EP0533615A1 - Installation for the thermal treatment of successive charges - Google Patents

Installation for the thermal treatment of successive charges Download PDF

Info

Publication number
EP0533615A1
EP0533615A1 EP92810469A EP92810469A EP0533615A1 EP 0533615 A1 EP0533615 A1 EP 0533615A1 EP 92810469 A EP92810469 A EP 92810469A EP 92810469 A EP92810469 A EP 92810469A EP 0533615 A1 EP0533615 A1 EP 0533615A1
Authority
EP
European Patent Office
Prior art keywords
oven
elevator
tank
load
installation according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP92810469A
Other languages
German (de)
French (fr)
Other versions
EP0533615B1 (en
Inventor
Pierre Beuret
Jacques Beuret
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Codere
Original Assignee
Codere
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=4241472&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP0533615(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Codere filed Critical Codere
Publication of EP0533615A1 publication Critical patent/EP0533615A1/en
Application granted granted Critical
Publication of EP0533615B1 publication Critical patent/EP0533615B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0006Details, accessories not peculiar to any of the following furnaces
    • C21D9/0018Details, accessories not peculiar to any of the following furnaces for charging, discharging or manipulation of charge
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/74Methods of treatment in inert gas, controlled atmosphere, vacuum or pulverulent material

Definitions

  • Processing installations comprising one or more ovens, as well as one or more tanks and means for transferring a load successively from a loading station into the oven, then into the tank and then extracting this load from the tank and l to bring to an exit station, already exist.
  • Mention may in particular be made of European patent application No. 0 296 102 which was published on December 21, 1988.
  • Swiss patent CH-478,918 also describes such an installation.
  • the bell is suspended inside the oven by suspension means which are capable of rotating it around its axis when the elevator is in the upper position, so that the load can be placed on supports projections integral with the inner wall of the bell.
  • the purpose of the present invention is to design an installation of the type indicated simpler than the already known installations, capable of being controlled manually, while guaranteeing a circulation of the charge between the various elements of the installation which eliminates the risks for the treated parts, in particular the risks of contact with air, and consequently of oxidation.
  • the subject of the present invention is an installation for the heat treatment of successive loads, comprising an oven with vertical arrangement, open downwards and situated in a higher position, a container provided with an elevator and placed in a position lower, a horizontal access path installed at the height of the base of the tank, provided with loading means, and a charging lift placed next to the tank so as to raise a load placed by the loading means on the elevator to introduce it into the oven, the latter being horizontally movable between a position above the charging elevator and a position above the tray, characterized by a sliding plane placed at the height of the base of the oven and allowing the shifting of a load supported by the charging elevator at the height of said plane, by movement of the oven.
  • the installation shown in the drawing is a simple installation which comprises only an oven and a tank, for example a quench tank. It is an installation allowing various treatments such as austenitization, case hardening, accelerated case hardening, carbonitriding, nitriding, annealing, tempering.
  • an oven 1 which is a bell oven 2, the latter having at its base an opening 3 limited by a belt 4 whose role will be explained later.
  • Heating bodies 5, a turbine 6 and a double jacket 7 ensure the uniformity of the speeds of the treatment gases in the charge by forced circulation inside and around the bell 2.
  • the oven 1 is mobile from right to left and from left to right in the plane of the drawing in fig. 1. For this, it is carried by rollers 8, which roll on a track designated by 9 in FIG. 4.
  • the oven 1 When it is located in the position of fig. 1, the oven 1 can be closed by means of a plug 10 which is supported by the plate 11 of an elevator 12, guided by two columns 13 (see fig. 4) and driven by a screw 14, actuated by a motor 15.
  • the control of the motor 15 thus makes it possible to hermetically close the oven 1.
  • the oven 1 When moved to the left in fig. 1, the oven 1 is located above a quench tank 16, rectangular in plan, closed by a cover 17 and which contains an elevator 18 consisting of a vertical guide column 19, a screw d drive 20, a support arm 21 and a plate 22. Inside the tank, are placed guide plates 23 delimiting a channel which allows a homogeneous flow of the coolant through the load by '' Circulating pumps or stirring pumps. As seen in fig. 2, the cover 17 is provided with an opening 24 through which the plate 22 of the elevator 18 can pass.
  • the carriage 25 rolls by means of rollers 16 on a loading track comprising two parallel rails 27 (fig. 1), located at the base from the bin, next to it. It comprises a box 28, and at its upper part a support 29 in the form of a semicircle capable of receiving a base grid 30 of a load 31 made up of loose parts in stacked baskets.
  • An eccentric device 32 maneuvered by a lever 33, makes it possible to lower or slightly raise the box 28 relative to the chassis on which the rollers 26 pivot, which makes it possible to deposit a load transported by the loading carriage on the inner flat surface of the plug 10 placed on the plate 11 brought into the lower position.
  • the loading carriage 25 can be evacuated and that the elevator 12 can be driven so as to charge the load 31 and at the same time to close the oven by means of the plug 10.
  • the box 28 and the carriage 25 are also visible in FIG. 4 which illustrates the movement of the lever 33 allowing the transfer of the load from the carriage 25 to the plate 11 of the loading elevator.
  • Fig. 5 illustrates the operation of transferring the charge after a heat treatment at high temperature and under a controlled atmosphere.
  • the elevator 12 is actuated so as to be placed in an intermediate position between the closed position of the oven visible in FIG. 1 and the lower loading position described above.
  • the plug 10 is extracted from the bell of the oven and its flat upper surface is flush with the upper plane of the cover 17 of the tank 16.
  • the oven is then moved from right to left in FIG. 5, the rollers 8 rolling on the rails 9, so that the base belt 4 pushes the base grid 30 on the internal face of the plug 10 and slides this grid until it reaches the cover 17.
  • the elevator 18 is again actuated so as to bring the load into a drip position represented by 31 ′ in FIG. 5.
  • the unloading carriage which also includes a base in the form of a semicircle and which is carried by three rollers 35 mounted on the two rails 36 and 37 is then brought into the unloading position.
  • the load 31 comes to rest on the base of the carriage 38.
  • the latter can be evacuated to the unloading station once the elevator 18 has been lowered into the interior Tray.
  • a manual or motorized transfer then routes the load to a washing machine or to a next treatment cell, or to an evacuation ramp.
  • Figs. 6, 7 and 8 represent a second embodiment in which there is, for the tray and for the oven, the same arrangement as in the first embodiment, but the elevators of the tray and the oven are arranged so as to little different so as to make better use of the available space.
  • the elevator 39 carries the plug 10 of the oven. It comprises a horizontal arm 40 fixed to the end of a perpendicular arm 41 which is itself guided in overhang by a column 42 and driven vertically by a jack 43.
  • FIG. 8 shows the vertical arrangement of the guide column 42 and the jack 43.
  • a similar column 44 and a jack 45 are arranged immediately next to the elements 42 and 43 but inside the enclosure of the tank 16.
  • the jack 45 actuates an arm 46, fixed to a transverse arm 47 which supports a plate 48 similar to the plate 22.
  • the assembly 44, 45, 46, 47 and 48 constitutes an elevator 49 placed inside the container 16 in a similar manner to the elevator 22.
  • Figs. 9 and 10 show a third embodiment illustrating an installation according to the invention and constructed with an oven of rectangular shape and a tank also of rectangular shape.
  • the oven 51 is also of similar construction to the oven 1 while the tank 52 comprises elements similar to those of the tank 16.
  • the improved embodiment which can be seen in FIGS. 11, 12 and 13, is distinguished by different features.
  • a furnace 61 movable horizontally on a structure 62, a charging elevator 63 and a tray 64 constitute the main elements of this installation.
  • the oven 61 moves horizontally on two parallel rails 65 and 66 so as to pass from a position above the elevator 63 to a position above the tank 64 and vice versa.
  • a horizontal tray 67 whose upper face is flat extends above the tray of which it forms the cover and below the location occupied by the oven during charging.
  • This plate has a circular opening 68 centered relative to the plate 69 of the elevator 63.
  • the elevator 63 carries a hydraulic piston (not shown) which makes it possible to move the plate 69 and the plug 71 relative to the arm of the elevator , actuated itself by a jack 78 and guided by a column 76.
  • the grid 72 supporting the load 73 is carried by the plate 69.
  • a cylindrical mantle 74 in the form of a bowl surrounds the plate 69. It is mounted on the arm of the elevator.
  • the cylinder 78 is actuated to raise the elevator until the upper edge of the mantle 74 abuts against the underside of the cover 67.
  • the grid is then at the height of the sliding plane.
  • the piston 70 is controlled so that the plate 69, as well as the plug 71 and the load 73 pass through the opening 68.
  • the plug seals the lower opening of the oven, to allow the temperature rise and the heat treatment parts (position in dashed lines in Figures 12 and 13).
  • the mantle 74 is then abutted by its upper edge against the cover 67. It ensures a sealed closure of the oven 61 even when the plug is not in its fully closed position. This sealing effect makes it possible to shift the load on the sliding plane defined by the ribs 68 without risk of oxidation of the parts, although the plug is then in an intermediate position.
  • Coat 74 can be made in different ways. It can include two parts which telescoping or a single part, as shown in the drawing. It can be moved by one or more cylinders.
  • the mantle can also be constituted by a flexible metallic fabric capable of deforming according to the position of the elevator, in order to seal the opening 68 of the sliding plate in a leaktight manner when the load is shifted with the entire oven. to be slid onto the tray 75 (fig. 11) of the tank elevator.
  • the columns 76 and 77 as well as the cylinders 78 and 79 for controlling the elevators are devices grouped close to one another at the rear of the installation. It is very compact and has a minimum number of elements.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Tunnel Furnaces (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)
  • Furnace Charging Or Discharging (AREA)
  • Fertilizers (AREA)
  • Agricultural Chemicals And Associated Chemicals (AREA)

