EP0589366A1 - Arrangement d'aciérie - Google Patents
Arrangement d'aciérie Download PDFInfo
- Publication number
- EP0589366A1 EP0589366A1 EP93115002A EP93115002A EP0589366A1 EP 0589366 A1 EP0589366 A1 EP 0589366A1 EP 93115002 A EP93115002 A EP 93115002A EP 93115002 A EP93115002 A EP 93115002A EP 0589366 A1 EP0589366 A1 EP 0589366A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- steel
- arrangement according
- along
- drain line
- steel mill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C17/00—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/28—Manufacture of steel in the converter
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/52—Manufacture of steel in electric furnaces
- C21C5/5252—Manufacture of steel in electric furnaces in an electrically heated multi-chamber furnace, a combination of electric furnaces or an electric furnace arranged for associated working with a non electric furnace
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C7/00—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
- C21C7/0075—Treating in a ladle furnace, e.g. up-/reheating of molten steel within the ladle
Definitions
- the invention relates to a steelworks arrangement according to the preamble of claim 1.
- drain lines can be straight, curved, closed as circular or oval lines.
- EP-B 0 061 749 which forms the preamble, discloses a multi-stage steel production process which, in addition to melting the steel, comprises several refining steps, such as analysis adjustment and degassing, and in which certain steel production facilities are arranged in a circular flow line.
- a pan moves on a floor conveyor along this drain line.
- the pig iron is produced in a blast furnace outside the discharge line and fed to the discharge line by means of another floor conveyor.
- this solution does not result in a significant reduction in personnel. Every steel production unit and the crane must be equipped with the appropriate personnel for unit operation and control.
- the invention has for its object to find a steel mill arrangement, which in addition to an optimal material flow in the Steel production also allows a substantial reduction in personnel, an optimal direct flow of information with clear management structures and a clear process flow.
- the steelworks arrangement should have practically no emissions and should largely ensure a simplified direct material and media flow.
- Every drain line is the existence of a center area. It can be selected in an L or U shape with corresponding transitions on the straight legs.
- a drain line that is arcuate or circular is particularly advantageous.
- the steel mill arrangement may include facilities that enable continuous steel production. However, it can also include a combination of continuous and sequential manufacturing steps or manufacturing facilities. According to one embodiment, steel production facilities are provided for sequential steel production.
- Converters or arc furnaces etc. are used for steel production. applicable.
- An advantageous embodiment is a combination of one or more arc furnaces, preferably direct current arc furnaces, and of devices for metallurgical changes in the molten steel, for example ladle furnaces and / or a steel degassing unit.
- a continuous caster is advantageously connected directly or via a holding furnace to a continuous forming device, e.g. Rolling mill, connected.
- the continuous casting installation can have a continuous conveying direction which runs away from the control station in the form of a radiation. If the continuous casting device has an arcuate mold, the operating side for the mold is advantageously arranged on the outside of the casting curve.
- the transport and lifting devices are also advantageously redesigned.
- radially arranged cranes cover a circular control surface.
- the control devices for the cranes are provided in the central control station.
- the second crane pushes the defective crane in front of it like a carousel, thus covering the entire lifting requirements.
- An additional increase in performance or an extension of the time available for metallurgical change of the melt can be realized if several stations for treating the steel melt are arranged on their own circular path along the discharge line and a position for transfer or takeover, a preliminary position along the circular path. and post-treatment, a preheating and optionally a parking position are provided.
- An embodiment that has this objective in mind can provide a roof over the steelworks arrangement that has a gable line that substantially matches the drain line.
- a collecting pipe for dust and flue gas can be arranged along the gable line with little effort and this can be connected to an exhaust air cleaning system.
- 3 denotes a device for melting steel, in this example a direct-current arc furnace.
- This arc furnace 3 can be combined with known scrap preheating and loading devices, not shown.
- the next steel production device along the discharge line 4 is a device for continuous casting, also called a continuous casting plant 8.
- the steel produced leaves the discharge line as a billet or bloom block, or as a thin slab or strip.
- the empty pans of the continuous casting plant 8 are freed of slag along the drain line in subsequent stations 31-33, repaired, if necessary provided with a new outflow control and then prepared for a subsequent tap.
- the drain line 4 or in a neighboring area can also be provided with brick lining stations with appropriate drying facilities.
- the circular drain line 4 comprises the drain path of the ladle filled with steel from the arc furnace 3 to the continuous casting installation 8 and then the path of the empty ladle from the continuous casting installation 8 to the arc furnace 3 for a subsequent racking.
