EP0113661A2 - Modular roadway construction method and prefabricated units therefor - Google Patents

Modular roadway construction method and prefabricated units therefor Download PDF

Info

Publication number
EP0113661A2
EP0113661A2 EP84100045A EP84100045A EP0113661A2 EP 0113661 A2 EP0113661 A2 EP 0113661A2 EP 84100045 A EP84100045 A EP 84100045A EP 84100045 A EP84100045 A EP 84100045A EP 0113661 A2 EP0113661 A2 EP 0113661A2
Authority
EP
European Patent Office
Prior art keywords
shell
filler
element according
pillars
slabs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP84100045A
Other languages
German (de)
French (fr)
Other versions
EP0113661A3 (en
Inventor
Miron Tuval
Andre Wexler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0113661A2 publication Critical patent/EP0113661A2/en
Publication of EP0113661A3 publication Critical patent/EP0113661A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/006Foundations for pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/001Pavings made of prefabricated single units on prefabricated supporting structures or prefabricated foundation elements except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames
    • E01C5/10Prestressed reinforced units ; Prestressed coverings from reinforced or non-reinforced units
    • E01C5/105Prestressed reinforced units ; Prestressed coverings from reinforced or non-reinforced units on prefabricated supporting structures or prefabricated foundation elements, except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal
    • E01D2101/34Metal non-ferrous, e.g. aluminium

