EP1017552B1 - Building panel and method and apparatus of forming same - Google Patents

Building panel and method and apparatus of forming same Download PDF

Info

Publication number
EP1017552B1
EP1017552B1 EP98939987A EP98939987A EP1017552B1 EP 1017552 B1 EP1017552 B1 EP 1017552B1 EP 98939987 A EP98939987 A EP 98939987A EP 98939987 A EP98939987 A EP 98939987A EP 1017552 B1 EP1017552 B1 EP 1017552B1
Authority
EP
European Patent Office
Prior art keywords
baffles
filling
panels
core material
supporting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP98939987A
Other languages
German (de)
French (fr)
Other versions
EP1017552A1 (en
EP1017552A4 (en
Inventor
Paul Russell Moses
Robert Lawrence Munn
Robert Story
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Boral Resources NSW Pty Ltd
Original Assignee
Boral Resources NSW Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AUPO8864A external-priority patent/AUPO886497A0/en
Priority claimed from AUPP3181A external-priority patent/AUPP318198A0/en
Application filed by Boral Resources NSW Pty Ltd filed Critical Boral Resources NSW Pty Ltd
Publication of EP1017552A1 publication Critical patent/EP1017552A1/en
Publication of EP1017552A4 publication Critical patent/EP1017552A4/en
Application granted granted Critical
Publication of EP1017552B1 publication Critical patent/EP1017552B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • B28B1/16Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted for producing layered articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/008Producing shaped prefabricated articles from the material made from two or more materials having different characteristics or properties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/30Producing shaped prefabricated articles from the material by applying the material on to a core or other moulding surface to form a layer thereon
    • B28B1/32Producing shaped prefabricated articles from the material by applying the material on to a core or other moulding surface to form a layer thereon by projecting, e.g. spraying
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/24Unitary mould structures with a plurality of moulding spaces, e.g. moulds divided into multiple moulding spaces by integratable partitions, mould part structures providing a number of moulding spaces in mutual co-operation
    • B28B7/241Detachable assemblies of mould parts providing only in mutual co-operation a number of complete moulding spaces
    • B28B7/243Detachable assemblies of mould parts providing only in mutual co-operation a number of complete moulding spaces for making plates, panels or similar sheet- or disc-shaped objects
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres

