EP0165712A2 - Brückenkonstruktion - Google Patents

Brückenkonstruktion Download PDF

Info

Publication number
EP0165712A2
EP0165712A2 EP85303531A EP85303531A EP0165712A2 EP 0165712 A2 EP0165712 A2 EP 0165712A2 EP 85303531 A EP85303531 A EP 85303531A EP 85303531 A EP85303531 A EP 85303531A EP 0165712 A2 EP0165712 A2 EP 0165712A2
Authority
EP
European Patent Office
Prior art keywords
bridge
launching rail
vehicle
launching
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP85303531A
Other languages
English (en)
French (fr)
Other versions
EP0165712A3 (en
EP0165712B1 (de
Inventor
Thomas Stuart Parramore
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WFEL Ltd
Original Assignee
Fairey Engineering Ltd
Williams Fairey Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=10562405&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP0165712(A2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Fairey Engineering Ltd, Williams Fairey Engineering Ltd filed Critical Fairey Engineering Ltd
Publication of EP0165712A2 publication Critical patent/EP0165712A2/de
Publication of EP0165712A3 publication Critical patent/EP0165712A3/en
Application granted granted Critical
Publication of EP0165712B1 publication Critical patent/EP0165712B1/de
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/127Portable or sectional bridges combined with ground-supported vehicles for the transport, handling or placing of such bridges or of sections thereof