Definitions

  • the present invention concerns novel structural elements and their use in construction in general including the construction of roads, runways, motorways, viaducts, aqueducts and the like, all to be referred to collectively as "roadways”.
  • a struc- tural element comprising a rigid shell, a free-flowing filler material within the shell and at least one reinforcing rod or cable extending across the filler and tying at least two opposite walls of the shell.
  • the free-flowing filler material of a structural element according to the invention may be granular solid, e.g. sand; clay and the like or a liquid such as water.
  • the filler is a free- flowing granular material such as sand, it is preferably moistened by liquid lubricant, e.g. water, which enables to maximize the dense packing of the filler.
  • Structural elements according to the invention may be in the form of slabs, panels, beams, blocks, walls, pillars with or.without headplates, etc.
  • the reinforcing rods or cables in structural elements according to the invention may be prestressed, post-stressed or not stressed at all.
  • the shell may be of any suitable rigid material having the desired mechanical properties such as, for example, concrete, iron, steel, aluminium and the like.
  • the structural elements according to the invention may be prefabricated or may be made in situ. Whether the one or the other way is preferred will depend on the surrounding circumstances such as size of the elements and their cost of transportation.
  • the shell without one of its walls with the reinforcing cable (s) or rod (s) anchored in one or more existing walls.
  • the rod (s) or cable (s) may be prestressed or post-stressed or remain unstressed as may be required. This is then followed. by the insertion of the filler, at which stage the open side of the structure is uppermost.
  • the still open element is preferably placed on a vibrator which in case of a granular filler ensures dense packing and in the case of a liquid; filler such as water, ensures the escape of air bubbles.
  • the missing wall is applied to the element.
  • the shell is of concrete
  • some of the moisture of the wet filler or some of the filler water is taken up by the concrete during setting.
  • Slabs according to the invention can be used to advantage for the construction of roadways.
  • the slabs according to the invention are placed directly on the ground. Where this method is practised the ground will have to be prepared somewhat but to a much lesser degree of refinement than in conventional roadway construction techniques.
  • Another method of constructing a roadway in accordance with the invention comprises implanting prefabricated pillars in the ground to protrude from the ground at a desired height and placing slabs according to the invention on such pillars.
  • the pillars may comprise headplates for better supporting the slabs.
  • beams may be used and placed.across adjacent pillars with or without head portions and the slabs according to the invention are then placed on such beams.
  • Any pillars and beams used in the performance of constructions in accordance with the invention may themselves be constructional elements according to the invention or else they may be conventional, e.g. of reinforced concrete or steel.
  • the pillars and beams are preferably prefabricated while the slabs may be prefabricated or be made in situ, depending on their size.
  • Prefabricated pillars used for the construction of roadways in accordance with the invention may be of modular design, that is they may be so designed that one fits on top of the other in a manner such that the plurality form a practically integral pillar without change of static characteristics. Accordingly a plurality of such pillars can be joined together to form an integral pillar of the desired height.
  • the pillars act as the foundation and as supporting columns at the same time.
  • the underground portion of the pillars is so shaped as to fulfil the function of piles or poles.
  • Such pillars are preferably placed in the ground with the aid of a vibrating implanter which forces the pillars into the ground to the desired protrusion height.
  • connecting plates may be placed and sustaining pillars may then be mounted on the connecting plates and slabs be placed thereon. In any way the bottom part of the slabs stays clear of the highest topographical protrusion of the ground and this way the need for ground preparation is generally eliminated.
  • the slabs are so designed that juxtaposed slabs interengage, e.g. by way of interlock or overlap of end and/or side portions.
  • Slab 1 according to the invention shown in Fig. 1 comprises a main portion 2 and a set off end portion 3 that serves for overlap with a correspondingly shaped end portion of another slab according to the invention.
  • the slab is made of a concrete shell 4, a compact granular filler material 5, e.g. wet sand with a moisture content of 10-20% by weight, and a plurality of rows of reinforcing rods or struts 6, each such row being arranged in this particular case in the form of recurring V-shaped segments.
  • the shell 4 comprises an expanded metal grid 7 embedded therein as shown in Figs. 2 and - 3.
  • the wet sand used as filler in the embodiment of Figs. 1. to 3 may be replaced by other materials such as clay, by a flowing wet mass such as grout or by a pure liquid such as water.
  • a slab of the kind of Figs. 1 to 3 may be prefabricated or produced in situ. It can be made large, e.g. about 100 m. long, and slabs of such a size will obviously have to be produced in situ. Such large slabs are used for placing directly on the ground. For other applications, such as pillar supported roadways, wall construction and the like, smaller slabs will be used.
  • a trough-shaped concrete shell 9 with an expanded metal grid 10 embedded therein is cast in a form assembly comprising an outer form 11 and an insert 12, the latter .being shown in Fig. 4 in the extracted position.
  • the bottom plate of shell 9 is cast in form 11 with an expanded metal grid embedded therein and a plurality of reinforcing rods 14 anchored in the bottom plate in the manner shown.
  • the insert 12 is inserted and the side walls of the shell 9 are cast in the spaces between form 11 and insert 12, again with an expanded metal' grid embedded therein.
  • a filler material e.g.
  • the shell 9 may be extracted from form 11 prior to the introduction of the filler material 15. After the filler material 15 has been poured in, the shell 9 either within form 11 or after removal therefrom, is placed on a vibrator in order to compact the filler and thereafter an upper concrete plate with an expanded metal grid embedded therein is cast on top of the filled shell 9 so that the apexes of grid 14 or rods 6, as the case may be, become embedded in the upper plate similar as the lower apexes are embedded in the bottom of shell 9.
