der zweiten Ausführungsform ist in dem rückwärtigen Bereich eine Schutzeinrichtung 24 angebracht.This applies in the same way for in Fig. 4 in a Side view illustrated second embodiment of according to the invention stage element 12. This corresponds with respect to the case foldable in the case shown twice Training the stage cover 22 and its support by a strut 36 of the shown in Figs. 1 and 2 Embodiment. Instead of the support member 18 of the first Embodiment, the stage cover 22 but with a Carrier 16 connected. In the carrier 16, of which as in the Stage system according to FIG. 3 at both lateral edges one each is provided (see Fig. 6), it is essentially vertically aligned in the mounting state Struts, by suitable fasteners 46 at the similarly designed carriers 16 more Stage elements are attachable, so that a multi-storey scaffolding, each with cantilevered Stage coverings 22 results. Also in the illustrated Embodiment of the second embodiment is in the Rear area a guard 24 attached.

Wie sich aus Fig. 5 ergibt, ist auch die zweite -Ausführungsform des erfindungsgemäßen Bühnenelements 12 mittels des Scharniers 38, über das der Bühnenbelag 22 insgesamt klappbar an dem Träger 16 angebracht ist, in eine flache Gestalt zusammenklappbar. Hierdurch können auch mehrere Bühnenelemente 12 der zweiten Ausführungsform auf geringem Raum flach aufeinandergestapelt gelagert werden. Hierbei ergibt sich gegenüber der oben beschriebenen ersten Ausführungsform der weiterer Vorteil, dass keine zusätzlichen Träger gelagert werden müssen, da diese in Form der Träger 16 als Bestandteil des Bühnenelements 12 vorgesehen sind. As is apparent from Fig. 5, the second is also Embodiment of the stage element 12 according to the invention by means of the hinge 38, via which the stage covering 22 a total of hinged on the support 16 is mounted in a flat shape collapsible. This can also be done a plurality of stage elements 12 of the second embodiment be stored flat stacked on a small space. This results from the first described above Embodiment of the further advantage that no additional Carrier must be stored, as these in the form of the carrier 16th are provided as part of the stage element 12.

In Fig. 6 ist entsprechend der Darstellung von Fig. 3 ein Beispiel eines Bühnensystems 10 gezeigt, das aus drei übereinander angeordneten Bühnenelementen 12 der zweiten Ausführungsform besteht. Wie sich aus Fig. 6 ergibt, sind die Träger 16 jeweils an beiden Seitenrändern vorgesehen. Es sei erwähnt, dass die Träger 16 der zweiten Ausführungsform in ihrem unteren Bereich so gestaltet sein können, dass sie nicht nur mit den Trägern 16 weiterer Bühnenelemente verbindbar sind, sondern zusätzlich auf ebenem Boden aufstellbar und auf der Konsole eines Kletterschalungssystems anbringbar sind, wie nachfolgend noch genauer erläutert wird. Dies gilt selbstverständlich in gleicher Weise für die bei der ersten Ausführungsform vorgesehenen Träger 20, an denen bevorzugt mehrere Bühnenelemente 14 anbringbar sind. Es sei noch erwähnt, dass für die Träger 16 derzeit eine Höhe von 2 m bevorzugt wird, so dass hierdurch entsprechend ein Bühnensystem eingerichtet werden kann, dessen Bühnenbeläge 22 in der Höhe jeweils um 2 m voneinander beabstandet sind.In Fig. 6 is corresponding to the illustration of Fig. 3 a Example of a stage system 10 shown that consists of three stacked stage elements 12 of the second Embodiment exists. As is apparent from Fig. 6, the Carrier 16 each provided on both side edges. It was mentions that the beams 16 of the second embodiment in FIG their lower area can be designed to be not only with the carriers 16 other stage elements connectable, but also on level ground installable and on the console of a climbing formwork system are attachable, as will be explained in more detail below. Of course, this applies equally to the case of the first embodiment provided carrier 20, where preferably several stage elements 14 are attachable. It was still mentioned that for the carrier 16 currently a height of 2 m is preferred, so that thereby a corresponding Stage system can be set up, its stage cover 22nd each spaced apart by 2 m in height.

