EP0646429A1 - Method of and apparatus for low-pressure casting - Google Patents
Method of and apparatus for low-pressure casting Download PDFInfo
- Publication number
- EP0646429A1 EP0646429A1 EP94113720A EP94113720A EP0646429A1 EP 0646429 A1 EP0646429 A1 EP 0646429A1 EP 94113720 A EP94113720 A EP 94113720A EP 94113720 A EP94113720 A EP 94113720A EP 0646429 A1 EP0646429 A1 EP 0646429A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- mold
- cavity
- casting
- low
- sand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C9/00—Moulds or cores; Moulding processes
- B22C9/06—Permanent moulds for shaped castings
- B22C9/061—Materials which make up the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D18/00—Pressure casting; Vacuum casting
- B22D18/04—Low pressure casting, i.e. making use of pressures up to a few bars to fill the mould
Definitions
- This invention relates to a method of and an apparatus for low-pressure casting, and more particularly to those which facilitate automation of the casting step.
- Low-pressure casting has been wide used for mass production of, for instance, cylinder heads of automotive engines.
- molten light metal such as aluminum alloy held in a tightly enclosed vessel is cast in a cavity in a mold under a relatively low pressure of inert gas or air applied to the surface of the molten metal.
- the mold employed in such low-pressure casting is of metal and comprises a lower mold, an upper mold which is moved up and down toward and away from the lower mold and a pair of slide molds which are disposed between the upper and lower molds to be movable left and right and are slidably engaged with the upper and lower molds. When these molds are closed, a cavity having a shape conforming to the shape of a product to be cast is formed.
- molten metal cannot be fed deep into the cavity or flow marks can be generated on the surface of the product. Further the mold can expand due to heat of the molten metal and the cavity can be partly narrowed, which can result in short molding and/or products with defects due to residual gas in the cavity.
- the cavity is formed by a sand mold, and the sand mold is supported by metal molds. Then molten metal is cast in the cavity and is held under a pressure.
- the structure of the casting mold comprises a sand mold forming a cavity, metal molds supporting the sand mold, and a gas discharge passage which communicates with the sand mold through the metal molds and discharges gas in the cavity.
- the cast product remains on the lower mold held in the sand mold after the casting mold is opened with the upper mold moved upward and the slide molds moved away from each other.
- the primary object of the present invention is to provide a method of and an apparatus for low-pressure casting which is suitable for automation of the casting step, can greatly shorten the casting cycle time and can improve the quality of the cast molds.
- a low-pressure casting apparatus in accordance with a first aspect of the present invention is provided with a casting mold which can be opened and closed and is closed to form therein a cavity which is filled with molten metal to form a cast product and characterized in that said casting mold comprises an upper mold of metal, a lower mold of metal and a sand mold which is disposed between the upper and lower molds and forms a part of the cavity.
- a top wall of the cavity is formed by a lower surface of the upper mold, at least a part of a side wall of the cavity is formed by the sand mold, and the upper mold contacts with the molten metal filled in the cavity in a larger area than the lower mold.
- the upper mold is provided with a holding means for holding the cast product on the lower surface of the upper mold when the casting mold is opened in order to more surely lift the cast product and the sand mold together.
- the holding means may be a projecting member which projects into the cavity from the lower surface of the upper mold. This is advantageous in that the upper mold need not be additionally provided with such a means.
- a bulge portion may be formed on the upper surface of the lower mold and a gate may be formed between a side wall of the bulge portion and a side wall of the sand mold. This makes the molten metal in the gates to be solidified at a lower rate than that forming the product and can result in a higher quality of the cast product.
- a coolant passage can be formed in the metal member so that the molten metal in the cavity can be quickly cooled.
- a limiting member for limiting the space between the upper and lower molds is formed integrally with the upper mold. With this arrangement, the distance between the lower and upper molds can be held proper without slide mold. More preferably the limiting member is formed so as to surround the sand mold. This arrangement eliminates possibility of molten metal leaking out the casting mold 1 even if the side walls of the cavities are formed by the sand mold.
- the sand mold comprises a base frame, a core member disposed on the base frame, and an outer frame which is disposed on the base frame to support the core member together with the base frame and forms four side walls of the cavity. This arrangement permits the sand mold to be set to the lower mold by an automated system.
- the casting mold may be provided with a pair of sand molds so that a pair of cast products can be cast by one casting operation.
- a low-pressure casting method in accordance with a second aspect of the present invention comprises the steps of preparing a casting mold comprising an upper metal mold, a lower metal mold and a sand mold which is disposed between the upper and lower metal molds, forming a part of a cavity by the metal molds and the other part of the cavity by the sand mold, filling the cavity with molten metal, and opening the casting mold after the molten metal is solidified.
- a top wall of the cavity is formed by the upper metal mold, the other part of the wall of the cavity is formed by the lower metal mold, the casting mold is opened with the cast product and the sand mold held on the upper mold and then the cast product and the sand mold are removed from the upper mold.
- the sand mold is in the form of a core assembly having an opening on an upper side thereof prepared by positioning a core member on a base frame and positioning an outer frame on the core member, and the core assembly is placed on the lower mold, and the upper mold is placed on the core assembly to close the opening of the core assembly.
- This method permits the sand mold to be set to the lower mold by an automated system, which permits the casting step to be automated and shortens the casting cycle time.
- FIGS. 1 and 2 are cross-sectional views showing a casting mold, with the upper and lower molds apart from each other, which is mounted on a casting machine of the low-pressure casting apparatus.
- Figures 1 and 2 are respectively taken along lines I-I and II-II in Figure 5 which is a plan view of a base frame 11 of a core assembly 4 to be described later.
- a casting mold 1 comprises a lower mold 2 consisting of one metal mold, an upper mold 3 consisting of one metal mold and a pair of core assemblies 4 which solely consist of sand molds and are disposed between the lower and upper molds 2 and 3.
- Metal telescopic members 5 for forming combustion chambers are fit in bulge portions 2a formed on the upper surface of the lower mold 2 and core pins 6 for forming plug holes extend toward the lower mold 2 from a lower surface of the upper mold 3.
- Coolant passages 8 and 9 are provided in the telescopic members 5 and the core pins 6 ( Figure 2).
- Reference numeral 10 denotes a spacer which limits the distance between the lower and upper molds 2 and 3 when the casting mold 1 is closed.
- the spacer 10 is formed integrally with the upper mold 3 along the periphery of the lower surface of the upper mold so as to surround the core assemblies 4 when the casting mold 1 is closed.
- each core assembly 4 comprises a base frame 11 (shown in Figure 5 in plan), four outer frames 12 to 15 of sand which are mounted on the base frame 11 and form four side walls of the cavity, a sand core 16 ( Figures 6A to 6D) which is incorporated between the outer frame 14 and the base frame 11 and form exhaust ports, sand cores 17 which are formed integrally with the outer frame 15 and form intake ports, a sand core 18 ( Figures 7A to 7D) which is provided with end portions 18a and 18b supported between the base frame 11 and the outer frame 12 and between the base frame 11 and the outer frame 13 and forms a water jacket, and a sand core 19 for forming an oil jacket.