Abstract

The charging trolley (25) brings the charge and deposits it on the plug (10) of the oven (1). <??>The introduction of the charge into the oven (1) and its closure are performed by the action of the lift (12) which comes down again after the treatment to an intermediate position, from which the oven (1) can be moved horizontally, the lower belt (4) pushing the base grid of the charge onto the lid (17) and the tray (22) of the lift (18) placed in upper position. The lid (17) ensures that the oven opening is sealed against the gases for protecting the charge. <??>This lift makes it possible to introduce the charge into the quenching tank and then to return it into a draining position and to deposit it on the discharging trolley (38) travelling on the line (36, 37). <IMAGE>

Description

Des installations de traitement comportant un ou plusieurs fours, de même qu'un ou plusieurs bacs et des moyens pour transférer une charge successivement d'un poste de chargement dans le four, puis dans le bac et pour extraire ensuite cette charge du bac et l'amener à une station de sortie, existent déjà. On citera notamment la demande de brevet européen No. 0 296 102 qui a été publiée le 21 décembre 1988.Processing installations comprising one or more ovens, as well as one or more tanks and means for transferring a load successively from a loading station into the oven, then into the tank and then extracting this load from the tank and l to bring to an exit station, already exist. Mention may in particular be made of European patent application No. 0 296 102 which was published on December 21, 1988.

Le brevet suisse CH-478 918 décrit aussi une installation de ce genre. Dans cette dernière, la cloche est suspendue à l'intérieur du four par des moyens de suspension qui sont capables de la faire tourner autour de son axe quand l'élévateur est en position supérieure, de sorte que la charge peut être placée sur des appuis saillants solidaires de la paroi intérieure de la cloche.Swiss patent CH-478,918 also describes such an installation. In the latter, the bell is suspended inside the oven by suspension means which are capable of rotating it around its axis when the elevator is in the upper position, so that the load can be placed on supports projections integral with the inner wall of the bell.

Cette installation connue permet de transférer la charge de l'élévateur au four, puis de celui-ci au bac de trempe, mais l'accrochage de la charge à la cloche est une opération délicate et d'autre part lors du déplacement du four de la position de changement à la position de transfert dans le bac, la base du four est ouverte et par conséquent la charge est soumise au risque d'oxydation. Un autre inconvénient de cette installation connue est que les moyens de suspension de la cloche empêchent de placer une turbine de circulation des gaz à l'emplacement le plus favorable, soit au sommet du four, dans l'axe de la cloche.This known installation makes it possible to transfer the load from the elevator to the oven, then from the latter to the quenching tank, but the attachment of the load to the bell is a delicate operation and on the other hand when the oven is moved from the change position to the transfer position in the tank, the base of the oven is open and therefore the load is subject to the risk of oxidation. Another drawback of this known installation is that the bell suspension means prevent the placing of a gas circulation turbine at the most favorable location, ie at the top of the furnace, in the axis of the bell.

Le but de la présente invention est de concevoir une installation du genre indiqué plus simple que les installations déjà connues, susceptible d'être commandée manuellement, tout en garantissant une circulation de la charge entre les divers éléments de l'installation qui élimine les risques pour les pièces traitées, notamment les risques de contact avec l'air, et par conséquent d'oxydation.The purpose of the present invention is to design an installation of the type indicated simpler than the already known installations, capable of being controlled manually, while guaranteeing a circulation of the charge between the various elements of the installation which eliminates the risks for the treated parts, in particular the risks of contact with air, and consequently of oxidation.

