EP0717149B1 - Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art - Google Patents
Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art Download PDFInfo
- Publication number
- EP0717149B1 EP0717149B1 EP95402782A EP95402782A EP0717149B1 EP 0717149 B1 EP0717149 B1 EP 0717149B1 EP 95402782 A EP95402782 A EP 95402782A EP 95402782 A EP95402782 A EP 95402782A EP 0717149 B1 EP0717149 B1 EP 0717149B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- beams
- concrete
- structure according
- composite wood
- concrete structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 50
- 238000010276 construction Methods 0.000 title claims description 5
- 230000006835 compression Effects 0.000 claims abstract description 20
- 238000007906 compression Methods 0.000 claims abstract description 20
- 239000000126 substance Substances 0.000 claims abstract description 4
- 230000009974 thixotropic effect Effects 0.000 claims abstract 2
- 239000002023 wood Substances 0.000 claims description 31
- 229910000831 Steel Inorganic materials 0.000 claims description 12
- 239000010959 steel Substances 0.000 claims description 12
- 239000002131 composite material Substances 0.000 claims description 11
- 238000009415 formwork Methods 0.000 claims description 5
- 239000011178 precast concrete Substances 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 2
- 238000005470 impregnation Methods 0.000 claims 1
- 239000002184 metal Substances 0.000 abstract description 6
- 229910052751 metal Inorganic materials 0.000 abstract description 6
- 230000000284 resting effect Effects 0.000 abstract description 2
- 239000007787 solid Substances 0.000 description 5
- 239000011150 reinforced concrete Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000007935 neutral effect Effects 0.000 description 2
- 239000000565 sealant Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 241001644893 Entandrophragma utile Species 0.000 description 1
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 229920002522 Wood fibre Polymers 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 230000003416 augmentation Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005246 galvanizing Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000002025 wood fiber Substances 0.000 description 1
- 229910000634 wood's metal Inorganic materials 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/10—Wood
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
- E04B2005/232—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with special provisions for connecting wooden stiffening ribs or other wooden beam-like formations to the concrete slab
- E04B2005/237—Separate connecting elements
Definitions
- the present invention which of model tests and studies were carried out at ENPEPE-FORMEQUIP Geomaterials Laboratory, concerns the realization of mixed wood-concrete structures, especially for obtaining aprons of engineering structures such as bridges.
- Such structures include solid wood or laminated beams glued to their part lower and a concrete compression slab connected on the beams at their upper part.
- the object of the present invention is to remedy to this disadvantage and it proposes for this purpose substitute, for metal beams, modes of known construction mentioned above, beams of wood of section defined according to the loads applied (may vary from solid wooden section solid in an I-section also in solid wood or a section of complex shape in glued laminate). She has also for object, thanks to a judicious choice of position of the neutral fiber of the composite section (at the border between wood and concrete), to decrease considerably the quantities of steel to be put in place to arm the compression slab.
- connection systems which have only used for building floors and low capacity gateways, are not designed to withstand all compression and shear generated in engineering structures.
- the connector which can be consisting of a folded sheet or obtained by welding two standard angles in head-to-tail position, has an opening on its upper vertical wing for the passage of a longitudinal streak intended to be drowned in concrete.
- the connector according to the invention is perfectly suited to the execution of decks with a mixed wood-concrete structure. Indeed its upper part works exactly as in mixed metal / concrete decks in which the connector is embedded in the compressed part of the transmitting concrete a compression which dimensions it (it also prevents, thanks to the thread passing through all connectors in a row, lifting the slab). Of even its lower part pressed into a slot in the beam transmits in the best possible conditions wood compression within the limits of constraints admissible of it (defined by calculation). The mobilization of efforts is ensured by filling of the slit using the product defined above.
- the connector is temporarily fixed on the wood by a point and the efforts of tearing off connector-wood are taken up by constituted bolts a rod inserted in a pilot hole and sealed with product defined above in order to reconstitute the material around the stem, and a head opposing the uprising.
- the set of connectors thus defined according to the invention is able to resist all efforts generated by the cutting forces known in the engineering structures including fatigue efforts.
- the longitudinal wooden beams are normally braced at a rate defined by the calculation. These spacers are in principle made up a steel tube taking up the shears crossing a wooden concrete element which takes up the compressions and a FE 500 steel clamping rod or hard steel - (depending on the efforts concerned) - which resumes pull-ups.
- the wooden beams rest on headers constituting supports.
- prefabricated elements placed on the bank of the deck on a side notch of the edge beams both serve as vertical lost formwork for the compression slab and the overlying sidewalk but also of protection against the flow of water the along the edge beams and decorative facing.
- the invention as defined can be implemented implemented both in developing countries development for its maximum use of local resources and the simplicity of its execution, and in industrial countries that wish to develop the wood industry at reasonable costs thanks to low consumption of labor on site properly said.
- FIG. 1 there is shown a bridge deck produced according to the invention, which comprises wooden beams 1 which can be solid or laminated glued.
