EP0505010B1 - A method for reinforcing a covering layer on ground - Google Patents

A method for reinforcing a covering layer on ground Download PDF

Info

Publication number
EP0505010B1
EP0505010B1 EP92200790A EP92200790A EP0505010B1 EP 0505010 B1 EP0505010 B1 EP 0505010B1 EP 92200790 A EP92200790 A EP 92200790A EP 92200790 A EP92200790 A EP 92200790A EP 0505010 B1 EP0505010 B1 EP 0505010B1
Authority
EP
European Patent Office
Prior art keywords
layer
net
reinforcement
binding
hardening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP92200790A
Other languages
German (de)
French (fr)
Other versions
EP0505010A1 (en
Inventor
Germain Baert
Yves Vancraeynest
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MOBILMAT NV
Bekaert NV SA
Original Assignee
MOBILMAT NV
Bekaert NV SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MOBILMAT NV, Bekaert NV SA filed Critical MOBILMAT NV
Publication of EP0505010A1 publication Critical patent/EP0505010A1/en
Application granted granted Critical
Publication of EP0505010B1 publication Critical patent/EP0505010B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/16Reinforcements
    • E01C11/165Reinforcements particularly for bituminous or rubber- or plastic-bound pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/005Methods or materials for repairing pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving
    • E01C7/145Sliding coverings, underlayers or intermediate layers ; Isolating or separating intermediate layers; Transmission of shearing force in horizontal intermediate planes, e.g. by protrusions, by inlays

