EP0345650B1 - Anchor hole drilling rig - Google Patents

Anchor hole drilling rig Download PDF

Info

Publication number
EP0345650B1
EP0345650B1 EP89109963A EP89109963A EP0345650B1 EP 0345650 B1 EP0345650 B1 EP 0345650B1 EP 89109963 A EP89109963 A EP 89109963A EP 89109963 A EP89109963 A EP 89109963A EP 0345650 B1 EP0345650 B1 EP 0345650B1
Authority
EP
European Patent Office
Prior art keywords
drilling
mount
support
drill
carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP89109963A
Other languages
German (de)
French (fr)
Other versions
EP0345650A2 (en
EP0345650A3 (en
Inventor
Johann Haberer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bauer Spezialtiefbau GmbH
Original Assignee
Bauer Spezialtiefbau GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bauer Spezialtiefbau GmbH filed Critical Bauer Spezialtiefbau GmbH
Priority to AT89109963T priority Critical patent/ATE79153T1/en
Publication of EP0345650A2 publication Critical patent/EP0345650A2/en
Publication of EP0345650A3 publication Critical patent/EP0345650A3/en
Application granted granted Critical
Publication of EP0345650B1 publication Critical patent/EP0345650B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C29/00Propulsion of machines for slitting or completely freeing the mineral from the seam
    • E21C29/22Propulsion of machines for slitting or completely freeing the mineral from the seam by wheels, endless tracks or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • E21D20/006Machines for drilling anchor holes and setting anchor bolts having magazines for storing and feeding anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/025Rock drills, i.e. jumbo drills

Definitions

  • the invention relates to an anchor drilling device according to DE-A-2435535 with a drilling carriage and a mount mounted thereon for introducing load anchors into the ground, as described in the preamble of the main claim.
  • load anchors are used in civil engineering to secure supporting walls in a predetermined angular range.
  • the anchor is then inserted and then anchored in its end region by pressing in a filler material.
  • long large load anchors are increasingly used. While in the past mainly single-rod anchors with diameters of 26 mm and 32 mm were used, for which drill rods with diameters of 70 to 76 mm were required, drilling equipment with diameters of 133 mm and more is quite common for the strand anchors that are widely used today.
  • the invention has for its object to provide an anchor drilling machine of the type mentioned, in which the operation is simplified and the changeover times are shortened and at the same time the use of heavy anchor drilling tool is made possible.
  • the invention has the advantage that large forces can be transmitted from the drilling mount via the support to the rotatable upper part of the device and the operation and monitoring of the anchor drilling device during drilling operation including drilling, pressing and pulling work can be carried out by the drilling master alone.
  • the operator station can be arranged very close to the drilling point so that it has an optimal view of the drilling point and the drill string. Due to the arrangement of the carriage, drilling material falls freely to the ground and does not touch any machine parts. Due to the automated boom assembly and dismantling as well as the loading and unloading, manual labor is no longer necessary and booms with a relatively large diameter, for example up to a diameter of 176 mm, and in long lengths, for example up to 6 m, can be processed. In this way, great drilling progress and short downtimes are achieved on the one hand, and heavy physical work can be avoided on the other.
  • an anchor drilling device designated overall by 10, has a drilling carriage 11 with a crawler track 12.
  • a device upper part 14 is rotatably mounted via a slewing ring 13. It comprises a drive unit 15, an operator station for a drilling master surrounded by a closed driver's cab 16 and a support 17 arranged essentially perpendicular to the slewing ring 13 for receiving a drill carriage 18.
  • the drill carriage 18 is pivotally mounted in a carriage 19, which is guided on the support 17 so as to be displaceable in height.
  • the drill carriage 18 carries a drill drive 20 as well as a front holder 21 and clamping jaws 32 for a drill (not shown) or a drill pipe with which the drill or drill pipe is held in the drilling position.
  • a drill pipe section 22 protrudes in the drilling direction beyond the holder 21 or the drilling mount 18, where it is moved according to arrow 23 when drilling the hole outwards and when pulling inwards. Otherwise, the drill string is rotatably held in the drilling position on the drilling mount 18.
  • the support 17 is located in the direction of travel on the front boundary of the drilling carriage 11, so that the drilling mount 18 can be pivoted in the plane of the drawing in front of the support 17 and the crawler track 12. In this way, the drill carriage 18 can be pivoted to any angle.
  • the starting height for the drilling point is determined by a longitudinal displacement of the slide 19.
  • the support consists of two cross-stiffened steel rails 43.
  • the pivoting of the drill carriage 18 takes place hydraulically by means of a hydraulic cylinder 24 which is arranged between the rear end of the drill carriage 18 and an arm 25 on the upper side of the carriage 19.
  • the carriage 19 is also hydraulically adjustable in height.
  • the drill carriage 18 also carries a hydraulically operated rod magazine 26 for receiving a plurality of rod tubes 27, which in the example shown here lie in a row perpendicular to the plane of the drawing, so that only the first rod tube is visible and the other rod tubes are covered.
  • the drill pipe which is located in the extension of the drill pipe section 22 in the drilling position, is also covered by the drill pipe 27 in the drill magazine 26.
  • the rod magazine 26 comprises two approximately U-shaped brackets 28, 29 which are fastened to the drill carriage 18 perpendicular to the plane of the drawing in such a way that the rod magazine 26 follows every pivoting and vertical movement of the drill carriage 18. The repetition of the loading and unloading in any position of the drill carriage 18 is thus ensured.
  • the drill carriage 18 consists of a steel support 36, on the underside of which a rear holder 30 for a drill pipe 31 is arranged in the drilling position.
  • the drill pipe 31 is rotatably mounted in the rear holder 33, being held by two jaws 32.
  • the details of the rod magazine 26 described below relate to the holder 29, which is otherwise identical to the holder 28 (FIG. 1).
  • On the top of the drill carriage 18 is a further hydraulic cylinder running transversely to its longitudinal axis 33 arranged over which a push rod 34 is longitudinally displaceable according to arrow 35.
  • a support arm 37 At the free end of the push rod 34 there is a support arm 37, at the free end of which a fork 38 for receiving the drill pipe 27 is attached.
  • the fork 38 serves as a longitudinal magazine for the drill pipes 27, which are releasably clamped side by side between an upper and a lower fork arm 39, 40 parallel to the push rod 34.
  • the clamping takes place with the aid of hydraulic cylinders 41, which are each assigned to one of the drill pipes.
  • the hydraulic cylinders 41 are supported on the lower fork arm 40, while the drill pipes 27 are pressed onto the upper fork arm 39 by means of holding jaws 42 on the free ends of the hydraulic cylinders 41.
  • the drill pipes 27 can be held securely in any position of the drilling mount 18 by a corresponding pressure.
  • the fork 38 When changing the boom, the fork 38 is moved by a longitudinal movement of the push rod 34 into a position below the drill carriage 18 in such a way that a drill pipe 27 lying in the fork 38 comes to lie in a position in which it is already drilled with a boom section 22 (Fig. 1) can be screwed or unscrewed from such a pipe section 22.
  • a boom section 22 FIG. 1
  • the screwing can also be carried out automatically with the aid of the hydraulically actuated clamping jaws 32 under control from the driver's cab 16.
  • the driver's cab 16 is arranged in the immediate vicinity of the region of the drilling mount 18 facing the borehole and at the end of the drilling carriage 11 lying in the direction of travel.
  • the operator thus has all the units essential for the drilling process and the borehole undisturbed in view.
  • the anchor drilling machine 10 can be reliably controlled by a single operator.
  • the support 17 and the drill carriage 18 lie with a sufficiently large free space in the direction of travel before the end of the crawler track 12, so that an unimpeded pivoting movement of the drill carriage 18 is possible.
  • this far-above arrangement ensures that even with a rotational movement of the upper part of the caterpillar under arrow 44 there is sufficient space in each rotational position for an unimpeded pivoting movement of the drilling mount 18.
  • the support 17 Since the support 17 is attached directly to the device upper part 14, it can absorb very high forces.
  • the drill carriage 18 can thus be up to 10 m long and can be loaded with several correspondingly long drill rods.
  • the support can accommodate 17 large propulsive forces.
  • large forces can be absorbed without having to accept significant restrictions with regard to the degree of freedom in the alignment of the drilling mount 18.
  • the driver's cab 16 is also at the optimal distance from the borehole.

