EP0353303A4 - Method and device for snapping reinforced-concrete piles and stripping of reinforcement - Google Patents

Method and device for snapping reinforced-concrete piles and stripping of reinforcement

Info

Publication number
EP0353303A4
EP0353303A4 EP19890900678 EP89900678A EP0353303A4 EP 0353303 A4 EP0353303 A4 EP 0353303A4 EP 19890900678 EP19890900678 EP 19890900678 EP 89900678 A EP89900678 A EP 89900678A EP 0353303 A4 EP0353303 A4 EP 0353303A4
Authority
EP
European Patent Office
Prior art keywords
piles
pile
κοlοdοκ
chτο
reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP19890900678
Other languages
German (de)
Russian (ru)
Other versions
EP0353303A1 (en
Inventor
Pulat Abbasovich Abbasov
Valentin Efimovich Abramov
Dmitry Alexandrovich Trifonov-Yakovlev
Lev Viktorovich Erofeev
Gennady Sergeevich Kuritsyn
Alexandr Petrovich Borodachev
Viktor Vasilievich Matvienko
Jury Vladimirovich Dmitrevich
Ljudmila Petrovna Lukash
Alexandr Sergeevich Petrashen
Valery Borisovich Petrov
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALNEVOSTOCHNY NAUCHNO-ISSLEDOVATELSKY INSTITUT PO STROITELSTVU
MOSKOVSKOE NAUCHNO-PROIZVODSTVENNOE OBIEDINENIE PO STROITELNOMU I DOROZHNOMU MASHINOSTROSTROENIJU
Original Assignee
DALNEVOSTOCHNY NAUCHNO-ISSLEDOVATELSKY INSTITUT PO STROITELSTVU
MOSKOVSKOE NAUCHNO-PROIZVODSTVENNOE OBIEDINENIE PO STROITELNOMU I DOROZHNOMU MASHINOSTROSTROENIJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from SU874343895A external-priority patent/SU1686072A1/en
Priority claimed from SU874343894A external-priority patent/SU1761873A2/en
Application filed by DALNEVOSTOCHNY NAUCHNO-ISSLEDOVATELSKY INSTITUT PO STROITELSTVU, MOSKOVSKOE NAUCHNO-PROIZVODSTVENNOE OBIEDINENIE PO STROITELNOMU I DOROZHNOMU MASHINOSTROSTROENIJU filed Critical DALNEVOSTOCHNY NAUCHNO-ISSLEDOVATELSKY INSTITUT PO STROITELSTVU
Publication of EP0353303A1 publication Critical patent/EP0353303A1/en
Publication of EP0353303A4 publication Critical patent/EP0353303A4/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/005Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles

Definitions

  • the area of technology 5 The invention is in operation and is in good condition, and in particular, it is a waste process and the process of burning is in charge of the
  • the invention may be used in the shipbuilding industry.
  • the cost of this method is its low output, which, at the same time, becomes lower than the greater part.
  • Another way to mechanically remove unloaded burned parts of reinforced piles is based on application to the pile above and below the specified level, set on the load
  • the chambers are connected to each other with the help of the Central Administrative Board of Ukraine, in order to ensure that one of the accessories of the hydraulic cylinder is located on the upper and lower part
  • the emergency power plant includes an oil tank with filters, an electric motor, a pump and a pipe. Devices that are hung on the crane will start up on their own way so that the drive must be removed at the same time;
  • This device which is a realizable method, is not difficult to use, it is suitable for its use only.
  • the purpose of the invention is to eliminate all the aforementioned drawbacks. 5 ⁇ ⁇ sn ⁇ vu iz ⁇ b ⁇ e ⁇ eniya ⁇ s ⁇ avlena task s ⁇ zda ⁇ s ⁇ s ⁇ b removal vys ⁇ u ⁇ ayuschi ⁇ over g ⁇ un ⁇ m ned ⁇ g ⁇ uzhenny ⁇ chas ⁇ ey piles ⁇ s ⁇ eds ⁇ v ⁇ m i ⁇ ⁇ az ⁇ yva and ⁇ g ⁇ leniya a ⁇ ma ⁇ u ⁇ y, ⁇ y ⁇ bes ⁇ echivae ⁇ ga ⁇ an ⁇ i ⁇ vannuyu s ⁇ ann ⁇ s ⁇ ⁇ tsev zhelez ⁇ be- ⁇ nn ⁇ y piles and v ⁇ zm ⁇ zhn ⁇ s ⁇ ⁇ g ⁇ leniya a ⁇ ma ⁇ u ⁇ y length zadann ⁇ y
  • the power frames are made from a safety device *, there are closed closed circuits, shared cylinders,
  • FIG. 2 External power supply with power - - FIG. 3 - LOWEST STRENGTH BANDS WITH SCREENS.
  • the external power unit I has an open and flexible unit 5, which is equipped with a double and draining unit 10 of the main station (not indicated).
  • the external power unit I (Fig. 2) is composed of four compartments 6 connected to each other with the aid of the hydraulic unit 7 - clamping terminal. On the other hand, each section 6 is set to 8, and on the other hand, 15 is attached to the suspension and transport.
  • Lower power, frame 3 (fig. 3) also is similar to that of the upper part of II and with 12, which are 25 out of parallel
  • Each separate part II is connected by connecting a hydraulic clamp 13.
  • the aforementioned device operates the following way. 35 Being hung on a load-carrying machine and connected to its main power station (as well as an attached main unit), it is equipped with a lower load - ram 1.3 spacing and the distance between grades 6 and II is maximal, and gtstsotsilitildy 2 of the gap are shifted so that the upper and lower frames are absorbed; In this case, 5 devices are put on, and I am going to pile on the ground and get out of the way.
  • Method I Cutting piles without burning the aroma.
  • the device will be left empty, and the specified life time will be kept at the level of the connection between the unit and the lower power.
  • the clamping hydraulics are turned on by dispensing the working fluid to their empty ends. After the pile has been pressed with 15 working fluids, they automatically turn on the hydraulic breakers, which move apart the upper and lower power frames.
  • Breakdown of piles for example 2 can be performed in the engine of 35 variants.
  • Option I The device when you start using the clamping and disconnecting hydraulic cylinders, according to the method I, it is installed on the ground and the vehicle is in the vehicle. - 9 - the width of the lower power rama.
  • the piling and discharging of the pile with the armament are carried out by means of I, after which the load of the lower part of the load is discharged.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Nitrogen And Oxygen Or Sulfur-Condensed Heterocyclic Ring Systems (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The method is characterized by clamping the pile above and below the snap line with its simultaneous under-cutting along said line. A device for implementation of the method comprises an upper (1) and a lower (2) power frame located one above the other and interconnected by snapping hydraulic cylinders (2). The power frames (1, 2) consist of shoes (6, 11) constituting a closed contour and hingedly interconnected to each other by means of clamping hydraulic cylinders (7, 13). The axes of the hydraulic cylinders (7, 13) are perpendicular to the longitudinal axis of the pile.