Definitions

  • the following invention relates to a method and apparatus for forming a building panel.
  • the invention also relates to a building panel.
  • Lightweight concrete building panels are known. Such panels are produced in a raw, unfinished condition for installation. After being installed into a building under construction, the panels are rendered or otherwise coated to provide an acceptable surface finish. This process requires the labour of a skilled renderer in applying the rendered finish with a trowel Furthermore, the strength of such known lightweight concrete panels is not high.
  • This apparatus comprises two horizontal mould sections and means for moving the two mould sections together to form a mould cavity.
  • a flowable settable material is laid onto a surface of each mould section and partially set.
  • the mould sections are then brought together and further flowable material is introduced between the first layers of flowable material
  • the sheet material is formed once all the flowable material has fully set.
  • mould sections or baffles horizontally requires a significant amount of area, and thus limits the number of panels producible at any one time
  • re-orientating the mould sections or baffles produces difficulties concerning mould section or baffle construction as well as reliable pre-coating of the mould section or baffle.
  • a method of forming a building panel or panels comprising the steps of:-
  • the baffles can be moved together after filling the space with core material but prior to setting of the core material and coating material.
  • the baffles are moved apart and/or separately removed after setting ofthe core material and coating material so as to release the formed panel(s).
  • the method further provides n+1 baffles in a parallel spaced interrelationship, between which n panels are formed where n equals any integer greater than or equal to 1.
  • the panels are removed in a direction substantially parallel to the plane of the baffles by application of force thereto.
  • the baffles are located within a mould box or supporting frame.
  • the baffles are moved toward one another by means of hydraulic clamping cylinders.
  • an apparatus to form a building panel or panels between baffles including:
  • each baffle is substantially hollow, having a pair of spaced apart side sheets.
  • each baffle has air inlet means by which air can be injected to the space between the sheets so as to outwardly expand the same under pressure to assist in releasing the set panels from the baffles.
  • each baffle is solid.
  • Plywood is a suitable material for a solid baffle.
  • the plywood can be plastics coated.
  • the baffles can be a composite of plywood, nylon, PVC and steel.
  • the baffles have extraction engagement holes to which an extraction device can be anchored for the purpose of applying force to the set panels for removal.
  • the supporting frame is formed upon a mobile structure.
  • the mobile structure has one or more posts to which clamping cylinders are affixed, said clamping cylinders being associated with side walls of the supporting frame.
  • the side walls of the supporting frame act as end baffles.
  • the means for substantially filling the space between the two baffles with a settable core material includes a hopper from which there extends one or more filling tubes, the hopper being mounted upon a frame and being pivotable about a horizontal axis, the hopper being adapted to be raised and lowered such that the filling tubes enter and are withdrawn from a space between adjacent baffles while core material is being delivered thereto by said filling tubes.
  • means are provided to oscillate the hopper horizontally, during vertical withdrawal of the tubes and delivery of the core material.
  • cleaning means are located along said path and operable to clean said baffles as said baffles pass through said cleaning means.
  • a mould box or supporting frame 10 has a pair of side walls 11, a bottom 12 and a pair of solid end doors 13. Walls 11, bottom 12 and end doors 13 define a cavity into which a number of baffles 14 can be inserted.
  • the sides 11, bottom 12 and end doors 13 are preferably fabricated from solid steel or other metal or strong material.
  • the end doors 13 are hinged at the bottom edge thereof to the bottom 12.
  • the doors open outwardly and downwardly as shown in Fig. 1.
  • the baffles 14 fit neatly into the mould box or supporting frame 10 and divide the mould cavity into sections, i.e., individual cavities between respective baffles into which building panels are cast.
  • the internal length of the mould box or supporting frame determines the panel length which is typically 2.6m.
  • the internal height of the mould box or supporting frame determines the panel width which is typically 0.6m.
  • the spacing between the inserted baffles is set by means of spacers 22 which are typically 75mm wide. That is, the space between the baffles is typically 75mm. It should be appreciated however that these dimensions can vary depending on the required panel dimensions.
  • the mould box or supporting frame is situated upon a mobile base 20 has wheels 23.
  • a pair of posts 19 extends upwardly from the mobile base 20.
  • Clamping cylinder 18 cooperates with one of the side walls 11 as shown in Fig. 5.
  • the opposing side wall 11 is affixed to the base 20.
  • a lifting frame 15 as shown in Fig. 2 has a pair of hooks 21 at its lower extremities. These hooks 21 are adapted to cooperate with individual baffles 14 for the purpose of lifting the same out of the mould box or supporting frame.
  • the lifting frame 15 can be raised and lowered by means of an overhead pulley system or crane for example.
  • each baffle 14 has a pair of spaced apart sheets 24 defining a space 25 therebetween.
  • Sheets 24 are preferably steel or other metal such as aluminium.
  • the sheets are intended to be substantially planar, though capable of flexing under the application of internal air pressure to the cavity 25.
  • Each baffle 14 has an extraction engagement hole 16, the purpose of which shall be described below.
  • building panels can be fabricated as follows.
  • the lifting frame 15 can be raised so as to raise an individual baffle 14 from the mould box or supporting frame 10.
  • the baffle 14 can then have applied thereto a coating.
  • the coating as applied to the surfaces of the baffles 14 is typically 3mm thick. However, this dimension can vary depending on particular applications.
  • the coating is applied by a spraying technique, typically using apparatus of a type, though smaller than, spray guns used for concrete pool finishing and in the mining industry and sold under the trade mark "Shot-crete".
  • the coating material typically has a blend of sand, cement, water and a cross-linking polymer emulsion.
  • the coating material can also include supplementary cementitious materials.
  • the cross-linking polymer emulsion is sourced from National Starch and Chemicals Pty Ltd. However, there are many other polymers available and suitable for use in the present process.
  • the emulsion is typically used as a concrete additive for repair and patching of concrete.
  • the emulsion is used as a partial replacement for water to give flexibility and added tensile strength to the coating applied to the opposed planar surfaces of the baffles 14.
  • the cross linking polymer emulsion is used as a partial replacement for water to give flexibility and added tensile strength to the spray mortar skin.
  • Optional additives to the coating material include fibres, typically polypropylene fibres as used in concrete crack control, coloured oxides, silica fume and flyash. The coating material can be modified to suit any local materials or finished panel requirements.
  • the coating material in general should display good adhesion to the core material, good tensile strength, flexibility, water resistance and provide a durable surface to the finished panel.
  • the baffle 14 With the end doors 13 in the closed position, the baffle 14 is inserted into the mould box or supporting frame 10.
  • the baffles can be placed first, then the doors closed to assist in aligning the baffles into precise position.
  • lifting rods are also inserted into the end doors for the purpose of assisting with removal of the panels after hardening.
  • the spacers 22 are then positioned alongside the baffle. The coating and inserting steps are repeated for the desired number of baffles.
  • the clamping cylinders 18 are then activated to force one of the side walls 11 toward the other until such time as the spaces between the respective baffles is limited by their engagement with the respective spacers 22.
  • the core mix Whilst the sprayed coating is still fresh, the core mix is added to the cavities between the baffles.
  • the mixture used for the core material typically has sand, cement, water, an air entraining agent and a lightweight aggregate, typically coated polystyrene beads, possibly of the type known as BST.
  • the core material can also contain supplementary cementitious materials and/or chemical admixtures.
  • the air entraining agent can be a commercially available admixture.
  • the BST material has expanded polystyrene, chemically coated beads.
  • the wall panels Whilst maintained in position, the wall panels are allowed to cure, typically over an 18 hour period.
  • the coating material thus fuses with the core material to provide a strong integral wall panel.
  • the clamping cylinders 18 are released so as to remove lateral pressure from the walls 11 and baffles 14.
  • air can be applied under pressure to the space 26 between the respective opposed sheets 24 of the baffles 14. As a result the sheets 24 will flex outwardly, detaching the panels 17 therefrom.
  • a hand held pneumatic cylinder has a pair of hooks is then used to push the individual panels 14 out of the mould box or supporting frame. To this end, the hooks on the pneumatic cylinder can be engaged with the extraction engagement holes 16 at the ends of each baffle 14.
  • a pushing element or foot of the cylinder is then engaged with the end surface of the panel 17 to push the same out through the opposed opened door region of the mould box or supporting frame. That is, the reaction force associated with this pushing action is transferred to the baffles 14 by interengagement of the hand held tool with the baffles 14.
  • the extraction cylinder is held like a rifle by an operator. With both doors 13 open, and upon activation of a trigger, the pushing foot pushes the concrete panel out through one of the open doors 13 to be received by a pallet for dispatch.
  • the baffles 14 might have an internal frame structure to prevent the opposed sheets 24 from closing towards one another during the application of force by clamping cylinders 18.
  • the extraction engagement hole 16 might also serve as a means of applying the required internal pressure to the baffle cavity 25 to release the formed panels 17.
  • the extraction cylinder might have two triggers or a two-pull trigger action, one activation of the trigger, or one of the triggers, serving to activate engagement hooks, and the other acting to activate the pushing foot to extract the formed panel.
  • the pushing foot pushes the formed panels through a distance of about 300mm for the purpose of allowing access for manual lifting to the pallet.
  • steel or other reinforcing mesh or other reinforcing means can be positioned between the baffles to be surrounded by the core material.
  • a further feature can be the fitting of a profiler which can trim the edge of the panel as cast and provide a detail such as a tongue and groove to the edge.
  • FIGs. 7 to 13 of the accompanying drawings there is schematically depicted the plant layout and other detail associated with a modified method and apparatus for forming building panels.
  • Figs. 11A, 12B, 13A and 13B show further modified apparatus.
  • This plant layout is designed for higher production throughput than is the case as discussed above with reference to Figs. 1 to 6A.
  • the overall method is similar to that described above with reference to Figs. 1 to 6A.