Definitions

  • This invention relates to a method of constructing a modular bridge across a span and to a vehicle for use in such a method.
  • EP-A-0081388 discloses a modular bridge comprising at least one intermediate bridge module and two end bridge modules, each of the bridge modules comprising two longitudinal main girder structures and an intermediate deck having a deck surface, the main girder structures being foldably connected one along each side of the deck and being foldable from an operative position in which the main girder structures offer extensions of the deck surface on either side of the deck for use to a closed position in which the main girder structures are folded beneath the deck, the main girder structures of the end bridge modules being longitudinally tapered in depth when seen from a side of the module in its operative position, the.main girder structures of the intermediate module(s) not being so tapered, wherein each of the end bridge modules and the intermediate bridge module(s), are connected to form a bridge.
  • EP-A-0081388 discloses the construction of such bridge by putting up a building frame, having upwardly facing rollers, on the first bank of the span to be crossed. A preliminary beam is assembled on the frame and pushed outwards towards the bank. The bridge aseembly is assembled progressively on the frame, behind the preliminary beam, with the beam being attached to the leading module. The preliminary beam has at its outer end a jacking unit with support rollers so that, when the jacking unit reaches the far bank of the span, it may rest on its and allow the assembly of beam and bridge to roll across the span, the bridge assembly is then lowered onto the bank and the beam withdrawn back through the bridge assembly. This procedure is illustrated in Figures 23A to 23F of EP-A-0081388.
  • EP-A-0075671 discloses a demountable non-opening bridge comprising discrete channel-section modules and an H-section launching girder, wherein modules comprise a central part and two wing parts, the wing parts comprise box-section track girders, the two wing parts are downwardly hinging below the central part for transportation, in the laying of the bridge the launching girders are assembled and made first, whereafter the various modules are coupled together and pushed over the launching girder and the launching girder remains in the bridge as a bearing element.
  • EP-A-0075671 discloses the construction of such a bridge by the joint use of a laying vehicle having a cantilever arm and a four-tonne crane.
  • the laying vehicle moves to the bank of the span to be crossed with a launching girder ramp (or end) member already in position on guide rollers of the cantilever arm.
  • the cantilever arm comprises a pinion to advance the ramp member over the span by means of a cooperating rack.
  • the crane delivers launching girder inner sections which are coupled up and advanced. Once the launching girder has reached the required length, a second launching girder ramp (end) member is coupled up.
  • the cantilever arm of the laying vehicle is lowered so that the launching girder is then supported by its own hydraulically deployable feet.
  • EP-A-0075671 also discloses the use of a single laying vehicle combining the capabilities of the laying vehicle and crane described above. It is equipped both with a cantilever arm and with a four-tonne crane.
  • a vehicle for launching a modular bridge comprising a frame deployable over the back of the vehicle, a support on the frame for a launching rail for the bridge, and means for supporting a bridge module.
  • bridge modules With this construction, it is possible for bridge modules to be placed, for example by a crane, in position on the launching rail, while the launching rail is still supported by the vehicle.
  • successive bridge modules can be coupled together at the site of the vehicle itself, rather than over a span which the modular bridge is to cross.
  • the frame is slidably deployable over the back of the vehicle.
  • the absence of any pivoting joints in such a construction ensures a strong structure, which can quickly be deployed.
  • the frame may be suitably jacked down once deployed.
  • the frame may itself comprise a first sliding frame slidable with respect to the vehicle body. There may also be a second sliding frame slidablewith respect to the first sliding frame.
  • the advantage of having the jacking down point as far away from the back of the vehicle body as possible is that it allows the vehicle body to function effectively as a counter weight for the launching rail during the construction of the bridge. All that is needed is that the moment of the launching rail (when fully boomed out) about the fulcrum at the jacking down point is less than the moment of the vehicle body about the fulcrum.
  • the launching rail support is tiltable with respect to the frame. This is useful because, apart from the effect due to launching rail droop, the far end of the launching rail, when fully boomed out, will be more or less at the height of the launching rail support on the vehicle on the home bank of the span, which will of course be above the level of the home bank itself.
  • the far end of the launching rail can be landed by tilting the tiltable support. This also applied when the far bank is lower than the home bank.
  • the launching rail support be tiltably mounted on the second sliding frame.
  • the vehicle can comprise means for booming out the launching rail, so as to keep the number of other items of equipment required to a minimum.
  • the booming out means may be mounted on the launching rail support and, in a particularly preferred embodiment, takes the form of a caterpillar-type friction drive under the launching rail.
