EP0982560A1 - Method for constructing, repair, maintenance and transport of heavy armoured fighting vehicles consisting of several modules - Google Patents
Method for constructing, repair, maintenance and transport of heavy armoured fighting vehicles consisting of several modules Download PDFInfo
- Publication number
- EP0982560A1 EP0982560A1 EP98250302A EP98250302A EP0982560A1 EP 0982560 A1 EP0982560 A1 EP 0982560A1 EP 98250302 A EP98250302 A EP 98250302A EP 98250302 A EP98250302 A EP 98250302A EP 0982560 A1 EP0982560 A1 EP 0982560A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- modules
- les
- ebcl
- des
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41H—ARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
- F41H7/00—Armoured or armed vehicles
- F41H7/02—Land vehicles with enclosing armour, e.g. tanks
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41A—FUNCTIONAL FEATURES OR DETAILS COMMON TO BOTH SMALLARMS AND ORDNANCE, e.g. CANNONS; MOUNTINGS FOR SMALLARMS OR ORDNANCE
- F41A23/00—Gun mountings, e.g. on vehicles; Disposition of guns on vehicles
- F41A23/20—Gun mountings, e.g. on vehicles; Disposition of guns on vehicles for disappearing guns
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41A—FUNCTIONAL FEATURES OR DETAILS COMMON TO BOTH SMALLARMS AND ORDNANCE, e.g. CANNONS; MOUNTINGS FOR SMALLARMS OR ORDNANCE
- F41A23/00—Gun mountings, e.g. on vehicles; Disposition of guns on vehicles
- F41A23/34—Gun mountings, e.g. on vehicles; Disposition of guns on vehicles on wheeled or endless-track vehicles
- F41A23/42—Gun mountings, e.g. on vehicles; Disposition of guns on vehicles on wheeled or endless-track vehicles for rocket throwers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41H—ARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
- F41H7/00—Armoured or armed vehicles
- F41H7/02—Land vehicles with enclosing armour, e.g. tanks
- F41H7/04—Armour construction
- F41H7/048—Vehicles having separate armoured compartments, e.g. modular armoured vehicles
Definitions
- the invention relates to a new method of construction and repair. maintenance, modernization and transport of EBCL / Heavy Combat Armored Vehicles / of the 4th generation, weighing 120 to 150 tonnes, double that of the MBT / Main Battle Tank / of the 3- th generation.
- T-72, T-80, T-90, LEOPARD 2, ABRAMS M1 A2, CHALLENGER 2, ARIETE C-1, MERKAWA, EBC LECLERC are all limited in width by the maximum gauge of the railways, 3500 to 3600 mm, and therefore at a weight between 45 t and 62 t: this is a dead end .
- One goal of the 3M METHOD is to use three railroad cars, on three parallel tracks, to assemble the three modules of an EBCL from 120 to 150 t.
- Another goal is to use three standard semi-trailers HET M 1000, used for 20 years by TACOM in the USA, for assemble or divide a 120 t EBCL.
- HET M 1000 used for 20 years by TACOM in the USA, for assemble or divide a 120 t EBCL.
- One of the aims of the invention is to increase the volume inside the EBCLs, and especially the one occupied by multi-layer shielding CHOBHAM, have more ammunition and fuel, have especially new equipment, such as TV-observation cameras.
- a goal of the 3M Method is the construction of three very sophisticated modules, and easy to modernize individually, not necessarily at the same time, according to technical progress in various fields, electronic, mechanical, hydraulic, thermal, pneumatic. scientist, etc.
- An important goal is to be able to mechanize the feeding ammunition for the cannon, machine guns and missile launchers the central module, providing for openings and windows, normally split by additional armor modules.
- One goal is to automate, to robotize the central module armament and better protect it from an explosion, or at least do that if hit by a shell or missile, both other modules, the modulator-crew and the engine module will be intact, and can be reused.
