EP0869285B1 - Load sensing control with flushing circuit - Google Patents

Load sensing control with flushing circuit Download PDF

Info

Publication number
EP0869285B1
EP0869285B1 EP98103929A EP98103929A EP0869285B1 EP 0869285 B1 EP0869285 B1 EP 0869285B1 EP 98103929 A EP98103929 A EP 98103929A EP 98103929 A EP98103929 A EP 98103929A EP 0869285 B1 EP0869285 B1 EP 0869285B1
Authority
EP
European Patent Office
Prior art keywords
pressure
load
line
indicating
flushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP98103929A
Other languages
German (de)
French (fr)
Other versions
EP0869285A2 (en
EP0869285A3 (en
Inventor
Reinhold Schniederjan
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Brueninghaus Hydromatik GmbH
Original Assignee
Brueninghaus Hydromatik GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brueninghaus Hydromatik GmbH filed Critical Brueninghaus Hydromatik GmbH
Publication of EP0869285A2 publication Critical patent/EP0869285A2/en
Publication of EP0869285A3 publication Critical patent/EP0869285A3/en
Application granted granted Critical
Publication of EP0869285B1 publication Critical patent/EP0869285B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B53/00Component parts, details or accessories not provided for in, or of interest apart from, groups F04B1/00 - F04B23/00 or F04B39/00 - F04B47/00
    • F04B53/18Lubricating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/08Regulating by delivery pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B53/00Component parts, details or accessories not provided for in, or of interest apart from, groups F04B1/00 - F04B23/00 or F04B39/00 - F04B47/00
    • F04B53/08Cooling; Heating; Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B2205/00Fluid parameters
    • F04B2205/06Pressure in a (hydraulic) circuit
    • F04B2205/061Pressure in a (hydraulic) circuit after a throttle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B2205/00Fluid parameters
    • F04B2205/06Pressure in a (hydraulic) circuit
    • F04B2205/062Pressure in a (hydraulic) circuit before a throttle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B2205/00Fluid parameters
    • F04B2205/09Flow through the pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B2205/00Fluid parameters
    • F04B2205/15By-passing over the pump

Definitions

  • a load pressure-controlled flow controller is in generally referred to as a load-sensing controller and is used, for. B. from the DE 44 47 154 A 1 known.
  • the known flow controller compares the load pressure a working line downstream of a measuring throttle or orifice plate with the Delivery pressure with which the hydraulic pump the pressure medium upstream of the measuring throttle feeds into the work management.
  • the pressure difference between the the delivery pressure on the hydraulic pump side and the load pressure on the consumer side correspond to this Pressure drop at the preferably adjustable measuring throttle and possibly the additional one Pressure drop in the work line.
  • the control valve regulates the delivery volume of the Hydraulic pump so that the pressure drop across the measuring throttle is as constant as possible.
  • the one from the hydraulic pump into the working line delivered flow rate can be changed by changing the opening cross section of the measuring throttle can be varied because the pressure drop across the flow restrictor depends on its flow resistance and thus depends on the opening cross-section. Due to the load pressure
  • the flow rate controller adjusts the displacement volume of the hydraulic pump to that of the Consumers needed quantity coordinated. If the pressure drop at the measuring throttle increases, the hydraulic pump is pivoted back to a lower delivery volume. However, if the pressure drop at the measuring throttle decreases, the hydraulic pump in In the direction of an increase in the funding volume further pivoted until the Balance is restored.
  • the known load pressure-controlled flow controller has the disadvantage that at fully or almost completely swung back hydraulic pump in zero stroke operation or stand-by operation in the hydraulic pump almost no pressure medium is circulated. An operating condition can therefore occur in which one for lubrication and Cooling of the hydraulic pump is not ensured sufficient housing flushing. This can to overheat the hydraulic pump or to tear off the lubricating film cause corresponding damage.
  • the hydraulic pump works against that completely or almost completely closed measuring throttle, so that in the upstream area of the measuring throttle a delivery pressure as dynamic pressure in the Working line builds up, but the delivery volume funded by the hydraulic pump relative is low and not safe for maintaining the cooling and lubricating function sufficient.
  • the invention is therefore based on the object of a load pressure-guided Flow controller according to the preamble of claim 1 so that only in Operating range of a very low delivery volume of the hydraulic pump an adequate Lubrication and cooling function is maintained.
  • the object is in connection with the characterizing features of claim 1 solved with the generic features.
  • the invention is based on the knowledge to improve the cooling and Lubrication function one from the working line upstream of the measuring throttle branched flushing circuit for flushing the interior of the hydraulic pump provided.
  • the flushing circuit according to the invention is only required if that of the Pumped delivery volume for maintaining the cooling and Lubrication function is too low.
  • a flushing valve arranged in the flushing circuit is actuated with the load signaling pressure. If the load signal pressure in the load pressure signal line is a predetermined threshold exceeds the flushing circuit by actuating the flushing valve.
  • the constructive effort for the additional rinsing circuit is relatively low. Generating of additional measured variables is not necessary, because according to the invention the Load signaling pressure, which is for controlling the load-sensing control valve anyway is required for controlling the flushing valve.
  • the flush valve not between switching on and switching off the rinsing circuit abruptly switches, but in the area above the Switch-off point characterizing the threshold value the pressure medium flow in the flushing circuit throttles with increasing load signal pressure. Pressure peaks when switching the purge valve are prevented in this way.
  • the flush valve does not feed the pressure of the working line directly into the Housing flush line.
  • the housing flush line is rather at a branch point between the purge valve and the pressure medium tank downstream of the purge valve connected.
  • an effective pressure reduction is achieved and prevents pressure fluctuations and pressure peaks occurring in the working line have an undamped effect in the housing flushing line.
  • a branch throttle and between the branch point and the pressure medium tank a tank throttle be provided so that the Pressure reduction in the housing flushing line from the ratio of the opening cross-sections of these chokes results.
  • Branch valve can be arranged, which interrupts the housing flushing line when on the Branch pressure prevailing pressure, e.g. B. when pressure peaks occur, a predetermined threshold value exceeds.
  • Claim 6 structurally combines the branch valve and the branch throttle.
  • Fig. 1 shows a schematic, hydraulic circuit diagram of a first Embodiment of the load pressure-controlled flow controller 1 according to the invention.
  • the load pressure-controlled flow controller 1 further developed according to the invention is also under the term "load-sensing controller" known and is in its generic Basic function briefly described below.
  • the hydraulic pump 2 sucks pressure medium 3 from a pressure medium tank via a suction line 4 and feeds it into a working line 5 under a delivery pressure.
  • the Working line 5 is via an adjustable measuring throttle 6 with at least one on the downstream section 5b of the working line 5 connected consumers connected, via which the pressure medium flows back into the pressure medium tank 4.
  • the Section between the hydraulic pump 2 and the measuring throttle 6 is hereinafter referred to as upstream section 5a of the working line 5.
  • the working line 5 is connected to the delivery flow controller 1 according to the invention via a load pressure signaling line 7.
  • the upstream section 5a of the working line 5 for detecting the delivery pressure generated by the hydraulic pump 2 in the upstream section 5a of the working line 5 is connected to the delivery flow controller 1 according to the invention via a delivery pressure signaling line 8.
  • the load pressure signaling line 7 transmits a load signaling pressure to a control valve 9 as a control signal
  • the delivery pressure signaling line 8 transmits a delivery signaling pressure to the control valve 9 as a control signal.
  • the control valve 9 is designed as a 3/2-way valve and has a first pressure chamber 10 connected to the load pressure signaling line 7 and a second pressure chamber 11 connected to the delivery pressure signaling line 8. If the delivery signal pressure transmitted through the delivery pressure reporting line 8 increases compared to the load reporting pressure transmitted through the load pressure reporting line 7 or the load reporting pressure decreases compared to the delivery reporting pressure, the control valve 9 is shifted in the direction of its first control position 12.
  • the control valve 9 connects the working line 5 to the control pressure line 13, so that a control pressure 15 which is movable in a first control cylinder 14 is acted upon by control pressure in such a way that the delivery volume V g is pivoted back towards the minimum delivery volume V gmin ,
  • the control valve 9 is shifted towards its second control position 18. In the second control position 18, the control valve 9 connects the control pressure line 13 to the pressure medium tank 4. Therefore, the first control cylinder 14 is relieved and the hydraulic pump 2 is further pivoted in the direction of the maximum delivery volume V gmax , so that the delivery volume V g of the hydraulic pump 2 increases ,
  • the control valve 9 can assume any intermediate position, so that continuous control of the delivery volume of the hydraulic pump 2 is made possible.
  • the delivery volume of the hydraulic pump 2 is reduced when the pressure drop at the measuring throttle 6 increases, and conversely, the delivery volume of the hydraulic pump 2 is increased when the pressure drop at the measuring throttle 6 decreases.
  • the control valve 9 therefore regulates the delivery volume V g so that there is a constant pressure drop across the measuring throttle 6. Since the pressure drop at the measuring throttle 6, on the other hand, is proportional to the volume flow in the working line 5 flowing through the measuring throttle 6, the hydraulic pump 2 is regulated to a constant delivery volume V g by the load pressure-controlled flow rate controller 1.
  • a pressure relief valve 19 is used to limit the pressure in the load pressure signaling line 7 provided that the load pressure signaling line 7 connects to a pressure medium tank 4.
  • the invention relates to a further development of the load-pressure-controlled flow rate controller 1 in the operating range of a low or almost vanishing delivery volume V g of the hydraulic pump 2.
  • V g a low or almost vanishing delivery volume of the hydraulic pump 2.
  • the hydraulic pump 2 delivers against the completely or almost closed measuring throttle 6 and maintains a relatively high delivery pressure in the upstream section 5a, while the load pressure prevailing in the downstream section 5b of the working line 5 is relatively low.
  • the purge valve 30 If the load pressure signaling line 7 only a low load signaling pressure leads, the purge valve 30 by the spring 32 in a first switching state 33rd pressed, in which the purge valve 30 a throttled, preferably adjustable Passage has. If the load pressure in the load pressure signaling line exceeds the predetermined first threshold value, the purge valve 30 interrupts the Flushing circuit by pushing the flushing valve 30 into a second switching state 34, in which it has no passage. It has been shown that the load reporting pressure represents a reliable criterion for switching the flushing circuit on or off, because the load pressure in the downstream section 5b of the working line 5 is low when the measuring throttle 6 is completely or almost completely closed.
  • the flushing valve 30 has a Connection line 35 connected to the working line 5, so that the rinsing circuit the working line 5 is branched off.
  • the purge valve 30 is via a tank throttle 36 and a cooler 37 connected to the pressure medium tank 4.
  • a branch point 38 Between the purge valve 30 and the tank throttle 36 is a branch point 38, one of which Branch purge line 39 branches.
  • a branch valve 40 In the housing flushing line 39, preferably in the vicinity the branch point 38, a branch valve 40 is arranged, which a Branch choke 41 has.
  • the branch valve 40 is designed so that it Housing flush line 39 interrupts when the prevailing at the branch point 38 Pressure exceeds a predetermined threshold. That way you can Pressure peaks are kept away from the housing flushing line 39.
  • the housing flushing line 39 from the main branch 42 of the flushing circuit becomes one Reduction of the case purge pressure is achieved, without doing anything special Pressure reducing valve would be necessary.
  • the pressure in the housing flushing line 39 is due to the Ratio of the opening cross sections of the tank throttle 36 and the branch throttle 41 adjustable.
  • the structural union of the branch throttle 41 and the branch valve 40 allows a particularly compact design.
  • FIG. 2 shows an exemplary embodiment for a concrete realization of the one in FIG. 1 shown hydraulic circuit used flush valve 30th
  • a connection 51 for the connecting line 35 is in each case in a valve body 50 the working line 5, a connection 52 for the connecting line 31 with the load pressure signaling line 7 and a further connection 53 for a line leading to the branch point 38 leads, provided.
  • the one connected to the load pressure signaling line 7 Port 52 opens into a pressure chamber 54, which has a pressure surface 55 of an actuating piston 56 acted against a return spring 57.
  • the actuating piston 56 is in one step-cylindrical bore 58 of the valve body 50 against the return spring 57 movable.
  • the Bore 58 has an annular extension 59.
  • the adjusting piston 56 has a first one Section 60 and a second section 61 each with an enlarged diameter. The first section 60 with an enlarged diameter separates the one with the load pressure signaling line 7 connected terminal 52 of the connected to the working line 5 Connection 51. Both sections 60 and 61 simultaneously serve to guide the actuating piston 56 in the cylindrical bore 58.
  • the Adjusting piston 56 has a section 62 with a reduced diameter, on which Transition between the reduced diameter section 62 and the first Section 60 with an enlarged diameter a control edge 63 is formed.
  • the Control edge 63 reaches the return spring edge 64 of the annular groove 59 is the Connection between the connection 51 connected to the working line 5 and the the branch 38 connected connection 53 interrupted.
  • the Edge 64 of the annular groove 59 reached, a throttling effect already occurs, so that the Connection between the terminals 51 and 53 is not abruptly interrupted, but the cross section gradually increases with increasing displacement of the adjusting piston 56 reduced.
  • the flush volume required for flushing the housing of the hydraulic pump 2 is through a z. B. by means of a thread adjustable stop 65 on which the actuating piston 56 strikes in its rest position, adjustable.
  • FIG. 3 shows an alternative embodiment of the inventive load pressure-controlled flow rate controller 1. Elements already described are included matching reference numerals, so that a repetitive description unnecessary.
  • FIG. 3 differs from that already based on 1 described embodiment in that the flush valve 30 and Pressure relief valve 19 are structurally combined to a particularly compact design to achieve the flow rate controller 1 according to the invention and the manufacturing costs further to reduce.
  • the combined pressure limiting and flushing valve 30, 19 is a 4/2-way valve formed and via the connecting line 31 with the load pressure signaling line 7, and the Connection line 35 connected to the working line 5. At the same time it stands combined pressure limiting and flushing valve 30, 19 with the branch point 38 of the Rinsing circuit in connection.
  • the combined pressure relief and purge valve 30, 19 can be any Take intermediate position.
  • d. H. for pressure cutoff or pressure limitation, d. H. for the threshold value at which the pressure limiting valve 19 is triggered, on the one hand and for the pressure setting for the flush volume pressure, d. H. the threshold, at which the rinsing cycle is interrupted, on the other hand, are different Values adjustable.
  • Fig. 4 is a concrete one Realization of the combined used in the embodiment of FIG. 3 Pressure relief and purge valve 30, 19 shows. Already used in Fig. 2 Reference numerals are used in the same way to facilitate the assignment.
  • valve body 50 there is a connection to the working line 5 via the connecting line 35 connected working line connection 51, one via the connecting line 31 with the Load pressure reporting line 7 connected load reporting connection 52, one with the Flushing circuit, in particular with branch point 38, connected flushing connection 53 and a plurality of tank connections 80-83 connected to the pressure medium tank 4 are formed.
  • the actuating piston 56 is against a first return spring 84, which actuates the actuating piston 56 permanently acted upon, and against a second return spring 85 which actuates the actuating piston 56 only applied from a predetermined minimum shift from the rest position, in one step-cylindrical bore 86 movable.
  • the control edge 63 interrupts the connection between the Working line connection 51 and the flushing connection 53 when the actuating piston 56th is displaced accordingly far against the first return spring 84, so that the control edge 63 reaches the edge 64 of the annular groove 59.
  • the threshold at which the Flushing cycle is interrupted therefore, by adjusting the bias of the first Return spring 84 variable. This first threshold is typically below 30 bar.
  • a pressure chamber 54 is located in valve body 50 for displacing actuating piston 56 formed, which is connected to the load signaling connection 52 and a pressure surface 55th of the actuating piston 56.
  • the actuating piston 56 has a third section 90 expanded diameter, which in the rest position of the actuating piston 56, the load signaling connection 52 separates from the tank connection 82. If the adjusting piston 56 so far is shifted that the control edge 91 of the actuating piston 56, the edge 92 of the Valve body 50 formed annular groove 93, there is a throttled connection between the load signaling connection 52 and the tank connection 82. In this way the load reporting pressure in the load pressure reporting line 7 to a predetermined threshold limited.
  • the second return spring 85 only acts on the actuating piston 56, when the control edge 91 reaches the area of the edge 92 of the valve body 50, however not yet when the control edge 63 is in the area of the edge 64 of the annular groove 59, are the first threshold for interrupting the rinsing cycle by setting the first return spring 64 and the second threshold value for the pressure limitation of the Load reporting pressure by adjusting the second return spring 85 independently of each other adjustable. While the first threshold is typically below 30 bar the second threshold is typically above 30 bar.
  • the flushing quantity with which the flushing circuit is supplied can be adjusted by setting the Stop 65, on which the adjusting piston 56 strikes in its rest position, adjustable.
  • Fig. 4 also shows a specific embodiment for the branch valve 40.
  • Das Branch valve 40 has a pressure chamber 100, which has a pressure surface 101 of the Actuating piston 102 urged against a return spring 103. If the actuating piston 102 so is shifted far that the control edge 104 the edge 105 of the extension 106th reached, the connection between the branch 38 and the housing flushing line 39 interrupted.
  • the branch throttle 41 is integrated in the actuating piston 102.
  • the invention is not limited to the exemplary embodiments shown. As part of The invention can use a variety of other specific valve designs come. There are also a large number of other specific configurations of one load pressure-controlled flow rate controller.
  • the embodiment shown in Fig. 4 Branch valve 40 can of course also be used in the exemplary embodiment according to FIG. 1 are used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Fluid-Pressure Circuits (AREA)