- a control station 11 for the steel production facilities is provided in a tower-shaped building 10. Due to the central position of the control station 11 to the steel manufacturing facilities 5 - 8, it is possible to create fields of view 12, 12 'to the steel manufacturing facilities 3 - 8.
- One or more arc furnaces 3 in combination with one or more continuous casting plants 8 are ideally suited for sequential steel production.
- the facilities for metallurgical changes in the molten steel 5, 6 are designed according to the steel program to be cast and the type of steel melting furnace.
- several stations 15-19 are arranged along the drain line 4 for treating the steel melts on their own circular path 14.
- positions for transfer or takeover 15, for pretreatment and aftertreatment 16 or 17, for preheating 18 and / or for parking 19 of pans are generally provided.
- the continuous casting installation 8 is equipped with an arc mold 20.
- the intermediate vessel 21 and the pouring ladle 23 are arranged in such a way that the operating side 24 for the mold monitoring lies on the outside of the pouring bend 26.
- the strand conveyor 27 runs from the central control station 11 radiating away.
- the control devices for the cranes are also provided in the central control station at several points, each with a direct view of the corresponding working area of the crane. Both the control desks for several steelmaking devices and the control devices for the cranes can be designed on a level 29 in the central control station.
- a roof 40 above the steelworks arrangement has a gable line similar to the drain line 4. In the example chosen, it is circular. Along the gable line there is a collecting pipe 41 for dust and smoke, which is connected to an exhaust air purification system.
- primary units 40 can be assigned to such units.
- the primary housings 40 are designed by segmented boundary walls with optionally immovable, movable or hinged, etc. ceilings 41.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Crushing And Grinding (AREA)
- Metal Rolling (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH2999/92 | 1992-09-25 | ||
CH02999/92A CH686562A5 (de) | 1992-09-25 | 1992-09-25 | Stahlwerksanordnung. |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0589366A1 true EP0589366A1 (fr) | 1994-03-30 |
EP0589366B1 EP0589366B1 (fr) | 1999-01-27 |
Family
ID=4246366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP93115002A Expired - Lifetime EP0589366B1 (fr) | 1992-09-25 | 1993-09-17 | Arrangement d'aciérie |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0589366B1 (fr) |
AT (1) | ATE176282T1 (fr) |
CH (1) | CH686562A5 (fr) |
DE (1) | DE59309340D1 (fr) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1496569A (fr) * | 1966-10-13 | 1967-09-29 | Chicago Bridge & Iron Co | Procédé et appareil d'affinage de métaux |
DE3147074A1 (de) * | 1981-02-17 | 1982-09-09 | AMCA International Corp., 44601 Alliance, Ohio | Stranggiesseinrichtung |
DE3116925A1 (de) * | 1981-04-29 | 1982-11-18 | FB Agentur GmbH, 2870 Delmenhorst | "anlage zur verhuettung von metallen" |
EP0061749B1 (fr) * | 1981-03-30 | 1986-02-26 | Nippon Steel Corporation | Méthode d'affinage dans un procédé multi-étapes d'élaboration d'acier |
EP0219891A1 (fr) * | 1985-10-04 | 1987-04-29 | DANIELI & C. OFFICINE MECCANICHE S.p.A. | Dispositif pour manipuler des poches de coulée |
-
1992
- 1992-09-25 CH CH02999/92A patent/CH686562A5/de not_active IP Right Cessation
-
1993
- 1993-09-17 AT AT93115002T patent/ATE176282T1/de not_active IP Right Cessation
- 1993-09-17 DE DE59309340T patent/DE59309340D1/de not_active Expired - Fee Related
- 1993-09-17 EP EP93115002A patent/EP0589366B1/fr not_active Expired - Lifetime
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1496569A (fr) * | 1966-10-13 | 1967-09-29 | Chicago Bridge & Iron Co | Procédé et appareil d'affinage de métaux |
DE3147074A1 (de) * | 1981-02-17 | 1982-09-09 | AMCA International Corp., 44601 Alliance, Ohio | Stranggiesseinrichtung |
EP0061749B1 (fr) * | 1981-03-30 | 1986-02-26 | Nippon Steel Corporation | Méthode d'affinage dans un procédé multi-étapes d'élaboration d'acier |
DE3116925A1 (de) * | 1981-04-29 | 1982-11-18 | FB Agentur GmbH, 2870 Delmenhorst | "anlage zur verhuettung von metallen" |
EP0219891A1 (fr) * | 1985-10-04 | 1987-04-29 | DANIELI & C. OFFICINE MECCANICHE S.p.A. | Dispositif pour manipuler des poches de coulée |
Also Published As
Publication number | Publication date |
---|---|