Dans ce but, la présente invention a pour objet une installation pour le traitement thermique de charges successives, comprenant un four à disposition verticale, ouvert vers le bas et situé dans une position supérieure, un bac muni d'un élévateur et placé dans une position inférieure, une voie d'accès horizontale installée à la hauteur de la base du bac, munie de moyens de chargement, et un élévateur d'enfournement placé à côté du bac de manière à élever une charge placée par les moyens de chargement sur l'élévateur pour l'introduire dans le four, celui-ci étant mobile horizontalement entre une position située au-dessus de l'élévateur d'enfournement et une position située au-dessus du bac, caractérisée par un plan de glissement placé à la hauteur de la base du four et permettant le ripage d'une charge supportée par l'élévateur d'enfournement à la hauteur du dit plan, par déplacement du four.To this end, the subject of the present invention is an installation for the heat treatment of successive loads, comprising an oven with vertical arrangement, open downwards and situated in a higher position, a container provided with an elevator and placed in a position lower, a horizontal access path installed at the height of the base of the tank, provided with loading means, and a charging lift placed next to the tank so as to raise a load placed by the loading means on the elevator to introduce it into the oven, the latter being horizontally movable between a position above the charging elevator and a position above the tray, characterized by a sliding plane placed at the height of the base of the oven and allowing the shifting of a load supported by the charging elevator at the height of said plane, by movement of the oven.

On va décrire ci-après, à titre d'exemple, plusieurs formes d'exécution de l'installation selon l'invention en se référant au dessin annexé dont

  • la fig. 1 est une vue en élévation schématique vue dans la direction des voies parallèles de chargement et de déchargement,
  • la fig. 2 est une vue schématique en plan de dessus du four et du bac de l'installation de la fig. 1,
  • la fig. 3 est une vue également en plan de dessus montrant les voies et les chariots de chargement et de déchargement,
  • la fig. 4 est une vue en élévation schématique dans une direction perpendiculaire aux voies de chargement et de déchargement,
  • la fig. 5 est une figure en élévation analogue à la fig. 1 montrant l'élévateur d'enfournement dans une position intermédiaire,
  • la fig. 6 est une vue semblable à la fig. 1 d'une deuxième forme d'exécution de l'installation selon l'invention,
  • la fig. 7 est une vue en plan de dessus de cette deuxième forme d'exécution,
  • la fig. 8 est une vue en élévation selon la flèche A de la fig. 7,
  • la fig. 9 est une vue schématique semblable à la fig. 1 montrant une troisième forme d'exécution,
  • la fig. 10 est une vue en plan de dessus analogue aux fig. 2 et 7 montrant la troisième forme d'exécution, et
  • les fig. 11, 12 et 13 représentent respectivement en plan de dessus, en élévation selon la flèche A et en élévation/coupe selon la flèche B une forme d'exécution munie d'un perfectionnement.
Several embodiments of the installation according to the invention will be described below, by way of example, with reference to the accompanying drawing,
  • fig. 1 is a schematic elevation view seen in the direction of the parallel loading and unloading tracks,
  • fig. 2 is a schematic plan view from above of the oven and of the installation bin of FIG. 1,
  • fig. 3 is also a top plan view showing the loading and unloading tracks and carriages,
  • fig. 4 is a schematic elevation view in a direction perpendicular to the loading and unloading tracks,
  • fig. 5 is a figure in elevation similar to FIG. 1 showing the rack elevator in an intermediate position,
  • fig. 6 is a view similar to FIG. 1 of a second embodiment of the installation according to the invention,
  • fig. 7 is a plan view from above of this second embodiment,
  • fig. 8 is an elevational view along arrow A of FIG. 7,
  • fig. 9 is a schematic view similar to FIG. 1 showing a third embodiment,
  • fig. 10 is a top plan view similar to FIGS. 2 and 7 showing the third embodiment, and
  • fig. 11, 12 and 13 represent respectively in top plan, in elevation along arrow A and in elevation / section along arrow B an embodiment provided with an improvement.

L'installation représentée au dessin est une installation simple qui ne comporte qu'un four et qu'un bac, par exemple un bac de trempe. Il s'agit d'une installation permettant divers traitement comme l'austénitisation, la cémentation, la cémentation accélérée, la carbonitruration, la nitruration, le recuit, le revenu.The installation shown in the drawing is a simple installation which comprises only an oven and a tank, for example a quench tank. It is an installation allowing various treatments such as austenitization, case hardening, accelerated case hardening, carbonitriding, nitriding, annealing, tempering.

Dans l'installation de la fig. 1, on voit tout d'abord un four 1 qui est un four à cloche 2, celle-ci présentant à sa base une ouverture 3 limitée par une ceinture 4 dont le rôle sera expliqué plus loin. Des corps de chauffe 5, une turbine 6 et une double chemise 7 assurent l'homogénéité des vitesses des gaz de traitement dans la charge par circulation forcée à l'intérieur et autour de la cloche 2. Le four 1 est mobile de droite à gauche et de gauche à droite dans le plan du dessin de la fig. 1. Pour cela, il est porté par des galets 8, qui roulent sur une voie de roulement désignée par 9 à la fig. 4.In the installation of fig. 1, we first see an oven 1 which is a bell oven 2, the latter having at its base an opening 3 limited by a belt 4 whose role will be explained later. Heating bodies 5, a turbine 6 and a double jacket 7 ensure the uniformity of the speeds of the treatment gases in the charge by forced circulation inside and around the bell 2. The oven 1 is mobile from right to left and from left to right in the plane of the drawing in fig. 1. For this, it is carried by rollers 8, which roll on a track designated by 9 in FIG. 4.

Lorsqu'il est situé dans la position de la fig. 1, le four 1 peut être fermé au moyen d'un bouchon 10 qui est supporté par le plateau 11 d'un élévateur 12, guidé par deux colonnes 13 (voir fig. 4) et entraîné par une vis 14, actionnée par un moteur 15. La commande du moteur 15 permet ainsi de fermer hermétiquement le four 1. Ces conditions permettent une rapide montée en température de la charge, cela par convection et rayonnement de l'énergie de chauffage, dispensé par les corps de chauffe et grâce à la turbine de circulation forcée des gaz de traitement. Cette solution a l'avantage d'assurer un traitement thermique de grande précision où les dispersions de température dans l'ensemble de la charge ne seront pas supérieures à ±5°C.When it is located in the position of fig. 1, the oven 1 can be closed by means of a plug 10 which is supported by the plate 11 of an elevator 12, guided by two columns 13 (see fig. 4) and driven by a screw 14, actuated by a motor 15. The control of the motor 15 thus makes it possible to hermetically close the oven 1. These conditions allow a rapid rise in temperature of the load, this by convection and radiation of the heating energy, dispensed by the heating bodies and thanks to the turbine for forced circulation of process gases. This solution has the advantage of ensuring high-precision heat treatment where the temperature dispersions throughout the load will not be greater than ± 5 ° C.

De même pour l'homogénéité des vitesses des gaz des traitements dans la charge par circulation forcée au travers de la double chemise.Likewise for the homogeneity of the gas speeds of the treatments in the charge by forced circulation through the double jacket.