Definitions

  • the invention relates to a method for reinforcing a covering layer of ground by fixing at least one reinforcement net to a supporting surface or foundation of the layer to be reinforced or strengthened and by then applying a covering layer of sufficient thickness to the foundation so that the reinforcement net is completely imbedded in the layer.
  • the covering layer consists of a slightly porous pourable self-hardening mixture, such as bituminous concrete. After pouring, the layer is compressed by rollers.
  • a reinforcement net that is being utilized with success for implementing such a method is sold by N.V. BEKAERT S.A. under the name "MESH TRACK".
  • MESH TRACK is a mesh or netting braided from galvanized steel wire that is reinforced at regular distances with a three-wire strand. The hexagonal meshes of this net are formed by twisting the wires together, the three-wire strands being arranged at regular distances from one another in the twisted sections thus formed. Plastic mats or nets can also be utilized.
  • coils of reinforcement net are rolled out in the longitudinal direction on the ground foundation and fixed to it with nails in order to hold the reinforcement net in place during the application and rolling of the covering layer and to ensure a good bonding between foundation and asphalt.
  • Suitable pieces of reinforcing nets can also be cut from a net coil and successively deposited in a transverse orientation on the ground.
  • ASTAMAT® Wapen tegen Asfaltvervorming
  • Wegen of april 1988 pp. 23 and 24
  • ASTAMAT-net is deposited on the underground and filled up by a filling layer which is further rolled (compacted) before applying the covering layer. The net is not sticked to the underground before filling it up.
  • the binding layer should preferably adhere well to the foundation and the reinforcement net must be sufficiently enclosed in this layer.
  • the material of the binding layer will also adhere well to the net and will also enable a firm bonding with the upper layer of the covering which is to be poured.
  • a relatively dense (i.e. non porous) binding layer moreover, will protect the net even more and therefore increase the durability of the reinforcement.
  • the invention thus provides in principle a method for reinforcing a covering layer of ground in which the upper part of the covering consists of a pourable self-hardening mixture, as claimed in claim 1.
  • At least one reinforcement net is first placed on the supporting surface or foundation of the ground and then a slightly viscous pourable binding layer of a self-hardening material of sufficient thickness and density is applied so that the net is embedded or enclosed in the layer and isolated from the air. After at least partial hardening of this binding layer, a pourable self-hardening mixture is applied to form the upper part of the covering layer and the covering layer thus formed is compacted. Before applying the covering layer, the binding layer already present is in general not previously compressed or compacted.
  • composition of the binding layer as defined in claim 1 is such that it can fully spread out at temperatures lower than 80 degrees C (e.g. at 10 to 25 degrees), whereby irregularities and cracks in the foundation surface are effectively filled up.
  • the net is firmly enclosed and anchored in a dense layer, which in this way protects the net and resists water penetration and thus the possibility of being undermined or washed away.
  • the upper part of the covering layer is a layer of bituminous concrete (usually applied hot), in which the binding layer is a slightly viscous bituminous mortar that contains a powdered mineral filler, sharp sand and possibly natural sand and crushed rock.
  • the granule thicknesses in the mixture vary between zero and 7 mm.
  • the mortar to be formed is composed of 100 parts by weight of this mineral granular mass mixed with 10 to 18 parts by weight of a cationic bitumen emulsion and 1 to 4 parts by weight of an emulsion destabilizer (dissociation accelerator, such as cement) which causes the gradual elimination of the water phase from the mixture to bring about its hardening.
  • an emulsion destabilizer dissociation accelerator, such as cement
  • the freshly prepared bitumen emulsion generally contains about 60 % bitumen and 40 % water.
  • the weight of the binding layer is somewhere between 5 and 40 kg per m 2 of foundation surface area, and preferably between 8 and 20 kg/m 2 .
  • the binding layer can comprise also less than 5 % wght of finely divided fibers of steel, polypropylene or other reinforcing fibers such as 8 % wght of Dramix® steel fibers or 1 % wght of Duomix® fibers (Duomix and Dramix are trade mark names of N.V. Bekaert S.A.).
  • At least a part of the sharp sand, as well as the crushed rock, may originate from limestone, porphyry or other minerals.
  • the mineral filler is in powder form.
  • the hardness of the bitumens utilized can be selected between, for example, 40 and 200, and preferably between 70 and 150.
  • the percentage weight of the filler powder (powder thickness smaller than 0.08 mm), together with the other particles with a granule size of less than 2 mm (i.e. that fall through a sieve with square mesh holes having a surface area of 4 mm 2 ), will amount to at most 65 % of the total amount of mineral particles in the binding layer and, by preference, less than 50 %.
  • a residual bituminous binding agent in fact, forms between the mineral particles.
  • the binding layer is sufficiently hardened for the upper layer to be applied when the residual bituminous binding agent content is between 6 and 18 % by weight of the binding layer and, by preference, between 8 and 16 % by weight.
  • the covering layer 1 represented in figure 1 includes a reinforcement net 5 that consists of a braided steel wire netting with hexagonal mesh: "Mesh Track”.
  • the hexagonal meshes are created by intermittent mutual twisting together of neighbouring longitudinal wires, whereby reinforcement elements 7 in the form of strands are inserted in the twisted sections at regular distances from one another running in the transverse direction.
  • the longitudinal wires and the strands 7 are preferably made of steel wire and the wires are preferably galvanized.
  • the longitudinal wires can, for example, have a nominal diameter of 2.45 mm, while the wires of the three-wire stands 7 have a nominal diameter of 3 mm.
  • the meshes can, for example, have the following dimensions : 118 mm between the twisted sections in the longitudinal direction and 80 mm between the twisted sections in the transverse direction.
  • the strands 7 are inserted at a distance of 225 mm from one another. All the dimensions given above are given only as examples.
  • the reinforcement net 5 can also be equipped with longitudinal elements 8. These elements 8 can also be steel wire or strands of steel wire ; they can also be made of strip steel. Elements 7 and 8 can cross one another at a nearly perpendicular angle.
  • the reinforcement mesh 5 can also be made of plastic or of plastic-coated steel wires.
  • Plastic mesh with thickened crossing points for example the TENSAR or HATELITE types (trade mark names), are also suitable: the crossing points here are thus thicker than the connecting segments of the net between these crossing points.
  • a reinforcement net is first rolled out onto the support surface of the foundation 2 of ground, for example a road, onto which an upper layer 1 must be applied (see figure 1).
  • This foundation 2 can, for example, be an old existing road.
  • the mixture for a binding layer 6 of sufficient thickness is now applied over the net 5, so that the net is sufficiently enclosed in the layer 6.
  • the mesh pattern of the net 5 is preferably still to be recognized after the mixture of layer 6 is poured (and spread out).
  • the upper layer 3 for example of bituminous concrete, can be applied.
  • the application of the upper layer 3 proceeds without any problems. With an adjusted composition of the binding layer, it is perhaps possible even one hour after the application of the layer 6 to start with the application of the upper layer.
  • this binding layer 6 for fixing the reinforcement net 5
  • the cost for fixing the net 5 decreases markedly, which makes the use in the reinforcement of asphalt very attractive.
  • this reinforcement method makes it possible to keep the final thickness of the upper layer to be applied 1 to 2 cm lower than with a net fixation by means of hooks or clamps. At the same time, therefore, there is a saving on material.
  • the composition of the binding layer 6 will of course be adjusted in accordance with the nature of the foundation surface, of the net 5 to be imbedded and of the composition of the upper layer 3. Among other things, it can be advisable to put, for example, 0.1 to 0.2 kg/m 2 of a bitumen emulsion on the foundation surface beforehand as an adhesive for the binding layer. If so desired, elastomers can be added to the bituminous mortar of layer 6 in order to increase its elasticity and shock absorption capacity. Corrosion inhibitors can also be mixed in for an increased protection of the wire mesh against corrosion.
  • the granulate mass consists of at least 50 % by weight of granules of thicknesses of between 2 and 7 mm (sometimes between 2 and 4 mm), approximately 10 % filler powder and the rest being mineral granules of thicknesses between 0.08 mm and 2 mm.
  • the viscous pourable or flowable mixture is spread out to a thickness of 5 to 7 mm. This means about 15 kg binding layer material per m 2 of road surface area.
  • the net is thereby completely covered with and embedded in the layer 6, which is now left untouched for at least one hour so that the water will gradually be eliminated from the layer 6 and evaporate, resulting in a hardened layer 6 with a nearly dry surface.
  • the meshes of the net 5 can still be recognized through the binding material cover. This indicates that the mortar 6 is sufficiently fluid to penetrate through and around the wires of the "Mesh Track" net 5.
  • the surface of the layer 6 is thus slightly profiled in the ribbed pattern of the Mesh Track netting.
  • the invention is also applicable for the reinforcement of other ground or areas of land such as, for example, industrial floors, parking lots, wharfs, airfield pavements, etc., where on a solid foundation a binding layer 6 is applied with a composition as described above (and with a thickness, for example, of 2 to 3 cm) and reinforced with a net 5.
  • a cement concrete layer for example, can be poured and spread out to a thickness of 8 to 15 cm, possibly with the insertion of a suitable layer of glue.
  • This cement concrete layer can, for example, include fibers or pieces of steel wire (Dramix trade mark) as reinforcement (so-called fiber concrete).