Description

Die Erfindung betrifft einen lastdruckgeführten Förderstromregler zur konstanten Regelung des Förderstroms einer Hydropumpe nach dem Oberbegriff des Anspruchs 1.The invention relates to a load pressure-controlled flow controller for constant Regulation of the flow rate of a hydraulic pump according to the preamble of claim 1.

Ein lastdruckgeführter Förderstromregler nach dem Oberbegriff des Anspruchs 1 wird im allgemeinen als Load-Sensing-Regler bezeichnet und ist zum z. B. aus der DE 44 47 154 A 1 bekannt. Der bekannte Förderstromregler vergleicht den Lastdruck an einer Arbeitsleitung stromabwärts einer Meß-Drossel oder Meßblende mit dem Förderdruck, mit welchem die Hydropumpe das Druckmittel stromaufwärts der Meß-Drossel in die Arbeitsleitung einspeist. Die Druckdifferenz zwischen dem hydropumpenseitigen Förderdruck und dem verbraucherseitigen Lastdruck entspricht dem Druckabfall an der vorzugsweise einstellbaren Meß-Drossel und ggf. dem zusätzlichen Druckabfall in der Arbeitsleitung. Das Regelventil regelt das Fördervolumen der Hydropumpe so ein, daß der Druckabfall an der Meß-Drossel möglichst konstant ist. Dies entspricht einem konstanten Förderstrom durch die Meßdrossel bei gegebenem Öffnungsquerschnitt der Meßdrossel. Der von der Hydropumpe in die Arbeitsleitung abgegebene Förderstrom kann durch Verändern des Öffnungsquerschnitts der Meß-Drossel variiert werden, da der Druckabfall an der Meß-Drossel von deren Strömungswiderstand und somit von deren Öffnungsquerschnitt abhängt. Durch den lastdruckgeführten Förderstromregler wird das Verdrängungsvolumen der Hydropumpe auf die vom Verbraucher benötigte Menge abgestimmt. Steigt der Druckabfall an der Meß-Drossel an, wird die Hydropumpe zu einem geringeren Fördervolumen hin zurückgeschwenkt. Verringert sich der Druckabfall an der Meß-Drossel hingegen, wird die Hydropumpe in Richtung auf eine Vergrößerung des Fördervolumens weiter ausgeschwenkt, bis das Gleichgewicht wieder hergestellt ist.A load pressure-controlled flow controller according to the preamble of claim 1 is in generally referred to as a load-sensing controller and is used, for. B. from the DE 44 47 154 A 1 known. The known flow controller compares the load pressure a working line downstream of a measuring throttle or orifice plate with the Delivery pressure with which the hydraulic pump the pressure medium upstream of the measuring throttle feeds into the work management. The pressure difference between the the delivery pressure on the hydraulic pump side and the load pressure on the consumer side correspond to this Pressure drop at the preferably adjustable measuring throttle and possibly the additional one Pressure drop in the work line. The control valve regulates the delivery volume of the Hydraulic pump so that the pressure drop across the measuring throttle is as constant as possible. This corresponds to a constant flow through the measuring throttle for a given Opening cross section of the measuring throttle. The one from the hydraulic pump into the working line delivered flow rate can be changed by changing the opening cross section of the measuring throttle can be varied because the pressure drop across the flow restrictor depends on its flow resistance and thus depends on the opening cross-section. Due to the load pressure The flow rate controller adjusts the displacement volume of the hydraulic pump to that of the Consumers needed quantity coordinated. If the pressure drop at the measuring throttle increases, the hydraulic pump is pivoted back to a lower delivery volume. However, if the pressure drop at the measuring throttle decreases, the hydraulic pump in In the direction of an increase in the funding volume further pivoted until the Balance is restored.

