EP0387466A2 - Artificial football and athletics pitch - Google Patents

Artificial football and athletics pitch Download PDF

Info

Publication number
EP0387466A2
EP0387466A2 EP89600005A EP89600005A EP0387466A2 EP 0387466 A2 EP0387466 A2 EP 0387466A2 EP 89600005 A EP89600005 A EP 89600005A EP 89600005 A EP89600005 A EP 89600005A EP 0387466 A2 EP0387466 A2 EP 0387466A2
Authority
EP
European Patent Office
Prior art keywords
artificial
channels
carpet
perforated
covered
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP89600005A
Other languages
German (de)
French (fr)
Other versions
EP0387466A3 (en
EP0387466B1 (en
Inventor
Zacharias Kofinas
Zacharias Karelas
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0387466A2 publication Critical patent/EP0387466A2/en
Publication of EP0387466A3 publication Critical patent/EP0387466A3/en
Application granted granted Critical
Publication of EP0387466B1 publication Critical patent/EP0387466B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63CSKATES; SKIS; ROLLER SKATES; DESIGN OR LAYOUT OF COURTS, RINKS OR THE LIKE
    • A63C19/00Design or layout of playing courts, rinks, bowling greens or areas for water-skiing; Covers therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds

Definitions

  • the invention relates to an artificial football and athletic field of usual dimensions, which will replace the existing field of natural grass carpet.
  • the existing grass carpet is removed from the surface.
  • the soil is compressed using a paver.
  • the depth and width of the channels will be adapted according to the goals and needs pursued.
  • the three interior surfaces of the channels are coated with 10 cm concrete. thick, while saving the inclination of their shape.
  • the rest of the ground surface is covered with 10-12 cm concrete. thick, lightly reinforced and forming a perfectly horizontal surface.
  • the channels are covered with a grid made either of hard plastic or of duraluminium (diagram 3).
  • the grooves in this layer lead to the canals.
  • a perforated carpet made of elastic material of natural or artificial origin, of perfect quality and green or other color, which consists of two levels of grids positioned one on top of the other perpendicularly, each width and height of 0.002 m. at 0.006. and thus forming a perforated surface with the dimension of holes from 0.002 to 0.006 m. (diagram 8).
  • the water is easily evacuated to the small canals and then to the city's drainage network.
  • the advantage of this invention is that the artificial terrain is not influenced by rain or snow.
  • the permanent system of artificial rain starts up and the snow in a small period melts and drains out in the form of water. rain, decorate the surface of the ground using the perforated carpet.
  • the amount of snow stored on the surface of the artificial carpet is less than any other surface which receives the same amount of snow 1) because of the composition of the carpet and 2) because of the artificial salt water rain that has just been used.
  • the hardness - softness of the surface of the artificial carpet if we compare it it is identical to the hardness-softness of the natural carpet, which is in identical condition to the best conditions of a natural ground and its carpet in grass.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The pitch has an infra-structure which is an underground network of inclined channels that are covered by a grid. The rest of the surface is covered with a layer of concrete which is 10-12 cm thick. The concrete is covered with a grooved layer in hard plastics material. An artificial perforated mat made of elastic material, such as natural or artificial rubber, covers the whole surface. The mat's upper surface has conical projections of the same material or strengthened with nylon, or other threads. Hot air can be circulated through the channels.

Description

L' invention se réfère à un terrain artificiel de football et d' Athlétisme de dimensions habituelles, qui rem­placera le terrain existant de tapis en gazon naturel.The invention relates to an artificial football and athletic field of usual dimensions, which will replace the existing field of natural grass carpet.

Les terrains de football ou d' athlétisme qui sont utilusés à nos jours sont avec tapis en gazon naturel et très peu a vec sol en plasique. Le sol de ces deux terrains a le désacantage qu'il ne peut pas dégager dépuis la surface la pluie et la neige.The football or athletic fields which are used nowadays are with natural grass carpet and very little with plastic soil. The soil of these two terrains has the disadvantage that it cannot clear from the surface rain and snow.

La construction de ce terrain artificiel se réfère aux éléments suivants :The construction of this artificial ground refers to the following elements:

On enlève de la surface le tapis en gazon existant.The existing grass carpet is removed from the surface.