Lorsqu'il est déplacé sur la gauche à la fig. 1, le four 1 se trouve au-dessus d'un bac de trempe 16, de forme rectangulaire en plan, fermé par un couvercle 17 et qui contient un élévateur 18 constitué d'une colonne de guidage verticale 19, d'une vis d'entraînement 20, d'un bras de support 21 et d'un plateau 22. A l'intérieur du bac, sont placées des tôles de guidage 23 délimitant un canal qui permet un flux homogène du liquide de refroidissement à travers la charge par l'intermédiaire de circulateurs ou pompes de brassage. Comme on le voit à la fig. 2, le couvercle 17 est muni d'une ouverture 24 à travers laquelle peut passer le plateau 22 de l'élévateur 18.When moved to the left in fig. 1, the oven 1 is located above a quench tank 16, rectangular in plan, closed by a cover 17 and which contains an elevator 18 consisting of a vertical guide column 19, a screw d drive 20, a support arm 21 and a plate 22. Inside the tank, are placed guide plates 23 delimiting a channel which allows a homogeneous flow of the coolant through the load by '' Circulating pumps or stirring pumps. As seen in fig. 2, the cover 17 is provided with an opening 24 through which the plate 22 of the elevator 18 can pass.

Pour assurer le transport de la charge, on prévoit deux chariots, soit un chariot de chargement 25 et un chariot de déchargement 38. Le chariot 25 roule par l'intermédiaire de galets 16 sur une voie de chargement comportant deux rails parallèles 27 (fig. 1), située au niveau de la base du bac, à côté de ce dernier. Il comporte un caisson 28, et à sa partie supérieure un support 29 en forme de demi-cercle apte à recevoir une grille de base 30 d'une charge 31 constituée de pièces en vrac dans des paniers empilés. Un dispositif à excentrique 32, manoeuvré par un levier 33, permet d'abaisser ou d'élever légèrement le caisson 28 par rapport au chassis sur lequel pivotent les galets 26, ce qui permet de déposer une charge transportée par le chariot de chargement sur la surface plane intérieure du bouchon 10 placé sur le plateau 11 amené en position inférieure. Cette opération de transfert étant effectuée, on conçoit que le chariot de chargement 25 peut être évacué et que l'élévateur 12 peut être entraîné de façon à enfourner la charge 31 et en même temps à fermer le four au moyen du bouchon 10. Le caisson 28 et le chariot 25 sont également visibles à la fig. 4 qui illustre le mouvement du levier 33 permettant le transfert de la charge du chariot 25 au plateau 11 de l'élévateur de chargement.To ensure the transport of the load, provides two carriages, namely a loading carriage 25 and an unloading carriage 38. The carriage 25 rolls by means of rollers 16 on a loading track comprising two parallel rails 27 (fig. 1), located at the base from the bin, next to it. It comprises a box 28, and at its upper part a support 29 in the form of a semicircle capable of receiving a base grid 30 of a load 31 made up of loose parts in stacked baskets. An eccentric device 32, maneuvered by a lever 33, makes it possible to lower or slightly raise the box 28 relative to the chassis on which the rollers 26 pivot, which makes it possible to deposit a load transported by the loading carriage on the inner flat surface of the plug 10 placed on the plate 11 brought into the lower position. This transfer operation being carried out, it is understood that the loading carriage 25 can be evacuated and that the elevator 12 can be driven so as to charge the load 31 and at the same time to close the oven by means of the plug 10. The box 28 and the carriage 25 are also visible in FIG. 4 which illustrates the movement of the lever 33 allowing the transfer of the load from the carriage 25 to the plate 11 of the loading elevator.

La fig. 5 illustre l'opération de transfert de la charge après un traitement thermique à haute tempérture et sous atmosphère contrôlée. L'élévateur 12 est actionné de façon à venir se placer dans une position intermédiaire entre la position de fermeture du four visible à la fig. 1 et la position inférieure de chargement décrite précédemment. Dans cette position intermédiaire, le bouchon 10 est extrait de la cloche du four et sa surface supérieure plane se trouve à fleur du plan supérieur du couvercle 17 du bac 16. Le four est alors déplacé de droite à gauche à la fig. 5, les galets 8 roulant sur les rails 9, de sorte que la ceinture de base 4 pousse la grille de base 30 sur la face interne du bouchon 10 et fait glisser cette grille jusqu'à ce qu'elle parvienne sur le couvercle 17. Le déplacement du four se poursuit jusqu'à ce que la grille 30 se trouve sur la face supérieure du plateau 22 de l'élévateur 18 qui a été amené dans une position où cette surface supérieure se trouve aussi à fleur de la surface 17. Ainsi, la charge est amenée immédiatement au-dessus du bac de trempe tout en restant confinée à l'intérieur de la cloche du four et par conséquent protégée de l'atmosphère extérieur. Il suffit dès lors de manoeuvrer l'élévateur 18 de façon à faire descendre la charge dans le bac, puis de ramener le four dans sa position initiale et de le refermer au moyen de l'élévateur 12 et du bouchon 10. Cette partie de l'installation est dès lors prête pour un nouveau chargement effectué au moyen du chariot 25 et de l'élévateur 12.Fig. 5 illustrates the operation of transferring the charge after a heat treatment at high temperature and under a controlled atmosphere. The elevator 12 is actuated so as to be placed in an intermediate position between the closed position of the oven visible in FIG. 1 and the lower loading position described above. In this intermediate position, the plug 10 is extracted from the bell of the oven and its flat upper surface is flush with the upper plane of the cover 17 of the tank 16. The oven is then moved from right to left in FIG. 5, the rollers 8 rolling on the rails 9, so that the base belt 4 pushes the base grid 30 on the internal face of the plug 10 and slides this grid until it reaches the cover 17. The displacement of the oven continues until the grid 30 is on the upper face of the plate 22 of the elevator 18 which has been brought into a position where this upper surface is also flush with the surface 17. Thus, the charge is brought immediately above the quench tank while remaining confined inside the oven bell and therefore protected from the outside atmosphere. It is therefore sufficient to maneuver the elevator 18 so as to bring the load down into the tank, then return the oven to its initial position and close it by means of the elevator 12 and the plug 10. This part of the The installation is therefore ready for a new loading carried out by means of the carriage 25 and the elevator 12.