- the EBCL aim for long distance combat, leaving the MBT to fight in the villa and under normal conditions, especially at night and when crossing rivers.
- the 3M method aims to facilitate, within the framework of NATO countries, better collaboration between countries like FRANCE, ENGLAND, FRG, SWEDEN, ITALY, where each of them formerly built its 3rd generation MBT, countries which now have the interest of building only one type of module, but in large series.
- the USA and CANADA can also join forces with CORSICA and JAPAN to build an EBCL different from that of EUROPEANS.
- the same method is applicable for howitzers heavy of 155 mm, or even of a caliber and a greater range.
- One of the aims of the invention is the modernization of the HET M 1000 from the USA TACOM, built over 20 years ago.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
Abstract
Description
L'invention concerne une nouvelle, méthode de construction, de réparation. d'entretien, de modernisation et de transport d'EBCL / Engins Blindés de Combat Lourds /de la 4-ème génération, d'un poids de 120 à 150 tonnes, double de celui des MBT / Main Battle Tank/ de la 3-ème génération. Ceux-ci, T-72, T-80, T-90, LEOPARD 2, ABRAMS M1 A2, CHALLENGER 2, ARIETE C-1, MERKAWA, EBC LECLERC, sont tous limités en largeur par le gabarit maximum des chemins de fer, 3500 à 3600 mm, et donc à un poids compris entre 45 t et 62 t: c'est là une impasse.The invention relates to a new method of construction and repair. maintenance, modernization and transport of EBCL / Heavy Combat Armored Vehicles / of the 4th generation, weighing 120 to 150 tonnes, double that of the MBT / Main Battle Tank / of the 3- th generation. These, T-72, T-80, T-90, LEOPARD 2, ABRAMS M1 A2, CHALLENGER 2, ARIETE C-1, MERKAWA, EBC LECLERC, are all limited in width by the maximum gauge of the railways, 3500 to 3600 mm, and therefore at a weight between 45 t and 62 t: this is a dead end .
L'idée maitresse de la METHODE des 3 M est de surmonter cette difficile impasse; elle a pour but la construction d' EBCL de 120 à 150 t, et cela par:
- l'assemblage rapide et relativement facil de trois modules principaux, le module avant groupant ensemble l'équipage de 3 ou de 4 hommes, le module central automatisé /robotisé/contenant surtout l'armement et les munitions, le module arrière mécanique et moteur. Le module équipage peut être à l'arrière et le module moteur à l'avant.
- le transport par voies ferrées entre usines, casernes, polygone, dépôts, ateliers de réparation des 3 modules différents,
- le transport par la route des 3 modules entre usines, casernes, dépôts, polygones, ateliers de modernisation et entretien,
- la cannibalisation des EBCL après la période de construction,
- la construction d'EBCL avec canon lisse de 140 mm,
- la construction de chars-obusiers lourds,avec canon de 155 mm,
- le transport rapide par air, mer et terre des EBCL.
- the quick and relatively easy assembly of three main modules, the front module grouping together the crew of 3 or 4 men, the central automated / robotic module / containing mainly armaments and ammunition, the mechanical and engine rear module. The crew module can be at the rear and the engine module at the front.
- transport by rail between factories, barracks, polygon, depots, repair workshops for the 3 different modules,
- the transport by road of the 3 modules between factories, barracks, depots, polygons, modernization and maintenance workshops,
- cannibalization of EBCLs after the construction period,
- EBCL construction with 140 mm smooth barrel,
- the construction of heavy howitzer tanks, with a 155 mm gun,
- rapid transport by air, sea and land of EBCLs.