Abstract

An anchor drilling implement for producing soil anchors is described, which is provided with a drill carriage and a pivotable and vertically adjustable drilling mount. The drill carriage comprises a caterpillar gear and an implement upper part rotatable by means of a turntable and carrying a support for the mount. The implement upper part also carries a driving cab in the immediate vicinity of the support, so that said cab performs all the support movements and an unrestricted view of the drill hole or shaft is ensured in any position of the mount. The drilling mount is preferably also provided with a tool magazine, which can be controlled from the driving cab.

Description

Die Erfindung betrifft ein Ankerbohrgerät gemäß der DE-A-2435535 mit einem Bohrwagen und einer darauf angebrachten Lafette zum Einbringen von Lastankern in das Erdreich, wie es im Oberbegriff des Hauptanspruchs beschrieben ist.The invention relates to an anchor drilling device according to DE-A-2435535 with a drilling carriage and a mount mounted thereon for introducing load anchors into the ground, as described in the preamble of the main claim.

Bekanntlich werden im Tiefbau Lastanker zur Absicherung von Stützwänden in einem vorgegebenen Winkelbereich ausgeführt. Anschließend wird der Anker eingeführt und dann durch Einpressen eines Füllmaterials in seinem Endbereich verankert. Um günstige Quadratmeter-Preise beim Verbau zu erreichen, werden in zunehmendem Maße lange Großlastanker verwendet. Während früher überwiegend Einstabanker mit Durchmessern von 26 mm und 32 mm verbaut wurden, für die man Bohrgestänge mit Durchmessern von 70 bis 76 mm benötigte, sind für die heute vielfach verwendeten Litzenanker Bohrausrüstungen mit Durchmessern von 133 mm und mehr durchaus üblich.As is known, load anchors are used in civil engineering to secure supporting walls in a predetermined angular range. The anchor is then inserted and then anchored in its end region by pressing in a filler material. In order to achieve favorable square meter prices for shoring, long large load anchors are increasingly used. While in the past mainly single-rod anchors with diameters of 26 mm and 32 mm were used, for which drill rods with diameters of 70 to 76 mm were required, drilling equipment with diameters of 133 mm and more is quite common for the strand anchors that are widely used today.

