EP0717149B1 - Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art - Google Patents

Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art Download PDF

Info

Publication number
EP0717149B1
EP0717149B1 EP95402782A EP95402782A EP0717149B1 EP 0717149 B1 EP0717149 B1 EP 0717149B1 EP 95402782 A EP95402782 A EP 95402782A EP 95402782 A EP95402782 A EP 95402782A EP 0717149 B1 EP0717149 B1 EP 0717149B1
Authority
EP
European Patent Office
Prior art keywords
beams
concrete
structure according
composite wood
concrete structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP95402782A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP0717149A1 (fr
Inventor
Philippe Drisin
Myriam Olivier
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Soprese (societe A Responsabilite Limitee)
Original Assignee
Soprese (societe A Responsabilite Limitee)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Soprese (societe A Responsabilite Limitee) filed Critical Soprese (societe A Responsabilite Limitee)
Publication of EP0717149A1 publication Critical patent/EP0717149A1/fr
Application granted granted Critical
Publication of EP0717149B1 publication Critical patent/EP0717149B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/10Wood
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B2005/232Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with special provisions for connecting wooden stiffening ribs or other wooden beam-like formations to the concrete slab
    • E04B2005/237Separate connecting elements

Definitions

  • the present invention which of model tests and studies were carried out at ENPEPE-FORMEQUIP Geomaterials Laboratory, concerns the realization of mixed wood-concrete structures, especially for obtaining aprons of engineering structures such as bridges.
  • Such structures include solid wood or laminated beams glued to their part lower and a concrete compression slab connected on the beams at their upper part.
  • the object of the present invention is to remedy to this disadvantage and it proposes for this purpose substitute, for metal beams, modes of known construction mentioned above, beams of wood of section defined according to the loads applied (may vary from solid wooden section solid in an I-section also in solid wood or a section of complex shape in glued laminate). She has also for object, thanks to a judicious choice of position of the neutral fiber of the composite section (at the border between wood and concrete), to decrease considerably the quantities of steel to be put in place to arm the compression slab.
  • connection systems which have only used for building floors and low capacity gateways, are not designed to withstand all compression and shear generated in engineering structures.
  • the connector which can be consisting of a folded sheet or obtained by welding two standard angles in head-to-tail position, has an opening on its upper vertical wing for the passage of a longitudinal streak intended to be drowned in concrete.
  • the connector according to the invention is perfectly suited to the execution of decks with a mixed wood-concrete structure. Indeed its upper part works exactly as in mixed metal / concrete decks in which the connector is embedded in the compressed part of the transmitting concrete a compression which dimensions it (it also prevents, thanks to the thread passing through all connectors in a row, lifting the slab). Of even its lower part pressed into a slot in the beam transmits in the best possible conditions wood compression within the limits of constraints admissible of it (defined by calculation). The mobilization of efforts is ensured by filling of the slit using the product defined above.
  • the connector is temporarily fixed on the wood by a point and the efforts of tearing off connector-wood are taken up by constituted bolts a rod inserted in a pilot hole and sealed with product defined above in order to reconstitute the material around the stem, and a head opposing the uprising.
  • the set of connectors thus defined according to the invention is able to resist all efforts generated by the cutting forces known in the engineering structures including fatigue efforts.
  • the longitudinal wooden beams are normally braced at a rate defined by the calculation. These spacers are in principle made up a steel tube taking up the shears crossing a wooden concrete element which takes up the compressions and a FE 500 steel clamping rod or hard steel - (depending on the efforts concerned) - which resumes pull-ups.
  • the wooden beams rest on headers constituting supports.
  • prefabricated elements placed on the bank of the deck on a side notch of the edge beams both serve as vertical lost formwork for the compression slab and the overlying sidewalk but also of protection against the flow of water the along the edge beams and decorative facing.
  • the invention as defined can be implemented implemented both in developing countries development for its maximum use of local resources and the simplicity of its execution, and in industrial countries that wish to develop the wood industry at reasonable costs thanks to low consumption of labor on site properly said.
  • FIG. 1 there is shown a bridge deck produced according to the invention, which comprises wooden beams 1 which can be solid or laminated glued.
  • the beams are section in I and consist of several elements superimposed assembled together. They could however be rectangular.
  • Beams 1 extend in the direction longitudinal of the bridge between piers and abutments, and they are braced using a set made of 2 steel tubes passing through butons wood 3, the whole being tightened by pre-stressed rods 4.
  • the beams 1 are notched by notches 5, intended to receive prefabricated concrete vaults 6 which are arranged in arch shape and serve to form the space included between the beams 1.
  • the outer notches 5 of the edge beams allow to support cornices prefabricated 7 which have as their object, in addition to their role decorative and protective beams, formwork vertically the concrete slab 8 of the deck as well as the overlying sidewalk 9.
  • Beams 1 and prefabricated concrete blocks 6 serve as formwork for pouring the concrete slab 8, which is simply armed with a double layer of trellis welded to resist some conditions to limits, and not at the transverse moments which are eliminated thanks to the arch effect created by the concrete blocks 6.
  • Connectors 12 in the form of a double angle connect the wooden beams 1 to the concrete slab 8 in opposing the sliding forces between these elements.
  • a sealing layer 10 and a wearing layer 11 cover the concrete slab 8.
  • the connector 12 consists of a sheet folded about 8mm thick S-shaped without upper and lower bars produced by folding or by welding two angles together.
  • the amount upper 13 has dimensions of the order of 10cm x 10 cm. It is drilled with a hole 14 allowing the introduction of a round strip of about 12mm.
  • a central hole 19 allows the introduction of a connector positioning and fixing tip.
  • the lower upright 20 has dimensions of the order of 10cm x 3.5cm.
  • the vault in prefabricated concrete blocks are made using two shore lines 22 and a key line 23 extending slightly beyond the beam in order to form the ends 24 of the apron projecting from the beams wood.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)
  • Chemical And Physical Treatments For Wood And The Like (AREA)
  • Rod-Shaped Construction Members (AREA)
EP95402782A 1994-12-13 1995-12-12 Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art Expired - Lifetime EP0717149B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR9414975A FR2727993A1 (fr) 1994-12-13 1994-12-13 Structure mixte bois-beton destinee notamment a la realisation de tabliers d'ouvrages d'art
FR9414975 1994-12-13

