EP0293381B1 - System for the insulation of mining installations and a method for implementing the system - Google Patents

System for the insulation of mining installations and a method for implementing the system Download PDF

Info

Publication number
EP0293381B1
EP0293381B1 EP87901166A EP87901166A EP0293381B1 EP 0293381 B1 EP0293381 B1 EP 0293381B1 EP 87901166 A EP87901166 A EP 87901166A EP 87901166 A EP87901166 A EP 87901166A EP 0293381 B1 EP0293381 B1 EP 0293381B1
Authority
EP
European Patent Office
Prior art keywords
insulation
rock
thermal insulation
accordance
waterproof membrane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
EP87901166A
Other languages
German (de)
French (fr)
Other versions
EP0293381A1 (en
Inventor
Jan-Ake Akesson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bergab-Berggeologiska Undersokningar AB
Original Assignee
Bergab-Berggeologiska Undersokningar AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bergab-Berggeologiska Undersokningar AB filed Critical Bergab-Berggeologiska Undersokningar AB
Priority to AT87901166T priority Critical patent/ATE58205T1/en
Publication of EP0293381A1 publication Critical patent/EP0293381A1/en
Application granted granted Critical
Publication of EP0293381B1 publication Critical patent/EP0293381B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383—Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall

Definitions

  • the present invention relates to a system for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer and a waterproof membrane are installed immediately adjacent to the rock or on the surface of a reinforcing layer applied thereto, so that they follow the contours of the rock or the reinforcing layer.
  • the invention also relates to a method for implementing the insulation system for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer and a waterproof membrane are installed immediately adjacent to the rock or on the surface of a reinforcing layer applied thereto, so that they follow the contours of the rock or the reinforcing layer.
  • ice encroaches upon the free clearance for the vehicles in rail and road tunnels, for example. This results in disruptions to the traffic. As the air temperature rises, the ice thaws and drops down. Equipment, vehicles and people, etc., can suffer damage and injury.
  • Ice clearance work is both dangerous and costly. Deaths have occurred in Sweden in conjunction with ice clearance. Considerable sums are spent every year on ice clearance work. Ice clearance usually means that a road tunnel, for example, must be closed either completely or partially. The result is the disruption of traffic.
  • insulated vaults made of plastic and sheet metal are installed inside tunnels.
  • the disadvantages associated with these vaults are, for example, that they require a certain amount of space, which means that an increased tunnel cross-section must be blasted, or that inroads must be made on the free space for the traffic, for example. They are also expensive, and they involve long delivery and installation periods (prefabrication for different sizes of tunnel).
  • the fire prevention authorities have also begun to adopt a negative attitude towards plastic vaults in traffic tunnels where vehicle fires, for instance, can occur. Extruded cellular plastic matting (AT-B-370 850) has also been used.
  • this system exhibits the same disadvantages as those outlined above for the vaults.
  • Experiments have also been conducted into heating the air, in this way preventing freezing. This is a very expensive method, however, and is susceptible to plant breakdown. Insulated drains are sometimes used locally. More often than not these produce a poor effect, since any water leakage due to blockages has to be removed from the area which has already been drained by the drains. Furthermore, such local applications provide poor protection against the cold.
  • the principal object of the present invention is thus to prevent ice formation and to permit the advancing water to be led away in a drainage system.
  • the invention must take up the smallest possible space, require a short installation period and be flexible (ease of adaptation to other tunnel cross-sections, etc.).
  • the invention must also be suitable for use not only for the complete insulation of a timing installation, but also for the partial insulation of an installation.
  • the rock itself maintains a comparatively even temperature of about +5°C throughout the year.
  • the water which finds its way through the fissures in principle exhibits the same temperature as the surrounding rock.
  • the aim of the invention is thus to prevent the cold air from cooling down the rock and the water.
  • Said object is achieved by means of a method in accordance with the present invention, which is characterized essentially in that thermal insulation to counteract frost is installed on the surface of the waterproof membrane, and in that fire-retardant insulation is installed on the surface of said thermal insulation.
  • a further object of the present invention is to disclose a method for making available a system for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer and a waterproof membrane are installed immediately adjacent to the rock or on the surface of a reinforcing layer applied thereto, so that they follow the contours of the rock or the reinforcing layer.
  • Said further object is achieved by means of a method in accordance with the present invention, which is characterized essentially in that thermal insulation is installed on the surface of the waterproof membrane for the purpose of counteracting frost, and in that fire-retardant insulation is installed on the surface of the thermal insulation.
  • the invention consists of a number of components which are combined to produce a system for the frost insulation of mining installations.
  • the system consists of the following components and is composed in the following manner.
  • Installed immediately adjacent to the rock 1 or on the outside of a reinforcing layer 2 are, on the one hand, a draining layer 3 and, on the other hand, a waterproof membrane 4.
  • the water is led away via the draining layer 3 to a drainage pipe which takes the water out of the installation.
  • the draining layer 3 and the waterproof membrane 4 are installed close up against the rock 1 or the reinforcing layer 2, so that they follow the contours of the rock, requiring a minimum of space.
  • This method has been used for many years for the removal of water, in so doing preventing dropping water and running water, etc., although no frost insulation is achieved in this design.
  • a reinforcing mesh 5 can be attached to the surface of the waterproof membrane 4.
  • Thermal insulation 5 consisting, for example, of polyurethane is then applied by spraying or by some other appropriate method.
  • the reinforcing mesh 5 functions, where it is used, as a reinforcement inside the insulating layer, in this way producing a stable, insulating layer.
  • the thickness of the insulation is simply varied depending on the air temperature with which the system is required to contend.
  • a fire-resistant material 7 is applied to the outside of the thermal insulation 5, 6 in order to provide fire-proofing.
  • the nature of the fire-resistant layer 7 may vary to suit the various requirements of the fire prevention authorities.
  • a thin layer of fire-retardant plaster can usually be applied on the outside of the thermal insulation 5, 6.
  • the frost insulating system thus consists of a number of components, all of which are available by length or by weight.
  • the system is built up simply directly on site and can be adapted to suit different tunnel cross-sections and different requirements, etc. As it follows the contour of the rock, a minimum of space is required.
  • the method by which it is applied is also suitable for systematic handling, so that not only entire mining installations, but also parts of mining installations can be insulated.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Building Environments (AREA)
  • Cultivation Of Seaweed (AREA)
  • Glass Compositions (AREA)
  • Two-Way Televisions, Distribution Of Moving Picture Or The Like (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