Aus wirtschaftlichen und bohrtechnischen Gründen ist es hierbei erforderlich, mit zwei Bohrausrüstungen gleichzeitig zu arbeiten, so daß das Innengestänge mit der wertvollen Bohrkrone aus den bei den bekannten Bohrverfahren entstehenden verrohrten Bohrungen ausgebaut werden kann.For economic and drilling reasons, it is necessary to work with two drilling equipments at the same time, so that the inner rod with the valuable drill bit can be removed from the cased bores produced in the known drilling methods.

Die Bedienung eines Ankerbohrgerätes und insbesondere das Auswechseln des Bohrgestänges kann in der rauhen Umgebung einer Baustelle mit großen körperlichen Anstrengungen verbunden sein.The operation of an anchor drilling machine and in particular the replacement of the drill pipe can be associated with great physical exertion in the harsh environment of a construction site.

Der Erfindung liegt die Aufgabe zugrunde, ein Ankerbohrgerät der eingangs genannten Art anzugeben, bei welchem die Bedienung vereinfacht und die Umrüstzeiten verkürzt werden und gleichzeitig die Verwendung von schwerem Ankerbohrwerkzeug ermöglicht wird.The invention has for its object to provide an anchor drilling machine of the type mentioned, in which the operation is simplified and the changeover times are shortened and at the same time the use of heavy anchor drilling tool is made possible.

Diese Aufgabe wird gemäß dem kennzeichnenden Teil des Hauptanspruchs gelöst. Weiterbildungen der Erfindung sind in den Unteransprüchen beschrieben.This object is achieved in accordance with the characterizing part of the main claim. Developments of the invention are described in the subclaims.

Die Erfindung hat den Vorteil, daß große Kräfte von der Bohrlafette über den Support auf das drehbare Geräteoberteil übertragen werden können und die Bedienung und Überwachung des Ankerbohrgeräts während des Bohrbetriebs einschließlich der Bohr-, Verpreß- und Zieharbeit allein vom Bohrmeister durchgeführt werden kann. Der Bedienungsplatz kann äußerst nahe am Bohrpunkt angeordnet werden, so daß er eine optimale Sicht auf den Bohrpunkt und den Bohrstrang hat. Durch die Anordnung der Lafette fällt Bohrgut frei zu Boden und berührt keine Maschinenteile. Durch den automatisierten Gestängeauf- und -abbau sowie das Ein- und Ausmagazinieren ist Handarbeit nicht mehr erforderlich und es kann Gestänge mit relativ großem Durchmesser, beispielsweise bis zu einem Durchmesser von 176 mm, und in großen Längen, bis beispielsweise 6 m, verarbeitet werden. Auf diese Weise werden einerseits ein großer Bohrfortschritt und kurze Stillstandszeiten erreicht und andererseits kann schwere körperliche Arbeit vermieden werden.The invention has the advantage that large forces can be transmitted from the drilling mount via the support to the rotatable upper part of the device and the operation and monitoring of the anchor drilling device during drilling operation including drilling, pressing and pulling work can be carried out by the drilling master alone. The operator station can be arranged very close to the drilling point so that it has an optimal view of the drilling point and the drill string. Due to the arrangement of the carriage, drilling material falls freely to the ground and does not touch any machine parts. Due to the automated boom assembly and dismantling as well as the loading and unloading, manual labor is no longer necessary and booms with a relatively large diameter, for example up to a diameter of 176 mm, and in long lengths, for example up to 6 m, can be processed. In this way, great drilling progress and short downtimes are achieved on the one hand, and heavy physical work can be avoided on the other.

Nachfolgend wird die Erfindung anhand eines in der Zeichnung dargestellten Ausführungsbeispiels weiter beschrieben.

  • Fig. 1 zeigt schematisch eine Frontansicht eines Ankerbohrgeräts;
  • Fig. 2 zeigt schematisch einen Querschnitt entlang der Schnittlinie A-B durch die Lafette des Ankerbohrgeräts gemäß Fig. 1 und
  • Fig. 3 zeigt schematisch eine Draufsicht auf das Ankerbohrgerät gemäß Fig. 1.
The invention is described below with reference to an embodiment shown in the drawing.
  • Fig. 1 shows schematically a front view of an anchor drilling machine;
  • FIG. 2 schematically shows a cross section along the section line AB through the mount of the anchor drilling machine according to FIGS. 1 and
  • FIG. 3 schematically shows a top view of the anchor drilling machine according to FIG. 1.