Dans les années 1968-70 les USA et la RFA ont étudié ensemble, construit et testé 17 prototypes du MBT-70. Aucun tank n'a été retenu, et an ALLEMAGNE les experts de plusieurs sociétés ont réussi la construction du LEOPARD 2, avec canon lisse de 120. Les USA ont construit le M1 ABRAMS, avec canon de 105, an série et finalement, après achat de la licence de fabrication du canon lisse de 120, ont alors modernisé les M1 A1 et M1 A2 ABRAMS.In the years 1968-70 the USA and the FRG studied together, built and tested 17 prototypes of the MBT-70. No tank was not retained, and in GERMANY experts from several companies successfully built the LEOPARD 2, with a smooth 120 barrel. The USA built the M1 ABRAMS, with 105 gun, serial and finally, after purchase of the license to manufacture the smooth barrel of 120, then modernized the M1 A1 and M1 A2 ABRAMS.
De très nombreux progrès furent introduits dans les MBT de la 3-ème génération comme le blindage CHOBHAM, le blindage réactif, les canons lisses de 120 et 125 mm, la stabilisation du canon, les calculateurs de tir, la noctovision, les équipements laser, l'automatisation du chargement du canon, la computerisation, la navigation et la transmission des informations, les progrès des moteurs diesel et des transmissions automatiques, la protection ABC, anti-incendie et anti-explosion, mais ces MBT restent limités à 6o tonnes. En FRANCE le EBC LECLERC, dernier-né des MBT de la 3-ème génération, semble facile à équiper du nouveau canon lisse de 140 mm, et ce en augmentant sa masse de 55 t à 60-62 t. Selon certaines informations, la RUSSIE aurait construit un nouveau MBT, avec canon lisse de 135 mm.Many advances were introduced in the 3rd generation MBT such as CHOBHAM shielding, shielding reactive, smooth 120 and 125 mm guns, stabilization of the cannon, fire computers, night vision, equipment laser, gun loading automation, computerization, navigation and transmission of information, progress diesel engines and automatic transmissions, protection ABC, fire and explosion proof, but these MBTs remain limited to 6o tonnes. In FRANCE the EBC LECLERC, the latest MBT of the 3rd generation, seems easy to equip with the new gun smooth 140 mm, increasing its mass from 55 t to 60-62 t. According to reports, RUSSIA has built a new MBT, with 135 mm smooth barrel.
Très souvent dans le passé, certains militaires ont annoncé la fin des MBT, proposant des chars légers, rapides et transportables par avion. Il exista des avions cargos capables de transporter plus de 120 t, ce qui ne limite pas le poids des EBCL.Very often in the past, some soldiers have announced the end of MBT, offering light, fast and transportable by air. There were cargo planes capable of transport more than 120 t, which does not limit the weight of the EBCLs.
On sait par expérience, qu'entre le début d'un projet de nouveau MBT, les études, les essais de prototype et la préparation de la fabrication, il faut compter 10 années de travail en EUROPE, 5 à 7 aux USA et en RUSSIE. Maintenant l'UNION EUROPEENNE peut faire mieux, surtout dans la cadre de l'OTAN. Le LEOPARD 2 aurait été un grand succès, si plusieurs pays de l/OTAN l'avaient adopté, et en avait partagé la fabrication en grande série.We know from experience that between the start of a project again MBT, studies, prototype testing and preparation of manufacturing, it takes 10 years of work in EUROPE, 5 to 7 in the USA and RUSSIA. Now the EUROPEAN UNION can do better, especially within the framework of NATO. LEOPARD 2 would have been a great success, if several NATO countries had it adopted, and had shared the mass production.
Un but de la METHODE des 3 M est d'utiliser trois wagons de chemin de fer, sur trois voies parallèles, pour assembler les trois modules d'un EBCL de 120 à 150 t.One goal of the 3M METHOD is to use three railroad cars, on three parallel tracks, to assemble the three modules of an EBCL from 120 to 150 t.