  • the pillar according to the invention shown in Figs. 5 and 6 comprises a pole 17 and a headplate 13.
  • Pole 17 is of conventional design, e.g. massive, reinforced concrete.
  • Headplate 18 comprises a concrete shell 19 and a filler mass 20, e.g. of wet sand or solid concrete. Inside shell 19 there are two rows of identical, satellite boxes 21a to 25a and 21b to 25b, all of which are filled with a filler material which may be the same or different from the filler material 20.
  • the boxes 21a, 23a and 25a accomodate concrete-filled tubes 26a to 30a and likewise boxes 21b, 23b and 25b accomodate concrete filled tubes 26b to 30b.
  • Each of the concrete filled tubes 26a through 30a and 26b through 30b accomodates 3 vertical reinforcing rod such as, for. example, rod 31 in box 21b and rod 32 in box 25b.
  • All the vertical reinforcing rods such as rod 31 and 32 are thus sheathed and they extend through a filler between two opposite walls of the headplate 18, namely the top and the bottom walls.
  • Preferably the vertical reinforcing rods are post-stressed.
  • the headplate 18 further comprises two horizontal tubes 34, 35 both filled with concrete accomodating respectively reinforcing rods 36 and 37. These two reinforcing rods are thus also sheathed similar as all vertical reinforcing rods and they extend between two opposite side walls of the concrete shell across the filler 20. Preferably reinforcing rods 36 and 37 are also post-stressed.
  • the headplate 18 according to the invention weighs less and in the case of sand filler is about 30% less expensive than a headplate of massive reinforced concrete with the same mechanical properties.
  • the headplate 18 may be adapted for standing thereon other structural elements, e.g. block shaped elements of similar construction as headplate 18.but higher. Where this is practiced the vertical reinforcing rods such as rods 31 and 32 shown in Figs. 5 and 6 will pass through all stacked elements connecting them to each other. This means that the vertical rods will be positioned only after the elements are stacked and they may, if desired, be post-stressed.
  • other structural elements e.g. block shaped elements of similar construction as headplate 18.but higher.
  • the vertical reinforcing rods such as rods 31 and 32 shown in Figs. 5 and 6 will pass through all stacked elements connecting them to each other. This means that the vertical rods will be positioned only after the elements are stacked and they may, if desired, be post-stressed.
  • the ensuing vertical assembly may be capped by another headplate similar to plate 18 and the vertical rods are anchored in the lowermost and uppermost plates thus holding together all the elements stacked on the lowermost headplate 18.
  • an integral pillar may be produced in which the vertical tying rods may be post-stressed.
  • rods 36 and 37 may be post-stressed.
  • Fig. 7 shows by way of example some surface ways that can be constructed in accordance with the invention.
  • a graded roadway starting at a level and rising to a height while 41 shows the surfaceway being used as a landing strip and 42 shows the component parts of a surfaceway being used as a viaduct to hold rails for railroad vehicles.
  • a ground depression bridged by a roadway 44.
  • the main component parts of the roadway shown in Fig. 7 are modular pillars shown in two different forms as pillars 45 and 46; modular beams which are shown in two different forms, modular beam 47 and modular beam 48, and the slabs 49.
  • the pillars 45 and 46 may have a head portion according to the invention of the kind shown in Figs. 5 and 6 and slabs 49 may for example be in the form shown in Figs. 1 to 3.
  • Grading utilized in the system is controlled by monitoring the amount by which the pillars protrude from the ground.
  • the nodular pillars are placed one on top of the other to obtain the desired height.
  • a single pillar is shown at 50 while pillars 46 are each made out of two modular portions. In this way the roadway climbs to the desired height at a desired slope.
  • Fig. 8 shows a beam 52 that can be used in the construction of a roadway with slabs and pillars according to the invention. It has an inverted T-shaped profile and two hollow channels 53 and 54 which if desired may be filled with a filler material or else serve for the accommodation of functional elements such as, for example, electric cables and wires. Shoulders 55 and 56 serve for receiving the end portions of the slabs such as slab 1 of Fig. 1.
  • the modular pillar 57 shown in Fig.9 comprises at one end a socket 58 and at the other end a protuberance 59 whereby it is adapted for interlocking alignment with similar modular pillars.
  • the pillar 57 may also be directly fixed in the ground and may support at its top a slab such as-slab 1 of Figs. to 3, either directly or with the interposition of other structural elements such as a headplate or a beam.
  • Beam 60 of Fig. 10 is an edge beam. Similar as beam 52 of Fig. 8 it comprises channels 61 and 62 and a shoulder 63 while the other shoulder in the beam of Fig. 8 is replaced here by a wall portion 64.
  • Figs. 8 to 10 may or may not be made in accordance with the invention. In any event they are useful for constructing roadways using slabs and pillar heads according to the invention of the kind described hereinbefore.
  • a vibrating unit may be used to force the pillars into the ground surface that does not have to be prepared in any manner.
  • the vibrating unit forces the pillars into the ground to the desired protrusion height.
  • the height may be measured with any suitable instrument such as a laser altitude measuring device which is accurate and easily utilized.
  • One or more pillars can be placed on top of an inset pillar to obtain the height desired for the roadway. When a number of pillars are placed in position beams are placed over the pillars and/or the pillars are fitted with headplates, e.g. as shown in Figs. 5 and 6.
  • the new methods of roadway construction with slabs and other structural elements according to the invention are extremely versatile and cost effective since almost the entire roadway is prefabricated or made from elements fabricated in situ. Where pillars are used the roadway runs overhead the topmost topographical protrusion so that no ground surface preparation is necessary at all. Where slabs are placed directly on the ground some ground preparation is required but to a much lesser degree than in conventional road construction methods.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)