  • the baffles no longer include a pair of spaced metal sheets, but instead are formed as a single sheet of material or laminated solid layers of material. Typically, a single sheet of plastics coated plywood forms each baffle 14.
  • the plant layout of Figs. 7 and 8 can be described as follows. The individual baffles are placed in a mould box or supporting frame 70 and carried by a fork lift to a chain drive conveyor 71. The individual baffles are then picked up by a baffle unloading hoist 72 and conveyed in the direction indicated by arrow A along a suspended pipe conveyor 73.
  • the pipe conveyor conveys individual baffles to a cleaning and oiling station 74 where the baffles are cleaned and coated with oil which acts as a mould release agent.
  • the individual baffles are then conveyed to spraying station 75 where the individual baffles are coated on both sides with a coating material.
  • the panels are then conveyed by the pipe conveyor to the core filling station 76.
  • the empty mould box or supporting frame 70 is conveyed by a chain drive or other conveyor apparatus to a rotation station 77 where the mould box or supporting frame 70 is rotated through 180° and then further conveyed by the conveyor belt or chain drive conveyor the core filling station 76.
  • the mould box or supporting frame receives the cleaned, oiled and coated baffles for core filling.
  • a core filling apparatus receives the filler material from a mixer 79.
  • FIG. 7A there is schematically depicted in plan view a modified plant layout.
  • Fig. 7A shows the baffle preparation station 400, the spray station 75, the mould assembly station 410, the mould filling station 78, a demoulding and mould disassembly station 420 and an edge detailing and palletising station 430.
  • the baffles 14 are suspended from a monorail 73 that is used to transport the individual baffles through the process stations 400, 75 and 410. Individual baffles are cleaned, oiled and generally prepared such that they can receive the settable coating material and can be separated from the moulded panel after it has cured.
  • Demoulding and mould disassembly which occurs at station 420 takes place as follows. Once the panels are sufficiently cured and hardened, the still full moulds are disassembled to remove the panels. The baffles and panels are progressively stripped from the mould frame. The device and operators first take off the outermost baffle and replace it on the monorail as at the beginning of the process. The device and operators then separate the outermost panel from the mould frame and deliver it to the edge detailing and palletising station (Fig. 14 and Fig. 14A). The process is repeated until all of the full mould has been disassembled and the formed panels removed and delivered to the detailing station.
  • the edge detailing and palletising station is shown in Figs. 14 and 14A.
  • the formed panels are delivered to the edge detailing and palletising station to be completed.
  • the edge detailing station uses a grinding wheel to create a groove 500 in one long edge of the panel to match the tongue 510 that is formed in the opposite long edge of the panel during the casting process.
  • the panels are indicated by reference 520 in Fig. 14 and Fig. 14A.
  • the finished panels have a surface finish thereon determined by the surface texture of the baffles.
  • the settable core material melds to some degree with the skin material and provides a hard wearing and durable surface in the finished panel which does not require subsequent rendering or in situ cosmetic treatment.
  • FIG. 10A there is schematically depicted an individual baffle 100 which includes a plywood panel 105 surrounded by a steel frame 101. At the upper part of the steel frame 101, there extends a pair of projections 102 which are engaged by hooks suspended from the pipe conveyor. At the bottom of each baffle 100 there projects a pair of mould box or supporting frame alignment lugs 104 which serve to engage with a locating track 135 in the bottom of the mould box or supporting frame, which locating track includes recesses 136 which are spaced by a set distance defining the thickness of a panel to be moulded between the baffles.
  • Fig. 11 there is shown the detail of a method of simultaneously spraying both sides of a solid baffle 14.
  • the spray assembly includes a plurality of spray guns 110 positioned at both sides of the baffle 14.
  • the baffle 14 is drawn by the pipe conveyor 73 inbetween the spray guns 110 during spraying so as to achieve a uniform coating on each side.
  • a carriage 112 is associated with the pipe conveyor 73 in somewhat the same manner as a curtain ring is associated with a curtain rod.
  • the carriage is pulled along the pipe conveyor by a cable or chain.
  • a cable 113 suspended from the carriage 112 includes hooks 103 (Fig. 10A) which engage with the projections 102 of each baffle to suspend and convey the baffle 14.
  • a coating material pump 114 which provides a head of a coating material to a coating material metering and delivering apparatus 115.
  • the metering and delivering apparatus 115 operates like a vein pump and includes a number of wheels or rollers which pass along fixed lengths of tube through which a coating material passes.
  • the rate at which a coating material is delivered to the spray nozzles 110 can be adjusted by altering the distance of travel of the rollers along the lengths of tube, by altering the length of tube, or by altering the diameter of the tubes.
  • a baffle spraying apparatus is shown associated with a different type of pumping apparatus.
  • the individual baffles 14 are sprayed on both sides with the coating material mixture.
  • the mixture is predominantly a water, sand, cement, flyash, fibre, polymer, and other concrete additive blend. It is prepared in a mixer 200.
  • the mixer 200 delivers the coating material mixture to a pump 115.
  • the pump 115 delivers the mixture via hoses 111 to the spray guns 110.
  • the mixture which is under pressure is sprayed by the guns 110 onto the baffles 14.
  • the mixture then coats the vertical surfaces of the baffles 114.
  • a baffle supporting frame 120 and associated core filling apparatus 78 The core filling apparatus 78 includes a hopper 121 which is filled with sufficient core material to fill the space between all baffles in the baffle supporting frame 120.
  • the hopper 121 is pivotally mounted at 122 to a frame 123. Extending from the hopper 121 is a pair of filling tubes 124 through which core material from the hopper can pass.
  • the hopper 121 and filling tubes 124 are adapted to be drawn vertically upwardly along a track 125 by means of a hoist.
  • the hopper can be pivoted vertically about pivot axis 121 into the vertical position depicted at the right in Fig. 12.
  • the hopper can be pivoted prior to lifting.
  • the hoist By means of the hoist, the hopper 121 can be lowered such that the tips of the fill tubes (which are now extended downwardly from the hopper) are nearby the bottom of the mould box or supporting frame between a pair of baffles.
  • Means are provided for oscillating the hopper 121 from side-to-side in the direction indicated by arrow B whilst raising the hopper 121 and nozzles 124 in the direction indicated by arrow C.
  • the means for providing the oscillation in the direction of arrow B can be camshafts, solenoids, pneumatic rams, hydraulic rams or other oscillation mechanisms.
  • the aim is to fill the space between the baffles with core material at a controlled rate. That is, the rate of delivery of the core material is adjusted such that the core is filled at the same rate as the rate at which the nozzles are vertically withdrawn from the mould box or supporting frame. This controlled rate of filling prevents the core material from shearing a coating material from the baffle surfaces during the filling process.
  • the mould box or supporting frame is shifted along so as to align the next, empty cavity with the filling tubes whereupon the filling tubes are lowered with hopper 121 and the process continued.
  • the hopper 121 and the fill tubes 124 oscillate backwards and forwards in the direction indicated by arrow B during vertical withdrawal such that the tips of each fill tube 124 follow a sinusoidal path. This method of filling also prevents the encapsulation of air pockets in the core.
  • Figs. 12A and 12B an alternative core filling station is depicted.
  • the filling station places the core mixture in the moulds, filling the space between each baffle.
  • the core mixture is predominantly a water, cement, flyash, modified and coated EPS, polymer, and other concrete additive blend.
  • the core mixture is prepared and mixed in a core mixer 210 mounted upon a frame above hopper 122.
  • the core mixture is then delivered to the hopper 112.
  • the core mixture is delivered from the hopper 122 via the nozzles 124 into the moulds.
  • the mixer 210 includes a horizontally oriented substantially cylindrical mixing tub 211 having an opening 212 through which ingredients pass for mixing in the tub 211.
  • a helical blade or blades 213 are located upon a rotating shaft 214 which is driven by an external motor 215.
  • the tub 211 is pivotally mounted upon a shaft which is common or coaxial with the shaft of the mixing blades. The tub 211 can pivot so as to allow delivery under flow of the mixed material to the hopper 122.
  • the nozzles 124 receive the core material from the hopper 122 by a device such as an auger 215 or other pumping device.
  • first and second baffles 14 alongside the side wall of the baffle supporting frame 120.
  • the upper edge of the sidewall includes a vertically projecting pin 130 which cooperates with a baffle locking pin 132.
  • the baffle locking pins 132 each include a pair of legs 131, each defining recesses 133 into which lugs 134 projecting from the ends of each baffle are received. The distance between the recesses 131 defines the spacing between the baffles 14 and thus the thickness of the panels produced.
  • the locking pin 132 at the right hand side shown in Fig. 13 cooperates with the vertically projecting pin 130 to define the position of the first baffle 14.
  • the locking pins as well as the interaction of the lugs 104 with the bottom of the baffle supporting frame 120 rigidly secure each baffle in place.
  • the locking pins 132 are positioned so as to extend into the space between each baffle and are twisted by a mechanical means through 90° to engage the recesses 133 over the respective pins 134.
  • baffles 14 are a composite involving plywood, nylon, PVC, and steel.
  • the manufacturing process involves the automation-assisted assembly, filling and de-assembly of the moulds.
  • the locking pins 132 are rotated through 90° in the opposite direction to enable release of each panel for conveying out of the mould box or supporting frame.
  • Fig. 13A there is shown apparatus alternative to that shown in Fig. 13.
  • a plurality of locking clamps 300, 302 and 303 are provided.
  • Each locking clamp has a plurality of downwardly depending lugs 304 which, in cooperation with the upper edge of each baffle defines the baffle spacing.
  • a locking handle 301 is pivotally connected to the locking clamp 300 and includes a tab 305 to engage with features provided at the upper edge of each baffle.
  • a similar tab 305 is provided at the remotely located depending lug of each locking clamp.
  • baffles of the process of Figs. 7 to 13 to that of Figs. 1 to 6A it is no longer necessary to apply air to release panels from the baffles. This is due to the fact that the baffles are solid. Also, there is no need to apply lateral force to each baffle to position the same as described with reference to Figs. 1 to 6.
  • a hand-held pneumatic cylinder is not used in the plant of Figs. 7 to 13 to remove the panels from the mould box or supporting frame. Rather, each baffle is sequentially moved sideways and lifted from the mould box or supporting frame using a lifting system as described earlier.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Laminated Bodies (AREA)
  • Forklifts And Lifting Vehicles (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Producing Shaped Articles From Materials (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Panels For Use In Building Construction (AREA)
  • Battery Mounting, Suspending (AREA)
  • Fencing (AREA)

