EP0589366A1 - Arrangement d'aciérie - Google Patents

Arrangement d'aciérie Download PDF

Info

Publication number
EP0589366A1
EP0589366A1 EP93115002A EP93115002A EP0589366A1 EP 0589366 A1 EP0589366 A1 EP 0589366A1 EP 93115002 A EP93115002 A EP 93115002A EP 93115002 A EP93115002 A EP 93115002A EP 0589366 A1 EP0589366 A1 EP 0589366A1
Authority
EP
European Patent Office
Prior art keywords
steel
arrangement according
along
drain line
steel mill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP93115002A
Other languages
German (de)
English (en)
Other versions
EP0589366B1 (fr
Inventor
Heinrich Marti
Heiner Flotzinger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MTAG MARTI-TECHNOLOGIE AG
Original Assignee
MARTI TECHNOLOGIE AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MARTI TECHNOLOGIE AG filed Critical MARTI TECHNOLOGIE AG
Publication of EP0589366A1 publication Critical patent/EP0589366A1/fr
Application granted granted Critical
Publication of EP0589366B1 publication Critical patent/EP0589366B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • C21C5/5252Manufacture of steel in electric furnaces in an electrically heated multi-chamber furnace, a combination of electric furnaces or an electric furnace arranged for associated working with a non electric furnace
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/0075Treating in a ladle furnace, e.g. up-/reheating of molten steel within the ladle

Definitions

  • the invention relates to a steelworks arrangement according to the preamble of claim 1.
  • drain lines can be straight, curved, closed as circular or oval lines.
  • EP-B 0 061 749 which forms the preamble, discloses a multi-stage steel production process which, in addition to melting the steel, comprises several refining steps, such as analysis adjustment and degassing, and in which certain steel production facilities are arranged in a circular flow line.
  • a pan moves on a floor conveyor along this drain line.
  • the pig iron is produced in a blast furnace outside the discharge line and fed to the discharge line by means of another floor conveyor.
  • this solution does not result in a significant reduction in personnel. Every steel production unit and the crane must be equipped with the appropriate personnel for unit operation and control.
  • the invention has for its object to find a steel mill arrangement, which in addition to an optimal material flow in the Steel production also allows a substantial reduction in personnel, an optimal direct flow of information with clear management structures and a clear process flow.
  • the steelworks arrangement should have practically no emissions and should largely ensure a simplified direct material and media flow.
  • Every drain line is the existence of a center area. It can be selected in an L or U shape with corresponding transitions on the straight legs.
  • a drain line that is arcuate or circular is particularly advantageous.
  • the steel mill arrangement may include facilities that enable continuous steel production. However, it can also include a combination of continuous and sequential manufacturing steps or manufacturing facilities. According to one embodiment, steel production facilities are provided for sequential steel production.
  • Converters or arc furnaces etc. are used for steel production. applicable.
  • An advantageous embodiment is a combination of one or more arc furnaces, preferably direct current arc furnaces, and of devices for metallurgical changes in the molten steel, for example ladle furnaces and / or a steel degassing unit.
  • a continuous caster is advantageously connected directly or via a holding furnace to a continuous forming device, e.g. Rolling mill, connected.
  • the continuous casting installation can have a continuous conveying direction which runs away from the control station in the form of a radiation. If the continuous casting device has an arcuate mold, the operating side for the mold is advantageously arranged on the outside of the casting curve.
  • the transport and lifting devices are also advantageously redesigned.
  • radially arranged cranes cover a circular control surface.
  • the control devices for the cranes are provided in the central control station.
  • the second crane pushes the defective crane in front of it like a carousel, thus covering the entire lifting requirements.
  • An additional increase in performance or an extension of the time available for metallurgical change of the melt can be realized if several stations for treating the steel melt are arranged on their own circular path along the discharge line and a position for transfer or takeover, a preliminary position along the circular path. and post-treatment, a preheating and optionally a parking position are provided.
  • An embodiment that has this objective in mind can provide a roof over the steelworks arrangement that has a gable line that substantially matches the drain line.
  • a collecting pipe for dust and flue gas can be arranged along the gable line with little effort and this can be connected to an exhaust air cleaning system.
  • 3 denotes a device for melting steel, in this example a direct-current arc furnace.
  • This arc furnace 3 can be combined with known scrap preheating and loading devices, not shown.
  • the next steel production device along the discharge line 4 is a device for continuous casting, also called a continuous casting plant 8.
  • the steel produced leaves the discharge line as a billet or bloom block, or as a thin slab or strip.
  • the empty pans of the continuous casting plant 8 are freed of slag along the drain line in subsequent stations 31-33, repaired, if necessary provided with a new outflow control and then prepared for a subsequent tap.
  • the drain line 4 or in a neighboring area can also be provided with brick lining stations with appropriate drying facilities.
  • the circular drain line 4 comprises the drain path of the ladle filled with steel from the arc furnace 3 to the continuous casting installation 8 and then the path of the empty ladle from the continuous casting installation 8 to the arc furnace 3 for a subsequent racking.
  • a control station 11 for the steel production facilities is provided in a tower-shaped building 10. Due to the central position of the control station 11 to the steel manufacturing facilities 5 - 8, it is possible to create fields of view 12, 12 'to the steel manufacturing facilities 3 - 8.
  • One or more arc furnaces 3 in combination with one or more continuous casting plants 8 are ideally suited for sequential steel production.
  • the facilities for metallurgical changes in the molten steel 5, 6 are designed according to the steel program to be cast and the type of steel melting furnace.
  • several stations 15-19 are arranged along the drain line 4 for treating the steel melts on their own circular path 14.
  • positions for transfer or takeover 15, for pretreatment and aftertreatment 16 or 17, for preheating 18 and / or for parking 19 of pans are generally provided.
  • the continuous casting installation 8 is equipped with an arc mold 20.
  • the intermediate vessel 21 and the pouring ladle 23 are arranged in such a way that the operating side 24 for the mold monitoring lies on the outside of the pouring bend 26.
  • the strand conveyor 27 runs from the central control station 11 radiating away.
  • the control devices for the cranes are also provided in the central control station at several points, each with a direct view of the corresponding working area of the crane. Both the control desks for several steelmaking devices and the control devices for the cranes can be designed on a level 29 in the central control station.
  • a roof 40 above the steelworks arrangement has a gable line similar to the drain line 4. In the example chosen, it is circular. Along the gable line there is a collecting pipe 41 for dust and smoke, which is connected to an exhaust air purification system.
  • primary units 40 can be assigned to such units.
  • the primary housings 40 are designed by segmented boundary walls with optionally immovable, movable or hinged, etc. ceilings 41.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Crushing And Grinding (AREA)
  • Metal Rolling (AREA)
EP93115002A 1992-09-25 1993-09-17 Arrangement d'aciérie Expired - Lifetime EP0589366B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH2999/92 1992-09-25
CH02999/92A CH686562A5 (de) 1992-09-25 1992-09-25 Stahlwerksanordnung.