  • the bridge module support means may comprise a first bridge module support on the frame and a second bridge module support on the vehicle body.
  • the first bridge module support is preferably provided at the jacking down point of the frame.
  • the second bridge module support may take the form of one or more outriggers deployed from the vehicle body.
  • the outriggers may be retractable by, for example, hydraulic piston and cylinder arrangements.
  • Each of the first and second bridge module supports may be in two parts, each of which parts being suitable for supporting a main girder structure of a bridge module.
  • the vehicle can comprise means for launching bridge modules along the launching rail.
  • the bridge module launching means may be mounted on the bridge module support means, particularly on the first bridge module support.
  • the bridge module launching means may comprise one or more friction drives.
  • a vehicle in accordance with the first aspect of the invention may be used in a method according to a second aspect of the invention, according to which there is provided a method of constructing a modular bridge across a span, the method comprising deploying a frame over the back of the launching vehicle on the home bank of the span, placing a first bridge launching rail module on a support for the launching rail on the frame, booming out the launching rail as it is formed and placing subsequent launching rail modules on the launching rail support and coupling them to the launching rail being formed, landing the far end of the launching rail on the far bank of the span, placing a first bridge module on the launching rail and on bridge module support means on the vehicle, launching the bridge along the launching rail as the bridge is formed and placing subsequent bridge modules on the launching rail and on the bridge module support means and coupling them to the bridge being formed.
  • the frame may be deployed by sliding it over the back of the vehicle.
  • a bridge formed on such modules will normally comprise two end modules, in each of which the main girder structures are longitudinally tapered in depth when seen from the side of the module and at least one intermediate module in which the main girder structures are not so tapered.
  • the main girder structures be box girder structures; that each main girder structure comprise at least one lifting attachment on a surface offering the extension of the deck surface; that each of the lifting attachments be recessed; that each main girder structure comprise at least one lifting attachment on a surface which is facing a corresponding surface of the other main girder structure when the module is in the operative position; that the deck comprise two lip portions and that each of the main girder structures comprise a shoulder portion, each of which lip portions stays on a respective one of the shoulder portions when the module is in the operative position; and/or that the module further comprise a bracing means between the main girder structure for bracing the module when in the operative position.
  • the disclosed bracing means comprised steel bracing wires.
  • the bridge modules preferably comprise bracing arms, one end of each of which is pivotably attached either to a main girder structure or to the deck surface, and the other end of which is receivable in a slide in the other of the main girder structure.and the deck.
  • the bracing arm is pivotably attached to the main girder structure and receivable in a slide in the deck.
  • a further preferred feature of a bridge module usable in the present invention concerns means for joining adjacent bridge modules.
  • joining plates are provided at each end of each of the intermediate bridge modules and at the inner end of each of the end modules. Each joining plate would be provided with a hole to receive a pin when joining plates of adjacent bridge modules are placed together. So much is similar with the present case.
  • pairs of joining plates would be provided at one end of the bridge module and would be adapted to lie either side of single joining plates of adjacent bridge modules.
  • a pin would be manually inserted through the resulting laminate of joining plates to hold the modules together.
  • the arrangement of joining plate is hermaphrodite in nature.
  • means may be provided for remotely inserting a pin through a laminate of joining plates, each of which is provided with a pin-receiving hole.
  • Such means may take the form of a bell-crank lever, adapted to be operable from the side of a bridge module when in position on the launching rail and arranged to move a pin through a laminate of joining plates.
  • a preferred feature of the method of the invention involves the use of means for altering the angle of approach offered by one or both of the end bridge modules.
  • Such means may take the form of a hydraulically operable articulating ram for moving a tapered portion of the end bridge module with respect to a connecting portion of the module, which is adapted to connect to the end module to an adjacent intermediate module.
  • One or more filling elements may be inserted in the end module so that the hydraulic cylinders can be relaxed after articulation.
  • each bridge comprising a number of modules, may be provided with a sub-frame or bracing frame for (a) bracing the bridge in the open position and (b) supporting the bridge on the launching rail so that it can be boomed out across the span.
  • a sub-frame may be provided at each end of a bridge, preferably being located at the inner end of each of the end modules.
  • Each sub-frame preferably has a pair of rollers, one for bearing on each flange of the inverted T-section of the launching rail.