Abstract

The invention relates to a method for reinforcing a covering layer (1) on ground (2) wherein the upper part (3) of the layer (1) comprises a pourable and self-hardening mixture (e.g. bituminous concrete), by a) placing at least one reinforcement net (5) on the supporting surface or foundation of the ground and b) then applying a binding layer (6) consisting of a self-hardening material of sufficient thickness and density so that the net (5) is enclosed in the layer (6) and c) after at least partial hardening of this binding layer (6) for anchoring the net, applying the pourable self-hardening mixture to constitute the upper part (3) of the covering layer and compacting the covering thus formed. <IMAGE>

Description

  • The invention relates to a method for reinforcing a covering layer of ground by fixing at least one reinforcement net to a supporting surface or foundation of the layer to be reinforced or strengthened and by then applying a covering layer of sufficient thickness to the foundation so that the reinforcement net is completely imbedded in the layer. The covering layer consists of a slightly porous pourable self-hardening mixture, such as bituminous concrete. After pouring, the layer is compressed by rollers.
  • Such a method for reinforcing or strengthening ground, in particular roads, is already known.
  • A reinforcement net that is being utilized with success for implementing such a method is sold by N.V. BEKAERT S.A. under the name "MESH TRACK". "MESH TRACK" is a mesh or netting braided from galvanized steel wire that is reinforced at regular distances with a three-wire strand. The hexagonal meshes of this net are formed by twisting the wires together, the three-wire strands being arranged at regular distances from one another in the twisted sections thus formed. Plastic mats or nets can also be utilized.
  • For the reinforcement of a covering layer of ground, for example a road, in which this layer consists of bitumen, asphalt or similar material containing hydrocarbons (in short : asphalt roads), coils of reinforcement net are rolled out in the longitudinal direction on the ground foundation and fixed to it with nails in order to hold the reinforcement net in place during the application and rolling of the covering layer and to ensure a good bonding between foundation and asphalt. Suitable pieces of reinforcing nets can also be cut from a net coil and successively deposited in a transverse orientation on the ground.
  • One disadvantage of the method described above is the expensive and time-consuming operation of fixing such a reinforcement net to the foundation. This is the case in particular for the fastening of a "Mesh Track" netting. For fixing such a reinforcement net braided of steel wire to the foundation, clamps and/or hooks are used that are clamped over the wires or the strands of the net and are fastened to the foundation by means of plugs and pins. For fastening plastic nets, a gravel cover is usually utilized, i.e. a sufficiently thick layer of crushed rock is deposited over the nets.
  • From EP 0015432 a method is also known for fixing an elastic net to a foundation and then, for example, pouring sand over it to form a floor covering for indoor sport rooms.
  • It is known from the article : "ASTAMAT® : Wapen tegen Asfaltvervorming" published in the magazine "Wegen" of april 1988 pp. 23 and 24 to use a braided net of stainless steel strips (ASTAMAT) to reinforce bituminous layers. According to the left column of page 24 the ASTAMAT-net is deposited on the underground and filled up by a filling layer which is further rolled (compacted) before applying the covering layer. The net is not sticked to the underground before filling it up.
  • It is further disclosed in the article "Geogrids in reinforcing asphaltic pavements", published in the magazine "Highways" 1990 - January p.12 to fix Netlon Tensar® grids at one end to the underground by nailing. The grid is then tensioned over the underground and fixed under tension at the opposite end. Thereafter a surface dressing (chip seal) is applied and then rolled.
  • It is an object of the invention to avoid this rather laborious net fixing procedure by providing a new method for securing a reinforcement net to a foundation. It is thus an object of the method to realize a strong and durable - but especially an easy and economical bound between the foundation and the reinforcement net. At the same time, of course, a satisfactory reinforcement effect must be assured for the self-hardening mixture of the covering layer that is to be poured.
  • Surprisingly, it has now been established that the application of a particular self-hardening binding layer of small thickness over and around the reinforcement net fulfills these objectives. The binding layer should preferably adhere well to the foundation and the reinforcement net must be sufficiently enclosed in this layer. By preference, the material of the binding layer will also adhere well to the net and will also enable a firm bonding with the upper layer of the covering which is to be poured. A relatively dense (i.e. non porous) binding layer, moreover, will protect the net even more and therefore increase the durability of the reinforcement.
  • The invention thus provides in principle a method for reinforcing a covering layer of ground in which the upper part of the covering consists of a pourable self-hardening mixture, as claimed in claim 1.