In Fig. 7 ist in einer Seitenansicht die Verwendung des erfindungsgemäßen Bühnensystems 10 bei dem Bewehren gezeigt. In der gezeigten Situation ist die Innenschalung 48 bereits aufgestellt und gegenüber dem Boden 30 abgestützt. Für das Bühnensystem 10 ist zu erkennen, dass es ebenfalls auf dem ebenen Boden 30 aufgestellt ist. Es sei erwähnt, dass in den Fig. 7 bis 9 ein Bühnensystem bestehend aus mehreren Bühnenelementen der zweiten Ausführungsform gezeigt ist, und dass selbstverständlich ebenso ein Bühnensystem bestehend aus Bühnenelementen der ersten Ausführungsform verwendbar ist.In Fig. 7 is a side view of the use of Stage system 10 according to the invention shown in the reinforcement. In the situation shown, the inner formwork 48 is already placed and supported against the ground 30. For the Stage system 10 can be seen that it is also on the level bottom 30 is set up. It should be mentioned that in the Fig. 7 to 9, a stage system consisting of several Stage elements of the second embodiment is shown, and that of course also a stage system consisting of Stage elements of the first embodiment is usable.

Wie in Fig. 7 zu erkennen ist, ist der oberste Bühnenbelag 22 zurückgeklappt, was für das Anbringen der Bewehrungen 50 vorteilhaft war. In der in Fig. 7 dargestellten Situation werden nunmehr von den beiden unteren Bühnenbelägen 22 aus die Bewehrarbeiten durchgeführt. Hierbei ist es vorteilhaft, die Bühnenbeläge 22 jeweils vollständig auszuklappen, so dass die Arbeitskräfte möglichst nah an die Bewehrungen 50 herankommen können. Die frei auskragende Ausbildung der Bühnenbeläge 22 bietet den Vorteil, dass im Bereich der Bewehrungsarbeiten keine störenden Träger oder Stützen vorhanden sind.As can be seen in FIG. 7, the uppermost stage covering 22 folded back, what for attaching the reinforcements 50 was beneficial. In the situation shown in Fig. 7 are now from the two lower stage coverings 22 the reinforcements were carried out. It is advantageous each completely unfold the stage coverings 22 so that the workforce as close as possible to the reinforcements 50 can approach. The cantilevered training of the Stage covers 22 offers the advantage that in the area of Reinforcement no disturbing beams or columns available.

Aus Fig. 8 ergibt sich die vorteilhafte Verwendbarkeit des neuartigen Bühnensystems 10 auch für die nach dem Bewehren erforderlichen Arbeiten. Zum einen ist, wie für die beiden unteren Bühnenbeläge zu erkennen ist, der jeweilige vordere Bereich 42 in vorteilhafter Weise derart teilweise zurückgeklappt, dass Raum für ein Schalungselement 34 geschaffen wird. Dieses ist ferner jeweils über geeignete Befestigungs- und Justiereinrichtungen 52 an den jeweiligen Trägern 16 der Bühnenelemente angeschlossen. Somit ist, wie sich aus Fig. 8 ergibt, das erfindungsgemäße Bühnensystem 10 auch für das Einrichten und Fixieren der Schalungselemente 34 verwendbar. Zusätzlich können, wie im oberen Bereich der Fig. 8 erkennbar ist, die Betonierarbeiten von dem erfindungsgemäßen Bühnensystem 10 aus durchgeführt werden, ohne dass dieses versetzt oder durch ein anderes Bühnensystem oder Gerüst ersetzt werden muss. Die frei auskragende Ausbildung der Bühnenbeläge 22 bietet in diesem Zusammenhang den Vorteil, dass die Betonierarbeiten nicht durch Träger oder Stützen gestört werden. Dieser Vorteil wird insbesondere gegenüber den herkömmlichen Fassadengerüsten realisiert, die das erfindungsgemäße Bühnensystem ersetzen kann. Der Vollständigkeit halber sei erwähnt, dass in ähnlicher Weise, wie in Fig. 8 dargestellt ist, auch die Betonierung von Decken möglich ist, indem im Inneren des Bauwerks anstelle der in Fig. 7 und 8 gezeigten Innenschalung 48 ein Deckenschalungssystem aufgestellt wird, auf das nachfolgend ebenfalls von dem in Fig. 8 obersten Bühnenbelag aus betoniert wird. Des weiteren wird das beim Betonieren auf der Decke befindliche Personal durch den obersten Bühnenbelag vor einem Absturz geschützt. From Fig. 8, the advantageous usability of new stage system 10 also for the after reinforcement required work. For one thing, as for the two lower stage covers can be seen, the respective front Area 42 advantageously so partially folded back that space for a formwork element 34th is created. This is also each suitable Attachment and adjustment devices 52 to the respective Carriers 16 of the stage elements connected. Thus, how As is apparent from Fig. 8, the stage system 10 according to the invention also for setting up and fixing the formwork elements 34th usable. In addition, as in the upper part of the Fig. 8 can be seen, the concreting of the Stage system 10 according to the invention can be carried out, without this being offset or by another stage system or scaffolding must be replaced. The cantilevered Training the stage covers 22 provides in this context the advantage that the concreting work is not by carriers or supports are disturbed. This advantage is particular realized compared to the conventional facade scaffolding, the can replace the stage system of the invention. Of the For the sake of completeness it should be mentioned that in a similar way, as shown in Fig. 8, the concreting of Ceilings are possible by placing inside the building instead the inner formwork 48 shown in Fig. 7 and 8 a Slab formwork system is placed on the following also from the top stage covering in FIG. 8 is concreted. Furthermore, this is when concreting on the Ceiling personnel through the top stage cover protected from falling.