Abstract

Structural elements for use in constructing roadways, turnways, viaducts and the like comprise a rigid shell, a freeflowing filler material and at least one reinforcing rod or cable extending across the filler and tying at least two opposite walls of the shell.

Description

  • The present invention concerns novel structural elements and their use in construction in general including the construction of roads, runways, motorways, viaducts, aqueducts and the like, all to be referred to collectively as "roadways".
  • In the following the utilization of structural elements according to the invention will be described mainly with respect to the construction of roadways, it being understood that the utilization of the said structural elements is not restricted thereto.
  • In recent years the rate of construction of new roadways is ever increasing, both for the expansion of existing networks of motorways and for establishing roadway networks in areas where until now there have almost been no modern roadways. At the same time the cost for the construction of roadways is also ever increasing, the contributing factors being the cost of labour, the cost for the preparation of the ground on which the roads run by grading and/or filling so that a relatively smooth substrate is prepared for the roadway surface, and the cost of the materials required for roadway surfacing which is in particular high when the surface has to be adapted for heavy duty. Taking the case of a road, depending on the economics of the area where the road is being constructed, either a large labour force is used for preparing the ground or large amounts of heavy construction equipment are used, or both. The cost of the road increase of course even more where, for example, the road is laid across a swamp area or along a waterfront. Thus where the roadway goes through a swamp area, then to prepare the ground for the road it is necessary to drain the swamp, fill the drained area and level and/or grade the fill. In case of a roadway that is to run along a waterfront where the soil is usually very soft and the ground water level is close to the surface, the problems are even more complex and special means are required to keep away the ground water. Many times in fact the cost of placing a read across a swamp area or along a waterfront is so high that an alternative route around the wet area is chosen even though this is also extremely expensive.
  • The need for careful levelling and grading of the ground before laying a road surface could be obviated if the road surface were to be made of a heavy duty mass that is resistant to the forces to which it is subjected in use even if supported from below only at selected points and not over the entire lower face. Such a surface mass could be laid directly on an uneven ground or mounted on pillars so as to be in fact supported at selective spots only rather than over the entire lower face and still withstand all the forces acting on the upper face thereof. The only known material that would practically come into consideration for such requirements would be massive reinforced concrete but the material and handling costs of such a roadway surface are so high as to cancel out any saving achieved by not fully or not at all levelling and grading the ground. Thus, while the idea is theoretically sound it could hitherto not be practically realised.
  • The need for heavy-duty highly resistant structural elements arises also in connection with other forms of civil engineering such as the construction of buildings, factory halls, bridges, aqueducts, viaducts for railways, etc.
  • It is an object of the present invention to provide heavy-duty stress-resistant structural elements that are lighter and cheaper than conventional structural elements of similar size and mechanical properties.
  • It is a further object of the present invention to provide a new method for the construction of roadways making use of the new structural elements according to the invention.
  • In accordance with the invention there is provided a struc- tural element comprising a rigid shell, a free-flowing filler material within the shell and at least one reinforcing rod or cable extending across the filler and tying at least two opposite walls of the shell.
  • The free-flowing filler material of a structural element according to the invention may be granular solid, e.g. sand; clay and the like or a liquid such as water. Where the filler is a free- flowing granular material such as sand, it is preferably moistened by liquid lubricant, e.g. water, which enables to maximize the dense packing of the filler.
  • Structural elements according to the invention may be in the form of slabs, panels, beams, blocks, walls, pillars with or.without headplates, etc.
  • The reinforcing rods or cables in structural elements according to the invention may be prestressed, post-stressed or not stressed at all.
  • It has been found that structural elements according to the invention are extremely strong. If concrete is used in the shell the amount of concrete required is about half or even less than that needed.for conventional structural elements of similar size and mechanical properties and at the same time are also less expensive to make. These unique properties are due to the action of the filler which co-acts with the shell to withstand the compressive forces that act upon it. The filler material whether free-flowing granular or liquid, acts as a high viscosity liquid for transmitting forces in all directions, thereby to spread the compressive forces exerted thereon by transmission from the shell.
  • The shell may be of any suitable rigid material having the desired mechanical properties such as, for example, concrete, iron, steel, aluminium and the like.
  • The structural elements according to the invention may be prefabricated or may be made in situ. Whether the one or the other way is preferred will depend on the surrounding circumstances such as size of the elements and their cost of transportation.
  • For the manufacture of a unit according to the invention it is possible to first cast the shell without one of its walls with the reinforcing cable (s) or rod (s) anchored in one or more existing walls. The rod (s) or cable (s) may be prestressed or post-stressed or remain unstressed as may be required. This is then followed. by the insertion of the filler, at which stage the open side of the structure is uppermost. During the insertion of the filler the still open element is preferably placed on a vibrator which in case of a granular filler ensures dense packing and in the case of a liquid; filler such as water, ensures the escape of air bubbles. When the filler has been fully inserted and compacted or degased, as the case may be, the missing wall is applied to the element. Where the shell is of concrete, some of the moisture of the wet filler or some of the filler water is taken up by the concrete during setting.