  • Each of the launching rail modules is of a lightweight hollow construction of rectangular section.
  • the depth and width of each module is such that it can be accommodated beneath a bridge formed from bridge modules, which will now be described.
  • each intermediate bridge module 31 comprises a centre decking 33 and left and right main girder structures 35 and 37 which can pivot about a respective axis 39 or 41 (Figure 4C) to adopt the folded configuration shown in Figure 4D for the purposes of transport.
  • the intermediate bridge modules 31 is provided with a recovery sling 61, which comprises wires each attached to a lower portion of a surface of a respective one of the main girder structure 35 and 37 which is inwardly facing when the module is open, the wires terminating in a common ring 63, which is accessible from above the centre deck.
  • a recovery sling 61 which comprises wires each attached to a lower portion of a surface of a respective one of the main girder structure 35 and 37 which is inwardly facing when the module is open, the wires terminating in a common ring 63, which is accessible from above the centre deck.
  • the module is simply picked up by a crane acting at the ring 63.
  • the module will fold to the position shown in Figure 4 D . Again, the general principle of the folding process is described in EP-A-0081388 and will not be repeated here.
  • the intermediate bridge module As for the dimensions of the intermediate bridge module, it is again 19 feet 6 inches in length (5.94 metres) to be compatible with the ISO 6.1 metre (20 feet) container system. When the module is in its folded condition, it is 8 feet (2.44 metres) in width, again to be compatible with the ISO container requirements, but in its open position the total width of the intermediate bridge module 31 is 13 feet 5 inches (4.1 metres), which is a sufficient width for carrying such heavy vehicle as tanks.
  • Each of the main girder structures 35 and 37, over which the tracks of the tanks pass is 40.5 inches (1.03 metres) in height (in the open position) and 39 inches (1 metre) in width (again in the open position).
  • the tapered end bridge module 75 shown in Figures 5A to 5D has many features in common with the intermediate bridge module 31, but differs in that the main girder structures 77 and 79 are tapered when seen from the side, when the module is in its open (deployed) position.
  • the end module 75 again comprises a deck 81, but this time only five deck members 81a to 81e are provided.
  • the deck member at the fully tapered end of the end module 75 (the right-hand in Figures 5A and 5B) is missing: its place is taken in the fully assembed bridge by the bearing pad 29.
  • the deck section 8le nearest the fully tapered end is provided with a connection 83 for connecting the module to the launching rail, as will subsequently be described.
  • the end bridge module 75 can be opened from a closed position (shown in Figures 5D and 5E) to an open position (shown in Figures 5A, 5B and 5C) by lifting the end module 75 at recessed lifting points 85 and 87 on the deck-extension surfaces of the main girder structures 77 and 79 by means of a crane.
  • a recovery sling (not shown) for the reverse operation is also provided. Opening and closing the end modules 75 is again very similar to the process described in EP -A-0081388 and will not be repeated here.
  • a difference between the end bridge module 75 and the intermediate bridge module 31 is that the end bridge module 75 is articulated by way of a pivot 103 at a lower portion of the end bridge module adjacent where it is connected to an intermediate bridge module 31.
  • the articulation means that the end bridge module is split into a ramp section 105 and a joining section 107.
  • the ramp section 105 can be moved relative to the joining section 107 by means of a hydraulic piston and cylinder arrangement 109 mounted at the joining end of each main girder structure 77 and 79.
  • the upper surface of the deck 81 is level. This is shown by the discontinuous lines in Figure 5A.
  • the lower surfaces of the main girder structures 77 and 79 are level. This is usually, though not exclusively, the position adopted when the bridge is in use for carrying traffic.
  • This configuration is shown in solid lines in Figure 5A. In such a configuration, there will be a gap 111 above the point of articulation at the pin 103.
  • the gap 111 can be filled in use by a deck compression unit 113, which is a planar narrow deck extension unit. Hydraulic pressure in the piston and cylinder arrangement 109 can be relaxed once the deck compression unit is in place.
  • the maximum overall dimensions for the end bridge module 75 are the same as for the intermediate bridge module 31.
  • Figures 6A, 6B and 6C show an inter-trackway bracing frame.
  • One of these is located under the deck at each end of the bridge formed from end and intermediate bridge modules 75 and 31 and allows the bridge to be supported on a launching rail, formed from launching rail end and intermediate modules 13 and 1, during booming out.
  • FIGS 7A to 7E give an overall view of a bridge 131 after construction.
  • the bridge comprises three intermediate bridge modules 31 and two end bridge modules 75. These can clearly be seen in the side and plan views of Figures 7A and 7B.
  • Underneath the deck of the bridge 131 can be seen (in dotted lines in Figure 7B) a launching rail 133, which is itself formed of intermediate modules 1 and end modules 13.
  • a bracing frame 115 can be seen in position in Figure 7D.
  • the frame 139 comprises a first sliding frame 141, which is slidably deployable over the back of the vehicle by means of a first endless roller chain 143, which is powered by a hydraulic motor (not shown).