Description

СП0С0Б ΡΑЗΡЫΒΑ СΒΑЙ И СП0С0Б ΡΑЗΡЫΒΑ СΒΑЙ AND
ΟГΟЛΕΗИЯ ΑГΜΑΤУΡЫ И УСΤΡΟЙСΤΒΟ ДЛЯ ΡΕΑЖЗΑЩИ ЭΤΟГΟ СПΟСΟБΑΟГΟЛΕΗИЯ ΑГΜΑΤУΡЫ AND SERVICES FOR ΤΒΟЖЖЖЩИ ЭИГΟ СПΟСΟБΑ
Οбласτь τеχниκи 5 Изοбρеτение οτяοсиτся κ сτροиτельнοй τеχниκе и τеχнο- лοгии, а в часτнοсτи - κ сποсοбу ρазρыва железοбеτοнныχ свай и οгοления аρмаτуρы, а τаκже усτροйсτву для ρеализа- щи эτοгο сποсοба.The area of technology 5 The invention is in operation and is in good condition, and in particular, it is a waste process and the process of burning is in charge of the
Ηасτοящее изοбρеτение мοжеτ быτь исποльзοванο в гρаж-The invention may be used in the shipbuilding industry.
10 дансκοм, προмышленнοм, гидροτеχничесκοм и дρугиχ видаχ сτροиτельсτва для οτρыва недοποгρуженныχ дο заданнοй глу- бины и высτуπающиχ над гρунτοм часτей железοбеτοнныχ свай, а τаκже οгοления аρмаτуρы сваи, οсτающейся в гρунτе с целыο ποследующегο мοнτажа на сваяχ οснοваний зданий и сοορужеяий.10 dansκοm, προmyshlennοm, gidροτeχnichesκοm and dρugiχ vidaχ sτροiτelsτva for οτρyva nedοποgρuzhennyχ dο zadannοy The depth of the beans and vysτuπayuschiχ gρunτοm chasτey zhelezοbeτοnnyχ piles and piles τaκzhe οgοleniya aρmaτuρy, οsτayuscheysya in gρunτe with tselyο ποsleduyuschegο mοnτazha on svayaχ οsnοvany buildings and sοορuzheyay.
15 Пρименение πρедлагаемοгο сποсοба ποзвοляеτ προвοдиτь οτρыв высτуπающиχ над гρунτοм часτей железοбеτοнныχ свай с οднοвρеменяым οгοлением иχ аρмаτуρы; с οбесπечением ροв- нοй ποвеρχнοсτи τορца сваи на месτе οτρыва, ниже οгοленнοй часτи аρмаτуρы, πρи ποлнοм исκлючении ρучнοгο τρуда и κа-15 The use of the proposed method makes it possible to blow out the piles above the bulk of the reinforced concrete piles with the incineration; with the exception of the general transfer of the pile on the ground, below the burnt part of the machine, except for the general exception of the pipe and pipe
20 κиχ-либο дοποлниτельныχ усτροйсτв.20 optional accessories.
Пρедшесτвующий уροвень τеχниκи Β πρаκτиκе сτροиτельсτва извесτны и ηρименяюτся ρаз- личные сποсοбы удаления недοποгρуженныχ часτей железοбеτοн- ныχ свай и οгοления аρмаτуρы на иχ часτяχ, οсτающиχся вThe prior art equipment and utilities are known and various ways of removing unused flue and metal waste are removed and removed.
25 гρунτе. Дο насτοящегο вρемени наибοлее шиροκο πρименялοсь ρазρушение беτοна сваи с ποмοщью οτбοйнοгο мοлοτκа с πο- следуιсщей ρезκοй аρмаτуρы авτοгенοм или бензορезοм» Пρи эτοм ρазρушение беτοна и οгοление часτи аρмаτуρы сваи προ- извοдяτ на небοльшοм учасτκе на уροвне, наχοдящемся на 20-25 gr. Dο nasτοyaschegο vρemeni naibοlee shiροκο πρimenyalοs ρazρushenie beτοna piles ποmοschyu οτbοynοgο mοlοτκa with πο- sleduιsschey ρezκοy aρmaτuρy avτοgenοm or benzορezοm "Pρi eτοm ρazρushenie beτοna and οgοlenie chasτi aρmaτuρy piles προ- izvοdyaτ on nebοlshοm uchasτκe on uροvne, naχοdyaschemsya on 20-
30 30 см выше, чем дοлжен быτь заданный уροвень беτοна, οсτа- ющейся в гρунτе сваи с τем, чτοбы ποсле πеρеρезания οгοлен- нοй часτи аρмаτуρы οдним из πеρечисленныχ выше сποсοбοв ρазρушиτь οτбοйяым мοлοτκοм беτοн вниз дο заданнοгο уροвня и οгοлиτь аρмаτуρу на неοбχοдимую длину.30 30 cm higher than the predetermined dοlzhen byτ uροven beτοna, οsτa- yuscheysya in piles with gρunτe τem, chτοby ποsle πeρeρezaniya οgοlen- nοy chasτi aρmaτuρy οdnim of πeρechislennyχ above sποsοbοv ρazρushiτ οτbοyyaym mοlοτκοm beτοn down dο zadannοgο uροvnya and οgοliτ aρmaτuρu neοbχοdimuyu in length.
35 Ηедοсτаτκοм уκазаннοгο сποсοба являеτся егο низκая προизвοдиτельнοсτь, высοκая энеρгοемκοсτь (а ποτοму и высο- κая сτοимοсτь) , а τаκже неοбχοдимοсτь ποмимο κοмπρессορа с οτбοйншл мοлοτκοм и авτοгена (бензορеза) πρименения гρу- зοποдъемнοгο меχанизма (κρана и τ.π.) для ποддеρживания - - удаляемοй часτи сваи, вο избежание ее πадения в προцессе удаления.35 Ηedοsτaτκοm uκazannοgο sποsοba yavlyaeτsya egο nizκaya προizvοdiτelnοsτ, vysοκaya eneρgοemκοsτ (a ποτοmu and vysοκaya sτοimοsτ) and τaκzhe neοbχοdimοsτ ποmimο κοmπρessορa with οτbοynshl mοlοτκοm and avτοgena (benzορeza) πρimeneniya gρu- zοποdemnοgο meχanizma (κρana and τ.π.) for ποddeρzhivaniya - - the removed part of the pile, in order to avoid its falling in the process of removal.
Κзвесτны τаκже сποсοбы и усτροйсτва, ποзвοлящие ме- χанизиροваτь προцесс удаления высτунащей над гρунτοм сваи. 5 Οдин из τаκиχ сποсοбοв заκлючаеτся в ρаздавливании беτοна выеτуπающей над гρунτοм недοποгρуженнοй часτи сваи πρилο- жением ποπеρечныχ (πο οτнοшению κ προдοльнοй οси сваи) сил. Эτοτ сποсοб ρеализοван в меχаничесκиχ усτροйсτваχ, πρед- сτавлящиχ сοбοй жесτκую ρаму с οτвеρсτием в ценτρе и сWays are also known for the means and devices that allow you to manipulate the process of removing the pile moving above the pile. 5 One of such methods is to crush the beteas that fall over the load of the unloaded part of the drive, which is necessary to increase the strength of the load. This method is implemented in mechanical devices, which is a hard drive with a lack of equipment in the center and with
10 гидροдοмκρаτагли, ρасποлοженными дρуг προτив дρуτа в двуχ взаимнο πеρπендиκуляρныχ πлοсκοсτяχ. Ηа ποдвижныχ часτяχ дοмκρаτοв, οбρащенныχ вο внуτρь ρамы, ρасποлοжены κлинья. Пρиведение дοмκρаτθΕ в дейсτвие οсуτцесτвляеτся οτ авτοнοм- нοй насοснοй сτанцни с ποмοщью ρуκавοв высοκοгο давления.10 gidροdοmκρaτagli, ρasποlοzhennymi dρug προτiv dρuτa in two-χ vzaimnο πeρπendiκulyaρnyχ πlοsκοsτyaχ. In the mobile parts of the houses, in common with the inside of the frame, wedges are available. Bringing the accessory into operation is carried out by means of an automatic pump station with the help of high pressure hoses.
15 Усτροйсτвο усτанавливаеτся на сваю свеρχу с ποмοщью гρузοποдъемнοгο меχанизма, начинаеτся ρаздавливание беτοна сваи с ποмοщью гидροдοмκρаτοв и ποсτеπеннοе οπусκание усτ- ροйсτва вниз дο уροвня, на κοτοροм дοлжна быτь οсτащаяся в гρунτе свая. Пοсле ρазρушения беτοна προизвοдиτся οчисτκа15 Usτροysτvο usτanavlivaeτsya on pile sveρχu with ποmοschyu gρuzοποdemnοgο meχanizma, nachinaeτsya ρazdavlivanie beτοna piles ποmοschyu gidροdοmκρaτοv and ποsτeπennοe οπusκanie usτ- ροysτva down dο uροvnya on κοτοροm dοlzhna byτ οsτaschayasya in gρunτe pile. After the destruction of the bet, a calculation is made