Un autre but, est d'utiliser trois semi-remorques type
HET M 1000, utilisés depuis 20 ans par le TACOM des USA, pour
assembler ou diviser un EBCL de 120 t. Pour un EBCL de 150 t il
faut moderniser le HET, augmenter la nombre de roues de 20 à 24.Another goal is to use three standard semi-trailers
HET
Un des buts de l'invention, est d'augmenter la volume intérieur des EBCL, et surtout celui occupé par le blindage multi-couches CHOBHAM, avoir plus de munitions et de carburant, avoir surtout de nouveaux équipements,comme des caméras TV-observation.One of the aims of the invention is to increase the volume inside the EBCLs, and especially the one occupied by multi-layer shielding CHOBHAM, have more ammunition and fuel, have especially new equipment, such as TV-observation cameras.
En divisant un EBCL en trois modules et en groupant dans un seul module fortement blindé l'équipage, si l'EBCL est touche par un obus ou un missile, les chances de survie de celui-ci sont presque triplées, par rapport à un MBT classique de 3-ème générationBy dividing an EBCL into three modules and grouping in a single heavily armored module for the crew, if the EBCL is hit by a shell or a missile, the chances of its survival are almost tripled, compared to a conventional 3rd generation MBT
Un but de la Méthode des 3 M est la construction des trois modules très perfectionnés, et facils à moderniser individuellement, pas nécessairement dans le même temps, suivant les progrès techniques dans divers domaines, électroniques, mécanique, hydraulique, thermiques, pneumatique. scientifique, etc.A goal of the 3M Method is the construction of three very sophisticated modules, and easy to modernize individually, not necessarily at the same time, according to technical progress in various fields, electronic, mechanical, hydraulic, thermal, pneumatic. scientist, etc.
Un but important est de pouvoir mécaniser l'alimentation en munition du canon, des mitrailleuses et des lance-missiles du module central, an prévoyant des ouvertures et des fenêtres, normalement fendes par des modules blindage-annexe.An important goal is to be able to mechanize the feeding ammunition for the cannon, machine guns and missile launchers the central module, providing for openings and windows, normally split by additional armor modules.
Un but est d'automatiser, de robotiser le module central armement et mieux le protéger contre une explosion, ou du moins faire que s'il est touché par un obus ou un missile, les deux autres modules, la moduler-équipage et le module-moteur seront intacts, et pourront être réutilisés.One goal is to automate, to robotize the central module armament and better protect it from an explosion, or at least do that if hit by a shell or missile, both other modules, the modulator-crew and the engine module will be intact, and can be reused.
Le canon de 140 ayant une portée accrue et un télé-mètre laser, portant jusqu'à 10 km, un des buts est le montage d' un mât télescopique sur le côté du module arrière.The 140 gun with an increased range and a telemeter laser, carrying up to 10 km, one of the goals is the assembly of a telescopic mast on the side of the rear module.
Les EBCL ont pour but le combat à grande distance, laissant aux MBT le combat en villa et dans las conditions normales, surtout de nuit et lors du franchissement de rivières.The EBCL aim for long distance combat, leaving the MBT to fight in the villa and under normal conditions, especially at night and when crossing rivers.
La méthode des 3 M a pour but de faciliter, dans le cadre des pays de l'OTAN, une meilleure collaboration entra des pays comme la FRANCE, l'ANGLETERRE, la RFA, la SUEDE, l'ITALIE, où chacun d'eux jadis construisait son MBT de 3-ème génération, pays qui ont maintenant pour intérèt à ne construire qu'un seul type de module, mais en grande série. Les USA et le CANADA peuvent aussi s'associer avec la CORSE et le JAPON, pour construire un EBCL différent de celui des EUROPEENS. The 3M method aims to facilitate, within the framework of NATO countries, better collaboration between countries like FRANCE, ENGLAND, FRG, SWEDEN, ITALY, where each of them formerly built its 3rd generation MBT, countries which now have the interest of building only one type of module, but in large series. The USA and CANADA can also join forces with CORSICA and JAPAN to build an EBCL different from that of EUROPEANS.