- the core assembly 4 has an opening in the upper surface thereof.
- the top wall of the cavity 7 is formed by a metal mold, i.e., the lower surface 3a of the upper mold 3 and the side walls and the bottom wall of the cavity are all formed by sand molds except a part of the bottom wall. Accordingly, the area in which the upper mold 3 is brought into contact with the molten metal is larger than that of the lower mold 2.
- a vent passage 18c is formed through the end portion 18b of the sand core 18 for forming the water jacket and gas generated from the core during casting can be drawn out by connecting a suction nozzle 20 to the vent passage 18C.
- the pair of core assemblies 4 in the assembled state are placed in a predetermined position on the lower mold 2 and the upper mold 3 is positioned on the core assemblies 4 so that the upper mold 3 closes the openings in the core assemblies 4, whereby the cavities 7 are formed.
- the lower mold 2 is provided with three gates 21 one at the center and the others in the left and right edge portions thereof.
- the gate 21 in the right edge portion of the lower mold 2 communicates with the cavity 7 in the right side core assembly 4 through a gate 22 formed in the base frame 11 (which forms the bottom wall and the lower portion of the side wall of the cavity 7) and the gate 21 in the left edge portion of the lower mold 2 communicates with the cavity 7 in the left side core assembly 4 through another gate 22 formed in the base frame 11.
- the central gate 21 communicates with both the cavities 7 through still another gate 22 and the molten metal fed through the central gate 21 is distributed to both the cavities 7.
- the gates 22 are formed between the side walls of the bulge portions 2a of the lower mold 2 and the side walls of the base frames 11 which are of sand.
- the lower mold 2 is mounted on a molten metal distributor 24 provided with a molten metal supply passage 23. Molten metal stored in a tightly closed furnace is injected into the distributor 24 through a stalk and and then into the cavities 7 through the gates 21 and 22 when the surface of the molten metal in the furnace is pressed by air under a low pressure.
- the core pins 6 are used as a means for holding the cast products together with the core assemblies 4, the upper mold 3 need not be additionally provided with such a means.
- the telescopic members 5 of metal are fit in the bulge portions 2a formed on the upper surface of the lower mold 2, and the gates 22 are formed by the side walls of the bulge portions 2a and the side walls of the sand mold, the molten metal in the gates 22 is solidified at a lower rate than that forming the product, which can result in a higher quality of the cast product.
- the spacer 10 for limiting the distance between the lower and upper molds 2 and 3 upon closure of the casting mold 1 is provided so as to surround the core assemblies 4 when the casting mold 1 is closed, the distance between the lower and upper molds 2 and 3 can be held proper without slide mold and there is no possibility of molten metal leaking out the casting mold 1 even if the side walls of the cavities 7 are formed by sand molds.
- the core assemblies 4 are set to the lower mold 2 with the sand cores 16 to 19 having been assembled into the core assemblies 4, automation of the casting step is further facilitated and the casting cycle time is further shortened.
- Figures 8 and 9 are respectively a front view and a side view of a casting apparatus Q in which the casting mold 1 is employed.
- the casting apparatus Q comprises a casting machine 30, a core setter 31 for supplying the core assemblies 4 to the casting machine 30, and an extractor 32 which takes out the cast products W (with the core assemblies 4) from the casting machine 30.
- the casting machine 30 is connected through a stalk 34 to a furnace 33 in which molten metal 26 is stored.
- the molten metal 26 in the furnace 33 is supplied to the distributor 24 through the stalk 34.
- the lower mold 2 is fixedly mounted on a lower platen 35 and the upper mold 3 is fixedly mounted on an upper platen 36.
- Reference numeral 37 denotes an ejector plate.
- a casting plant provided with a plurality of such casting apparatuses Q will be described with reference to Figures 10 to 13, hereinbelow.
- the plant has upper and lower floors, and a plurality of casting apparatuses Q are positioned on the upper floor and means for transferring the core assemblies 4 and the cast products W are positioned on the lower floor.
- Elevators E1 to E14 are disposed beside the casting apparatuses Q and transfers pallets (not shown) with core assemblies 4 from the lower floor to the upper floor and vacant pallets from the upper floor to the lower floor.
- Elevators F1 to E8 are transfers pallets (not shown) with cast products W from the upper floor to the lower floor and vacant pallets from the lower floor to the upper floor.
- the elevators F1 to F8 are disposed between adjacent two casting apparatuses Q except the elevators F1 and F5 which are faced to core assembly lines G1 and G2 to be described later.
- the elevators E1 to E7 and F1 to F4 are for the casting line L1 and the elevators E8 to E14 and F5 to F8 are for the casting line L2.
- Core assembly lines G1 and G2 are provided respectively at the right hand ends of the casting lines L1 and L2. Elevators H1 and H2 transfers pallets with core assemblies 4 assembled by the core assembly lines G1 and G2 from the upper floor to the lower floor and vacant pallets from the lower floor to positions above the upper floor.
- a pair of parallel conveyor lines K1 and K2 are provided on the lower floor.
- One conveyor line K1 extends along the elevator E1 to E7 for the casting line L1 and the other conveyor line K2 extends along the elevator E8 to E14 for the casting line L2.
- Stockers S1 to S2 for stocking vacant pallets are provided close to the elevators H1 and H2.
- Figure 12 shows the casting line L1 and the conveyor line K1.
- MA denotes the surface of the lower floor and MB denotes the surface of the upper floor.
- the conveyor line K1 comprises lower and upper conveyors K1a and K1b.
- the lower conveyor K1a runs leftward in Figure 12 and conveys the pallets with the core assemblies 4 assembled in the core assembly line G1 to the elevators E1 to E7 and the vacant pallets to the elevators F1 to F4.
- the upper conveyor K1b runs rightward and conveys the pallets with the cast products W which are transferred from the upper floor to the lower floor by the elevators F1 to F4 to the after-treatment line J1 and the vacant pallets which are transferred from the upper floor to the lower floor by the elevators E1 to E7 to the elevator H1.
- the conveyor line K2 is of the same arrangement.
- Figure 13 shows the layout in the core assembly lines G1 and G2 on the lower floor.
- P1 and P2 respectively denote core conveyor lines each having upper and lower conveyors.
- the upper conveyors of the respective core conveyor lines P1 and P2 runs rightward and convey vacant pallets from the upper ends of the elevators H1 and H2 to the upper ends of elevators R1 and R2 disposed at the right side ends.
- the elevators R1 and R2 are returning elevators for transferring the vacant pallets from the ends of the upper conveyors to the beginnings of the lower conveyors.
- the return elevators R1 and R2 are of the substantially the same heights as the elevators H1 and H2.
