EP0733583B1 EP96420060A EP96420060A EP0733583B1 EP 0733583 B1 EP0733583 B1 EP 0733583B1 EP 96420060 A EP96420060 A EP 96420060A EP 96420060 A EP96420060 A EP 96420060A EP 0733583 B1 EP0733583 B1 EP 0733583B1
Authority
EP
European Patent Office
Prior art keywords
jib
mast
articulated
crane
foldable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP96420060A
Other languages
German (de)
French (fr)
Other versions
EP0733583A1 (en
Inventor
François Aquino
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Manitowoc Crane Group France SAS
Original Assignee
Potain SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potain SA filed Critical Potain SA
Publication of EP0733583A1 publication Critical patent/EP0733583A1/en
Application granted granted Critical
Publication of EP0733583B1 publication Critical patent/EP0733583B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • B66C23/348Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes the erection being operated by jacks

Definitions

  • the present invention relates to a self-erecting crane automated, in particular a foldable mast crane, provided an arrow articulated at the top of the mast and made in three successive elements articulated to each other, to know, an arrowhead, an intermediate element of arrow and an arrowhead.
  • the invention relates to a crane whose the boom is folded laterally along the mast and more precisely to a device which allows the folding the arrowhead simultaneously with the folding up the crane for transport.
  • the present invention provides an improvement sensitive to the previous embodiment by providing a device for extending the folding of the arrow laterally along the mast to an arrow made in three elements articulated to each other, so to allow the transport of the folded crane under a smaller footprint, even with a length boom more important.
  • a crane comprises a mast, in particular foldable, at the top of which is articulated, in the centered position, an arrow whose hinge axis is inclined at an acute angle (A) relative to a direction perpendicular to the defined vertical median plane by the mast and the boom in the deployed working position, realized in three successive elements articulated one to the others, designated respectively as arrowheads, intermediate arrow and arrowhead element, the boom foot and the intermediate boom member being hinged at their lower members around an articulation axis inclined at an angle (B), substantially equal to half (A / 2) of the acute angle of inclination (A) of the articulation axis of the boom at top of mast, relative to a perpendicular direction in the vertical median plane of the arrow, so that folded position, the intermediate boom element and the arrowhead are positioned laterally by relative to the mast, the crane further comprising a device motorized unfolding / folding of the mast and boom assembly and means for unfolding / folding the boom elements, and this
  • the additional device for unfolding / folding the arrowhead, relative to the intermediate element of arrow consists of a connecting rod articulated to the part front of the arrow foot and a punch articulated to the rear part of the intermediate boom element, the connecting rod and the punch being articulated together at the top of the punch, of a lever articulated at the rear of the arrowhead and likely to rest on the structure of said arrowhead, and of a drawing connecting the top of the connecting rod / punch assembly to the free end of the lever, to form a quadrilateral deformable.
  • the pulling comprises several successive elements, a first simple element articulated at the top of the whole connecting rod / punch and on which is formed longitudinally a light, a second element comprising a part simple connected to the first element by an axis crossing the light and a double part providing space for the passage of a tie rod supporting the intermediate element, and a third element consisting of two binoculars connecting by joints the ends of the double part of the second tie rod and the free ends of two identical connecting rods forming the lever articulated at the posterior part of the arrowhead.
  • the part lower side of the foldable mast is fitted laterally, side where the boom, unfolding or unfolding is done several rollers likely to take contact with the underside of the arrowhead to finish the complete folding of the crane.
  • the crane shown schematically in the drawing comprises a fixed or rolling basic chassis 1, retractable, supporting by means of a orientation device 2 a rotating frame 3 which carries at the rear a counterweight 4 and at the front of which is articulated around a horizontal axis 5, a foldable mast 6 composed of a lower mast or base mast 7 and a mast upper 8 connected to each other by articulation on their rear face about a horizontal axis 9; the mast of base 7 and upper mast 8 have, in the example considered, an octagonal section.
  • This crane is provided a foldable / collapsible distributor boom 10, carried out in three successive designated elements respectively as jib foot 11, element arrow intermediate 12 and arrowhead 13.
  • the foldable mast 6 is motorized for its unfolding / folding by means of a jack 14, 15 whose body 14 is connected to the base mast 7 by articulation around a horizontal axis 16 disposed on the rear face of this mast base 7 and whose rod 15 is connected by articulation around a horizontal axis 17 at the top of a set of two double connecting rods 18, 19 articulated respectively around a horizontal axis 20 arranged at the part top of base mast 7 and a horizontal axis 21 arranged at the lower part of the upper mast 8.
  • the upper mast 8 is connected to the rotating chassis 3, by means of two dressage shrouds 22, symmetrically arranged on either side of the mast 6 and articulated respectively around a horizontal axis 23 to the base of the upper mast 8 and around a horizontal axis 24 on a support 25 fixed to the rear of the rotating chassis 3.
  • the jib foot 11 is articulated at the top of the mast 6 around a horizontal axis 26 in the working position of the crane ( Figure 5), the axis 26 being placed on an easel 27 protruding under the arrow foot 11.
  • the foot of boom 11 can be folded forward against the mast upper 8, in the folded transport position shown Figures 1 to 3.
  • the easel 27 bears to its part rear upper a rear arrow punch 28 articulated around a horizontal axis 29 and foldable towards the front on the boom 11.
  • the intermediate jib element 12 is articulated at the foot of the arrow 11 around an axis 37, horizontal in working position of the crane, located at the junction of respective lower members 38, 39 of the elements of arrow 12, 11.
  • the intermediate arrow element 12 carries to its rear part a punch 40 whose base is articulated around the aforementioned axis 37, which is foldable towards the front on said intermediate jib element 12.
  • a flexible tie rod of constant length 41 produced in the form of cable for example, connects the apex 42 of the punch 40 to a joint 43 disposed on the upper frame 44 of the front part of the intermediate boom element 12.
  • the respective vertices 34, 42 of the punches 28, 40 are connected to each other by a flexible tie rod 45, produced in the form of a cable for example, while the vertex 34 of the rear arrow punch 28 is connected to the revolving chassis 3, by a rear tie rod flexible 46 also achievable in cable, one point intermediate 47 is fixed to one end of a connecting rod 48 having its other end hinged at 49 on the face rear of base mast 7.
  • the arrowhead 13 is articulated to the element arrow intermediate 12 around an axis 50, the direction is perpendicular to the vertical median plane of arrow 10, arranged at the junction of the members respective upper 51, 44 of the arrow elements 13, 12.
  • the posterior ends of the lower members 52 of the arrowhead 13 come into contact at 53 with the front ends of lower members 38 of the intermediate arrow element 12 to form a assembly aligned with the jib foot 11 and constituting the horizontal distributing jib 10 of the crane.
  • a cable 54 of unfolding / folding the arrow 10 connects a point 55 of the lower rear part of the intermediate element of arrow 12 to a tensioning device 56 fixed to the rear lower part of base mast 7;
  • cable 54 of constant length, passes successively over a first pulley 57 arranged inside the part front of the jib foot 11, on a second pulley 58 arranged inside the rear part of the foot arrow 11, then it forms, as shown in particular by the FIG.
  • a device is provided additional unfolding / folding of the arrowhead 13 relative to the intermediate boom element 12, shown in detail in Figure 12.
  • This device is consisting of: a connecting rod 64 articulated to the part front of jib foot 11 around a horizontal axis 65 disposed on a support 66 fixed to the end of the upper chord 36 and a punch 67 articulated at the rear part of the intermediate jib element 12 around a horizontal axis 68 disposed on a support 69 fixed to the bracing of the lower members 38, the connecting rod 64 and the punch 67 being articulated together at the apex of said punch 67 about a horizontal axis 70; a lever 71, formed of two identical connecting rods 72 and mounted in parallel, articulated at the rear of the arrowhead 13 around horizontal axes 73 arranged on supports 74 fixed to the bracing of lower members 52, capable of bearing on a symmetrical double support 75 fixed to the end of the upper chord 51 in the vicinity of the axis hinge 50 of the arrow
  • the tie rod 76 has several rigid elements successive, a first simple element 79 of relatively short length, the first end of which is articulated around the horizontal axis 70 constituting the apex of the connecting rod 64 / punch 67 assembly and the other of which end forms a longitudinal light 80, a second element 81 comprising a simple part 82 connected to the first element 79 by a horizontal axis 83 traversing perpendicularly the light 80 and a double part 84 leaving a space 85 for the passage of the tie rod 41 supporting the intermediate jib element 12 and a third element 86 consisting of two binoculars 87 identical and mounted in parallel, connecting around axes horizontal articulation 88 the free ends of the second tie member 81 with free ends 78 of two identical connecting rods 72 forming the lever 71.
  • the hinge pin 26 of the jib foot 11 at the top of the mast 6 is inclined at an angle A relative to the usual hinge axis direction 89, perpendicular to the median vertical plane P of the crane in deployed working position, angle A being defined in a plane perpendicular to the longitudinal axis of the mast 6.
  • the hinge pin 37, between the boom foot 11 and the intermediate boom element 12 this is inclined at an acute angle B relative to the axis direction usual 90 articulation, perpendicular to the plane vertical center P of the crane in the deployed position job.
  • the angle B has a value substantially equal to A / 2, and it is the same direction as the angle A in the plane horizontal of arrow 10 when it is aligned.
  • angles of inclination A and B are relatively low value; advantageously, the value of the angle A (expressed in radians and comparable to its tangent) is substantially equal to the ratio between the width of the upper mast 8 and the length of this mast higher 8.
  • the crane In transport position, the crane is presented as shown in Figures 1 to 3.
  • the mast 6 is folded over itself and lowered substantially to the horizontal.
  • Foot of boom 11 is folded over mast 6 and, seen from above ( Figure 3), it is oblique, that is to say with its longitudinal axis making an angle A with the axis longitudinal of the upper mast 8.
  • the intermediate element of boom 12 is folded up under boom foot 11 and it is applied laterally against the upper mast 8, while the arrowhead 13 is folded under the intermediate jib element 12 along its axis longitudinal, the respective upper members 51, 44 said jib elements 13, 12 appearing facing face.
  • the mast 6 In the working position, shown in Figure 5, the mast 6 is straightened and deployed in a vertical position, while arrow 10 is aligned in position substantially horizontal to ensure its function of distributor boom with a cart.
  • the set formed by the mast 6 and the boom 10 is arranged symmetrically by relation to the vertical median plane P (see also figure 4), as in a conventional crane.
  • the additional device for unfolding / folding the arrowhead 13 relative to the intermediate element arrow 12 is folded over said element 12 thanks to the shortening of the length of the tie 76 by displacement of the horizontal axis 83 of the tie rod 81 in the longitudinal opening 80 of the tie rod 79.
  • the element arrow intermediate 12 and the arrowhead 13 is offset from mast 6 due to the inclination of articulation axes 26, 37, so that the element arrow midpoint 12 and arrowhead 13 can cross mast 6 without meeting it, like the show Figures 8, 9 and 10 where said elements of arrow 12, 13 appear as passing "in front" of the mast 6.
  • the arrowhead 13 is supported under the members lower 52 on a set of rollers 91 fixed on one side of the lower part 7 of the foldable mast 6 and while the arrowhead 13 folds under the intermediate jib element 12, the tie 76, connecting the punch 67 to the lever 71, disappears while shortening thanks to the displacement of axis 83 in the light 80 formed on the tie member 79.
  • the crane At the end of the folding operation, the crane is in the transport position described above, with its arrow 10 folded laterally relative to the mast 6.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The crane comprises a foldable mast (6) at the top of which a foldable jib (10) is pivoted in a centred position. The jib is made from three elements (11-13) which are pivoted to each other. The pivoting axis (26) of the jib foot (11), at the top of the mast, is perpendicularly inclined to the vertical median plane of the crane in its deployed working position. The pivoting axis (37) of the intermediate jib (12) on the jib foot is inclined at an angle equal to half that of the jib foot. The jib point (13) is pivoted to the intermediate element, at the level of the upper members, about an axis (50) perpendicular to the jib median plane. The jib is thus foldable on the side of the mast for crane transportation.