Der bekannte lastdruckgeführte Förderstromregler hat jedoch den Nachteil, daß bei vollständig oder fast vollständig zurückgeschwenkter Hydropumpe im Null-Hubbetrieb bzw. Stand-By-Betrieb in der Hydropumpe so gut wie kein Druckmittel umgewälzt wird. Es kann daher ein Betriebszustand auftreten, bei welchem eine für die Schmierung und Kühlung der Hydropumpe ausreichende Gehäusespülung nicht sichergestellt ist. Dies kann zu einer Überhitzung der Hydropumpe oder zu einem Abreißen des Schmierfilms mit entsprechenden Schädigungen führen. Die Hydropumpe arbeitet dabei gegen die vollständig oder fast vollständig geschlossene Meß-Drossel, so daß sich zwar in dem stromaufwärtigen Bereich der Meß-Drossel ein Förderdruck als Staudruck in der Arbeitsleitung aufbaut, das von der Hydropumpe geförderte Fördervolumen jedoch relativ gering ist und für die Aufrechterhaltung der Kühl- und Schmierfunktion nicht sicher ausreicht.However, the known load pressure-controlled flow controller has the disadvantage that at fully or almost completely swung back hydraulic pump in zero stroke operation or stand-by operation in the hydraulic pump almost no pressure medium is circulated. An operating condition can therefore occur in which one for lubrication and Cooling of the hydraulic pump is not ensured sufficient housing flushing. This can to overheat the hydraulic pump or to tear off the lubricating film cause corresponding damage. The hydraulic pump works against that completely or almost completely closed measuring throttle, so that in the upstream area of the measuring throttle a delivery pressure as dynamic pressure in the Working line builds up, but the delivery volume funded by the hydraulic pump relative is low and not safe for maintaining the cooling and lubricating function sufficient.

Ein weiterer Pastdruckgeführte Förderstromregler nach dem Oberbegriff des Anspruchs 1 ist aus der US 38 56 436 A bekannt, wo zur Aufrechterhaltung der Kühl- und Schmierfunktion eine konstante Spülfördermenge, unabhängig vom Betriebsverhalten der Pumpe, fließt.Another paste pressure-controlled flow controller after the The preamble of claim 1 is known from US 38 56 436 A, where a constant to maintain the cooling and lubricating function Flush flow rate, regardless of the operating behavior of the pump, flows.

Der Erfindung liegt daher die Aufgabe zugrunde, einen lastdruckgeführten Förderstromregler nach dem Oberbegriff des Anspruchs 1 so weiterzubilden, daß nur im Betriebsbereich eines sehr geringen Fördervolumens der Hydropumpe eine ausreichende Schmier- und Kühlfunktion aufrecht erhalten wird.The invention is therefore based on the object of a load pressure-guided Flow controller according to the preamble of claim 1 so that only in Operating range of a very low delivery volume of the hydraulic pump an adequate Lubrication and cooling function is maintained.

Die Aufgabe wird durch die kennzeichnenden Merkmale des Anspruchs 1 in Verbindung mit den gattungsbildenden Merkmalen gelöst.The object is in connection with the characterizing features of claim 1 solved with the generic features.

Der Erfindung liegt die Erkenntnis zugrunde, zur Verbesserung der Kühl- und Schmierfunktion einen von der Arbeitsleitung stromaufwärts der Meß-Drossel abgezweigten Spülkreislauf zum Spülen des Gehäuseinnenraums der Hydropumpe vorzusehen. Der erfindungsgemäße Spülkreislauf wird nur benötigt, wenn das von der Hydropumpe geförderte Fördervolumen für die Aufrechterhaltung der Kühl- und Schmierfunktion zu gering ist. Entsprechend der erfindungsgemäßen Erkenntnis kann als eine auf ein geringes Fördervolumen hindeutende Meßgröße, der für die Lastdruckführung ohnehin vorhandene Lastmeldedruck in der Lastdruck-Meldeleitung verwendet werden. Mit dem Lastmeldedruck wird ein in dem Spülkreislauf angeordnetes Spülventil betätigt. Wenn der Lastmeldedruck in der Lastdruck-Meldeleitung einen vorgegebenen Schwellwert überschreitet, wird der Spülkreislauf durch Betätigen des Spülventils abgeschaltet. Der konstruktive Aufwand für den zusätzlichen Spülkreislauf ist relativ gering. Das Erzeugen von zusätzlichen Meßgrößen ist nicht erforderlich, da erfindungsgemäß der Lastmeldedruck, welcher für die Ansteuerung des Load-Sensing-Regelventils ohnehin benötigt wird, für die Ansteuerung des Spülventils mitgenutzt wird.The invention is based on the knowledge to improve the cooling and Lubrication function one from the working line upstream of the measuring throttle branched flushing circuit for flushing the interior of the hydraulic pump provided. The flushing circuit according to the invention is only required if that of the Pumped delivery volume for maintaining the cooling and Lubrication function is too low. According to the knowledge according to the invention, as a measurement quantity indicating a low delivery volume, that for the load pressure control existing load signaling pressure can be used in the load pressure signaling line. A flushing valve arranged in the flushing circuit is actuated with the load signaling pressure. If the load signal pressure in the load pressure signal line is a predetermined threshold exceeds the flushing circuit by actuating the flushing valve. The constructive effort for the additional rinsing circuit is relatively low. Generating of additional measured variables is not necessary, because according to the invention the Load signaling pressure, which is for controlling the load-sensing control valve anyway is required for controlling the flushing valve.

Die Ansprüche 2 bis 11 betreffen vorteilhafte Weiterbildungen der Erfindung.Claims 2 to 11 relate to advantageous developments of the invention.

Entsprechend Anspruch 2 ist es vorteilhaft, daß das Spülventil nicht zwischen Zuschalten und Abschalten des Spülkreislaufs abrupt umschaltet, sondern im Bereich oberhalb des den Abschaltpunkt kennzeichnenden Schwellwerts den Druckmittelfluß in dem Spülkreislauf mit zunehmenden Lastmeldedruck drosselt. Druckspitzen beim Umschalten des Spülventils werden auf diese Weise verhindert.According to claim 2, it is advantageous that the flush valve not between switching on and switching off the rinsing circuit abruptly switches, but in the area above the Switch-off point characterizing the threshold value the pressure medium flow in the flushing circuit throttles with increasing load signal pressure. Pressure peaks when switching the purge valve are prevented in this way.

Entsprechend einer in Anspruch 3 angegebenen besonders vorteilhaften Weiterbildung der Erfindung speist das Spülventil den Druck der Arbeitsleitung nicht unmittelbar in die Gehäusespülleitung ein. Die Gehäusespülleitung ist vielmehr an einem Abzweigpunkt zwischen dem Spülventil und dem Druckmitteltank stromabwärts des Spülventils angeschlossen. Auf diese Weise wird eine wirkungsvolle Druckuntersetzung erreicht und verhindert, daß in der Arbeitsleitung auftretende Druckschwankungen und Druckspitzen sich ungedämpft in der Gehäusespülleitung auswirken. Entsprechend Anspruch 4 kann in der Gehäusespülleitung eine Abzweige-Drossel und zwischen dem Abzweigepunkt und dem Druckmitteltank eine Tank-Drossel vorgesehen sein, so daß sich die Druckuntersetzung in der Gehäusespülleitung aus dem Verhältnis der Öffnungsquerschnitte dieser Drosseln ergibt. Zur weiteren Verhinderung von Druckspitzen in der Gehäusespülleitung kann in der Gehäusespülleitung entsprechend Anspruch 5 ein Abzweigeventil angeordnet sein, das die Gehäusespülleitung unterbricht, wenn der an dem Abzweigepunkt herrschende Druck, z. B. beim Auftreten von Druckspitzen, einen vorgegebenen Schwellwert überschreitet. Besonders vorteilhaft sind entsprechend Anspruch 6 das Abzweigeventil und die Abzweigedrossel baulich vereinigt.According to a particularly advantageous development of the Invention, the flush valve does not feed the pressure of the working line directly into the Housing flush line. The housing flush line is rather at a branch point between the purge valve and the pressure medium tank downstream of the purge valve connected. In this way, an effective pressure reduction is achieved and prevents pressure fluctuations and pressure peaks occurring in the working line have an undamped effect in the housing flushing line. According to claim 4 can in the housing flushing line a branch throttle and between the branch point and the pressure medium tank a tank throttle be provided so that the Pressure reduction in the housing flushing line from the ratio of the opening cross-sections of these chokes results. To further prevent pressure peaks in the Housing flush line can be in the housing flush line according to claim 5 Branch valve can be arranged, which interrupts the housing flushing line when on the Branch pressure prevailing pressure, e.g. B. when pressure peaks occur, a predetermined threshold value exceeds. Corresponding are particularly advantageous Claim 6 structurally combines the branch valve and the branch throttle.