On compresse à l' aide d'un paveur le sol.The soil is compressed using a paver.

Le terrain ainsi formé ABCD ( Schéma 1 ) est separé en deux parties égales avec une ligne EF ( schéma 1 ). Dans les parties du terrain AEFD et EBCF en des canaux inclinés, dista ncés de 2 à 3 mètres entre eux et lesquels commencent dépuis la ligne EF et finissent aux cotés AD et BC ( schéma2).The ground thus formed ABCD (Diagram 1) is separated into two equal parts with a line EF (diagram 1). In the parts of the ground AEFD and EBCF in inclined channels, separated by 2 to 3 meters between them and which start from the line EF and end at the sides AD and BC (diagram2).

La profondeure et la largeure des canaux seront a­adaptées selon les buts et bésoins poursuivis.The depth and width of the channels will be adapted according to the goals and needs pursued.

On revêt les trois surfaces intérieures des ca - naux avec du béton de 10 cm. d' épaisseur , tout en sauve­gardant l' inclinaison de leur forme.The three interior surfaces of the channels are coated with 10 cm concrete. thick, while saving the inclination of their shape.

On couvre le restant de la surface du terrain avec du béto n de 10 - 12 cm. d' épaisseur, légerement armé et en formant une surface parfaitement horizontale.The rest of the ground surface is covered with 10-12 cm concrete. thick, lightly reinforced and forming a perfectly horizontal surface.

Les canaux sont couverts d' une grille constituée soit de matière plastique dure , soit de duraluminium (sché­ma 3 ).The channels are covered with a grid made either of hard plastic or of duraluminium (diagram 3).

La surface entière du terrain , sauf celle des ca­naux , est couverte d' une couche cannelée constituée de ma­tière plastique dure ( schéma 4 ) .The entire surface of the land, except that of the canals, is covered with a grooved layer made of hard plastic (diagram 4).

Les sillons de cette couche aboutissent aux canaux.The grooves in this layer lead to the canals.

A chaque côté AD et BC on creuse un canal incliné de prpfondeur et largeur analogue aux bésoins et buts (sché­ma 5 ) .On each side AD and BC, an inclined channel of depth and width similar to the needs and goals is dug (diagram 5).

Ces canaux vont recevoir l' eau des petits canaux ( schéma 6 ) .These canals will receive water from the small canals (Figure 6).

En suite ces eaux seront évacuées soit vers le ré­seau de deversement de la ville , soit vers deux puits (sché­ma 7 ).These waters will then be evacuated either to the city's drainage network, or to two wells (Figure 7).

Dans ces petits canaux se trouve une installation permanente de pluie artificielle dont les extrémités auront la possibilité de sortir automatiquement des petits canaux à la surface du terrain et d' y revenir.In these small canals there is a permanent installation of artificial rain, the ends of which will have the possibility of automatically leaving and returning from the small channels on the surface of the ground.

Aux quatre côtés externes du terrain existent des installations permanentes de p̂luie artificielle. Comme pluie artificielle on utilise : 1) l' eau du réseau public , 2) de l'eau salée d' un reservoir existant, tous les deux en tempé­rature naturelle ou chauffée. Si la pression de l' eau de vil­le est petite on utilise des compresseurs.On the four external sides of the site, there are permanent artificial rain installations. As artificial rain we use: 1) water from the public network, 2) salt water from an existing reservoir, both at natural or heated temperature. If the city water pressure is small, compressors are used.

Sous les gradins existe une installation de clima­tisation laquelle avec des installations existantes dans les petits canaux procure de l' eau chaude à l' atmosphère de la surface du terrain.Under the stands there is an air conditioning system which with existing systems in small canals provides hot water to the atmosphere of the land area.

Sur la surface entière du terrain, on installe tapis troué constitué de matière élastique de provenance naturelle ou artificielle , de qualité parfaite et de couleur vert ou autre, lequel se constitue de deux niveaux de grilles posi­tionnées l' une sur l' autre perpendiculairement , chacune de largeur et d' hauteur de 0,002 m. à 0,006 . et en formant ain­si une surface trouée avec comme dimension des trous de 0,002 à 0,006 m. ( schéma 8 ) .On the entire surface of the ground, we install a perforated carpet made of elastic material of natural or artificial origin, of perfect quality and green or other color, which consists of two levels of grids positioned one on top of the other perpendicularly, each width and height of 0.002 m. at 0.006. and thus forming a perforated surface with the dimension of holes from 0.002 to 0.006 m. (diagram 8).