  • According to the present invention, at least one reinforcement net is first placed on the supporting surface or foundation of the ground and then a slightly viscous pourable binding layer of a self-hardening material of sufficient thickness and density is applied so that the net is embedded or enclosed in the layer and isolated from the air. After at least partial hardening of this binding layer, a pourable self-hardening mixture is applied to form the upper part of the covering layer and the covering layer thus formed is compacted. Before applying the covering layer, the binding layer already present is in general not previously compressed or compacted.
  • The composition of the binding layer as defined in claim 1 is such that it can fully spread out at temperatures lower than 80 degrees C (e.g. at 10 to 25 degrees), whereby irregularities and cracks in the foundation surface are effectively filled up. At the same time, the net is firmly enclosed and anchored in a dense layer, which in this way protects the net and resists water penetration and thus the possibility of being undermined or washed away.
  • Naturally the composition of the binding layer claimed constitutes an important element of the invention. The upper part of the covering layer is a layer of bituminous concrete (usually applied hot), in which the binding layer is a slightly viscous bituminous mortar that contains a powdered mineral filler, sharp sand and possibly natural sand and crushed rock. The granule thicknesses in the mixture vary between zero and 7 mm. The mortar to be formed is composed of 100 parts by weight of this mineral granular mass mixed with 10 to 18 parts by weight of a cationic bitumen emulsion and 1 to 4 parts by weight of an emulsion destabilizer (dissociation accelerator, such as cement) which causes the gradual elimination of the water phase from the mixture to bring about its hardening. One to two parts of the accelerator is usually sufficient. The freshly prepared bitumen emulsion generally contains about 60 % bitumen and 40 % water. The weight of the binding layer is somewhere between 5 and 40 kg per m2 of foundation surface area, and preferably between 8 and 20 kg/m2. The binding layer can comprise also less than 5 % wght of finely divided fibers of steel, polypropylene or other reinforcing fibers such as 8 % wght of Dramix® steel fibers or 1 % wght of Duomix® fibers (Duomix and Dramix are trade mark names of N.V. Bekaert S.A.).
  • At least a part of the sharp sand, as well as the crushed rock, may originate from limestone, porphyry or other minerals. The mineral filler is in powder form. According to the generally known needle penetration test, the hardness of the bitumens utilized can be selected between, for example, 40 and 200, and preferably between 70 and 150.
  • The percentage weight of the filler powder (powder thickness smaller than 0.08 mm), together with the other particles with a granule size of less than 2 mm (i.e. that fall through a sieve with square mesh holes having a surface area of 4 mm2), will amount to at most 65 % of the total amount of mineral particles in the binding layer and, by preference, less than 50 %.
  • During the elimination of the water phase a residual bituminous binding agent, in fact, forms between the mineral particles. The binding layer is sufficiently hardened for the upper layer to be applied when the residual bituminous binding agent content is between 6 and 18 % by weight of the binding layer and, by preference, between 8 and 16 % by weight.
  • The invention will now be further explained on the basis of the attached drawings.
  • Figure 1
    shows in perspective a part of an area of ground in which the covering layer, reinforcement net and foundation are represented and
    Figure 2
    relates to an accompanying cross-section.
  • The covering layer 1 represented in figure 1 includes a reinforcement net 5 that consists of a braided steel wire netting with hexagonal mesh: "Mesh Track". The hexagonal meshes are created by intermittent mutual twisting together of neighbouring longitudinal wires, whereby reinforcement elements 7 in the form of strands are inserted in the twisted sections at regular distances from one another running in the transverse direction. The longitudinal wires and the strands 7 are preferably made of steel wire and the wires are preferably galvanized. The longitudinal wires can, for example, have a nominal diameter of 2.45 mm, while the wires of the three-wire stands 7 have a nominal diameter of 3 mm. The meshes can, for example, have the following dimensions : 118 mm between the twisted sections in the longitudinal direction and 80 mm between the twisted sections in the transverse direction. The strands 7 are inserted at a distance of 225 mm from one another. All the dimensions given above are given only as examples. The reinforcement net 5 can also be equipped with longitudinal elements 8. These elements 8 can also be steel wire or strands of steel wire ; they can also be made of strip steel. Elements 7 and 8 can cross one another at a nearly perpendicular angle.
  • The reinforcement mesh 5 can also be made of plastic or of plastic-coated steel wires. Plastic mesh with thickened crossing points, for example the TENSAR or HATELITE types (trade mark names), are also suitable: the crossing points here are thus thicker than the connecting segments of the net between these crossing points.
  • The method according to the invention is described below. A reinforcement net is first rolled out onto the support surface of the foundation 2 of ground, for example a road, onto which an upper layer 1 must be applied (see figure 1). In order to make the net as even and flat as possible, a roller or similar means can be driven back and forth over it. This foundation 2 can, for example, be an old existing road.