Description

La présente invention concerne une grue à montage automatisé, notamment une grue à mât pliable, pourvue d'une flèche articulée au sommet du mât et réalisée en trois éléments successifs articulés les uns aux autres, à savoir, un pied de flèche, un élément intermédiaire de flèche et une pointe de flèche.The present invention relates to a self-erecting crane automated, in particular a foldable mast crane, provided an arrow articulated at the top of the mast and made in three successive elements articulated to each other, to know, an arrowhead, an intermediate element of arrow and an arrowhead.

L'invention est relative à une grue dont le repliage de la flèche s'effectue latéralement le long du mât et plus précisément à un dispositif qui permet le repliage de la pointe de flèche simultanément avec le repliage de la grue, en vue de son transport.The invention relates to a crane whose the boom is folded laterally along the mast and more precisely to a device which allows the folding the arrowhead simultaneously with the folding up the crane for transport.

On connaít par le document EP-A-0473518 un mode de réalisation d'une telle grue équipée d'une flèche, composée seulement de deux éléments articulés l'un à l'autre au niveau de leurs membrures inférieures. La flèche de cette grue est articulée en position centrée, au sommet du mât, autour d'un axe d'articulation incliné d'un angle aigu (A) par rapport à une direction perpendiculaire au plan médian vertical défini par le mât et la flèche en position déployée de travail, tandis que l'axe d'articulation des deux éléments de flèche est incliné d'un angle (B), sensiblement égal à la moitié (A/2) de l'angle aigu d'inclinaison (A) de l'axe d'articulation de la flèche au sommet du mât, par rapport à une direction perpendiculaire au plan médian vertical de la flèche. Ce mode de réalisation de la flèche, à deux éléments, limite la longueur de la flèche qui, une fois repliée, doit satisfaire aux exigences des différents gabarits de transport, notamment en ce qui concerne la longueur du colis.We know from document EP-A-0473518 a mode of realization of such a crane equipped with a boom, composed only of two articulated elements one to the other at their lower members. The boom of this crane is articulated in centered position, at top of the mast, around an axis of articulation inclined by acute angle (A) to a perpendicular direction in the vertical median plane defined by the mast and the arrow in extended working position, while the axis of articulation of the two boom elements is inclined by an angle (B), substantially equal to half (A / 2) of the acute angle of inclination (A) of the articulation axis of the arrow at the top of the mast, relative to a direction perpendicular to the vertical median plane of the arrow. This boom, two-element, boundary the length of the boom which, when folded, must meet the requirements of the different templates transport, especially with regard to the length of the parcel.

La présente invention apporte un perfectionnement sensible au mode de réalisation précédent en fournissant un dispositif permettant d'étendre le repliage de la flèche latéralement le long du mât à une flèche réalisée en trois éléments articulés les uns aux autres, de manière à permettre le transport de la grue repliée sous un encombrement plus faible, même avec une flèche de longueur plus importante.The present invention provides an improvement sensitive to the previous embodiment by providing a device for extending the folding of the arrow laterally along the mast to an arrow made in three elements articulated to each other, so to allow the transport of the folded crane under a smaller footprint, even with a length boom more important.