System for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer (3) and a waterproof membrane (4) are installed immediately adjacent to the rock (1) or on the surface of a reinforcing layer (2) applied thereto, so that they follow the contours of the rock or the reinforcing layer. The insulating system reduces the risk of water freezing to form ice in mining installations. Thermal insulation (6) to counteract frost is installed on the surface of the waterproof membrane (4), and fire-retardant insulation (7) is installed on the surface of said thermal insulation (6). The invention also relates to a method for implementing the system.

Description

  • The present invention relates to a system for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer and a waterproof membrane are installed immediately adjacent to the rock or on the surface of a reinforcing layer applied thereto, so that they follow the contours of the rock or the reinforcing layer.
  • The invention also relates to a method for implementing the insulation system for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer and a waterproof membrane are installed immediately adjacent to the rock or on the surface of a reinforcing layer applied thereto, so that they follow the contours of the rock or the reinforcing layer.
  • Wherever water-bearing fissures pass through mining installations, tunnels, rock cavities and open cuts, etc., water is present in the form of moisture, drops or running/sprinkling water. This water can freeze in the winter. Undulating ice and icicles are then formed. This phenomenon occurs in those parts of a mining installation where the air temperature falls below the freezing point. Examples of those mining installations where this occurs are the outer parts of transport tunnels (tunnels which run from the surface down to a main tunnel) and rail and road tunnels which are open at both ends and thus permit cold air to flow into and through the tunnel. This phenomenon frequently occurs in rock cuttings along highways.
  • The formation of ice poses major problems. In many cases the ice encroaches upon the free clearance for the vehicles in rail and road tunnels, for example. This results in disruptions to the traffic. As the air temperature rises, the ice thaws and drops down. Equipment, vehicles and people, etc., can suffer damage and injury.
  • The ice must be chipped away (cleared) continuously in order to eliminate the risk of damage and to maintain the function of the installation. Ice clearance work is both dangerous and costly. Deaths have occurred in Sweden in conjunction with ice clearance. Considerable sums are spent every year on ice clearance work. Ice clearance usually means that a road tunnel, for example, must be closed either completely or partially. The result is the disruption of traffic.
  • The formation of ice also affects the rock and any reinforcements in the installation. Blocks of rock can fall down when the water in a fissure freezes and forces out the block. Reinforcements made of sprayed concrete and poured concrete suffer frost damage as a result of rupture due to frost. This results in a reduced service life and in increased maintenance and repair costs.
  • In summary, therefore, the formation of ice in mining installations gives rise to major problems associated with restricted use, the risk of damage, reduced service life and increased costs of maintenance and repair work. Continuous ice clearance is necessary, and this is both dangerous and costly.
  • A number of different systems are currently available for solving the problem of ice formation. For example, insulated vaults made of plastic and sheet metal are installed inside tunnels. The disadvantages associated with these vaults are, for example, that they require a certain amount of space, which means that an increased tunnel cross-section must be blasted, or that inroads must be made on the free space for the traffic, for example. They are also expensive, and they involve long delivery and installation periods (prefabrication for different sizes of tunnel). The fire prevention authorities have also begun to adopt a negative attitude towards plastic vaults in traffic tunnels where vehicle fires, for instance, can occur. Extruded cellular plastic matting (AT-B-370 850) has also been used. Generally speaking, this system exhibits the same disadvantages as those outlined above for the vaults. Experiments have also been conducted into heating the air, in this way preventing freezing. This is a very expensive method, however, and is susceptible to plant breakdown. Insulated drains are sometimes used locally. More often than not these produce a poor effect, since any water leakage due to blockages has to be removed from the area which has already been drained by the drains. Furthermore, such local applications provide poor protection against the cold.
  • The principal object of the present invention is thus to prevent ice formation and to permit the advancing water to be led away in a drainage system. At the same time the invention must take up the smallest possible space, require a short installation period and be flexible (ease of adaptation to other tunnel cross-sections, etc.). The invention must also be suitable for use not only for the complete insulation of a timing installation, but also for the partial insulation of an installation.