In Fig. 9 ist schließlich dargestellt, wie das erfindungsgemäße Bühnensystem 10 in vorteilhafter Weise mit einem Kletterschalungssystem kombiniert werden kann, das eine Konsole 32 aufweist, auf welche das Bühnenschalungssystem 10 mit seinem untersten Träger 16 montierbar ist. Hierzu wird das Bühnensystem 10 üblicherweise im weitgehend zusammengebauten Zustand auf die mittels der Klettervorrichtungen außen an dem Bauwerk angebrachten Konsolen 32 gehoben. Nachfolgend ist das Bühnensystem 10 als Teil des Kletterschalungssystems wiederum für sämtliche der erforderlichen Arbeiten einsetzbar. Zunächst kann in der der Fig. 7 entsprechenden Situation von den vollständig ausgeklappten Bühnenbelägen 22 aus das Bewehren durchgeführt werden. Wie in Fig. 9 zu erkennen ist, können nachfolgend bei teilweise zurückgeklappten Bühnenbelägen 22 die Schalungselemente 34 der Außenschalung eingebracht und an den Trägern 16 des Bühnensystems 10 fixiert werden. Schließlich kann insbesondere von dem obersten Bühnenbelag 10 aus das Betonieren durchgeführt werden. Wenn die Außenschalung zu irgendeinem Zeitpunkt entfernt werden muss, so bietet es sich wiederum an, die Bühnenbeläge 22 zumindest teilweise zurückzuklappen, so dass genügend Raum für die Handhabung der Schalungselemente 34 zur Verfügung steht. Es sei noch erwähnt, dass das vollständige Gerüst, das durch das erfindungsgemäße Bühnensystem 10 gebildet wird, zusammen mit den daran angebrachten Schalungselementen 34, der Konsole 32 und der unterhalb angebrachten Hängebühne 54 mittels eines Krans umgesetzt werden kann, wenn dieser anstelle eines Klettersystems Verwendung findet.In Fig. 9 is finally shown how the inventive stage system 10 in an advantageous manner a climbing formwork system can be combined, the one Console 32, to which the stage formwork system 10th with its lowest support 16 is mountable. For this purpose is the stage system 10 usually largely assembled state on the means of Climbing equipment attached to the exterior of the building Consoles 32 lifted. Hereinafter, the stage system 10 is as Part of the climbing formwork system again for all of can be used for required work. First, in the Fig. 7 corresponding situation of the complete unfolded stage coverings 22 performed from the reinforcement become. As can be seen in Fig. 9, below can at partially folded back stage coverings 22 the Formwork elements 34 of the outer formwork introduced and to the Supports 16 of the stage system 10 are fixed. After all can in particular from the top stage covering 10 of the Concreting be performed. If the outside formwork too it must be removed at any time in turn, the stage coverings 22 at least partially fold back, leaving enough room for handling the Shuttering elements 34 is available. It is still mentions that the complete scaffolding created by the Stage system 10 according to the invention is formed, together with the attached formwork elements 34, the console 32nd and below suspended suspended platform 54 by means of a Cranes can be implemented if this instead of a Klettersystems is used.