Publications (2)

Publication Number Publication Date
EP0589366A1 true EP0589366A1 (fr) 1994-03-30
EP0589366B1 EP0589366B1 (fr) 1999-01-27

Family

ID=4246366

Family Applications (1)

Application Number Title Priority Date Filing Date
EP93115002A Expired - Lifetime EP0589366B1 (fr) 1992-09-25 1993-09-17 Arrangement d'aciérie

Country Status (4)

Country Link
EP (1) EP0589366B1 (fr)
AT (1) ATE176282T1 (fr)
CH (1) CH686562A5 (fr)
DE (1) DE59309340D1 (fr)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1496569A (fr) * 1966-10-13 1967-09-29 Chicago Bridge & Iron Co Procédé et appareil d'affinage de métaux
DE3147074A1 (de) * 1981-02-17 1982-09-09 AMCA International Corp., 44601 Alliance, Ohio Stranggiesseinrichtung
DE3116925A1 (de) * 1981-04-29 1982-11-18 FB Agentur GmbH, 2870 Delmenhorst "anlage zur verhuettung von metallen"
EP0061749B1 (fr) * 1981-03-30 1986-02-26 Nippon Steel Corporation Méthode d'affinage dans un procédé multi-étapes d'élaboration d'acier
EP0219891A1 (fr) * 1985-10-04 1987-04-29 DANIELI & C. OFFICINE MECCANICHE S.p.A. Dispositif pour manipuler des poches de coulée

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1496569A (fr) * 1966-10-13 1967-09-29 Chicago Bridge & Iron Co Procédé et appareil d'affinage de métaux
DE3147074A1 (de) * 1981-02-17 1982-09-09 AMCA International Corp., 44601 Alliance, Ohio Stranggiesseinrichtung
EP0061749B1 (fr) * 1981-03-30 1986-02-26 Nippon Steel Corporation Méthode d'affinage dans un procédé multi-étapes d'élaboration d'acier
DE3116925A1 (de) * 1981-04-29 1982-11-18 FB Agentur GmbH, 2870 Delmenhorst "anlage zur verhuettung von metallen"
EP0219891A1 (fr) * 1985-10-04 1987-04-29 DANIELI & C. OFFICINE MECCANICHE S.p.A. Dispositif pour manipuler des poches de coulée