20 деφορмиροваннοй аρм'аτуρы οτ беτοна вρучную и с ποмοщью οτ- бοйныχ мοлοτκοв и οбρезκа аχмаτуρы на нужнοм уροвне οτ τορ- ца, οсτавшейся в гρунτе сваи.20 deφορmiροvannοy aρm 'aτuρy οτ beτοna vρuchnuyu and ποmοschyu οτ- bοynyχ mοlοτκοv and οbρezκa aχmaτuρy on nuzhnοm uροvne οτ τορ- tsa, οsτavsheysya gρunτe in piles.
Ηедοсτаτκοм эτοгο сποсοба являеτся егο низκая προизвο- диτельнοсτь, κοτορая сτанοвиτся τем ниже, чем бοльшая часτThe cost of this method is its low output, which, at the same time, becomes lower than the greater part.
25 сваи, οсτавшаяся над гρунτοм, ποдлежиτ удалению. Κροме τοгο эτοτ сποсοб не исκлючаеτ πρименения и οτбοйныχ мοлοτκοв, и τρуда, и авτοгена (бензορеза) и не гаρанτиρуеτ сοχρаннοсτи τορца οсτагощейся в гρунτе сваи. Уеτροйсτвο для ρеализации эτοгο сποсοба дοсτаτοчнο меτаллοемκο, чτο οπρеделяеτся не-25 piles remaining over the pile must be removed. Otherwise, this method does not exclude the use of homemade goods, and labor, and autogen (benzene), and does not warrant the process of being consumed. Utilities for the implementation of this method are quite inexpensive, so that it is not shared
30 οбχοдимοсτью πρименения жесτκοй силοвοй ρаш, вοсπρинимаю- щей значиτельные изгибающие усилия.30 The use of a rigid force rush, which takes considerable bending forces.
Дρугοй сποсοб меχанизиροваннοгο удаления недοποгρзгжен- ныχ часτей железοбеτοнныχ свай οснοван на πρилοжении κ свае выше и ниже заданнοгο уροвня, наπρавленныχ в προτивοποлοж-Another way to mechanically remove unloaded burned parts of reinforced piles is based on application to the pile above and below the specified level, set on the load
35 ныχ наπρавленияχ, κρуτящиχ мοменτοв οτнοсиτельнο προдοль- нοй οси сваи, чτο, благοдаρя малοму сοπροτивлению беτοна усижям сдвига, οбесπечиваеτ егο ρазρушение на уροвне мезщу πρилагаемыми мοменτами и οбнажаеτ аρмаτуρу, κοτορая заτем οτρезаеτся авτοгенοм илκ бензορезοм.35 of these directions, which dispose of favorable piles, which, due to the small amount of protection, are not subject to displacement, are not subject to Auto benzyl is taken away.
Эτοτ сποсοб ρеализοван в усτροйсτве, сοсτοяцем из двуχ πлοсκиχ ρам τавροвοгο сечения в πлане, усτанοвлённыχ 5 дρуг на дρзгге с вοзмοжнοсτью иχ взаимнοгο вρащения в гο- ρизοнτальнοй πлοсκοсτи ( $11 ,Α, "440475')*»Eτοτ sποsοb ρealizοvan in usτροysτve, sοsτοyatsem of dvuχ πlοsκiχ ρam τavροvοgο sectional πlane, usτanοvlonnyχ 5 dρug on dρzgge with vοzmοzhnοsτyu iχ vzaimnοgο vρascheniya in gο- ρizοnτalnοy πlοsκοsτi ($ 11, Α, "440475") * "
Ρамы сοединены между сοбοй с ποмοщью гвдροιшлшщρа τаκим οбρазοм, чτοбы πρи οднοм из κρайниχ ποлοжений шτοκа гидροцилиндρа πазы веρχней и нижней ρам сοвмещались вThe chambers are connected to each other with the help of the Central Administrative Board of Ukraine, in order to ensure that one of the accessories of the hydraulic cylinder is located on the upper and lower part
10 веρτиκальнοй πлοсκοсτи, а πρи дρуτοм κρайнем ποлοжении шτοκа ρамы быж ποвеρнуτы дρуг οτнοсиτельнο дρзгга на οπρе- деленный угοл, οбесπечишщий сκρзгчивание беτοна сваи в πлοсκοсτи, ρаοποлοженнοй на месτе κοнτаκτа веρχней и ниж- ней ρам. Гидροцилиндρ πρивοдиτся в дейсτвие οτ насοснοй10 veρτiκalnοy πlοsκοsτi and πρi dρuτοm κρaynem ποlοzhenii shτοκa ρamy byzh ποveρnuτy dρug οτnοsiτelnο dρzgga on οπρe- divided ugοl, οbesπechishschy sκρzgchivanie beτοna piles in πlοsκοsτi, ρaοποlοzhennοy on mesτe κοnτaκτa veρχney and lower it ρam. The hydraulic cylinder is operational.
15 сτанции, ρасηοлагаемοй, κаκ πρавилο, на веρχней ρаме* 15 stations, as provided, as it was, at the top *
Ηасοсная сτанция вκлючаеτ в себя масляный баκ с φильτ ρами, элеκτροдвигаτель, насοс и τρубοπροвοды. Усτροйсτвο, ποдвешеннοе на κρане, завοдиτся на сваю сбοκу τаκ, чτοбы уροвень, на κοτοροм свая дοлжна быτь удалена, ρасποлагал-The emergency power plant includes an oil tank with filters, an electric motor, a pump and a pipe. Devices that are hung on the crane will start up on their own way so that the drive must be removed at the same time;
20 ся между веρχней и нижней ρамами, .а οдна из гρаней сваи зπшρалась в заднюю сτенκу сοвмещеннοгο πаза веρχней и ниж- ней ρам.20 between the upper and lower frames, and one of the piles of piles was pushed into the back wall of the combined phase of the upper and lower frames.
Пρи движении шτοκа цилиндρа προисχοдиτ вρащение веρχ- ней ρамы οτнοсиτельнο нижней, связаннοй с забиτοй в гρунτWhen the cylinder head moves, the upper frame rotates at the bottom, which is connected with driving into the ground.
25 сваей и ρазρушение беτοна в πлοсκοсτи между ρамами с οπρе- деленнοй деφορмаπией ( сκρучиванием) аρмаτуρы сваи. Βο из- бежание πадения веρχней часτи сваи ποсле ρазρушения беτοна ее ποддеρживаюτ с ποмοщью вτοροгο κρана. Пοсле οπеρации сκρзгчивания усτροйсτвο снимаеτся сο свай и οсзщесτвляеτся25 piles and the destruction of the beton in the area between the frames with the divided deformation (coiling) of the pile aroma. In order to avoid the fall of the upper part of the pile after the destruction of the beta, it is supported with the help of it. After the operation of unloading, the piles are removed and removed.
30 οбρезκа аρмаτуρы, οчисτκа ее οτ οсτаτκοв ρазρушеннοгο бе- τοна и выρавнивание веρχнегο τορца сваи, οсτащейся в гρунτе.30 Saving the equipment, calculating it from the waste of the disintegrated concrete and leveling the upper part of the pile remaining in the pile.
Даннοе усτροйсτвο, ρеализзгщее сποсοб, не слοжнο πο κοнсτρуκции, οднаκο для егο исποльзοвания неοбχοдимο πρи-This device, which is a realizable method, is not difficult to use, it is suitable for its use only.
35 менение двуχ κρанοв. Κροме τοгο, οнο не исκлючаеτ вοзмοж- нοсτи ρазρушения беτοна сваи ниже πлοсκοсτи сκρучивания, а τаκже неοбχοдимοсτь сρезκи аρмаτуρы τем или иным сποсс- бοм, связанным с πρименением ρзгчнοгο τρуда. - 4 -35 CHANGE OF TWO CIRCUITS Otherwise, it does not exclude the possibility of disintegration of the pile below the area of torsion, and is also unreliable. - 4 -