Une fois que l'opération de trempe est terminée, on actionne à nouveau l'élévateur 18 de façon à amener la charge dans une position d'égouttement représentée par 31′ à la fig. 5. Le chariot de déchargement qui comporte également une embase en forme de demi-cercle et qui est porté par trois galets 35 montés sur les deux rails 36 et 37 est alors amené en position de déchargement. En abaissant légèrement le plateau de l'élévateur 18, la charge 31 vient reposer sur l'embase du chariot 38. Ce dernier peut être évacué vers le poste de déchargement une fois que l'élévateur 18 a été abaissé jusqu'à l'intérieur du bac.Once the quenching operation is complete, the elevator 18 is again actuated so as to bring the load into a drip position represented by 31 ′ in FIG. 5. The unloading carriage which also includes a base in the form of a semicircle and which is carried by three rollers 35 mounted on the two rails 36 and 37 is then brought into the unloading position. By slightly lowering the platform of the elevator 18, the load 31 comes to rest on the base of the carriage 38. The latter can be evacuated to the unloading station once the elevator 18 has been lowered into the interior Tray.

Un transfert manuel ou motorisé achemine alors la charge vers une machine à laver ou vers une prochaine cellule de traitement, ou une rampe d'évacuation.A manual or motorized transfer then routes the load to a washing machine or to a next treatment cell, or to an evacuation ramp.

On comprend qu'en utilisant seulement deux voies de transport parallèles dont une pour le chargement et l'autre pour le déchargement, on peut prévoir le long de cette paire de voies une série d'installations avec chacune un four, un bac et un élévateur de chargement, la disposition relative de ces éléments étant celle décrite ci-dessus.We understand that by using only two parallel transport tracks, one for loading and the other for unloading, one can provide along this pair of tracks a series of installations each with an oven, a tank and a loading elevator, the relative arrangement of these elements being that described above.

Les fig. 6, 7 et 8 représentent une deuxième forme d'exécution dans laquelle on retrouve, pour le bac et pour le four, la même disposition que dans la première forme d'exécution, mais les élévateurs du bac et du four sont disposés de façon un peu différente de manière à réaliser une meilleure utilisation de l'espace disponible.Figs. 6, 7 and 8 represent a second embodiment in which there is, for the tray and for the oven, the same arrangement as in the first embodiment, but the elevators of the tray and the oven are arranged so as to little different so as to make better use of the available space.

On retrouve donc un four 1 avec une cloche 2 et un bac de trempe 16. Ce dernier est disposé dans une position inférieure et fixe alors que le four 1 est placé dans une position supérieure et mobile latéralement de façon à pouvoir être amené alternativement au-dessus du bac 16 ou au-dessus d'un élévateur de chargement qui est désigné ici par 39. Comme dans la première forme d'exécution, l'élévateur 39 porte le bouchon 10 du four. Il comporte un bras horizontal 40 fixé à l'extrémité d'un bras perpendiculaire 41 qui est lui-même guidé en porte-à-faux par une colonne 42 et entraîné verticalement par un vérin 43. La fig. 8 montre la disposition verticale de la colonne de guidage 42 et du vérin 43. Une colonne similaire 44 et un vérin 45 sont disposés immédiatement à côté des éléments 42 et 43 mais à l'intérieur de l'enceinte du bac 16. Le vérin 45 actionne un bras 46, fixé à un bras transversal 47 qui supporte un plateau 48 analogue au plateau 22. L'ensemble 44, 45, 46, 47 et 48 constitue un élévateur 49 placé à l'intérieur du bac 16 de façon analogue à l'élévateur 22.We therefore find an oven 1 with a bell 2 and a quenching tank 16. The latter is disposed in a lower and fixed position while the oven 1 is placed in an upper position and movable laterally so that it can be brought alternately to- above the tank 16 or above a loading elevator which is designated here by 39. As in the first embodiment, the elevator 39 carries the plug 10 of the oven. It comprises a horizontal arm 40 fixed to the end of a perpendicular arm 41 which is itself guided in overhang by a column 42 and driven vertically by a jack 43. FIG. 8 shows the vertical arrangement of the guide column 42 and the jack 43. A similar column 44 and a jack 45 are arranged immediately next to the elements 42 and 43 but inside the enclosure of the tank 16. The jack 45 actuates an arm 46, fixed to a transverse arm 47 which supports a plate 48 similar to the plate 22. The assembly 44, 45, 46, 47 and 48 constitutes an elevator 49 placed inside the container 16 in a similar manner to the elevator 22.

On voit encore à la fig. 6 les moyens 50 qui assurent la circulation du liquide de trempe à l'intérieur du bac 16. Ces deux circulateurs 50 sont situés dans les angles extérieurs du bac.We still see in fig. 6 means 50 which ensure the circulation of the quenching liquid inside the tank 16. These two circulators 50 are located in the outside corners of the tank.

Les fig. 9 et 10 montrent une troisième forme d'exécution illustrant une installation selon l'invention et construite avec un four de forme rectangulaire et un bac également de forme rectangulaire. Le four 51 est par ailleurs de construction analogue au four 1 tandis que le bac 52 comporte des éléments analogues à ceux du bac 16.Figs. 9 and 10 show a third embodiment illustrating an installation according to the invention and constructed with an oven of rectangular shape and a tank also of rectangular shape. The oven 51 is also of similar construction to the oven 1 while the tank 52 comprises elements similar to those of the tank 16.

La forme d'exécution perfectionnée, que l'on voit aux figures 11, 12 et 13, se distingue par différentes particularités.The improved embodiment, which can be seen in FIGS. 11, 12 and 13, is distinguished by different features.

Un four 61 mobile horizontalement sur une structure 62, un élévateur d'enfournement 63 et un bac 64 constituent les éléments principaux de cette installation.A furnace 61 movable horizontally on a structure 62, a charging elevator 63 and a tray 64 constitute the main elements of this installation.

Le four 61 se déplace horizontalement sur deux rails 65 et 66 parallèles de manière à passer d'une position située au-dessus de l'élévateur 63 à une position située au-dessus du bac 64 et vice versa.The oven 61 moves horizontally on two parallel rails 65 and 66 so as to pass from a position above the elevator 63 to a position above the tank 64 and vice versa.

Un plateau horizontal 67 dont la face supérieure est plane s'étend au-dessus du bac dont il forme le couvercle et au-dessous de l'emplacement occupé par le four lors de l'enfournement. Ce plateau comporte une ouverture circulaire 68 centrée par rapport au plateau 69 de l'élévateur 63. L'élévateur 63 porte un piston hydraulique (non représenté) qui permet de déplacer le plateau 69 et le bouchon 71 par rapport au bras de l'élévateur, actionné lui-même par un vérin 78 et guidé par une colonne 76. La grille 72 supportant la charge 73 est portée par le plateau 69. Un manteau cylindrique 74 en forme de cuvette entoure le plateau 69. Il est monté sur le bras de l'élévateur.A horizontal tray 67 whose upper face is flat extends above the tray of which it forms the cover and below the location occupied by the oven during charging. This plate has a circular opening 68 centered relative to the plate 69 of the elevator 63. The elevator 63 carries a hydraulic piston (not shown) which makes it possible to move the plate 69 and the plug 71 relative to the arm of the elevator , actuated itself by a jack 78 and guided by a column 76. The grid 72 supporting the load 73 is carried by the plate 69. A cylindrical mantle 74 in the form of a bowl surrounds the plate 69. It is mounted on the arm of the elevator.