  • The rock itself maintains a comparatively even temperature of about +5°C throughout the year. The water which finds its way through the fissures in principle exhibits the same temperature as the surrounding rock. The aim of the invention is thus to prevent the cold air from cooling down the rock and the water.
  • Said object is achieved by means of a method in accordance with the present invention, which is characterized essentially in that thermal insulation to counteract frost is installed on the surface of the waterproof membrane, and in that fire-retardant insulation is installed on the surface of said thermal insulation.
  • A further object of the present invention is to disclose a method for making available a system for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer and a waterproof membrane are installed immediately adjacent to the rock or on the surface of a reinforcing layer applied thereto, so that they follow the contours of the rock or the reinforcing layer.
  • Said further object is achieved by means of a method in accordance with the present invention, which is characterized essentially in that thermal insulation is installed on the surface of the waterproof membrane for the purpose of counteracting frost, and in that fire-retardant insulation is installed on the surface of the thermal insulation.
  • The invention is described below in relation to two illustrative embodiments, in conjunction with which reference is made to the drawings, in which:
    • Fig. 1 shows a first illustrative embodiment of an insulating system; and
    • Fig. 2 shows a second illustrative embodiment of an insulating system.
  • The invention consists of a number of components which are combined to produce a system for the frost insulation of mining installations. The system consists of the following components and is composed in the following manner. Installed immediately adjacent to the rock 1 or on the outside of a reinforcing layer 2 are, on the one hand, a draining layer 3 and, on the other hand, a waterproof membrane 4. The water is led away via the draining layer 3 to a drainage pipe which takes the water out of the installation. The draining layer 3 and the waterproof membrane 4 are installed close up against the rock 1 or the reinforcing layer 2, so that they follow the contours of the rock, requiring a minimum of space. This method has been used for many years for the removal of water, in so doing preventing dropping water and running water, etc., although no frost insulation is achieved in this design.
  • It is proposed in accordance with the present invention to supplement the basic system with thermal insulation 6 in the following way, in so doing preventing frost formation. A reinforcing mesh 5 can be attached to the surface of the waterproof membrane 4. Thermal insulation 5 consisting, for example, of polyurethane is then applied by spraying or by some other appropriate method. The reinforcing mesh 5 functions, where it is used, as a reinforcement inside the insulating layer, in this way producing a stable, insulating layer. The thickness of the insulation is simply varied depending on the air temperature with which the system is required to contend.
  • A fire-resistant material 7 is applied to the outside of the thermal insulation 5, 6 in order to provide fire-proofing. The nature of the fire-resistant layer 7 may vary to suit the various requirements of the fire prevention authorities. A thin layer of fire-retardant plaster can usually be applied on the outside of the thermal insulation 5, 6.
  • In the case of rock 1 which exhibits a very uneven contour, it is possible first to install a smooth mesh 8 on the surface of the rock 1 or the sprayed concrete 2 for the purpose of evening out the contours, and to let this mesh 8 form part of the reinforcing layer 2. The system as previously described is then applied to the surface of mesh 8, as shown in Fig. 2, with a draining layer 3, a waterproof membrane 4 followed by reinforcement 5, if required, and by thermal insulation 6, and a fire-retardant layer 7.
  • The frost insulating system thus consists of a number of components, all of which are available by length or by weight. The system is built up simply directly on site and can be adapted to suit different tunnel cross-sections and different requirements, etc. As it follows the contour of the rock, a minimum of space is required. The method by which it is applied is also suitable for systematic handling, so that not only entire mining installations, but also parts of mining installations can be insulated.
  • Further advantages include the fact that existing systems for the removal of water can be supplemented easily with thermal frost insulation, so that the water which is leaking into the workings will not freeze;
    • -that it can be constructed from a number of components, which are applied directly on site;
    • -that it can be used in all kinds of mining installation, irrespective of their size and form, etc.;
    • -that the nature of the insulation can be varied depending on the external temperature with which the system is to contend;
    • -that it is a flexible system which follows the surface of the rock and thus takes up a minimum amount of space; and
    • -that it can be provided with various kinds of fire protection.
  • The invention is not restricted to the illustrative embodiments described above and illustrated in the drawings, but may be varied within the scope of the Patent Claims without departing from the idea of invention.