Entsprechend einer Weiterbildung nach Anspruch 7 ist an der Lastdruck-Meldeleitung ein Druckbegrenzungsventil angeschlossen, um den in der Lastdruck-Meldeleitung herrschenden Lastmeldedruck auf einen vorgegebenen zweiten Schwellwert zu begrenzen und somit eine Übersteuerung des Regelventils zu verhindern. Entsprechend Anspruch 8 können in diesem Fall das Druckbegrenzungsventil und das Spülventil zu einem kombinierten Druckbegrenzungs-Spülventil baulich vereinigt sein, dessen bevorzugte bauliche Ausgestaltung im Anspruch 9 angegeben ist.According to a development according to claim 7 is on the load pressure signaling line Pressure relief valve connected to the in the load pressure signaling line limit the prevailing load reporting pressure to a predetermined second threshold value and thus to prevent the control valve from being overridden. According to claim 8 In this case, the pressure relief valve and the purge valve can be combined into one Combined pressure relief flush valve be structurally united, the preferred structural design is specified in claim 9.

Entsprechend Anspruch 10 ist es vorteilhaft, für die Rückstellung des Stellkolbens zwei Rückstellfedern vorzusehen, wobei eine erste Rückstellfeder den Stellkolben permanent beaufschlagt und eine zweite Rückstellfeder den Stellkolben erst ab einer vorgegebenen Mindestverschiebung beaufschlagt. Durch Verändern der Vorspannung der ersten Rückstellfeder kann der erste Schwellwert für das Einschalten des Spülkreislaufs und durch Verändern der Vorspannung der zweiten Rückstellfeder der den Druckbegrenzungsdruck bestimmende zweite Schwellwert variiert werden. Entsprechend Anspruch 11 ist durch Einstellen des Anschlags, an welchem der Stellkolben in seiner Ruhestellung anschlägt, der im Spülmittelkreis fließende Spülmittelstrom variierbar.According to claim 10, it is advantageous to reset the actuating piston two To provide return springs, with a first return spring the actuator piston permanently acted upon and a second return spring the actuating piston only from a predetermined Minimum displacement applied. By changing the preload of the first Return spring can be the first threshold for switching the flushing circuit on and through Change the preload of the second return spring or the pressure limiting pressure determining second threshold can be varied. According to claim 11 is by Setting the stop at which the actuating piston strikes in its rest position, the Flux of detergent flowing in the detergent circuit can be varied.

Bevorzugte Ausführungsbeispiele der Erfindung werden nachfolgend unter Bezugnahme auf die Zeichnung näher beschrieben. In der Zeichnung zeigen:

Fig. 1
einen hydraulischen Schaltplan eines ersten Ausführungsbeispiels des erfindungsgemäßen Förderstromreglers;
Fig. 2
eine konkrete Realisierung des bei dem in Fig. 1 dargestellten Ausführungsbeispiels des erfindungsgemäßen Förderstromreglers verwendeten Spülventils in einer schematischen Darstellung;
Fig. 3
einen hydraulischen Schaltplan eines zweiten Ausführungsbeispiels des erfindungsgemäßen Förderstromreglers; und
Fig. 4
eine konkrete Realisierung des bei dem in Fig. 3 dargestellten Ausführungsbeispiels des erfindungsgemäßen Förderstromreglers verwendeten kombinierten Druckbegrenzungs- und Spülventils in einer schematischen Darstellung.
Preferred embodiments of the invention are described below with reference to the drawing. The drawing shows:
Fig. 1
a hydraulic circuit diagram of a first embodiment of the flow controller according to the invention;
Fig. 2
a concrete implementation of the flushing valve used in the embodiment of the delivery flow controller according to the invention shown in FIG. 1 in a schematic representation;
Fig. 3
a hydraulic circuit diagram of a second embodiment of the flow controller according to the invention; and
Fig. 4
a concrete realization of the combined pressure limiting and flushing valve used in the embodiment of the delivery flow controller according to the invention shown in FIG. 3 in a schematic representation.

Fig. 1 zeigt einen schematischen, hydraulischen Schaltplan eines ersten Ausführungsbeispiels des erfindungsgemäßen, lastdruckgeführten Förderstromreglers 1. Der erfindungsgemäß weitergebildete, lastdruckgeführte Förderstromregler 1 ist auch unter dem Begriff "Load-Sensing-Regler" bekannt und wird in seiner gattungsgemäßen Grundfunktion nachfolgend kurz beschrieben.Fig. 1 shows a schematic, hydraulic circuit diagram of a first Embodiment of the load pressure-controlled flow controller 1 according to the invention. The load pressure-controlled flow controller 1 further developed according to the invention is also under the term "load-sensing controller" known and is in its generic Basic function briefly described below.

Die Hydropumpe 2 saugt über eine Saugleitung 3 Druckmittel aus einem Druckmitteltank 4 an und speist dieses unter einem Förderdruck in eine Arbeitsleitung 5 ein. Die Arbeitsleitung 5 ist über eine einstellbare Meß-Drossel 6 mit zumindest einem an dem stromabwärtigen Abschnitt 5b der Arbeitsleitung 5 angeschlossenen Verbraucher verbunden, über welchen das Druckmittel in den Druckmitteltank 4 zurückfließt. Der Abschnitt zwischen der Hydropumpe 2 und der Meß-Drossel 6 wird nachfolgend als stromaufwärtiger Abschnitt 5a der Arbeitsleitung 5 bezeichnet.The hydraulic pump 2 sucks pressure medium 3 from a pressure medium tank via a suction line 4 and feeds it into a working line 5 under a delivery pressure. The Working line 5 is via an adjustable measuring throttle 6 with at least one on the downstream section 5b of the working line 5 connected consumers connected, via which the pressure medium flows back into the pressure medium tank 4. The Section between the hydraulic pump 2 and the measuring throttle 6 is hereinafter referred to as upstream section 5a of the working line 5.

Zum Erfassen des verbraucherseitig, in dem stromabwärtigen Abschnitt 5b der Arbeitsleitung 5 herrschenden Lastdrucks ist die Arbeitsleitung 5 über eine Lastdruck-Meldeleitung 7 mit dem erfindungsgemäßen Förderstromregler 1 verbunden. Dagegen ist der stromaufwärtige Abschnitt 5a der Arbeitsleitung 5 zur Erfassung des von der Hydropumpe 2 in dem stromaufwärtigen Abschnitt 5a der Arbeitsleitung 5 erzeugten Förderdrucks mit über eine Förderdruck-Meldeleitung 8 mit dem erfindungsgemäßen Förderstromregler 1 verbunden. Die Lastdruck-Meldeleitung 7 überträgt als Regelsignal einen Lastmeldedruck an ein Regelventil 9, während die Förderdruck-Meldeleitung 8 als Regelsignal einen Fördermeldedruck an das Regelventil 9 überträgt. Das Regelventil 9 ist im dargestellten Ausführungsbeispiel als 3/2-Wegeventil ausgebildet und weist eine mit der Lastdruck-Meldeleitung 7 verbundene erste Druckkammer 10 und eine mit der Förderdruck-Meldeleitung 8 verbundene zweite Druckkammer 11 auf. Wenn der durch die Förderdruck-Meldeleitung 8 übertragene Fördermeldedruck gegenüber dem durch die Lastdruck-Meldeleitung 7 übertragenen Lastmeldedruck zunimmt oder der Lastmeldedruck gegenüber dem Fördermeldedruck abnimmt wird das Regelventil 9 in Richtung auf seine erste Regelstellung 12 verschoben. In der ersten Regelstellung 12 verbindet das Regelventil 9 die Arbeitsleitung 5 mit der Stelldruckleitung 13, so daß ein in einem ersten Stellzylinder 14 beweglicher erster Stellkolben 15 so mit Stelldruck beaufschlagt wird, daß das Fördervolumen Vg in Richtung auf das minimale Fördervolumen Vgmin zurückgeschwenkt wird. Ein in einem zweiten Stellzylinder 16 bewegbarer zweiter Stellkolben 17 bewirkt die entsprechende Rückstellkraft für das Wiederausschwenken der Hydropumpe 2.To detect the load pressure prevailing on the consumer side in the downstream section 5b of the working line 5, the working line 5 is connected to the delivery flow controller 1 according to the invention via a load pressure signaling line 7. By contrast, the upstream section 5a of the working line 5 for detecting the delivery pressure generated by the hydraulic pump 2 in the upstream section 5a of the working line 5 is connected to the delivery flow controller 1 according to the invention via a delivery pressure signaling line 8. The load pressure signaling line 7 transmits a load signaling pressure to a control valve 9 as a control signal, while the delivery pressure signaling line 8 transmits a delivery signaling pressure to the control valve 9 as a control signal. In the exemplary embodiment shown, the control valve 9 is designed as a 3/2-way valve and has a first pressure chamber 10 connected to the load pressure signaling line 7 and a second pressure chamber 11 connected to the delivery pressure signaling line 8. If the delivery signal pressure transmitted through the delivery pressure reporting line 8 increases compared to the load reporting pressure transmitted through the load pressure reporting line 7 or the load reporting pressure decreases compared to the delivery reporting pressure, the control valve 9 is shifted in the direction of its first control position 12. In the first control position 12, the control valve 9 connects the working line 5 to the control pressure line 13, so that a control pressure 15 which is movable in a first control cylinder 14 is acted upon by control pressure in such a way that the delivery volume V g is pivoted back towards the minimum delivery volume V gmin , A second actuating piston 17, which can be moved in a second actuating cylinder 16, effects the corresponding restoring force for the hydraulic pump 2 to pivot out again.