Abstract

A building panel includes a central core and a pair of opposed coating surfaces formed integrally with the core. The method of forming the building panel includes the application of a flowable, settable coating material to respective surfaces of at least two baffles (100), placing the baffles in a substantially parallel, spaced interrelationship, at least substantially filling the space between the two baffles (100) with a settable core material prior to setting of the core material, and allowing the core material and coating material to set.

Description

The following invention relates to a method and apparatus for forming a building panel. The invention also relates to a building panel.
Lightweight concrete building panels are known. Such panels are produced in a raw, unfinished condition for installation. After being installed into a building under construction, the panels are rendered or otherwise coated to provide an acceptable surface finish. This process requires the labour of a skilled renderer in applying the rendered finish with a trowel Furthermore, the strength of such known lightweight concrete panels is not high.
It is known from US 5209968 to place two pieces ofweb material into a pan on top of each other, pour cement slurry on top of those pieces of web material, vibrate the pan to secrete the slurry into the pieces of web material; then take those saturated pieces of web material and place them on top of each other in a mould. A further core mixture is then poured into the mould and on top of the saturated web material, the mould is vibrated, two further pieces of saturated material are placed on top of the mould, and a flat plate is then added to compress the mixture before the entire mould is again vibrated.
From AU 7820375, there is also known apparatus for the production of sheet material. This apparatus comprises two horizontal mould sections and means for moving the two mould sections together to form a mould cavity. A flowable settable material is laid onto a surface of each mould section and partially set. The mould sections are then brought together and further flowable material is introduced between the first layers of flowable material The sheet material is formed once all the flowable material has fully set.
Another document, US 4191521, discloses a method of moulding a panel, in particular a prefabricated wall panel, apparatus for carrying out such method and the products thereof wherein the panels are moulded in a substantially upright orientation in moulds split along the plane of the panel thereby enabling a large number of panels to be moulded in juxtaposed relationship, and, where required, a relief pattern to be formed in each major face thereof and also, if required, a tongue to be formed along one longitudinal edge of the panel and a groove along the other.
Laying mould sections or baffles horizontally requires a significant amount of area, and thus limits the number of panels producible at any one time However, re-orientating the mould sections or baffles produces difficulties concerning mould section or baffle construction as well as reliable pre-coating of the mould section or baffle.
Furthermore, arranging the mould sections or baffles and organising the materials is time consuming.
It is an object of the present invention to overcome or substantially ameliorate at least one ofthe above disadvantages and/or more generally to provide an improved building panel and a method and apparatus for forming a building panel.
There is disclosed herein a method of forming a building panel or panels, the method comprising the steps of:-
  • (a) applying a flowable, settable coating material to respective surfaces of at least two baffles,
  • (b) placing the baffles in a substantially parallel, spaced interrelationship,
  • (c) at least substantially filling the space between the two baffles with a settable core material prior to setting of the coating material and subsequent to step b, and
  • (d) allowing the core material and coating material to set;
  •    characterised by the baffles in step (b) being placed in vertical spaced relationship.
    Alternatively, the baffles can be moved together after filling the space with core material but prior to setting of the core material and coating material.
    Preferably, the baffles are moved apart and/or separately removed after setting ofthe core material and coating material so as to release the formed panel(s).
    Preferably, the method further provides n+1 baffles in a parallel spaced interrelationship, between which n panels are formed where n equals any integer greater than or equal to 1.
    Preferably, after the baffles are moved apart, the panels are removed in a direction substantially parallel to the plane of the baffles by application of force thereto.
    Preferably, the baffles are located within a mould box or supporting frame.
    Preferably, the baffles are moved toward one another by means of hydraulic clamping cylinders.
    There is further disclosed herein an apparatus to form a building panel or panels between baffles, the apparatus including:
  • coating means operable to apply a flowable settable coating material to surfaces of said baffles as said baffles pass through said coating means ;
  • a supporting frame into which at least two coated baffles are placed;
  • said frame having means to locate said baffles vertically in a substantially parallel, spaced interrelationship to define a minimum space therebetween, and
  • filling means operable to deliver a settable core material between each of said baffles to at least substantially fill said space as said baffles pass through said filling means;
  •    characterised by a first conveyor defining a path along which the baffles travel and a second conveyor operably associated with said first conveyor and adapted to move said frame into position to receive said baffles, the coating means being located along said path, the supporting frame being positionable along said path, and the filling means being adjacent said second conveyor
    Preferably, each baffle is substantially hollow, having a pair of spaced apart side sheets.
    Preferably, each baffle has air inlet means by which air can be injected to the space between the sheets so as to outwardly expand the same under pressure to assist in releasing the set panels from the baffles.
    Alternatively, each baffle is solid. Plywood is a suitable material for a solid baffle. The plywood can be plastics coated. As a further alternative, the baffles can be a composite of plywood, nylon, PVC and steel.
    Preferably, the baffles have extraction engagement holes to which an extraction device can be anchored for the purpose of applying force to the set panels for removal.
    Preferably, the supporting frame is formed upon a mobile structure.
    Preferably, the mobile structure has one or more posts to which clamping cylinders are affixed, said clamping cylinders being associated with side walls of the supporting frame.
    Preferably, the side walls of the supporting frame act as end baffles.
    Preferably, the means for substantially filling the space between the two baffles with a settable core material includes a hopper from which there extends one or more filling tubes, the hopper being mounted upon a frame and being pivotable about a horizontal axis, the hopper being adapted to be raised and lowered such that the filling tubes enter and are withdrawn from a space between adjacent baffles while core material is being delivered thereto by said filling tubes.
    Preferably, means are provided to oscillate the hopper horizontally, during vertical withdrawal of the tubes and delivery of the core material.
    Preferably, cleaning means are located along said path and operable to clean said baffles as said baffles pass through said cleaning means.
    Preferred methods of the present invention will now be described by way of example with reference to the accompanying drawings which depict a preferred apparatus for use in the method, wherein:
  • Fig. 1 is a schematic side elevational view of a mould box or supporting frame having a baffle lifted therefrom by means of a lifting frame, the mould box or supporting frame shown with its end doors open,
  • Fig. 2 is a schematic elevational view of the lifting frame of Fig. 1,
  • Fig. 3 is a schematic elevational view of the mould box or supporting frame of Fig. 1 with the end doors closed,
  • Fig. 4 is a schematic end elevational view of the mould box or supporting frame of Fig. 1 with baffles in place therein,
  • Fig 5 is a schematic plan view of the mould box or supporting frame of Figs. 1, 3 and 4 with the baffles in place,
  • Fig. 5A is a schematic exploded illustration ofa portion of the structure depicted in Fig. 5,
  • Fig. 6 is a schematic end elevational view of the mould box or supporting frame,
  • Fig. 6A is a schematic exploded partial view of a pair of baffles having a panel formed therebetween,
  • Fig. 7 is a schematic general plant layout,
  • Fig. 7A is a schematic general plant layout of a modified plant,
  • Fig 8 is a schematic cross-sectional elevational view of the plant layout of Fig. 7 taken at A-A in Fig. 7,
  • Fig. 9 is a schematic plan view of a conveyor layout,
  • Fig. 10 is a schematic elevational view of the conveyor layout of Fig. 9,
  • Fig. 10A is a schematic elevational view of a baffle,
  • Fig. 11 is a schematic elevational view of a spray assembly and associated pumping apparatus,
  • Fig. 11A is a schematic elevational view of another spray assembly and its associated pumping apparatus,
  • Fig. 12 is a schematic elevational view of concrete core filling apparatus,
  • Fig. 12A is a schematic end elevational view of another concrete core filling apparatus,
  • Fig. 12B is a schematic front elevational view of the apparatus of Fig. 12A,
  • Fig. 13 is a schematic end elevational view of a mould release system,
  • Fig. 13A is a schematic end elevational view of another mould release system,
  • Fig. 13B is a schematic end elevational detail of part of the mould release system of Fig. 13A, and
  • Figs. 14 and 14A are schematic partial elevational views of finished panels.
  • In Figs. 1 to 6A of the accompanying drawings there is schematically depicted a mould box or supporting frame 10. Mould box 10 has a pair of side walls 11, a bottom 12 and a pair of solid end doors 13. Walls 11, bottom 12 and end doors 13 define a cavity into which a number of baffles 14 can be inserted.
    The sides 11, bottom 12 and end doors 13 are preferably fabricated from solid steel or other metal or strong material. The end doors 13 are hinged at the bottom edge thereof to the bottom 12. The doors open outwardly and downwardly as shown in Fig. 1. The baffles 14 fit neatly into the mould box or supporting frame 10 and divide the mould cavity into sections, i.e., individual cavities between respective baffles into which building panels are cast.