Publications (2)

Publication Number Publication Date
EP0717149A1 EP0717149A1 (fr) 1996-06-19
EP0717149B1 true EP0717149B1 (fr) 2000-08-16

Family

ID=9469750

Family Applications (1)

Application Number Title Priority Date Filing Date
EP95402782A Expired - Lifetime EP0717149B1 (fr) 1994-12-13 1995-12-12 Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art

Country Status (4)

Country Link
EP (1) EP0717149B1 (esLanguage)
AT (1) ATE195563T1 (esLanguage)
DE (1) DE69518396T2 (esLanguage)
FR (1) FR2727993A1 (esLanguage)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12509882B2 (en) 2023-01-26 2025-12-30 Som Iw Holdings, Llc Timber-concrete composite connector and ductile reinforcement chair

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5809722A (en) * 1997-02-06 1998-09-22 Keith M. Wright Girder supported reinforced concrete slab building structures with shearing connectors, and methods of constructing the building structures and connectors
RU2134321C1 (ru) * 1997-11-03 1999-08-10 Хабаровский государственный технический университет Засыпное сооружение под насыпью
RU2131956C1 (ru) * 1997-11-06 1999-06-20 Хабаровский государственный технический университет Засыпное сооружение под насыпью
DE19808208A1 (de) * 1998-02-27 1999-09-02 Fischer Artur Werke Gmbh Verbindungselement zum Verbinden von Holz und Beton
FR2843978B1 (fr) * 2002-08-28 2005-03-11 Conseil Service Investissement Procede de realisation d'un ouvrage de franchissement comportant un conduit interne
RU2269618C1 (ru) * 2005-02-04 2006-02-10 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Мост тоннельного типа
EP2557244A1 (en) * 2011-08-09 2013-02-13 MiTek Holdings, Inc. A bracket for connecting timber to concrete
ES2511992B1 (es) * 2013-04-08 2015-07-28 Carlos González Bravo Conector para conexión de estructuras mixtas de madera-hormigón
DE102016125008A1 (de) * 2016-12-20 2018-06-21 Fischer Italia S.R.L. Holz-Beton-Verbinder und Befestigungsanordnung
CN111549912A (zh) * 2020-06-04 2020-08-18 郑州大学 一种使用槽钢与自攻螺钉的木—混凝土连接结构