Lors d'une opération d'enfournement le vérin 78 est actionné pour faire monter l'élévateur jusqu'à ce que le bord supérieur du manteau 74 bute contre la face inférieure du couvercle 67. La grille se trouve alors à la hauteur du plan de glissement. Le piston 70 est commandé de manière que le plateau 69, ainsi que le bouchon 71 et la charge 73 passent à travers l'ouverture 68. Le bouchon vient obturer l'ouverture inférieure du four, pour permettre la montée en température et le traitement thermique des pièces (position en traits mixtes aux figures 12 et 13). Le manteau 74 est alors en butée par son bord supérieur contre le couvercle 67. Il assure une fermeture étanche du four 61 même quand le bouchon ne se trouve pas dans sa position de fermeture complète. Cet effet d'étanchéité permet d'effectuer le ripage de la charge sur le plan de glissement définie par les nervures 68 sans risque d'oxydation des pièces, bien que le bouchon se trouve alors dans une position intermédiaire.During a charging operation the cylinder 78 is actuated to raise the elevator until the upper edge of the mantle 74 abuts against the underside of the cover 67. The grid is then at the height of the sliding plane. The piston 70 is controlled so that the plate 69, as well as the plug 71 and the load 73 pass through the opening 68. The plug seals the lower opening of the oven, to allow the temperature rise and the heat treatment parts (position in dashed lines in Figures 12 and 13). The mantle 74 is then abutted by its upper edge against the cover 67. It ensures a sealed closure of the oven 61 even when the plug is not in its fully closed position. This sealing effect makes it possible to shift the load on the sliding plane defined by the ribs 68 without risk of oxidation of the parts, although the plug is then in an intermediate position.

Le manteau 74 peut être réalisé de différentes manières. Il peut comprendre deux parties qui se téléscopent ou une seule partie, comme représenté au dessin. Il peut être déplacé par un ou plusieurs vérins. Le manteau peut aussi être constitué par un tissu métallique souple apte à se déformer suivant la position de l'élévateur, afin de fermer de manière étanche l'ouverture 68 du plateau de glissement au moment où la charge est ripée avec l'ensemble du four pour être glissée sur le plateau 75 (fig. 11) de l'élévateur du bac.Coat 74 can be made in different ways. It can include two parts which telescoping or a single part, as shown in the drawing. It can be moved by one or more cylinders. The mantle can also be constituted by a flexible metallic fabric capable of deforming according to the position of the elevator, in order to seal the opening 68 of the sliding plate in a leaktight manner when the load is shifted with the entire oven. to be slid onto the tray 75 (fig. 11) of the tank elevator.

On remarque dans la forme d'exécution des fig. 11, 12 et 13 que les colonnes 76 et 77 ainsi que les vérins 78 et 79 de commande des élévateurs sont des dispositifs groupés à proximité les uns des autres à l'arrière de l'installation. Celle-ci est très compacte et comporte un nombre minimum d'éléments.Note in the embodiment of Figs. 11, 12 and 13 that the columns 76 and 77 as well as the cylinders 78 and 79 for controlling the elevators are devices grouped close to one another at the rear of the installation. It is very compact and has a minimum number of elements.

Les installations décrites ci-dessus possèdent de nombreux avantages par rapport aux installations existantes:

  • 1. Au moyen de trois dispositifs motorisés seulement, l'ensemble des transferts pour l'ensemble des traitements est assuré avec toute la souplesse nécessaire.
  • 2. Durant tout le traitement, la charge est protégée par l'atmosphère de traitement, soit dans le four, soit dans le bac.
  • 3. Le four à cloche peut être un four à haute température et du fait que son ouverture est située à la base de la cloche, la température et la circulation des gaz sont homogènes.
  • 4. L'ensemble de l'installation occupe une surface au sol très réduite.
  • 5. Un même moyen de chargement et de déchargement, à commande manuelle ou éventuellement motorisée, permet de faire travailler plusieurs unités de traitement composées chacune d'un four, d'un bac ou de deux bacs et d'un élévateur de chargement, ce dernier pouvant, le cas échéant, être mobile.
  • 6. La charge est supportée par un plateau tout au long de l'opération et il n'est donc'pas nécessaire de prévoir un moyen d'accrochage pour un transfert suspendu sur le bac de refroidissement.
  • 7. La conception générale du système est très simple tout en étant souple, ce qui réduit les frais d'installation.
  • 8. L'ensemble de l'installation peut facilement être automatisé ou informatisé.
The installations described above have many advantages over existing installations:
  • 1. By means of only three motorized devices, all transfers for all treatments are provided with all the necessary flexibility.
  • 2. During the whole treatment, the load is protected by the treatment atmosphere, either in the oven or in the tank.
  • 3. The bell oven can be a high temperature oven and because its opening is located at the base of the bell, the temperature and gas circulation are homogeneous.
  • 4. The entire installation occupies a very small floor area.
  • 5. The same means of loading and unloading, manually or possibly motorized, makes it possible to operate several processing units each composed of an oven, a tank or two tanks and a loading lift, the latter can, if necessary, be mobile.
  • 6. The load is supported by a plate throughout the operation and it is therefore not necessary to provide a hooking means for a suspended transfer on the cooling tank.
  • 7. The general design of the system is very simple while being flexible, which reduces installation costs.
  • 8. The entire installation can easily be automated or computerized.

Claims (10)