La même méthode est applicable pour des chars-obusiers lourds de 155 mm, ou même d'un calibre et une portée plus grande.The same method is applicable for howitzers heavy of 155 mm, or even of a caliber and a greater range.
Un des buts de l'invention est la modernisation du HET
M 1000 du TACOM des USA, construit il y a plus de 20 ans deça.One of the aims of the invention is the modernization of the HET
L'invention décrite ci-après, à l'aide d'exemples non limitatifs, permet de nombreuses combinaisons nouvelles d'éléments connus, mais l'idée maitresse resta la même, la Méthode des 3 M, pour le montage, les réparations, le transport des EBCL.
- La Pl.I/23 présente un atelier de montage avec 3 voies ferrées,
- La Pl.II montre deux chars lourds, de 120 t et 150 t,sur une
semi-remorque HET
M 1000, une bonne solution pour la méthode 3 M - La Pl.III représente schématiquement un EBCL composé de 3 modules principaux, 5, 8 et 9, où le module-équipage est a l'avant. Une autre version avec module équipage à l'arrière est réalisable.
- La Pl.IV montre l'utilisation de 3 semi-remorques HET M 1000, disposés parallèlement. C'est là l'idée maitresse de la Méthode des 3 M, qui permet la construction d'EBCL de plus grande largeur que les 3 600 mm des MBT des la 3-ème génération.
- La Pl.V résume comment préparer les calculs théoriques de la division d'un EBCL en trois modules principaux, 8,5 et 9.
- La Pl.VI illustre comment effectuer les calculs de résistance du module central en torsion, flexion, cisaillement, compression.
- La Pl.VII représente une semi-remorque HET M 1000,et une autre plus longue de 2 m, avec une grue de levage à portée variable.
- La Pl.VIIIreprésente schématiquement deux
modules 8 et 9 sur un HETM 1000, les forces sur le HET et le camion-tracteur 3, - La Pl.IX illustre comment fixer le module central 5, la
tourelle 6 et les blindages annexes 7 sur un HET, soit ensemble 60 t. - La Pl.X montre comment préparer le module central pour montage.
- La Pl.XI représente le seul module- avant 8 sur le HET, l'emplacement
10 étant libre, ou occupé par un
module 9. Pour deux EBCL il faut 4 HET, et pour un EBCL il en faut 3HET M 1000, au moins. - La Pl.XII représente un module arrière 9 sur un HET
M 1000. - La Pl.XIII montre,en élévation, deux EBCL de 120 à 150 t maxi.
- La Pl.XIV représente trois vues avant d'un EBCL.
- La Pl.XV illustre deux vues en coupe du module central 5, 6 et
une vue arrière du
module 9. - La Pl.XVI est une vue agrandie de la fenêtre de chargement et de contrôle du module central, après enlèvement du blindage.
- La Pl.XVII montre comment fixer ensemble le module central 5
aux modules arrière et avant, 9
et 8. - La Pl.XVIII a pour but de montrer l'importance du projet, des calculs et des essais des boulons, et des points de fixation, du module central aux modules avant et arrière,
- La Pl.XIX représente schématiquement le système d'alimentation automatique du canon, en munitions de 140 type APFSDS et HEAT.
- La Pl.XX montre, schématiquement, l'alimentation automatique du canon de 140, ou de l'obusier de 155, en projectiles et charges séparées, et ce grâce aux deux fenêtres latérales de l'EBCL.
- La Pl.XXI représente deux maillons de chenille, à trois rangées de patins, vue de dessous ou de l'extérieur, en matière composite, polyester renforcé par fibres de verre ou de Kevlar, avec des axes intérieurs noyés, en acier haute résistance.
- La Pl.XXII est une vue par dessous, côté appui sur le sol, avec vue des patins en élastomère, et aussi comment renforcer les éléments de chenille,avec des fibres de verre ou de Kevlar.