Claims (11)

1. A system for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer (3) and a waterproof membrane (4) are installed immediately adjacent to the rock (1) or on the surface of a reinforcing layer (2, 8) applied thereto, so that they follow the contours of the rock or the reinforcing layer, characterized in that thermal insulation (6) to counteract frost is installed on the surface of the waterproof membrane (4), and in that fire-retardant insulation (7) is installed on the surface of said thermal insulation (6). -
2. A system in accordance with Patent Claim 1, characterized in that the thermal insulation (6) is applied by spraying onto the surface of the waterproof membrane (4).
3. A system in accordance with Patent Claim 2, characterized in that a reinforcing mesh (5) is secured to the surface of the waterproof membrane (4), around which mesh the thermal insulation (6) is applied by spraying.
4. A system in accordance with any of the preceding Patent Claims, characterized in that the thermal insulation (6) consists of polyurethane.
5. A system in accordance with any of the preceding Patent Claims, characterized in that the fire-retardant insulation (7) consists of plaster.
6. A method for implementing a system in accordance with any of the preceding Patent Claims for the insulation of tunnels, rock cavities and similar mining installations, in conjunction with which a draining layer (3) and a waterproof membrane (4) are installed immediately adjacent to the rock (1) or on the surface of a reinforcing layer (2, 8) applied thereto, so that they follow the contours of the rock or the reinforcing layer, characterized in that thermal insulation (6) is installed on the surface of the waterproof membrane (4) for the purpose of counteracting frost, and in that fire-retardant insulation (7) is installed on the surface of the thermal insulation (6).
7. A method in accordance with Patent Claim 6, characterized in that the thermal insulation (6) is applied by spraying onto the surface of the waterproof membrane (4).
8. A method in accordance with any of the Patent Claims 6-7, characterized in that a reinforcing mesh (5) is secured to the surface of the waterproof membrane (4), whereupon the thermal insulation (6) is applied around said mesh (5) by spraying.
9. A method in accordance with any of the Patent Claims 7-8, characterized in that polyurethane is applied by spraying in order to form said thermal insulation (6).
10. A method in accordance with any of the Patent Claims 6-9, characterized in that fire-retardant insulation (7) in the form of plaster is installed on the surface of the thermal insulation (6).
11. A method in accordance with any of the Patent Claims 6-10, characterized in that the system is applied directly on site, and in that parts of or entire mining installations are insulated, in conjunction with which, for example, the thermal frost-protecting insulation (5, 6) is installed over existing water-removing drainage layers (3) and waterproof membranes (4).
EP87901166A 1986-02-11 1987-02-11 System for the insulation of mining installations and a method for implementing the system Expired EP0293381B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT87901166T ATE58205T1 (en) 1986-02-11 1987-02-11 SYSTEM FOR INSULATION OF MINING EQUIPMENT AND METHOD OF IMPLEMENTING SUCH SYSTEM.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SE8600585 1986-02-11
SE8600585A SE453113B (en) 1986-02-11 1986-02-11 INSULATION SYSTEM FOR STORAGE INSTALLATIONS AND PROCEDURES FOR ASTADKOMMA SYSTEM