    The internal length of the mould box or supporting frame determines the panel length which is typically 2.6m. The internal height of the mould box or supporting frame determines the panel width which is typically 0.6m. The spacing between the inserted baffles is set by means of spacers 22 which are typically 75mm wide. That is, the space between the baffles is typically 75mm. It should be appreciated however that these dimensions can vary depending on the required panel dimensions.
    As illustrated, the mould box or supporting frame is situated upon a mobile base 20 has wheels 23. A pair of posts 19 extends upwardly from the mobile base 20. To each post 20 there is affixed an hydraulic clamping cylinder 18. Clamping cylinder 18 cooperates with one of the side walls 11 as shown in Fig. 5. The opposing side wall 11 is affixed to the base 20.
    A lifting frame 15 as shown in Fig. 2 has a pair of hooks 21 at its lower extremities. These hooks 21 are adapted to cooperate with individual baffles 14 for the purpose of lifting the same out of the mould box or supporting frame. The lifting frame 15 can be raised and lowered by means of an overhead pulley system or crane for example.
    With reference to Fig. 6A, each baffle 14 has a pair of spaced apart sheets 24 defining a space 25 therebetween. Sheets 24 are preferably steel or other metal such as aluminium. The sheets are intended to be substantially planar, though capable of flexing under the application of internal air pressure to the cavity 25. Each baffle 14 has an extraction engagement hole 16, the purpose of which shall be described below.
    In use of the apparatus as described above, building panels can be fabricated as follows.
    By use of an appropriate pulley or crane system, the lifting frame 15 can be raised so as to raise an individual baffle 14 from the mould box or supporting frame 10. The baffle 14 can then have applied thereto a coating. The coating as applied to the surfaces of the baffles 14 is typically 3mm thick. However, this dimension can vary depending on particular applications. Typically, the coating is applied by a spraying technique, typically using apparatus of a type, though smaller than, spray guns used for concrete pool finishing and in the mining industry and sold under the trade mark "Shot-crete".
    The coating material typically has a blend of sand, cement, water and a cross-linking polymer emulsion. The coating material can also include supplementary cementitious materials. Typically, the cross-linking polymer emulsion is sourced from National Starch and Chemicals Pty Ltd. However, there are many other polymers available and suitable for use in the present process. The emulsion is typically used as a concrete additive for repair and patching of concrete. The emulsion is used as a partial replacement for water to give flexibility and added tensile strength to the coating applied to the opposed planar surfaces of the baffles 14. The cross linking polymer emulsion is used as a partial replacement for water to give flexibility and added tensile strength to the spray mortar skin. Optional additives to the coating material include fibres, typically polypropylene fibres as used in concrete crack control, coloured oxides, silica fume and flyash. The coating material can be modified to suit any local materials or finished panel requirements.
    Irrespective of the emulsion used, the coating material in general should display good adhesion to the core material, good tensile strength, flexibility, water resistance and provide a durable surface to the finished panel.
    With the end doors 13 in the closed position, the baffle 14 is inserted into the mould box or supporting frame 10. Alternatively, the baffles can be placed first, then the doors closed to assist in aligning the baffles into precise position. At this stage, lifting rods are also inserted into the end doors for the purpose of assisting with removal of the panels after hardening. The spacers 22 are then positioned alongside the baffle. The coating and inserting steps are repeated for the desired number of baffles.
    The clamping cylinders 18 are then activated to force one of the side walls 11 toward the other until such time as the spaces between the respective baffles is limited by their engagement with the respective spacers 22.
    Whilst the sprayed coating is still fresh, the core mix is added to the cavities between the baffles. The mixture used for the core material typically has sand, cement, water, an air entraining agent and a lightweight aggregate, typically coated polystyrene beads, possibly of the type known as BST. The core material can also contain supplementary cementitious materials and/or chemical admixtures. The air entraining agent can be a commercially available admixture. The BST material has expanded polystyrene, chemically coated beads.
    Whilst maintained in position, the wall panels are allowed to cure, typically over an 18 hour period. The coating material thus fuses with the core material to provide a strong integral wall panel.
    After curing, the clamping cylinders 18 are released so as to remove lateral pressure from the walls 11 and baffles 14. To assist in detaching the set panels from the baffles, air can be applied under pressure to the space 26 between the respective opposed sheets 24 of the baffles 14. As a result the sheets 24 will flex outwardly, detaching the panels 17 therefrom.
    Upon opening of the end doors 13, access is gained to the ends of the baffles 14 and formed panels 17. A hand held pneumatic cylinder has a pair of hooks is then used to push the individual panels 14 out of the mould box or supporting frame. To this end, the hooks on the pneumatic cylinder can be engaged with the extraction engagement holes 16 at the ends of each baffle 14. A pushing element or foot of the cylinder is then engaged with the end surface of the panel 17 to push the same out through the opposed opened door region of the mould box or supporting frame. That is, the reaction force associated with this pushing action is transferred to the baffles 14 by interengagement of the hand held tool with the baffles 14. The extraction cylinder is held like a rifle by an operator. With both doors 13 open, and upon activation of a trigger, the pushing foot pushes the concrete panel out through one of the open doors 13 to be received by a pallet for dispatch.
    It should be appreciated that modifications and alterations obvious to those skilled in the art are not to be considered as beyond the scope of the present invention. For example, the baffles 14 might have an internal frame structure to prevent the opposed sheets 24 from closing towards one another during the application of force by clamping cylinders 18. Also, the extraction engagement hole 16 might also serve as a means of applying the required internal pressure to the baffle cavity 25 to release the formed panels 17.
    Furthermore, the extraction cylinder might have two triggers or a two-pull trigger action, one activation of the trigger, or one of the triggers, serving to activate engagement hooks, and the other acting to activate the pushing foot to extract the formed panel.
    Typically, the pushing foot pushes the formed panels through a distance of about 300mm for the purpose of allowing access for manual lifting to the pallet.
    As an additional feature, steel or other reinforcing mesh or other reinforcing means can be positioned between the baffles to be surrounded by the core material. A further feature can be the fitting of a profiler which can trim the edge of the panel as cast and provide a detail such as a tongue and groove to the edge.
    In Figs. 7 to 13 of the accompanying drawings there is schematically depicted the plant layout and other detail associated with a modified method and apparatus for forming building panels. Figs. 11A, 12B, 13A and 13B show further modified apparatus. This plant layout is designed for higher production throughput than is the case as discussed above with reference to Figs. 1 to 6A. The overall method is similar to that described above with reference to Figs. 1 to 6A.
    In the plant of Figs. 8 to 13, the baffles no longer include a pair of spaced metal sheets, but instead are formed as a single sheet of material or laminated solid layers of material. Typically, a single sheet of plastics coated plywood forms each baffle 14. The plant layout of Figs. 7 and 8 can be described as follows. The individual baffles are placed in a mould box or supporting frame 70 and carried by a fork lift to a chain drive conveyor 71. The individual baffles are then picked up by a baffle unloading hoist 72 and conveyed in the direction indicated by arrow A along a suspended pipe conveyor 73. The pipe conveyor conveys individual baffles to a cleaning and oiling station 74 where the baffles are cleaned and coated with oil which acts as a mould release agent. The individual baffles are then conveyed to spraying station 75 where the individual baffles are coated on both sides with a coating material. The panels are then conveyed by the pipe conveyor to the core filling station 76. During the time that the baffles are conveyed by the pipe conveyor 73. The empty mould box or supporting frame 70 is conveyed by a chain drive or other conveyor apparatus to a rotation station 77 where the mould box or supporting frame 70 is rotated through 180° and then further conveyed by the conveyor belt or chain drive conveyor the core filling station 76. At the core station 76, the mould box or supporting frame receives the cleaned, oiled and coated baffles for core filling.
    A core filling apparatus receives the filler material from a mixer 79.
    In Fig. 7A, there is schematically depicted in plan view a modified plant layout. Fig. 7A shows the baffle preparation station 400, the spray station 75, the mould assembly station 410, the mould filling station 78, a demoulding and mould disassembly station 420 and an edge detailing and palletising station 430. The baffles 14 are suspended from a monorail 73 that is used to transport the individual baffles through the process stations 400, 75 and 410. Individual baffles are cleaned, oiled and generally prepared such that they can receive the settable coating material and can be separated from the moulded panel after it has cured.
    Demoulding and mould disassembly which occurs at station 420 takes place as follows. Once the panels are sufficiently cured and hardened, the still full moulds are disassembled to remove the panels. The baffles and panels are progressively stripped from the mould frame. The device and operators first take off the outermost baffle and replace it on the monorail as at the beginning of the process. The device and operators then separate the outermost panel from the mould frame and deliver it to the edge detailing and palletising station (Fig. 14 and Fig. 14A). The process is repeated until all of the full mould has been disassembled and the formed panels removed and delivered to the detailing station.