Sur la surface supérieure des frilles se situent des élevations coniques de la même matière plastique avec di­mension de base de 0,002 à 0,005 m. , de sommet 0,001m. à 0,003 et de hauteur 0,01m. à 0,07 m. ( schéma 9 ).On the upper surface of the frills are conical elevations of the same plastic with a basic dimension of 0.002 to 0.005 m. , with a height of 0.001m. at 0.003 and height 0.01m. at 0.07 m. (diagram 9).

Ces élevations sont simples ou fortifiées d' un fil en lin ou en nylon ( schéma 10 ).These farms are simple or fortified with a linen or nylon thread (diagram 10).

A l' aide de ce tapis troué et de la surface cannelé située en dessous , l' eau est facilement évacuée vers les pe­tits canaux et ensuite vers le réseau de deversement de la ville.Using this perforated mat and the grooved surface underneath, the water is easily evacuated to the small canals and then to the city's drainage network.

L' avantage de cette invention est que le terrain artificiel n' est pas influencé par la plui ou la neige.The advantage of this invention is that the artificial terrain is not influenced by rain or snow.

Plus concrétement, même si il pleut abondamment plu­sieurs jours et nuits, après cin minutes que la pluie s'ar­rête, sur le terrain il y aura aucune trace d' eau.More concretely, even if it rains abundantly several days and nights, after fifty minutes that the rain stops, on the ground there will be no trace of water.

Mais dans le cas où la pluie persiste, alors il se­ra possible pour les joueurs de continuer le jeu sur un ter­rain où il n' y aura par de trace de pluie mais où les joueurs seront mouillés tandis que le tapis présentera une humidité relative.But in case the rain persists, then it will be possible for the players to continue the game on a ground where there will be no trace of rain but where the players will be wet while the carpet has relative humidity.

Dans le cas où le terrain sera couvert de neige de quelques centimètres jusqu'à plus qu'un mètre, le systè­me permanent de pluie artificielle se met en marche et la neige dans une petite période fond et s' évacue en forme d' eau de pluie, dépuis la surface du terrain à l'aide du tapis troué.In the case where the ground will be covered with snow from a few centimeters up to more than one meter, the permanent system of artificial rain starts up and the snow in a small period melts and drains out in the form of water. rain, depuis the surface of the ground using the perforated carpet.

Si pendant la durée du jeu il neige, la quantité de neige emmagasinée sur la surface du tapis artificial est inférieure de n' importe autre surface qui reçoit la même quan­tité de neige 1) à cause de la composition du tapis et 2) à cause de la pluie artificielle en eau salé qui vient d'être utilisée.If during the duration of the game it is snowing, the amount of snow stored on the surface of the artificial carpet is less than any other surface which receives the same amount of snow 1) because of the composition of the carpet and 2) because of the artificial salt water rain that has just been used.

Dans ce terrain artificiel il existe un mécanisme de climatisation, sousterrain qui dispense à l' atmosphère de la surface du terrain de l' air chsud à intensité modulable.In this artificial ground there is a subterranean air conditioning mechanism which dispenses to the atmosphere of the ground surface chsud air with adjustable intensity.

En ce qui concerne la dureté - mollesse de la sur - facedu tapis artificiel , si on la compare elle est identique à la dureté-molesse du tapis naturel, lequel se trouve en con­dition identique aux meilleures conditions d' un terrain na­turel et de son tapis en gazon.Regarding the hardness - softness of the surface of the artificial carpet, if we compare it it is identical to the hardness-softness of the natural carpet, which is in identical condition to the best conditions of a natural ground and its carpet in grass.

Nous pouvons aussi, à la surface supérieure des grilles du tapis troué, à la place des élevations poser n'im­porte quelle couche poreuse.We can also, on the upper surface of the grids of the perforated carpet, instead of elevations lay any porous layer.