  • Slabs according to the invention can be used to advantage for the construction of roadways. By one method the slabs according to the invention are placed directly on the ground. Where this method is practised the ground will have to be prepared somewhat but to a much lesser degree of refinement than in conventional roadway construction techniques.
  • Another method of constructing a roadway in accordance with the invention comprises implanting prefabricated pillars in the ground to protrude from the ground at a desired height and placing slabs according to the invention on such pillars.
  • The pillars may comprise headplates for better supporting the slabs. If desired, beams may be used and placed.across adjacent pillars with or without head portions and the slabs according to the invention are then placed on such beams. Any pillars and beams used in the performance of constructions in accordance with the invention may themselves be constructional elements according to the invention or else they may be conventional, e.g. of reinforced concrete or steel.
  • The pillars and beams are preferably prefabricated while the slabs may be prefabricated or be made in situ, depending on their size.
  • Prefabricated pillars used for the construction of roadways in accordance with the invention may be of modular design, that is they may be so designed that one fits on top of the other in a manner such that the plurality form a practically integral pillar without change of static characteristics. Accordingly a plurality of such pillars can be joined together to form an integral pillar of the desired height.
  • In a roadway according to the invention built on pillars, the pillars act as the foundation and as supporting columns at the same time.
  • With the aid of such modular pillars it is possible to provide any desired grading by varying the extent of protrusion of the pillars from the ground in accordance with a desired pattern. In this way a graded, sloping roadway is produced.
  • In the construction of a roadway in accordance with the invention using pillars the underground portion of the pillars is so shaped as to fulfil the function of piles or poles. Such pillars are preferably placed in the ground with the aid of a vibrating implanter which forces the pillars into the ground to the desired protrusion height. On the protruding portion of the pillars connecting plates may be placed and sustaining pillars may then be mounted on the connecting plates and slabs be placed thereon. In any way the bottom part of the slabs stays clear of the highest topographical protrusion of the ground and this way the need for ground preparation is generally eliminated.
  • Preferably the slabs are so designed that juxtaposed slabs interengage, e.g. by way of interlock or overlap of end and/or side portions.
  • The invention is illustrated by way of example only in the accompanying drawings in which:
    • Fig. 1 is a perspective view, partly torn open, of a slab according to the invention;
    • Fig. 2 is a longitudinal section along line II-II of Fig. 1 drawn to a larger scale;
    • Fig. 3 is a section along line III-III of Fig. 2;
    • Fig, 4 is a diagrammatic sectional view of a phase in the production of a slab according to Figs. 1 to 3;
    • Fig. 5 is a section through a pillar according to the invention taken along line V-V of Fig. 6;
    • Fig. 6 is a section along line VI-VI of Fig. 5:
    • Fig. 7 is a pictorial view of different roadways constructed in accordance with the invention; and
    • Figs. 8, 9 and 10 are perspective views of respectively a modular beam, a modular pillar and a modular edgebeam all for use in the performance of construction methods according to the invention.
  • Slab 1 according to the invention shown in Fig. 1 comprises a main portion 2 and a set off end portion 3 that serves for overlap with a correspondingly shaped end portion of another slab according to the invention. The slab is made of a concrete shell 4, a compact granular filler material 5, e.g. wet sand with a moisture content of 10-20% by weight, and a plurality of rows of reinforcing rods or struts 6, each such row being arranged in this particular case in the form of recurring V-shaped segments. The shell 4 comprises an expanded metal grid 7 embedded therein as shown in Figs. 2 and-3.
  • The wet sand used as filler in the embodiment of Figs. 1. to 3 may be replaced by other materials such as clay, by a flowing wet mass such as grout or by a pure liquid such as water.
  • Depending on size and logistic considerations, a slab of the kind of Figs. 1 to 3 may be prefabricated or produced in situ. It can be made large, e.g. about 100 m. long, and slabs of such a size will obviously have to be produced in situ. Such large slabs are used for placing directly on the ground. For other applications, such as pillar supported roadways, wall construction and the like, smaller slabs will be used.
  • In order to prevent corrosion of the reinforcing rods or struts these may be enclosed in cells 61 created by the provision of two partitions extending across the width of the slab and separating the said rods or struts from the filler material 5.
  • One way of producing a slab according to Figs. 1 to 3 is illustrated in Fig. 4. As shown a trough-shaped concrete shell 9 with an expanded metal grid 10 embedded therein is cast in a form assembly comprising an outer form 11 and an insert 12, the latter .being shown in Fig. 4 in the extracted position. At first the bottom plate of shell 9 is cast in form 11 with an expanded metal grid embedded therein and a plurality of reinforcing rods 14 anchored in the bottom plate in the manner shown. Thereafter the insert 12 is inserted and the side walls of the shell 9 are cast in the spaces between form 11 and insert 12, again with an expanded metal' grid embedded therein. Before or after the setting of shell 9 a filler material 15, e.g. wet sand, is poured into the shell and then insert 12 is removed. If desired the shell 9 may be extracted from form 11 prior to the introduction of the filler material 15. After the filler material 15 has been poured in, the shell 9 either within form 11 or after removal therefrom, is placed on a vibrator in order to compact the filler and thereafter an upper concrete plate with an expanded metal grid embedded therein is cast on top of the filled shell 9 so that the apexes of grid 14 or rods 6, as the case may be, become embedded in the upper plate similar as the lower apexes are embedded in the bottom of shell 9.