  • According to the invention the mixture for a binding layer 6 of sufficient thickness is now applied over the net 5, so that the net is sufficiently enclosed in the layer 6. The mesh pattern of the net 5 is preferably still to be recognized after the mixture of layer 6 is poured (and spread out).
    After a sufficient curing time, by preference a couple of hours, and without compressing layer 6, the upper layer 3, for example of bituminous concrete, can be applied. The application of the upper layer 3 (asphalting) proceeds without any problems. With an adjusted composition of the binding layer, it is perhaps possible even one hour after the application of the layer 6 to start with the application of the upper layer.
  • It is clear that by the use of this binding layer 6 for fixing the reinforcement net 5, the cost for fixing the net 5 decreases markedly, which makes the use in the reinforcement of asphalt very attractive. Moreover, this reinforcement method makes it possible to keep the final thickness of the upper layer to be applied 1 to 2 cm lower than with a net fixation by means of hooks or clamps. At the same time, therefore, there is a saving on material.
  • The composition of the binding layer 6 will of course be adjusted in accordance with the nature of the foundation surface, of the net 5 to be imbedded and of the composition of the upper layer 3. Among other things, it can be advisable to put, for example, 0.1 to 0.2 kg/m2 of a bitumen emulsion on the foundation surface beforehand as an adhesive for the binding layer. If so desired, elastomers can be added to the bituminous mortar of layer 6 in order to increase its elasticity and shock absorption capacity. Corrosion inhibitors can also be mixed in for an increased protection of the wire mesh against corrosion.
  • Example
  • A steel wire net 5 of the "Mesh Track" type from N.V. Bekaert S.A. (with the construction and mesh dimensions as given on page 5) is rolled out on a cleanly scraped concrete road. The net is then compacted very flat and even against the road surface. Subsequently a bituminous mortar 6 as binding layer, based mainly on porphyry is poured in the usual manner, with a composition of 15 parts by weight of bitumen emulsion and 1 part by weight of dissociation accelerator per 100 parts of granulate mass. The granulate mass consists of at least 50 % by weight of granules of thicknesses of between 2 and 7 mm (sometimes between 2 and 4 mm), approximately 10 % filler powder and the rest being mineral granules of thicknesses between 0.08 mm and 2 mm. The viscous pourable or flowable mixture is spread out to a thickness of 5 to 7 mm. This means about 15 kg binding layer material per m2 of road surface area. The net is thereby completely covered with and embedded in the layer 6, which is now left untouched for at least one hour so that the water will gradually be eliminated from the layer 6 and evaporate, resulting in a hardened layer 6 with a nearly dry surface. The meshes of the net 5 can still be recognized through the binding material cover. This indicates that the mortar 6 is sufficiently fluid to penetrate through and around the wires of the "Mesh Track" net 5. The surface of the layer 6 is thus slightly profiled in the ribbed pattern of the Mesh Track netting.
  • It is known that with asphalt reinforcement in road construction keeping the reinforcement immovable and well anchored during the pouring of the asphalt (upper layer 3) is a critical point. Indeed the nets often have the tendency to bulge locally between the forward moving pouring area behind the truck and the compacting machine following immediately after it. According to the invention it now appears, however, that during the application of the upper asphalt layer 3 the hardened binding layer 6 is sufficiently stable to prevent this tendency to bulge and to hold the mesh immovable and flat. This is at the same time an indication that a strong bonding with the road surface is assured.
  • Ordinary hot bituminous concrete is now poured on top of the hardened binding layer and rolled out to a thickness of 4.5 cm. This thickness of the total cover 1 (upper layer 3 plus binding layer 6) is thus a good 1 cm less than with the traditional hardened asphalt layers for hard/solid road foundations. The somewhat profiled surface of the binding layer 6 promotes the mechanical anchoring of layer 3 to layer 6 and thereby the reinforcement of the upper asphalt layer 3 and prevents undue horizontal sliding of this upper layer under the weight of the vehicles. If so desired, a thin film of a bituminous glue can be sprayed on the binding layer before the bituminous concrete is poured in order to further promote a durable bonding of the two layers to each other.
  • The invention is also applicable for the reinforcement of other ground or areas of land such as, for example, industrial floors, parking lots, wharfs, airfield pavements, etc., where on a solid foundation a binding layer 6 is applied with a composition as described above (and with a thickness, for example, of 2 to 3 cm) and reinforced with a net 5. Then as upper layer 3 a cement concrete layer, for example, can be poured and spread out to a thickness of 8 to 15 cm, possibly with the insertion of a suitable layer of glue. This cement concrete layer can, for example, include fibers or pieces of steel wire (Dramix trade mark) as reinforcement (so-called fiber concrete).