- the beams are section in I and consist of several elements superimposed assembled together. They could however be rectangular.
- Beams 1 extend in the direction longitudinal of the bridge between piers and abutments, and they are braced using a set made of 2 steel tubes passing through butons wood 3, the whole being tightened by pre-stressed rods 4.
- the beams 1 are notched by notches 5, intended to receive prefabricated concrete vaults 6 which are arranged in arch shape and serve to form the space included between the beams 1.
- the outer notches 5 of the edge beams allow to support cornices prefabricated 7 which have as their object, in addition to their role decorative and protective beams, formwork vertically the concrete slab 8 of the deck as well as the overlying sidewalk 9.
- Beams 1 and prefabricated concrete blocks 6 serve as formwork for pouring the concrete slab 8, which is simply armed with a double layer of trellis welded to resist some conditions to limits, and not at the transverse moments which are eliminated thanks to the arch effect created by the concrete blocks 6.
- Connectors 12 in the form of a double angle connect the wooden beams 1 to the concrete slab 8 in opposing the sliding forces between these elements.
- a sealing layer 10 and a wearing layer 11 cover the concrete slab 8.
- the connector 12 consists of a sheet folded about 8mm thick S-shaped without upper and lower bars produced by folding or by welding two angles together.
- the amount upper 13 has dimensions of the order of 10cm x 10 cm. It is drilled with a hole 14 allowing the introduction of a round strip of about 12mm.
- a central hole 19 allows the introduction of a connector positioning and fixing tip.
- the lower upright 20 has dimensions of the order of 10cm x 3.5cm.
- the vault in prefabricated concrete blocks are made using two shore lines 22 and a key line 23 extending slightly beyond the beam in order to form the ends 24 of the apron projecting from the beams wood.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Bridges Or Land Bridges (AREA)
- Chemical And Physical Treatments For Wood And The Like (AREA)
- Rod-Shaped Construction Members (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR9414975A FR2727993A1 (fr) | 1994-12-13 | 1994-12-13 | Structure mixte bois-beton destinee notamment a la realisation de tabliers d'ouvrages d'art |
| FR9414975 | 1994-12-13 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP0717149A1 EP0717149A1 (fr) | 1996-06-19 |
| EP0717149B1 true EP0717149B1 (fr) | 2000-08-16 |
Family
ID=9469750
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP95402782A Expired - Lifetime EP0717149B1 (fr) | 1994-12-13 | 1995-12-12 | Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art |
Country Status (4)
| Country | Link |
|---|---|
| EP (1) | EP0717149B1 (esLanguage) |
| AT (1) | ATE195563T1 (esLanguage) |
| DE (1) | DE69518396T2 (esLanguage) |
| FR (1) | FR2727993A1 (esLanguage) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12509882B2 (en) | 2023-01-26 | 2025-12-30 | Som Iw Holdings, Llc | Timber-concrete composite connector and ductile reinforcement chair |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5809722A (en) * | 1997-02-06 | 1998-09-22 | Keith M. Wright | Girder supported reinforced concrete slab building structures with shearing connectors, and methods of constructing the building structures and connectors |
| RU2134321C1 (ru) * | 1997-11-03 | 1999-08-10 | Хабаровский государственный технический университет | Засыпное сооружение под насыпью |
| RU2131956C1 (ru) * | 1997-11-06 | 1999-06-20 | Хабаровский государственный технический университет | Засыпное сооружение под насыпью |
| DE19808208A1 (de) * | 1998-02-27 | 1999-09-02 | Fischer Artur Werke Gmbh | Verbindungselement zum Verbinden von Holz und Beton |
| FR2843978B1 (fr) * | 2002-08-28 | 2005-03-11 | Conseil Service Investissement | Procede de realisation d'un ouvrage de franchissement comportant un conduit interne |
| RU2269618C1 (ru) * | 2005-02-04 | 2006-02-10 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Мост тоннельного типа |
| EP2557244A1 (en) * | 2011-08-09 | 2013-02-13 | MiTek Holdings, Inc. | A bracket for connecting timber to concrete |
| ES2511992B1 (es) * | 2013-04-08 | 2015-07-28 | Carlos González Bravo | Conector para conexión de estructuras mixtas de madera-hormigón |
| DE102016125008A1 (de) * | 2016-12-20 | 2018-06-21 | Fischer Italia S.R.L. | Holz-Beton-Verbinder und Befestigungsanordnung |
| CN111549912A (zh) * | 2020-06-04 | 2020-08-18 | 郑州大学 | 一种使用槽钢与自攻螺钉的木—混凝土连接结构 |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB415844A (en) * | 1933-04-13 | 1934-09-06 | Francis Albert Leon Wellard | Improvements in the construction of arches for bridges, culverts and similar purposes |
| DE673556C (de) * | 1936-09-20 | 1939-03-24 | Otto Schaub | Verbunddecke aus Holzrippen und Betonplatte |
| FR2611778B1 (fr) * | 1987-02-26 | 1992-04-24 | Paris Ouest Entreprise | Plancher a collaboration bois-beton |