Wenn der durch die Lastdruck-Meldeleitung 7 übertragene Lastmeldedruck gegenüber dem durch die Förderdruck-Meldeleitung 8 übertragene Fördermeldedruck zunimmt oder der Fördermeldedruck gegenüber dem Lastmeldedruck abnimmt, wird das Regelventil 9 in Richtung auf seine zweite Regelstellung 18 verschoben. In der zweiten Regelstellung 18 verbindet das Regelventil 9 die Stelldruckleitung 13 mit dem Druckmitteltank 4. Daher wird der erste Stellzylinder 14 entlastet und die Hydropumpe 2 in Richtung auf das maximale Fördervolumen Vgmax weiter ausgeschwenkt, so daß sich das Fördervolumen Vg der Hydropumpe 2 erhöht.If the load signaling pressure transmitted through the load pressure signaling line 7 increases compared to the delivery signaling pressure transmitted through the delivery pressure signaling line 8 or the delivery signaling pressure decreases compared to the load signaling pressure, the control valve 9 is shifted towards its second control position 18. In the second control position 18, the control valve 9 connects the control pressure line 13 to the pressure medium tank 4. Therefore, the first control cylinder 14 is relieved and the hydraulic pump 2 is further pivoted in the direction of the maximum delivery volume V gmax , so that the delivery volume V g of the hydraulic pump 2 increases ,

Zwischen der ersten Regelstellung 12 und der zweiten Regelstellung 18 kann das Regelventil 9 jede beliebige Zwischenstellung einnehmen, so daß eine kontinuierliche Regelung des Fördervolumens der Hydropumpe 2 ermöglicht wird. Im Ergebnis wird das Fördervolumen der Hydropumpe 2 verringert, wenn der Druckabfall an der Meß-Drossel 6 zunimmt und umgekehrt wird das Fördervolumen der Hydropumpe 2 vergrößert, wenn der Druckabfall an der Meß-Drossel 6 sinkt. Das Regelventil 9 regelt daher das Fördervolumen Vg so ein, daß ein konstanter Druckabfall an der Meß-Drossel 6 entsteht. Da der Druckabfall an der Meß-Drossel 6 andererseits dem durch die Meß-Drossel 6 fließenden Volumenstrom in der Arbeitsleitung 5 proportional ist wird durch den lastdruckgeführten Förderstromregler 1 die Hydropumpe 2 auf ein konstantes Fördervolumen Vg eingeregelt.Between the first control position 12 and the second control position 18, the control valve 9 can assume any intermediate position, so that continuous control of the delivery volume of the hydraulic pump 2 is made possible. As a result, the delivery volume of the hydraulic pump 2 is reduced when the pressure drop at the measuring throttle 6 increases, and conversely, the delivery volume of the hydraulic pump 2 is increased when the pressure drop at the measuring throttle 6 decreases. The control valve 9 therefore regulates the delivery volume V g so that there is a constant pressure drop across the measuring throttle 6. Since the pressure drop at the measuring throttle 6, on the other hand, is proportional to the volume flow in the working line 5 flowing through the measuring throttle 6, the hydraulic pump 2 is regulated to a constant delivery volume V g by the load pressure-controlled flow rate controller 1.

Zur Druckbegrenzung in der Lastdruck-Meldeleitung 7 ist ein Druckbegrenzungsventil 19 vorgesehen, daß die Lastdruck-Meldeleitung 7 mit einem Druckmitteltank 4 verbindet. Durch die Begrenzung des von der Lastdruck-Meldeleitung geführten Lastmeldedrucks wird eine Übersteuerung des erfindungsgemäßen Förderstromreglers 1 insbesondere beim Auftreten von Druckspitzen vermieden. A pressure relief valve 19 is used to limit the pressure in the load pressure signaling line 7 provided that the load pressure signaling line 7 connects to a pressure medium tank 4. By limiting the load signal pressure led by the load pressure signaling line is an override of the flow rate controller 1 of the invention in particular Avoidance of pressure peaks avoided.

Die Erfindung betrifft eine Weiterbildung des lastdruckgeführten Förderstromreglers 1 im Betriebsbereich eines geringen oder fast verschwindenden Fördervolumens Vg der Hydropumpe 2. Wie bereits einleitend beschrieben, besteht bei einer geschlossenen oder fast geschlossenen Meß-Drossel 6 die Gefahr, daß die Hydropumpe 2 nicht ausreichend geschmiert ist und überhitzt wird. In diesem Betriebszustand fördert die Hydropumpe 2 gegen die ganz oder fast geschlossene Meß-Drossel 6 und hält in dem stromaufwärtigen Abschnitt 5a einen relativ hohen Förderdruck aufrecht, während der in dem stromabwärtigen Abschnitt 5b der Arbeitsleitung 5 herrschende Lastdruck relativ gering ist. Da der an den stromabwärtigen Abschnitt 5b der Arbeitsleitung 5 angeschlossene Verbraucher in diesem Betriebszustand fast keinen oder nur einen sehr geringen Förderstrom abnimmt, strömt durch die Hydropumpe 2 in diesem Stand-By-Betriebszustand nur ein sehr geringer Volumenstrom, mit welchem sich die Kühl- und Schmierfunktion nicht sicher aufrechterhalten läßt.The invention relates to a further development of the load-pressure-controlled flow rate controller 1 in the operating range of a low or almost vanishing delivery volume V g of the hydraulic pump 2. As already described in the introduction, there is a risk that the hydraulic pump 2 is not adequately lubricated when the measuring throttle 6 is closed or almost closed and is overheated. In this operating state, the hydraulic pump 2 delivers against the completely or almost closed measuring throttle 6 and maintains a relatively high delivery pressure in the upstream section 5a, while the load pressure prevailing in the downstream section 5b of the working line 5 is relatively low. Since the consumer connected to the downstream section 5b of the working line 5 decreases almost no or only a very low flow rate in this operating state, only a very small volume flow flows through the hydraulic pump 2 in this stand-by operating state, with which the cooling and Lubrication function cannot be maintained safely.

Hier setzt die Erfindung ein und schlägt vor, einen zusätzlichen Spülkreislauf zum Spülen des Gehäuseinnenraums der Hydropumpe 2 vorzusehen. Erfindungsgemäß wird der Spülkreislauf nur dann zugeschaltet, wenn er tatsächlich benötigt wird, d. h. im Betriebsbereich eines zu Schmier- und Kühlzwecken nicht ausreichenden Fördervolumens der Hydropumpe 2. Erfindungsgemäß wird als Steuersignal für das Zuschalten des Spülkreislaufs der durch die Lastdruck-Meldeleitung 7 übertragene Lastmeldedruck ausgenutzt. Der Lastmeldedruck steht zur Ansteuerung des Regelventils 9 ohnehin zur Verfügung und es ist daher nicht notwendig für das Zuschalten des Spülkreislaufs eine zusätzliche Steuergröße zu erzeugen. In dem Spülkreislauf ist daher ein Spülventil 30 vorgesehen, das über eine Verbindungsleitung 31 mit der Lastdruck-Meldeleitung 7 verbunden ist. Wenn die Lastdruck-Meldeleitung 7 nur einen geringen Lastmeldedruck führt, wird das Spülventil 30 durch die Feder 32 in einen ersten Schaltzustand 33 gedrückt, in welchem das Spülventil 30 einen gedrosselten, vorzugsweise einstellbaren Durchlaß aufweist. Wenn der Lastdruck in der Lastdruck-Meldeleitung einen vorgegebenen ersten Schwellwert überschreitet, unterbricht das Spülventil 30 den Spülkreislauf, indem das Spülventil 30 in einen zweiten Schaltzustand 34 gedrückt wird, in welchem es keinen Durchlaß aufweist. Es hat sich gezeigt, daß der Lastmeldedruck ein zuverlässiges Kriterium für das Zuschalten bzw. Abschalten des Spülkreislaufs darstellt, da der Lastdruck in dem stromabwärtigen Abschnitt 5b der Arbeitsleitung 5 niedrig ist, wenn die Meß-Drossel 6 ganz oder fast vollständig geschlossen ist.This is where the invention comes in and proposes an additional rinsing circuit for rinsing of the housing interior of the hydraulic pump 2. According to the Flushing circuit only switched on when it is actually needed, d. H. in the Operating range of a delivery volume that is insufficient for lubrication and cooling purposes the hydraulic pump 2. According to the invention is used as a control signal for switching on the Flushing circuit of the load signal pressure transmitted through the load pressure signaling line 7 exploited. The load reporting pressure is available to control the control valve 9 anyway Available and it is therefore not necessary to switch on the flushing circuit generate additional tax parameters. There is therefore a flush valve 30 in the flush circuit provided that via a connecting line 31 with the load pressure signaling line 7th connected is. If the load pressure signaling line 7 only a low load signaling pressure leads, the purge valve 30 by the spring 32 in a first switching state 33rd pressed, in which the purge valve 30 a throttled, preferably adjustable Passage has. If the load pressure in the load pressure signaling line exceeds the predetermined first threshold value, the purge valve 30 interrupts the Flushing circuit by pushing the flushing valve 30 into a second switching state 34, in which it has no passage. It has been shown that the load reporting pressure represents a reliable criterion for switching the flushing circuit on or off, because the load pressure in the downstream section 5b of the working line 5 is low when the measuring throttle 6 is completely or almost completely closed.