  • the first sliding frame 141 can be driven from a position shown in Figure 8A to a position shown in Figure 9A by means of the first endless roller chain 143.
  • the second sliding frame 145 is Slidably mounted above the first sliding frame 141.
  • the second sliding frame 145 is generally in the form of a beam. It can be slidably deployed along the first sliding frame 141 by means of a second endless roller chain 147, which is again driven by a hydraulic motor (not shown).
  • the first hold-down bracket embraces the first sliding frame 141 and keeps it adjacent the chassis 137.
  • the second hold-down bracket is shown in detail in Figure 12 and comprises upper and lower sleeve portions separated by a pair of anti-friction pads 153.
  • the lower sleeve again embraces the first sliding frame 141 and the upper sleeve embraces the second sliding frame 145.
  • the first hold-down bracket is mounted just to the front of the forward-most of the two rear axles of the vehicle, whereas the second hold-down bracket is mounted at the very back of the chassis.
  • the caterpillar-type friction drive 169 comprises an endless belt 171, which passes over a plurality of support rollers 173 and under a lower drive roller 175.
  • the drive roller 175 is itself coupled by an endless belt 177 to a hydraulic motor 179.
  • the cradle 219 can pivot about a horizontal axis parallel with the length of the vehicle 135 to stow neatly for transport.
  • a piston and cylinder arrangement 225 mounted underneath the cradle and on an outrigger arm 227 to which it is attached enables the angle of inclination above the cradle 219 to the horizontal to be varied. Variations in bridge slope can therefore be accommodated.
  • the bridge illustrated is to be built of a total of five bridge modules (three intermediate bridge modules 71 and two end bridge modules 75) and is capable of reaching a span of 100 feet (30.5 metres) (nominal). However, as some 95% of gaps in north-west Europe do not exceed 100 feet (30.5 metres), it is not foreseen that this will be a problem. Before construction proper can begin, all the components must be brought to the home bank. The components needed are as follows:
  • the launching rail modules can be stowed on the launching vehicle for transport. All the remaining components, together with necessary slings etc., could be brought to the site on a total of three GS trucks which, in addition to a standard mobile crane would be all the vehicles needed for the bridge to be constructed. The crane would be expected to have a 3.5 tonne lift at a 6 metre outreach.
  • the hydraulic power pack which is portable, is for articulating the end bridge modules 75 when jacking down the ends of the completed bridge.
  • the power pack can be powered by an air-cooled diesel engine of about 10 horsepower (7.5 kilowatts) driving a variable displacement pump working at a pressure of 3000 psi (20.6 MN/m2).
  • the engine would be provided with hand or inertia start to obviate the need for batteries.
  • Spare power units could be provided as a precaution against breakdown.
  • an emergency hand pump could be provided to enable the bridge to be jacked down in the event of power failure. Recovery, however, would hardly be feasible with a manual pump, due to the height to which the bridge has to be jacked.
  • the launching vehicle 135 is first reversed up to the span to be crossed.
  • the first sliding frame 141 is deployed and the frame outriggers 185 and 187, which function as jacks, are also deployed.
  • the chassis outriggers 213 and 215 may also be deployed at this stage.
  • an end launching rail module 13 is placed on the launching rail support 155 and held there by the hold-down rollers 181.
  • the toe of the end launching rail module 13 is so positioned that its toe is towards the far back.
  • An end bearing pad 29 may be in position on the toe of the end launching rail module 13.
  • the crane now lifts an intermediate launching rail module 1 into position behind the end launching rail module 13.
  • the end and intermediate launching rail modules 13 and 1 are coupled together. Because the intermediate launching rail modules only weigh. 0.8 tonnes each, --it is not necessary for the crane to be chocked at this stage.
  • the second sliding frame 145 is now deployed and the construction of the launching rail completed by joining on two further intermediate launching rail modules 1 and a final end launching rail module 13. As each intermediate launching rail module 13 is added, the launching rail is boomed out by means of the friction drive 169.
  • the first tapered end bridge module 75 is lifted by the crane and unfolded. It is desirable for the crane to be chocked by means of outriggers and jacks before this stage because of the 3.5 tonne weight of the bridge modules.
  • a first roller bracing frame 115 is fitted between the trackways of the end bridge module 75.
  • the end bridge module 75 is articulated upwards (in the position shown by the discontinuous lines in Figure 5A) so that the upper chord, is approximately horizontal. In this way, the end bridge module 75 is appropriately aligned for connection to an intermediate bridge module 31.
  • the hydraulic power pack is now lifted onto the bridge by the crane.
  • the launching rail 133 is now landed on the far bank, as shown in Figure 16. This is achieved by tilting the support 155 by actuating the hydraulic piston and cylinder arrangement 159. The extent of tilt of the support 155 will depend on the level of the far bank with respect to the home bank.
  • the launching rail 133 now forms a simply supported beam across the span and along which the bridge can be launched. It should be noted that all the hydraulic requirements of the equipment of the launching vehicle can be satisfied by a hydraulic pump fitted to the vehicle engine power take-off.