| CH687397A5 (fr) * | 1992-11-14 | 1996-11-29 | Bettex Fabienne | Plancher mixte bois-beton. |
| FR2702236B1 (fr) * | 1993-03-03 | 1995-08-04 | Gauthier Daniel | Element de construction composite bois-beton. |
-
1994
- 1994-12-13 FR FR9414975A patent/FR2727993A1/fr active Granted
-
1995
- 1995-12-12 DE DE69518396T patent/DE69518396T2/de not_active Expired - Fee Related
- 1995-12-12 EP EP95402782A patent/EP0717149B1/fr not_active Expired - Lifetime
- 1995-12-12 AT AT95402782T patent/ATE195563T1/de not_active IP Right Cessation
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12509882B2 (en) | 2023-01-26 | 2025-12-30 | Som Iw Holdings, Llc | Timber-concrete composite connector and ductile reinforcement chair |
Also Published As
| Publication number | Publication date |
|---|---|
| ATE195563T1 (de) | 2000-09-15 |
| DE69518396T2 (de) | 2001-03-29 |
| FR2727993B1 (esLanguage) | 1997-02-07 |
| EP0717149A1 (fr) | 1996-06-19 |
| DE69518396D1 (de) | 2000-09-21 |
| FR2727993A1 (fr) | 1996-06-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0717149B1 (fr) | Structure mixte bois-béton destinée notamment à la réalisation de tabliers d'ouvrages d'art | |
| CA1322668C (fr) | Plancher a collaboration bois-beton | |
| EP1045089B1 (fr) | Structure de maçonnerie et procédé de renforcement associé | |
| WO1998054418A1 (fr) | Ossature de batiment | |
| WO2000046458A1 (fr) | Dalle de construction, assemblage de telles dalles et utilisation pour realiser des structures pouvant supporter des charges importantes | |
| EP0369914A1 (fr) | Procédé de solidarisation d'une masse de matière à un support fonctionnel et dispositifs ainsi obtenus | |
| FR2795438A1 (fr) | Structure de pont ou de passerelle mixte beton-acier, en particulier de pont a tablier bipoutre mixte sous chaussee | |
| FR3066514B1 (fr) | Coffrage perdu isolant et procede associe pour realiser un mur. | |
| FR2573848A1 (fr) | Structure stable se composant d'elements tubulaires et de cables post-tendus ou d'autres organes de tension | |
| KR20090112983A (ko) | 목질부재의 접합구조 | |
| EP1452670B1 (fr) | Procédé de renforcement d'un élément de construction et élément de construction | |
| JP3924231B2 (ja) | 鉄筋コンクリート造部材の補強構造 | |
| FR2607854A1 (fr) | Technique de consolidation d'une charpente et pieces necessaires a la mise en place de cette technique | |
| FR2642776A1 (fr) | Elements de plancher a precontrainte relachable et procede de realisation d'une fouille par la technique de la paroi moulee les mettant en oeuvr | |
| FR2817575A1 (fr) | Structure de maconnerie et procede de renforcement associe | |
| WO1990011417A1 (fr) | Structure notamment en bois et procede de realisation | |
| FR2570740A1 (fr) | Poutrelles en bois colle a ame mince | |
| Ekeberg et al. | Flisa Bridge, Norway—a record-breaking timber bridge | |
| FR2865490A1 (fr) | Procede et dispositif de renforcement de structure. | |
| FR2736372A1 (fr) | Structure de poutre et ouvrages l'utilisant | |
| EP1045091B1 (fr) | Procédé de renforcement d'un élément de construction | |
| EP2246497A1 (fr) | Fondation d'immeuble à isolation thermique et d'étanchéité | |
| FR2459343A1 (fr) | Charpente destinee notamment aux constructions industrielles en pays a risque cyclonique | |
| WO2002092929A1 (fr) | Dispositif pour construction, notamment de type habitation | |
| WO2006117460A1 (fr) | Procede d'assemblage d'une charpente de toiture et batiment obtenu au moyen dudit procede |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE LI NL |
|
| 17P | Request for examination filed |
Effective date: 19961217 |
|
| GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
| 17Q | First examination report despatched |
Effective date: 19990723 |
|
| GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
| GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
| GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
| GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE LI NL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20000816 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20000816 |
|
| REF | Corresponds to: |
Ref document number: 195563 Country of ref document: AT Date of ref document: 20000915 Kind code of ref document: T |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REF | Corresponds to: |
Ref document number: 69518396 Country of ref document: DE Date of ref document: 20000921 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20001114 Year of fee payment: 6 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20001130 Year of fee payment: 6 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20001231 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20001231 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed | ||
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20011231 |
|
| BERE | Be: lapsed |
Owner name: SOPRESE S.A.R.L. Effective date: 20011231 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020702 |