- the upper ends of the elevators R1 and R2 are respectively connected with the upper ends of the elevators H1 and H2 by the upper conveyors and the lower ends of the elevators R1 and R2 are respectively connected with the lower ends of the elevators H1 and H2 by the lower conveyors.
- the vacant pallets conveyed above the surface MB of the upper floor by the elevator H1 and H2 are conveyed respectively to the upper ends of the elevator R1 and R2 by the upper conveyors of the conveyor lines P1 and P2, and then transferred respectively to the lower conveyors of the conveyor lines P1 and P2 by the elevators R1 and R2.
- the core assemblies 4 assembled by the core assembly line G1 and G2 are placed on the pallets, and conveyed leftward by the lower conveyors, and then stocked in a core stocker 40 together with data thereon.
- the core assemblies 4 Upon receipt of a delivery requirement signal from the casting apparatuses Q1 to Q14, the core assemblies 4 are delivered from the stocker 40 and bonded by bonding machines 41, and then conveyed to the elevators H1 and H2. Thereafter the core assemblies 4 are transferred to the lower floor by the elevators H1 and H2 and placed on the lower conveyors of the conveyor lines K1 and K2.
- the core assemblies 4 are conveyed to the elevator E5 by the lower conveyor K1a and then transferred to the upper floor by the elevator E5. Then the core assemblies 4 are set to the casting mold 1 on the casting machine 30 by the core setter 31 of the casting apparatus Q5 and casting is carried out in the manner described above.
- the pallets from which the core assemblies 4 are removed is transferred to the lower floor and is conveyed to the elevator H1 by the upper conveyor K1b. Then the vacant pallet is lifted above the surface MB of the upper floor and conveyed to the upper end of the elevator R1 by the upper conveyor of the conveyor line P1. Then the vacant pallet is transferred downward by the elevator R1 on to the lower conveyor of the conveyor line P1 and returned to the core assembly line G1.
- the cast products W cast by the casting machine 30 of the casting apparatus Q5 are taken out from-the casting mold 1 by the extractor 32 and transferred to the lower floor by the elevator F3. Then the cast products W are conveyed rightward to the after-treatment line J1 and are subjected to after-treatments such as removal of core assemblies 4 from the cast products W, cutting the gates and the like.
- the casting plant of this example has a two-floor structure wherein the casting apparatuses Q1 to Q14 are disposed on the upper floor and the conveyor lines K1 and K2 for conveying the core assemblies 4 and the cast products W are disposed on the lower floor. Accordingly, in this plant, the space factor is excellent, and many casting apparatuses can be installed in a limited space, and the structure about the casting machines can be simplified, whereby maintenance is facilitated.
- each of the conveyor line K1 and K2 comprises a core assembly carrying-in line (the lower conveyor) and a cast product carrying-out line (the upper conveyor), carrying the core assemblies 4 in the casting apparatuses Q1 to Q14 and carrying the cast products W out therefrom can be effected with a very high efficiency.
- Figure 14 is a flow chart showing the core delivery routine for delivering the core assemblies 4 (non-bonded) from the core stocker 40 in the core assembly line G1.
- the centralized controller When receiving a work completion signal (to be described later) from the casting machine (step S1), the centralized controller reads out the kind of the core assemblies 4 to be delivered from the delivery requirement signal (step S2). Then the centralized controller causes the core assemblies 4 of the designated kind to be taken out from the core stocker 40 (step S3), and conveyed to the bonding machine 41 by the lower conveyor of the conveyor line P1 (step S4). The centralized controller causes the bonding machine 41 to inject adhesive into the core assemblies 4 to bond them. (step S5) The centralized controller causes the bonded core assemblies 4 to be transferred to the lower floor by the elevator H1 (step S6) Then the centralized controller detects the kind of the core assemblies 4 (step S7) and designates the destination (step S8). Thereafter the centralized controller causes the core assemblies 4 to be placed on the lower conveyor K1a of the conveyor line K1 (step S9) and generates a work completion signal a (step S10). Thus one cycle of the core delivery routine is ended.
- Figure 15 is a flow chart showing the core carrying-in routine for carrying the core assemblies 4 in the casting apparatus Q5.
- the centralized controller When receiving the work completion signal a (step S11), the centralized controller stores in a memory the order of the core assemblies 4 to be conveyed by the lower conveyor K1a of the conveyor line K1 (step S12). Then the centralized controller determines whether desired core assemblies 4 reach the elevator E5 for the casting apparatus Q5 (which output the delivery requirement signal) by a limit switch provided on the lower conveyor K1a). (step S13) When it is determined that the desired core assemblies 4 reach the elevator E5, the centralized controller causes a knock pin (not shown) to stop the core assemblies 4 at the elevator E5 (step S14), and causes the core assemblies 4 to be transferred to the upper floor by the elevator E5 (step S15). Thus one cycle of the core carrying-in routine is ended.
- Figure 16 is a flow chart showing the core setting routine for setting the core assemblies 4 to the casting casting machine 30 of the casting apparatus Q5.
- the centralized controller checks the kind of the core assemblies 4 delivered, (step S21) When the core assemblies 4 delivered do not conform to the requirement, the centralized controller returns the core assemblies 4 by the elevator E5, and generates a work completion signal. (steps S22, S31 and S32) When the core assemblies 4 delivered conform to the requirement, the centralized controller causes the core setter 31 to hold the core assemblies 4. When the core setter complete holding the core assemblies 4, the centralized controller detects the temperature T A of the casting mold 1 and the temperature T B of the molten metal. (steps S24 and S25) Then the centralized controller determines whether the temperatures T A and T B are in the ranges of 320°C to 460°C and 690°C to 715°C, respectively. (step S26)
- the centralized controller When it is determined that the temperatures T A and T B are in the ranges, the centralized controller causes the core setter 31 to place the core assemblies 4 on the casting mold 1. (step S26) Then the centralized controller detects whether the core assemblies 4 are positioned in place by use of photoelectric tubes. When it is determined that the core assemblies 4 do not block light, the centralized controller generates a core setting completion signal, and otherwise alarms and interrupts the operation. (steps S28 to S30 and S34 and S35)
- Figure 17 is a flow chart showing a mold closing routine.
- the centralized controller first determines whether casting is to be initiated. (step S81) When it is determined that casting is to be initiated, the centralized controller begins to close the casting mold 1. (step S82) Then the centralized controller determines whether the casting mold 1 has been completely closed. (step S83) When it is determined that the casting mold 1 has been completely closed, the centralized controller sets a mold closure completion flag. (step S84) Otherwise, the centralized controller sets a timer, and when the casting mold 1 is not completely closed before lapse of the time set to the timer, the centralized controller alarms and interrupts the operation. (steps S85 to S88)
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Molds, Cores, And Manufacturing Methods Thereof (AREA)
Abstract
Description
- This invention relates to a method of and an apparatus for low-pressure casting, and more particularly to those which facilitate automation of the casting step.