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB415844A (en) * 1933-04-13 1934-09-06 Francis Albert Leon Wellard Improvements in the construction of arches for bridges, culverts and similar purposes
DE673556C (de) * 1936-09-20 1939-03-24 Otto Schaub Verbunddecke aus Holzrippen und Betonplatte
FR2611778B1 (fr) * 1987-02-26 1992-04-24 Paris Ouest Entreprise Plancher a collaboration bois-beton
CH687397A5 (fr) * 1992-11-14 1996-11-29 Bettex Fabienne Plancher mixte bois-beton.
FR2702236B1 (fr) * 1993-03-03 1995-08-04 Gauthier Daniel Element de construction composite bois-beton.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12509882B2 (en) 2023-01-26 2025-12-30 Som Iw Holdings, Llc Timber-concrete composite connector and ductile reinforcement chair

Also Published As

Publication number Publication date
ATE195563T1 (de) 2000-09-15
DE69518396T2 (de) 2001-03-29
FR2727993B1 (esLanguage) 1997-02-07
EP0717149A1 (fr) 1996-06-19
DE69518396D1 (de) 2000-09-21
FR2727993A1 (fr) 1996-06-14

Similar Documents

Publication Publication Date Title
EP0717149B1 (fr) Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art
CA1322668C (fr) Plancher a collaboration bois-beton
EP1045089B1 (fr) Structure de maçonnerie et procédé de renforcement associé
WO1998054418A1 (fr) Ossature de batiment
WO2000046458A1 (fr) Dalle de construction, assemblage de telles dalles et utilisation pour realiser des structures pouvant supporter des charges importantes
EP0369914A1 (fr) Procédé de solidarisation d'une masse de matière à un support fonctionnel et dispositifs ainsi obtenus
FR2795438A1 (fr) Structure de pont ou de passerelle mixte beton-acier, en particulier de pont a tablier bipoutre mixte sous chaussee
FR3066514B1 (fr) Coffrage perdu isolant et procede associe pour realiser un mur.
FR2573848A1 (fr) Structure stable se composant d'elements tubulaires et de cables post-tendus ou d'autres organes de tension
KR20090112983A (ko) 목질부재의 접합구조
EP1452670B1 (fr) Procédé de renforcement d'un élément de construction et élément de construction
JP3924231B2 (ja) 鉄筋コンクリート造部材の補強構造
FR2607854A1 (fr) Technique de consolidation d'une charpente et pieces necessaires a la mise en place de cette technique
FR2642776A1 (fr) Elements de plancher a precontrainte relachable et procede de realisation d'une fouille par la technique de la paroi moulee les mettant en oeuvr
FR2817575A1 (fr) Structure de maconnerie et procede de renforcement associe
WO1990011417A1 (fr) Structure notamment en bois et procede de realisation
FR2570740A1 (fr) Poutrelles en bois colle a ame mince
Ekeberg et al. Flisa Bridge, Norway—a record-breaking timber bridge
FR2865490A1 (fr) Procede et dispositif de renforcement de structure.
FR2736372A1 (fr) Structure de poutre et ouvrages l'utilisant
EP1045091B1 (fr) Procédé de renforcement d'un élément de construction
EP2246497A1 (fr) Fondation d'immeuble à isolation thermique et d'étanchéité
FR2459343A1 (fr) Charpente destinee notamment aux constructions industrielles en pays a risque cyclonique
WO2002092929A1 (fr) Dispositif pour construction, notamment de type habitation
WO2006117460A1 (fr) Procede d'assemblage d'une charpente de toiture et batiment obtenu au moyen dudit procede

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE LI NL

17P Request for examination filed

Effective date: 19961217

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

17Q First examination report despatched

Effective date: 19990723

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE LI NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20000816

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20000816

REF Corresponds to:

Ref document number: 195563

Country of ref document: AT

Date of ref document: 20000915

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 69518396

Country of ref document: DE

Date of ref document: 20000921

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20001114

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20001130

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20001231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20001231

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20011231

BERE Be: lapsed

Owner name: SOPRESE S.A.R.L.

Effective date: 20011231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020702