Ferner kann der Bühnenbelag 22 jeweils einen integrierten Durchstieg aufweisen, so dass sich in einem Gerüst, das durch zahlreiche neben- und übereinander angeordnete Bühnenelemente 12 oder 14 gebildet wird, durch Kombination mit entsprechenden Leiterelementen ein vollständiger Durchstieg gewährleisten lässt. Furthermore, the stage cover 22 each have an integrated Have got through, so in a scaffold that through numerous side and superimposed stage elements 12 or 14 is formed by combination with corresponding ladder elements a complete passage ensure.

In Fig. 10 ist in einer Seitenansicht eine alternative Ausführungsform des erfindungsgemäßen Bühnensystems 10 gezeigt. Diese Ausführungsform stimmt mit der Ausführungsform der Fig. 4 bis 6 insofern überein, als das einzelne Bühnenelement 12 einen Träger 16 aufweist, an dem ein frei auskragender Bühnenbelag 22 klappbar angebracht ist. Die Ausführungsform gemäß Fig. 10 unterscheidet sich jedoch von derjenigen gemäß Fig. 4 bis 6 dadurch, dass der Bühnenbelag 22 im Bereich des oberen Endes des einzelnen Trägers 16 des Bühnenelementes 12 angebracht ist. Hierdurch ergibt sich der Vorteil, dass die massiv ausgebildeten Träger 16 des obersten Bühnenelementes (vgl. Fig. 6), die an sich aus statischen Gründen nicht mehr erforderlich sind, eingespart werden können. Wie aus Fig. 10 hervorgeht, endet das oberste Bühnenelement 12 im Bereich der Anbringstelle des obersten Bühnenbelags 22, und oberhalb des Niveaus erstreckt sich im Gegensatz zu der Ausführungsform von Fig. 6 kein Träger 16 mehr. Um den Sicherheitsanforderungen genüge zu tun, ist in das obere Ende der beiden parallel zueinander angeordneten obersten Träger 16 lediglich ein vergleichsweise leichtes Steckgeländer 24 als Schutzeinrichtung eingesteckt.In Fig. 10 is an alternative in a side view Embodiment of the stage system 10 according to the invention shown. This embodiment is consistent with the embodiment Figs. 4 to 6 insofar as the single Stage element 12 has a carrier 16, on which a free cantilevered stage cover 22 is attached hinged. The Embodiment of FIG. 10, however, differs from that of FIG. 4 to 6 in that the stage covering 22 in the region of the upper end of the individual carrier 16 of the Stage element 12 is attached. This results in the Advantage that the solid support 16 of the uppermost Stage element (see Fig. 6), which in itself from static Reasons are no longer necessary to be saved can. As is apparent from Fig. 10, the uppermost ends Stage element 12 in the region of the attachment point of the uppermost Decking 22, and above the level extends in Contrary to the embodiment of FIG. 6, no carrier 16 more. To meet the safety requirements, is in the upper end of the two arranged parallel to each other top carrier 16 only a comparatively light Plug rail 24 inserted as a protective device.