- La coupe Fig.23 montre les roues de ⊘ 700 et de ⊘ 1000 appuyant sur les chenilles à triple rangées de patin. Les MBT ont des chenilles à deux rangées de patins, soit 600 à 660 mm, alors que pour les EBCL il faut des chenilles de 950 à 1050 mm.
- Pl.I / 23 presents an assembly workshop with 3 railways,
- Pl. II shows two heavy tanks, 120 t and 150 t, on a
HET M 1000 semi-trailer, a good solution for the 3M method - Pl.III schematically represents an EBCL composed of 3 main modules, 5 , 8 and 9, where the crew module is at the front. Another version with aft crew module is possible.
- Pl. IV shows the use of 3
HET M 1000 semi-trailers, arranged in parallel. This is the main idea of the 3M Method , which allows the construction of EBCL of greater width than the 3600 mm of MBT of the 3rd generation. - Pl.V summarizes how to prepare the theoretical calculations for the division of an EBCL into three main modules, 8 , 5 and 9 .
- Pl.VI illustrates how to perform the resistance calculations of the central module in torsion, bending, shear, compression.
- Pl.VII represents a
HET M 1000 semi-trailer, and another 2 m longer, with a lifting crane with variable reach. - Pl. VIII schematically represents two
8 and 9 on amodules HET M 1000, the forces on the HET and thetractor truck 3 , - Pl.IX illustrates how to fix the
central module 5 , theturret 6 and theadditional shields 7 on a HET, i.e. together 60 t. - Pl.X shows how to prepare the central module for mounting.
- Pl.XI represents the
only front module 8 on the HET,slot 10 being free, or occupied by amodule 9 . For two EBCLs you need 4 HET, and for one EBCLs you need at least 3 HETM 1000. - Pl.XII represents a
rear module 9 on aHET M 1000. - Pl.XIII shows, in elevation, two EBCLs from 120 to 150 t max.
- Pl.XIV shows three front views of an EBCL.
- Pl.XV illustrates two sectional views of the
5 , 6 and a rear view of thecentral module module 9 . - Pl.XVI is an enlarged view of the loading and control window of the central module, after removing the shielding.
- Pl.XVII shows how to fix the
central module 5 together to the rear and front modules, 9 and 8 . - Pl.XVIII aims to show the importance of the project, calculations and tests of the bolts, and the fixing points, from the central module to the front and rear modules,
- Pl.XIX schematically represents the automatic feeding system of the gun, in ammunition of 140 type APFSDS and HEAT.
- Pl.XX shows, schematically, the automatic feeding of the cannon of 140, or the howitzer of 155, in projectiles and separate charges, thanks to the two side windows of the EBCL.
- Pl.XXI represents two caterpillar links, with three rows of pads, seen from below or from the outside, in composite material, polyester reinforced with glass fibers or Kevlar, with embedded internal axes, in high-strength steel.
- Pl.XXII is a view from below, side resting on the ground, with a view of the elastomer pads, and also how to reinforce the track elements, with glass or Kevlar fibers.
- The section Fig. 23 shows the ⊘ 700 and ⊘ 1000 wheels pressing on the tracks with three rows of skids. MBTs have tracks with two rows of pads, ie 600 to 660 mm, while for EBCLs, tracks from 950 to 1050 mm are required.
Après cette présentation résumée, une présentation des
détails de l'invention de la méthode des 3 M montre bien l'importance
de cette invention, invention qui permet de sortir d'une
impasse, et de débuter la génération des EBCL de la 4-ème génération.
Un tonnage double ne signifie nullement que la coût des EBCL
serait le double de celui des MBT de 3-ème génération.