  • Bridge construction proceeds by use of the crane.
  • the connection or coupling between successive bridge modules 75 and 31 or 31 and 31 is made by connecting pins.
  • the lower chord outer pins are placed by hand.
  • the lever mechanism 101 used for sliding the lower chord inner pins into position obviates the necessity for a man to go underneath the bridge.
  • the upper chord tension connections can be made by a man standing on the deck.
  • the bridge is moved forward by a module's length by means of the bridge module friction drive unit 209 and 211.
  • a second roller bracing frame 115 is fitted between the trackways of the second end bridge module 75.
  • the first end bridge module 75 can be jacked down by means of the hydraulic power pack (not shown) which is on the bridge. The weight of the bridge will then be transmitted by means of the end bridge module, rather than the launching rail, to the far bank.
  • the hydraulic power pack is again used.
  • the articulation of the second end bridge module 75 (which is at the home bank) is operated so that the ramp section 105 supports the weight of the bridge on the bridge support rollers 205 and 207 and the bridge module friction drive units 209 and 211, which are on the frame 139 of the vehicle 135.
  • the launching rail 133 may then be connected to the second roller bracing frame 115 by a tension link W.
  • the second sliding frame 145 which no longer supports the weight of the bridge through the launching rail 133, can then be retracted.
  • the launching rail 133 can be lowered down onto a second end bearing pad 29, which has been positioned to receive it.
  • the ramp portion 105 of the second end bridge module 75 can be lifted clear of the vehicle, again by means of the hydraulic piston and cylinder arrangement 109 in the second end bridge module.
  • the frame outrigger jacks can be raised and the first and second sliding frames 141 and 145 can be retracted clear of the bridge.
  • the chassis outriggers 213 and 215 can then be stowed and the vehicle 135 driven away. Meanwhile, the piston and cylinder arrangement 109 of the second end bridge module 75 can-be used to jack down the home bank end of the bridge and if necessary, as with the far bank end, a deck compression unit l13 may be inserted.
  • the bridge is now complete and can be opened to traffic.
  • the launching rail remains in the bridge, ready for recovery, which can take place from either end, due to the symmetrical construction of the bridge.
  • the launching rail is suspended from the tension connection marked W and from a corresponding one at the other end of the bridge, the lower connecting pins joining the end launching rail modules 13 to their respective neighbouring intermediate launching rail modules 1 can be removed. It is possible to reduce the end slope of the bridge, or even to have the deck level, by reducing the width of the deck compression units 113 shown in Figure 5A.
  • each end launching rail module 13 and each intermediate launching rail module 1 is provided with a tension connection for connection to the centre decking of the bridge at the appropriate point.
  • the sequence for recovery and dismantling the bridge is essentially the reverse of the launching sequence.
  • the timing may be comparable.
  • a bridge of MLC 70 capability can readily be built efficiently and rapidly. It is anticipated that a nominal 100 feet (30.5 metres) span could be bridged with the aid of a launching vehicle, a crane and six men in less than 15 minutes by night. The six men include the bridge commander and crane operator. The 4 metre wide deck presented by the bridge in use should be sufficient for conveying the majority of ground based military equipment across the span.
  • the maximum height of the launching vehicle 135 (see Figures 1A and lB) will be 10 feet (3 metres).
  • the maximum width when all the outriggers are in the stowed position will be lO feet 6 inches (3.2 metres), but this includes the width of the pads 193 on the frame outriggers 185 and 187.
  • the width of the vehicle without the frame outriggers 185 and 187 is 8 feet 9 inches (2.7 metres).
  • the vehicle with all outriggers stowed is 32 feet (9.75 metres) long from the front to the furthest rear extremity.
  • the length between the centres of the pads 193 and a mid line between the two rear axles of the launching vehicle is 16 feet 6 inches (5 metres). There is a further 17.7 feet (5.4 metres) between this midline and the front axle.
  • the front axle weight of the vehicle is 7 tonnes and each of the rear axles transmits a weight of 7.5 tonnes.
  • the launching rail 133 is composed of five modules, each of which weighs about 0.8 tonne.
  • the total weight of the launching rail is therefore 4 tonnes. Because of the symmetrical nature of the 100 feet (30.5 metres) launching rail, this can be regarded as acting 50 feet (15.25 metres) from the centres of the pads 193, when the launching rail is fully boomed out, to give a clockwise moment of 61 metre-tonnes, which is comfortably less than the 142.8 metre-tonnes anti-clockwise moment due to the vehicle 135. Stability during construction is therefore assured.
  • the pads 193 should be capable of transmitting a load of at least the total weight of the launching rail and the launching vehicle 135. In practice, they should therefore be able to support a load of about 26 tonnes.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
EP19850303531 1984-06-14 1985-05-20 Brückenkonstruktion Expired EP0165712B1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB8415135 1984-06-14
GB8415135 1984-06-14