Claims (14)

  1. A method for the reinforcement of a covering layer (1) of ground (2) wherein the upper part (3) of the layer (1) consists of a pourable, self-hardening mixture, and which layer (1) is produced by :
    a) placing at least one reinforcement net (5) on the supporting surface or foundation (4) of the ground and
    b) then applying a binding layer (6) composed of a self-hardening material of sufficient thickness and density so that the net (5) is enclosed in the layer (6) and;
    c) applying the pourable self-hardening mixture to constitute the upper part (3) of the covering layer (1) and
    d) compacting the covering thus formed ;
    characterized in that the binding layer (6) to be applied is a slightly viscous flowable bituminous mortar, containing a mixture of 10 to 18 parts by weight of a cationic bitumen emulsion and 1 to 4 parts by weight of an emulsion destabilizer with 100 parts by weight of a mineral granule mass in the form of a powder-like filler, sharp sand, optional natural sand and crushed rock, wherein the granule thickness of these mineral particles is between zero and 7 mm and
    wherein the dissociation destabilizer causes the water phase to be eliminated gradually from the mortar in the process of hardening through the formation of a residual bituminous binding agent between the mineral particles and that the mixture to constitute the upper part (3) of layer (1) is applied after at least partial hardening of this binding layer (6) for anchoring the net.
  2. A method according to claim 1, wherein the content of the residual bituminous binding agent amounts to between 6 and 18 % by weight of the binding layer after hardening and before the application of the upper layer (3).
  3. A method according to claim 1, wherein the amount of binding layer applied is between 5 and 40 kg/m2 of foundation surface area.
  4. A method according to claim 3, wherein the amount of said binding layer applied is between 8 and 20 kg/m2 of foundation surface area.
  5. A method according to claim 1, characterized in that the largest transverse dimension of the meshes of the net (5) amounts to at least one time the mean thickness of the largest solid pieces present in the upper part (3) of the covering layer.
  6. A method according to claim 5, wherein the reinforcement net (5) comprises steel wire.
  7. A method according to claim 5, wherein the reinforcement mesh is a braided steel wire mesh.
  8. A method according to claim 7, wherein the braided net comprises reinforcement elements (7) running transversely in a number of its braided crossing points.
  9. A method according to claim 8, wherein the reinforcement elements (7) are strands of steel wire.
  10. A method according to claim 5, wherein the reinforcement mesh is a plastic net.
  11. A method according to claim 1, wherein the amount of mineral particles of a thickness less than 2 mm in the mineral granule mass amounts to at most 65 % by weight of said mass.
  12. A method according to claim 11, wherein this amount of particles amounts to at most 50 % by weight.
  13. A method according to claim 1, wherein the bituminous mortar of the binding layer (6) comprises further an elastomer.
  14. A method according to claim 1, wherein corrosion inhibitors are mixed in the binding layer (6).
EP92200790A 1991-03-22 1992-03-19 A method for reinforcing a covering layer on ground Expired - Lifetime EP0505010B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE9100268 1991-03-22
BE9100268A BE1004705A3 (en) 1991-03-22 1991-03-22 Method for reinforcing a top layer of LAND.