C'est sur ces deux Fig.24 et 25 que l'on peut jugerde la différence des MBT de la 3-ème génération, qui sont devenus des ensembles très compacts et d'une grande complexité, ou chaque place est utilisée au maximum,et où le blindage serre tous les composants et l'équige, et les EBCL de la 4-ème génération, où la place est encore très dégagée pour un très important blindage multi-couches CHOBHAM, et des blindages réactifs. Il est inutil de présenter en coupa le module moteur, car la combinaison nouvelle d'éléments connus, comme les moteurs diesel, les boites de transmission automatiques, les freins, les radiateurs, les pompes, les réservoirs, les installations anti-incendie et anti-explosion, tout cela exista et c'est sur des maquettes que l'on peut le mieux projeter
It is on these two Figs. 24 and 25 that we can judge the difference of the 3rd generation MBTs, which have become very compact and very complex, where each seat is used to the maximum, and where the armor squeezes all the components and supports it, and the EBCLs of the 4th generation, where there is still a lot of room for a very large CHOBHAM multi-layer armor, and reactive armor. It is useless to present in cut the engine module, because the new combination of known elements, like diesel engines, automatic gearboxes, brakes, radiators, pumps, tanks, fire-fighting and anti -explosion, all this existed and it is on models that we can best project this
Claims (10)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP98250302A EP0982560A1 (en) | 1998-08-27 | 1998-08-27 | Method for constructing, repair, maintenance and transport of heavy armoured fighting vehicles consisting of several modules |
FR9813352A FR2782789B3 (en) | 1998-08-27 | 1998-10-26 | "TURTLE" CABINS FOR 3-EME AND 4-EME GENERATION ARMORED COMBAT VEHICLES |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP98250302A EP0982560A1 (en) | 1998-08-27 | 1998-08-27 | Method for constructing, repair, maintenance and transport of heavy armoured fighting vehicles consisting of several modules |
Publications (1)
Publication Number | Publication Date |
---|---|
EP0982560A1 true EP0982560A1 (en) | 2000-03-01 |
Family
ID=8234601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP98250302A Withdrawn EP0982560A1 (en) | 1998-08-27 | 1998-08-27 | Method for constructing, repair, maintenance and transport of heavy armoured fighting vehicles consisting of several modules |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0982560A1 (en) |
FR (1) | FR2782789B3 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004017012A1 (en) * | 2002-07-23 | 2004-02-26 | Krauss-Maffei Wegmann Gmbh & Co. Kg | Armoured wheeled vehicle consisting of individual sections |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR504610A (en) * | 1918-03-29 | 1920-07-10 | Automobiles Delahaye Soc D | Armament of war tanks |
DE866319C (en) * | 1943-10-26 | 1953-02-09 | Daimler Benz Ag | Chariot |
US4031807A (en) * | 1974-09-20 | 1977-06-28 | Societe Anonyme Secmafer | Armoured assault car |
DE2907745A1 (en) * | 1979-02-28 | 1980-09-04 | Uwe Tholen | Modular self-propelled machine - has drive and drive wheels on frame with axles, electrical power sources and control unit |
GB1605174A (en) * | 1971-04-29 | 1982-11-03 | Blohm Voss Ag | Armoured vehicle |
FR2510737A1 (en) * | 1981-08-03 | 1983-02-04 | Fives Cail Babcock | Armoured reconnaissance or combat vehicle - has identical front and back shells each forming assembly including driving wheels and linked by armour plating |
FR2547046A1 (en) * | 1976-06-29 | 1984-12-07 | Acec | SELF PROPELLED SHIELDED ENGINE |
DE3719289C1 (en) * | 1987-06-10 | 1988-12-08 | Bundesrep Deutschland | Small combat vehicle system, configured in a modular manner, for wheeled or tracked vehicles (track-laying vehicles |