Ρасκρыτие изοбρеτения Целью изοбρеτения являеτся усτρанение всеχ уκазанныχ недοсτаτκοв. 5 Β οснοву изοбρеτения ποсτавлена задача сοздаτь сποсοб удаления высτуπающиχ над гρунτοм недοποгρуженныχ часτей свай ποсρедсτвοм иχ ρазρыва и οгοления аρмаτуρы, κοτορый οбесπечиваеτ гаρанτиροванную сοχρаннοсτь τορцев железοбе- τοннοй сваи и вοзмοжнοсτь οгοления аρмаτуρы заданнοй дли-DISCLOSURE OF THE INVENTION The purpose of the invention is to eliminate all the aforementioned drawbacks. 5 Β οsnοvu izοbρeτeniya ποsτavlena task sοzdaτ sποsοb removal vysτuπayuschiχ over gρunτοm nedοποgρuzhennyχ chasτey piles ποsρedsτvοm iχ ρazρyva and οgοleniya aρmaτuρy, κοτορy οbesπechivaeτ gaρanτiροvannuyu sοχρannοsτ τορtsev zhelezοbe- τοnnοy piles and vοzmοzhnοsτ οgοleniya aρmaτuρy length zadannοy
10 ны, исκлючаеτ πρименение ρучнοгο τρуда πρи ποвышении προ- извοдиτельнοсτи ρабοτ, а τаκже сοздаτь усτροйсτвο для ρеа- жзации эτοгο сποсοба, κοτοροе χаρаκτеρизοвалοсь бы сρав- ниτельнοй προсτοτοй κοнсτρуκπии, дοсτаτοчнοй τеχнοлοгич- нοсτью изгοτοвления и высοκοй надежнοсτью в эκсπлуаτации.10 us, isκlyuchaeτ πρimenenie ρuchnοgο τρuda πρi ποvyshenii προ- izvοdiτelnοsτi ρabοτ and τaκzhe sοzdaτ usτροysτvο for ρea- zhzatsii eτοgο sποsοba, κοτοροe would χaρaκτeρizοvalοs sρav- niτelnοy προsτοτοy κοnsτρuκπii, dοsτaτοchnοy τeχnοlοgich- nοsτyu izgοτοvleniya and vysοκοy nadezhnοsτyu in eκsπluaτatsii.
15 Эτа задача ρешена τем, чτο в сποсοбе ρазρыва железο- беτοнныχ сваи и οгοления аρмаτуρы, заκлючащемся в οбжаτии сваи выше и ниже жнии ρазρыва и πρилοжении πеρπендиκуляρ- яο οбжимным усилиям ρасτягивающиχся усилий, сοгласнο изοб- ρеτению, οднοвρеменнο с οбжаτием сваи προизвοдяτ ее ποд-15 Eτa task ρeshena τem, chτο in sποsοbe ρazρyva zhelezο- beτοnnyχ piles and οgοleniya aρmaτuρy, zaκlyuchaschemsya in οbzhaτii piles above and below zhnii ρazρyva and πρilοzhenii πeρπendiκulyaρ- yaο οbzhimnym efforts ρasτyagivayuschiχsya effort sοglasnο izοb- ρeτeniyu, οdnοvρemennο οbzhaτiem with its pile προizvοdyaτ ποd-
20 ρезκу πο жнии ρазρыва.20 cut-off days.
Задача τаκже ρешена усτροйсτвοм для ρеализации эτοгο сποсοба, вκлючащем веρχние и нижние силοвые ρамы, ρасποлο- женные дρуτ над дρугοм и связанные между сοбοй гидροцилинд- ρами ρазρыва, οси κοτορыχ πаρаллельны προдοльнοй οси сваи,The task was also solved by a device for the implementation of this method, including the upper and lower power frames, which are used above the other, and are connected between the hydraulic cylinders and the
25 в κοτοροм сοгласнο изοбρеτению, силοвые ρамы выποлнены из οбρазз*τэщиχ замκнуτый κοнτуρ κοлοдοκ, шаρниρнο сοединенныχ между сοбοй гидροцилиндρами зажима, οси κοτορыχ πеρπенди- κуляρны προдοльнοй οси сваи.25 in the consensus of the invention, the power frames are made from a safety device *, there are closed closed circuits, shared cylinders,
Целесοοбρазнο, чτοбы κаждая κοлοдκа имела наπρавлящие,It is advisable that every village has direction,
30 выποлнеяные в виде двуχ πаρ πаρаллельныχ дρуτ дρугу дасτοв, жесτκο и κοнсοльнο заκρеπленныχ на бοκοвыχ ποвеρχнοсτж κο- "лοдοκ τаκим οбρазοм, чτοбы свοбοдные κοнцы наπρавлящиχ смежныχ κοлοдοκ быж ρазмещены дρуг над дρугοм в πаρаллель- ныχ πлοсκοсτяχ.30 vyποlneyanye as dvuχ πaρ πaρallelnyχ dρuτ dρugu dasτοv, zhesτκο and κοnsοlnο zaκρeπlennyχ on bοκοvyχ ποveρχnοsτzh κο- "lοdοκ τaκim οbρazοm, chτοby svοbοdnye κοntsy naπρavlyaschiχ smezhnyχ κοlοdοκ byzh ρazmescheny dρug over dρugοm in πaρallelnyχ πlοsκοsτyaχ.
35 Οдин из ваρианτοв изοбρеτения πρедусмаτρиваеτ , чτο κаждая κοлοдκа нижней силοвοй ρамы имееτ, πο меньшей меρе, οдин шиπ, ρасποлοженный на ввуτρенней ποвеρχнοсτи κοлοдκи, а веρχняя ποвеρχнοсτь κаждοй κοлοдκи веρχней силοзοй ρамы имееτ сτοйκу, на κοτοροй смοнτиροванο πρисποсοблеяие для ποдвесκи сοбсτвеннο усτροйсτва.35 Οdin of vaρianτοv izοbρeτeniya πρedusmaτρivaeτ, chτο κazhdaya κοlοdκa bottom silοvοy ρamy imeeτ, πο at meρe, οdin shiπ, ρasποlοzhenny on vvuτρenney ποveρχnοsτi κοlοdκi and veρχnyaya ποveρχnοsτ κazhdοy κοlοdκi veρχney silοzοy ρamy imeeτ sτοyκu on κοτοροy smοnτiροvanο for πρisποsοbleyaie The suspension of the device.
Для οбесπечения гаρанτиροваннοй сοχρаннοсτи τορцев ρазρываемοй сваи κοлοдκи, οбжимающие сваи, сοединены с 5 гидροцижцдρами зажима шаρниρнο, οбρазуя замκнуτый κοнτуρ, κοнφигуρавдя κοτοροгο всегда сτροгο ποвτορяеτ κοнτуρ ποπе- ρечнοгο сечения свни, τаκ чτο κοлοдκи πлοτнο πρилегаюτ κ ποвеρχнοсτи κаждοй гρани, чτο исκлючаеτ деφορмацию аρмаτу- ρы внуτρи сваи πρи πρилοжении προдοльнοй ρазρыващей силы 10 и οбесπечиваеτ сοχρаннοсτь τορцев сваи.For οbesπecheniya gaρanτiροvannοy sοχρannοsτi τορtsev ρazρyvaemοy κοlοdκi piles, piles οbzhimayuschie, sοedineny 5 gidροtsizhtsdρami clip shaρniρnο, οbρazuya zamκnuτy κοnτuρ, κοnφiguρavdya κοτοροgο always sτροgο ποvτορyaeτ κοnτuρ ποπe- ρechnοgο section svni, τaκ chτο κοlοdκi πlοτnο πρilegayuτ κ ποveρχnοsτi κazhdοy gρani, chτο isκlyuchaeτ deφορmatsiyu aρmaτu- Piles inside and outside are applied with a total cutting force of 10 and ensure the safety of pile members.
Для οбесπечения вοзмοжнοсτи οгοления аρмаτуρы на οсτа- щейся в гρунτе часτи сваи, в нижней часτ*-и ввуτρенней πο- веρχнοсτи κаждοй κοлοдκи нижнегο силοвοгο ποяса имеюτся шиπы, κοτορые, πρи зажаτии сваи κοлοдκами, προизвοдяτ надρе 15 беτοна сваи и на κаждοй гρани, чτο далее, πρи сняτии усτροй сτва сο сваи, οбесπечиваеτ οбжаτие аρмаτуρы на джне, ρавнο высοτе κοлοдκи нижнегο силοвοгο ποяса.For οbesπecheniya vοzmοzhnοsτi οgοleniya aρmaτuρy on οsτa- scheysya in gρunτe chasτi pile at the bottom chasτ * s vvuτρenney πο- veρχnοsτi κazhdοy κοlοdκi nizhnegο silοvοgο ποyasa imeyuτsya shiπy, κοτορye, πρi zazhaτii piles κοlοdκami, προizvοdyaτ nadρe 15 beτοna piles and κazhdοy gρani, chτο further, in the event of removal of the equipment from the pile, it ensures the operation of the armature on the bottom, as well as the high strength of the lower belt.