Wie aus dem unteren Bereich der Fig. 10 hervorgeht, erstreckt sich bei dieser Ausführungsform des erfindungsgemäßen Bühnensystems 10 die jeweilige Schutzeinrichtung 24, also das Geländer, des einzelnen Bühnenelementes 14 von dem unteren Ende der Träger 16 bis zu der erforderlichen Höhe. Der Bühnenbelag für das unterste Niveau (abgesehen von den darunter angeordneten Hängebühnen 54) wird durch den Bühnenbelag der Konsole 32 gebildet, in dem der mit Strichlinien angedeutete Durchstieg ausgebildet ist. Hinsichtlich der Befestigung der Träger 16 sei noch angemerkt, dass diese, wie dies auch aus der Figur erkennbar ist, bei dem gezeigten Fall an der Konsole 32 bzw. bei anderen Anwendungsfällen an einem geeigneten Bodenträger ergänzend durch Stützstreben 56 abgestützt sind. Hierdurch können die einzelnen Träger 16 etwas leichter dimensioniert werden, was deren Wirtschaftlichkeit erhöht.As is apparent from the lower portion of Fig. 10 extends in this embodiment of the invention Stage system 10, the respective protection device 24, so the Railing, the single stage element 14 from the lower End of the carrier 16 up to the required height. Of the Stage covering for the lowest level (apart from the underneath suspended platforms 54) is replaced by the Stage covering the console 32 formed in which the with Dashed lines indicated traverse is formed. With regard to the attachment of the carrier 16 is still noted that these, as can be seen from the figure is, in the case shown on the console 32 and at other applications on a suitable floor support supplementally supported by support struts 56. hereby the individual carriers 16 can be dimensioned somewhat lighter which increases their profitability.

Ein weiterer Unterschied zwischen der Ausführungsform gemäß Fig. 10 und der in den Fig. 4 bis 6 gezeigten Ausführungsform liegt darin, dass der Bühnenbelag 22 insgesamt nach unten abklappbar ist. Wie sich aus den Fig. 2 und 5 ergibt, ist bei den bisher beschriebenen Ausführungsformen ein Nach-oben-Klappen vorgesehen. Da sich der Bühnenbelag 22 bei der Ausführungsform gemäß Fig. 10 im Bereich des oberen Trägerendes des einzelnen Trägers 16 befindet, ist ein Abklappen nach unten vorteilhaft, da hierdurch die Dimensionen des einzelnen vorgefertigten und zusammengeklappten Bühnenelementes 12 in zweckmäßigen Grenzen gehalten werden können. Im einzelnen wird der Bühnenbelag 22 zum Transportieren und Lagern derart nach unten geklappt, dass er auf der Schutzeinrichtung 24 aufliegt. In Übereinstimmung mit den vorangehend beschriebenen Ausführungsformen ist der vorderste Abschnitt 42 des einzelnen Bühnenbelages 22 auch bei der Ausführungsform von Fig. 10 nach oben klappbar.Another difference between the embodiment according to Fig. 10 and the embodiment shown in Figs. 4 to 6 is that the stage covering 22 total down can be folded down. As is apparent from Figs. 2 and 5, is at the embodiments described so far an up-flaps intended. Since the stage cover 22 at the Embodiment of FIG. 10 in the region of the upper Carrier end of the individual carrier 16 is a Fold down advantageous because this way the Dimensions of the individual prefabricated and folded stage element 12 within reasonable limits can be kept. In detail, the stage cover 22 for transporting and storing down in such a way, that it rests on the protective device 24. In Consistent with those described above Embodiments is the foremost portion 42 of FIG single stage covering 22 also in the embodiment of Fig. 10 can be folded upwards.

Im Hinblick auf die Konsole 32 sei noch erwähnt, dass der Bereich an der Gebäuderückseite zwischen den Stützstreben 56 in vorteilhafter Weise dazu genutzt werden kann, Material abzulegen und zu dem Bühnenbelag von der Gebäuderückseite her zuzuführen. Zu diesem Zweck kann beispielsweise an den am weitesten von dem Gebäude entfernten Rand der Konsole 32 sowie sich zu dem Gebäude im Bereich der jeweiligen Stützstreben 56 erstreckend ein Geländer vorgesehen sein, und das in der Fig. 10 gezeigte Geländer 24 an dem untersten Bühnenelement 12 entfallen. In ähnlicher Weise ist es selbstverständlich auch an allen weiteren Bühnenelementen 12 des gezeigten Bühnensystems möglich, an der Gebäuderückseite eigene Konsolen zum Ablegen und Zuführen von Material anzubringen, was jedoch in den Figuren nicht dargestellt ist. With regard to the console 32 should be mentioned that the Area at the back of the building between the support struts 56 can be used advantageously to material to take off and to the stage covering from the back of the building ago supply. For this purpose, for example, to the am farthest edge of the console 32 away from the building as well as to the building in the area of the respective Support struts 56 may be provided extending a railing, and the railing 24 shown in Fig. 10 at the lowest Stage element 12 omitted. In a similar way it is of course also on all other stage elements 12th of the shown stage system possible, at the back of the building own consoles for storing and feeding material to attach, which is not shown in the figures.