  • The pillar according to the invention shown in Figs. 5 and 6 comprises a pole 17 and a headplate 13. Pole 17 is of conventional design, e.g. massive, reinforced concrete.
  • Headplate 18 comprises a concrete shell 19 and a filler mass 20, e.g. of wet sand or solid concrete. Inside shell 19 there are two rows of identical, satellite boxes 21a to 25a and 21b to 25b, all of which are filled with a filler material which may be the same or different from the filler material 20. The boxes 21a, 23a and 25a accomodate concrete-filled tubes 26a to 30a and likewise boxes 21b, 23b and 25b accomodate concrete filled tubes 26b to 30b. Each of the concrete filled tubes 26a through 30a and 26b through 30b accomodates 3 vertical reinforcing rod such as, for. example, rod 31 in box 21b and rod 32 in box 25b. All the vertical reinforcing rods such as rod 31 and 32 are thus sheathed and they extend through a filler between two opposite walls of the headplate 18, namely the top and the bottom walls. Preferably the vertical reinforcing rods are post-stressed.
  • The headplate 18 further comprises two horizontal tubes 34, 35 both filled with concrete accomodating respectively reinforcing rods 36 and 37. These two reinforcing rods are thus also sheathed similar as all vertical reinforcing rods and they extend between two opposite side walls of the concrete shell across the filler 20. Preferably reinforcing rods 36 and 37 are also post-stressed.
  • The headplate 18 according to the invention weighs less and in the case of sand filler is about 30% less expensive than a headplate of massive reinforced concrete with the same mechanical properties.
  • If desired the headplate 18 may be adapted for standing thereon other structural elements, e.g. block shaped elements of similar construction as headplate 18.but higher. Where this is practiced the vertical reinforcing rods such as rods 31 and 32 shown in Figs. 5 and 6 will pass through all stacked elements connecting them to each other. This means that the vertical rods will be positioned only after the elements are stacked and they may, if desired, be post-stressed.
  • The ensuing vertical assembly may be capped by another headplate similar to plate 18 and the vertical rods are anchored in the lowermost and uppermost plates thus holding together all the elements stacked on the lowermost headplate 18. In this way an integral pillar may be produced in which the vertical tying rods may be post-stressed. Where a more massive pillar is required it is possible to juxtapose in an interengaging manner two or more pillars and headplates of the kind shown in Figs. 5 and 6 with horizontal rods such as rods 36 and 37 connecting the juxtaposed headplates 18. Here again rods 36 and 37 may be post-stressed.
  • The pictorial illustration of Fig. 7 shows by way of example some surface ways that can be constructed in accordance with the invention. For example at 40 there is a graded roadway starting at a level and rising to a height while 41 shows the surfaceway being used as a landing strip and 42 shows the component parts of a surfaceway being used as a viaduct to hold rails for railroad vehicles. At 43 there is shown a ground depression bridged by a roadway 44.
  • The main component parts of the roadway shown in Fig. 7 are modular pillars shown in two different forms as pillars 45 and 46; modular beams which are shown in two different forms, modular beam 47 and modular beam 48, and the slabs 49. The pillars 45 and 46 may have a head portion according to the invention of the kind shown in Figs. 5 and 6 and slabs 49 may for example be in the form shown in Figs. 1 to 3.
  • Grading utilized in the system is controlled by monitoring the amount by which the pillars protrude from the ground. The nodular pillars are placed one on top of the other to obtain the desired height. Thus for example in the roadway 40 a single pillar is shown at 50 while pillars 46 are each made out of two modular portions. In this way the roadway climbs to the desired height at a desired slope.
  • Fig. 8 shows a beam 52 that can be used in the construction of a roadway with slabs and pillars according to the invention. It has an inverted T-shaped profile and two hollow channels 53 and 54 which if desired may be filled with a filler material or else serve for the accommodation of functional elements such as, for example, electric cables and wires. Shoulders 55 and 56 serve for receiving the end portions of the slabs such as slab 1 of Fig. 1.
  • The modular pillar 57 shown in Fig.9 comprises at one end a socket 58 and at the other end a protuberance 59 whereby it is adapted for interlocking alignment with similar modular pillars. However the pillar 57 may also be directly fixed in the ground and may support at its top a slab such as-slab 1 of Figs. to 3, either directly or with the interposition of other structural elements such as a headplate or a beam.
  • Beam 60 of Fig. 10 is an edge beam. Similar as beam 52 of Fig. 8 it comprises channels 61 and 62 and a shoulder 63 while the other shoulder in the beam of Fig. 8 is replaced here by a wall portion 64.
  • The structural elements of Figs. 8 to 10 may or may not be made in accordance with the invention. In any event they are useful for constructing roadways using slabs and pillar heads according to the invention of the kind described hereinbefore. For constructing a roadway with slabs according to the invention on pillars a vibrating unit may be used to force the pillars into the ground surface that does not have to be prepared in any manner. The vibrating unit forces the pillars into the ground to the desired protrusion height. The height may be measured with any suitable instrument such as a laser altitude measuring device which is accurate and easily utilized. One or more pillars can be placed on top of an inset pillar to obtain the height desired for the roadway. When a number of pillars are placed in position beams are placed over the pillars and/or the pillars are fitted with headplates, e.g. as shown in Figs. 5 and 6.
  • The new methods of roadway construction with slabs and other structural elements according to the invention are extremely versatile and cost effective since almost the entire roadway is prefabricated or made from elements fabricated in situ. Where pillars are used the roadway runs overhead the topmost topographical protrusion so that no ground surface preparation is necessary at all. Where slabs are placed directly on the ground some ground preparation is required but to a much lesser degree than in conventional road construction methods.
  • While the principles of the invention have been described above in connection with specific apparatus and applications, it is to be understood that this description is made by way of example only and not as a limitation on the scope of the invention.