    Features of the edge detailing and palletising station are shown in Figs. 14 and 14A. The formed panels are delivered to the edge detailing and palletising station to be completed. The edge detailing station uses a grinding wheel to create a groove 500 in one long edge of the panel to match the tongue 510 that is formed in the opposite long edge of the panel during the casting process. Once the panels have edge details complete, they are palletised for final curing and ultimate delivery to the customer. In some cases, the panels are cut to different sizes prior to palletising. The panels are indicated by reference 520 in Fig. 14 and Fig. 14A. The finished panels have a surface finish thereon determined by the surface texture of the baffles. The settable core material melds to some degree with the skin material and provides a hard wearing and durable surface in the finished panel which does not require subsequent rendering or in situ cosmetic treatment.
    In Fig. 10A, there is schematically depicted an individual baffle 100 which includes a plywood panel 105 surrounded by a steel frame 101. At the upper part of the steel frame 101, there extends a pair of projections 102 which are engaged by hooks suspended from the pipe conveyor. At the bottom of each baffle 100 there projects a pair of mould box or supporting frame alignment lugs 104 which serve to engage with a locating track 135 in the bottom of the mould box or supporting frame, which locating track includes recesses 136 which are spaced by a set distance defining the thickness of a panel to be moulded between the baffles.
    In Fig. 11 there is shown the detail of a method of simultaneously spraying both sides of a solid baffle 14. The spray assembly includes a plurality of spray guns 110 positioned at both sides of the baffle 14. The baffle 14 is drawn by the pipe conveyor 73 inbetween the spray guns 110 during spraying so as to achieve a uniform coating on each side. A carriage 112 is associated with the pipe conveyor 73 in somewhat the same manner as a curtain ring is associated with a curtain rod. The carriage is pulled along the pipe conveyor by a cable or chain. A cable 113 suspended from the carriage 112 includes hooks 103 (Fig. 10A) which engage with the projections 102 of each baffle to suspend and convey the baffle 14.
    Also shown in Fig. 11 is a coating material pump 114 which provides a head of a coating material to a coating material metering and delivering apparatus 115. The metering and delivering apparatus 115 operates like a vein pump and includes a number of wheels or rollers which pass along fixed lengths of tube through which a coating material passes. The rate at which a coating material is delivered to the spray nozzles 110 can be adjusted by altering the distance of travel of the rollers along the lengths of tube, by altering the length of tube, or by altering the diameter of the tubes.
    In Fig. 11A, a baffle spraying apparatus is shown associated with a different type of pumping apparatus. The individual baffles 14 are sprayed on both sides with the coating material mixture. The mixture is predominantly a water, sand, cement, flyash, fibre, polymer, and other concrete additive blend. It is prepared in a mixer 200. The mixer 200 delivers the coating material mixture to a pump 115. The pump 115 delivers the mixture via hoses 111 to the spray guns 110. The mixture which is under pressure is sprayed by the guns 110 onto the baffles 14. The mixture then coats the vertical surfaces of the baffles 114.
    In Fig. 12 there is depicted a baffle supporting frame 120 and associated core filling apparatus 78. The core filling apparatus 78 includes a hopper 121 which is filled with sufficient core material to fill the space between all baffles in the baffle supporting frame 120. The hopper 121 is pivotally mounted at 122 to a frame 123. Extending from the hopper 121 is a pair of filling tubes 124 through which core material from the hopper can pass. The hopper 121 and filling tubes 124 are adapted to be drawn vertically upwardly along a track 125 by means of a hoist. Once raised into a position wherein the filling tubes 124 are vertically clear of the baffles in the cavity box, the hopper can be pivoted vertically about pivot axis 121 into the vertical position depicted at the right in Fig. 12. Alternatively, the hopper can be pivoted prior to lifting. By means of the hoist, the hopper 121 can be lowered such that the tips of the fill tubes (which are now extended downwardly from the hopper) are nearby the bottom of the mould box or supporting frame between a pair of baffles. Means are provided for oscillating the hopper 121 from side-to-side in the direction indicated by arrow B whilst raising the hopper 121 and nozzles 124 in the direction indicated by arrow C. The means for providing the oscillation in the direction of arrow B can be camshafts, solenoids, pneumatic rams, hydraulic rams or other oscillation mechanisms. The aim is to fill the space between the baffles with core material at a controlled rate. That is, the rate of delivery of the core material is adjusted such that the core is filled at the same rate as the rate at which the nozzles are vertically withdrawn from the mould box or supporting frame. This controlled rate of filling prevents the core material from shearing a coating material from the baffle surfaces during the filling process. Once the space between a pair of baffles is filled, the mould box or supporting frame is shifted along so as to align the next, empty cavity with the filling tubes whereupon the filling tubes are lowered with hopper 121 and the process continued. It should be noted that the hopper 121 and the fill tubes 124 oscillate backwards and forwards in the direction indicated by arrow B during vertical withdrawal such that the tips of each fill tube 124 follow a sinusoidal path. This method of filling also prevents the encapsulation of air pockets in the core.
    In Figs. 12A and 12B an alternative core filling station is depicted. Once the moulds are assembled with the settable coating material on each face of the baffles, they are moved into the filling station depicted. The filling station places the core mixture in the moulds, filling the space between each baffle. The core mixture is predominantly a water, cement, flyash, modified and coated EPS, polymer, and other concrete additive blend. The core mixture is prepared and mixed in a core mixer 210 mounted upon a frame above hopper 122. The core mixture is then delivered to the hopper 112. The core mixture is delivered from the hopper 122 via the nozzles 124 into the moulds. The hopper 122 and nozzles 124 move in such a manner that the core mixture is placed into each individual space between mould leaves until the entire mould is filled. The moulds are then stored for an adequate period of time to allow partial curing and hardening of the panels. The mixer 210 includes a horizontally oriented substantially cylindrical mixing tub 211 having an opening 212 through which ingredients pass for mixing in the tub 211. A helical blade or blades 213 are located upon a rotating shaft 214 which is driven by an external motor 215. The tub 211 is pivotally mounted upon a shaft which is common or coaxial with the shaft of the mixing blades. The tub 211 can pivot so as to allow delivery under flow of the mixed material to the hopper 122.
    The nozzles 124 receive the core material from the hopper 122 by a device such as an auger 215 or other pumping device.
    In Fig. 13 there are shown first and second baffles 14 alongside the side wall of the baffle supporting frame 120. The upper edge of the sidewall includes a vertically projecting pin 130 which cooperates with a baffle locking pin 132. The baffle locking pins 132 each include a pair of legs 131, each defining recesses 133 into which lugs 134 projecting from the ends of each baffle are received. The distance between the recesses 131 defines the spacing between the baffles 14 and thus the thickness of the panels produced. The locking pin 132 at the right hand side shown in Fig. 13 cooperates with the vertically projecting pin 130 to define the position of the first baffle 14. The locking pins as well as the interaction of the lugs 104 with the bottom of the baffle supporting frame 120 rigidly secure each baffle in place. Also shown in Fig. 13 is a locating track 135 at the bottom of the mould box or supporting frame and defining recesses 136 into which the lugs 104 are received. The locking pins 132 are positioned so as to extend into the space between each baffle and are twisted by a mechanical means through 90° to engage the recesses 133 over the respective pins 134.
    In Fig. 13B, there is shown in more detail one of baffles 14. The baffles are a composite involving plywood, nylon, PVC, and steel. The manufacturing process involves the automation-assisted assembly, filling and de-assembly of the moulds.
    After setting of the core material, the locking pins 132 are rotated through 90° in the opposite direction to enable release of each panel for conveying out of the mould box or supporting frame.
    In Fig. 13A there is shown apparatus alternative to that shown in Fig. 13. Instead of the apparatus indicated by reference numerals 130, 131, 132, 133 and 134, a plurality of locking clamps 300, 302 and 303 are provided. Each locking clamp has a plurality of downwardly depending lugs 304 which, in cooperation with the upper edge of each baffle defines the baffle spacing. Features at the lower end of each baffle are substantially identical with those as described above with reference to Fig. 13. A locking handle 301 is pivotally connected to the locking clamp 300 and includes a tab 305 to engage with features provided at the upper edge of each baffle. A similar tab 305 is provided at the remotely located depending lug of each locking clamp. By use of the apparatus of Fig. 13A, after being sprayed, each individual baffle is moved along the monorail to the mould assembly station. At the mould assembly station, the baffles are assembled into the mould frames and locked into position with the locking clamps otherwise known as "mould combs".
    An important distinction between the baffles of the process of Figs. 7 to 13 to that of Figs. 1 to 6A is that it is no longer necessary to apply air to release panels from the baffles. This is due to the fact that the baffles are solid. Also, there is no need to apply lateral force to each baffle to position the same as described with reference to Figs. 1 to 6.
    Also, a hand-held pneumatic cylinder is not used in the plant of Figs. 7 to 13 to remove the panels from the mould box or supporting frame. Rather, each baffle is sequentially moved sideways and lifted from the mould box or supporting frame using a lifting system as described earlier.