A cet effet, une grue selon l'invention comprend un mât, notamment pliable, au sommet duquel est articulée, en position centrée, une flèche dont l'axe d'articulation est incliné d'un angle aigu (A) par rapport à une direction perpendiculaire au plan médian vertical défini par le mât et la flèche en position déployée de travail, réalisée en trois éléments successifs articulés les uns aux autres, désignés respectivement comme pied de flèche, élément intermédiaire de flèche et pointe de flèche, le pied de flèche et l'élément intermédiaire de flèche étant articulés au niveau de leurs membrures inférieures autour d'un axe d'articulation incliné d'un angle (B), sensiblement égal à la moitié (A/2) de l'angle aigu d'inclinaison (A) de l'axe d'articulation de la flèche au sommet du mât, par rapport à une direction perpendiculaire au plan médian vertical de la flèche, de telle façon qu'en position repliée, l'élément intermédiaire de flèche et la pointe de flèche soient positionnés latéralement par rapport au mât, la grue comprenant encore un dispositif motorisé de dépliage/repliage de l'ensemble mât et flèche et des moyens de dépliage/repliage des éléments de flèche, et cette grue est caractérisée en ce que l'élément intermédiaire de flèche et la pointe de flèche sont articulés au niveau de leur membrure supérieure autour d'un axe d'articulation dont la direction est perpendiculaire au plan médian vertical de la flèche et en ce qu'un dispositif complémentaire de dépliage/repliage de la pointe de flèche par rapport à l'élément intermédiaire de flèche est disposé entre le pied de flèche et la pointe de flèche.To this end, a crane according to the invention comprises a mast, in particular foldable, at the top of which is articulated, in the centered position, an arrow whose hinge axis is inclined at an acute angle (A) relative to a direction perpendicular to the defined vertical median plane by the mast and the boom in the deployed working position, realized in three successive elements articulated one to the others, designated respectively as arrowheads, intermediate arrow and arrowhead element, the boom foot and the intermediate boom member being hinged at their lower members around an articulation axis inclined at an angle (B), substantially equal to half (A / 2) of the acute angle of inclination (A) of the articulation axis of the boom at top of mast, relative to a perpendicular direction in the vertical median plane of the arrow, so that folded position, the intermediate boom element and the arrowhead are positioned laterally by relative to the mast, the crane further comprising a device motorized unfolding / folding of the mast and boom assembly and means for unfolding / folding the boom elements, and this crane is characterized in that the element arrowhead and the arrowhead are articulated at the level of their upper frame around an articulation axis whose direction is perpendicular to the vertical median plane of the arrow and what an additional unfolding / folding device the arrowhead in relation to the intermediate element of arrow is arranged between the foot of arrow and the point arrow.

Selon un mode de réalisation préférentiel, le dispositif complémentaire de dépliage/repliage de la pointe de flèche, par rapport à l'élément intermédiaire de flèche, est constitué d'une bielle articulée à la partie antérieure du pied de flèche et d'un poinçon articulé à la partie postérieure de l'élément intermédiaire de flèche, la bielle et le poinçon étant articulés ensemble au sommet du poinçon, d'un levier articulé à la partie postérieure de la pointe de flèche et susceptible de prendre appui sur la structure de ladite pointe de flèche, et d'un tirant reliant le sommet de l'ensemble bielle/poinçon à l'extrémité libre du levier, pour former un quadrilatère déformable.According to a preferred embodiment, the additional device for unfolding / folding the arrowhead, relative to the intermediate element of arrow, consists of a connecting rod articulated to the part front of the arrow foot and a punch articulated to the rear part of the intermediate boom element, the connecting rod and the punch being articulated together at the top of the punch, of a lever articulated at the rear of the arrowhead and likely to rest on the structure of said arrowhead, and of a drawing connecting the top of the connecting rod / punch assembly to the free end of the lever, to form a quadrilateral deformable.

Selon une forme de réalisation particulière, le tirant comporte plusieurs éléments successifs, un premier élément simple articulé au sommet de l'ensemble bielle/poinçon et sur lequel est ménagée longitudinalement une lumière, un deuxième élément comprenant une partie simple reliée au premier élément par un axe traversant la lumière et une partie double ménageant un espace pour le passage d'un tirant supportant l'élément intermédiaire, et un troisième élément constitué de deux jumelles reliant par articulations les extrémités de la partie double du deuxième élément de tirant et les extrémités libres de deux bielles identiques formant le levier articulé à la partie postérieure de la pointe de flèche.According to a particular embodiment, the pulling comprises several successive elements, a first simple element articulated at the top of the whole connecting rod / punch and on which is formed longitudinally a light, a second element comprising a part simple connected to the first element by an axis crossing the light and a double part providing space for the passage of a tie rod supporting the intermediate element, and a third element consisting of two binoculars connecting by joints the ends of the double part of the second tie rod and the free ends of two identical connecting rods forming the lever articulated at the posterior part of the arrowhead.

Suivant une autre particularité, la partie inférieure du mât pliable est équipée latéralement, du côté où se fait le pliage/dépliage de la flèche, d'un ou plusieurs galets de roulement susceptibles de prendre contact avec le dessous de la pointe de flèche pour finir le pliage complet de la grue.According to another particularity, the part lower side of the foldable mast is fitted laterally, side where the boom, unfolding or unfolding is done several rollers likely to take contact with the underside of the arrowhead to finish the complete folding of the crane.

On réalise ainsi une grue à montage automatisé qui, à l'état replié donc en position de transport, occupe un encombrement optimal avec le pied de flèche se présentant en oblique et appliqué sur le mât, tandis que l'élément intermédiaire de flèche et la pointe de flèche sont positionnés l'un au-dessus de l'autre latéralement par rapport au mât. This produces a self-erecting crane which, when folded, therefore in the transport position, occupies optimal space with the boom foot is slanting and applied to the mast, while the intermediate arrow element and the arrowhead are positioned one above the other laterally relative to the mast.

Cette disposition n'entrai ne aucun surdimensionnement car, en position de travail, la flèche dépliée et le mât sont disposés dans un même plan vertical comme dans une grue classique. L'application de l'invention à une grue avec flèche réalisée en trois éléments articulés les uns aux autres permet d'augmenter les performances de la grue, notamment en matière de portée.This provision does not entail any oversizing because, in working position, the boom unfolded and the mast are arranged in the same vertical plane as in a conventional crane. Application of the invention to a jib crane made of three articulated elements to each other increases the performance of the crane, especially in terms of reach.

De toute façon, l'invention sera mieux comprise à l'aide de la description qui suit, en référence au dessin schématique annexé représentant, à titre d'exemple, une forme d'exécution de cette grue à montage automatisé, avec flèche en trois éléments articulés, repliable latéralement :