Wie Fig. 1 zeigt, weist ein insgesamt mit 10 bezeichnetes Ankerbohrgerät einen Bohrwagen 11 mit einem Raupenfahrwerk 12 auf. Auf dem Raupenfahrwerk 12 ist über einen Drehkranz 13 ein Geräteoberteil 14 drehbar gelagert. Es umfaßt ein Antriebsaggregat 15, einen von einem geschlossenen Führerhaus 16 umgebenen Bedienungsplatz für einen Bohrmeister sowie einen im wesentlichen senkrecht zum Drehkranz 13 angeordneten Support 17 zur Aufnahme einer Bohrlafette 18.As shown in FIG. 1, an anchor drilling device, designated overall by 10, has a drilling carriage 11 with a crawler track 12. On the crawler track 12, a device upper part 14 is rotatably mounted via a slewing ring 13. It comprises a drive unit 15, an operator station for a drilling master surrounded by a closed driver's cab 16 and a support 17 arranged essentially perpendicular to the slewing ring 13 for receiving a drill carriage 18.

Die Bohrlafette 18 ist in einem Schlitten 19 schwenkbar gelagert, der höhenverschiebbar auf dem Support 17 geführt ist.The drill carriage 18 is pivotally mounted in a carriage 19, which is guided on the support 17 so as to be displaceable in height.

Die Bohrlafette 18 trägt einen Bohrantrieb 20 sowie eine vordere Halterung 21 und Klemmbacken 32 für einen Bohrer (nicht dargestellt) oder ein Bohrgestänge, mit welchem der Bohrer bzw. das Bohrgestänge in der Bohrposition gehalten wird. Um die Darstellung übersichtlich zu halten, ist eine rückwärtige Halterung für den Bohrer bzw. das Bohrgestänge in der Bohrposition nicht wiedergegeben. In Fig. 1 ragt ein Bohrgestänge-Abschnitt 22 in Bohrrichtung über die Halterung 21 bzw. die Bohrlafette 18 hinaus, wo er gemäß Pfeil 23 beim Abteufen der Bohrung nach außen und beim Ziehen nach innen bewegt wird. Im übrigen ist das Bohrgestänge in Bohrposition drehbar an der Bohrlafette 18 gehalten.The drill carriage 18 carries a drill drive 20 as well as a front holder 21 and clamping jaws 32 for a drill (not shown) or a drill pipe with which the drill or drill pipe is held in the drilling position. In order to keep the presentation clear, a rear holder for the drill or the drill pipe in the drilling position is not shown. In Fig. 1, a drill pipe section 22 protrudes in the drilling direction beyond the holder 21 or the drilling mount 18, where it is moved according to arrow 23 when drilling the hole outwards and when pulling inwards. Otherwise, the drill string is rotatably held in the drilling position on the drilling mount 18.

Der Support 17 befindet sich in Fahrtrichtung an der vorderen Begrenzung des Bohrwagens 11, so daß die Bohrlafette 18 in der Zeichenebene im Freiraum vor dem Support 17 und dem Raupenfahrwerk 12 geschwenkt werden kann. Auf diese Weise kann die Bohrlafette 18 in einen beliebigen Neigungswinkel verschwenkt werden. Die Ansatzhöhe für den Bohrpunkt wird durch eine Längsverschiebung des Schlittens 19 festgelegt. Der Support besteht aus zwei querversteiften Stahlschienen 43.The support 17 is located in the direction of travel on the front boundary of the drilling carriage 11, so that the drilling mount 18 can be pivoted in the plane of the drawing in front of the support 17 and the crawler track 12. In this way, the drill carriage 18 can be pivoted to any angle. The starting height for the drilling point is determined by a longitudinal displacement of the slide 19. The support consists of two cross-stiffened steel rails 43.

Das Verschwenken der Bohrlafette 18 erfolgt hydraulisch mittels eines Hydraulikzylinders 24 der zwischen dem rückwärtigen Ende der Bohrlafette 18 und einem Arm 25 an der Oberseite des Schlittens 19 angeordnet ist. Auch der Schlitten 19 ist hydraulisch höhenverstellbar.The pivoting of the drill carriage 18 takes place hydraulically by means of a hydraulic cylinder 24 which is arranged between the rear end of the drill carriage 18 and an arm 25 on the upper side of the carriage 19. The carriage 19 is also hydraulically adjustable in height.

Die Bohrlafette 18 trägt ferner ein hydraulisch betätigtes Gestängemagazin 26 zur Aufnahme von mehreren Gestängerohren 27, die in dem hier dargestellten Beispiel in einer Reihe senkrecht zur Zeichenebene liegen, so daß lediglich das erste Gestängerohr sichtbar ist und die übrigen Gestängerohre verdeckt werden. Von den Gestängerohren 27 im Gestängemagazin 26 wird ferner auch das Bohrgestänge verdeckt, welches sich in Verlängerung des Bohrgestängeabschnitts 22 in der Bohrposition befindet.The drill carriage 18 also carries a hydraulically operated rod magazine 26 for receiving a plurality of rod tubes 27, which in the example shown here lie in a row perpendicular to the plane of the drawing, so that only the first rod tube is visible and the other rod tubes are covered. The drill pipe, which is located in the extension of the drill pipe section 22 in the drilling position, is also covered by the drill pipe 27 in the drill magazine 26.