- Low-pressure casting has been wide used for mass production of, for instance, cylinder heads of automotive engines. In the low-pressure casting, molten light metal such as aluminum alloy held in a tightly enclosed vessel is cast in a cavity in a mold under a relatively low pressure of inert gas or air applied to the surface of the molten metal.
- Generally the mold employed in such low-pressure casting is of metal and comprises a lower mold, an upper mold which is moved up and down toward and away from the lower mold and a pair of slide molds which are disposed between the upper and lower molds to be movable left and right and are slidably engaged with the upper and lower molds. When these molds are closed, a cavity having a shape conforming to the shape of a product to be cast is formed.
- In such a casting mold, since the cavity is entirely surrounded by metal walls, molten metal cast in the mold is robbed of a large amount of heat upon contact with the cavity wall and especially the molten metal cast in a part of the cavity which defines a thin part of the product is very quickly cooled.
- As a result, molten metal cannot be fed deep into the cavity or flow marks can be generated on the surface of the product. Further the mold can expand due to heat of the molten metal and the cavity can be partly narrowed, which can result in short molding and/or products with defects due to residual gas in the cavity.
- When a sand mold having a small specific heat is used instead of the metal mold, temperature drop of the molten metal and short molding can be minimized. However since a pressure is applied to the molten metal during casting and solidifying step, the sand mold can be broken or moved. Accordingly, this approach cannot be applied to casting of precision products.
- In order to overcome these problems, a novel method of low-pressure casting and a novel structure of a casting mold have been proposed, for instance, in Japanese Unexamined Patent Publication No. 63(1988)72466.
- In the method of low-pressure casting, the cavity is formed by a sand mold, and the sand mold is supported by metal molds. Then molten metal is cast in the cavity and is held under a pressure.
- The structure of the casting mold comprises a sand mold forming a cavity, metal molds supporting the sand mold, and a gas discharge passage which communicates with the sand mold through the metal molds and discharges gas in the cavity.
- However in the method and the structure of the casting mold, since the cavity is wholly formed by the sand mold, the cast product remains on the lower mold held in the sand mold after the casting mold is opened with the upper mold moved upward and the slide molds moved away from each other.
- Therefore, a troublesome work and a long time are required to remove the cast product and the sand mold from the lower mold. Further the sand scattered over the upper surface of the lower mold when the sand mold is removed from the lower mold must be cleared off the lower mold, which takes a long time. These problems prevents shortening of the casting cycle and obstructs automation of the casting step.
- In view of the foregoing observations and description, the primary object of the present invention is to provide a method of and an apparatus for low-pressure casting which is suitable for automation of the casting step, can greatly shorten the casting cycle time and can improve the quality of the cast molds.
- A low-pressure casting apparatus in accordance with a first aspect of the present invention is provided with a casting mold which can be opened and closed and is closed to form therein a cavity which is filled with molten metal to form a cast product and characterized in that said casting mold comprises an upper mold of metal, a lower mold of metal and a sand mold which is disposed between the upper and lower molds and forms a part of the cavity.
- In one embodiment, a top wall of the cavity is formed by a lower surface of the upper mold, at least a part of a side wall of the cavity is formed by the sand mold, and the upper mold contacts with the molten metal filled in the cavity in a larger area than the lower mold.
- With this arrangement, the cast product is lifted together with the sand mold trailed by the upper mold when the upper mold is moved upward away from the lower mold to open the
casting mold 1, and accordingly removal of the cast product is facilitated, which makes it feasible automation of the casting step. Further since no sand remains on the lower mold cleaning of the casting mold is simplified, which result in shortening of the casting cycle time coupled with facilitation of removal of the products. - Preferably, the upper mold is provided with a holding means for holding the cast product on the lower surface of the upper mold when the casting mold is opened in order to more surely lift the cast product and the sand mold together.
- The holding means may be a projecting member which projects into the cavity from the lower surface of the upper mold. This is advantageous in that the upper mold need not be additionally provided with such a means.
- A bulge portion may be formed on the upper surface of the lower mold and a gate may be formed between a side wall of the bulge portion and a side wall of the sand mold. This makes the molten metal in the gates to be solidified at a lower rate than that forming the product and can result in a higher quality of the cast product.
- Further when a metal member which forms a part of the cavity is mounted on the bulge portion, a coolant passage can be formed in the metal member so that the molten metal in the cavity can be quickly cooled.
- In one preferred embodiment, a limiting member for limiting the space between the upper and lower molds is formed integrally with the upper mold. With this arrangement, the distance between the lower and upper molds can be held proper without slide mold. More preferably the limiting member is formed so as to surround the sand mold. This arrangement eliminates possibility of molten metal leaking out the
casting mold 1 even if the side walls of the cavities are formed by the sand mold. - In another preferred embodiment, the sand mold comprises a base frame, a core member disposed on the base frame, and an outer frame which is disposed on the base frame to support the core member together with the base frame and forms four side walls of the cavity. This arrangement permits the sand mold to be set to the lower mold by an automated system.
- The casting mold may be provided with a pair of sand molds so that a pair of cast products can be cast by one casting operation.
- A low-pressure casting method in accordance with a second aspect of the present invention comprises the steps of preparing a casting mold comprising an upper metal mold, a lower metal mold and a sand mold which is disposed between the upper and lower metal molds, forming a part of a cavity by the metal molds and the other part of the cavity by the sand mold, filling the cavity with molten metal, and opening the casting mold after the molten metal is solidified.
- In one preferred embodiment, a top wall of the cavity is formed by the upper metal mold, the other part of the wall of the cavity is formed by the lower metal mold, the casting mold is opened with the cast product and the sand mold held on the upper mold and then the cast product and the sand mold are removed from the upper mold. This facilitates removal of the cast product and makes it feasible automation of the casting step, and at the same time results in shortening of the casting cycle time.
- Preferably, the sand mold is in the form of a core assembly having an opening on an upper side thereof prepared by positioning a core member on a base frame and positioning an outer frame on the core member, and the core assembly is placed on the lower mold, and the upper mold is placed on the core assembly to close the opening of the core assembly. This method permits the sand mold to be set to the lower mold by an automated system, which permits the casting step to be automated and shortens the casting cycle time.
-
- Figure 1 is a cross-sectional view of a casting mold employed in a casting machine of a low-pressure casting apparatus in accordance with an embodiment of the present invention,
- Figure 2 is another cross-sectional view of the casting mold,
- Figure 3 is a perspective view of a core assembly,
- Figure 4 is an exploded perspective view of the core assembly,
- Figure 5 is a plan view of a lower frame of the core assembly,
- Figure 6A is a rear view of a sand core for forming exhaust ports,
- Figure 6B is a plan view of the same,
- Figure 6C is a front view of the same,
- Figure 6D is a bottom view of the same,
- Figure 7A is a rear view of a sand core for forming a water jacket,
- Figure 7B is a plan view of the same,
- Figure 7C is a front view of the same,
- Figure 7D is a bottom view of the same,
- Figure 8 is a front view of the casting apparatus,
- Figure 9 is a side view of the casting apparatus,
- Figure 10 is a plan view showing a part of a casting plant provided with a plurality of casting apparatuses of the present invention,
- Figure 11 is a plan view showing another part of the casting plant,
- Figure 12 is a front view of the casting plant,
- Figure 13 is a plan view of a core assembly line of the plant,
- Figure 14 is a flow chart showing the core delivery routine,
- Figure 15 is a flow chart showing the core carrying-in routine,
- Figure 16 is a flow chart showing the core setting routine, and
- Figure 17 is a flow chart showing the mold closing routine.