  • Figure 1 montre, en vue de côté, une grue selon l'invention en position repliée, permettant son transport ;
  • Figure 2 est une vue en bout de la grue repliée, suivant la direction II de figure 1 ;
  • Figure 3 est une vue en plan par dessus, partielle, de cette grue repliée ;
  • Figure 4 est une vue en plan par dessus de la flèche alignée, montrant l'orientation des axes d'articulation de ses éléments ;
  • Figure 5 montre, en vue de côté, la grue avec son mât dressé et la flèche déployée en position horizontale ;
  • Figures 6 à 10 illustrent plusieurs phases de dépliage/repliage de cette grue ;
  • Figure 11 est une vue schématique en perspective du mouflage du câble de dépliage/repliage de la flèche ;
  • Figure 12 est une vue en perspective montrant le détail du dispositif permettant le dépliage/repliage de la pointe de flèche.
  • In any case, the invention will be better understood with the aid of the description which follows, with reference to the appended diagrammatic drawing representing, by way of example, an embodiment of this crane with automatic assembly, with three-jib boom articulated elements, foldable laterally:
  • Figure 1 shows, in side view, a crane according to the invention in the folded position, allowing its transport;
  • Figure 2 is an end view of the folded crane, in the direction II of Figure 1;
  • Figure 3 is a partial plan view from above of this folded crane;
  • Figure 4 is a plan view from above of the aligned arrow, showing the orientation of the hinge axes of its elements;
  • Figure 5 shows, in side view, the crane with its mast raised and the boom deployed in a horizontal position;
  • Figures 6 to 10 illustrate several stages of unfolding / folding this crane;
  • Figure 11 is a schematic perspective view of the hauling of the boom unfolding / folding cable;
  • Figure 12 is a perspective view showing the detail of the device for unfolding / folding the arrowhead.
  • La grue représentée schématiquement sur le dessin comprend un châssis de base fixe ou roulant 1, rétractable, supportant par l'intermédiaire d'un dispositif d'orientation 2 un châssis tournant 3 qui porte à l'arrière un contrepoids 4 et à l'avant duquel est articulé, autour d'un axe horizontal 5, un mât pliable 6 composé d'un mât inférieur ou mât de base 7 et d'un mât supérieur 8 reliés l'un à l'autre par articulation sur leur face arrière autour d'un axe horizontal 9 ; le mât de base 7 et le mât supérieur 8 présentent, dans l'exemple considéré, une section octogonale. Cette grue est pourvue d'une flèche distributrice 10 dépliable/repliable, réalisée en trois éléments successifs désignés respectivement comme pied de flèche 11, élément intermédiaire de flèche 12 et pointe de flèche 13.The crane shown schematically in the drawing comprises a fixed or rolling basic chassis 1, retractable, supporting by means of a orientation device 2 a rotating frame 3 which carries at the rear a counterweight 4 and at the front of which is articulated around a horizontal axis 5, a foldable mast 6 composed of a lower mast or base mast 7 and a mast upper 8 connected to each other by articulation on their rear face about a horizontal axis 9; the mast of base 7 and upper mast 8 have, in the example considered, an octagonal section. This crane is provided a foldable / collapsible distributor boom 10, carried out in three successive designated elements respectively as jib foot 11, element arrow intermediate 12 and arrowhead 13.

    Le mât pliable 6 est motorisé pour son dépliage/repliage au moyen d'un vérin 14, 15 dont le corps 14 est relié au mât de base 7 par articulation autour d'un axe horizontal 16 disposé sur la face arrière de ce mât de base 7 et dont la tige 15 est reliée par articulation autour d'un axe horizontal 17 au sommet d'un ensemble de deux doubles bielles 18, 19 articulées respectivement autour d'un axe horizontal 20 disposé à la partie supérieure du mât de base 7 et d'un axe horizontal 21 disposé à la partie inférieure du mât supérieur 8.The foldable mast 6 is motorized for its unfolding / folding by means of a jack 14, 15 whose body 14 is connected to the base mast 7 by articulation around a horizontal axis 16 disposed on the rear face of this mast base 7 and whose rod 15 is connected by articulation around a horizontal axis 17 at the top of a set of two double connecting rods 18, 19 articulated respectively around a horizontal axis 20 arranged at the part top of base mast 7 and a horizontal axis 21 arranged at the lower part of the upper mast 8.

    Le mât supérieur 8 est relié au châssis tournant 3, par l'intermédiaire de deux haubans de dressage 22, disposés symétriquement de part et d'autre du mât 6 et articulés respectivement autour d'un axe horizontal 23 à la base du mât supérieur 8 et autour d'un axe horizontal 24 sur un support 25 fixé à l'arrière du châssis tournant 3.The upper mast 8 is connected to the rotating chassis 3, by means of two dressage shrouds 22, symmetrically arranged on either side of the mast 6 and articulated respectively around a horizontal axis 23 to the base of the upper mast 8 and around a horizontal axis 24 on a support 25 fixed to the rear of the rotating chassis 3.

    Le pied de flèche 11 est articulé au sommet du mât 6 autour d'un axe 26 horizontal en position de travail de la grue (figure 5), l'axe 26 étant disposé sur un chevalet 27 dépassant sous le pied de flèche 11. Ainsi, le pied de flèche 11 peut être rabattu sur l'avant contre le mât supérieur 8, dans la position repliée de transport montrée aux figures 1 à 3. Le chevalet 27 porte à sa partie arrière supérieure un poinçon arrière de flèche 28 articulé autour d'un axe horizontal 29 et rabattable vers l'avant sur le pied de flèche 11.The jib foot 11 is articulated at the top of the mast 6 around a horizontal axis 26 in the working position of the crane (Figure 5), the axis 26 being placed on an easel 27 protruding under the arrow foot 11. Thus, the foot of boom 11 can be folded forward against the mast upper 8, in the folded transport position shown Figures 1 to 3. The easel 27 bears to its part rear upper a rear arrow punch 28 articulated around a horizontal axis 29 and foldable towards the front on the boom 11.

    Un tirant 30, en deux parties rigides 31, 32 successives articulées entre elles en 33, relie le sommet 34 du poinçon arrière de flèche 28 à une articulation 35 disposée sur la membrure supérieure 36 de la partie avant du pied de flèche 11.A tie rod 30, in two rigid parts 31, 32 successive articulated together at 33, connects the summit 34 from the rear arrow punch 28 to a hinge 35 arranged on the upper chord 36 of the front part of the jib foot 11.

    L'élément intermédiaire de flèche 12 est articulé au pied de flèche 11 autour d'un axe 37, horizontal en position du travail de la grue, disposé à la jonction des membrures inférieures respectives 38, 39 des éléments de flèche 12, 11.The intermediate jib element 12 is articulated at the foot of the arrow 11 around an axis 37, horizontal in working position of the crane, located at the junction of respective lower members 38, 39 of the elements of arrow 12, 11.

    L'élément intermédiaire de flèche 12 porte à sa partie arrière un poinçon 40 dont la base est articulée autour de l'axe 37 précité, et qui est rabattable vers l'avant sur ledit élément intermédiaire de flèche 12. Un tirant souple de longueur constante 41, réalisé sous forme de câble par exemple, relie le sommet 42 du poinçon 40 à une articulation 43 disposée sur la membrure supérieure 44 de la partie avant de l'élément intermédiaire de flèche 12.The intermediate arrow element 12 carries to its rear part a punch 40 whose base is articulated around the aforementioned axis 37, which is foldable towards the front on said intermediate jib element 12. A flexible tie rod of constant length 41, produced in the form of cable for example, connects the apex 42 of the punch 40 to a joint 43 disposed on the upper frame 44 of the front part of the intermediate boom element 12.

    Les sommets respectifs 34, 42 des poinçons 28, 40, sont reliés l'un à l'autre par un tirant de liaison souple 45, réalisé sous forme de câble par exemple, tandis que le sommet 34 du poinçon arrière de flèche 28 est relié au châssis tournant 3, par un tirant arrière de retenue souple 46 également réalisable en câble, dont un point intermédiaire 47 est fixé à une extrémité d'une bielle 48 ayant son autre extrémité articulée en 49 sur la face arrière du mât de base 7.The respective vertices 34, 42 of the punches 28, 40, are connected to each other by a flexible tie rod 45, produced in the form of a cable for example, while the vertex 34 of the rear arrow punch 28 is connected to the revolving chassis 3, by a rear tie rod flexible 46 also achievable in cable, one point intermediate 47 is fixed to one end of a connecting rod 48 having its other end hinged at 49 on the face rear of base mast 7.