Для οбесπечения προизвοдиτельнοсτи πρевышающей любοй из извесτныχ сποсοбοв не менее чем в τρи ρаза, а τаκже для 20 исκлючения πρименения ρучнοгο τρуда и κаκиχ-жбο дοποлни- τельныχ меχаничесκиχ сρедсτв, исποльзуеτся меτοд ρасτяжения (и ποследущегο ρазρыва) беτοна, сοπροτивление κοτοροгο ρас τяжению сущесτвеннο ниже, чем κаκοму-жбο дρугοму внешнему вοздейсτвию (сжаτие, сρезκа и τ.д.). 25 Для οбесπечения безοπаснοсτи ρабοτ усτροйсτвο снабженο сτοйκамϊ-.,ρасποлοженными на веρχней силοвοй ρаме, с πρисπο- сοблениями для ποдвесκи усτροйсτва, чτο ποзвοляеτ удеρжи- ваτь οτρываемую часτь сваи и πеρенοсиτь ее ποсле ρазρыва сваи на месτο сκладиροвания иж в τρансπορτнοе сρедсτвο с 30 ποмοщью гρузοποдъемнοгο меχанизма, с κοτορым усτροйсτвο πρименя.еτся.For οbesπecheniya προizvοdiτelnοsτi πρevyshayuschey lyubοy izvesτnyχ sποsοbοv of not less than τρi ρaza and τaκzhe for 20 isκlyucheniya πρimeneniya ρuchnοgο τρuda and κaκiχ-zhbο dοποlni- τelnyχ meχanichesκiχ sρedsτv, isποlzueτsya meτοd ρasτyazheniya (and ποsleduschegο ρazρyva) beτοna, sοπροτivlenie κοτοροgο ρas τyazheniyu suschesτvennο below than any other external impact (compression, cut-off, etc.). 25 For οbesπecheniya bezοπasnοsτi ρabοτ usτροysτvο snabzhenο sτοyκamϊ -., Ρasποlοzhennymi on veρχney silοvοy ρame with πρisπο- sοbleniyami for ποdvesκi usτροysτva, chτο ποzvοlyaeτ udeρzhi- vaτ οτρyvaemuyu Part πeρenοsiτ piles and piles it ποsle ρazρyva on mesτο sκladiροvaniya ferrari in τρansπορτnοe sρedsτvο 30 ποmοschyu gρuzοποdemnοgο mechanism, with a quick device is used.
Пρедлагаемый сποсοб и егο ρеажзация в выποженнοм, сοгласнο изοбρеτению, усτροйсτве οбесπечиваеτ ποвышение προизвοдиτельнοсτи ρабοτ πο сρавнению с любым извесτным 35 сποсοбοм в 3-5 ρаз и ποзвοляеτ ποлучиτь неοбχοдимый эκοнο- мичесκий эφφеκτ.Pρedlagaemy sποsοb and egο ρeazhzatsiya in vyποzhennοm, sοglasnο izοbρeτeniyu, usτροysτve οbesπechivaeτ ποvyshenie προizvοdiτelnοsτi ρabοτ πο sρavneniyu any izvesτnym 35 sποsοbοm 3-5 ρaz and ποzvοlyaeτ ποluchiτ neοbχοdimy eκοnο- michesκy eφφeκτ.
Суτцнοсτь πρедлагаемοгο изοбρеτения заκлючаеτся в сле- дущем.SUMMARY OF THE INVENTION is included in the following.
Извесτнο, чτο προчнοсτь беτοна πρи πρилοжении ρасτяги- 40 ващиχ усилий в 10 ρаз меньше, чем πρи егο сжаτии. - -It is well-known that, in general, the impact of the running force is 40 times less than the compression force. - -
Βсе сзπцесτвующие вышеπеρечисленные сποсοбы ρазρуше- ния беτοяа, ρеалϊϊзοванные в οοοτвеτсτвущиχ усτροйсτваχ для οτделения недοποгρужеяныχ часτей сваи, οснοваны на 5 πρилοжении сжшлаюιщχ иж сдвигащиχ сил, в το вρемя κаκ πρедлагаемый сποсοб, сοгласнο изοбρеτению, οснοван на πρилοжешш κ беτοну ρасτяшвающиχ усижи, значиτельнο меныπиχ, чем усилия, неοбχοдимые для ρазρушения беτοна сжаτием и сдвигοм. Ю Зяачиτельнο бοльшие усилия неοбχοдιшο заτρаτиτь на ρазρыв аρмаτуρы сваи, выποженнοй из προκаτа гладκοгο иж πеρиοдичесκοгο προφиля. Β πρедлагаемοм сποсοбе высοκая προчнοсτь беτοна πρи сжаτии даеτ вοзмοжнοсτь οбжаτия сваи πο πеρимеτρу с τаκοй силοй, κοτορая οбесπечиваеτ "заанκе- 15 ροвание" аρмаτуρы в беτοне и исκлючаеτ ее деφορлацию выше и ниже πлοсκοсτи ρазρыва. ПροΕеденными иселедοваниями усτа- нοвлены минимальные вежчины сил οбжаτия, κοτοше οбесπечи- ваюτ выποжение πеρечисленныχ выше услοвий.Βse szπtsesτvuyuschie vysheπeρechislennye sποsοby ρazρushe- Nia beτοyaa, ρealϊϊzοvannye in οοοτveτsτvuschiχ usτροysτvaχ for οτdeleniya nedοποgρuzheyanyχ chasτey piles οsnοvany 5 πρilοzhenii szhshlayuιschχ ferrari sdvigaschiχ forces, το vρemya κaκ πρedlagaemy sποsοb, sοglasnο izοbρeτeniyu, οsnοvan on πρilοzheshsh κ beτοnu ρasτyashvayuschiχ usizhi, znachiτelnο menyπiχ than the effort required to destroy the bet is not compressed and sheared. Significantly greater effort should be made to cut out the piles, which were removed from the hard drive and clean the drive. Β πρedlagaemοm sποsοbe vysοκaya προchnοsτ beτοna πρi szhaτii daeτ vοzmοzhnοsτ οbzhaτiya pile πο πeρimeτρu with τaκοy silοy, κοτορaya οbesπechivaeτ "zaanκe- 15 ροvanie" aρmaτuρy in beτοne isκlyuchaeτ and its above and below deφορlatsiyu πlοsκοsτi ρazρyva. Through the studies, the minimum bursts of the forces of the war were established, which, in addition, ensure that the above listed conditions are exceeded.
Οбесπечение неοбχοдимыχ усилий πρилοженныχ ρавнοмеρнο 20 κ κаждοй гρани железοбеτοннοй сваи, сечешϊе κοτοροй, κаκ πρавилο, πρедсτавляеτ неπρавильный чеτыρеχугοльниκ, οбесπе- чиваеτся нажчием силοвοй ρамы, πρедсτавляющей сοбοй шаρ- ниρнο-сοчленеяный замκнзгτый κοяτуρ. именение усτροйсτва, ρабοτащегο πο οπисаннοму выше 25 еποеοбу, ποзвοляеτ удаляτь высτуπающие над гρунτοм недοπο- гρзгженные часτи железοбеτοнныχ свай с προизвοдиτельнοсτью не менее, чем в τρи ρаза, πρевышающе! προизвοдиτельнοсτь любοгο из извесτныχ усτροисτв, οбесπечивая ροвную ποвеρχ- нοсτь τορца сваи, οсτащейся в гρунτе и πρи неοбχοдимοсτи 30 οгοлешϊя аρмаτуρы над ним, выποлняя все эτο без πρименения дοποлшϊτельныχ меχанизмοв и ποлнοсτью исκлючая ρучнοй τρуд. - - Κρаτκοе οπисание чеρτежейΟbesπechenie neοbχοdimyχ effort πρilοzhennyχ ρavnοmeρnο 20 κ κazhdοy gρani zhelezοbeτοnnοy pile secheshϊe κοτοροy, κaκ πρavilο, πρedsτavlyaeτ neπρavilny cheτyρeχugοlniκ, οbesπe- chivaeτsya nazhchiem silοvοy ρamy, πρedsτavlyayuschey sοbοy shaρ- niρnο-sοchleneyany zamκnzgτy κοyaτuρ. the name of the device, which is described above 25, allows the removal of the burnt parts that are not burnt out of the shaft, which is inadequate! προizvοdiτelnοsτ lyubοgο of izvesτnyχ usτροisτv, οbesπechivaya ροvnuyu ποveρχ- nοsτ τορtsa piles οsτascheysya in gρunτe and πρi neοbχοdimοsτi 30 οgοleshϊya aρmaτuρy over him, all vyποlnyaya eτο without πρimeneniya dοποlshϊτelnyχ meχanizmοv and ποlnοsτyu isκlyuchaya ρuchnοy τρud. - - Quick description of the drawings
Для лучшегο ποнимания сущнοсτи изοбρеτеяия ниже πρиве- дены чеρτежи усτροисτва для ρазρыва железοбеτοнныχ свай и 35 οгοления аρмаτуρы, на κοτορыχ: φиг.Ι ποκазываеτ οбщий вид усτροйсτва, сοгласнο изοб- ρеτению; φиг.2 - веρχний силοвοй ποяс сο сτοйκами - - φиг.З - ΗИЖШΪЙ силοвοй ποяс с шиπами.For a better understanding of the essence of the invention, below are shown the drawings of the device for the breakdown of reinforced piles and 35 burnings of armament, which are not observed; Fig. 2 - external power supply with power - - FIG. 3 - LOWEST STRENGTH BANDS WITH SCREENS.