Publications (2)

Publication Number Publication Date
EP0505010A1 EP0505010A1 (en) 1992-09-23
EP0505010B1 true EP0505010B1 (en) 1997-09-10

Family

ID=3885404

Family Applications (1)

Application Number Title Priority Date Filing Date
EP92200790A Expired - Lifetime EP0505010B1 (en) 1991-03-22 1992-03-19 A method for reinforcing a covering layer on ground

Country Status (7)

Country Link
EP (1) EP0505010B1 (en)
AT (1) ATE158041T1 (en)
BE (1) BE1004705A3 (en)
DE (1) DE69222073T2 (en)
DK (1) DK0505010T3 (en)
ES (1) ES2109306T3 (en)
GR (1) GR3025165T3 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239484A (en) * 2015-09-24 2016-01-13 沈阳建筑大学 Road surface structure suitable for heavy-duty traffic
EP3702531A1 (en) 2019-02-28 2020-09-02 SK Wiegrink Beteiligungs GmbH Joint filling profile

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08128211A (en) * 1994-10-28 1996-05-21 Tonen Corp Reinforcement of concrete floor plate
EP0734768B1 (en) * 1995-04-01 2002-08-28 Roche Diagnostics GmbH Method of binding a biological substance
BE1010910A3 (en) * 1997-02-07 1999-03-02 Bekaert Sa Nv Reinforcing mesh FOR STRENGTHENING OF ASPHALT.
FR2777577A1 (en) * 1998-04-15 1999-10-22 6D Solutions RIGID STRUCTURE FOR REINFORCING AND VERTICAL SOLIDARIZATION OF BEARING STRUCTURES AS HIGHWAYS OR BRIDGES HAVING JOINTS OR CRACKS
WO2002046532A1 (en) * 2000-12-05 2002-06-13 Josef Ermer Arrangement for constructing and consolidating ground, particularly roads
ITMI20041261A1 (en) 2004-06-23 2004-09-23 Italcementi Spa HIGH DURABILITY PHOTOCATALYTIC FLOORING FOR THE ABATEMENT OF URBAN POLLUTANTS
EP1609910A1 (en) * 2004-06-24 2005-12-28 Global Engineering and Trade S.r.L. A pavement with photocatalytic effect
DE102005054235A1 (en) * 2005-11-14 2007-05-24 FITR-Gesellschaft für Innovation im Tief- und Rohrleitungsbau Weimar mbH Joint-less circulation surface forming method for use during manufacturing concrete floor, involves applying and hardening fresh concrete in fixed mat, and providing connection of concrete layer with mat by form of mat
KR100726452B1 (en) 2006-07-25 2007-06-11 정혜원 An overhead bridge and a bridge elasticity floor material paving method
EP2318590A1 (en) 2008-07-18 2011-05-11 Contec International GmbH Load-bearing surface
JP6647017B2 (en) * 2015-11-11 2020-02-14 スリーエム イノベイティブ プロパティズ カンパニー Road repair or reinforcement sheet
KR101995931B1 (en) * 2019-02-21 2019-07-03 모든철망 주식회사 Road Pavement Construction Method using Reinforcement Mesh
CN110106763A (en) * 2019-05-14 2019-08-09 广州同欣康体设备有限公司 The method for paving of prefabrication type movement surface layer
CN111979868B (en) * 2020-08-24 2022-04-12 陕西建工机械施工集团有限公司 Construction method of pavement surface double-layer steel mesh concrete
CN113089470A (en) * 2021-04-14 2021-07-09 四川省交通建设集团股份有限公司 Bridge deck high-toughness ultrathin wearing layer and construction method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1862011A (en) * 1928-01-03 1932-06-07 Robert B Gage Concrete pavement and its construction
US1707939A (en) * 1928-08-06 1929-04-02 Leon R Mackenzie Wear course for pavements
FR2615520B1 (en) * 1987-05-20 1989-08-25 Lefebvre Jean Ets BITUMINOUS COMPOSITION FOR COLD-CAST COATINGS, PROCESS FOR MAKING SUCH A COATING AND FIBER METERING DEVICE FOR CARRYING OUT THE METHOD
FR2640297B1 (en) * 1988-12-09 1991-10-11 Screg Routes & Travaux METHOD FOR CONSTRUCTING AN ARMED PAVEMENT USING A METAL STRUCTURE