    La pointe de flèche 13 est articulée à l'élément intermédiaire de flèche 12 autour d'un axe 50, dont la direction est perpendiculaire au plan médian vertical de la flèche 10, disposé à la jonction des membrures supérieures respectives 51, 44 des éléments de flèche 13, 12. En position déployée de travail (figure 5), les extrémités postérieures des membrures inférieures 52 de la pointe de flèche 13 viennent en contact en 53 avec les extrémités antérieures des membrures inférieures 38 de l'élément intermédiaire de flèche 12 pour former un ensemble aligné avec le pied de flèche 11 et constituant la flèche distributrice horizontale 10 de la grue.The arrowhead 13 is articulated to the element arrow intermediate 12 around an axis 50, the direction is perpendicular to the vertical median plane of arrow 10, arranged at the junction of the members respective upper 51, 44 of the arrow elements 13, 12. In the deployed working position (Figure 5), the posterior ends of the lower members 52 of the arrowhead 13 come into contact at 53 with the front ends of lower members 38 of the intermediate arrow element 12 to form a assembly aligned with the jib foot 11 and constituting the horizontal distributing jib 10 of the crane.

    Comme montré aux figures 5 à 11, un câble 54 de dépliage/repliage de la flèche 10 relie un point 55 de la partie arrière inférieure de l'élément intermédiaire de flèche 12 à un dispositif de mise en tension 56 fixé à la partie inférieure arrière du mât de base 7 ; le câble 54, de longueur constante, passe successivement sur une première poulie 57 disposée à l'intérieur de la partie avant du pied de flèche 11, sur une deuxième poulie 58 disposée à l'intérieur de la partie arrière du pied de flèche 11, puis il forme, comme le montre notamment la figure 11, un mouflage 59 sur une pluralité de poulies 60, 61, disposées respectivement suivant deux axes horizontaux parallèles 62, 63, le premier axe 62 étant porté par la partie arrière du chevalet 27 et le second axe 63 étant porté par le sommet du mât supérieur 8.As shown in Figures 5 to 11, a cable 54 of unfolding / folding the arrow 10 connects a point 55 of the lower rear part of the intermediate element of arrow 12 to a tensioning device 56 fixed to the rear lower part of base mast 7; cable 54, of constant length, passes successively over a first pulley 57 arranged inside the part front of the jib foot 11, on a second pulley 58 arranged inside the rear part of the foot arrow 11, then it forms, as shown in particular by the FIG. 11, a haul 59 on a plurality of pulleys 60, 61, arranged respectively along two horizontal axes parallel 62, 63, the first axis 62 being carried by the rear part of the bridge 27 and the second axis 63 being carried by the top of the upper mast 8.

    Par ailleurs, il est prévu un dispositif complémentaire de dépliage/repliage de la pointe de flèche 13 par rapport à l'élément intermédiaire de flèche 12, représenté en détail à la figure 12. Ce dispositif est constitué : d'une bielle 64 articulée à la partie antérieure du pied de flèche 11 autour d'un axe horizontal 65 disposé sur un support 66 fixé à l'extrémité de la membrure supérieure 36 et d'un poinçon 67 articulé à la partie postérieure de l'élément intermédiaire de flèche 12 autour d'un axe horizontal 68 disposé sur un support 69 fixé au contreventement des membrures inférieures 38, la bielle 64 et le poinçon 67 étant articulés ensemble au sommet dudit poinçon 67 autour d'un axe horizontal 70 ; d'un levier 71, formé de deux bielles 72 identiques et montées parallèlement, articulées à la partie postérieure de la pointe de flèche 13 autour d'axes horizontaux 73 disposés sur des supports 74 fixés au contreventement des membrures inférieures 52, susceptible de prendre appui sur un support double symétrique 75 fixé à l'extrémité de la membrure supérieure 51 au voisinage de l'axe d'articulation 50 de la pointe de flèche 13 sur l'élément intermédiaire de flèche 12 ; et d'un tirant 76 reliant le sommet 70 de l'ensemble bielle 64 / poinçon 67 à l'extrémité double 77 du levier 71 formée par les extrémités libres respectives 78 des deux bielles identiques 72, ces extrémités définissant un dernier axe d'articulation. Un quadrilatère déformable est ainsi formé, dont les quatre sommets sont constitués, respectivement, par les axes d'articulation 68,70,73 et 78.In addition, a device is provided additional unfolding / folding of the arrowhead 13 relative to the intermediate boom element 12, shown in detail in Figure 12. This device is consisting of: a connecting rod 64 articulated to the part front of jib foot 11 around a horizontal axis 65 disposed on a support 66 fixed to the end of the upper chord 36 and a punch 67 articulated at the rear part of the intermediate jib element 12 around a horizontal axis 68 disposed on a support 69 fixed to the bracing of the lower members 38, the connecting rod 64 and the punch 67 being articulated together at the apex of said punch 67 about a horizontal axis 70; a lever 71, formed of two identical connecting rods 72 and mounted in parallel, articulated at the rear of the arrowhead 13 around horizontal axes 73 arranged on supports 74 fixed to the bracing of lower members 52, capable of bearing on a symmetrical double support 75 fixed to the end of the upper chord 51 in the vicinity of the axis hinge 50 of the arrowhead 13 on the element boom intermediate 12; and a tie 76 connecting the top 70 of the connecting rod 64 / punch 67 assembly the double end 77 of the lever 71 formed by the respective free ends 78 of the two connecting rods identical 72, these ends defining a last axis of articulation. A deformable quadrilateral is thus formed, of which the four vertices are made up, respectively, by the axes of articulation 68,70,73 and 78.

    Le tirant 76 comporte plusieurs éléments rigides successifs, un premier élément simple 79 de relativement faible longueur dont la première extrémité est articulée autour de l'axe horizontal 70 constituant le sommet de l'ensemble bielle 64 / poinçon 67 et dont l'autre extrémité forme une lumière longitudinale 80, un deuxième élément 81 comprenant une partie simple 82 reliée au premier élément 79 par un axe horizontal 83 traversant perpendiculairement la lumière 80 et une partie double 84 ménageant un espace 85 pour le passage du tirant 41 supportant l'élément intermédiaire de flèche 12 et un troisième élément 86 constitué de deux jumelles 87 identiques et montées parallèlement, reliant autour d'axes d'articulation horizontaux 88 les extrémités libres du deuxième élément de tirant 81 aux extrémités libres 78 des deux bielles identiques 72 formant le levier 71.The tie rod 76 has several rigid elements successive, a first simple element 79 of relatively short length, the first end of which is articulated around the horizontal axis 70 constituting the apex of the connecting rod 64 / punch 67 assembly and the other of which end forms a longitudinal light 80, a second element 81 comprising a simple part 82 connected to the first element 79 by a horizontal axis 83 traversing perpendicularly the light 80 and a double part 84 leaving a space 85 for the passage of the tie rod 41 supporting the intermediate jib element 12 and a third element 86 consisting of two binoculars 87 identical and mounted in parallel, connecting around axes horizontal articulation 88 the free ends of the second tie member 81 with free ends 78 of two identical connecting rods 72 forming the lever 71.