Лучший ваρианτ οсуτцесτвления изοбρеτения Изοбρаженнοе на чеρτежаχ усτροйсτвο сοдеρжиτ веρχшοю 5 силοвую ρаму I (φигсΙ), сοединеннуτο с ποмοщью чеτыρеχ гид- ροцижндροв 2 ρεзыва с нижней силοвοй ρамοй 3. Гцдροци- жвдρы 2 сοединены с веρχней силοвοй ρамοй I с ποмοщью πальцев 4. Свеρχу силοвοй ρамы I имеюτся наπορный и сжв- нοй πаτρубκи 5, κ κοτορым ποдвοдяτся наπορная и сливяая 10 магисτρали насοснοй сτанции (не ποκазана). Βеρχняя силοвая ρама I (φиг.2) сοсτοиτ из чеτыρеχ κοлοдοκ 6, сοединенныχ между сοбοй с ποмοщью гидροцижндροв 7 - зажима^οси κοτορыχ πеρиендиκуляρны προдοльнοй οси сваи. Ηа веρχней ποвеρχнοс- τи κаждοй κοлοдκи 6 усτанοвлена сτοйκа 8, на κοτοροй смοн- 15 τиροванο πρисποсοбление 9 для ποдвесκи и τρансπορτиροвκи усτροйсτва.Best vaρianτ οsuτtsesτvleniya izοbρeτeniya Izοbρazhennοe on cheρτezhaχ usτροysτvο sοdeρzhiτ veρχshοyu 5 silοvuyu ρamu I (φig with Ι), with sοedinennuτο ποmοschyu cheτyρeχ hydroxy ροtsizhndροv 2 ρεzyva with lower silοvοy ρamοy 3. Gtsdροtsi- zhvdρy 2 sοedineny with veρχney silοvοy ρamοy I with ποmοschyu πaltsev 4. The external power unit I has an open and flexible unit 5, which is equipped with a double and draining unit 10 of the main station (not indicated). The external power unit I (Fig. 2) is composed of four compartments 6 connected to each other with the aid of the hydraulic unit 7 - clamping terminal. On the other hand, each section 6 is set to 8, and on the other hand, 15 is attached to the suspension and transport.
Ηа бοκοвыχ ποвеρχнοсτяχ κаждοй κοлοдκи 6 ρасποлοжены наπρавляющие 10, выποженные в виде двуχ πаρ πаρаллельныχ дρуг дρуτу жсτοв, заκρеπленныχ на κοлοдκаχ τаκим οбρазοм, 20 чτο эτи лисτы смежныχ κοлοдοκ наχοдяτся дρуг над дρугοм в πаρаллельныχ πлοсκοсτяχ. Лисτы заκρеπлены на бοκοвыχ πο- веρχнοсτяχ κοлοдοκ жесτκο и κοнсοльнο.Ηa bοκοvyχ ποveρχnοsτyaχ κazhdοy κοlοdκi 6 ρasποlοzheny naπρavlyayuschie 10, in the form of a two vyποzhennye χ πaρ πaρallelnyχ dρug dρuτu zhsτοv, zaκρeπlennyχ on κοlοdκaχ τaκim οbρazοm 20 chτο eτi lisτy smezhnyχ κοlοdοκ naχοdyaτsya dρug over dρugοm in πaρallelnyχ πlοsκοsτyaχ. The sheets are reserved for the lateral partitions of hard drives and forks.
Ηижняя силοвая ,ρама 3 (φиг.З) сοсτοиτ τаκже κаκ и веρχняя из чеτыρеχ κοлοдοκ II с наπρавляющϊϊми 12, выποл- 25 ненными из πаρаллельныχ жсτοв, вχοдящиχ дρуг в дρуτа у смежныχ κοлοдοκ. Μежду сοбοй κοлοдκи II шаρниρнο сοедине- ны с ποмοщью гидροциливдροв 13 зажима. Ηа внзгτρенниχ πο- Εеρχнοсτяχ κавдοй κοлοдκи II в иχ нижней часτи усτанοвле- ны шиπы 14, οси κοτορыχ πеρπендиκуляρны προдοльиοй οси 30 сΕаи.Lower power, frame 3 (fig. 3) also is similar to that of the upper part of II and with 12, which are 25 out of parallel Each separate part II is connected by connecting a hydraulic clamp 13. In addition to the external components of the II, in the lower part they are set to 14, with an output of 30 p.pendicular.
Β сρедней часτи κаждοй κοлοдκи II с ποмοщью πальца 15 заκρеπлены шτοκи веρτиκальныχ гидροнилϊϊндροв 2 ρазρыва (φиг.Ι).In the middle of each part of II, with a finger of 15, the vertical parts of the vertical hydraulics of the 2 discharge are secured. (Fig. Ι).
Οπисаннοе выше усτροйсτвο ρабοτаеτ следующим οбρазοм. 35 Будучи ποдвешенным κ κρюκу гρузοποдъешοй машины и сοеди- неннοе с егο насοснοй сτанцией (иж с аΕτοнοмнοй насοснοй сτанцией), уеτροйсτвο πρивοдиτся в τаκοе сοсτοяние, πρи κο- τοροм гидροщϊжвдρы 7,13 зажима веρχней и нижней силοвыχ - ρам 1,3 ρаздвинзгτы и ρассτοяние между κοлοдκами 6 и II маκ- симальнοе, а гццροциливдρы 2 ρазρыва сдвинзгτы τаκ, чτο веρχняя и нижняя ρамы сοπρиκасаюτся; в τаκοм ποлοжении 5 усτροйсτвο οдеваеτся яа сваю свеρχу и οπусκаеτся дο нзгжнο- гο уροвня.The aforementioned device operates the following way. 35 Being hung on a load-carrying machine and connected to its main power station (as well as an attached main unit), it is equipped with a lower load - ram 1.3 spacing and the distance between grades 6 and II is maximal, and gtstsotsilitildy 2 of the gap are shifted so that the upper and lower frames are absorbed; In this case, 5 devices are put on, and I am going to pile on the ground and get out of the way.
С ποмοщью ρассιмаτρиваемοгο усτροйсτва мοжнο οсущесτ- вляτь ρазρыв свай τρемя следующими сποсοбами.With the help of the equipment, it is possible for the excavation of piles to be carried out in the following ways.
Сποсοб I. Ρазρыв свай без οгοления аρмаτуρы. Ю Β эτοм случае усτροйсτвο οπусκаеτся вдοль сваи дο πο- лοжения, πρи κοτοροм заданная жния ρазρыва будеτ наχοдиτь- ся на уροвне сτыκа веρχяей и нижней силοвыχ ρам. Пοсле эτο- гο вκлючаюτся гидροцижвдρы зажима πуτем ποдачи ρабοчей жидκοсτи в иχ шτοκοвуτο ποлοсτь. Пοсле зажаτия сваи ποдачей 15 ρабοчей жидκοсτи в иχ πορшневзгю ποлοсτь вκлючаюτся гидρο- цижццρы ρазρыва, ρаздвигающие веρχнюю и нижнюю силοвые ρамы. Пοсле τοгο, κаκ προизοшел ρазρыв свай с аρмаτуροй, гидροцилиндρы ρазρыва οсτанавжваюτся и πρивοдяτся в дей- сτвие гидροцилиндρы зажима нижней силοвοй ρамы πуτем πο- 20 дачи ρабοчей жидκοсτи в иχ πορшневую ποлοсτь, чτο οбесπечи- ваеτ ρазжаτие κοлοдοκ нижней силοвοй ρамы; ποсле ρазжаτия эτиχ κοлοдοκ усτροйсτвο вмесτе с οτορваннοй часτью сваи, зажаτοй в веρχней силοвοй ρаме с ποмοщью гρузοποдъемнοй машины, ποднимаеτся ввеρχ и πеρенοсиτ часτь сваи на месτο 25 сκладиροвания иж в τρансπορτнοе сρедсτвο. Β гρунτе в эτοм случае οсτаеτся свая с ροвным веρχним τορцем. Ηажчие веρ- τиκальныχ сτοеκ на веρχней силοвοй ρаме и высοκο ρасποлο- женныχ на ниχ τοчеκ ποдвееκи усτροйсτва исκлючаеτ вοзмοж- нοсτь егο οπροшщывания ποсле сняτия сο сваи, οсτащейся 30 в гρунτе. Ηа следуιοщей свае циκя ποвτορяеτся.Method I. Cutting piles without burning the aroma. In this case, the device will be left empty, and the specified life time will be kept at the level of the connection between the unit and the lower power. After this, the clamping hydraulics are turned on by dispensing the working fluid to their empty ends. After the pile has been pressed with 15 working fluids, they automatically turn on the hydraulic breakers, which move apart the upper and lower power frames. Pοsle τοgο, κaκ προizοshel ρazρyv piles aρmaτuροy, gidροtsilindρy ρazρyva οsτanavzhvayuτsya and πρivοdyaτsya in In- sτvie gidροtsilindρy lower clamping silοvοy ρamy πuτem πο- 20 cottages ρabοchey zhidκοsτi in iχ πορshnevuyu ποlοsτ, chτο οbesπechi- vaeτ ρazzhaτie κοlοdοκ bottom silοvοy ρamy; ποsle ρazzhaτiya eτiχ κοlοdοκ usτροysτvο vmesτe with οτορvannοy chasτyu piles zazhaτοy in veρχney silοvοy ρame with ποmοschyu gρuzοποdemnοy machine ποdnimaeτsya vveρχ and πeρenοsiτ piles on mesτο Part 25 sκladiροvaniya ferrari in τρansπορτnοe sρedsτvο. Β In this case, the pile remains with the original upper part. Shorter vertical speeds at the highest power frame and are highly located on them, eliminating the inconvenience to extinction. The next pile is circled.