    Claims (18)

    1. A method of forming a building panel or panels (17), the method comprising the steps of:-
      (a) applying a flowable, settable coating material to respective surfaces of at least two baffles (14),
      (b) placing the baffles vertically in a substantially parallel, spaced interrelationship, characterised by the steps of
      (c) at least substantially filling the space (25) between the two baffles with a settable core material prior to setting of the coating material and subsequent to step b, and
      (d) allowing the core material and coating material to set.
    2. The method of claim 1, wherein the baffles are moved together after filling the space with core material but prior to setting of the core material and coating material.
    3. The method of claim 1 or claim 2, wherein the baffles are moved apart and/or separately removed after setting of the core material and coating material so as to release the formed panel(s)
    4. The method of any one of claims 1 to 3, providing n+1 baffles in a parallel spaced interrelationship, between which n panels are formed where n equals any integer greater than or equal to 1.
    5. The method of claim 3, wherein after the baffles are moved apart, the panels are removed in a direction substantially parallel to the plane ofthe baffles by application of force thereto.
    6. The method of any one of claims 1 to 5, wherein the baffles are located within a mould box or supporting frame (10).
    7. The method of any one of claims 1 to 6, wherein the baffles are moved toward one another by means of hydraulic clamping cylinders (18).
    8. An apparatus to form a building panel or panels (17) between baffles (14), the apparatus including:
      coating means (75) operable to apply a flowable settable coating material to surfaces of said baffles as said baffles pass through said coating means ;
      a supporting frame (10) into which at least two coated baffles are placed;
      said frame (10) having means (22) to locate said baffles vertically in a substantially parallel, spaced interrelationship to define a minimum space (25) therebetween, and
      filling means (76) operable to deliver a settable core material between each of said baffles to at least substantially fill said space as said baffles pass through said filling means;
         characterised by a first conveyor (73) defining a path along which the baffles (14) travel and a second conveyor operably associated with said first conveyor and adapted to move said frame into position to receive said baffles, the coating means being located along said path, the supporting frame (10) being positionable along said path, and the filling means being adjacent said second conveyor.
    9. The apparatus of claim 8, wherein each baffle is substantially hollow, having a pair of spaced apart side sheets (24).
    10. The apparatus of claim 9, wherein each baffle has air inlet means (16) by which air can be injected into the space between the sheets so as to outwardly expand the same under pressure to assist in releasing the set panels (17) from the baffles (14).
    11. The apparatus of claim 8, wherein each baffle is solid.
    12. The apparatus of claim 8, wherein the baffles have extraction engagement holes to which an extraction device can be anchored for the purpose of applying force to the set panels for removal
    13. The apparatus of any one of claims 8 to 12, wherein the supporting frame is formed upon a mobile structure (20).
    14. The apparatus of claim 13, wherein the mobile structure (20) has one or more posts (19) to which clamping cylinders are affixed, said clamping cylinders being associated with said walls of the supporting frame.
    15. The apparatus of claim 14, wherein the side walls of the supporting frame act as end baffles.
    16. The apparatus of claim 8, wherein the means for substantially filling the space between the two baffles with a settable core material includes a hopper (121) from which there extends one or more filling tubes (124), the hopper being mounted upon a frame and being pivotable about a horizontal axis, the hopper being adapted to be raised and lowered such that the filling tubes enter and are withdrawn from a space between adjacent baffles while core material is being delivered thereto by said filling tubes.
    17. The apparauts of claim 16, wherein means are provided to oscillate the hopper (121) horizontally, during vertical withdrawal of the tubes (124) and delivery of the core material.
    18. The apparatus of claim 8, including cleaning means (74) located along said path and operable to clean said baffles as said baffles pass through said cleaning means.
    EP98939987A 1997-08-29 1998-08-28 Building panel and method and apparatus of forming same Expired - Lifetime EP1017552B1 (en)

    Applications Claiming Priority (5)

    Application Number Priority Date Filing Date Title
    AUPO8864A AUPO886497A0 (en) 1997-08-29 1997-08-29 Method and apparatus for forming a building panel
    AUPO886497 1997-08-29
    AUPP3181A AUPP318198A0 (en) 1998-04-24 1998-04-24 Method and apparatus for forming a building panel
    AUPP318198 1998-04-24
    PCT/AU1998/000706 WO1999011442A1 (en) 1997-08-29 1998-08-28 Building panel and method and apparatus of forming same

    Publications (3)

    Publication Number Publication Date
    EP1017552A1 EP1017552A1 (en) 2000-07-12
    EP1017552A4 EP1017552A4 (en) 2000-12-06
    EP1017552B1 true EP1017552B1 (en) 2004-07-14

    Family

    ID=25645592

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP98939987A Expired - Lifetime EP1017552B1 (en) 1997-08-29 1998-08-28 Building panel and method and apparatus of forming same

    Country Status (13)

    Country Link
    EP (1) EP1017552B1 (en)
    JP (1) JP2001514101A (en)
    KR (1) KR20010023294A (en)
    CN (2) CN1268918A (en)
    AT (1) ATE270946T1 (en)
    CA (1) CA2303270A1 (en)
    DE (1) DE69825064D1 (en)
    HK (1) HK1043957B (en)
    ID (1) ID26624A (en)
    IL (1) IL134671A0 (en)
    MY (1) MY120547A (en)
    NZ (1) NZ503329A (en)
    WO (1) WO1999011442A1 (en)

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US11534939B2 (en) 2017-08-09 2022-12-27 Sika Technology Ag Device for applying a building material