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP90201085.9 Division-Into 1990-05-01

Publications (3)

Publication Number Publication Date
EP0165712A2 true EP0165712A2 (de) 1985-12-27
EP0165712A3 EP0165712A3 (en) 1987-01-21
EP0165712B1 EP0165712B1 (de) 1990-11-28

Family

ID=10562405

Family Applications (2)

Application Number Title Priority Date Filing Date
EP19850303531 Expired EP0165712B1 (de) 1984-06-14 1985-05-20 Brückenkonstruktion
EP90201085A Withdrawn EP0396196A1 (de) 1984-06-14 1985-05-20 Brückenkonstruktion

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP90201085A Withdrawn EP0396196A1 (de) 1984-06-14 1985-05-20 Brückenkonstruktion

Country Status (2)

Country Link
EP (2) EP0165712B1 (de)
DE (1) DE3580707D1 (de)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2186614A (en) * 1986-02-14 1987-08-19 Salzgitter Ag A haulage vehicle for bridge parts
EP0256446A2 (de) * 1986-08-20 1988-02-24 Fried. Krupp AG Hoesch-Krupp Verlegesystem für eine zerlegbare Brücke
FR2619134A1 (fr) * 1987-08-04 1989-02-10 Mediterranee Const Ind Pont modulaire a mise en oeuvre rapide
JP2016044387A (ja) * 2014-08-19 2016-04-04 株式会社内山商会 車両通行用ブリッジ

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MX352718B (es) * 2011-09-06 2017-12-06 Matiere Star Viga metálica adaptada para realizar un elemento constitutivo del pilotaje de un puente.
DE102014008178A1 (de) 2014-06-10 2015-12-17 General Dynamics European Land Systems-Germany Gmbh Transportierbare faltbare Brücke
DE102015115364A1 (de) * 2015-09-11 2017-03-16 Krauss-Maffei Wegmann Gmbh & Co. Kg Kuppelvorrichtung zur Verbindung zweier Brückenelemente
CN106758763B (zh) * 2016-12-13 2018-08-03 湖北华舟重工应急装备股份有限公司 一种人工拼装式双层公路快速桥

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2026399A (en) * 1978-06-08 1980-02-06 Magirus Deutz Ag Vehicle more particularly a lorry for transporting a multi-component mobile bridge
DE2846182A1 (de) * 1978-10-24 1980-05-08 Porsche Ag Brueckenlegegeraet
EP0075671A1 (de) * 1981-09-30 1983-04-06 DORNIER SYSTEM GmbH Zerlegbare Festbrücke
EP0081388A2 (de) * 1981-12-08 1983-06-15 Williams Fairey Engineering Ltd Transportierbare Brückenkonstruktion
EP0093873A1 (de) * 1982-05-08 1983-11-16 Fried. Krupp Gesellschaft mit beschränkter Haftung Kraftfahrzeug zum Transportieren und Verlegen einer Festbrücke

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2196674B (en) * 1980-03-04 1988-09-28 Secr Defence Launching apparatus for transportable bridges