Claims (22)

1. A structural element comprising a rigid shell, a free- flowing filler material within the shell and at least one reinforcing rod or cable extending across the filler and tying at least two opposite walls of the shell.
2. The structural element claimed in claim 1 characterised thereby that the said reinforcing rod or cable is enclosed within a cell created by partitions extending across the interior space of the shell.
3. An element according to Claim 1 or 2, wherein the shell is of concrete.
4. An element according to Claim 1 or 2, wherein the shell is of metal.
5. An element according to any one of Claims 1 to 4, wherein the filler is a solid granular material.
6. An element according to Claim 5, wherein said granular material.has a moisture content.
7. An element according to Claim 5 or 6, wherein the filler material is sand.
8. An element according to any one of Claims 1 to 4, wherein the filler material is liquid.
9. An element according to Claim 8, wherein the filler material is water.
10. An element according to any one of Claims 1 to 9, being a slab.
11. A slab according to Claim 10 adapted for interengagment with other slabs.
12. An element according to any one of Claims 1 to 9 being a pillar.
13. A pillar according to Claim 12 being a modular unit adapted for intergration in alignment with other units.
14. An element according to any one of Claims 1 to 9 being a beam.
15. An element according to any one of Claims 1 to 9 being a pillar headplate.
16. A headplate according to Claim 15 comprising a concrete shell, a main central filler mass and satellite boxes with filler mass and vertical and horizontal reinforcing rods extending across said main and satellite filler masses between opposite shell walls.
17. A headplate according to Claim 16, wherein said reinforcing rods are sheathed in concrete.
18. A headplate according to any one of Claims 15 or 16 adapted for association with other elements according to the invention.
19. A method of red construction comprising laying slabs according to Claim 10 or 11 directly on the ground.
20. A method of constructing a roadway comprising implanting prefabricated pillars in the ground to protrude from the ground at a desired height and placing the slabs according to Claim 10 or 11 on sach pillars, if desired with the interposition of other structural elements.
21. A method accordinc to Claim 19, wherein beams are interposed between the villars and slabs.
22. A method according to Claim 19 or 20, wherein headplates are mounted on the pillars.
EP84100045A 1983-01-05 1984-01-03 Modular roadway construction method and prefabricated units therefor Withdrawn EP0113661A3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IL67621 1983-01-05
IL67621A IL67621A (en) 1983-01-05 1983-01-05 Modular roadway construction method and prefabricated units therefor

Publications (2)

Publication Number Publication Date
EP0113661A2 true EP0113661A2 (en) 1984-07-18
EP0113661A3 EP0113661A3 (en) 1985-08-21

Family

ID=11053983

Family Applications (1)

Application Number Title Priority Date Filing Date
EP84100045A Withdrawn EP0113661A3 (en) 1983-01-05 1984-01-03 Modular roadway construction method and prefabricated units therefor

Country Status (7)

Country Link
EP (1) EP0113661A3 (en)
JP (1) JPS59192105A (en)
AU (1) AU2287883A (en)
BR (1) BR8400083A (en)
IL (1) IL67621A (en)
NO (1) NO840031L (en)
ZA (1) ZA839682B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2170258A (en) * 1985-01-25 1986-07-30 John Michael Dyson Repairing PRC houses
GB2210090A (en) * 1987-09-17 1989-06-01 Sydney Rowe Bridge module
FR2636082A1 (en) * 1988-09-06 1990-03-09 Hornn Francois Footbridge, in particular for pedestrians
WO1993017186A1 (en) * 1992-02-29 1993-09-02 Hugo Rademacher Roadways and roadway supports designed as a prefabricated modular construction system
NL1006180C2 (en) * 1997-05-30 1998-12-10 Holland Railconsult Supporting member for supporting rails and a method for manufacturing them.
WO2011074999A1 (en) * 2009-12-17 2011-06-23 Sychev Viktor Vasilievich Roadbed
NL1039249C2 (en) * 2011-12-19 2013-06-26 Fdn Construction B V BRIDGE.
US10577753B2 (en) 2015-08-03 2020-03-03 Sterling Site Access Solutions, Llc Crane mat and method of manufacture