- A low-pressure casting apparatus in accordance with an embodiment of the present invention which is for casting at one time a pair of cylinder heads for a V-6 engine will be described, hereinbelow. Figures 1 and 2 are cross-sectional views showing a casting mold, with the upper and lower molds apart from each other, which is mounted on a casting machine of the low-pressure casting apparatus. Figures 1 and 2 are respectively taken along lines I-I and II-II in Figure 5 which is a plan view of a
base frame 11 of acore assembly 4 to be described later. - In Figures 1 and 2, a casting
mold 1 comprises alower mold 2 consisting of one metal mold, anupper mold 3 consisting of one metal mold and a pair ofcore assemblies 4 which solely consist of sand molds and are disposed between the lower andupper molds telescopic members 5 for forming combustion chambers are fit inbulge portions 2a formed on the upper surface of thelower mold 2 andcore pins 6 for forming plug holes extend toward thelower mold 2 from a lower surface of theupper mold 3. When the lower andupper molds core assemblies 4 positioned in a predetermined place, cavities 7 are formed with the cavity walls formed by thelower mold 2, theupper mold 3, thecore assemblies 4, thetelescopic members 5 and the core pins 6. -
Coolant passages telescopic members 5 and the core pins 6 (Figure 2).Reference numeral 10 denotes a spacer which limits the distance between the lower andupper molds mold 1 is closed. Thespacer 10 is formed integrally with theupper mold 3 along the periphery of the lower surface of the upper mold so as to surround thecore assemblies 4 when the castingmold 1 is closed. - As shown in Figures 3 and 4, each
core assembly 4 comprises a base frame 11 (shown in Figure 5 in plan), fourouter frames 12 to 15 of sand which are mounted on thebase frame 11 and form four side walls of the cavity, a sand core 16 (Figures 6A to 6D) which is incorporated between theouter frame 14 and thebase frame 11 and form exhaust ports,sand cores 17 which are formed integrally with theouter frame 15 and form intake ports, a sand core 18 (Figures 7A to 7D) which is provided withend portions base frame 11 and theouter frame 12 and between thebase frame 11 and theouter frame 13 and forms a water jacket, and asand core 19 for forming an oil jacket. Thecore assembly 4 has an opening in the upper surface thereof. - Thus only the top wall of the cavity 7 is formed by a metal mold, i.e., the
lower surface 3a of theupper mold 3 and the side walls and the bottom wall of the cavity are all formed by sand molds except a part of the bottom wall. Accordingly, the area in which theupper mold 3 is brought into contact with the molten metal is larger than that of thelower mold 2. - A
vent passage 18c is formed through theend portion 18b of thesand core 18 for forming the water jacket and gas generated from the core during casting can be drawn out by connecting asuction nozzle 20 to the vent passage 18C. - The pair of
core assemblies 4 in the assembled state are placed in a predetermined position on thelower mold 2 and theupper mold 3 is positioned on thecore assemblies 4 so that theupper mold 3 closes the openings in thecore assemblies 4, whereby the cavities 7 are formed. - As shown in Figures 1 and 2, the
lower mold 2 is provided with threegates 21 one at the center and the others in the left and right edge portions thereof. Thegate 21 in the right edge portion of thelower mold 2 communicates with the cavity 7 in the rightside core assembly 4 through agate 22 formed in the base frame 11 (which forms the bottom wall and the lower portion of the side wall of the cavity 7) and thegate 21 in the left edge portion of thelower mold 2 communicates with the cavity 7 in the leftside core assembly 4 through anothergate 22 formed in thebase frame 11. Thecentral gate 21 communicates with both the cavities 7 through still anothergate 22 and the molten metal fed through thecentral gate 21 is distributed to both the cavities 7. Thegates 22 are formed between the side walls of thebulge portions 2a of thelower mold 2 and the side walls of the base frames 11 which are of sand. - The
lower mold 2 is mounted on amolten metal distributor 24 provided with a moltenmetal supply passage 23. Molten metal stored in a tightly closed furnace is injected into thedistributor 24 through a stalk and and then into the cavities 7 through thegates - Since the core pins 6 fixed to the
upper mold 3 to extend into the cavities 7 are caught by the cast products when the molten metal is solidified and at the same time theupper mold 3 is in contact with the-molten metal in a larger area than thelower mold 2, the cast products are lifted together with thecore assemblies 4 trailed by theupper mold 3 when theupper mold 3 is moved upward to open the castingmold 1. - Accordingly removal of the cast products is facilitated, which makes it feasible automation of the casting step. Further since no sand remains on the
lower mold 2 cleaning of the castingmold 1 is simplified, which result in shortening of the casting cycle time coupled with facilitation of removal of the products. - Further in this particular embodiment, since the core pins 6 are used as a means for holding the cast products together with the
core assemblies 4, theupper mold 3 need not be additionally provided with such a means. - Further since the
telescopic members 5 of metal are fit in thebulge portions 2a formed on the upper surface of thelower mold 2, and thegates 22 are formed by the side walls of thebulge portions 2a and the side walls of the sand mold, the molten metal in thegates 22 is solidified at a lower rate than that forming the product, which can result in a higher quality of the cast product. - Further since the
spacer 10 for limiting the distance between the lower andupper molds mold 1 is provided so as to surround thecore assemblies 4 when the castingmold 1 is closed, the distance between the lower andupper molds mold 1 even if the side walls of the cavities 7 are formed by sand molds. - Further, in this particular embodiment, since the
core assemblies 4 are set to thelower mold 2 with thesand cores 16 to 19 having been assembled into thecore assemblies 4, automation of the casting step is further facilitated and the casting cycle time is further shortened. - Figures 8 and 9 are respectively a front view and a side view of a casting apparatus Q in which the casting
mold 1 is employed. - The casting apparatus Q comprises a casting
machine 30, acore setter 31 for supplying thecore assemblies 4 to the castingmachine 30, and anextractor 32 which takes out the cast products W (with the core assemblies 4) from the castingmachine 30. The castingmachine 30 is connected through astalk 34 to afurnace 33 in whichmolten metal 26 is stored. Themolten metal 26 in thefurnace 33 is supplied to thedistributor 24 through thestalk 34. Thelower mold 2 is fixedly mounted on alower platen 35 and theupper mold 3 is fixedly mounted on anupper platen 36.Reference numeral 37 denotes an ejector plate. - A casting plant provided with a plurality of such casting apparatuses Q will be described with reference to Figures 10 to 13, hereinbelow. The plant has upper and lower floors, and a plurality of casting apparatuses Q are positioned on the upper floor and means for transferring the