Also Published As

Publication number Publication date
CH686562A5 (de) 1996-04-30
DE59309340D1 (de) 1999-03-11
EP0589366B1 (fr) 1999-01-27
ATE176282T1 (de) 1999-02-15

Similar Documents

Publication Publication Date Title
EP1750872A1 (fr) Installation de coulee continue comprenant au moins un robot, et procede pour faire fonctionner une installation de coulee continue comprenant au moins un robot
LU84481A1 (de) Schutzvorrichtung fuer pfannendeckel
EP0313959B1 (fr) Installation pour l'élaboration de l'acier, en particulier une mini-installation
DE60310081T2 (de) Metallbandstranggiessanlage
EP3572532B1 (fr) Intégration d'un four de fusion de ferraille dans une aciérie à convertisseur
EP0589366B1 (fr) Arrangement d'aciérie
EP0005692B1 (fr) Installation de conversion de métal avec un convertisseur basculant
EP0015251B1 (fr) Dispositif pour récipient métallurgique avec un tube protecteur
DE4104910C3 (de) Stahlnachbehandlungsanlage
EP0456641B1 (fr) Procede permettant d'eviter la formation de gaz de fumee lors de processus metallurgiques et du transport de metaux fondus d'un recipient metallurgique a des recipients de coulee et dispositif de transport de metaux fondus d'un four metallurgique a un recipient de coulee
EP0760395B1 (fr) Installation pour le transport de métal liquide dans la halle de coulée d'un four à cuve et procédé pour le service de cette installation
DE4240667C2 (de) Stahlwerksanlage mit einem an einem ringförmigen Tragelement befestigten metallurgischen Gefäß
DE956406C (de) Umlauf-Trommelkonverter zum Behandeln von Schmelzen, insbesondere fluessigem Roheisen
DE19545831C2 (de) Verfahren zum Betreiben einer Doppelgefäß-Lichtbogenofen-Anlage sowie Doppelgefäß-Lichtbogenofen
DE3903444C1 (en) Method and apparatus for transporting liquid metal from a metallurgical furnace to a casting vessel
DE2506704C3 (de) Metallschmelzanlage mit einem Behandlungsstand für die Einstellung der Analyse von Metallschmelzen, insbesondere für die Entschwefelung flüssigen Roheisens oder flüssigen Rohstahls
DE1940761C3 (de) Anlage fuer kontinuierliche Stahlerzeugung
EP0294451B1 (fr) Procede de coulage continu de barres metalliques
DE3134094A1 (de) "vorrichtung zum vorwaermen von rohstoffen zur stahlerzeugung"
DE2705565C3 (de) Abgaseinrichtung für kippbare metallurgische Öfen, insbesondere für Stahlwerkskonverter
EP0025028B1 (fr) Position de poche pour effectuer des traitements métallurgiques de bains d'acier en fusion
EP2436789A1 (fr) Procédé et dispositif de préparation de résidus d'installations industrielles
DE2060493C3 (de) Verfahren zur kontinuierlichen Herstellung von Stahl durch Spriihfrischen und Anlage zur Durchführung des Verfahrens
DE1558297C (de) Vorrichtung zum unterbrechungsfreien Beschicken einer Rotations-Stranggießvorrichtung, sowie Betriebsverfahren hierfür
EP1137501A1 (fr) Machine a couler les gueuses

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE DE FR GB IT

17P Request for examination filed

Effective date: 19940708

17Q First examination report despatched

Effective date: 19970602

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MTAG MARTI-TECHNOLOGIE AG

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE DE FR GB IT

REF Corresponds to:

Ref document number: 176282

Country of ref document: AT

Date of ref document: 19990215

Kind code of ref document: T

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 19990128

REF Corresponds to:

Ref document number: 59309340

Country of ref document: DE

Date of ref document: 19990311

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20020812

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20020815

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20020903

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030917

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030930

BERE Be: lapsed

Owner name: MARTI-TECHNOLOGIE A.G. *MTAG

Effective date: 20030930

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20030917

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040528

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20040810

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20040818

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050917

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050917

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060401