    Comme décrit dans le brevet européen précité N° 0473518, l'axe d'articulation 26 du pied de flèche 11 au sommet du mât 6 est incliné d'un angle A par rapport à la direction d'axe d'articulation 89 habituelle, perpendiculaire au plan vertical médian P de la grue en position déployée de travail, l'angle A étant défini dans un plan perpendiculaire à l'axe longitudinal du mât 6. Quant à l'axe d'articulation 37, entre le pied de flèche 11 et l'élément intermédiaire de flèche 12, celui-ci est incliné d'un angle aigu B par rapport à la direction d'axe d'articulation 90 habituelle, perpendiculaire au plan vertical médian P de la grue en position déployée de travail. L'angle B possède une valeur égale sensiblement à A/2, et il est de même sens que l'angle A dans le plan horizontal de la flèche 10 lorsque celle-ci est alignée. De toute façon, les angles d'inclinaison A et B sont de relativement faible valeur ; avantageusement, la valeur de l'angle A (exprimée en radians et assimilable à sa tangente) est sensiblement égale au rapport entre la largeur du mât supérieur 8 et la longueur de ce mât supérieur 8.As described in the aforementioned European patent N ° 0473518, the hinge pin 26 of the jib foot 11 at the top of the mast 6 is inclined at an angle A relative to the usual hinge axis direction 89, perpendicular to the median vertical plane P of the crane in deployed working position, angle A being defined in a plane perpendicular to the longitudinal axis of the mast 6. As for the hinge pin 37, between the boom foot 11 and the intermediate boom element 12, this is inclined at an acute angle B relative to the axis direction usual 90 articulation, perpendicular to the plane vertical center P of the crane in the deployed position job. The angle B has a value substantially equal to A / 2, and it is the same direction as the angle A in the plane horizontal of arrow 10 when it is aligned. In any case, the angles of inclination A and B are relatively low value; advantageously, the value of the angle A (expressed in radians and comparable to its tangent) is substantially equal to the ratio between the width of the upper mast 8 and the length of this mast higher 8.

    En position de transport, la grue se présente comme montrée aux figures 1 à 3. Le mât 6 est replié sur lui-même et abaissé sensiblement à l'horizontale. Le pied de flèche 11 est rabattu au-dessus du mât 6 et, vu de dessus (figure 3), il se présente en oblique, c'est-à-dire avec son axe longitudinal faisant un angle A avec l'axe longitudinal du mât supérieur 8. L'élément intermédiaire de flèche 12 est replié sous le pied de flèche 11 et il est appliqué latéralement contre le mât supérieur 8, tandis que la pointe de flèche 13 est rabattue sous l'élément intermédiaire de flèche 12 suivant son axe longitudinal, les membrures supérieures respectives 51, 44 desdits éléments de flèche 13, 12 se présentant face à face.In transport position, the crane is presented as shown in Figures 1 to 3. The mast 6 is folded over itself and lowered substantially to the horizontal. Foot of boom 11 is folded over mast 6 and, seen from above (Figure 3), it is oblique, that is to say with its longitudinal axis making an angle A with the axis longitudinal of the upper mast 8. The intermediate element of boom 12 is folded up under boom foot 11 and it is applied laterally against the upper mast 8, while the arrowhead 13 is folded under the intermediate jib element 12 along its axis longitudinal, the respective upper members 51, 44 said jib elements 13, 12 appearing facing face.

    En position de travail, montrée à la figure 5, le mât 6 est redressé et déployé en position verticale, tandis que la flèche 10 est alignée en position sensiblement horizontale pour assurer sa fonction de flèche distributrice avec un chariot. L'ensemble formé par le mât 6 et la flèche 10 est disposé symétriquement par rapport au plan médian vertical P (voir aussi figure 4), comme dans une grue classique. Dans cette position, le dispositif complémentaire de dépliage/ repliage de la pointe de flèche 13 par rapport à l'élément intermédiaire de flèche 12 est rabattu sur ledit élément 12 grâce au raccourcissement de la longueur du tirant 76 par déplacement de l'axe horizontal 83 de l'élément de tirant 81 dans la lumière longitudinale 80 de l'élément de tirant 79.In the working position, shown in Figure 5, the mast 6 is straightened and deployed in a vertical position, while arrow 10 is aligned in position substantially horizontal to ensure its function of distributor boom with a cart. The set formed by the mast 6 and the boom 10 is arranged symmetrically by relation to the vertical median plane P (see also figure 4), as in a conventional crane. In this position, the additional device for unfolding / folding the arrowhead 13 relative to the intermediate element arrow 12 is folded over said element 12 thanks to the shortening of the length of the tie 76 by displacement of the horizontal axis 83 of the tie rod 81 in the longitudinal opening 80 of the tie rod 79.

    Comme illustré aux figures 6 à 10, le repliage de la grue s'effectue de la manière suivante :As illustrated in Figures 6 to 10, the folding of the crane is carried out as follows:

    A partir de la position de travail, on commande le raccourcissement du vérin 14, 15 par rentrée de sa tige 15 dans son corps 14, pour faire pivoter le mât de base 7 vers l'avant autour de son axe d'articulation 5 sur le châssis tournant 3, tandis que le mât supérieur 8 pivote vers l'arrière, autour de son axe d'articulation 9 sur le mât de base 7, sous l'action des haubans de dressage 22 qui le retiennent.From the working position, the shortening of the jack 14, 15 by retracting its rod 15 in its body 14, to rotate the base mast 7 forward around its axis of articulation 5 on the rotating frame 3, while the upper mast 8 pivots backwards, around its hinge axis 9 on the base mast 7, under the action of the seat stays 22 who are holding him back.

    Pendant que s'effectue ce mouvement, le tirant arrière de retenue 46 se détend et, sous l'action du poids mort de la flèche 10, le poinçon arrière de flèche 28 pivote vers l'avant autour de son axe d'articulation 29 sur le chevalet 27 du pied de flèche 11. Dans le même temps, le poinçon 40 pivote vers l'avant autour de son axe d'articulation 37 sous l'action du poids mort de l'élément intermédiaire de flèche 12 et de la pointe de flèche 13, tandis que l'ensemble desdits éléments de flèche 12, 13 se rabat progressivement, le poinçon 40 entraínant dans son pivotement les éléments de mât 12 et 13, encore alignés, autour de l'axe d'articulation 37 - voir figure 6. Le mouvement se poursuivant, l'ensemble formé par le poinçon 67, les bielles 72 et le tirant 76 se redresse jusqu'à ce que le levier 71 vienne en butée sur le support 75 fixé à l'extrémité de la membrure supérieure 51 de la pointe de flèche 13 au voisinage de l'axe d'articulation 50 de ladite pointe de flèche 13 sur l'élément intermédiaire de flèche 12. Le levier 71 entraíne progressivement le rabattement de la pointe de flèche 13, contre l'élément intermédiaire de flèche 12, les membrures supérieures respectives 51, 44 se présentant finalement face à face - voir figure 7.While this movement is taking place, pulling it back rest 46 relaxes and, under the action of the weight dead arrow 10, rear arrow punch 28 pivots forward around its hinge pin 29 on the easel 27 of the arrow foot 11. In the same time, the punch 40 pivots forward around its axis 37 under the action of the dead weight of the element intermediate arrow 12 and arrowhead 13, while all of said arrow elements 12, 13 are gradually flap, the punch 40 driving in its pivoting the mast elements 12 and 13, still aligned, around the hinge pin 37 - see figure 6. The movement continuing, the assembly formed by the punch 67, the connecting rods 72 and the tie rod 76 straightens until that the lever 71 abuts on the support 75 fixed to the end of the upper chord 51 of the point of arrow 13 in the vicinity of the hinge axis 50 of said arrowhead 13 on the intermediate element of arrow 12. The lever 71 gradually drives the folding of the arrowhead 13 against the element boom intermediate 12, upper members respectively 51, 44 finally presenting themselves face to face - see figure 7.