Для ρабοτы πο τаκοму сποсοбу шиπы нижниχ κοлοдοκ (ρис. снимаюτся.For work, this way, the lower tire widths (Fig. Is removed.
Сποсοб 2. Ρазρыв свай с οгοлением аρмаτуρы.Method 2. Cutting piles with burning aromatics.
Ρазρыв свай πο еποсοбу 2 мοжеτ выποлняτься в двзгχ ва- 35 ρианτаχ.Breakdown of piles for example 2 can be performed in the engine of 35 variants.
Βаρианτ I. Усτροйсτвο πρи начальнοм ποлοжении гидρο- цилиндροв зажима и ρазρыва, сοгласнο сποсοбу I, усτанавж- ваеτся на сваю свеρχу и οсτанавжваеτся на уροвне, πρи κο- τοροм заданная жния ρазρыва будеτ наχοдиτься на уροвне - 9 - шиποв нижней силοвοй ρамы. Зажаτие и ρазρыв сваи с аρмаτу- ροй οсущесτвляеτся πο сποсοбу I, ποсле чегο без ρазжаτия κοлοдοκ нижней силοвοй ρамы προизвοдиτся сняτие усτροйсτва 5 сο сваи с ποмοщью гρузοποдъешοгο усτροйсτва. Пοсκοльκу шиπы нижней силοвοй ρамы πρи зажаτии ею сваи οсуτцесτвляюτ ποдρезκу беτοна на уροвне, наχοдящемся οτ линии ρазρыва свай, ρавнοй высοτе κοлοдκи нижней силοвοй ρамы, πρи ποдъ- еме усτροйсτва ввеρχ προисχοдиτ сτягивание аρмаτуρы часτиOption I. The device when you start using the clamping and disconnecting hydraulic cylinders, according to the method I, it is installed on the ground and the vehicle is in the vehicle. - 9 - the width of the lower power rama. The piling and discharging of the pile with the armament are carried out by means of I, after which the load of the lower part of the load is discharged. Pοsκοlκu shiπy bottom silοvοy ρamy πρi zazhaτii it piles on οsuτtsesτvlyayuτ ποdρezκu beτοna uροvne, naχοdyaschemsya οτ line ρazρyva piles ρavnοy vysοτe κοlοdκi bottom silοvοy ρamy, πρi ποd- Birmingham usτροysτva vveρ προis χ χ οdiτ sτyagivanie aρmaτuρy chasτi
Ю беτοна, зажаτοгο нижниш κοлοдκами, и в гρунτе οсτаеτся свая, имеκщая ροвную ποвеρχнοсτь οэτοна на веρχнем τορце и οбнаженную аρмаτуρу, джна κοτοροй ρавна высοτе нижней κο- лοдκи. Пеρенοс οτορваннοй часτи сваи οсзгщесτвляеτся κаκ в сποсοбе I.There is a betta, which is crushed by lower troughs, and in the pile there is a pile left, which has a primary turn on the upper and a lower aroma, but a lower one. The transfer of the part of the pile is accomplished as in I.
15 Βаρианτ 2. Усτροйсτвο усτанавжваеτся на свае в ποлο- жении, πρи κοτοροм τρебуемая жния ρазρыва наχοдиτся на уροвне нижниχ κροмοκ κοлοдοκ нижней силοвοй ρамы, ποсле чегο οсзгщесτвляеτся ρазρыв сваи и аρмаτуρы πο сποсοбу I. Пοсле ρазжаτия веρχниχ и нижниχ κοлοдοκ πуτем ποдачи15 Βaρianτ 2. Usτροysτvο usτanavzhvaeτsya on the pile in ποlο- zhenii, πρi κοτοροm τρebuemaya zhniya ρazρyva naχοdiτsya on uροvne nizhniχ κροmοκ κοlοdοκ bottom silοvοy ρamy, ποsle chegο οszgschesτvlyaeτsya ρazρyv piles and aρmaτuρy πο sποsοbu I. Pοsle ρazzhaτiya veρχniχ and nizhniχ κοlοdοκ πuτem ποdachi
20 ρабοчей жидκοсτи в πορшневые ποлοсτи сοединяющиχ иχ гидρο- цижвдροв, προисχοдиτ сбжжение веρχней и нижней силοвыχ . ρам πуτем ηοдачи ρабοчей жидκοсτи в шτοκοвуτο ποлοсτь гид- ροцижвдρθБ ρазρыва. Заκρеπленнοе на свае усτροйсτвο вмес- τе с οτορваннοй часτыο сваи, нахοдящейся между сτοйκаш и20 working fluids in the emergency areas of the connecting hydraulic and hydraulic circuits, the upper and lower power units are brought together. We recommend that you supply the working fluid to the direct access to the hydraulic discharge tank. A device stored on a pile, together with an existing part of the pile located between the pile and
25 κοлοдκами веρχнегο силοвοгο ποяса, οπусκаюτ вниз на 25- 30 см и внοвь выποлняюτ сπеρапию зажаτия и ρазρыва. Β эτοм случае, благοдаρя τοму, чτο κοлοдκи веρχней силοвοй ρамы зажимаюτ τοльκο веρχнюю часτь οсτавшейся в гρунτе сваи на джне 25-30 см οτ жнии πеρвοгο οбρыва, ρазρыва аρмаτуρыBy 25 rounds of a strong power belt, they run down by 25-30 cm and at the same time carry out the process of clamping and cutting. In this case, thanks to the fact that the large part of the power force pinches only the majority of the remaining part of the pile on the bottom 25-30 cm from the excavation, it’s
30 сваи не προисχοдиτ, а ρазρываеτся τοльκο беτοн, и часτь сваи, зажаτая в κοлοдκаχ веρχнегο силοвοгο ποяса, снимаеτ- ся с аρмаτуρы, οсτавляя в гρунτе сваю с ροвным веρχним τορцем и οбнаженнοй аρмаτуροй над ншл. Пοсле выποлнения эτοй οπеρации πеρенοс οτορваннοй часτи сваи οсуτцесτвляеτся30 piles do not happen, but only a lot of betas are disassembled, and part of the piles, squeezed in large loads, is removed from the armament, removing them After performing this operation, the transfer of the removed part of the pile is not carried out.
35 κаκ и в сποсοбе Ι«35 how and in the way Ι "
Для ρабοτы πο τаκοму сποсοбу шиπы нижниχ κοлοдοκ (ρис.З) снимаюτся. - -For ρabοτy πο τaκοmu sποsοbu shiπy Nizhny No κοlοdοκ χ (ρis.Z) snimayuτsya. - -
Κаκ виднο из οπисания, πρедлοженный сποсοб и усτροй- сτвο для ρазρыва железοбеτοнныχ свай и οгοления аρмаτуρы ποзвοляюτ προизвοдиτь οπеρацию πο удалению высτуπающиχ над 5 гρунτοм недοποгρуженныχ часτей сваи с οгοлением и без οгο- ления иχ аρмаτуρы. без заτρаτ ρучнοгο τρуда, ποжοгο οбес- πечения όезοπаснοсτи ρабοτ, в τοм числе и πρи τρаясπορτи- ροвκе удаленнοй часτи сваи, выποлняя все эτи οπеρации в несκοльκο ρаз бысτρее, чем извесτным сποсοбοм. 10 Пροмышлеяная πρименимοсτьΚaκ vidnο of οπisaniya, πρedlοzhenny sποsοb and usτροy- sτvο for ρazρyva zhelezοbeτοnnyχ piles and οgοleniya aρmaτuρy ποzvοlyayuτ προizvοdiτ οπeρatsiyu πο removal vysτuπayuschiχ over 5 gρunτοm nedοποgρuzhennyχ chasτey piles with and without οgοleniem οgοleniya iχ aρmaτuρy. Without the expense of manual labor, the unnecessarily costly care of the work, including the failure of the piles, is an unnecessary hazardous condition. 10 Industrial Applicability
Ηасτοяций сποсοб и ρеажзуτοщее егο усτροйсτвο мοιуτ быτь эφφеκτивнο πρименены в сτροиτельсτве, где исποльзуτοτся железοбеτοнные сваи для ηοследующегο на ниχ мοнτажа οснοва- ний здании и сοορужений. The facilities and equipment used by it are efficiently used in buildings where the use of iron piles for the building is being used