Publications (2)

Publication Number Publication Date
EP0293381A1 EP0293381A1 (en) 1988-12-07
EP0293381B1 true EP0293381B1 (en) 1990-11-07

Family

ID=20363420

Family Applications (1)

Application Number Title Priority Date Filing Date
EP87901166A Expired EP0293381B1 (en) 1986-02-11 1987-02-11 System for the insulation of mining installations and a method for implementing the system

Country Status (6)

Country Link
EP (1) EP0293381B1 (en)
AU (1) AU7025987A (en)
FI (1) FI88198C (en)
NO (1) NO174524C (en)
SE (1) SE453113B (en)
WO (1) WO1987004756A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2911365A1 (en) * 2007-01-15 2008-07-18 Pastiforms S Soc Par Actions S Multifunction liner for constructing e.g. tunnel, has strip whose rebates permit assembling of liner elements, and drainage layer whose protuberances are separated relative to each other to form drainage channels or drainage geotextile

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4025212A1 (en) * 1990-08-09 1992-02-13 Huels Troisdorf TRAFFIC TUNNEL FOR COLD REGIONS
ATE180313T1 (en) * 1993-10-14 1999-06-15 Albert Thalmann PROFILE STRIPS MADE OF FLEXIBLE SEALING MATERIAL
EP0725185A1 (en) * 1996-01-08 1996-08-07 Roland F. Wolfseher Lining tunnels and method for its attachment
ES2118035B1 (en) * 1996-03-18 1999-07-01 Construcciones Aplicaciones Y COATING SHEET.
ATE253172T1 (en) * 1997-08-15 2003-11-15 Koester Bauchemie Gmbh METHOD FOR SEALING UNDERGROUND CAVITIES AGAINST WATER ENTRY
GB9815685D0 (en) * 1998-07-20 1998-09-16 Mbt Holding Ag Waterproofer
WO2001007756A1 (en) * 1999-07-23 2001-02-01 William Claudio Bona Lining system
US6793441B2 (en) 2000-06-12 2004-09-21 W. R. Grace & Co.-Conn. Tunnel waterproofing method
US6767164B2 (en) 2000-06-12 2004-07-27 W. R. Grace & Co.-Conn. Tunnel waterproofing construction method
FR2838159B1 (en) * 2002-04-03 2004-12-17 Etancheite D Ouvrages Souterra WATERPROOF DEVICE FOR DRAINING PERCOLATING WATER ON A TUNNEL COATING
CN105587325B (en) * 2014-10-22 2018-08-14 广东工业大学 A kind of anti-icing composite plate in tunnel based on phase-change material
JP6534208B2 (en) * 2015-09-15 2019-06-26 藤森工業株式会社 Tunnel tarpaulin

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT339948B (en) * 1975-06-30 1977-11-10 Iso Bau Abdichtungen Im Hoch U METHOD FOR FASTENING A SEALING FILM MADE OF PLASTIC ON A BASE AND FASTENING BODY FOR FASTENING PLASTIC FILMS TO PERFORM THE METHOD
DE2837333A1 (en) * 1978-08-26 1980-03-06 Dynamit Nobel Ag Proofing walls against water seepage and pressure - with crosslinked polyolefin foam laminated to plasticised PVC ply lining
AT370850B (en) * 1982-01-07 1983-05-10 Seebode Gerhard FASTENING DEVICE FOR THE APPLICATION OF INSULATING FILMS TO THE EXCAVATING SURFACES OF UNDERGROUND BUILDINGS