WO1998025099A1 (en) * | 1996-12-02 | 1998-06-11 | Bofors Ab | Method and device for a 360° traversable artillery gun |
-
1998
- 1998-08-27 EP EP98250302A patent/EP0982560A1/en not_active Withdrawn
- 1998-10-26 FR FR9813352A patent/FR2782789B3/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR504610A (en) * | 1918-03-29 | 1920-07-10 | Automobiles Delahaye Soc D | Armament of war tanks |
DE866319C (en) * | 1943-10-26 | 1953-02-09 | Daimler Benz Ag | Chariot |
GB1605174A (en) * | 1971-04-29 | 1982-11-03 | Blohm Voss Ag | Armoured vehicle |
US4031807A (en) * | 1974-09-20 | 1977-06-28 | Societe Anonyme Secmafer | Armoured assault car |
FR2547046A1 (en) * | 1976-06-29 | 1984-12-07 | Acec | SELF PROPELLED SHIELDED ENGINE |
DE2907745A1 (en) * | 1979-02-28 | 1980-09-04 | Uwe Tholen | Modular self-propelled machine - has drive and drive wheels on frame with axles, electrical power sources and control unit |
FR2510737A1 (en) * | 1981-08-03 | 1983-02-04 | Fives Cail Babcock | Armoured reconnaissance or combat vehicle - has identical front and back shells each forming assembly including driving wheels and linked by armour plating |
DE3719289C1 (en) * | 1987-06-10 | 1988-12-08 | Bundesrep Deutschland | Small combat vehicle system, configured in a modular manner, for wheeled or tracked vehicles (track-laying vehicles |
WO1998025099A1 (en) * | 1996-12-02 | 1998-06-11 | Bofors Ab | Method and device for a 360° traversable artillery gun |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004017012A1 (en) * | 2002-07-23 | 2004-02-26 | Krauss-Maffei Wegmann Gmbh & Co. Kg | Armoured wheeled vehicle consisting of individual sections |
Also Published As
Publication number | Publication date |
---|---|
FR2782789B3 (en) | 2000-10-20 |
FR2782789A1 (en) | 2000-03-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0982560A1 (en) | Method for constructing, repair, maintenance and transport of heavy armoured fighting vehicles consisting of several modules | |
Cappellano et al. | Italian Light Tanks: 1919–45 | |
Kinnear et al. | Soviet T-62 Main Battle Tank | |
Dunstan | Chieftain Main Battle Tank 1965–2003 | |
RU2492402C2 (en) | Multi-purpose antitank (anti-aircraft) weapon | |
RU2388987C1 (en) | Self-propelled artillery joined weapon | |
Camp et al. | Surviving the Ride: A Pictorial History of South African-Manufactured Armoured Vehicles | |
Fletcher | Crusader and Covenanter Cruiser Tanks 1939–45 | |
Fletcher | British Battle Tanks: British-made Tanks of World War II | |
Roberts | US Airborne Tanks, 1939–1945 | |
Higgins | Panzer II Vs 7TP: Poland 1939 | |
Lathrop et al. | M60 Main Battle Tank 1960–91 | |
Moore | Tank Hunter: World War One | |
Anderson | Panther | |
Anderson | The History of the Panzerwaffe: Volume 2: 1942–45 | |
Newsome | Valentine Infantry Tank 1938–45 | |
RU221578U1 (en) | TRUCK WITH PROTECTED TANDEM CAB | |
RU2355992C1 (en) | Wheeled armored vehicle | |
RU2701280C2 (en) | Reconnaissance combat vehicle | |
Tucker-Jones | The Panther Tank: Hitlers T-34 Killer | |
Grant | Tiger vs Churchill: North-West Europe, 1944–45 | |
Anderson | Sturmartillerie: Spearhead of the infantry | |
KAJETANOWICZ | PRODUCTION AND MODERNIZATION OF T-34-85 TANK IN POLAND | |
Norris | World War II Trucks and Tanks | |
Doyle | M1 Abrams |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT CH DE ES FI FR GB IT LI SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
K1C1 | Correction of patent application (title page) published |
Effective date: 20000301 |
|
17P | Request for examination filed |
Effective date: 20000830 |
|
AKX | Designation fees paid |
Free format text: AT CH DE ES FI FR GB IT LI SE |
|
17Q | First examination report despatched |
Effective date: 20040914 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20060307 |