Claims (10)

1) Terrain artificiel de football et d' athlétisme qui a comme infrastructure un réseau souterrain d' évacua­tion de l' eau à l' aide de petits et grand canaux, couverts d' une grille.1) Artificial football and athletic field which has as infrastructure an underground network of evacuation of water using small and large channels, covered with a grid. 2) Le restant de la surface est couvert d' une cou­che de béton dre 10 à 12 cm.2) The rest of the surface is covered with a 10 to 12 cm layer of concrete. 3) Sur toute la surface en béton se trouve une cou­che cannelée en matière plastique dure .3) On the entire concrete surface there is a grooved layer of hard plastic. 4) Sur la surface cannelée ainsi que sur la grille des canaux se trouve un tapis artificiel troué formant des carrès vides de dimension de 0,002 m. à 0,006 m. en matiè­re élastique ( caoutchouc ) d' origine naturel ou artificiel. Sur la surface du tapis troué se trouvent des élevations co­niques de la même matière , simples ou fortifiés de fil en lin ou en nylon : leur dimension de la base de 0,002 m. à 0,005. , du sommet 0,001 m. à 0,003 . et hauteur de 0,01 m. à 0,007 m.4) On the fluted surface as well as on the grid of the channels there is a perforated artificial carpet forming empty carves of dimension of 0.002 m. at 0.006 m. made of elastic material (rubber) of natural or artificial origin. On the surface of the perforated carpet are conical elevations of the same material, simple or fortified with linen or nylon thread: their base dimension of 0.002 m. at 0.005. , from the summit 0.001 m. at 0.003. and height of 0.01 m. 0.007 m. 5) A l' intérieur des petits canaux il existe une installation permanente de pluie artificielle dont les ex­tremités automatiquement sortent à la surface du terrain et reviennent dans les petits canaux.5) Inside the small channels there is a permanent installation of artificial rain, the ends of which automatically come out on the surface of the ground and return to the small channels. 6) A l' intérieur des petits canaux il existe une installation de climatisation à air chaud , laquelle peut aussi s' établir en dehors du terrain.6) Inside the small channels there is a hot air conditioning system, which can also be installed outside the field. 7) Selon la quatrième pretention , le tapis troué peut être fabriqué non seulement dépuis une matière élas­ tique mais aussi d' autre matière en plastique, nylon ou au­tre composition plus performante.7) According to the fourth claim, the perforated carpet can be produced not only from a material elas tick but also of other plastic, nylon or other more efficient material. 8) Selon la cinquième pretention, comme pluie ar­tificielle on utilise : 1) de l' eau du réseau de la vil­le, 2) de l' eau salé provenant d' un reservoir en tempé­rature égale à l' environement ou chauffée.8) According to the fifth claim, as artificial rain we use: 1) water from the city network, 2) salt water from a reservoir at a temperature equal to the environment or heated. 9) Selon la quatrième pretention à la place des é­levations coniques du tapis troué nous pouvons poser n'im­porte quelle autre couche poreuse laquelle sera constituée de matière élastique ou nylon ou plastique ou bien d' une autre composition avec un plus grand rendement.9) According to the fourth claim instead of the conical elevations of the perforated carpet we can lay any other porous layer which will be made of elastic material or nylon or plastic or of another composition with a higher yield. 10) Selon la huitième pretention comme pluie ar­tificielle nous pouvons utiliser n' importe quel autre élé­ment liquide non melangé , ou mixture ou bien une composituon chimique avec un rendement plus grand pour le dégel de la neige.10) According to the eighth claim as artificial rain we can use any other unmixed liquid element, or mixture or else a chemical compound with a greater yield for thawing snow.
EP19890600005 1989-03-15 1989-03-21 Artificial football and athletics pitch Expired - Lifetime EP0387466B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GR89010157 1989-03-15
GR89100157 1989-03-15

Publications (3)

Publication Number Publication Date
EP0387466A2 true EP0387466A2 (en) 1990-09-19
EP0387466A3 EP0387466A3 (en) 1991-02-06
EP0387466B1 EP0387466B1 (en) 1993-09-22

Family

ID=10939351

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19890600005 Expired - Lifetime EP0387466B1 (en) 1989-03-15 1989-03-21 Artificial football and athletics pitch

Country Status (2)