Das Gestängemagazin 26 umfaßt zwei etwa U-förmige Halterungen 28,29 die senkrecht zur Zeichenebene in der Weise an der Bohrlafette 18 befestigt sind, daß das Gestängemagazin 26 jede Schwenk- und Vertikalbewegung der Bohrlafette 18 mitmacht. Somit ist der Wiederholvorgang des Ein- und Ausmagazinierens in jeder Stellung der Bohrlafette 18 gewährleistet.The rod magazine 26 comprises two approximately U-shaped brackets 28, 29 which are fastened to the drill carriage 18 perpendicular to the plane of the drawing in such a way that the rod magazine 26 follows every pivoting and vertical movement of the drill carriage 18. The repetition of the loading and unloading in any position of the drill carriage 18 is thus ensured.

Fig. 2 zeigt einen Querschnitt A-B durch die Bohrlafette 18 und das Gestängemagazin 26. Demnach besteht die Bohrlafette 18 aus einem Stahlträger 36 an dessen Unterseite eine hintere Halterung 30 für ein Gestängerohr 31 in der Bohrposition angeordnet ist. Das Gestängerohr 31 ist in der hinteren Halterung 33 drehbar gelagert, wobei es von zwei Backen 32 gehalten ist. Die nachfolgend beschriebenen Einzelheiten des Gestängemagazins 26 beziehen sich auf die Halterung 29, die im übrigen mit der Halterung 28 (Fig. 1) gleichartig ist. Auf der Oberseite der Bohrlafette 18 ist ein quer zu deren Längsachse verlaufender weiterer Hydraulikzylinder 33 angeordnet, über welchen eine Schubstange 34 gemäß Pfeil 35 längsverschiebbar ist. Am freien Ende der Schubstange 34 befindet sich ein Trägerarm 37, an dessen freiem Ende eine Gabel 38 zur Aufnahme der Gestängerohre 27 befestigt ist. Die Gabel 38 dient als Längsmagazin für die Gestängerohre 27, die zwischen einem oberen und einem unteren Gabelarm 39,40 parallel zur Schubstange 34 nebeneinanderliegend lösbar eingespannt sind. Das Einspannen erfolgt mit Hilfe von Hydraulikzylindern 41 die jeweils einem der Gestängerohre zugeordnet sind. Hierbei sind die Hydraulikzylinder 41 am unteren Gabelarm 40 abgestützt, während die Gestängerohre 27 mit Hilfe von Haltebacken 42 an den freien Enden der Hydraulikzylinder 41 an den oberen Gabelarm 39 angedrückt werden. Durch einen entsprechenden Druck können die Gestängerohre 27 in jeder Lage der Bohrlafette 18 sicher gehalten werden.2 shows a cross section AB through the drill carriage 18 and the rod magazine 26. Accordingly, the drill carriage 18 consists of a steel support 36, on the underside of which a rear holder 30 for a drill pipe 31 is arranged in the drilling position. The drill pipe 31 is rotatably mounted in the rear holder 33, being held by two jaws 32. The details of the rod magazine 26 described below relate to the holder 29, which is otherwise identical to the holder 28 (FIG. 1). On the top of the drill carriage 18 is a further hydraulic cylinder running transversely to its longitudinal axis 33 arranged over which a push rod 34 is longitudinally displaceable according to arrow 35. At the free end of the push rod 34 there is a support arm 37, at the free end of which a fork 38 for receiving the drill pipe 27 is attached. The fork 38 serves as a longitudinal magazine for the drill pipes 27, which are releasably clamped side by side between an upper and a lower fork arm 39, 40 parallel to the push rod 34. The clamping takes place with the aid of hydraulic cylinders 41, which are each assigned to one of the drill pipes. Here, the hydraulic cylinders 41 are supported on the lower fork arm 40, while the drill pipes 27 are pressed onto the upper fork arm 39 by means of holding jaws 42 on the free ends of the hydraulic cylinders 41. The drill pipes 27 can be held securely in any position of the drilling mount 18 by a corresponding pressure.

Bei einem Gestängewechsel wird die Gabel 38 durch eine Längsbewegung der Schubstange 34 in eine Position unterhalb der Bohrlafette 18 in der Weise verschoben, daß ein in der Gabel 38 liegendes Gestängerohr 27 in einer Position zu liegen kommt, in welcher es mit einem bereits abgebohrten Gestängeabschnitt 22 (Fig. 1) verschraubt werden kann bzw. von einem derartigen Rohrabschnitt 22 abgeschraubt werden kann. Durch ein Öffnen des betreffenden Hydraulikzylinders 41 ist eine Entnahme aus der Gabel 38 bzw. eine Aufnahme in die Gabel 38 ohne weiteres möglich. Auch das Verschrauben kann mit Hilfe der hydraulisch betätigbaren Klemmbacken 32 selbsttätig unter Steuerung vom Führerhaus 16 aus erfolgen.When changing the boom, the fork 38 is moved by a longitudinal movement of the push rod 34 into a position below the drill carriage 18 in such a way that a drill pipe 27 lying in the fork 38 comes to lie in a position in which it is already drilled with a boom section 22 (Fig. 1) can be screwed or unscrewed from such a pipe section 22. By opening the relevant hydraulic cylinder 41, removal from the fork 38 or inclusion in the fork 38 is readily possible. The screwing can also be carried out automatically with the aid of the hydraulically actuated clamping jaws 32 under control from the driver's cab 16.