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2911365A1 (en) * 2007-01-15 2008-07-18 Pastiforms S Soc Par Actions S Multifunction liner for constructing e.g. tunnel, has strip whose rebates permit assembling of liner elements, and drainage layer whose protuberances are separated relative to each other to form drainage channels or drainage geotextile

Also Published As

Publication number Publication date
SE8600585L (en) 1987-08-12
FI88198B (en) 1992-12-31
NO174524C (en) 1994-05-25
WO1987004756A1 (en) 1987-08-13
FI88198C (en) 1993-04-13
SE453113B (en) 1988-01-11
NO874227D0 (en) 1987-10-09
EP0293381A1 (en) 1988-12-07
FI883697A0 (en) 1988-08-09
FI883697L (en) 1988-08-09
NO174524B (en) 1994-02-07
AU7025987A (en) 1987-08-25
SE8600585D0 (en) 1986-02-11
NO874227L (en) 1987-10-09

Similar Documents

Publication Publication Date Title
WO1987004756A1 (en) System for the insulation of mining installations and a method for implementing the system
CN114301024A (en) A highway tunnel cable trench thermal insulation, temperature control and moisture-proof system
CN106836663A (en) The construction method of water-proof insulating roof
RU2439260C2 (en) Method of building roof collecting systems protection against icing
EA039178B1 (en) Tunnel profile element covering periphery of tunnel profile
EP0375738B1 (en) Fire resistant insulation composition
Adnan et al. Common utility tunnel for utility services at Putrajaya, new administrative centre of Malaysia
RU2175364C2 (en) Intra-city circular motorway
Haynes et al. Icing problems at Corps projects
Mackinlay et al. Roof design in regions of snow and cold
EP1952980B1 (en) Covering sheet
CN220814149U (en) Novel heat insulation structure for drainage ditches on two sides of railway in tunnel
SU1082899A1 (en) Surface gate of hydraulic structure
RU2022102C1 (en) Construction made of ice
Grønhaug Optimization of Linings in Road Tunnels
KR100399874B1 (en) Protecting method against water leakage of concrete cracks
CN207795277U (en) A kind of Tunnel Engineering anti-freezing structure of frozen ground regions
JP2002322772A (en) Gutter and fixing member for the same
FI82110C (en) VAEGTRUMMA.
CN104989040B (en) The cold area roofing antiseep drainage system practice
Abildgren et al. STOREBAELT EASTERN RAILWAY TUNNEL: FIXED EQUIPMENT AND RAILWAY SYSTEMS.
Carey Solving problems of ice-blocked drainage
RU2296284C2 (en) Horizontal heat exchanger
Miller How to Cope With Freeze Damage and Ice Buildup on Outside Storage Tanks
JPH0234832B2 (en) TOKETSUSURUSUIIKINIMOCHIIRUKOZOBUTSU

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19880729

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE FR GB IT LI LU NL SE

17Q First examination report despatched

Effective date: 19900412

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE FR GB IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19901107

Ref country code: BE

Effective date: 19901107

REF Corresponds to:

Ref document number: 58205

Country of ref document: AT

Date of ref document: 19901115

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3766105

Country of ref document: DE

Date of ref document: 19901213

ITF It: translation for a ep patent filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19910228

ET Fr: translation filed
NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19940120

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19940203

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19940207

Year of fee payment: 8

Ref country code: CH

Payment date: 19940207

Year of fee payment: 8

Ref country code: AT

Payment date: 19940207

Year of fee payment: 8

ITTA It: last paid annual fee
EAL Se: european patent in force in sweden

Ref document number: 87901166.6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19950211

Ref country code: AT

Effective date: 19950211

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19950228

Ref country code: CH

Effective date: 19950228

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19950211

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19951031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19951101

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19970217

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980212

EUG Se: european patent has lapsed

Ref document number: 87901166.6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050211