core assemblies 4 and the cast products W are positioned on the lower floor. - As shown in Figure 10, fourteen casting apparatuses Q are arranged in two rows on the upper floor and form two casting lines L1 and L2. Elevators E1 to E14 are disposed beside the casting apparatuses Q and transfers pallets (not shown) with
core assemblies 4 from the lower floor to the upper floor and vacant pallets from the upper floor to the lower floor. Elevators F1 to E8 are transfers pallets (not shown) with cast products W from the upper floor to the lower floor and vacant pallets from the lower floor to the upper floor. The elevators F1 to F8 are disposed between adjacent two casting apparatuses Q except the elevators F1 and F5 which are faced to core assembly lines G1 and G2 to be described later. The elevators E1 to E7 and F1 to F4 are for the casting line L1 and the elevators E8 to E14 and F5 to F8 are for the casting line L2. - Core assembly lines G1 and G2 are provided respectively at the right hand ends of the casting lines L1 and L2. Elevators H1 and H2 transfers pallets with
core assemblies 4 assembled by the core assembly lines G1 and G2 from the upper floor to the lower floor and vacant pallets from the lower floor to positions above the upper floor. - As shown in Figure 11, a pair of parallel conveyor lines K1 and K2 are provided on the lower floor. One conveyor line K1 extends along the elevator E1 to E7 for the casting line L1 and the other conveyor line K2 extends along the elevator E8 to E14 for the casting line L2. At the right hand ends of the conveyor lines K1 and K2, there are respectively provided after-treatment lines J1 and J2 for carrying out after-treatments such as removal of
core assemblies 4 from the cast products W, cutting the gates and the like. Stockers S1 to S2 for stocking vacant pallets are provided close to the elevators H1 and H2. - Figure 12 shows the casting line L1 and the conveyor line K1. MA denotes the surface of the lower floor and MB denotes the surface of the upper floor.
- The conveyor line K1 comprises lower and upper conveyors K1a and K1b. The lower conveyor K1a runs leftward in Figure 12 and conveys the pallets with the
core assemblies 4 assembled in the core assembly line G1 to the elevators E1 to E7 and the vacant pallets to the elevators F1 to F4. The upper conveyor K1b runs rightward and conveys the pallets with the cast products W which are transferred from the upper floor to the lower floor by the elevators F1 to F4 to the after-treatment line J1 and the vacant pallets which are transferred from the upper floor to the lower floor by the elevators E1 to E7 to the elevator H1. The conveyor line K2 is of the same arrangement. - Figure 13 shows the layout in the core assembly lines G1 and G2 on the lower floor. P1 and P2 respectively denote core conveyor lines each having upper and lower conveyors. The upper conveyors of the respective core conveyor lines P1 and P2 runs rightward and convey vacant pallets from the upper ends of the elevators H1 and H2 to the upper ends of elevators R1 and R2 disposed at the right side ends. The elevators R1 and R2 are returning elevators for transferring the vacant pallets from the ends of the upper conveyors to the beginnings of the lower conveyors.
- The return elevators R1 and R2 are of the substantially the same heights as the elevators H1 and H2. The upper ends of the elevators R1 and R2 are respectively connected with the upper ends of the elevators H1 and H2 by the upper conveyors and the lower ends of the elevators R1 and R2 are respectively connected with the lower ends of the elevators H1 and H2 by the lower conveyors. The vacant pallets conveyed above the surface MB of the upper floor by the elevator H1 and H2 are conveyed respectively to the upper ends of the elevator R1 and R2 by the upper conveyors of the conveyor lines P1 and P2, and then transferred respectively to the lower conveyors of the conveyor lines P1 and P2 by the elevators R1 and R2.
- The
core assemblies 4 assembled by the core assembly line G1 and G2 are placed on the pallets, and conveyed leftward by the lower conveyors, and then stocked in acore stocker 40 together with data thereon. Upon receipt of a delivery requirement signal from the casting apparatuses Q1 to Q14, thecore assemblies 4 are delivered from thestocker 40 and bonded bybonding machines 41, and then conveyed to the elevators H1 and H2. Thereafter thecore assemblies 4 are transferred to the lower floor by the elevators H1 and H2 and placed on the lower conveyors of the conveyor lines K1 and K2. - Assuming that the delivery requirement signal is output from the casting apparatus Q5 of the casting line L1, the
core assemblies 4 are conveyed to the elevator E5 by the lower conveyor K1a and then transferred to the upper floor by the elevator E5. Then thecore assemblies 4 are set to the castingmold 1 on the castingmachine 30 by thecore setter 31 of the casting apparatus Q5 and casting is carried out in the manner described above. - The pallets from which the
core assemblies 4 are removed is transferred to the lower floor and is conveyed to the elevator H1 by the upper conveyor K1b. Then the vacant pallet is lifted above the surface MB of the upper floor and conveyed to the upper end of the elevator R1 by the upper conveyor of the conveyor line P1. Then the vacant pallet is transferred downward by the elevator R1 on to the lower conveyor of the conveyor line P1 and returned to the core assembly line G1. - The cast products W cast by the casting
machine 30 of the casting apparatus Q5 are taken out from-thecasting mold 1 by theextractor 32 and transferred to the lower floor by the elevator F3. Then the cast products W are conveyed rightward to the after-treatment line J1 and are subjected to after-treatments such as removal ofcore assemblies 4 from the cast products W, cutting the gates and the like. - As can be understood from the description above, the casting plant of this example has a two-floor structure wherein the casting apparatuses Q1 to Q14 are disposed on the upper floor and the conveyor lines K1 and K2 for conveying the
core assemblies 4 and the cast products W are disposed on the lower floor. Accordingly, in this plant, the space factor is excellent, and many casting apparatuses can be installed in a limited space, and the structure about the casting machines can be simplified, whereby maintenance is facilitated. - Further since each of the conveyor line K1 and K2 comprises a core assembly carrying-in line (the lower conveyor) and a cast product carrying-out line (the upper conveyor), carrying the
core assemblies 4 in the casting apparatuses Q1 to Q14 and carrying the cast products W out therefrom can be effected with a very high efficiency. - An example of a control routine executed by a centralized controller when the casting plant is controlled by the centralized controller will be described with reference to the flow charts shown in Figures 14 to 17, hereinbelow. For the purpose of simplification, the following description is made with respect to the casting apparatus Q5 in the casting L1.