Bei der erfindungsgemäßen Ausbildung des Spülkreislaufs ist das Spülventil 30 über eine Verbindungsleitung 35 mit der Arbeitsleitung 5 verbunden, so daß der Spülkreislauf aus der Arbeitsleitung 5 abgezweigt wird. Das Spülventil 30 ist über eine Tank-Drossel 36 und einen Kühler 37 mit dem Druckmitteltank 4 verbunden. Zwischen dem Spülventil 30 und der Tank-Drossel 36 befindet sich ein Abzweigepunkt 38, von welchem eine Gehäusespülleitung 39 abzweigt. In der Gehäusespülleitung 39, vorzugsweise in der Nähe der Abzweigestelle 38, ist ein Abzweigeventil 40 angeordnet, welches eine Abzweigedrossel 41 aufweist. Das Abzweigeventil 40 ist so ausgebildet, daß es die Gehäusespülleitung 39 unterbricht, wenn der an dem Abzweigepunkt 38 herrschende Druck einen vorgegebenen Schwellwert überschreitet. Auf diese Weise können Druckspitzen von der Gehäusespülleitung 39 ferngehalten werden. Durch die Abzweigung der Gehäusespülleitung 39 von dem Hauptzweig 42 des Spülkreislaufs wird eine Untersetzung des Gehäusespüldrucks erreicht, ohne das dazu ein besonderes Druckminderventil notwendig wäre. Der Druck in der Gehäusespülleitung 39 ist durch das Verhältnis der Öffnungsquerschnitte der Tank-Drossel 36 und der Abzweige-Drossel 41 einstellbar. Die bauliche Vereinigung der Abzweige-Drossel 41 und des Abzweigeventils 40 gestattet eine besonders kompakte Bauweise.In the embodiment of the flushing circuit according to the invention, the flushing valve 30 has a Connection line 35 connected to the working line 5, so that the rinsing circuit the working line 5 is branched off. The purge valve 30 is via a tank throttle 36 and a cooler 37 connected to the pressure medium tank 4. Between the purge valve 30 and the tank throttle 36 is a branch point 38, one of which Branch purge line 39 branches. In the housing flushing line 39, preferably in the vicinity the branch point 38, a branch valve 40 is arranged, which a Branch choke 41 has. The branch valve 40 is designed so that it Housing flush line 39 interrupts when the prevailing at the branch point 38 Pressure exceeds a predetermined threshold. That way you can Pressure peaks are kept away from the housing flushing line 39. Through the junction the housing flushing line 39 from the main branch 42 of the flushing circuit becomes one Reduction of the case purge pressure is achieved, without doing anything special Pressure reducing valve would be necessary. The pressure in the housing flushing line 39 is due to the Ratio of the opening cross sections of the tank throttle 36 and the branch throttle 41 adjustable. The structural union of the branch throttle 41 and the branch valve 40 allows a particularly compact design.

Fig. 2 zeigt ein Ausführungsbeispiel für eine konkrete Realisierung des in der in Fig. 1 dargestellten hydraulischen Schaltung verwendeten Spülventils 30.FIG. 2 shows an exemplary embodiment for a concrete realization of the one in FIG. 1 shown hydraulic circuit used flush valve 30th

In einem Ventilkörper 50 sind jeweils ein Anschluß 51 für die Verbindungsleitung 35 mit der Arbeitsleitung 5, ein Anschluß 52 für die Verbindungsleitung 31 mit der Lastdruck-Meldeleitung 7 und ein weiterer Anschluß 53 für eine Leitung, die zu dem Abzweigepunkt 38 führt, vorgesehen. Der mit der Lastdruck-Meldeleitung 7 in Verbindung stehende Anschluß 52 mündet in eine Druckkammer 54, die eine Druckfläche 55 eines Stellkolbens 56 gegen eine Rückstellfeder 57 beaufschlagt. Der Stellkolben 56 ist in einer stufenzylinderförmigen Bohrung 58 des Ventilkörpers 50 gegen die Rückstellfeder 57 bewegbar. Im Bereich des mit der Arbeitsleitung 5 verbundenen Anschlusses 51 weist die Bohrung 58 eine ringförmige Erweiterung 59 auf. Der Stellkolben 56 weist einen ersten Abschnitt 60 und einen zweiten Abschnitt 61 jeweils mit erweitertem Durchmesser auf. Der erste Abschnitt 60 mit erweiterten Durchmesser trennt den mit der Lastdruck-Meldeleitung 7 verbundenen Anschluß 52 von dem mit der Arbeitsleitung 5 verbundenen Anschluß 51. Beide Abschnitte 60 und 61 dienen gleichzeitig der Führung des Stellkolbens 56 in der zylinderförmigen Bohrung 58.A connection 51 for the connecting line 35 is in each case in a valve body 50 the working line 5, a connection 52 for the connecting line 31 with the load pressure signaling line 7 and a further connection 53 for a line leading to the branch point 38 leads, provided. The one connected to the load pressure signaling line 7 Port 52 opens into a pressure chamber 54, which has a pressure surface 55 of an actuating piston 56 acted against a return spring 57. The actuating piston 56 is in one step-cylindrical bore 58 of the valve body 50 against the return spring 57 movable. In the area of the connection 51 connected to the working line 5, the Bore 58 has an annular extension 59. The adjusting piston 56 has a first one Section 60 and a second section 61 each with an enlarged diameter. The first section 60 with an enlarged diameter separates the one with the load pressure signaling line 7 connected terminal 52 of the connected to the working line 5 Connection 51. Both sections 60 and 61 simultaneously serve to guide the actuating piston 56 in the cylindrical bore 58.

Zwischen den beiden Abschnitten 60 und 61 mit erweiterten Durchmesser weist der Stellkolben 56 einen Abschnitt 62 mit verminderten Durchmesser auf, wobei an dem Übergang zwischen dem Abschnitt 62 mit verringerten Durchmesser und dem ersten Abschnitt 60 mit erweiterten Durchmesser eine Steuerkante 63 ausgebildet ist. Sobald die Steuerkante 63 die rückstellfederseitige Kante 64 der Ringnut 59 erreicht, ist die Verbindung zwischen dem mit der Arbeitsleitung 5 verbundenen Anschluß 51 und dem mit der Abzweigung 38 verbundenen Anschluß 53 unterbrochen. Bevor die Steuerkante 53 die Kante 64 der Ringnut 59 erreicht, tritt bereits eine Drosselwirkung ein, so daß die Verbindung zwischen den Anschlüssen 51 und 53 nicht abrupt unterbrochen wird, sondern sich der Querschnitt mit zunehmender Verschiebung des Stellkolbens 56 allmählich verringert. Die für die Gehäusespülung der Hydropumpe 2 benötigte Spülmenge ist durch einen z. B. mittels eines Gewindes verstellbaren Anschlag 65, an welchem der Stellkolben 56 in seiner Ruhestellung anschlägt, einstellbar.Between the two sections 60 and 61 with an enlarged diameter, the Adjusting piston 56 has a section 62 with a reduced diameter, on which Transition between the reduced diameter section 62 and the first Section 60 with an enlarged diameter a control edge 63 is formed. As soon as the Control edge 63 reaches the return spring edge 64 of the annular groove 59 is the Connection between the connection 51 connected to the working line 5 and the the branch 38 connected connection 53 interrupted. Before the control edge 53 the Edge 64 of the annular groove 59 reached, a throttling effect already occurs, so that the Connection between the terminals 51 and 53 is not abruptly interrupted, but the cross section gradually increases with increasing displacement of the adjusting piston 56 reduced. The flush volume required for flushing the housing of the hydraulic pump 2 is through a z. B. by means of a thread adjustable stop 65 on which the actuating piston 56 strikes in its rest position, adjustable.

Selbstverständlich sind jedoch auch eine Vielzahl anderer konkreter Ausbildung des Spülventils 30 im Rahmen der Erfindung denkbar.Of course, a variety of other specific training of the Flushing valve 30 is conceivable within the scope of the invention.

Fig. 3 zeigt ein alternatives Ausführungsbeispiel des erfindungsgemäßen, lastdruckgeführten Förderstromreglers 1. Bereits beschriebene Elemente sind mit übereinstimmenden Bezugszeichen versehen, so daß sich eine wiederholende Beschreibung erübrigt.3 shows an alternative embodiment of the inventive load pressure-controlled flow rate controller 1. Elements already described are included matching reference numerals, so that a repetitive description unnecessary.

Das in Fig. 3 dargestellte Ausführungsbeispiel unterscheidet sich von dem bereits anhand von Fig. 1 beschriebenen Ausführungsbeispiel dadurch, daß das Spülventil 30 und das Druckbegrenzungsventil 19 baulich vereinigt sind, um eine besonders kompakt Bauweise des erfindungsgemäßen Förderstromreglers 1 zu erzielen und die Fertigungskosten weiter zu verringern.The embodiment shown in FIG. 3 differs from that already based on 1 described embodiment in that the flush valve 30 and Pressure relief valve 19 are structurally combined to a particularly compact design to achieve the flow rate controller 1 according to the invention and the manufacturing costs further to reduce.

Das kombinierte Druckbegrenzungs- und Spülventil 30, 19 ist als 4/2-Wegeventil ausgebildet und über die Verbindungsleitung 31 mit der Lastdruck-Meldeleitung 7, und die Verbindungsleitung 35 mit der Arbeitsleitung 5 verbunden. Gleichzeitig steht das kombinierte Druckbegrenzungs- und Spülventil 30, 19 mit dem Abzweigepunkt 38 des Spülkreislaufs in Verbindung.The combined pressure limiting and flushing valve 30, 19 is a 4/2-way valve formed and via the connecting line 31 with the load pressure signaling line 7, and the Connection line 35 connected to the working line 5. At the same time it stands combined pressure limiting and flushing valve 30, 19 with the branch point 38 of the Rinsing circuit in connection.