    Families Citing this family (12)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    ES2292276B1 (en) * 2004-09-07 2009-03-01 Grupo Inmobiliario Bricansa, S.A. MODULAR CONSTRUCTION SYSTEM.
    EP1965979A4 (en) * 2005-11-02 2012-03-14 Richard M Grabowski Self-forming structures
    DK177523B1 (en) * 2011-07-19 2013-09-02 Gb Holding Hoejbjerg Aps Method of manufacturing a high strength concrete plate member having a superior surface, as well as a high strength concrete panel manufactured by said method
    EP2747995A4 (en) * 2011-07-27 2016-03-16 Abbey And Pride Ip Pty Ltd Laminated product produced by placing one layer onto a semi set partially cured base layer.
    FI123797B (en) * 2011-12-22 2013-10-31 Elematic Oy Ab Process and plant for processing a concrete product
    CN102941621B (en) * 2012-11-22 2015-02-25 四川鸥克建材科技有限公司 Automatic production line of building wallboards
    CN106626027A (en) * 2017-03-06 2017-05-10 漳州市烨发工贸有限公司 Ceramic chain type full-automatic production line glaze spraying machine
    CN109109128A (en) * 2017-06-22 2019-01-01 株式会社泰明实业 Using the hollow slab process units of the wet type of ethylene tube and utilize its production method
    CN107525764A (en) * 2017-08-22 2017-12-29 中国建筑股份有限公司 For testing cast-in-place composite construction interlayer tensile bond strength test specimen and method of testing
    CN109610831A (en) * 2019-01-07 2019-04-12 五冶集团上海有限公司 A kind of modern logistics workshop terrace and high-supported formwork comprehensive construction method
    US12017380B2 (en) * 2019-01-18 2024-06-25 Benjamin Baader Adjustable apparatus, system and method for constructing insulated concrete forms
    CN112922347B (en) * 2021-04-06 2022-05-27 广东诚骏建设工程有限公司 Intelligent building pouring device and method

    Family Cites Families (11)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR1424775A (en) * 1965-02-16 1966-01-14 Travaux Pour La Construction E Apparatus for the vertical manufacture of concrete panels
    GB1153281A (en) * 1966-05-18 1969-05-29 Deutsche Bauakademie Process for Production of Building Slabs or Panels
    GB1278322A (en) * 1969-04-09 1972-06-21 Harold Wallace Haynes Improvements in and relating to methods of building construction
    US3809516A (en) * 1970-12-31 1974-05-07 S Komaki Apparatus for manufacturing a light-weight concrete panel with pattern designs on its surface
    DE2123478C3 (en) * 1971-05-12 1974-10-24 Armin 7500 Karlsruhe Kleiber Multiple formwork for the production of large-scale prefabricated parts made of concrete or the like
    AU7820375A (en) * 1974-02-13 1976-08-19 Commw Scient Ind Res Org Production of sheet material
    ZA772448B (en) * 1977-04-22 1978-07-26 Struys F Improvements in or relating to the moulding of panels and the like
    US4409768A (en) * 1980-06-02 1983-10-18 Joseph Boden Prefabricated wall panel
    IE903184A1 (en) * 1989-09-04 1991-03-13 A C I Australia Ltd Method of manufacturing glass-reinforced-concrete building¹products
    SI9010072A (en) * 1990-01-16 1997-10-31 Z Za Raziskavo Materiala In Ko Process of manufacture of concrete semifinished products, device for manufacture of concrete semifinished products and equipment to carry out the process
    US5209968A (en) * 1991-07-22 1993-05-11 Diversitech Corporation Composite structure with waste plastic core and method of making same

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US11534939B2 (en) 2017-08-09 2022-12-27 Sika Technology Ag Device for applying a building material

    Also Published As

    Publication number Publication date
    JP2001514101A (en) 2001-09-11
    HK1043957B (en) 2005-12-02
    CN1268918A (en) 2000-10-04
    CN1199767C (en) 2005-05-04
    KR20010023294A (en) 2001-03-26
    IL134671A0 (en) 2001-04-30
    ID26624A (en) 2001-01-25
    CA2303270A1 (en) 1999-03-11
    EP1017552A1 (en) 2000-07-12
    WO1999011442A1 (en) 1999-03-11
    EP1017552A4 (en) 2000-12-06
    HK1043957A1 (en) 2002-10-04
    CN1337302A (en) 2002-02-27
    NZ503329A (en) 2001-09-28
    ATE270946T1 (en) 2004-07-15
    MY120547A (en) 2005-11-30
    DE69825064D1 (en) 2004-08-19

    Similar Documents

    Publication Publication Date Title
    EP1017552B1 (en) Building panel and method and apparatus of forming same
    US9314940B2 (en) Automated concrete structural member fabrication method
    CA1089667A (en) Prefabricated building components of expanded material and cement and method for producing the same
    EP3419480B1 (en) Automated concrete structural member fabrication system and method
    US4131670A (en) Method of making prefabricated building components of expanded material and cement
    KR101308503B1 (en) Manufacturing apparatus for artificial stone
    WO2013014156A1 (en) Manufacturing concrete
    CN111844352A (en) Construction process for prefabricating mechanical high-efficiency guardrail
    US6240701B1 (en) Building panel and method and apparatus of forming same
    AU747361B2 (en) Building panel and method and apparatus of forming same
    EP3419434B1 (en) Concrete delivery subsystem for automated concrete fabrication system
    RU2140851C1 (en) Method and apparatus for producing construction panel
    RU2533475C1 (en) High-speed method of manufacture of building products with high void ratio by volumetric vertical moulding from heterogeneous mixes, building product with high void ratio, process line for manufacture of building products with high void ratio by volumetric vertical moulding from heterogeneous mixes
    CN208179908U (en) A kind of layout structure of Prefabricated construction panel production line
    MXPA00002035A (en) Building panel and method and apparatus of forming same
    TW406159B (en) Building panel and method and apparatus of forming same
    RU2211140C1 (en) Continuously cyclic method for production of finished sets of structural units of small, medium, large different-profile members on sectional transformable one-and multi-cell molding production lines with automated computerized system of control of manufacture parameters and production process
    SU1763201A1 (en) Continuous-conveyor line for making building articles
    RU51556U1 (en) TECHNOLOGICAL LINE FOR MANUFACTURING STONE STONE
    CA1079034A (en) Apparatus for the manufacture of prefabricated building components of expanded material and cement
    RU98768U1 (en) TECHNOLOGICAL LINE FOR THE PRODUCTION OF CONSTRUCTION WALL PREPARATION OF REMOVABLE FORMWORK
    CN108312323A (en) A kind of layout structure of Prefabricated construction panel production line

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 20000307

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    AX Request for extension of the european patent

    Free format text: AL PAYMENT 20000307;LT PAYMENT 20000307;LV PAYMENT 20000307;MK PAYMENT 20000307;RO PAYMENT 20000307;SI PAYMENT 20000307

    A4 Supplementary search report drawn up and despatched

    Effective date: 20001020

    AK Designated contracting states

    Kind code of ref document: A4

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    17Q First examination report despatched

    Effective date: 20021206

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    AX Request for extension of the european patent

    Extension state: AL LT LV MK RO SI

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040714

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040714

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

    Effective date: 20040714

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040714

    Ref country code: FI

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040714

    Ref country code: CY

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040714

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040714

    Ref country code: BE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040714

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040714

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REF Corresponds to:

    Ref document number: 69825064

    Country of ref document: DE

    Date of ref document: 20040819

    Kind code of ref document: P

    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: FG4D

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LU

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040828

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040830

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: MC

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040831

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: SE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20041014

    Ref country code: GR

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20041014

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20041014

    Ref country code: DK

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20041014

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20041025

    LTIE Lt: invalidation of european patent or patent extension

    Effective date: 20040714

    NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20050301

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20041014

    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: MM4A

    26N No opposition filed

    Effective date: 20050415

    EN Fr: translation not filed
    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: PT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20041214