Um die Figur übersichtlich zu halten, sind alle Leitungsverbindungen vom Antriebsaggregat 15 zu den einzelnen Hydraulikzylindern nicht in der Figur wiedergegeben.In order to keep the figure clear, all line connections from the drive unit 15 to the individual hydraulic cylinders are not shown in the figure.

Aus der Draufsicht auf das Ankerbohrgerät 10 gemäß Fig. 3 wird ersichtlich, daß das Führerhaus 16 in unmittelbarer Nähe des dem Bohrloch zugewandten Bereichs der Bohrlafette 18 und am in Fahrtrichtung vorne liegenden Ende des Bohrwagens 11 angeordnet ist. Die Bedienungsperson hat somit alle für den Bohrvorgang wesentlichen Aggregate und das Bohrloch ungestört im Blickfeld. Da ferner alle Steuereinrichtungen unter ergonomischen Gesichtspunkten im Führerhaus 16 angeordnet sind, kann das Ankerbohrgerät 10 zuverlässig von einer einzigen Bedienungsperson gesteuert werden.From the top view of the anchor drilling machine 10 according to FIG. 3 it can be seen that the driver's cab 16 is arranged in the immediate vicinity of the region of the drilling mount 18 facing the borehole and at the end of the drilling carriage 11 lying in the direction of travel. The operator thus has all the units essential for the drilling process and the borehole undisturbed in view. Furthermore, since all control devices are arranged in the cab 16 from an ergonomic point of view, the anchor drilling machine 10 can be reliably controlled by a single operator.

Der Support 17 und die Bohrlafette 18 liegen mit einem genügend großen Freiraum in Fahrtrichtung vor dem Ende des Raupenfahrwerks 12, so daß eine ungehinderte Schwenkbewegung der Bohrlafette 18 möglich ist. Außerdem wird durch diese weit vorstehende Anordnung erreicht, daß auch bei einer Drehbewegung des Geräteoberteils auf dem Raupenfahrwerk gemäß Pfeil 44 in jeder Drehstellung genügend Freiraum für eine ungehinderte Schwenkbewegung der Bohrlafette 18 vorhanden ist.The support 17 and the drill carriage 18 lie with a sufficiently large free space in the direction of travel before the end of the crawler track 12, so that an unimpeded pivoting movement of the drill carriage 18 is possible. In addition, this far-above arrangement ensures that even with a rotational movement of the upper part of the caterpillar under arrow 44 there is sufficient space in each rotational position for an unimpeded pivoting movement of the drilling mount 18.

Da der Support 17 unmittelbar am Geräteoberteil 14 befestigt ist, kann er sehr hohe Kräfte aufnehmen. Somit kann die Bohrlafette 18 bis zu 10 m lang sein und mit mehreren entsprechend langen Gestängerohren belastet werden. Außerdem kann der Support 17 große Vortriebskräfte aufnehmen. Insbesondere wenn der Support 17 am Geräteoberteil 14 nicht angelenkt sondern mit einer festen Schraub- oder Schweißverbindung befestigt ist, können große Kräfte aufgenommen werden, ohne daß wesentliche Einschränkungen bezüglich des Freiheitsgrades bei der Ausrichtung der Bohrlafette 18 in Kauf genommen werden müssen.Since the support 17 is attached directly to the device upper part 14, it can absorb very high forces. The drill carriage 18 can thus be up to 10 m long and can be loaded with several correspondingly long drill rods. In addition, the support can accommodate 17 large propulsive forces. In particular, if the support 17 is not articulated on the device upper part 14 but is fastened with a fixed screw or welded connection, large forces can be absorbed without having to accept significant restrictions with regard to the degree of freedom in the alignment of the drilling mount 18.

In jeder Drehstellung des Geräteoberteils befindet sich ferner das Führerhaus 16 in der optimalen Entfernung zum Bohrloch.In every rotational position of the upper part of the device, the driver's cab 16 is also at the optimal distance from the borehole.

Es kann zweckmäßig sein, den Support 17 mit einer leichten Neigung nach hinten auf die Mitte des Ankerbohrgeräts 10 zu versehen. Durch diese Maßnahme wird sichergestellt, daß die Ankerlafette 18 mit zunehmender Höhenverstellung zur Gewichtsverlagerung näher an den Mittelpunkt des Ankerbohrgeräts 10 versetzt wird. Somit wird eine zuverlässige Standfestigkeit des Ankerbohrgeräts 10 erreicht.It can be expedient to provide the support 17 with a slight inclination towards the center of the anchor drilling machine 10. This measure ensures that the anchor mount 18 is moved closer to the center of the anchor drilling device 10 with increasing height adjustment for weight shifting. Reliable stability of the anchor drilling machine 10 is thus achieved.