Bei einem geringen Lastmeldedruck in der Lastdruck-Meldeleitung 7 wird der Stellkolben des kombinierten Druckbegrenzungs- und Spülventil durch die Rückstellfeder 70 in die erste Regelstellung 71 gedrückt, in welcher die Arbeitsleitung 5 gedrosselt mit dem Abzweigepunkt 38 des Spülkreislaufs verbunden ist. Die Verbindung zwischen der Lastdruck-Meldeleitung 7 und dem Druckmitteltank 4 ist in dieser Regelstellung unterbrochen. In der schematisch eingezeichneten zweiten Regelstellung 72 hingegen, ist die Arbeitsleitung 5 von dem Abzweigepunkt 38 des Spülkreislaufs getrennt. Dagegen ist die Lastmeldeleitung 7 gedrosselt mit dem Druckmitteltank 4 verbunden, um den Lastmeldedruck auf einen vorgegebenen Maximalwert zu begrenzen und eine Übersteuerung des Regelventils 9 zu vermeiden. Zwischen den beiden Regelstellungen 71 und 72 kann das kombinierte Druckbegrenzungs- und Spülventil 30, 19 jede beliebige Zwischenstellung einnehmen. Für die Druckabschneidung bzw. Druckbegrenzung, d. h. für den Schwellwert, bei welchem das Druckbegrenzungsventil 19 ausgelöst wird, einerseits und für die Druckeinstellung für den Spülmengendruck, d. h. den Schwellwert, bei welchem der Spülkreislauf unterbrochen wird, andererseits, sind unterschiedliche Werte einstellbar. Dies wird besonders aus Fig. 4 deutlich, welche eine konkrete Realisierung des bei dem Ausführungsbeispiel nach Fig. 3 verwendeten, kombinierten Druckbegrenzungs- und Spülventils 30, 19 zeigt. Bereits in Fig. 2 verwendete Bezugszeichen sind übereinstimmend verwendet, um die Zuordnung zu erleichtern.At a low load signal pressure in the load pressure signal line 7, the control piston of the combined pressure relief and flushing valve through the return spring 70 in the pressed first control position 71, in which the working line 5 throttled with the Junction point 38 of the rinsing circuit is connected. The connection between the Load pressure signaling line 7 and the pressure medium tank 4 is in this control position interrupted. In the schematically drawn second control position 72, however, is the working line 5 is separated from the branch point 38 of the rinsing circuit. Against it the load signaling line 7 throttled to the pressure medium tank 4 connected to the Limit the load reporting pressure to a predetermined maximum value and a To avoid overriding the control valve 9. Between the two control positions 71 and 72, the combined pressure relief and purge valve 30, 19 can be any Take intermediate position. For pressure cutoff or pressure limitation, d. H. for the threshold value at which the pressure limiting valve 19 is triggered, on the one hand and for the pressure setting for the flush volume pressure, d. H. the threshold, at which the rinsing cycle is interrupted, on the other hand, are different Values adjustable. This is particularly clear from Fig. 4, which is a concrete one Realization of the combined used in the embodiment of FIG. 3 Pressure relief and purge valve 30, 19 shows. Already used in Fig. 2 Reference numerals are used in the same way to facilitate the assignment.

In dem Ventilkörper 50 ist ein mit der Arbeitsleitung 5 über die Verbindungsleitung 35 verbundener Arbeitsleitungs-Anschluß 51, ein über die Verbindungsleitung 31 mit der Lastddruck-Meldeleitung 7 verbundener Lastmelde-Anschluß 52, ein mit dem Spülkreislauf insbesondere mit dem Abzweigepunkt 38, verbundener Spül-Anschluß 53 und mehrere mit dem Druckmitteltank 4 verbundene Tank-Anschlüsse 80 - 83 ausgebildet. Der Stellkolben 56 ist gegen eine erste Rückstellfeder 84, die den Stellkolben 56 permanent beaufschlagt, und gegen eine zweite Rückstellfeder 85, die den Stellkolben 56 erst ab einer vorgegebenen Mindestverschiebung aus der Ruhelage beaufschlagt, in einer stufenzylinderförmigen Bohrung 86 bewegbar. Zwischen einem ersten erweiterten Abschnitt 60 und einem zweiten erweiterten Abschnitt 61 weist der Stellkolben 56 einen Abschnitt 62 mit verjüngtem Durchmesser auf, wie dies bereits anhand von Fig. 2 beschrieben wurde. Die Steuerkante 63 unterbricht die Verbindung zwischen dem Arbeitsleitungs-Anschluß 51 und dem Spül-Anschluß 53, wenn der Stellkolben 56 entsprechend weit gegen die erste Rückstellfeder 84 verschoben ist, so daß die Steuerkante 63 die Kante 64 der ringförmigen Nut 59 erreicht. Der Schwellwert, bei welchem der Spülkreislauf unterbrochen wird, ist daher durch Einstellen der Vorspannung der ersten Rückstellfeder 84 variierbar. Dieser erste Schwellwert liegt typischerweise unterhalb von 30 bar.In the valve body 50 there is a connection to the working line 5 via the connecting line 35 connected working line connection 51, one via the connecting line 31 with the Load pressure reporting line 7 connected load reporting connection 52, one with the Flushing circuit, in particular with branch point 38, connected flushing connection 53 and a plurality of tank connections 80-83 connected to the pressure medium tank 4 are formed. The actuating piston 56 is against a first return spring 84, which actuates the actuating piston 56 permanently acted upon, and against a second return spring 85 which actuates the actuating piston 56 only applied from a predetermined minimum shift from the rest position, in one step-cylindrical bore 86 movable. Between a first extended Section 60 and a second expanded section 61 has the actuating piston 56 Section 62 with a tapered diameter, as already shown in FIG. 2 has been described. The control edge 63 interrupts the connection between the Working line connection 51 and the flushing connection 53 when the actuating piston 56th is displaced accordingly far against the first return spring 84, so that the control edge 63 reaches the edge 64 of the annular groove 59. The threshold at which the Flushing cycle is interrupted, therefore, by adjusting the bias of the first Return spring 84 variable. This first threshold is typically below 30 bar.

Zur Verschiebung des Stellkolbens 56 ist in dem Ventilkörper 50 eine Druckkammer 54 ausgebildet, die mit dem Lastmelde-Anschluß 52 verbunden ist und eine Druckfläche 55 des Stellkolbens 56 beaufschlagt. Der Stellkolben 56 weist einen dritten Abschnitt 90 mit erweitertem Durchmesser auf, der in der Ruhestellung des Stellkolbens 56 den Lastmelde-Anschluß 52 von dem Tank-Anschluß 82 trennt. Wenn der Stellkolben 56 jedoch so weit verschoben wird, daß die Steuerkante 91 des Stellkolbens 56 die Kante 92 der an dem Ventilkörper 50 ausgebildeten Ringnut 93 erreicht, ergibt sich eine gedrosselte Verbindung zwischen dem Lastmelde-Anschluß 52 und dem Tank-Anschluß 82. Auf diese Weise wird der Lastmeldedruck in der Lastdruck-Meldeleitung 7 auf einen vorgegebenen Schwellwert begrenzt. Weil die zweite Rückstellfeder 85 den Stellkolben 56 erst dann beaufschlagt, wenn die Steuerkante 91 den Bereich der Kante 92 des Ventilkörpers 50 erreicht, jedoch noch nicht dann, wenn die Steuerkante 63 im Bereich der Kante 64 der Ringnut 59 ist, sind der erste Schwellwert für die Unterbrechung des Spülkreislaufs durch Einstellen der ersten Rückstellfeder 64 und der zweite Schwellwert für die Druckbegrenzung des Lastmeldedrucks durch Einstellen der zweiten Rückstellfeder 85 unabhängig voneinander einstellbar. Während der erste Schwellwert typischerweise unterhalb von 30 bar liegt, liegt der zweite Schwellwert typischerweise oberhalb von 30 bar.A pressure chamber 54 is located in valve body 50 for displacing actuating piston 56 formed, which is connected to the load signaling connection 52 and a pressure surface 55th of the actuating piston 56. The actuating piston 56 has a third section 90 expanded diameter, which in the rest position of the actuating piston 56, the load signaling connection 52 separates from the tank connection 82. If the adjusting piston 56 so far is shifted that the control edge 91 of the actuating piston 56, the edge 92 of the Valve body 50 formed annular groove 93, there is a throttled connection between the load signaling connection 52 and the tank connection 82. In this way the load reporting pressure in the load pressure reporting line 7 to a predetermined threshold limited. Because the second return spring 85 only acts on the actuating piston 56, when the control edge 91 reaches the area of the edge 92 of the valve body 50, however not yet when the control edge 63 is in the area of the edge 64 of the annular groove 59, are the first threshold for interrupting the rinsing cycle by setting the first return spring 64 and the second threshold value for the pressure limitation of the Load reporting pressure by adjusting the second return spring 85 independently of each other adjustable. While the first threshold is typically below 30 bar the second threshold is typically above 30 bar.

Selbstverständlich kann auf eine der beiden Rückstellfedern 84 oder 85 verzichtet werden, wenn die unabhängige Einstellung der beiden Schwellwerte in der Praxis nicht erforderlich ist. Die Spülmenge, mit welcher der Spülkreislauf versorgt wird, ist durch Einstellen des Anschlags 65, an welchem der Stellkolben 56 in seiner Ruhestellung anschlägt, einstellbar.Of course, one of the two return springs 84 or 85 can be omitted, if the independent setting of the two threshold values is not necessary in practice is. The flushing quantity with which the flushing circuit is supplied can be adjusted by setting the Stop 65, on which the adjusting piston 56 strikes in its rest position, adjustable.

Fig. 4 zeigt ferner ein konkretes Ausführungsbeispiel für das Abzweigeventil 40. Das Abzweigeventil 40 weist eine Druckkammer 100 auf, die eine Druckfläche 101 des Stellkolbens 102 gegen eine Rückstellfeder 103 beaufschlagt. Wenn der Stellkolben 102 so weit verschoben wird, daß die Steuerkante 104 die Kante 105 der Erweiterung 106 erreicht, wird die Verbindung zwischen der Abzweigung 38 und der Gehäusespülleitung 39 unterbrochen. Die Abzweige-Drossel 41 ist in den Stellkolben 102 integriert.Fig. 4 also shows a specific embodiment for the branch valve 40. Das Branch valve 40 has a pressure chamber 100, which has a pressure surface 101 of the Actuating piston 102 urged against a return spring 103. If the actuating piston 102 so is shifted far that the control edge 104 the edge 105 of the extension 106th reached, the connection between the branch 38 and the housing flushing line 39 interrupted. The branch throttle 41 is integrated in the actuating piston 102.

Die Erfindung ist nicht auf die dargestellten Ausführungsbeispiele begrenzt. Im Rahmen der Erfindung können eine Vielzahl anderer konkreter Ventilgestaltungen zum Einsatz kommen. Ferner ergeben sich eine Vielzahl anderer konkreter Ausgestaltungen eines lastdruckgeführten Förderstromreglers. Das in Fig. 4 gezeigte Ausführungsbeispiel des Abzweigeventils 40 kann selbstverständlich auch bei dem Ausführungsbeispiel nach Fig. 1 zum Einsatz kommen.The invention is not limited to the exemplary embodiments shown. As part of The invention can use a variety of other specific valve designs come. There are also a large number of other specific configurations of one load pressure-controlled flow rate controller. The embodiment shown in Fig. 4 Branch valve 40 can of course also be used in the exemplary embodiment according to FIG. 1 are used.