- Figure 14 is a flow chart showing the core delivery routine for delivering the core assemblies 4 (non-bonded) from the
core stocker 40 in the core assembly line G1. - When receiving a work completion signal (to be described later) from the casting machine (step S1), the centralized controller reads out the kind of the
core assemblies 4 to be delivered from the delivery requirement signal (step S2). Then the centralized controller causes thecore assemblies 4 of the designated kind to be taken out from the core stocker 40 (step S3), and conveyed to thebonding machine 41 by the lower conveyor of the conveyor line P1 (step S4). The centralized controller causes thebonding machine 41 to inject adhesive into thecore assemblies 4 to bond them. (step S5) The centralized controller causes the bondedcore assemblies 4 to be transferred to the lower floor by the elevator H1 (step S6) Then the centralized controller detects the kind of the core assemblies 4 (step S7) and designates the destination (step S8). Thereafter the centralized controller causes thecore assemblies 4 to be placed on the lower conveyor K1a of the conveyor line K1 (step S9) and generates a work completion signal a (step S10). Thus one cycle of the core delivery routine is ended. - Figure 15 is a flow chart showing the core carrying-in routine for carrying the
core assemblies 4 in the casting apparatus Q5. - When receiving the work completion signal a (step S11), the centralized controller stores in a memory the order of the
core assemblies 4 to be conveyed by the lower conveyor K1a of the conveyor line K1 (step S12). Then the centralized controller determines whether desiredcore assemblies 4 reach the elevator E5 for the casting apparatus Q5 (which output the delivery requirement signal) by a limit switch provided on the lower conveyor K1a). (step S13) When it is determined that the desiredcore assemblies 4 reach the elevator E5, the centralized controller causes a knock pin (not shown) to stop thecore assemblies 4 at the elevator E5 (step S14), and causes thecore assemblies 4 to be transferred to the upper floor by the elevator E5 (step S15). Thus one cycle of the core carrying-in routine is ended. - Figure 16 is a flow chart showing the core setting routine for setting the
core assemblies 4 to thecasting casting machine 30 of the casting apparatus Q5. - The centralized controller checks the kind of the
core assemblies 4 delivered, (step S21) When thecore assemblies 4 delivered do not conform to the requirement, the centralized controller returns thecore assemblies 4 by the elevator E5, and generates a work completion signal. (steps S22, S31 and S32) When thecore assemblies 4 delivered conform to the requirement, the centralized controller causes thecore setter 31 to hold thecore assemblies 4. When the core setter complete holding thecore assemblies 4, the centralized controller detects the temperature TA of the castingmold 1 and the temperature TB of the molten metal. (steps S24 and S25) Then the centralized controller determines whether the temperatures TA and TB are in the ranges of 320°C to 460°C and 690°C to 715°C, respectively. (step S26) - When it is determined that the temperatures TA and TB are in the ranges, the centralized controller causes the
core setter 31 to place thecore assemblies 4 on the castingmold 1. (step S26) Then the centralized controller detects whether thecore assemblies 4 are positioned in place by use of photoelectric tubes. When it is determined that thecore assemblies 4 do not block light, the centralized controller generates a core setting completion signal, and otherwise alarms and interrupts the operation. (steps S28 to S30 and S34 and S35) - Figure 17 is a flow chart showing a mold closing routine.
- The centralized controller first determines whether casting is to be initiated. (step S81) When it is determined that casting is to be initiated, the centralized controller begins to close the casting
mold 1. (step S82) Then the centralized controller determines whether the castingmold 1 has been completely closed. (step S83) When it is determined that the castingmold 1 has been completely closed, the centralized controller sets a mold closure completion flag. (step S84) Otherwise, the centralized controller sets a timer, and when the castingmold 1 is not completely closed before lapse of the time set to the timer, the centralized controller alarms and interrupts the operation. (steps S85 to S88)
Claims (17)
- A low-pressure casting apparatus (Q,Q1-Q14) provided with a casting mold (1) which can be opened and closed and is closed to form therein a cavity (7) which is filled with molten metal to form a cast product (W), characterized in that said casting mold (1) comprises an upper mold (3) of metal, a lower mold (2) of metal and a sand mold (4) which is disposed between the upper and lower molds (3,2) and forms a part of the cavity (7).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 1 in which a top wall of the cavity (7) is formed by a lower surface (3a) of the upper mold (3), at least a part of a side wall of the cavity (7) is formed by the sand mold (4), and the upper mold (3) contacts with the molten metal filled in the cavity (7) in a larger area than the lower mold (2).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 1 in which a top wall of the cavity (7) is formed by the upper mold (3), and a side wall of the cavity (7) and at least a part of a bottom wall of the cavity (7) are formed by the sand mold (4).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 2 or 3 in which said upper mold (3) is provided with a holding means (6) for holding the cast product (W) on the lower surface (3a) of the upper mold (3) when the casting mold (1) is opened.
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 4 in which said holding means (6) comprises a projecting member (6) which projects into the cavity (7) from the lower surface (3a) of the upper mold (3).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 5 in which said projecting member (6) is a core pin which projects into the cavity (7) at the center thereof.
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 2 in which a bulge portion (2a) is formed on the upper surface of the lower mold (2) and a gate (22) is formed between a side wall of the bulge portion (2a) and a side wall of the sand mold (4).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 6 in which said upper mold (3) is provided with a holding means (6) for holding the cast product (W) on the lower surface (3a) of the upper mold (3) when the casting mold (1) is opened.
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 7 in which a metal member (5) which forms a part of the cavity (7) is mounted on the bulge portion (2a) of the lower mold (2).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 1 in which a limiting member (10) for limiting the space between the upper and lower molds (3,2) is formed integrally with the upper mold (3).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 10 in which said limiting member (10) is formed so as to surround the sand mold (4).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 1 in which said sand mold (4) comprises a base frame (11), a core member (16-19) disposed on the base frame (11), and an outer frame (12-15) which is disposed on the base frame (11) to support the core member (16-19) together with the base frame (11) and forms four side walls of the cavity (7).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 1 in which said casting mold (1) comprises a single upper mold (3) of metal, a single lower mold (2) of metal and a pair of sand molds (4) which are disposed between the upper and lower molds (3,2).
- A low-pressure casting apparatus (Q,Q1-Q14) as defined in Claim 13 in which said casting mold (1) is provided with a gate (21) formed in a position between the sand molds (4) and a distributing passage (23) for distributing molten metal to the sand molds (4) through the gate (21).
- A low-pressure casting method for casting a product comprising the steps of
preparing a casting mold (1) comprising an upper metal mold (3), a lower metal mold (2) and a sand mold (4) which is disposed between the upper and lower metal molds (3,2),
forming a part of a cavity (7) by the metal molds (2,3) and the other part of the cavity (7) by the sand mold (4),
filling the cavity (7) with molten metal, and
opening the casting mold (1) after the molten metal is solidified. - A low-pressure casting method as defined in Claim 15 in which a top wall of the cavity (7) is formed by the upper metal mold (3), the other part of the wall of the cavity (7) is formed by the lower metal mold (2), the casting mold (1) is opened with the cast product (W) and the sand mold (4) held on the upper mold (3) and then the cast product (W) and the sand mold (4) are removed from the upper mold (3).