    Lorsque l'élément intermédiaire de flèche 12 et la pointe de flèche 13 parviennent dans la position montrée à la figure 8, le poids mort desdits éléments 12, 13 cesse d'être moteur, le câble 54 de repliage de flèche, dont la tension initiale a été réglée par le dispositif 56, est maintenu en tension grâce aux caractéristiques prédéterminées de son trajet depuis le point 55 jusqu'au dispositif 56 en passant par les poulies intermédiaires 57, 58, 60, 61 et grâce à son élasticité. Le câble 54 de repliage de flèche assure alors la continuité du mouvement jusqu'au repliage complet du pied de flèche 11 et de l'élément intermédiaire de flèche 12. Pendant tout ce temps, et progressivement, le pied de flèche 11, l'élément intermédiaire de flèche 12 et la pointe de flèche 13 se désaxent par rapport au mât 6 du fait de l'inclinaison des axes d'articulation 26, 37, de telle façon que l'élément intermédiaire de flèche 12 et la pointe de flèche 13 puissent croiser le mât 6 sans le rencontrer, comme le montrent les figures 8, 9 et 10 où lesdits éléments de flèche 12, 13 apparaissent comme passant "devant" le mât 6.When the intermediate arrow element 12 and the arrowhead 13 arrive in the position shown at FIG. 8, the dead weight of said elements 12, 13 ceases to be motor, the boom folding cable 54, the initial tension was adjusted by device 56, is maintained in tension thanks to the characteristics predetermined routes from point 55 to device 56 passing through the intermediate pulleys 57, 58, 60, 61 and thanks to its elasticity. Cable 54 of boom folding then ensures continuity of movement until complete folding of the jib foot 11 and the intermediate arrow element 12. During all this time, and gradually, the arrowhead 11, the element arrow intermediate 12 and the arrowhead 13 is offset from mast 6 due to the inclination of articulation axes 26, 37, so that the element arrow midpoint 12 and arrowhead 13 can cross mast 6 without meeting it, like the show Figures 8, 9 and 10 where said elements of arrow 12, 13 appear as passing "in front" of the mast 6.

    Pour finir le repliage complet de la flèche 10, la pointe de flèche 13 prend appui sous les membrures inférieures 52 sur un ensemble de galets de roulement 91 fixé sur un côté de la partie inférieure 7 du mât pliable 6 et tandis que la pointe de flèche 13 se rabat sous l'élément intermédiaire de flèche 12, le tirant 76, reliant le poinçon 67 au levier 71, s'efface en se raccourcissant grâce au déplacement de l'axe 83 dans la lumière 80 ménagée sur l'élément de tirant 79. To finish the complete folding of the arrow 10, the arrowhead 13 is supported under the members lower 52 on a set of rollers 91 fixed on one side of the lower part 7 of the foldable mast 6 and while the arrowhead 13 folds under the intermediate jib element 12, the tie 76, connecting the punch 67 to the lever 71, disappears while shortening thanks to the displacement of axis 83 in the light 80 formed on the tie member 79.

    En fin d'opération de repliage, la grue se trouve dans la position de transport décrite plus haut, avec sa flèche 10 repliée latéralement par rapport au mât 6.At the end of the folding operation, the crane is in the transport position described above, with its arrow 10 folded laterally relative to the mast 6.

    Il va de soi que l'on procède au dépliage de la grue dans les mêmes conditions, les mouvements étant inverses de ceux précédemment indiqués, en commandant l'allongement du vérin 14, 15.It goes without saying that we unfold the crane under the same conditions, the movements being opposite of those previously indicated, when ordering the extension of the jack 14, 15.

    On voit que la disposition inclinée des axes d'articulation respectifs 26, 37 de la flèche 10 sur le mât 6 et de l'élément intermédiaire de flèche 12 sur le pied de flèche 11, ainsi que le dispositif complémentaire 64 à 88 de repliage de la pointe de flèche 13 sous l'élément intermédiaire de flèche 12, permettent un repliage/dépliage continu, sans intervention manuelle et ne nécessitant aucun surdimensionnement. On obtient ainsi une grue à montage automatisé pourvue d'une flèche en trois éléments articulés les uns aux autres qui, à l'état replié, donc en position de transport, offre un encombrement optimal, aussi bien en hauteur qu'en largeur et en longueur.We see that the inclined arrangement of the axes respective articulation 26, 37 of arrow 10 on the mast 6 and the intermediate jib element 12 on the boom foot 11, as well as the complementary device 64 to 88 folding the arrowhead 13 under the intermediate arrow element 12, allow a continuous folding / unfolding, without manual intervention and not requiring any oversizing. We thus obtain a self-erecting crane with a jib boom three elements articulated to each other which, in the state folded, so in transport position, offers optimal dimensions, both in height and in width and in length.

    L'on se s'éloignerait pas de l'esprit de l'invention :

    • par des modifications de détail, concernant notamment les dispositifs de dépliage/repliage ;
    • par une application du même principe à des grues à mât télescopique, et non à mât pliable ;
    • par une application du même principe à des grues avec flèche inclinée ou relevable, l'angle d'inclinaison désiré de la flèche étant obtenu en raccourcissant simplement le tirant ou câble arrière de retenue 46.
    We would not stray from the spirit of the invention:
    • by modifications of detail, in particular concerning the unfolding / folding devices;
    • by applying the same principle to cranes with telescopic mast, and not with foldable mast;
    • by applying the same principle to cranes with inclined or lifting jib, the desired angle of inclination of the jib being obtained by simply shortening the tie rod or rear retaining cable 46.

    Claims (5)

    1. Automated-erection crane with laterally foldable jib, comprising a mast (6), notably foldable, at the top of which there is articulated, in a centred position, a jib (10) whose articulation shaft (26) is inclined at an acute angle (A) with respect to a direction (89) perpendicular to the vertical mid-plane (P) defined by the mast (6) and the jib (10) in the deployed working position, produced in three successive elements articulated on each other, designated respectively as the jib foot (11), the intermediate jib element (12) and the jib point (13), the jib foot (11) and the intermediate jib element (12) being articulated at their bottom booms (39, 38) about an articulation shaft (37) inclined at an angle (B), substantially equal to half (A/2) the acute inclination angle (A) of the shaft (26) by which the jib (10) is articulated on the top of the mast (6), with respect to a direction (90) perpendicular to the vertical mid-plane of the jib (10), so that, in the folded position, the intermediate jib element (12) and the jib point (13) are positioned laterally with respect to the mast (6), the crane also comprising a motorised device (14 to 25, 28, 30, 40, 41, 45, 46) for unfolding/folding the assembly consisting of mast (6) and jib (10), and means (54 to 63) for unfolding/folding the jib elements (11, 12, 13), characterised in that the intermediate jib element (12) and the jib point (13) are articulated, at their top boom (44, 51), about an articulation shaft (50) whose direction is perpendicular to the vertical mid-plane of the jib (10), and in that a complementary device (64 to 88) for unfolding/folding the jib point (13) with respect to the intermediate jib element (12) is disposed between the jib foot (11) and the jib point (13).
    2. Automated-erection crane with laterally foldable jib, according to Claim 1, characterised in that the complementary device for unfolding/folding the jib point (13), with respect to the intermediate jib element (12), consists of a link (64) articulated (65) on the rear part of the jib foot (11) and a stanchion (67) articulated (68) on the rear part of the intermediate jib element (12), the link (64) and the stanchion (67) being articulated together (at 70) on the top of the stanchion (67), of a lever (71) articulated (at 73) on the rear part of the jib point (13) and able to bear (at 75) on the structure of the said jib point (13), and of a tie (76) connecting the top (70) of the assembly consisting of link (64) / stanchion (67) to the free end (77) of the lever (71), to form a deformable quadrilateral.
    3. Automated-erection crane with laterally foldable jib according to Claim 2, characterised in that the tie (76) has several successive elements, a first single element (79) articulated (at 70) on tile top of the assembly consisting of link (64) / stanchion (67) and on which an aperture (80) is formed longitudinally, a second element (81) comprising a single part (82) connected to the first element by a shaft (83) passing through the aperture (80) and a double part (84) forming a space (85) for the passage of a tie (41) supporting the intermediate jib element (12), and a third element (86) consisting of two shackles (87) connecting, by articulations (88), the ends of the double part (84) of the second tie element (81) and the free ends (78) of two identical links (72) forming the lever (71) articulated (73) on the rear part of the jib point (13).
    4. Automated-erection crane with laterally foldable jib according to any one of Claims 1 to 3, with a foldable mast (6) composed of a bottom mast (7) and a top mast (8), characterised in that the bottom mast (7) is equipped laterally, on the side where the folding/unfolding of the jib (10) takes place, with one or more travelling wheels (91) able to make contact with the underside of the jib point (13) in order to finish the complete folding of the crane.
    5. Automated-erection crane with laterally foldable jib according to any one of Claims 1 to 4, with a foldable mast (6) composed of a bottom mast (7) and a top mast (8), characterised in that the value of the angle of inclination (A) of the shaft (26) by which jib foot (11) is articulated on the top of the mast (6), expressed in radians, is substantially equal to the ratio between the width of the top mast (8) and the length of this top mast (8).
    EP96420060A 1995-03-21 1996-02-26 Self-erecting crane with laterally foldable jib Expired - Lifetime EP0733583B1 (en)