Claims (11)

  1. Load pressure-controlled delivery-flow regulator (1) for a hydraulic pump (2) delivering, under a delivery pressure, to a working line (5), having
    a measuring throttle (6) arranged in the working line (5), a load pressure-indicating line (7), connected to the working line (5) downstream of the measuring throttle (6), for indicating a load pressure of a consumer connected to the working line (5) and for transmitting a load-indicating pressure as a function of the load pressure,
    a delivery pressure-indicating line (8), connected to the working line (5) upstream of the measuring throttle (6), for indicating the delivery pressure of the hydraulic pump (2) and for transmitting a delivery-indicating pressure as a function of the delivery pressure, and
    a regulating valve (9) which is connected to the load pressure-indicating line (7) and to the delivery pressure-indicating line (8) and regulates the delivery volume of the hydraulic pump (2), reducing the delivery volume of the hydraulic pump (2) as the difference between delivery-indicating pressure and load-indicating pressure increases and increasing it as the difference decreases,
    characterised by
    a flushing circuit (30, 38, 40, 39), branched from the working line (5) upstream of the measuring throttle (6), for flushing the housing interior of the hydraulic pump (2), with a flushing valve (30) which is connected to the load pressure-indicating line (7) and interrupts the flushing circuit (30, 38, 40, 39) if the load-indicating pressure prevailing in the load pressure-indicating line (7) exceeds a preset first threshold value.
  2. Load pressure-controlled delivery-flow regulator according to Claim 1,
    characterised in that, at a load-indicating pressure below the preset first threshold value, the flushing valve (30) throttles the flow through the flushing circuit (30, 38, 40, 39) as the load-indicating pressure increases.
  3. Load pressure-controlled delivery-flow regulator according to Claim 1 or 2,
    characterised in that the flushing valve (30) is arranged between the working line (5) and a pressure-medium tank (4), and a housing-flushing line (39) branches off at a branch point (38) downstream of the flushing valve (30).
  4. Load pressure-controlled delivery-flow regulator according to Claim 3,
    characterised in that a branch throttle (41) is provided in the housing-flushing line (39) and a tank throttle (36) is provided between the branch point (38) and the pressure-medium tank (4).
  5. Load pressure-controlled delivery-flow regulator according to Claim 3 or 4,
    characterised in that a branch valve (40), which interrupts the housing-flushing line (39) if the pressure prevailing at the branch point (38) exceeds a preset threshold value, is arranged in the housing-flushing line (39).
  6. Load pressure-controlled delivery-flow regulator according to Claim 4 and 5,
    characterised in that the branch valve (40) and the branch throttle (41) are structurally united.
  7. Load pressure-controlled delivery-flow regulator according to one of Claims 1 to 6,
    characterised in that a pressure-limiting valve (19), which limits the load-indicating pressure prevailing in the load pressure-indicating line (7) if a second threshold value is exceeded, is arranged between the load pressure-indicating line (7) and the pressure-medium tank (4).
  8. Load pressure-controlled delivery-flow regulator according to Claim 7,
    characterised in that the pressure-limiting valve (19) and the flushing valve (30) are structurally united to form a combined pressure-limiting and flushing valve (30, 19).
  9. Load pressure-controlled delivery-flow regulator according to Claim 8,
    characterised in that the combined pressure-limiting and flushing valve (30, 19) has
       a working-line connection (51) formed in a valve body (50) and connected to the working line (5),
       a load-indicating connection (52) formed in the valve body (50) and connected to the load pressure-indicating line (7),
       a flushing valve (53) formed in the valve body (50) and connected to the flushing circuit (38, 40, 39),
       at least one tank connection (82) formed in the valve body (50) and connected to the pressure-medium tank (4), and
       a controlling piston (56) movable in the valve body (50),
    there being formed on the controlling piston (56)
       a pressure surface (55) connected to the load-indicating connection (52) and subjected to the load-indicating pressure in order to displace the controlling piston (56) against at least one restoring spring (84, 85),
       a first control edge (63), which interrupts the connection between the working-line connection (51) and the flushing connection (53) owing to the displacement of the controlling piston (56) if the load-indicating pressure exceeds the first threshold value, and
       a second control edge (91), which breaks the connection between the load-indicating connection (52) and the tank connection (82) owing to the displacement of the controlling piston (56) if the load-indicating pressure exceeds the second threshold value.
  10. Load pressure-controlled delivery-flow regulator according to Claim 9,
    characterised in that a first restoring spring (84), which permanently acts on the controlling piston (56), and a second restoring spring (85), which acts on the controlling piston (56) only from a preset minimum displacement, are provided, and
    in that the pretension of the first restoring spring (84) is adjustable for the purpose of varying the first threshold value and/or the pretension of the second restoring spring (85) is adjustable for the purpose of varying the second threshold value.
  11. Load pressure-controlled delivery-flow regulator according to Claim 9 or 10,
    characterised in that the stop (65) of the controlling piston (56), against which the controlling piston (56) butts in its rest position, is adjustable for the purpose of varying the flushing-medium flow flowing in the flushing circuit (38, 40, 39).
EP98103929A 1997-04-04 1998-03-05 Load sensing control with flushing circuit Expired - Lifetime EP0869285B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19713934 1997-04-04
DE19713934A DE19713934B4 (en) 1997-04-04 1997-04-04 Load pressure-controlled flow regulator with flushing circuit

Publications (3)

Publication Number Publication Date
EP0869285A2 EP0869285A2 (en) 1998-10-07
EP0869285A3 EP0869285A3 (en) 1999-09-22
EP0869285B1 true EP0869285B1 (en) 2002-09-11

Family

ID=7825449

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98103929A Expired - Lifetime EP0869285B1 (en) 1997-04-04 1998-03-05 Load sensing control with flushing circuit

Country Status (2)

Country Link
EP (1) EP0869285B1 (en)
DE (2) DE19713934B4 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19930618A1 (en) * 1999-07-02 2001-01-04 Mannesmann Rexroth Ag Hydraulic control arrangement for supplying pressure medium to preferably several hydraulic consumers
DE10351930A1 (en) * 2003-11-07 2005-06-09 Linde Ag Hydrostatic machine
DE102005051482A1 (en) * 2005-10-27 2007-05-03 Brueninghaus Hydromatik Gmbh Load-pressure-controlled flow regulator with vibration damping
DE102009012560B4 (en) 2009-03-11 2019-09-12 Robert Bosch Gmbh Valve device for a control device
CN102878153B (en) * 2012-11-06 2015-03-18 南京贝奇尔机械有限公司 Pump-controlled switching device of multi-way valve testing platform, and switching controlling method of pump-controlled switching device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1284310A (en) * 1969-06-25 1972-08-09 Task Corp Improvements relating to fluid pumping systems
US3753627A (en) * 1971-04-09 1973-08-21 E Ward Pump bypass liquid control
US3856436A (en) * 1972-12-18 1974-12-24 Sperry Rand Corp Power transmission
GB1555118A (en) * 1975-10-04 1979-11-07 Lucas Industries Ltd Servo pressure control arrangements for variable stroke pumps
DE2925236A1 (en) * 1979-06-22 1981-01-15 Danfoss As Variable output pump with spring loaded servo piston - which is pressure actuated and coupled to idling valve with throttling action
DE4447154C2 (en) * 1994-12-29 2002-05-29 Brueninghaus Hydromatik Gmbh Load-sensing circuit

Also Published As

Publication number Publication date
EP0869285A2 (en) 1998-10-07
EP0869285A3 (en) 1999-09-22
DE59805468D1 (en) 2002-10-17
DE19713934A1 (en) 1998-10-08
DE19713934B4 (en) 2004-06-03

Similar Documents

Publication Publication Date Title
DE10319484B4 (en) Hydraulic control system
EP0294776B1 (en) Control circuit for a hydraulic adjusting device
DE102004012382B4 (en) Hydraulic arrangement
DE102005022275A1 (en) Hydraulic control arrangement
EP2613058B1 (en) Système hydraulique
DE4235709A1 (en) Hydrostatic drive system
DE10019254C2 (en) Pressure control valve
DE4108915C2 (en) Hydraulic device for supplying pressure medium to a privileged primary load circuit
DE4235707B4 (en) Hydrostatic drive system
WO1998021484A1 (en) Valve system and manufacture of same
DE3433535C2 (en) Two-position switching valve with hydraulic self-holding
EP0869285B1 (en) Load sensing control with flushing circuit
CH628117A5 (en) Brake-valve device
DE19953170B4 (en) Power control device and valve block for a power control device
EP1502027B1 (en) Regulatory device comprising a threshold value control valve
DE69402890T2 (en) Anti-lock modulator
DE19735482B4 (en) Hydraulic system with a differential cylinder and a rapid-action valve
EP1934487B1 (en) Hydraulic control device
EP3464908B1 (en) Valve device
EP1954949B1 (en) Hydraulic control device
EP0582859B1 (en) Hydraulic control device
DE102012218450A1 (en) Valve device, in particular for controlling a Druckabschneidventils
DE10035631C2 (en) Nullastschaltung
EP0135751A1 (en) Hydraulic device
WO2023237526A1 (en) Hydraulic system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): DE FR GB IT SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 19991013

AKX Designation fees paid

Free format text: DE FR GB IT SE

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

17Q First examination report despatched

Effective date: 20020307

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB IT SE

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20020911

REF Corresponds to:

Ref document number: 59805468

Country of ref document: DE

Date of ref document: 20021017

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

26N No opposition filed

Effective date: 20030612

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20080313

Year of fee payment: 11

Ref country code: GB

Payment date: 20080320

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20080314

Year of fee payment: 11

Ref country code: DE

Payment date: 20080321

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20080327

Year of fee payment: 11

EUG Se: european patent has lapsed
GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20090305

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20091130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090305

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090305

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090306