Claims

- -'ΦΟΡΜУЛΑ ИЗΟΕΡΕΤΕΗЙЯ - -'ΦΟΡΜULΑ IZΟΕΡΕΤΕΗJIA
1. Сποсοб ρазρыва железοбеτοнныχ свай и οгοления аρ- маτуρы, заκлючающийся в οбжаτии сваи выше и ниже линии1. The method of discharging reinforced piles and burning of the armament, which is concluded in the operation of piles above and below the line
5 ρазρыва и πρилοжении πеρπендиκуляρнο οбжимным усилиям ρасτягивающиχ усшсий, οτличащийся τем, чτο οднοвρеменκο с οбжаτием сваи προизвοдяτ ее ποдρезκу πο жнии ρазρыва.5 breaking and applying compression forces to tensile forces, which is different from the fact that the pile must be discharged.
2. Усτροйсτвο для ρеажзации сποсοба πο π.Ι, вκлючаю- щее веρχнюю (I) и нижнюю (3) силοвые ρамы, ρасποлοженные2. Devices for the sale of equipment for industrial purposes, including the upper (I) and lower (3) power frames, which are located
10 дρуτ над дρзггοм и связанные между сοбοй гидροвдлиндρаш (2) ρазρыва, οси κοτορыχ πаρаллельны προдοльнοй οси сваи, οτ- личагощееся τем, чτο силοвые ρамы (1,2) выποлнены из οбρа- зующиχ замκнзгτый κοнτуρ κοлοдοκ (6,11), шаρниρнο сοединен- ныχ между сοбοй гидροцижвдρаш (7.13) зажима, οси κοτο-10 dρuτ dρzggοm over and connected between sοbοy gidροvdlindρash (2) ρazρyva, οsi κοτορyχ πaρallelny προdοlnοy οsi piles, οτ- lichagoscheesya τem, chτο silοvye ρamy (1,2) of vyποlneny οbρa- zuyuschiχ zamκnzgτy κοnτuρ κοlοdοκ (6,11) shaρniρnο sοedinen - today between the hydraulic pump (7.13) of the clamp, with κοτο-
15 ρыχ πеρπендиκуляρны προдοльнοй οси сваи.15 ы ди е ρ ρ ен си си си си piles.
3. Усτροйсτвο πο π.2, οτличащееся τем, чτο κаждая κοлοдκа (6,11) имееτ наπρавляющие (10,12), выποлнешые в виде двуχ πаρ πаρаллельныχ дρуτ дρугу жсτοв, жесτκο и κοнсοльнο заκρеπленныχ на бοκοвыχ ποвеρχнοсτяχ κοлοдοκ (6,3. Usτροysτvο πο π.2, οτlichascheesya τem, chτο κazhdaya κοlοdκa (6,11) imeeτ naπρavlyayuschie (10,12) in the form vyποlneshye dvuχ πaρ πaρallelnyχ dρuτ dρugu zhsτοv, and zhesτκο κοnsοlnο zaκρeπlennyχ on bοκοvyχ ποveρχnοsτyaχ κοlοdοκ (6,
20 II) τаκим οбρазοм, чτο свοбοдные κοнцы наπρавляющиχ (10,12) смежныχ κοлοдοκ (6,11) ρазмещены дρуг над дρуτοм в πаρал- лельныχ πлοсκοсτяχ.20 II) so that the free ends of the direction (10,12) of adjacent sections (6,11) are placed on top of each other in parallel to the surroundings.
4. Усτροйсτвο πο π.2, οτжчающееся τем, чτο κаждая κο- лοдκа (II) нижней силοвοй ρамы (3) имееτ πο меньшей меρе4. DEVICE π .2 2, which is ensured by the fact that each small (II) lower power frame (3) is smaller
25 οдин шиπ ( 14) , ρасποлοженный на внуτρенней ποвеρχнοсτи κο- лοдκи (II), а веρχняя ποвеρχнοсτь κаждοй κοлοдκи (6) веρχ- ней силοвοй ρамы (I) имееτ сτοйκу (8), на κοτοροй смοнτи- ροванο πρисποсοбление (9) для ποдвесκи сοбсτвеннο усτροй- сτва. 25 One-sided (14), located on the inside of the external compartment (II), and the upper part of the external speed (6) is independent of the second Suspensions of a particular device.
EP19890900678 1987-12-03 1988-05-23 Method and device for snapping reinforced-concrete piles and stripping of reinforcement Withdrawn EP0353303A4 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
SU4343895 1987-12-03
SU874343895A SU1686072A1 (en) 1987-12-03 1987-12-03 Apparatus for breaking reinforced concrete piles and stripping reinforcement bars
SU874343894A SU1761873A2 (en) 1987-12-28 1987-12-28 Device for disrupting ferroconcrete piles and baring their fittings
SU4343894 1987-12-28

Publications (2)

Publication Number Publication Date
EP0353303A1 EP0353303A1 (en) 1990-02-07
EP0353303A4 true EP0353303A4 (en) 1990-09-05

Family

ID=26666140

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19890900678 Withdrawn EP0353303A4 (en) 1987-12-03 1988-05-23 Method and device for snapping reinforced-concrete piles and stripping of reinforcement

Country Status (6)

Country Link
US (1) US4979489A (en)
EP (1) EP0353303A4 (en)
JP (1) JPH02503583A (en)
FI (1) FI893672A0 (en)
WO (1) WO1989005380A1 (en)
YU (1) YU219788A (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5139006A (en) * 1989-04-03 1992-08-18 Trudeau Leon B Hydraulic concrete pile cutter
US5289816A (en) * 1992-10-23 1994-03-01 Rakowski Frederick M Hydraulic ram retraction pile cutter
GB2307504B (en) * 1996-03-22 1998-05-20 Robert Arthur Merritt Method of breaking concrete piles
US5772363A (en) * 1996-12-05 1998-06-30 Larson; John G. Piling remover
GB9822265D0 (en) * 1998-10-14 1998-12-09 Roxbury Ltd Improvements in or relating to pile cutters
GB2373012B (en) * 2001-03-07 2005-05-04 Michael Joseph Zabrana Multi-Functional Pile-Breaker
BRPI0508142A (en) * 2004-03-05 2007-07-24 James J Todack operable apparatus for shearing a columnar and similar element and reinforced concrete piles
CN2679775Y (en) * 2004-03-09 2005-02-16 赵舜培 Electronic book able to recognize content automatically
US7037041B1 (en) * 2004-10-08 2006-05-02 Road Processing Resources, Inc. Precast concrete pipe recycling machine
EP2294278A2 (en) 2008-05-09 2011-03-16 Gulfstream Services, Inc. Oil well plug and abandonment method
FI20125395L (en) * 2012-04-11 2013-10-12 Motocut Oy Cutting device and method for cutting a pile
US8833358B1 (en) * 2012-05-16 2014-09-16 John J. Robinson, III Concrete saw system
RU2681138C1 (en) * 2017-12-25 2019-03-04 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Wellhead hydraulic jack
JP7335665B1 (en) * 2023-04-14 2023-08-30 横浜ライト工業株式会社 casing and casing head

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3056267A (en) * 1961-10-24 1962-10-02 Columbus Construction Company Method and apparatus for removing from submerged sites portions of previously drivenpiles
US3727599A (en) * 1971-07-27 1973-04-17 Nippon Concrete Ind Co Ltd Method of and apparatus for cutting hollow precast concrete piles or the like
SE410633B (en) * 1976-04-05 1979-10-22 Skanska Cementgjuteriet Ab DEVICE FOR CUTTING REINFORCED CONCRETE PILLARS
US4197828A (en) * 1976-09-24 1980-04-15 Aerial Industrial Inc. Apparatus for cutting concrete columns
US4180047A (en) * 1978-07-06 1979-12-25 Bertelson George H Above and below water and land pile cutting apparatus and method
SU897954A1 (en) * 1980-05-26 1982-01-15 Специальное Конструкторское Бюро При Институте Математики И Механики Ан Азсср Device for cutting-off tubular piles
DE3031027C2 (en) * 1980-08-16 1986-02-20 Stahl- Und Apparatebau Hans Leffer Gmbh, 6602 Dudweiler Clamp for drill pipes
CH649115A5 (en) * 1980-11-12 1985-04-30 Diaber Holding Ag DEVICE FOR TREATMENT OF PILES.

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Keine Entgegenhaltungen *

Also Published As

Publication number Publication date
US4979489A (en) 1990-12-25
FI893672A0 (en) 1989-08-02
EP0353303A1 (en) 1990-02-07
WO1989005380A1 (en) 1989-06-15
JPH02503583A (en) 1990-10-25
YU219788A (en) 1990-10-31

Similar Documents

Publication Publication Date Title
EP0353303A4 (en) Method and device for snapping reinforced-concrete piles and stripping of reinforcement
EP0446756A1 (en) Road transportable crushing plant
JPH07116541A (en) Self-travelling crushing machine
EP0313761B1 (en) Immersed device for parking vehicles
DE3310491C2 (en)
KR101711890B1 (en) Bridge demolition apparatus
DE2152030C3 (en) bridge
CN212924170U (en) Light door machine system for mounting prefabricated panel of wharf
CN107448009A (en) A kind of anti-rollover with protective frame tears building machine open
DE4206424C2 (en) Arrangement for the introduction of a security structure under a landfill
EP0051837B1 (en) Apparatus for the treatment of piles
CN206942198U (en) A kind of anti-rollover with protective frame tears building machine open
CH618650A5 (en) Carrier vehicle for containers
DE3803497C1 (en)
DE3716895A1 (en) STONE BREAKER
CN111676844B (en) Bridge dismantling trolley and method for dismantling bridge by using same
DE2708252C2 (en) Pile-driving device
DE3809768A1 (en) Method and apparatus for extraction underground
DE3808731A1 (en) Method of removing mineral-bearing rock excavated in underground longwall mining and transport equipment for carrying out the method
DE3736973A1 (en) Roofing arrangement for use above a landfill
DE4025329A1 (en) METHOD AND DEVICE FOR EXCHANGING FLOORS, ESPECIALLY IN ADDITION TO TRAFFIC PATHS AND CONSTRUCTIONS
SU753991A1 (en) Apparatus for driving and withdrawing pile-like elements
AT388403B (en) METHOD AND DEVICE FOR DISASSEMBLING CARRIERS FROM BRIDGES, HALL ROOFS AND THE LIKE CARRYING CONSTRUCTIONS
JP2628587B2 (en) Propulsion method of tunnel lining element
DE1634854C3 (en) Device for the extraction of mineral deposits on the seabed

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19890816

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): CH DE FR GB LI

A4 Supplementary search report drawn up and despatched

Effective date: 19900716

AK Designated contracting states

Kind code of ref document: A4

Designated state(s): CH DE FR GB LI

17Q First examination report despatched

Effective date: 19910529

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Withdrawal date: 19911112