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239484A (en) * 2015-09-24 2016-01-13 沈阳建筑大学 Road surface structure suitable for heavy-duty traffic
EP3702531A1 (en) 2019-02-28 2020-09-02 SK Wiegrink Beteiligungs GmbH Joint filling profile

Also Published As

Publication number Publication date
ATE158041T1 (en) 1997-09-15
BE1004705A3 (en) 1993-01-12
EP0505010A1 (en) 1992-09-23
DE69222073T2 (en) 1998-02-05
DE69222073D1 (en) 1997-10-16
GR3025165T3 (en) 1998-02-27
ES2109306T3 (en) 1998-01-16
DK0505010T3 (en) 1998-03-30

Similar Documents

Publication Publication Date Title
EP0505010B1 (en) A method for reinforcing a covering layer on ground
US5746546A (en) Soil stabilization composition and method
WO2008126956A1 (en) Block having a load divergence function and manufacturing and road constructing method for the same
Vanelstraete et al. Laboratory testing and numerical modeling of overlay systems on cement concrete slabs
EP0199827A1 (en) Composition for reinforcing asphaltic roads and reinforced roads using the same
CA2390653A1 (en) Sub-grade thermo-structural bridge
CN212000419U (en) Road structure in hilly areas
CN113089410A (en) Asphalt pavement structure for permanent structure conversion of highway precast beam field pavement
Sharp Concrete in Highway Engineering: International Series of Monographs in Civil Engineering
Vanelstraete et al. Crack prevention and use of overlay systems
Hrapović Paving of concrete carriageway Case study Tauern motorway at the Wengen-Pongau junction
RU2043455C1 (en) Method for building road bed
US20090145055A1 (en) Landscape Edging Assembly
CN209703228U (en) Inserted type asphalt pavement structure
CN219886485U (en) Base layer reinforcing system of solidified soil reinforced composite pavement
US3518924A (en) Method of construction for streets and the like
JP2002309503A (en) Block pavement and construction method therefor
JP2896464B2 (en) Concrete body reinforcement laying method
Manufacturers PART 3 EXECUTION
Hawkins et al. To seal or not to seal? A field experiment to resolve an age-old dilemma
EP0216148A2 (en) Bituminous surfacing for roads and process for making bituminous surfacings in the cold state for roads
JPH086805Y2 (en) Pavement structure around the bridge joint
JP2939552B2 (en) Joint structure
GÜRER AN ECONOMICAL AND SUSTAINABLE TYPE OF ASPHALT PAVEMENT: CHIP SEALS
CN114032721A (en) Asphalt pavement composite structure and construction method thereof

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL PT SE

17P Request for examination filed

Effective date: 19930114

17Q First examination report despatched

Effective date: 19940623

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL PT SE

REF Corresponds to:

Ref document number: 158041

Country of ref document: AT

Date of ref document: 19970915

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: KIRKER & CIE SA

Ref country code: CH

Ref legal event code: EP

ITF It: translation for a ep patent filed

Owner name: SOCIETA' ITALIANA BREVETTI S.P.A.

REF Corresponds to:

Ref document number: 69222073

Country of ref document: DE

Date of ref document: 19971016

ET Fr: translation filed
REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2109306

Country of ref document: ES

Kind code of ref document: T3

REG Reference to a national code

Ref country code: GR

Ref legal event code: FG4A

Free format text: 3025165

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 19971204

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19991125

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19991127

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19991129

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19991130

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 19991201

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20000215

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20000222

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20000223

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20010316

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010319

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010319

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010320

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20010329

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010331

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20011001

EUG Se: european patent has lapsed

Ref document number: 92200790.1

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20011130

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20011001

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020101

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20021007

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20020930

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20110330

Year of fee payment: 20

Ref country code: GB

Payment date: 20110325

Year of fee payment: 20

Ref country code: ES

Payment date: 20110328

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20110329

Year of fee payment: 20

BE20 Be: patent expired

Owner name: *MOBILMAT N.V.

Effective date: 20120319

Owner name: S.A. *BEKAERT N.V.

Effective date: 20120319

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20120318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20120318

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20130725

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20120320