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1900319A (en) * 1931-03-13 1933-03-07 Vermeulen Aurele Structural device
FR747177A (en) * 1932-07-11 1933-06-12 Paving stone for road surfaces and other uses
DE1301036B (en) * 1963-11-26 1969-08-14 Hochtief Ag Hoch Tiefbauten Reinforced concrete hollow beams for bridge or ceiling panels
FR2112417A1 (en) * 1970-11-03 1972-06-16 Schmitter Adolf
US3909143A (en) * 1971-05-18 1975-09-30 Romanski Lon H Roadway construction and method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1900319A (en) * 1931-03-13 1933-03-07 Vermeulen Aurele Structural device
FR747177A (en) * 1932-07-11 1933-06-12 Paving stone for road surfaces and other uses
DE1301036B (en) * 1963-11-26 1969-08-14 Hochtief Ag Hoch Tiefbauten Reinforced concrete hollow beams for bridge or ceiling panels
FR2112417A1 (en) * 1970-11-03 1972-06-16 Schmitter Adolf
US3909143A (en) * 1971-05-18 1975-09-30 Romanski Lon H Roadway construction and method therefor

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2170258A (en) * 1985-01-25 1986-07-30 John Michael Dyson Repairing PRC houses
GB2210090A (en) * 1987-09-17 1989-06-01 Sydney Rowe Bridge module
FR2636082A1 (en) * 1988-09-06 1990-03-09 Hornn Francois Footbridge, in particular for pedestrians
WO1993017186A1 (en) * 1992-02-29 1993-09-02 Hugo Rademacher Roadways and roadway supports designed as a prefabricated modular construction system
NL1006180C2 (en) * 1997-05-30 1998-12-10 Holland Railconsult Supporting member for supporting rails and a method for manufacturing them.
WO2011074999A1 (en) * 2009-12-17 2011-06-23 Sychev Viktor Vasilievich Roadbed
NL1039249C2 (en) * 2011-12-19 2013-06-26 Fdn Construction B V BRIDGE.
WO2013095087A1 (en) * 2011-12-19 2013-06-27 Fdn Construction Bv Prefabricated bridge
US9551119B2 (en) 2011-12-19 2017-01-24 Fdn Construction Bv Prefabricated bridge
US10577753B2 (en) 2015-08-03 2020-03-03 Sterling Site Access Solutions, Llc Crane mat and method of manufacture
US11124925B2 (en) 2015-08-03 2021-09-21 Sterling Site Access Solutions, Llc Crane mat and method of manufacture
US11566385B2 (en) 2015-08-03 2023-01-31 Sterling Site Access Solutions, Llc Crane mat and method of manufacture

Also Published As

Publication number Publication date
NO840031L (en) 1984-07-06
EP0113661A3 (en) 1985-08-21
BR8400083A (en) 1984-09-11
IL67621A0 (en) 1983-05-15
IL67621A (en) 1989-10-31
ZA839682B (en) 1984-08-29
AU2287883A (en) 1984-07-12
JPS59192105A (en) 1984-10-31

Similar Documents

Publication Publication Date Title
CA1046297A (en) Precast element for the construction of trenched structures and the process related thereto
US20020129453A1 (en) Prefabricated pier system
CN109403170B (en) Steep slope road and construction method thereof
US4799348A (en) Method and equipment for making a rigid slab enabling to carry a building
US5540524A (en) Concrete slab foundation and method of construction
US4042308A (en) Modular roadway for a transportation system
CZ282158B6 (en) Paving and method of constructing thereof
US5870789A (en) Precast bridges
EP0113661A2 (en) Modular roadway construction method and prefabricated units therefor
CN108316344B (en) Construction method of subway station hall layer
CN210238260U (en) Full-prefabricated assembled structural bridge suitable for grassland wetland
CA1167272A (en) Pre-cast building unit, building and method utilizing same, and casting form therefor
CN209907694U (en) Ribbed steel mesh hollow-out cast-in-situ concrete T-shaped section hollow floor structure
CN108867664A (en) A kind of road based on contrary sequence method changes bridge section foundation pit supporting construction and its construction method
RU2379424C1 (en) Method for erection of foundation slab of framed structure
JP2003003420A (en) Supporting member for prefabricated bridge
RU2263176C1 (en) Protective case for bridge pier grillage and erection method thereof
CN111074933B (en) Construction method of plate rib type cast-in-place anchor rod high retaining wall
CN215800924U (en) High-altitude in-situ cast-in-situ bridge
CN114482600B (en) Single-channel stress compensation type high-speed railway station widening structure and construction method thereof
CN116732835A (en) Suspended roadbed structure and construction method
CN210134448U (en) Improved beam type bearing platform
CN210953068U (en) Weighing platform structure
SU1167246A1 (en) Mooring structure on rock foundation and method of erecting same
JP5062418B2 (en) Plane frame structure with precast concrete girder

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB IT LI LU NL SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB IT LI LU NL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19860422