Schließlich sei erwähnt, dass auch die an der Unterseite der Konsole 32 angebrachten Hängebühnen 54 aus vorgefertigten und leicht montierbaren Bühnenelementen bestehen, deren Bühnenbelag ebenfalls jeweils klappbar angebracht ist. Schließlich können im Bereich der Hängebühnen in vorteilhafter Weise Überbrückungsträger, beispielsweise zur Überbrückung von Gebäudeöffnungen, eingesetzt werden, wie sie für herkömmliche Faltbühnen bekannt sind.Finally, it should also be mentioned that at the bottom of the Console 32 mounted suspended platforms 54 from prefabricated and easily assembled stage elements, whose Stage cover is also hinged. Finally, in the area of suspended platforms in Advantageously bridging support, for example for Bridging building openings, used as they are are known for conventional folding stages.

Claims (10)

  1. Stage system (10) comprising a plurality of stage elements (12) of the same kind connectable to one another each having at least one support (16) which can be set up at a space from a building and at least one stage surface (22) of folding construction freely projecting in the installed state in the direction of the building, wherein the stage surfaces (22) of the stage system (10) are foldable independently of one another, characterised in that the plurality of stage elements (12) is arranged one over the other.
  2. Stage system (10) comprising at least one support (20) and a plurality of stage elements (14) of the same kind arranged one over the other, characterised in that the stage elements (14) each have at least one supporting element (18) by means of which the stage element (14) is fastenable to the support (20) set up at a space from a building and at least one stage surface (22) of folding construction freely projecting in the installed state in the direction of the building, wherein the stage surfaces (22) of the stage system (10) are foldable independently of one another.
  3. Stage system (10) according to claim 1 or 2, characterised in that each stage surface (22) foldable as a whole is attached to the support (16) or the supporting element (18).
  4. Stage system (10) according to at least one of the preceding claims, characterised in that each stage surface (22) is of multiply folding construction.
  5. Stage system (10) according to at least one of the preceding claims, characterised in that each stage element (12, 14) has a preferably removable protective device (24) arranged in the installed state on the rear side of the building.
  6. Stage system (10) according to at least one of the preceding claims, characterised in that each stage surface (22) and/or each protective device (24) possesses at least one telescopic balancing element.
  7. Stage system (10) according to at least one of the preceding claims, characterised in that the support (16, 20) is designed at the lower end thereof in such a way that the stage system can be set up on a level piece of ground (30).
  8. Stage system (10) according to at least one of the preceding claims, characterised in that the support (16, 20) is designed at the lower end thereof in such a way that the stage system is mountable on a pedestal (32).
  9. Stage system (10) according to at least one of the preceding claims, characterised in that the latter is anchorable on a built structure.
  10. Stage system (10) according to at least one of the preceding claims, characterised in that a shuttering element (34) is fixable thereon.
EP00113056A 1999-07-21 2000-06-23 Platform system Expired - Lifetime EP1070806B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19934273A DE19934273C2 (en) 1999-07-21 1999-07-21 scaffolding system
DE19934273 1999-07-21

Publications (2)

Publication Number Publication Date
EP1070806A1 EP1070806A1 (en) 2001-01-24
EP1070806B1 true EP1070806B1 (en) 2005-08-31

Family

ID=7915593

Family Applications (1)

Application Number Title Priority Date Filing Date
EP00113056A Expired - Lifetime EP1070806B1 (en) 1999-07-21 2000-06-23 Platform system

Country Status (3)

Country Link
EP (1) EP1070806B1 (en)
AT (1) ATE303487T1 (en)
DE (2) DE19934273C2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007026020A1 (en) * 2007-06-04 2008-12-11 Doka Industrie Gmbh Self-climbing system and method for concreting a beam and / or assembling a finished part by means of a self-climbing system
DE102021120438A1 (en) 2021-08-05 2023-02-09 Peri Se System for shuttering a wall element with a free-standing scaffold section