- A low-pressure casting method as defined in Claim 15 further comprising the steps of
preparing a sand mold (4) in the form of a core assembly (4) having an opening (7) on an upper side thereof by positioning a core member (16-19) on a base frame (11) and positioning an outer frame (12-15) on the core member (16-19),
placing the core assembly (4) on a lower mold (2), and
positioning an upper mold (3) on the core assembly (4) to close the opening (7) of the core assembly (4).
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21842293 | 1993-09-02 | ||
JP218422/93 | 1993-09-02 | ||
JP5376094 | 1994-03-24 | ||
JP53760/94 | 1994-03-24 | ||
JP19301494A JPH07308750A (en) | 1993-09-02 | 1994-08-17 | Low pressure casting device and low pressure casting method |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0646429A1 true EP0646429A1 (en) | 1995-04-05 |
EP0646429B1 EP0646429B1 (en) | 1998-12-09 |
Family
ID=27295058
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19940113720 Expired - Lifetime EP0646429B1 (en) | 1993-09-02 | 1994-09-01 | Method of and apparatus for low-pressure casting |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0646429B1 (en) |
JP (1) | JPH07308750A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0872295A1 (en) * | 1997-04-15 | 1998-10-21 | Wärtsilä NSD Schweiz AG | Casting mould and method for the production of hollow castings and hollow castings |
WO2005002761A1 (en) * | 2003-07-07 | 2005-01-13 | Meccanica Bassi S.P.A. | Bench, mold and casting procedure, in particular for engine cylinders heads |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4520579B2 (en) * | 2000-04-10 | 2010-08-04 | 本田技研工業株式会社 | Molding equipment for casting |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2646187A1 (en) * | 1976-10-13 | 1978-04-20 | Ture Arvid Bertland | Low pressure casting of steel in moulds - where stand pipe contains sliding stopper which chills metal in ingate (SW 8.11.76) |
JPS53130225A (en) * | 1977-04-20 | 1978-11-14 | Ebara Mfg | Method of casting long structure |
JPS5480235A (en) * | 1977-12-09 | 1979-06-26 | Kubota Ltd | Mold for casting |
JPS6372466A (en) * | 1986-09-11 | 1988-04-02 | Honda Motor Co Ltd | Casting method and mold construction thereof |
GB2208817A (en) * | 1987-08-21 | 1989-04-19 | Honda Motor Co Ltd | Low-pressure casting of light metal alloy |
KR890003452B1 (en) * | 1985-07-16 | 1989-09-21 | 송영국 | Method of casting for chilled roller |
-
1994
- 1994-08-17 JP JP19301494A patent/JPH07308750A/en active Pending
- 1994-09-01 EP EP19940113720 patent/EP0646429B1/en not_active Expired - Lifetime
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2646187A1 (en) * | 1976-10-13 | 1978-04-20 | Ture Arvid Bertland | Low pressure casting of steel in moulds - where stand pipe contains sliding stopper which chills metal in ingate (SW 8.11.76) |
JPS53130225A (en) * | 1977-04-20 | 1978-11-14 | Ebara Mfg | Method of casting long structure |
JPS5480235A (en) * | 1977-12-09 | 1979-06-26 | Kubota Ltd | Mold for casting |
KR890003452B1 (en) * | 1985-07-16 | 1989-09-21 | 송영국 | Method of casting for chilled roller |
JPS6372466A (en) * | 1986-09-11 | 1988-04-02 | Honda Motor Co Ltd | Casting method and mold construction thereof |
GB2208817A (en) * | 1987-08-21 | 1989-04-19 | Honda Motor Co Ltd | Low-pressure casting of light metal alloy |
Non-Patent Citations (4)
Title |
---|
DATABASE WPI Week 7851, Derwent World Patents Index; AN 78-91926 51! * |
DATABASE WPI Week 7932, Derwent World Patents Index; AN 79-58684 32! * |
DATABASE WPI Week 9036, Derwent World Patents Index; AN 90-272876 36! * |
PATENT ABSTRACTS OF JAPAN vol. 12, no. 294 (M - 730) 11 August 1988 (1988-08-11) * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0872295A1 (en) * | 1997-04-15 | 1998-10-21 | Wärtsilä NSD Schweiz AG | Casting mould and method for the production of hollow castings and hollow castings |
WO2005002761A1 (en) * | 2003-07-07 | 2005-01-13 | Meccanica Bassi S.P.A. | Bench, mold and casting procedure, in particular for engine cylinders heads |
Also Published As
Publication number | Publication date |
---|---|
JPH07308750A (en) | 1995-11-28 |
EP0646429B1 (en) | 1998-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2626322C (en) | Two tiered linear mold handling systems | |
US5971059A (en) | Molding and casting machine | |
US5611388A (en) | Method of and apparatus for low-pressure casting | |
EP1641579B1 (en) | Bench, mold and casting procedure in particular for engine cylinders heads | |
US6145577A (en) | Linear mold handling system | |
EP0646429B1 (en) | Method of and apparatus for low-pressure casting | |
US4571270A (en) | Process and autoclave for dewaxing mold for lost wax casting | |
KR100929159B1 (en) | Mold circulating multi casting method and apparatus | |
KR100324074B1 (en) | Foundry Equipment | |
JP3630446B2 (en) | Mold | |
JP3184372B2 (en) | Low pressure casting method | |
US20030217831A1 (en) | Cooling unit for a selective cooling of casting piece as they are obtained in casting molds | |
JP3460560B2 (en) | Casting apparatus and casting method | |
KR20000037409A (en) | A shell mould core forming apparatus | |
GB2047140A (en) | Conveying system in die-casting plant | |
EP1797979B1 (en) | Casting production apparatus and method | |
SK286624B6 (en) | Method and device for uphill casting, involving a casting mould comprising a pouring gate lying underneath and a sliding closure | |
JP4259038B2 (en) | Raw material skirting board removal method and skirting board removal device | |
JP2000108170A (en) | Equipment for taking-out molded article | |
CN210023766U (en) | Iron mold sand-lined production system | |
JPH0353790Y2 (en) | ||
JPH0314542B2 (en) | ||
JPH03277516A (en) | Cleaning apparatus for mold for resin package of element | |
JPH05192758A (en) | Low pressure casting apparatus | |
JPS58176052A (en) | Production device for connecting runner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE ES FR GB IT |
|
17P | Request for examination filed |
Effective date: 19951002 |
|
17Q | First examination report despatched |
Effective date: 19970902 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE ES FR GB IT |
|
REF | Corresponds to: |
Ref document number: 69415117 Country of ref document: DE Date of ref document: 19990121 |
|
ET | Fr: translation filed | ||
ITF | It: translation for a ep patent filed |
Owner name: SOCIETA' ITALIANA BREVETTI S.P.A. |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2126029 Country of ref document: ES Kind code of ref document: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20010905 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20010911 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20010920 Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020901 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020902 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20020901 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030603 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20031011 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050901 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20060824 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080401 |