CH686562A5 (de) | 1996-04-30 |
DE59309340D1 (de) | 1999-03-11 |
EP0589366B1 (fr) | 1999-01-27 |
ATE176282T1 (de) | 1999-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1750872A1 (fr) | Installation de coulee continue comprenant au moins un robot, et procede pour faire fonctionner une installation de coulee continue comprenant au moins un robot | |
LU84481A1 (de) | Schutzvorrichtung fuer pfannendeckel | |
EP0313959B1 (fr) | Installation pour l'élaboration de l'acier, en particulier une mini-installation | |
DE60310081T2 (de) | Metallbandstranggiessanlage | |
EP3572532B1 (fr) | Intégration d'un four de fusion de ferraille dans une aciérie à convertisseur | |
EP0589366B1 (fr) | Arrangement d'aciérie | |
EP0005692B1 (fr) | Installation de conversion de métal avec un convertisseur basculant | |
EP0015251B1 (fr) | Dispositif pour récipient métallurgique avec un tube protecteur | |
DE4104910C3 (de) | Stahlnachbehandlungsanlage | |
EP0456641B1 (fr) | Procede permettant d'eviter la formation de gaz de fumee lors de processus metallurgiques et du transport de metaux fondus d'un recipient metallurgique a des recipients de coulee et dispositif de transport de metaux fondus d'un four metallurgique a un recipient de coulee | |
EP0760395B1 (fr) | Installation pour le transport de métal liquide dans la halle de coulée d'un four à cuve et procédé pour le service de cette installation | |
DE4240667C2 (de) | Stahlwerksanlage mit einem an einem ringförmigen Tragelement befestigten metallurgischen Gefäß | |
DE956406C (de) | Umlauf-Trommelkonverter zum Behandeln von Schmelzen, insbesondere fluessigem Roheisen | |
DE19545831C2 (de) | Verfahren zum Betreiben einer Doppelgefäß-Lichtbogenofen-Anlage sowie Doppelgefäß-Lichtbogenofen | |
DE3903444C1 (en) | Method and apparatus for transporting liquid metal from a metallurgical furnace to a casting vessel | |
DE2506704C3 (de) | Metallschmelzanlage mit einem Behandlungsstand für die Einstellung der Analyse von Metallschmelzen, insbesondere für die Entschwefelung flüssigen Roheisens oder flüssigen Rohstahls | |
DE1940761C3 (de) | Anlage fuer kontinuierliche Stahlerzeugung | |
EP0294451B1 (fr) | Procede de coulage continu de barres metalliques | |
DE3134094A1 (de) | "vorrichtung zum vorwaermen von rohstoffen zur stahlerzeugung" | |
DE2705565C3 (de) | Abgaseinrichtung für kippbare metallurgische Öfen, insbesondere für Stahlwerkskonverter | |
EP0025028B1 (fr) | Position de poche pour effectuer des traitements métallurgiques de bains d'acier en fusion | |
EP2436789A1 (fr) | Procédé et dispositif de préparation de résidus d'installations industrielles | |
DE2060493C3 (de) | Verfahren zur kontinuierlichen Herstellung von Stahl durch Spriihfrischen und Anlage zur Durchführung des Verfahrens | |
DE1558297C (de) | Vorrichtung zum unterbrechungsfreien Beschicken einer Rotations-Stranggießvorrichtung, sowie Betriebsverfahren hierfür | |
EP1137501A1 (fr) | Machine a couler les gueuses |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE DE FR GB IT |
|
17P | Request for examination filed |
Effective date: 19940708 |
|
17Q | First examination report despatched |
Effective date: 19970602 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: MTAG MARTI-TECHNOLOGIE AG |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE DE FR GB IT |
|
REF | Corresponds to: |
Ref document number: 176282 Country of ref document: AT Date of ref document: 19990215 Kind code of ref document: T |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19990128 |
|
REF | Corresponds to: |
Ref document number: 59309340 Country of ref document: DE Date of ref document: 19990311 |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20020812 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20020815 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20020903 Year of fee payment: 10 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030917 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030930 |
|
BERE | Be: lapsed |
Owner name: MARTI-TECHNOLOGIE A.G. *MTAG Effective date: 20030930 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20030917 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040528 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20040810 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20040818 Year of fee payment: 12 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050917 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050917 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060401 |