Country Link
EP (1) EP0387466B1 (en)
DE (1) DE68909396T2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2913629A1 (en) * 1979-04-05 1980-10-30 Bernhard Debbeler Underground-ground surface heating system - has sewage water passed through heating pipes
WO1986001552A1 (en) * 1984-08-21 1986-03-13 Sparfel Ets Ground drainage method, system for implementing such method and application of the method
DE3721812A1 (en) * 1987-07-02 1989-02-02 Sekisui Europ Ag Sand-filled artificial turf
WO1989001076A1 (en) * 1987-07-23 1989-02-09 Noel Peter John Mogford Turf surfaces

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2913629A1 (en) * 1979-04-05 1980-10-30 Bernhard Debbeler Underground-ground surface heating system - has sewage water passed through heating pipes
WO1986001552A1 (en) * 1984-08-21 1986-03-13 Sparfel Ets Ground drainage method, system for implementing such method and application of the method
DE3721812A1 (en) * 1987-07-02 1989-02-02 Sekisui Europ Ag Sand-filled artificial turf
WO1989001076A1 (en) * 1987-07-23 1989-02-09 Noel Peter John Mogford Turf surfaces

Also Published As

Publication number Publication date
DE68909396T2 (en) 1994-04-28
EP0387466A3 (en) 1991-02-06
EP0387466B1 (en) 1993-09-22
DE68909396D1 (en) 1993-10-28

Similar Documents

Publication Publication Date Title
JP5437795B2 (en) Bunker lining assembly
IL131311A (en) Subsurface fluid drainage and storage systems
CN107190836A (en) A kind of U-shaped gutter in park and its construction method
FR2747265A1 (en) Plant culture on vertical surface
US6817811B1 (en) Construction for environmental protection in respect of water source and earth
WO2009111995A1 (en) Vegetation roof, especially pitched, and method of its production
KR100826512B1 (en) Vegetation structure using lattice nets, its manufacturing method and afforestation process using it thereof
KR101139219B1 (en) Side gutter for ridge of a mountain channel and construction method using the same
FR2691726A1 (en) Soft tennis court made of synthetic material - has drainage layer and surface with hexagonal section honeycomb layer between filled with dry or wet compacted pozzolana or zeolite
EP0029400B1 (en) Apparatus for protecting buildings and civil engineering constructions against water and moisture
EP0387466A2 (en) Artificial football and athletics pitch
CN111395104A (en) Colorful asphalt beam pouring type commercial residential district landscape pavement
FR2659996A1 (en) Device with alveolate structure for irrigating or draining playing fields
JP3664673B2 (en) Slope greening method
KR102305411B1 (en) Rain water storage device
CN1304700C (en) Environmentally-friendly ecological soil and water conservating construction method
JP4866032B2 (en) Tree planting structure
NO312912B1 (en) Procedure, system and anchor plug for use in road construction, especially on wet ground
JP2526403Y2 (en) Substrate for planting ground covering plants
KR200327419Y1 (en) Protector fixing structure for establishing of natural type river bank incline space
JP3701429B2 (en) Concrete green revetment block
JPH1129930A (en) Reinforced filling method
JPH1037199A (en) Greening work method for face of slope
JPS6354084B2 (en)
FR2720085A1 (en) Shock-absorbing, non-slip covering for soils, e.g. on embankments

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE

RBV Designated contracting states (corrected)

Designated state(s): BE CH DE FR GB IT LI NL SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE

RHK1 Main classification (correction)

Ipc: E01C 13/00

17P Request for examination filed

Effective date: 19910524

17Q First examination report despatched

Effective date: 19911223

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE CH DE FR GB IT LI NL SE

REF Corresponds to:

Ref document number: 68909396

Country of ref document: DE

Date of ref document: 19931028

ITF It: translation for a ep patent filed
GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 19940106

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
EAL Se: european patent in force in sweden

Ref document number: 89600005.6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19950221

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19950224

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19950228

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19950320

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19950330

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19950331

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19950622

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19960321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19960322

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19960331

Ref country code: CH

Effective date: 19960331

Ref country code: BE

Effective date: 19960331

BERE Be: lapsed

Owner name: KARELAS ZACHARIAS

Effective date: 19960331

Owner name: KOFINAS ZACHARIAS

Effective date: 19960331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19961001

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19960321

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19961129

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 19961001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19961203

EUG Se: european patent has lapsed

Ref document number: 89600005.6

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050321