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1206574A (en) * 1916-01-17 1916-11-28 Ferdinand Miller Tree-scaffold.
US2398604A (en) * 1945-05-25 1946-04-16 Thorne William Earl Collapsible scaffold
CA1270285A (en) * 1984-09-20 1990-06-12 John Clement Preston Method and apparatus for scaffolding
GB2180583B (en) * 1985-09-14 1989-08-23 Robert William Perry An improved collapsible scaffolding
WO1990014479A1 (en) * 1989-05-19 1990-11-29 Gkn Australia Limited Scaffolding
DE8909026U1 (en) * 1989-07-25 1989-09-14 Oesterreichische Doka Schalungs- Und Geruestungstechnik Ges.M.B.H., Amstetten, At
DE19718650A1 (en) * 1997-05-02 1998-11-05 Baumann Verwertungs Gmbh Scaffolding bracket

Also Published As

Publication number Publication date
ATE303487T1 (en) 2005-09-15
EP1070806A1 (en) 2001-01-24
DE19934273A1 (en) 2001-02-15
DE19934273C2 (en) 2003-11-27
DE50011055D1 (en) 2005-10-06

Similar Documents

Publication Publication Date Title
EP2411598B1 (en) Scaffold and methods for installing or removing such a scaffold
DE2658583A1 (en) STRUT FOR RAILING OF A WORKING PLANE OF A SCAFFOLDING
DE202022105308U1 (en) Device for preventing people from falling
DE102007021159B4 (en) Rostdeckenschalung for the integration of a column
EP2798133B1 (en) Panel for a system ceiling formwork, and a system ceiling formwork
EP2035314B1 (en) Lifting platform and method for setting up a lifting platform
DE3108020A1 (en) "PROTECTIVE DEVICE FOR METAL FRAME"
EP2557252B1 (en) Work platform and method for securely setting up a support frame tower
EP1070806B1 (en) Platform system
DE102013006380A1 (en) Decking for scaffolding
DE3341031A1 (en) Framework bracket for producing a bracket framework which can be adjusted in height and width and is fastened onto the rafters, purlins, cross members etc. forming part of a roof construction
WO2022106485A1 (en) Climbing rail
DE3401906A1 (en) Apparatus for the suspended fastening of a scaffold element
EP0625619B1 (en) Scaffolding platform
DE10325728B4 (en) Arrangement of protective nets on buildings
DE10121957A1 (en) Safety net temporary support frame for use during erection and dismantling of building scaffolding
DE19636550C2 (en) Stage covering for console stages or bridging platforms as well as method for assembling a console stage
DE3502659A1 (en) Scaffolding
EP3839172B1 (en) Railing post for a front railing, front railing for temporarily preventing falls from a new scaffolding level, scaffold for building, repair and/or assembly work and method for constructing a scaffold
DE802280C (en) Scaffolding
DE102021122288A1 (en) Scaffolding standard for vertical installation in a scaffolding section
CH444453A (en) Console frame
DE3003682A1 (en) Concrete ceiling formwork with connectable beam flanges - which support holder plates, facilitating mechanical dismantling
DE102010006561A1 (en) railing element
DE102022114668A1 (en) Reinforcement device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT CH DE FR GB LI

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20010330

AKX Designation fees paid

Free format text: AT CH DE FR GB LI

17Q First examination report despatched

Effective date: 20040706

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RTI1 Title (correction)

Free format text: PLATFORM SYSTEM

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT CH DE FR GB LI

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

Ref country code: CH

Ref legal event code: EP

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20050831

REF Corresponds to:

Ref document number: 50011055

Country of ref document: DE

Date of ref document: 20051006

Kind code of ref document: P

ET Fr: translation filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060630

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060630

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20060601

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20080613

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20080617

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20080624

Year of fee payment: 9

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20090623

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20100226

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090623

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090623

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20110624

Year of fee payment: 12

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 50011055

Country of ref document: DE

Effective date: 20130101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130101