    Applications Claiming Priority (2)

    Application Number Priority Date Filing Date Title
    FR9503529 1995-03-21
    FR9503529A FR2731999B1 (en) 1995-03-21 1995-03-21 AUTOMATED MOUNT CRANE WITH LATERAL FOLDABLE BOOM

    Publications (2)

    Publication Number Publication Date
    EP0733583A1 EP0733583A1 (en) 1996-09-25
    EP0733583B1 true EP0733583B1 (en) 1999-04-28

    Family

    ID=9477426

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP96420060A Expired - Lifetime EP0733583B1 (en) 1995-03-21 1996-02-26 Self-erecting crane with laterally foldable jib

    Country Status (7)

    Country Link
    EP (1) EP0733583B1 (en)
    CN (1) CN1147476A (en)
    AT (1) ATE179391T1 (en)
    DE (1) DE69602223T2 (en)
    ES (1) ES2132860T3 (en)
    FR (1) FR2731999B1 (en)
    RU (1) RU2169695C2 (en)

    Families Citing this family (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR2761970B1 (en) * 1997-04-11 1999-05-28 Potain Sa MAT LIFT DEVICE FOR TELESCOPIC TOWER CRANE
    FR2765564B1 (en) * 1997-07-02 1999-08-27 Potain Sa MATURE FOLDABLE IN THREE ELEMENTS WITH FOLDING / FOLDING DEVICE FOR TOWER CRANE
    FR2838415B1 (en) * 2002-04-12 2004-10-01 Potain Sa DEVICE FOR LIFTING AND FILLING THE MAT AND TILTING THE ARROW OF A CRANE
    CN102320526B (en) * 2011-09-14 2013-02-13 哈尔滨东建机械制造有限公司 Self-loading and unloading foldable tower crane
    CN110697436B (en) * 2019-10-16 2020-12-01 长沙理工大学 Horizontal rotation's folding arm conveyer

    Family Cites Families (6)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    JPS57170379A (en) * 1981-04-08 1982-10-20 Hitachi Ltd Undulating beam middle folding device for crane
    DE3303524A1 (en) * 1983-02-03 1984-08-09 Wilhelm 5020 Frechen König Revolving tower crane
    FR2550176B1 (en) * 1983-08-03 1985-10-11 Potain Sa FOLDING BOOM CRANE IN MULTIPLE ARTICULATED ELEMENTS
    IT1185969B (en) * 1985-10-02 1987-11-18 Cattaneo Luigi Spa ARTICULATED CRANE WITH TOWER LIFTING AND AUTOMATIC ARM EXTENSION
    FR2643625B2 (en) * 1988-09-20 1991-11-22 Potain Sa FOLDABLE CRANE WITH BOOM IN THREE ARTICULATED ARTICLES
    FR2665429B1 (en) * 1990-07-31 1992-10-02 Cadillon Sa AUTOMATED MOUNT CRANE, WITH LATERAL FOLDABLE BOOM.

    Also Published As

    Publication number Publication date
    DE69602223D1 (en) 1999-06-02
    EP0733583A1 (en) 1996-09-25
    ES2132860T3 (en) 1999-08-16
    RU2169695C2 (en) 2001-06-27
    FR2731999A1 (en) 1996-09-27
    ATE179391T1 (en) 1999-05-15
    DE69602223T2 (en) 1999-11-11
    FR2731999B1 (en) 1997-05-30
    CN1147476A (en) 1997-04-16

    Similar Documents

    Publication Publication Date Title
    CA2433290C (en) Folding bicycle
    EP0733584B1 (en) Automatic erection for a crane with a foldable boom
    EP0536060B1 (en) Crane jib which folds automatically
    EP1364906B1 (en) Tower crane with foldable counter-jib
    FR2605619A1 (en) REPLIABLE MACHINE FOR HANDLING AND LIFTING LOADS
    EP1301431B1 (en) Articulated jib crane
    EP0733583B1 (en) Self-erecting crane with laterally foldable jib
    EP0888997B1 (en) Mast foldable in three elements with folding/unfolding device for tower crane
    FR2550176A1 (en) Crane with multi-link folding outrigger
    EP0536061B1 (en) Automatically foldable tower crane
    EP0360702B1 (en) Collapsible crane with a jib comprising two or three elements articulating upon one another
    EP0473518B1 (en) Self-erecting crane with laterally foldable jib
    EP0870726B1 (en) Self erecting crane with a sideways foldable jib in the transport position
    FR2796632A1 (en) DEVICE FOR FOLDING A CRANE BOOM WITH NESTABLE ELEMENTS
    EP0269518B1 (en) Vehicle forming a space spreadable into a conch
    FR2548646A1 (en) REPLIABLE CRANE WITH QUICK DEPLOYMENT
    FR2577302A1 (en) Stabiliser with variable inclination and retractable base plate
    EP1057776B1 (en) Articulated jib crane
    EP1352870B1 (en) Device for erecting and unfolding the mast and for erecting the jib of a crane
    FR2636616A1 (en) Folding crane with a gib having two or three mutually articulated elements.
    FR2526776A1 (en) Fold up crane - has a pivoting jib, a telescopic mast and constant length compensating cable

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE CH DE DK ES GB IT LI NL PT SE

    17P Request for examination filed

    Effective date: 19960805

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    17Q First examination report despatched

    Effective date: 19981012

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT BE CH DE DK ES GB IT LI NL PT SE

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: SE

    Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

    Effective date: 19990428

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 19990428

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 19990428

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 19990428

    REF Corresponds to:

    Ref document number: 179391

    Country of ref document: AT

    Date of ref document: 19990515

    Kind code of ref document: T

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REF Corresponds to:

    Ref document number: 69602223

    Country of ref document: DE

    Date of ref document: 19990602

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DK

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 19990728

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: PT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 19990730

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FG2A

    Ref document number: 2132860

    Country of ref document: ES

    Kind code of ref document: T3

    GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

    Effective date: 19990428

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20000229

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20000229

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed
    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: BE

    Payment date: 20050309

    Year of fee payment: 10

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: BE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060228

    BERE Be: lapsed

    Owner name: *POTAIN

    Effective date: 20060228

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: ES

    Payment date: 20090220

    Year of fee payment: 14

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20090211

    Year of fee payment: 14

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: IT

    Payment date: 20090217

    Year of fee payment: 14

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100901

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FD2A

    Effective date: 20110308

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100226

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110307

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100227