Installation pour le traitement thermique de charges successives, comprenant un four à disposition verticale, ouvert vers le bas et situé dans une position supérieure, un bac muni d'un élévateur et placé dans une position inférieure, une voie d'accès horizontale installée à la hauteur de la base du bac, munie de moyens de chargement, et un élévateur d'enfournement placé à côté du bac de manière à élever une charge placée par les moyens de chargement sur l'élévateur pour l'introduire dans le four, celui-ci étant mobile horizontalement entre une position située au-dessus de l'élévateur d'enfournement et une position située au-dessus du bac, caractérisée par un plan de glissement placé à la hauteur de la base du four et permettant le ripage d'une charge supportée par l'élévateur d'enfournement à la hauteur du dit plan, par déplacement du four.Installation for the heat treatment of successive loads, comprising an oven with vertical arrangement, open downwards and situated in a higher position, a tank fitted with an elevator and placed in a lower position, a horizontal access path installed at the height of the base of the tank, provided with loading means, and a charging elevator placed next to the tank so as to raise a load placed by the loading means on the elevator to introduce it into the oven, ci being movable horizontally between a position above the charging elevator and a position above the tray, characterized by a sliding plane placed at the height of the base of the oven and allowing the sliding of a load supported by the charging elevator at the height of said plane, by movement of the oven. Installation selon la revendication 1, caractérisée en ce que l'élévateur d'enfournement porte un bouchon capable d'obturer le four, et en ce que ce bouchon présente une surface plane de support de la charge.Installation according to claim 1, characterized in that the charging elevator carries a plug capable of closing off the oven, and in that this plug has a flat surface for supporting the load. Installation selon la revendication 2, caractérisée en ce que le four est un four à cloche dont la base est conformée de manière à pousser latéralement une grille de support d'une charge pour la déplacer sur la dite surface de support, le bouchon étant placé dans une position intermédiaire, lors d'un déplacement du four de la position située au-dessus de l'élévateur d'enfournement vers la position située au-dessus du bac.Installation according to claim 2, characterized in that the oven is a bell oven, the base of which is shaped so as to push laterally a support grid of a load to move it on said support surface, the plug being placed in an intermediate position, when the oven moves from the position above the charging elevator to the position above the tray. Installation selon la revendication 3, caractérisée en ce que le bac est muni d'un couvercle avec une ouverture pour le passage du plateau de l'élévateur du bac, et en ce que la face supérieure du couvercle constitue une partie du dit plan de glissement.Installation according to claim 3, characterized in that the tank is provided with a cover with an opening for the passage of the tray of the tank lift, and in that the upper face of the cover constitutes part of said sliding plane . Installation selon la revendication 4, caractérisée en ce que le couvercle du bac, le plateau de l'élévateur du bac et la surface du bouchon forment, lorsque le bouchon est en position intermédiaire, le dit plan de glissement, sur lequel la grille de base se déplace par glissement lorsqu'elle est poussée par la base de la cloche du four.Installation according to claim 4, characterized in that the cover of the tank, the tray of the elevator of the tank and the surface of the plug form, when the plug is in the intermediate position, the said sliding plane, on which the base grid moves by sliding when pushed by the base of the oven bell. Installation selon la revendication 5, caractérisée en ce que les éléments du plan de glissement comportent une surface étanche aux gaz entre la cloche et le plan de glissement lors de la translation de la charge.Installation according to claim 5, characterized in that the elements of the sliding plane comprise a gas-tight surface between the bell and the sliding plane during the translation of the load. Installation selon la revendication 2, dans laquelle les moyens de chargement comporte des chariots, caractérisée en ce que les chariots sont munis de plateaux à déplacement vertical limité, permettant de transférer une grille portant une charge, respectivement du plateau d'un chariot d'enfournement sur le bouchon du four ou de l'élévateur du bac sur le plateau d'un chariot de déchargement.Installation according to claim 2, in which the loading means comprises carriages, characterized in that the carriages are provided with trays with limited vertical movement, making it possible to transfer a grid carrying a load, respectively from the tray of a charging trolley on the oven plug or on the tray lift on the tray of an unloading cart. Installation selon la revendication 7, caractérisée en ce que les plateaux des chariots présentent chacun une ouverture en demi-cercle.Installation according to claim 7, characterized in that the plates of the carriages each have an opening in a semicircle. Installation selon la revendication 7, caractérisée en ce que les plateaux des chariots sont supportés par un dispositif excentrique permettant ledit déplacement limité par action d'un levier.
   (sans priorité)
Installation according to claim 7, characterized in that the plates of the carriages are supported by an eccentric device allowing said movement limited by the action of a lever.
(without priority)
Installation selon la revendication 1, caractérisée en ce que l'élévateur d'enfournement est équipé d'un dispositif d'étanchéité apte à empêcher toute pénétration d'air dans le four quand le dit élévateur supporte une charge à une hauteur telle que sa surface de base est à la hauteur du plan de glissement.Installation according to claim 1, characterized in that the charging elevator is equipped with a sealing device capable of preventing any penetration of air into the oven when said elevator supports a load at a height such as its surface base is at the height of the sliding plane.
EP92810469A 1991-09-19 1992-06-18 Installation for the thermal treatment of successive charges Expired - Lifetime EP0533615B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH2782/91 1991-09-19
CH278291 1991-09-19

Publications (2)

Publication Number Publication Date
EP0533615A1 true EP0533615A1 (en) 1993-03-24
EP0533615B1 EP0533615B1 (en) 1997-07-23

Family

ID=4241472

Family Applications (1)

Application Number Title Priority Date Filing Date
EP92810469A Expired - Lifetime EP0533615B1 (en) 1991-09-19 1992-06-18 Installation for the thermal treatment of successive charges

Country Status (6)

Country Link
US (1) US5265851A (en)
EP (1) EP0533615B1 (en)
AT (1) ATE155822T1 (en)
CA (1) CA2072896C (en)
DE (1) DE69221050T2 (en)
ES (1) ES2106160T3 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0785402A1 (en) * 1996-01-17 1997-07-23 Pierre Beuret Heat treatment installation for metallic article loads
EP0805218A1 (en) * 1996-05-03 1997-11-05 Patherm SA Draining station and heat treatment installation comprising such a drain station
EP0806485A1 (en) * 1996-05-06 1997-11-12 Patherm SA Heat treatment installation
EP1018562A1 (en) * 1999-01-08 2000-07-12 Patherm SA Device and method for opening and closing automatically the cover of a quenching tank

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5402994A (en) * 1992-01-15 1995-04-04 Aichelin Gmbh Device for heat-treating metal workpieces
AU2003251972A1 (en) * 2002-07-18 2004-02-09 Consolidated Engineering Company, Inc. Method and system for processing castings
DE102005041233B4 (en) * 2005-08-31 2010-09-02 KGO Kaminski Gießerei- und Ofenanlagen GmbH Heat treatment plant
HRPK20050849B3 (en) * 2005-09-26 2008-11-30 Stupnišek Mladen Equipment and method for hardening in the rara gas atmosphere
WO2007073707A1 (en) * 2005-12-29 2007-07-05 Lac S.R.O. Furnace, particularly for thermal and chemotermal treatment of metal products
US8157497B2 (en) * 2008-05-06 2012-04-17 Kennametal Inc. Method and loader apparatus for TEM machine work chamber device
DE102014118637A1 (en) * 2014-12-15 2016-06-16 Jasta-Armaturen Gmbh & Co. Kg Preheating furnace for a bolt furnace

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT167102B (en) * 1949-06-20 1950-11-10 Elektrowaermebau Ing Josef Ebn Device for annealing and quenching and tempering bars, profiles and tubes made of iron and non-ferrous metals
FR995298A (en) * 1949-09-15 1951-11-29 Commanditaire Vennootschap Aro Method of loading and unloading a multi-chamber furnace for firing brick and iron laths, and devices for carrying out said method
CH478918A (en) * 1968-08-26 1969-09-30 Kaesermann & Sperisen S A Automatic installation for heat treatment of objects
FR2355261A1 (en) * 1976-06-17 1978-01-13 Daido Steel Co Ltd CONTINUOUS OVEN WITH CONTROLLED ATMOSPHERE AND THERMAL TREATMENT PROCESS
US4415145A (en) * 1980-06-16 1983-11-15 Firma Dr. Werner Herdieckerhoff Metal charge treatment apparatus
EP0296102B1 (en) * 1987-06-03 1993-05-05 Pierre Beuret Device with several components for heat treatment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4502671A (en) * 1982-10-30 1985-03-05 Nippon Steel Corporation Batch annealing apparatus
US4846675A (en) * 1987-06-01 1989-07-11 Worthington Industries, Inc. Annealing furnace