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2026399A (en) * 1978-06-08 1980-02-06 Magirus Deutz Ag Vehicle more particularly a lorry for transporting a multi-component mobile bridge
DE2846182A1 (de) * 1978-10-24 1980-05-08 Porsche Ag Brueckenlegegeraet
EP0075671A1 (de) * 1981-09-30 1983-04-06 DORNIER SYSTEM GmbH Zerlegbare Festbrücke
EP0081388A2 (de) * 1981-12-08 1983-06-15 Williams Fairey Engineering Ltd Transportierbare Brückenkonstruktion
EP0093873A1 (de) * 1982-05-08 1983-11-16 Fried. Krupp Gesellschaft mit beschränkter Haftung Kraftfahrzeug zum Transportieren und Verlegen einer Festbrücke

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2186614A (en) * 1986-02-14 1987-08-19 Salzgitter Ag A haulage vehicle for bridge parts
EP0256446A2 (de) * 1986-08-20 1988-02-24 Fried. Krupp AG Hoesch-Krupp Verlegesystem für eine zerlegbare Brücke
EP0256446A3 (en) * 1986-08-20 1989-07-26 Fried. Krupp Gmbh Positioning system for a dismountable bridge
FR2619134A1 (fr) * 1987-08-04 1989-02-10 Mediterranee Const Ind Pont modulaire a mise en oeuvre rapide
JP2016044387A (ja) * 2014-08-19 2016-04-04 株式会社内山商会 車両通行用ブリッジ

Also Published As

Publication number Publication date
EP0165712A3 (en) 1987-01-21
EP0396196A1 (de) 1990-11-07
EP0165712B1 (de) 1990-11-28
DE3580707D1 (en) 1991-01-10

Similar Documents

Publication Publication Date Title
US4920595A (en) Solid bridge kit
US4663793A (en) Methods of deploying a bridge of a particular construction
US9334668B2 (en) Modular drilling rig system
US3939988A (en) Tower crane
EP0081388B1 (de) Transportierbare Brückenkonstruktion
US7357616B2 (en) Method and apparatus for transporting oil rig
US4660731A (en) Telescopic crane for heavy loads
US4706825A (en) Portable folding bridge crane
US3944081A (en) Tower crane
PL205089B1 (pl) Wojskowy system do szybkiego wznoszenia mostów
US2772004A (en) Portable gantry crane
US4972538A (en) Launching apparatus for transportable bridges
US8096010B2 (en) Bridge span and bridge span transportation vehicle
EP0165712B1 (de) Brückenkonstruktion
US4150754A (en) Utility crane
US5940916A (en) Bridge span-by-span construction apparatus and method
EP0155840B1 (de) Vorrichtung und Verfahren zum Verschaffen von Zugang zur Unterseite einer Brücke
CA2038356C (en) Army bridge
US4665577A (en) Methods of constructing modular bridges
US3934729A (en) Tower crane
US4062081A (en) Transportable bridge and method
US5443353A (en) Automatic ramp car
EP0164936A2 (de) Brückenkonstruktion
JPH04504289A (ja) 橋下部検分設備
US5915423A (en) Bridge construction

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): DE FR GB

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): DE FR GB

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: WILLIAMS FAIREY ENGINEERING LTD.

17P Request for examination filed

Effective date: 19870708

17Q First examination report despatched

Effective date: 19890124

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: WILLIAMS FAIREY ENGINEERING LTD

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB

XX Miscellaneous (additional remarks)

Free format text: TEILANMELDUNG 90201085.9 EINGEREICHT AM 20/05/85.

ET Fr: translation filed
REF Corresponds to:

Ref document number: 3580707

Country of ref document: DE

Date of ref document: 19910110

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

26 Opposition filed

Opponent name: DORNIER GMBH

Effective date: 19910729

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20040510

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20040519

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20040527

Year of fee payment: 20

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20050519

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

RIN2 Information on inventor provided after grant (corrected)

Inventor name: PARRAMORE, THOMAS STUART