Claims (2)

1. An anchor drilling implement with a drill carriage and a support fitted thereto and constructed as a rail for a vertically adjustable drilling mount for inserting load anchors in the soil, wherein the drill carriage (11) is provided with a rotatably mounted implement upper part (14), wherein support (17) is constructed with one arm and is positioned directily on part (14), wherein the implement upper part (14) also carries a driving cab (16) positioned laterally alongside support (17), wherein support (17) is positioned so as to project over the caterpillar gear (14, 12) and wherein an unhindered pivoting of the mount (18) is possible in the resulting free space.
2. An anchor drilling implement according to claim 1, wherein a tool magazine (26) is arranged on the drilling mount (18) and can be hydraulically operated under the control of the driving cab (16).
EP89109963A 1988-06-08 1989-06-01 Anchor hole drilling rig Expired - Lifetime EP0345650B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT89109963T ATE79153T1 (en) 1988-06-08 1989-06-01 ANCHOR DRILL RIG.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3819537 1988-06-08
DE3819537A DE3819537A1 (en) 1988-06-08 1988-06-08 ANCHOR DRILLING DEVICE

Publications (3)

Publication Number Publication Date
EP0345650A2 EP0345650A2 (en) 1989-12-13
EP0345650A3 EP0345650A3 (en) 1990-03-07
EP0345650B1 true EP0345650B1 (en) 1992-08-05

Family

ID=6356145

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89109963A Expired - Lifetime EP0345650B1 (en) 1988-06-08 1989-06-01 Anchor hole drilling rig

Country Status (9)

Country Link
US (1) US5018588A (en)
EP (1) EP0345650B1 (en)
JP (1) JPH0235188A (en)
KR (1) KR920003635B1 (en)
AT (1) ATE79153T1 (en)
AU (1) AU611034B2 (en)
DE (2) DE3819537A1 (en)
NO (1) NO892187L (en)
PT (1) PT90779B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871319A (en) * 2010-06-30 2010-10-27 煤炭科学研究总院重庆研究院 Double-caterpillar drilling machine used in coal mines

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4030525A1 (en) * 1990-09-27 1992-04-09 Salzgitter Maschinenbau ROD MAGAZINE FOR A STONE DRILLING MACHINE
BE1004106A3 (en) * 1990-12-20 1992-09-22 Franco Gerard & Zonen B V B A Treatment device for oblong objects such as pipes on performance of drill work.
CA2518604C (en) * 1992-04-30 2008-03-25 Dreco Energy Services Ltd. Gripper head assembly for a pipe handling system
FI93256C (en) * 1993-06-21 1995-03-10 Tamrock Oy Equipment for handling drill rods
US5423390A (en) * 1993-10-12 1995-06-13 Dreco, Inc. Pipe racker assembly
DE9408941U1 (en) * 1994-06-01 1995-02-23 Klemm Bohrtech Holding device for supporting drill pipes
US6085852A (en) 1995-02-22 2000-07-11 The Charles Machine Works, Inc. Pipe handling device
DE19528620A1 (en) * 1995-08-04 1997-02-06 Tracto Technik Earth drilling rig
DE19610883A1 (en) * 1996-03-20 1997-09-25 Tracto Technik Drill pipe magazine
EP0819820A1 (en) * 1996-07-19 1998-01-21 Doll Fahrzeugbau Gmbh Horizontal drilling machine
US6213851B1 (en) 1998-07-07 2001-04-10 Delta International Machinery Corp. Abrading apparatus
DE19837692C2 (en) 1998-08-19 2003-04-03 Bentec Gmbh Drilling & Oilfield Systems Drilling device, drilling rig and method for drilling an exploration and production well
US6283702B1 (en) * 1999-02-17 2001-09-04 Inco Limited Drill rod loader
US7431105B2 (en) * 2006-07-25 2008-10-07 Stevens Joseph W Geothermal heat loop installation
US7748471B2 (en) * 2007-07-06 2010-07-06 Southeast Directional Drilling, Llc Mobile self-erecting directional drilling rig apparatus
DE202008006571U1 (en) 2008-05-14 2008-07-31 Heiss, Josef Mobile earth boring machine
ES2367492B1 (en) * 2008-11-13 2012-08-03 Perforaciones Y Voladuras, S.A. AUTONOMOUS DRILLING MACHINE.
AU2012258600B2 (en) * 2011-05-26 2017-01-19 Lavalley Industries, Llc An attachment for making up or breaking out pipe
CN104912484B (en) * 2015-04-21 2017-03-15 王发秀 Coal Full-automatic mine roofboltier
DE102018204348A1 (en) * 2018-02-23 2019-08-29 Hakan Demir earth auger
DE202019101322U1 (en) * 2019-03-08 2019-04-01 Wilfried Dekena Horizontal drilling rig
CN114046166B (en) * 2022-01-13 2022-03-25 太原理工大学 Push-pull type large-capacity full-automatic anchor rod drilling machine
CN114837573B (en) * 2022-07-06 2022-10-28 陕西中煤新能源有限公司 Drill bit guiding and adjusting device and method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1196159A (en) * 1966-10-07 1970-06-24 Atlas Copco Ab Improvements in Drilling Machines
US4022284A (en) * 1975-03-17 1977-05-10 Dresser Industries, Inc. Automatic alignment system for earth boring rig
US4258796A (en) * 1978-07-31 1981-03-31 The Salem Tool Company Earth drilling apparatus
US4312413A (en) * 1978-11-09 1982-01-26 Loftis James B Drilling apparatus
AU535127B2 (en) * 1979-09-18 1984-03-01 Ogimachi Pty Ltd Drill rig
AT382682B (en) * 1983-04-07 1987-03-25 Ver Edelstahlwerke Ag DEVICE FOR DRILLING
GB2169334B (en) * 1984-11-08 1988-01-20 Ming Luen Lam A drilling and/or lifting machine
CN1008382B (en) * 1984-11-08 1990-06-13 林明鸾 Piling, pile pulling and/or auger
US4645084A (en) * 1985-02-21 1987-02-24 Construction Robotics, Inc. Robot arm