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT167102B (en) * 1949-06-20 1950-11-10 Elektrowaermebau Ing Josef Ebn Device for annealing and quenching and tempering bars, profiles and tubes made of iron and non-ferrous metals
FR995298A (en) * 1949-09-15 1951-11-29 Commanditaire Vennootschap Aro Method of loading and unloading a multi-chamber furnace for firing brick and iron laths, and devices for carrying out said method
CH478918A (en) * 1968-08-26 1969-09-30 Kaesermann & Sperisen S A Automatic installation for heat treatment of objects
FR2355261A1 (en) * 1976-06-17 1978-01-13 Daido Steel Co Ltd CONTINUOUS OVEN WITH CONTROLLED ATMOSPHERE AND THERMAL TREATMENT PROCESS
US4415145A (en) * 1980-06-16 1983-11-15 Firma Dr. Werner Herdieckerhoff Metal charge treatment apparatus
EP0296102B1 (en) * 1987-06-03 1993-05-05 Pierre Beuret Device with several components for heat treatment

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
AT-A- 167 102 *
CH-A- 478 918 *
EP-A- 0 296 102 *
FR-A- 995 298 *
FR-A- 2 355 261 *
US-A- 4 415 145 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0785402A1 (en) * 1996-01-17 1997-07-23 Pierre Beuret Heat treatment installation for metallic article loads
EP0805218A1 (en) * 1996-05-03 1997-11-05 Patherm SA Draining station and heat treatment installation comprising such a drain station
EP0806485A1 (en) * 1996-05-06 1997-11-12 Patherm SA Heat treatment installation
EP1018562A1 (en) * 1999-01-08 2000-07-12 Patherm SA Device and method for opening and closing automatically the cover of a quenching tank

Also Published As

Publication number Publication date
CA2072896A1 (en) 1993-03-20
US5265851A (en) 1993-11-30
DE69221050T2 (en) 1997-11-13
DE69221050D1 (en) 1997-08-28
CA2072896C (en) 1996-08-20
EP0533615B1 (en) 1997-07-23
ATE155822T1 (en) 1997-08-15
ES2106160T3 (en) 1997-11-01

Similar Documents

Publication Publication Date Title
EP0533615B1 (en) Installation for the thermal treatment of successive charges
EP0236639B1 (en) Flexible automatic installation for performing a fast thermochemical treatment
EP0296102B1 (en) Device with several components for heat treatment
EP0070347A1 (en) Heat treating apparatus
EP0785402B1 (en) Heat treatment installation for metallic article loads
EP0309354B1 (en) Automatic apparatus for fast thermochemical treatment
EP0093060B1 (en) Rotary hearth furnace for thermic, thermochemical or electrothermic treatment of metals in a diluted atmosphere
EP0209408A1 (en) Apparatus for thermochemical treatments at various temperatures and atmospheres, especially for car manufacturing
EP0747493A2 (en) Heat treatment installation
EP1193317B1 (en) Installation for the heat treatment of metallic article loads
EP0295207A1 (en) Arrangement of bell-type furnace and quenching tank
FR2582438A1 (en) Handling and transportation cask for nuclear fuel assemblies and installation comprising a cask of this type
EP0671476B1 (en) Heat treatment plant
EP0805218B1 (en) Draining station and heat treatment installation comprising such a drain station
EP0806485A1 (en) Heat treatment installation
EP0477117B1 (en) Modular flexible thermic treatment device
FR2822531A1 (en) Apparatus for transferring hot material between a pre-treatment plant and an electric furnace includes bins having compartments receiving feedstock at a delivery station from the plant
EP1065287A1 (en) Heat treatment installation with at least a muffle furnace
FR2498205A1 (en) THERMAL TREATMENT INSTALLATION FOR METALLIC PARTS COMPRISING A VACUUMABLE CHAMBER
FR2758438A1 (en) HEAT TREATMENT UNIT FOR FOOD PRODUCTS
EP0973001B1 (en) Process for fastening or removing a load in a heat treatment installation with a bottomless furnace
WO2004033731A1 (en) Heat treatment method for metal parts
EP1092121A1 (en) Heat processing installation
CH638298A5 (en) MOBILE BELL OVEN HEAT TREATMENT PLANT.
EP0557202A1 (en) Furnace for the purification of polluted material

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU MC NL PT SE

17P Request for examination filed

Effective date: 19930602

RBV Designated contracting states (corrected)

Designated state(s): AT BE CH DE ES FR GB IT LI SE

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

17Q First examination report despatched

Effective date: 19961209

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE ES FR GB IT LI SE

REF Corresponds to:

Ref document number: 155822

Country of ref document: AT

Date of ref document: 19970815

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 19970723

REF Corresponds to:

Ref document number: 69221050

Country of ref document: DE

Date of ref document: 19970828

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2106160

Country of ref document: ES

Kind code of ref document: T3

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

26 Opposition filed

Opponent name: FRANCOIS STUDER S.A. & NOUVELLE TREMPERA S.A.

Effective date: 19980422

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

REG Reference to a national code

Ref country code: FR

Ref legal event code: RN

REG Reference to a national code

Ref country code: FR

Ref legal event code: D3

REG Reference to a national code

Ref country code: CH

Ref legal event code: PFA

Owner name: CODERE S.A.

Free format text: CODERE SA#ROUTE DE BURE 21#CH-2900 PORRENTRUY/JU (CH) -TRANSFER TO- CODERE S.A.#LA FENATTE#2942 ALLE (CH)

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20080716

Year of fee payment: 17

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20090228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080630

REG Reference to a national code

Ref country code: FR

Ref legal event code: RN

REG Reference to a national code

Ref country code: FR

Ref legal event code: FC

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20110620

Year of fee payment: 20

Ref country code: CH

Payment date: 20110516

Year of fee payment: 20

Ref country code: SE

Payment date: 20110613

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20110405

Year of fee payment: 20

Ref country code: AT

Payment date: 20110630

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20110520

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20110729

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20110824

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 69221050

Country of ref document: DE

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 69221050

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

BE20 Be: patent expired

Owner name: S.A. *CODERE

Effective date: 20120618

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20120617

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20120619

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20120617

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK07

Ref document number: 155822

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120618

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20130710

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20120619