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871319A (en) * 2010-06-30 2010-10-27 煤炭科学研究总院重庆研究院 Double-caterpillar drilling machine used in coal mines
CN101871319B (en) * 2010-06-30 2013-10-02 中煤科工集团重庆研究院 Double-caterpillar drilling machine used in coal mines

Also Published As

Publication number Publication date
JPH0235188A (en) 1990-02-05
NO892187D0 (en) 1989-05-31
ATE79153T1 (en) 1992-08-15
PT90779A (en) 1989-12-29
AU611034B2 (en) 1991-05-30
DE3819537C2 (en) 1990-08-30
PT90779B (en) 1994-02-28
EP0345650A2 (en) 1989-12-13
DE58901974D1 (en) 1992-09-10
DE3819537A1 (en) 1989-12-14
US5018588A (en) 1991-05-28
NO892187L (en) 1989-12-11
KR920003635B1 (en) 1992-05-04
EP0345650A3 (en) 1990-03-07
KR900000565A (en) 1990-01-30
AU3616089A (en) 1990-07-19

Similar Documents

Publication Publication Date Title
EP0345650B1 (en) Anchor hole drilling rig
CH704534A1 (en) Apparatus for drilling and columns of solid materials.
EP2304179B1 (en) Automated drilling and bolt setting device comprising separate carriages
DE10206645A1 (en) Manipulator for the fitting/removal of drill rods, at a horizontal drilling assembly, has pipe grips with a variety of movements in a guide at a jib supported by a pillar
DE3108877C2 (en) Anchor drilling and anchor setting device assigned to a tunneling machine
DD284067A5 (en) RUNNING TRACKING, LIFTING AND ALIGNING MACHINES FOR LIFTING AND BZW. OR SIDEWASHING A TRACK IN THE SOFT AND CROSSING AREA
DE19732532C2 (en) Method and device for horizontal directional drilling
DE4132314C1 (en) Vehicle mounted piling drill with mast - on which travels carriage with rotary head and tool duct laterally offset w.r.t.carriage guideway
DE2449074A1 (en) FIXING DEVICE FOR A DRILL
EP3299522B1 (en) Drilling apparatus and method for producing a borehole
DE19649108B4 (en) Short-face machine for underground mining with a guide for a drill for producing boreholes for ridge anchoring
DE4028596A1 (en) Equipment for sinking shafts - uses widening tool fixed to supporting and guiding tube which is inserted in pilot hole
DE3919824A1 (en) Mobile rotary boring and borehole lining arrangement - for installing concrete piles, is adapted from excavator or crane and safely distributes torque reaction forces
EP3584370B1 (en) Construction equipment and method for operating same
DE3445970A1 (en) Drilling carriage
EP2500514A2 (en) Method and device for expansion work during tunnel construction
DE10104337B4 (en) Linkage change device for horizontal drilling rigs
DE2817017C2 (en) Horizontal press drilling rig
EP0153567B1 (en) Combined large-diameter and blast hole drilling device
DE19524389C1 (en) Self-propelled vertical and horizontal drilling equipment
EP4063568B1 (en) Measurement assembly and erosion device with a measurement assembly
EP4083326B1 (en) Machine for use in civil engineering
DE3336159C2 (en) Drilling device for anchoring routes in underground mining
EP4083327A1 (en) Machine for use in civil engineering
DE19518820A1 (en) Drill for wide-bore holing in waterbearing ground

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE

17P Request for examination filed

Effective date: 19900322

17Q First examination report despatched

Effective date: 19910528

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 19920805

Ref country code: GB

Effective date: 19920805

Ref country code: FR

Effective date: 19920805

Ref country code: ES

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19920805

Ref country code: BE

Effective date: 19920805

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19920805

Ref country code: NL

Effective date: 19920805

Ref country code: SE

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19920805

REF Corresponds to:

Ref document number: 79153

Country of ref document: AT

Date of ref document: 19920815

Kind code of ref document: T

REF Corresponds to:

Ref document number: 58901974

Country of ref document: DE

Date of ref document: 19920910

EN Fr: translation not filed
NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 19920805

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Effective date: 19930601

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19930630

Ref country code: CH

Effective date: 19930630

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19930630

26N No opposition filed
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19940301